APM_Proposers_Day_Combined_Slides.pdf
PDF 3 MB Posted
- Attached to
- Atomically Precise Molecules (APM)
- Solicitation number
- DARPA-PS-26-141
About this file
This is a Proposers' Day presentation for the Defense Advanced Research Projects Agency (DARPA) Atomically Precise Molecules (APM) program (DARPA-PS-26-141), held on September 30, 2026. The APM program seeks to catalyze future materials capabilities through scalable programmable precision polymer (PPP) synthesis approaches where sequence, orientation, and composition of materials are programmable, with non-linear optical (NLO) materials as the primary application. The program is structured as a two-phase effort under an Other Transaction for Prototype agreement under 10 U.S.C. § 4022: Phase 1 (base) spans 12 months with material development objectives, and Phase 2 (option) spans 24 months focused on material integration and device fabrication. The estimated period of performance begins April 1, 2027.
Key program milestones include four demonstrations (synthesis assessment at month 6, non-linear assessment at month 11, revolutionary non-linear assessment at month 23, and integrated device performance at month 35) alongside design reviews and Independent Verification and Validation (IV&V) activities. All proposals must address four foundational pillars: generalizability, polymer design, material design, and technology sustainability. Performance metrics require proposers to define quantitative criteria for Phase 1, with Phase 2 targeting n³r₃₃ ≥ 8000 pm/V, optical loss of 1 dB/cm, VpiL ≤ 0.0005 V/cm, and bandwidth ≥ 10¹² Hz. Proposals use a fixed milestone payment structure with limited upfront payments; device fabrication costs should not be included. Abstract submission is mandatory by October 27, 2026 at 1:00 PM ET, with proposals due December 18, 2026 at 1:00 PM ET and anticipated oral presentations January 5–20, 2027. CMMC Level 2 (Self) certification is required with an optional compliance milestone of up to $25,000. Performers maintain IP ownership with commercialization rights while the government receives minimum Government Purpose Rights to foreground data and license rights for IV&V and technical evaluation activities. Non-U.S. organizations cannot participate; FFRDCs, UARCs, and government entities require specific documentation and justification.
View the file
Other files
Show all 14
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DISTRIBUTION A: Approved for Public Release, Distribution Unlimited
Atomically Precise Molecules (APM) Dr. John M. Hoffman
Program Manager (MXO)
Redefining Polymeric Materials
Proposers’ Day
September 30, 2026
DISTRIBUTION A: Approved for Public Release, Distribution Unlimited 2
APM Proposers’ Day Goals
1. To introduce the science and technology community (industry, academia, and government) to the APM program vision and goals;
2. To facilitate interaction between researchers with capabilities and interests relevant to the APM program goals;
3. To encourage and promote teaming arrangements among organizations that have the relevant expertise, research facilities, and capabilities for executing research and development responsive to the APM program goals;
4. To discuss approaches to IP and data rights to facilitate both:
a) successful technology commercialization and
b) long term government access to APM technologies;
5. To collect questions during the event that DARPA may answer during the event
a) Please send questions to APM@darpa.mil BEFORE THE LIGHTNING ROUND
Questions: APM@darpa.mil mailto:APM@darpa.mil
DISTRIBUTION A: Approved for Public Release, Distribution Unlimited 3
Proposers’ Day Agenda
