5-Addenda No.3.pdf

PDF 93 KB Posted

Attached to
Water Filtration Building
Solicitation number
US.194462
Issued by
Lackawanna County, Troxelville CDP, Pennsylvania

View the file

Other files

File Type Posted
4-Addenda No.2.pdf PDF
3-Addendum 1.pdf PDF
2-Specs Book TMA Water Filtration Building 7-14-25.pdf PDF
1-Project Drawings.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

2013 Sandy Drive, Suite 101 State College, PA 16803

814.753.4249

Sparta, NJ • Parsippany, NJ • State College, PA www.cpengineers.com

ADDENDA No. 3 August 28, 2025

Thompsontown Municipal Authority

Water Filtration Building General Construction Contract

Electrical Construction Contract

Engineer’s Project 1007.013

The following questions were posted on PennBID and responses are provided herein:

1. Question: 1) Is a finish schedule available? Where does the resilient tile apply? And what is the finish of the remaining concrete slab - unfinished concrete?

Answer: Please insert the following table into sheet A1-Floor Plan of the drawing set

Room Walls Floor Ceiling

Entry Painted Dry Wall Resilient Floor Drop Ceiling

Office Painted Dry Wall Resilient Floor Drop Ceiling

Bathroom Painted Dry Wall Resilient Floor Drop Ceiling

Garage Painted OSB Treated Concrete Painted OSB

DRAWING REVISIONS

No drawing revisions as part of this Addendum.

Addenda No. 3 TMA – Water Filtration Building www.cpengineers.com

SPECIFICATION REVISIONS

No specifications as part of this Addendum.

END OF ADDENDA