About this file

This document package includes a Contract Data Requirements List (CDRL) and a related federal contract opportunity notice. The CDRL outlines reporting requirements for a contractor developing an Automated IV Pressure Infuser, including submission of a Master Government Property List within 45 days of award and monthly thereafter. The federal contract notice is seeking proposals to develop the Automated IV Pressure Infuser to increase MEDEVAC capabilities, with a required Technology Readiness Level of 8. Offerors should submit a Statement of Work detailing design, development, testing, approval processes, production, training and fielding. The Army Medical Command will award a contract by January 2021 to complete the effort.

View the file

Other files

Show all 15

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

G. PREPARED BY

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item)

16. REMARKS

C. CATEGORY:

TDP ________ TM _______ OTHER _________________________

Form Approved OMB No. 0704-0188

15. TOTAL

PREVIOUS EDITION MAY BE USED.DD FORM 1423-1, AUG 96 (EG) Page ____ of ____ Pages

A. CONTRACT LINE ITEM NO. B. EXHIBIT

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE

7. DD 250 REQ

8. APP CODE

9. DIST STATEMENT

REQUIRED

10. FREQUENCY

11. AS OF DATE

12. DATE OF FIRST SUBMISSION

13. DATE OF SUBSEQUENT

SUBMISSION

14. DISTRIBUTION

a. ADDRESSEE

b. COPIES

Draft Final

Reg Repro

17. PRICE GROUP

18. ESTIMATED

TOTAL PRICE

H. DATE J. DATEI. APPROVED BY

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports (0701-0188), 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302. Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please DO NOT RETURN your form to the above address. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

Designed using Perform Pro, WHS/DIOR, Aug 96

B EXHIBIT: A
TDP:
TM:
OTHER: N/A
E CONTRACTPR NO: W81XWH-20-R-TBD
F CONTRACTOR: TBD
2 TITLE OF DATA ITEM: Master Government Property List
3 SUBTITLE: GFP, GFE, GFM and Contractor Acquired Property
6 REQUIRING OFFICE: USAMMDA-WHPE
9 DIST STATEMENT REQUIRED: N/A
11 AS OF DATE: SEE BLK 16
H DATE:
a ADDRESSEERow1: USAMMDA-WHPE
DraftRow1: 0
RegRow1: 1
ReproRow1: 0
a ADDRESSEERow2: PCO
DraftRow2:
RegRow2: 1
ReproRow2:
a ADDRESSEERow3: ACO
DraftRow3:
RegRow3: 1
ReproRow3:
a ADDRESSEERow4:
DraftRow4:
RegRow4:
ReproRow4:
a ADDRESSEERow5:
DraftRow5:
RegRow5:
ReproRow5:
a ADDRESSEERow6:
DraftRow6:
RegRow6:
ReproRow6:
a ADDRESSEERow7:
DraftRow7:
RegRow7:
ReproRow7:
a ADDRESSEERow8:
DraftRow8:
RegRow8:
ReproRow8:
a ADDRESSEERow9:
DraftRow9:
RegRow9:
ReproRow9:
a ADDRESSEERow10:
DraftRow10:
RegRow10:
ReproRow10:
a ADDRESSEERow11:
DraftRow11:
RegRow11:
ReproRow11:
a ADDRESSEERow12:
DraftRow12:
RegRow12:
ReproRow12:
a ADDRESSEERow13:
DraftRow13:
RegRow13:
ReproRow13:
a ADDRESSEERow14:
DraftRow14:
RegRow14:
ReproRow14:
a ADDRESSEERow15:
DraftRow15:
RegRow15:
ReproRow15:
a ADDRESSEERow16:
DraftRow16:
RegRow16:
ReproRow16:
a ADDRESSEERow17:
DraftRow17:
RegRow17:
ReproRow17:
a ADDRESSEERow18:
DraftRow18:
RegRow18:
ReproRow18:
a ADDRESSEERow19:
DraftRow19:
RegRow19:
ReproRow19:
a ADDRESSEERow20:
DraftRow20:
RegRow20:
ReproRow20:
a ADDRESSEERow21:
DraftRow21:
RegRow21:
ReproRow21:
a ADDRESSEERow22:
DraftRow22:
RegRow22:
ReproRow22:
a ADDRESSEERow23:
DraftRow23:
RegRow23:
ReproRow23:
a ADDRESSEERow24:
DraftRow24:
RegRow24:
ReproRow24:
a ADDRESSEERow25:
DraftRow25:
RegRow25:
ReproRow25:
a ADDRESSEERow26:
DraftRow26:
RegRow26:
ReproRow26:
a ADDRESSEERow27:
DraftRow27:
RegRow27:
ReproRow27:
a ADDRESSEERow28:
DraftRow28:
RegRow28:
ReproRow28:
a ADDRESSEERow29:
DraftRow29:
RegRow29:
ReproRow29:
a ADDRESSEERow30:
DraftRow30:
RegRow30:
ReproRow30:
a ADDRESSEERow31:
DraftRow31:
RegRow31:
ReproRow31:
a ADDRESSEERow32:
DraftRow32:
RegRow32:
ReproRow32:
a ADDRESSEERow33:
DraftRow33:
RegRow33:
ReproRow33:
a ADDRESSEERow34:
DraftRow34:
RegRow34:
ReproRow34:
a ADDRESSEERow35:
DraftRow35:
RegRow35:
ReproRow35:
a ADDRESSEERow36:
DraftRow36:
RegRow36:
ReproRow36:
a ADDRESSEERow37:
DraftRow37:
RegRow37:
ReproRow37:
a ADDRESSEERow38:
DraftRow38:
RegRow38:
ReproRow38:
Draft15 TOTAL: 0
Reg15 TOTAL: 3
Repro15 TOTAL: 0
J DATE: 18 SEP 2019
17 PRICE GROUP:
18 ESTIMATED TOTAL PRICE: INSERT IN SECT. B
Text1: CLINS
Text2: Automated IV Pressure Infuser
Text3: A004
5 CONTRACT REFERENCE: N/A
Text 4: DI-MGMT-80269
Text5: Block 4: This DID is for reference only. The report shall be prepared according to the remarks below