START TOPIC Speaker 8:00 AM Check-In/Poster Set-Up All 9:00 AM Welcome/Security Robert Shearer 9:05 AM MXO Overview Dr. Jonathan Hoffman 9:10 AM Program Overview and Structure Dr. John M. Hoffman 9:35 AM Contracting with DARPA Natalie Kent 9:50 AM DARPAConnect Sana Hoda
9:55 AM BREAK
10:05 AM Lightning Round
11:45 AM Q&A Responses Dr. John M. Hoffman 12:00 PM LUNCH (on your own)
1:00 PM Networking Time/Poster Session In person ONLY 1:00 PM One-on-ones (by appointment only) In person ONLY
5:00 PM ADJOURN
APM Program Overview
Basics of programmable precision polymeric (PPP) materials
Sequence, orientation, and composition of monomers define performance across length scales
Single polymers (Å scale)
Local structure (nm scale) Long-range structure
(nm-mm scale)
= adhesive
= non-linear optics If sequence, orientation, and composition can be controlled, we will have access to a near infinite palette of materials
100 nm doi: 10.1038/s41467-020-18005-7, 10.1126/science.adr7175 doi: 10.1038/s41586-024-08360-6DISTRIBUTION A: Approved for Public Release, Distribution Unlimited
Current synthesis approaches can’t make PPPs
Stereo Selective Catalysts
Monomers Iterative Step Grow th Polymerization
Monomer Sequence
Monomer Composition
Monomer Orientation
Monomers
Monomer Sequence
Monomer Composition
Monomer Orientation
Organo Metallic Coordination Polymerization
Challenge: simultaneously control of sequence, orientation, and composition
Monomer Orientation
Monomer Sequence Monomer Composition
DISTRIBUTION A: Approved for Public Release, Distribution Unlimited 6doi: 10.1016/j.progpolymsci.2023.101677
Material 𝑟𝑟33 = 𝛽𝛽𝑒𝑒𝑒𝑒𝑒𝑒 ⋅ 𝜌𝜌𝑛𝑛 < 𝑐𝑐𝑐𝑐𝑐𝑐3𝜃𝜃 >⋅ 𝐺𝐺
Device
𝑉𝑉𝜋𝜋𝐿𝐿 =
𝜆𝜆0 𝜔𝜔𝑠𝑠 Γ 𝑛𝑛𝑒𝑒3𝑟𝑟33
𝐵𝐵𝐵𝐵~
𝑛𝑛𝑒𝑒3𝑟𝑟33
𝐿𝐿
Current materials can’t provide desired performance 𝜔𝜔𝑠𝑠
𝐿𝐿
𝜆𝜆0
Non-linear organic material
Modulator
Or ga ni c
Dy es
< 𝑐𝑐𝑐𝑐𝑐𝑐3𝜃𝜃 >: Acentric Order 𝜌𝜌𝑛𝑛: Density
APM
Polym ers 𝛽𝛽𝑒𝑒𝑒𝑒𝑒𝑒: Hyperpolarizability 𝑛𝑛𝑒𝑒 : Refractive index 𝐺𝐺: Local field factors doi: 10.1063/5.0145212
Barium Titanate
(BTO)
Lithium Niobate
Potassium Dihydrogen Phosphate (KDP)
APM
Organic dyes
Random Polymer
Liquid Crystal
Quantum shapes
APM contributes to the Programmable Matter Economy
Sequence Defined Polymers
Non-linear photonics
New to nature catalysis Dyes and pigments
Molecular Computing
A new path to new materials with new functions across a wide variety of components and systems
APM Program Description
Goal: Catalyze future materials capabilities through scalable PPP synthesis approaches, where the sequence, orientation, and composition of materials are programmable
Generalizability Polymer Design Material Design Technology Sustainability
APM Foundation: All proposals MUST address these four pillars
APM Application: Non-linear Optical (NLO) Materials
DISTRIBUTION A: Approved for Public Release, Distribution Unlimited 10
APM Program Structure
Quest Commercial day
Design Review Performance, scaling, and transition
Demo 2 non-linear assessment
Design Review Device design material integration
Phase 1 (12 mo) – New chemistries Material development
Phase 2 (24 mo) – New materials Material integration and device fabrication
Demo 4 Integrated device performance
FY27 FY28 FY29 FY30
Q1 Q2 Q3 Q4 Q5 Q6 Q7 Q8 Q9 Q10 Q11 Q12
Demo 3 Revolutionary non-linear assessment
APM Program Milestones
Demo 1 Synthesis
Assessment
Evaluate material properties and device fabrication
IV&V
Demonstrations will be held throughout the program to evaluate sequence definition, material properties, and non-linear optical properties
Design Reviews will occur in Phase 2, the first focused on device design and material integration mid phase, and a second review focused on performance, scaling, and transition.
Quest will be cash prizes awarded to performers that demonstrate capabilities beyond program metrics.
Quest specifics will be announced during the course of the program.
