DD FORM 1423-1 FEB 2001- D00C DI- SESS-81759 Long Lead Time Items List (LLTIL).pdf

PDF 242 KB Posted

Attached to
Request for Proposal (RFP) for Mobile Electric Hybrid Power Sources (MEHPS)
Solicitation number
M67854-20-R-5003
Issued by

About this file

This document package contains a Contract Data Requirements List (CDRL) and details of a related federal contract opportunity. The CDRL outlines reporting requirements for a "SPECIAL EQUIPMENT LONG LEAD TIME ITEMS LIST" under Solicitation Number M67854-20-R-5003. This solicitation seeks proposals for the design, engineering, fabrication, testing and deployment of Mobile Electric Hybrid Power Sources. The Marine Corps Systems Command intends to award a single Firm-Fixed Price Indefinite Delivery/Indefinite Quantity contract for a base period of five years plus an optional three-year ordering period. Offerors must submit technical and price proposals, with technical factors considered more important than price. The contract will have a small business set-aside and NAICS code 221118.

View the file

Other files

File Type Posted
MEHPS RFP-M6785420R5003-Amendment 03.docx DOCX document
Amendment 03 Q and A.docx DOCX document
MEHPS RFP-M6785420R5003-Amendment 02-1.docx DOCX document
MEHPS RFP-M6785420R5003-Amendment 01.docx DOCX document
PSpec Summary of Changes for Amendment 01.docx DOCX document
Amendment 01 Q and A-Complete.docx DOCX document
A054X251_Advanced DCS Operator Manual_Rev7.pdf PDF
MEHPS Update PSpec 24Mar2020 Final.pdf PDF
DD FORM 1423-1 FEB 2001- L006 DI-PSSS-81523C Training Conduct Support Document (Lessons Plans).pdf PDF
DD FORM 1423-1 FEB 2001- D012 DI-SESS-81759A Logistics Product Data Summaries (DCN).pdf PDF
DD FORM 1423-1 FEB 2001- D00H DI-SESS-81639 Warranty Performance Reports.pdf PDF
DD FORM 1423-1 FEB 2001- A00D DI-MISC-80508B Technical Report-Study Services (Battery Transportation).pdf PDF
DD FORM 1423-1 FEB 2001 -B003 DI-MGMT-80368A Integrated Master Schedule.pdf PDF
DD FORM 1423-1 FEB 2001- L00B DI-SESS-81524B Training Evaluation Document.pdf PDF
MEHPS RFP-M6785420R5003.docx DOCX document
DD FORM 1423-1 FEB 2001- L010 DI-TMSS-81818 Technical Manual (TM) Validation Plan.pdf PDF
DD FORM 1423-1 FEB 2001- L003 DI-TMSS-81819A Technical Manual Validation Certificate.pdf PDF
DD FORM 1423-1 FEB 2001- D00G DI-MGMT-81803 Item Unique Identification (IUID) Marking Plan.pdf PDF
DD FORM 1423-1 FEB 2001- L009 DI-PSSS-81523C Training Conduct Support Document (Written and Performance.pdf PDF
DD FORM 1423-1 FEB 2001- A003 DI-SESS-81464A Performance Specification.pdf PDF
DD FORM 1423-1 FEB 2001- D014 DI-SESS-81759A Logistics Product Data Summaries SAIP.pdf PDF
DD FORM 1423-1 FEB 2001- D004 DI-MGMT-81899 DIMINISHING MANUFACTORING SOURCES AND MATERIAL SHORTAGES (D.pdf PDF
DD FORM 1423-1 FEB 2001- D003 MIL-DTL-28999C Publication Instruction Type.pdf PDF
MEHPS Update PSpec 24Mar2020 - Signature1.pdf PDF
DD FORM 1423-1 FEB 2001- A009 DI-SESS-80639D Engineering Change Proposal.pdf PDF
DD FORM 1423-1 FEB 2001- L007 DI-PSSS-81523C Training Conduct Support Document (Student Guides).pdf PDF
DD FORM 1423-1 FEB 2001- A00C DI-SESS-81757A Design Review Information Package (PRR).pdf PDF