Block 12: 45th calendar day following contract award Block 13: Tenth calendar day of each month

During performance of the Contract, the Contractor may purchase material or equipment using Governmental funds (Contractor Acquired Property (CAP)) if it is approved by the Contracting Officer. The Contractor shall provide a Master Government Property List (MGPL) inclusive of all CAP on the 45th calendar day following Contract award and the tenth calendar day of each subsequent month.

The MGPL shall include all equipment/property provided to the contract, including equipment transferred between projects, broken and obsolete equipment, and items purchased outside the United States. The MGPL shall consist of the following data elements at a minimum: Accountable Contract, Property Name, Original Manufacturer’s Name, , Equipment Identification Number Quantity, Contract to which equipment is assigned, Work Breakdown Structure Project Number, Item Unique Identifier or equivalent, Project Descriptor, Equipment Location, Date Placed in Service, Condition of Property (active, stored, in-transit, or waiting disposal), Government Property Type (Government Furnished Equipment, Government Furnished Material, Government Furnished Property, CAP), Unit Acquisition Cost (from accounting system) and Remarks.

The MGPL shall be delivered electronically in a spreadsheet using Microsoft Office Excel. Abbreviations are not allowed. Ninety (90) days prior to Contract expiration, the Contractor shall submit a final MGPL suitable for close-out purpose containing use/disposition recommendations.

2019-08-27T16:05:45-0400
WANG.JAY.YUAN.1379211905
2019-09-18T23:43:36-0400
MILANO.MAUREEN.COSTA.1229254070
Text8: 1
Text9: 1
Combo Box3:
0:
0: [LT]
Combo Box4: [A]
Combo Box5: [MTHLY]
Combo Box6: [SEE BLK 16]
Combo Box7: [SEE BLK 16]

File details come from the government source that posted it. Updated .