DISTRIBUTION A: Approved for Public Release, Distribution Unlimited 11
APM Program Metrics
Metric Current SOA Phase 1 Phase 2 Organics Demo 1 (month 6) Demo 2 (Month 11) Demo 3 (Month 23) Demo 4 (Month 35)
Ph ys ica l
Performer Defined* Performer Defined
Performer Defined: must include quantitative criteria for physical properties of the proposed synthesis approach that enable the non-linear properties of the material and device at the corresponding demonstration
Pe rfo rm an ce n3r33 (pm/V) ~4000 ≥ 3000 ≥ 8000 ≥ 8000 Optical Loss (dB/cm) 3 1 1 1
VpiL (V cm) ~0.009 ≤ 0.0005 Bandwidth (Hz) ~1011 ≥ 1012
*Proposers must identify appropriate quantitative metrics for each demonstration that facilitate tracking of the research progress towards the overall phase and program goals as described in the solicitation.
• Include a comparison against the SoA for each metric selected.
• Discuss thoroughly all details for meeting the metrics set forth for the program as well as the associated risks and risk-mitigation strategies to achieve those metrics and related milestones.
• Provide detailed technical rationale supporting the ability to achieve each milestone and plan for the testing and evaluation of tools, capabilities, materials, and/or devices at each milestone
An example: if proposing a linear polymer synthesis approach, potential quantitative metrics might include degree of polymerization, number and class (e.g., polar, nonpolar, charged) of monomers included in the polymer, stepwise monomer addition yield, dispersity, degree of tacticity, glass transition temperature, and purity required for material and/or device integration
DISTRIBUTION A: Approved for Public Release, Distribution Unlimited 12
Phase 1 – Programmable precision polymer synthesis
Objective
• Demonstrate new chemistries to synthesize programmable precision polymers with sequence, orientation, and composition control
• Employ these chemistries to synthesize polymeric materials with NLO properties
Key Metrics and Deliverables
• Demonstration (Month 6) to assess progress towards synthesis of programmable precision polymers
• Demonstrate PPP library synthesis
• Characterize PPP library including thermal, physical, chemical, and/or optical properties
• Demonstration (Month 11) of progress towards NLO properties that exceed the SoA (n3r33 ≥ 3000 pm/V and an optical loss of 1 dB/cm)
Goals:
• Synthesize Programmable Precision Polymers that show progress towards NLO properties exceeding the SoA (n3r33 ≥ 3000 pm/V and an optical loss of 1 dB/cm)
DISTRIBUTION A: Approved for Public Release, Distribution Unlimited 13
Phase 2 – Revolutionary NLO materials integrated in microsystems
Objective
• Demonstrate new chemistries can synthesize a revolutionary non-linear optical material
• Integrate this material into a modular and demonstrate a new state of the art in NLO performance
Key Metrics and Deliverables
• Demonstration (Month 23) to assess progress towards synthesis of revolutionary NLO material
• Demonstration (Month 35) to assess progress towards material integration in a microsystem
• Report on polymer/materials stability
• Report on polymer/materials scaling and manufacturing integration
• Delivery of full technical specifications
Goals:
• Synthesize materials that show progress towards revolutionary NLO performance (n3r33 ≥ 8000 pm/V and an optical loss of 1 dB/cm)
• Demonstrate progress towards modulators with VpiL ≤
0.0005 V/cm and a bandwidth of ≥ 1012 Hz
DISTRIBUTION A: Approved for Public Release, Distribution Unlimited 14
Evaluate physical properties of polymers synthesized through performer’s approach
Evaluate optical properties of materials composed of those polymers
Work with performer teams to design, build, and evaluate modulators that accommodate those materials
Independent Verification and Validation (IV&V)
• A government team will independently evaluate metrics throughout the program
• Performers will deliver materials to the IV&V team for evaluation
• Performers will work with IV&V team to develop an IV&V plan to facilitate evaluations
3 Major Roles of IV&V
DISTRIBUTION A: Approved for Public Release, Distribution Unlimited 15
PS Details
DISTRIBUTION A: Approved for Public Release, Distribution Unlimited 16
In and out of scope for APM
Questions: APM@darpa.mil
Out of scope:
• Specifically excluded is research that primarily results in evolutionary improvements to the existing state of practice, or research that pivots on exceptional claims that cannot be technically justified in the proposal
• Proposals aiming to employ solely inorganic materials without a polymeric component
• Proposals aiming to modify/repurpose existing NLO materials resulting in incremental improvements to the state-of-the-art (SoA)
In Scope:
We are open to a wide range of approaches that employ novel synthesis techniques that deliver previously synthetically inaccessible polymers/materials
Approaches must address the four pillars discussed previously
DISTRIBUTION A: Approved for Public Release, Distribution Unlimited 17
Security Overview
Questions: APM@darpa.mil
NOTE: the Government expects that the program goals as described herein cannot be met by performers intending to perform fundamental research
Element of Information Index Category Reason LDC or Distribution Statement Remarks
Synthesis and modeling processes of PPPs with non-linear optical properties, scale up process integration, and performance data applicable in next-generation military systems is protected as CUI and may be
CTI.
