This document contains a Contract Data Requirements List (CDRL) and Statement of Work (SOW) for the development of an automated IV pressure infuser. The CDRL outlines reporting requirements including submission of an Integrated Master Schedule (IMS) within 30 days of award and biannual updates. The IMS must be resourced loaded and traceable to the SOW, Project Management Plan, and Work Breakdown Structure. It must document delivery dates, milestones, tasks, durations, and schedule relationships. The SOW requires design, development, testing, materiel and airworthiness releases, network authority to operate, production, training, and fielding of an automated IV pressure infuser to achieve Technology Readiness Level 8. The contractor must submit the SOW and provide rationale for each proposed Contract Line Item Number to the Warfighter Health, Performance and Evacuation Project Management Office for review and approval.
View the file
Other files
Show all 15
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
G. PREPARED BY
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item)
16. REMARKS
C. CATEGORY:
TDP ________ TM _______ OTHER _________________________
Form Approved OMB No. 0704-0188
15. TOTAL
PREVIOUS EDITION MAY BE USED.DD FORM 1423-1, AUG 96 (EG) Page ____ of ____ Pages
A. CONTRACT LINE ITEM NO. B. EXHIBIT
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE
7. DD 250 REQ
8. APP CODE
9. DIST STATEMENT
REQUIRED
10. FREQUENCY
11. AS OF DATE
12. DATE OF FIRST SUBMISSION
13. DATE OF SUBSEQUENT
SUBMISSION
14. DISTRIBUTION
a. ADDRESSEE
b. COPIES
Draft Final
Reg Repro
17. PRICE GROUP
18. ESTIMATED
TOTAL PRICE
H. DATE J. DATEI. APPROVED BY
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports (0701-0188), 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302. Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please DO NOT RETURN your form to the above address. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
Designed using Perform Pro, WHS/DIOR, Aug 96
| B EXHIBIT: A |
| TDP: |
| TM: |
| OTHER: N/A |
| E CONTRACTPR NO: W81XWH-20-R-TBD |
| F CONTRACTOR: TBD |
| 2 TITLE OF DATA ITEM: Integrated Master Schedule (IMS) |
| 3 SUBTITLE: N/A |
| 6 REQUIRING OFFICE: USAMMDA-WHPE |
| 9 DIST STATEMENT REQUIRED: N/A |
| 11 AS OF DATE: See BLK 16 |
| H DATE: |
| a ADDRESSEERow1: USAMMDA-WHPE |
| DraftRow1: 0 |
| RegRow1: 1 |
| ReproRow1: 0 |
| a ADDRESSEERow2: PCO |
| DraftRow2: |
| RegRow2: 1 |
| ReproRow2: |
| a ADDRESSEERow3: ACO |
| DraftRow3: |
| RegRow3: 1 |
| ReproRow3: |
| a ADDRESSEERow4: |
| DraftRow4: |
| RegRow4: |
| ReproRow4: |
| a ADDRESSEERow5: |
| DraftRow5: |
| RegRow5: |
| ReproRow5: |
| a ADDRESSEERow6: |
| DraftRow6: |
| RegRow6: |
| ReproRow6: |
| a ADDRESSEERow7: |
| DraftRow7: |
| RegRow7: |
| ReproRow7: |
| a ADDRESSEERow8: |
| DraftRow8: |
| RegRow8: |
| ReproRow8: |
| a ADDRESSEERow9: |
| DraftRow9: |
| RegRow9: |
| ReproRow9: |
| a ADDRESSEERow10: |
| DraftRow10: |
| RegRow10: |
| ReproRow10: |
| a ADDRESSEERow11: |
| DraftRow11: |
| RegRow11: |
| ReproRow11: |
| a ADDRESSEERow12: |
| DraftRow12: |
| RegRow12: |
| ReproRow12: |
| a ADDRESSEERow13: |
| DraftRow13: |
| RegRow13: |
| ReproRow13: |
| a ADDRESSEERow14: |
| DraftRow14: |