DD FORM 1423-1 FEB 2001- L002 DI- TMSS-81701 Validation Plan.pdf PDF
DD FORM 1423-1 FEB 2001- D00E DI- SESS -81759 Common and Bulk Items List (CBIL).pdf PDF
DD FORM 1423-1 FEB 2001- A00F DI-SESS-81757A Design Review Information Package (IPR).pdf PDF
DD FORM 1423-1 FEB 2001- D008 DI-SESS-81758A Logistics Product Data Summaries (IBOM).pdf PDF
DD FORM 1423-1 FEB 2001- L001 DI-TMSS-81675 Equipment Technical Manual.pdf PDF
DD FORM 1423-1 FEB 2001- D002 DI-MGMT-80596 Government Furnished Information Deficiency Report.pdf PDF
DD FORM 1423-1 FEB 2001- L011 DI-SESS-81523B Training Conduct Support Document.pdf PDF
DD FORM 1423-1 FEB 2001- L00A DI-PSSS-81523C Training Conduct Support Document (Course Completion Certificate).pdf PDF
DD FORM 1423-1 FEB 2001- D00B DI-TMSS-81700 Job Manual.pdf PDF
DD FORM 1423-1 FEB 2001- D00F DI-SESS-81759A Logistics Product Data Summaries (SL-3).pdf PDF
DD FORM 1423-1 FEB 2001- D00D DI- SESS-81759 Tools and Test Equipment List (TTEL).pdf PDF
DD FORM 1423-1 FEB 2001- A004 DI-SESS-81000E Product Drawings-Models and Associated Lists (Product Spec.pdf PDF
DD FORM 1423-1 FEB 2001- A002 DI-SESS-81757A Design Review Information Package (TRR).pdf PDF
DD FORM 1423-1 FEB 2001- A006 DI-SAFT-80102C Safety Assessment Report (SAR).pdf PDF
DD FORM 1423-1 FEB 2001- D013 DI-SESS-81254B Request for Nomenclature.pdf PDF
DD FORM 1423-1 FEB 2001 -B001 DI-ADMN-81249A Conference Agenda.pdf PDF
DD FORM 1423-1 FEB 2001- A00E DI-MISC-80508B Technical Report - Study Services (Lithium Batteries).pdf PDF
DD FORM 1423-1 FEB 2001- A00A DI-SESS-81248B Interface Control Document (ICD).pdf PDF
DD FORM 1423-1 FEB 2001- A007 DI-MISC-81397C Hazardous Materials Management Program (HMMP) Report.pdf PDF
DD FORM 1423-1 FEB 2001- D00A DI-RELI-80685 Critical Items List.pdf PDF
DD FORM 1423-1 FEB 2001- L005 NAVMC 1553.1A Training Development Requirements (Curriculum Outline of Instruction (COI)).pdf PDF
DD FORM 1423-1 FEB 2001- D005 DI-MISC-80508B Technical Report - Study-Services (Provisioning Support Plan).pdf PDF
DD FORM 1423-1 FEB 2001- D001 DI-MGMT-80389B Receipt of Government Materiel Report.pdf PDF
Show 40 more

Latest 50 of 61 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DD FORM 1423-1, FEB 2001

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item)

PREVIOUS EDITION MAY BE USED.

Form Approved OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

TDP ________ TM _______ OTHER

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE

7. DD 250 REQ

8. APP CODE

9. DIST STATEMENT

REQUIRED

10. FREQUENCY

11. AS OF DATE

12. DATE OF FIRST SUBMISSION

13. DATE OF SUBSEQUENT

SUBMISSION

14. DISTRIBUTION

a. ADDRESSEE

b. COPIES

Draft Final

Reg Repro

15. TOTAL

16. REMARKS

17. PRICE GROUP

18. ESTIMATED

TOTAL PRICE

G. PREPARED BY H. DATE I. APPROVED BY J. DATE

Page of Pages

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item)

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

TDP ________ TM _______ OTHER

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

16. REMARKS (Continued)

DD FORM 1423-1, FEB 2001 Page of Pages

INSTRUCTIONS FOR COMPLETING DD FORM 1423

(See DoD 5010.12-M for detailed instructions.)