Defense Controlled Technical Information (CTI)
Executive Order#14104 - Federal Research & Development in Support of Domestic Manufacturing and US Jobs dated 28 July 2023
Distribution statements B through F
FOIA Exemptions 4 & 3 may be applicable
Data contractually identified as controlled by a business or individual as proprietary.
Proprietary Business Information
General Proprietary Business Information
(PROPIN)
18 U.S. Code § 1905
18 U.S. Code § 664
Federal Employees and Contractors Only (FEDCON)
FOIA Exemption 3 may be applicable
Information or data defined within the Commerce Control List (CCL), United States Munitions List (USML), or applied license applications to control export.
Export Control Export Controlled 10 USC 130(a), 13 USC 301(g), 42 USC 2077(a), 42 USC 2156, 42 USC 2168(a), 50 USC 4614(c), 50 USC 4605(l)(5), 15 CFR 718.3, 15 CFR 736 Supplement 2, 15 CFR 748.1(c), 15 CFR 760.5(c)
15 CFR 772.1, 15 CFR 774 Supplement 1, 15 CFR 774 Supplement 2, 22 CFR Part 120, 22 CFR 124.9(a)(5), 22 CFR 126.10(b), 32 CFR 250.4(a), 32 CFR 250.9
DISTRIBUTION STATEMENT D.
Distribution authorized to the Department of Defense and U.S.
DoD contractors only Export Controlled, (Date). Other requests shall be referred to DARPA, Microsystems Technology Office.
FOIA Exemptions 4 & 3 may be applicable
DISTRIBUTION A: Approved for Public Release, Distribution Unlimited 18
Evaluation Criteria (part 1)
1. Overall Scientific and Technical Merit o Demonstrate that the proposed technical approach is innovative, feasible, achievable, and complete.
o The proposed technical team has the expertise and experience to manage and accomplish the proposed technical approach, tasks, cost, and schedule. The proposal details the approach to team integration and how collaboration will be managed. Similar efforts completed/ongoing by the proposer in this area are fully described including identification of other Government sponsors.
o Provide quantitative justification (e.g., modeling/simulation, preliminary experimental results) for technical claims, including proposer-defined metrics.
o Demonstrate that task descriptions and associated technical elements provided are complete and in a logical sequence with all proposed deliverables clearly defined such that a final outcome that achieves the goal can be expected as a result of award. The proposal identifies major technical risks and planned mitigation efforts are clearly defined and feasible.
2. Potential Contribution and Relevance to the DARPA Mission o Discuss how the potential contributions of the proposed effort bolster the national security technology base and support DARPA’s mission to make pivotal early technology investments that create or prevent technological surprise.
DISTRIBUTION A: Approved for Public Release, Distribution Unlimited 19
Evaluation Criteria (part 2)
3. Budget and Price o The proposed solution is realistic and affordable. The budget is realistic and accurately reflects the technical goals and objectives of the solicitation and reflects a sufficient understanding of the level of effort and staffing needed to successfully accomplish the proposed technical approach.
o Each price element provides commensurate technical, schedule, or execution value, and is it necessary, appropriately scaled, and neither materially overestimated nor underestimated.
o It is expected that the effort will leverage all available relevant prior research in order to obtain the maximum benefit from the available funding.
o For proposals that contain resource share, the proposer has provided sufficient rationale as to the appropriateness of the resource share arrangement relative to the objectives of the proposed solution.
4. Plans and Capability to Accomplish Technology Transition o Clearly demonstrates its capability to transition the technology to the research, industrial, and/or operational military communities in such a way as to enhance U.S. defense and long-term commercial viability.
o The evaluation will take into consideration the extent to which the proposed IP rights structure will potentially impact the Government’s ability to assess deliverables and to transition the technology.