| RegRow14: |
| ReproRow14: |
| a ADDRESSEERow15: |
| DraftRow15: |
| RegRow15: |
| ReproRow15: |
| a ADDRESSEERow16: |
| DraftRow16: |
| RegRow16: |
| ReproRow16: |
| a ADDRESSEERow17: |
| DraftRow17: |
| RegRow17: |
| ReproRow17: |
| a ADDRESSEERow18: |
| DraftRow18: |
| RegRow18: |
| ReproRow18: |
| a ADDRESSEERow19: |
| DraftRow19: |
| RegRow19: |
| ReproRow19: |
| a ADDRESSEERow20: |
| DraftRow20: |
| RegRow20: |
| ReproRow20: |
| a ADDRESSEERow21: |
| DraftRow21: |
| RegRow21: |
| ReproRow21: |
| a ADDRESSEERow22: |
| DraftRow22: |
| RegRow22: |
| ReproRow22: |
| a ADDRESSEERow23: |
| DraftRow23: |
| RegRow23: |
| ReproRow23: |
| a ADDRESSEERow24: |
| DraftRow24: |
| RegRow24: |
| ReproRow24: |
| a ADDRESSEERow25: |
| DraftRow25: |
| RegRow25: |
| ReproRow25: |
| a ADDRESSEERow26: |
| DraftRow26: |
| RegRow26: |
| ReproRow26: |
| a ADDRESSEERow27: |
| DraftRow27: |
| RegRow27: |
| ReproRow27: |
| a ADDRESSEERow28: |
| DraftRow28: |
| RegRow28: |
| ReproRow28: |
| a ADDRESSEERow29: |
| DraftRow29: |
| RegRow29: |
| ReproRow29: |
| a ADDRESSEERow30: |
| DraftRow30: |
| RegRow30: |
| ReproRow30: |
| a ADDRESSEERow31: |
| DraftRow31: |
| RegRow31: |
| ReproRow31: |
| a ADDRESSEERow32: |
| DraftRow32: |
| RegRow32: |
| ReproRow32: |
| a ADDRESSEERow33: |
| DraftRow33: |
| RegRow33: |
| ReproRow33: |
| a ADDRESSEERow34: |
| DraftRow34: |
| RegRow34: |
| ReproRow34: |
| a ADDRESSEERow35: |
| DraftRow35: |
| RegRow35: |
| ReproRow35: |
| a ADDRESSEERow36: |
| DraftRow36: |
| RegRow36: |
| ReproRow36: |
| a ADDRESSEERow37: |
| DraftRow37: |
| RegRow37: |
| ReproRow37: |
| a ADDRESSEERow38: |
| DraftRow38: |
| RegRow38: |
| ReproRow38: |
| Draft15 TOTAL: 0 |
| Reg15 TOTAL: 3 |
| Repro15 TOTAL: 0 |
| J DATE: 18 SEP 2019 |
| 17 PRICE GROUP: |
| 18 ESTIMATED TOTAL PRICE: INSERT IN SECT. B |
| Text1: CLINS |
| Text2: Automated IV Pressure Infuser |
| Text3: A002 |
| 5 CONTRACT REFERENCE: N/A |
| Text 4: DI-MGMT-81650 |
| Text5: The IMS shall include activities to completely address the SOW & CWBS (CDRL A001). The initial IMS shall be submitted in conjunction with the proposal. A revised IMS based on the awarded scope shall be submitted within 30 days of contract award and update at IPRs twice a year. Microsoft Project compatible file required. Subsequent updates due within 10 working days following the Contractor’s accounting period cutoff date. The IMS will be resource loaded and will document the delivery date for each CLIN, critical path, major milestones, tasks/activities, duration, lead/lag/slack time, and schedule relationships, and will be directly traceable to the |
SOW, Project Management Plan and the CWBS. Contractor has 10 working days to respond and resubmit upon receipt of Government final comments and will provide the final document within 10 days after approval of changes is received.
| 2019-08-27T16:07:41-0400 | |
| WANG.JAY.YUAN.1379211905 |
| 2019-09-18T23:39:39-0400 | |
| MILANO.MAUREEN.COSTA.1229254070 |
| Text8: 1 |
| Text9: 1 |
| Combo Box3: |
| 0: |
| 0: [LT] |
| Combo Box4: [A] |
| Combo Box5: [Twice a Year] |
| Combo Box6: [SEE BLK 16] |
| Combo Box7: [SEE BLK 16] |
File details come from the government source that posted it. Updated .