FOR GOVERNMENT PERSONNEL

Item A. Self-explanatory.

Item B. Self-explanatory.

Item C. Mark (X) appropriate category: TDP - Technical Data Package;

TM - Technical Manual; Other - other category of data, such as "Provisioning,""Configuration Management," etc.

Item D. Enter name of system/item being acquired that data will support.

Item E. Self-explanatory (to be filled in after contract award).

Item F. Self-explanatory (to be filled in after contract award).

Item G. Signature of preparer of CDRL.

Item H. Date CDRL was prepared.

Item I. Signature of CDRL approval authority.

Item J. Date CDRL was approved.

Item 1. See DoD FAR Supplement Subpart 4.71 for proper numbering.

Item 2. Enter title as it appears on data acquisition document cited in Item 4.

Item 3. Enter subtitle of data item for further definition of data item (optional entry).

Item 4. Enter Data Item Description (DID) number, military specification number, or military standard number listed in DoD 5010.12-L (AMSDL), or one-time DID number, that defines data content and format requirements.

Item 5. Enter reference to tasking in contract that generates requirement for the data item (e.g., Statement of Work paragraph number).

Item 6. Enter technical office responsible for ensuring adequacy of the data item.

Item 7. Specify requirement for inspection/acceptance of the data item by the Government.

Item 8. Specify requirement for approval of a draft before preparation of the final data item.

Item 9. For technical data, specify requirement for contractor to mark the appropriate distribution statement on the data (ref. DoDD 5230.24).

Item 10. Specify number of times data items are to be delivered.

Item 11. Specify as-of date of data item, when applicable.

Item 12. Specify when first submittal is required.

Item 13. Specify when subsequent submittals are required, when applicable.

Item 14. Enter addressees and number of draft/final copies to be delivered to each addressee. Explain reproducible copies in Item 16.

Item 15. Enter total number of draft/final copies to be delivered.

Item 16. Use for additional/clarifying information for Items 1 through 15.

Examples are: Tailoring of documents cited in Item 4; Clarification of submittal dates in Items 12 and 13; Explanation of reproducible copies in Item 14.; Desired medium for delivery of the data item.

FOR THE CONTRACTOR

Item 17. Specify appropriate price group from one of the following groups of effort in developing estimated prices for each data item listed on the DD Form 1423.

a. Group I. Definition - Data which is not otherwise essential to the contractor's performance of the primary contracted effort (production, development, testing, and administration) but which is required by DD Form 1423.

Estimated Price - Costs to be included under Group I are those applicable to preparing and assembling the data item in conformance with Government requirements, and the administration and other expenses related to reproducing and delivering such data items to the Government.

b. Group II. Definition - Data which is essential to the performance of the primary contracted effort but the contractor is required to perform additional work to conform to Government requirements with regard to depth of content, format, frequency of submittal, preparation, control, or quality of the data item.

Estimated Price - Costs to be included under Group II are those incurred over and above the cost of the essential data item without conforming to Government requirements, and the administrative and other expenses related to reproducing and delivering such data item to the Government.

c. Group III. Definition - Data which the contractor must develop for his internal use in performance of the primary contracted effort and does not require any substantial change to conform to Government requirements with regard to depth of content, format, frequency of submittal, preparation, control, and quality of the data item.

Estimated Price - Costs to be included under Group III are the administrative and other expenses related to reproducing and delivering such data item to the Government.

d. Group IV. Definition - Data which is developed by the contractor as part of his normal operating procedures and his effort in supplying these data to the Government is minimal.

Estimated Price - Group IV items should normally be shown on the DD Form 1423 at no cost.

Item 18. For each data item, enter an amount equal to that portion of the total price which is estimated to be attributable to the production or development for the Government of that item of data.

These estimated data prices shall be developed only from those costs which will be incurred as a direct result of the requirement to supply the data, over and above those costs which would otherwise be incurred in performance of the contract if no data were required. The estimated data prices shall not include any amount for rights in data. The Government's right to use the data shall be governed by the pertinent provisions of the contract.