DISTRIBUTION A: Approved for Public Release, Distribution Unlimited 20
Elements of a Successful Technical Proposal
Further details available in the Program Solicitation Questions: APM@darpa.mil
Goal: Catalyze future materials capabilities through scalable PPP synthesis approaches, where the sequence, orientation, and composition of materials are programmable
• Provide a detailed review of the synthesis approach, including the chemical mechanisms that result in PPPs
• Provide a detailed description on the approach to selection of monomers and subsequent polymers that will be pursued for materials with NLO applications
• Provide a detailed description of the analytical methods that will be employed
• Describe how computational approaches will be used to enhance material development
• Describe the vision for scaling material production and material integration into manufacturing/fabrication processes
• Identify and justify appropriate quantitative metrics for each demonstration
• Include data, from previous experiments and/or modeling, to reinforce technical assertions and projections
• Discuss risks associated with your approach and potential mitigations
• Discuss a plan to met CUI requirements for the program
DISTRIBUTION A: Approved for Public Release, Distribution Unlimited 21
Reminders o Submit early o APM abstracts will be mandatory o Those wishing to submit a full proposal must provide notification o Adhere to the abstract and full proposal guidance and templates provided in the solicitation o Corroborate all technical claims with analytical or experimental evidence o Submit only one proposal per lead organization o Organizations can be part of multiple proposing teams (as subs) o When in doubt, refer to the Program Solicitation for guidance
DISTRIBUTION A: Approved for Public Release, Distribution Unlimited 22
Anticipated Timeline
• Proposer’s Day: 30 September 2026 (today)
• Abstract due date: 27 October 2026 at 1:00 PM ET
• Frequently Asked Questions deadline: 4 December 2026 at 1:00 PM ET
• Deadline to Submit Intent to Propose: 4 December 2026 at 5:00 PM ET
• Proposal Due Date: 18 December 2026 at 4:00 PM ET
• Estimated period of performance start: 01 April 2027
DISTRIBUTION A: Approved for Public Release, Distribution Unlimited 23
APM Team
John M. Hoffman, Program Manager
• Michael Dambach, Technical SETA
• Rebecca Levine, Technical SETA
• Trupti Brahmbhatt, Technical SETA
• KK Law, Technical SETA
• Chelsea Haughn, Technical SETA
• Jeff Stone, Programmatic SETA
• Robert Shearer, Program Security
Distribution Statement 24
Slide H1 long (adjusted width) Slide H2 header / Detail (add width to text box as needed) https://cvent.me/8oLRbrRegistration closes Oct 18!
Nov 2-4, 2026 Chicago, IL https://cvent.me/8oLRbr
Distribution Statement A. Approved for Public Release; Distribution Unlimited.
Atomically Precise Molecules (APM)
DARPA-PS-26-141
Proposers Day
September 30, 2026
Natalie Kent Agreements Officer
DARPA Contracts Management Office
Proposers Day Disclaimer
• Proposer Day seeks to provide general information to clarify program goals, objectives, and proposal preparation instructions.
• Ensure proposers understand that the Program Solicitation (PS) takes precedence over all other sources of information, including Proposers Day materials.
• Proposals will be evaluated solely in accordance with the instructions provided in the PS.
• Any FAQ responses differing from the PS will be formalized through an amendment to the PS, with a note indicating the impending amendment.
• Only a duly authorized Contracting/Agreements Officer may obligate the Government.
Distribution Statement A. Approved for Public Release; Distribution Unlimited.
3Distribution Statement A. Approved for Public Release; Distribution Unlimited.
APM
• Phase 1 (Base) – 12-month period of performance
• Phase 2 (Option) – 24-month period of performance
• Other Transaction for Prototype under 10 U.S.C. § 4022
• Fixed Milestone Payment Structure
• Proposers are responsible for establishing milestone payment amounts that align technical progress, cash flow requirements, and tangible Government value.
• Milestone valuations should represent a balanced allocation of risk and verifiable technical output.
• Milestones that propose large upfront payments - such as disproportionately high kickoff meetings, initial planning sessions, or preliminary design reviews without corresponding deliverable substance - will be challenged or rejected during negotiations.
Provided for Informational Purposes – DO NOT PRICE
• Proposals should not include costs for device fabrication.