DD FORM 1423-1 (BACK), FEB 2001

data_item: D00C
title: SPECIAL EQUIPMENT LONG LEAD TIME ITEMS LIST
sub:
auth: DI-SESS-81759A
ref: SOW SECTION 3.6.3.9
req_ofc: MARCORSYSCOM LCES PM ES
dd250: XX
appcode: A
dist: C
freq: ONE/R
asof: N/A
firstsub: SEE BLK 16
subsub: SEE BLK 16
addressee1: PM ES:
draft1:
reg1:
repro1:
addressee2: PROJECT OFFICER
draft2: 1
reg2: 1
repro2:
addressee3:
draft3:
reg3:
repro3:
addressee4:
draft4:
reg4:
repro4:
addressee5:
draft5:
reg5:
repro5:
addressee6:
draft6:
reg6:
repro6:
addressee7:
draft7:
reg7:
repro7:
addressee8:
draft8:
reg8:
repro8:
addressee9:
draft9:
reg9:
repro9:
addressee10:
draft10:
reg10:
repro10:
addressee11:
draft11:
reg11:
repro11:
addressee12:
draft12:
reg12:
repro12:
addressee13:
draft13:
reg13:
repro13:
addressee14:
draft14:
reg14:
repro14:
addressee15:
draft15:
reg15:
repro15:
addressee16:
draft16:
reg16:
repro16:
addressee17:
draft17:
reg17:
repro17:
addressee18:
draft18:
reg18:
repro18:
addressee19:
draft19:
reg19:
repro19:
addressee20:
draft20:
reg20:
repro20:
addressee21:
draft21:
reg21:
repro21:
addressee22:
draft22:
reg22:
repro22:
addressee23:
draft23:
reg23:
repro23:
addressee24:
draft24:
reg24:
repro24:
addressee25:
draft25:
reg25:
repro25:
addressee26:
draft26:
reg26:
repro26:
addressee27:
draft27:
reg27:
repro27:
addressee28:
draft28:
reg28:
repro28:
addressee29:
draft29:
reg29:
repro29:
addressee30:
draft30:
reg30:
repro30:
addressee31:
draft31:
reg31:
repro31:
addressee32:
draft32:
reg32:
repro32:
addressee33:
draft33:
reg33:
repro33:
addressee34:
draft34:
reg34:
repro34:
addressee35:
draft35:
reg35:
repro35:
addressee36:
draft36:
reg36:
repro36:
addressee37:
draft37:
reg37:
repro37:
addressee38:
draft38:
reg38x:
repro38:
total_draft: 1
total_reg: 1
total_repro: 0
remarks: BLK 4 - Draft, regular, and reproducible copies shall be delivered in the Contractor's

format.

BLK 8 - Requires Government review. Approval is for technical content and/or format.

BLK 9 - DISTRIBUTION STATEMENT C: Distribution authorized to U.S. Government agencies and their Contractors only; (Administrative or Operational Use); (29 April 2020).

Other requests for this document shall be referred to Commander, Marine Corps Systems Command, Attn: CT025-LCES, 2200 Lester Street, Quantico, VA 22134-6050.

BLK 12 - Report due 60 calendar days after Provisioning Conference. Government to determine/identify delivery dates.

BLK 13 - The Government requires 30 calendar days to review and provide comments; Contractor shall correct and resubmit within 30 calendar days after receipt of comments. Government to determine/identify delivery dates.

BLK 14 - A digital copy shall be delivered to the Block 14 addressees. Refer to Section G of the contract for distribution information.

group:
total_price:
prep_name: William E. Jones
line_item: 0004
exhibit: D
xtdp: Off
xtm: Off
othercat: X
system: MEHPS
ctr_no: M6785420R5003
contr:
remarksb:
Page2: 2
Reset:
2020-05-11T17:54:52-0400
JONES.WILLIAM.E.1041755403
prep_date: 11 May 2020
app_by: Anthony E. Reinhart
2020-05-12T08:11:32-0400
REINHART.ANTHONY.ERIC.1282782452
app_date: 12 May 2020
Page: 1
of_pages: 2
app: Adobe Professional 8.0

File details come from the government source that posted it. Updated .