• Phase II Quest Opportunities
Distribution Statement A. Approved for Public Release; Distribution Unlimited. 4
• APM is subject to program-specific CUI Guide
• Cybersecurity Maturity Model Certification (CMMC) Level 2 (Self)
• 110 NIST SP 800-171 R2 controls
• Two paths:
• Provide evidence your self-attestation is recorded in the Supplier Performance Risk System (SPRS) database; OR
• Provide details on path to compliance
• Optional CMMC Compliance Milestone (Milestone 2) – up to $25,000
• Limited milestone value allocated to Milestone 1 (Initial technical approach and development plan) to reflect only basic administrative and non-CUI kickoff activities
• Not authorized to performer any additional work until Milestone 2 is met
• Questions on CMMC – https://dowcio.war.gov/CMMC/
CMMC Requirements https://dowcio.war.gov/CMMC/
Distribution Statement A. Approved for Public Release; Distribution Unlimited. 5
APM Special Considerations
• Prototype OT under 10 U.S.C. § 4022
• The OT agreement will not require cost sharing unless the offeror is a traditional defense contractor who is not working with a nontraditional defense contractor participating in the program to a significant extent.
• Fundamental Research
• Program goals cannot be met by proposers intending to performer fundamental research.
• Publication review will be implemented for APM
• Intellectual Property
• Performers shall maintain ownership of all IP developed under any APM Agreement resulting from this solicitation and have rights to commercialize the IP
• Minimum of Government Purpose Rights to Foreground Data developed under the Agreement
• Background IP/Data developed prior to the Agreement at Private Expense
• Identified in the proposal
• License rights for the government to use to operate, maintain, inspect, test, analyze, and evaluate any asserted BIP solely for the purposes of performing IV&V, technical milestone verification, and performance metrics evaluation under the Agreement.
Proposal should focus on what the government can do with data; not a long list of restricted or limited rights.
Distribution Statement A. Approved for Public Release; Distribution Unlimited. 6
• Non-U.S. organizations cannot participate in this solicitation.
Proposer Eligibility Considerations
• Federally Funded Research and Development Centers (FFRDCs), University-Affiliated Research Centers (UARCs), and Government Entities (including national laboratories) may propose as prime or subcontractors if they:
• Offer unique and innovative approaches to this solicitation; and
• Can accomplish integral tasks that cannot be met by government or contractor resources.
• FFRDCs must provide a letter, on official letterhead from their sponsoring organization, that (a) cites the specific authority establishing their eligibility to propose to government solicitations and compete with industry, and (b) certifies the FFRDC’s compliance with the associated FFRDC sponsor agreement’s terms and conditions.
• UARCs must provide an OCI mitigation plan due to status as DARPA trusted advisor
• Government Entities must clearly demonstrate that the work is not otherwise available from the private sector and provide written documentation citing the specific statutory authority and contractual authority, if relevant, establishing their ability to propose to government solicitations and compete with industry.
If proposing one of these entities as a team member, ensure the Prime proposals includes the documentation above AND costs are presented as segregable.
Distribution Statement A. Approved for Public Release; Distribution Unlimited. 7
• No common Statement of Work. DARPA describes the problem, propers provide their solution
• Proposals are evaluated on individual merit and relevance as it relates to the stated research goals/objectives rather than against one another
• Selections will be made to proposers whose proposals are determined to be most advantageous to the
Government, all factors considered, including potential contributions to research program and availability of funding
• Evaluation Criteria
• Overall Scientific and Technical Merit …. Quantitative justification (e.g., modeling/simulation, preliminary experimental results) is provided for technical claims, including proposer-defined metrics…
• Potential Contribution and Relevance to the DARPA Mission … support DARPA’s mission…
• Budget and Price … price element provides commensurate technical, schedule, or execution value, and is necessary, appropriately scaled…
• Plans and Capability to Accomplish Technology Transition …will take into consideration the extent to which the proposed IP rights structure will potentially impact the Government’s ability to assess deliverables and to transition the technology…
• See Full Evaluation Criteria are in Section II of the PS
Scientific Review Process
Distribution Statement A. Approved for Public Release; Distribution Unlimited. 8
Dates/Time: All Times are Eastern Time Zone (ET)
• Posting Date: September 25, 2026
• Proposers Day: September 30, 2026
• Proposal Abstract Due Date: October 27, 2026, at 1:00 p.m.
• ABSTRACTS ARE REQUIRED TO SUBMIT A FULL PROPOSAL! DON’T BE LATE!
• CREATE YOUR BAAT ACCOUNT 24-48 HOURS PRIOR!
• Questions Due Date: December 4, 2026, at 5:00 p.m.
• Deadline to Notify of Intent to Submit Proposal: December 4, 2026, at 5:00 p.m.
• ASSIST IN SCHEDULING THE IN PERSON ORAL PROPOSALS
• EFORM60 FOR ANY U.S. PERMANENT RESIDENTS AND FOREIGN NATIONALS
• Proposal Due Date: December 18, 2026, at 1:00 p.m.
• ENSURE BAAT ACCOUNT IS ACTIVE 24-48 HOURS PRIOR!
• Anticipated Oral Presentation Dates: January 5 – 20, 2027
• Estimated Period of Performance Start: April 1, 2027(for pricing purposes)
APM Timelines
9Distribution Statement A. Approved for Public Release; Distribution Unlimited.
Tips for a compliant proposal
• Submit the abstract and proposal on time!
– Proposal due date and PS closing date are the same – do not be late!
– ENSURE BAAT ACCOUNT IS ACTIVE AT LEAST 1-DAY PRIOR TO SUBMISSION! Inactive accounts will be deleted if inactive for 30-days per DoW policy. ACCOUNTS MAY BE DEACTIVATED BETWEEN ABSTRACT
AND PROPOSAL.
– Confirm any proprietary subperformer information has been provided directly to the DARPA.
• Submit all required Attachments!
– READ instructions contained within each Attachment!
– If using an FFRDC, UARC, or Government Entity please be aware of all the required documentation!
– PRIMES – please ensure all the required sub-perfomrer information is included
– All proposals must include a detailed list of key, observable payment milestones (Milestone Plan)
• Submit within the page limitations described in the PS!
– Pages beyond the limit will not be reviewed
10Distribution Statement A. Approved for Public Release; Distribution Unlimited.
Communication
• Prior to Receipt of Proposals (Solicitation Phase): No restrictions, however Gov’t (PM/PCO) shall not dictate solutions or transfer technology
– Typically handled through the FAQ, but see PS exceptions
• After Receipt of Proposals/Prior to Selections (Scientific Review Phase): Limited to Agreements Officer or PS Coordinator (with approval) to address clarifications requested by the review team
– Proposal cannot be changed in response to clarification requests
• After Selection/Prior to Award (Negotiation Phase): Negotiations are conducted by the Contracting/Agreements Officer
– PM and/or AOR typically tasked with finalizing the SOW/TDD (with PI)
– PM and/or AOR typically involved in any technical discussions (i.e., partial selection discussions)
– Pre-award costs will not be reimbursed unless a pre-award cost agreement is negotiated prior to award
• Informal Feedback Sessions (Post Selection): May be requested/provided once the selection(s) are made
– If made on a timely basis (~2 wks. after letter), all requests will be accepted
Your path to working with DARPA starts here.www.DARPAConnect.us
DARPAConnect@darpa.mil http://www.darpaconnect.us/
Distribution Statement A: Approved for public release; distribution unlimited
Supporting Untapped Innovators
DARPAConnect is designed to broaden DARPA’s reach and stimulate growth and collaboration between DARPA, businesses, and academia.
DARPAConnect.us
UNCLASSIFIED
Regional and Virtual Events
Networking Opportunities
Training and Development
Customized Support and Mentoring
Distribution Statement “A” (Approved for Public Release, Distribution Unlimited)
Join the LinkedIn Group
Join at DARPAConnect.us
Deep Dive into DARPA These full-day events cover a breadth of topics key to working with DARPA. Hear directly from a speaker list packed with
DARPA program managers, leadership, and staff on hand to give you insider insights.
Sessions Include:
• Engaging DARPA Program Managers
• Heilmeier Catechism: Understanding
Effective DARPA Communication
• Understanding DARPA Announcements and
Contract Vehicles
• Reviewing and Analyzing a DARPA
Opportunity
• DARPA SBIR and STTR Program
• Understanding DARPA Security Resources
• Preparing Your DARPA Proposal
• Tying It All Together: Strategies for Success
• Opportunities for Networking
Regional Pop-Up Events
UNCLASSIFIED
Bringing DARPA’s Vision to Life
Introducing new, technology-integrated Mission Connect pop-up events designed to showcase DARPA interests and priorities.
Sessions Include:
NEW: Mission Connect Events
• Specific insights from DARPA’s technological leadership, including office leaders, staff, and a robust cohort of program managers
• Technology-focused deep dives, expert panels, demos, and showcases
• Extensive one-on-one networking and feedback opportunities
Michigan May 2026
Colorado November 2026
Customized Curriculum
Current Lessons Include:
• DARPA101: Introduction to DARPA
• The Heilmeier Catechism
• DARPA Award Vehicles and Solicitations
• Understanding DARPA Broad Agency Announcements (BAAs)
• Making the Most of a DARPA Proposers Day
• Introduction to DARPA Security
• DARPA SBIR/STTR Small Business Programs
• Tips for DARPA Proposal Success
• Opportunities to Work with DARPA
• Working with DARPA: Global Participation and Engagements
And more!
Webinars Online sessions that offer a unique opportunity to learn about the mechanics of working with DARPA directly from DARPA presenters.
One-on-One Coaching 30-minute private session where participants introduce their research interests and explore how they may fit at DARPA
Ask Me Anything An open forum where participants send in their questions and DARPA presenters answer them in a group setting
Office Hours 10-minute sessions during which participants ask specific questions about working with DARPA in a private setting open mic D A R P A DARPA’s new monthly 30-minute quick-hit session that brings you the latest from DARPA’s tech offices— key announcements, funding opportunities, upcoming events, and more.
The Connect Corner
SupportCustomized
AVAILABLE THROUGH DARPACONNECT.US
NAVIGATE THE DARPA
ENTERPRISE
ENGAGE PROGRAM
MANAGERS SPEAK THE HEILMEIER
We offer a one-stop-shop to navigate the changes and opportunities at DARPA
Identify and engage PMs whose research interests align with your research
Frame your ideas using DARPA’s Heilmeier Catechism
For Your DARPA Journey
Distribution Statement “A” (Approved for Public Release, Distribution Unlimited)
NOT FOR QUESTIONS SPECIFIC TO AN OPEN BAA.
Your path to working with DARPA starts here.Sana Hoda Sood
Sana.Sood.ctr@darpa.mil
| Welcome, Intro, Program Overview APM_260928 |
| �Atomically Precise Molecules (APM) |
| APM Proposers’ Day Goals |
| Proposers’ Day Agenda |
| �APM Program Overview |
| Basics of programmable precision polymeric (PPP) materials |
| Current synthesis approaches can’t make PPPs |
| Current materials can’t provide desired performance |
| APM contributes to the Programmable Matter Economy |
| APM Program Description |
| APM Program Structure |
| APM Program Metrics |
| Phase 1 – Programmable precision polymer synthesis |
| Phase 2 – Revolutionary NLO materials integrated in microsystems |
| Independent Verification and Validation (IV&V) |
| PS Details |
| In and out of scope for APM |
| Security Overview |
| Evaluation Criteria (part 1) |
| Evaluation Criteria (part 2) |
| Elements of a Successful Technical Proposal |
| Reminders |
| Anticipated Timeline |
| APM Team |
| Slide H1 long (adjusted width) |
| Proposer’s Day Agenda |
| Notes on program structure |
| Proposal Guidelines |
| Proposal guidelines (Abstract Phase) |
| Proposal guidelines (Cont.) |
| Required CMMC Level 2 Compliance in Phase 1 |
| Eligibility Information |
| Intellectual Property Position |
| Potential material characterization methods |
| Technical challenge: Current materials can’t provide accessible performance |
| Current synthesis approaches can’t make SDPs |
| Using nature as inspiration |
| Templating enables sequence and composition control |
| Monomer selectivity through molecular templating |
| Repurposing nature’s catalysts limits potential chemistries |
| Molecular engineering new to nature chemical reactions |
| Repurposing small molecule chemistries |
| Notes on program structure |
| Notes on program structure |
| APM Proposers Day_CMO Presentation |
| �Atomically Precise Molecules (APM)�DARPA-PS-26-141 |
| Proposers Day Disclaimer |
| APM |
| CMMC Requirements |
| APM Special Considerations |
| Proposer Eligibility Considerations |
| Scientific Review Process |
| APM Timelines |
| Tips for a compliant proposal |
| Communication |
| DARPAConnect 2026 Sept |
| Slide Number 1 |
| Supporting Untapped Innovators |
| Slide Number 3 |
| Regional Pop-Up Events |
| NEW: Mission Connect Events |
| Customized Curriculum |
| The Connect Corner |
| Slide Number 8 |
| Slide Number 9 |
File details come from the government source that posted it. Updated .