2-Specs Book TMA Water Filtration Building 7-14-25.pdf
PDF 5 MB Posted
- Attached to
- Water Filtration Building
- Solicitation number
- US.194462
- Issued by
- Lackawanna County, Troxelville CDP, Pennsylvania
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 4-Addenda No.2.pdf | ||
| 3-Addendum 1.pdf | ||
| 5-Addenda No.3.pdf | ||
| 1-Project Drawings.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
2013 Sandy Drive, Suite 101
State College, PA 16803
814.753.4249 www.cpengineers.com
BIDDING DOCUMENTS
FOR
Water Filtration Building
Borough of Thompsontown
Juniata County, Pennsylvania
CP Project No. 1007.013
Prepared For:
Thompsontown Municipal Authority
JULY 2025
2013 Sandy Drive, Suite 101
State College, PA 16803
814.753.4249 www.cpengineers.com
PROJECT MANUAL
FOR
CONSTRUCTION
of
WATER FILTRATION BUILDING
Contract One � General Construction
Contract Two � Electrical Construction for
THOMPSONTOWN MUNICIPAL
AUTHORITY
JUNIATA COUNTY, PENNSYLVANIA
July 2025
Engineer�s Project No. 1007.013
Inside Cover
Project No. 1007.008 Table of Contents Page 1
TABLE OF CONTENTS
Note: These specifications are arranged in the nationally recognized CSI (Construction Specification Institute) Format.
This Table of Contents is included for convenience only. It is not part of the Contract Documents and its accuracy is not guaranteed.
DIVISION 00 � Procurement and Contracting Requirements
• 00 01 30 � Invitation to Bid 2
• 00 02 00 � Instruction to Bidders 8
• 00 04 00 � Bid Form General 6
• 00 04 00 � Bid Form Electrical 6
• 00 04 90 � Non-Collusion Affidavit 2
• 00 05 20 � Agreement between Owner and General Contractor 8
• 00 05 21� Agreement between Owner and Electrical Contractor 8
• 00 06 10 � Performance Bond 4
• 00 06 15 � Payment Bond 4
• 00 07 00 � General Conditions, Table of Contents 6
• 00 07 00 � General Conditions 70
• 00 08 00 � Supplementary Conditions 4
• 00 08 10 � Prevailing Wage Determination 14
DIVISION 01 � General Requirements
• 01 11 00 � Summary of Work 2
• 01 11 40 � Coordination 2
• 01 11 50 � Measurement & Payment 2
• 01 13 30 � Submittal Procedures 6
DIVISION 02 � Site Work
• 02 41 00 � Demolition 2
DIVISION 03 � Concrete
• 03 33 00 � Cast-in-Place Concrete 6
DIVISION 05 � Metals
• 05 60 10 � Bronze Plaque 2
DIVISION 06 � Wood, Plastic & Composites
Project No. 1007.008 Table of Contents Page 2
• 06 10 00 � Rough Carpentry 4
• 06 20 00 � Finished Carpentry 2
DIVISION 07 � Thermal & Moisture Protection
• 07 40 10 � Vinyl Siding 4
• 07 41 13 � Metal Roofing Panels 8
DIVISION 08 � Doors & Windows
• 08 11 13 � Hollow Metal Doors and Frames 4
• 08 54 14 � Wood Clad, Double Hung Windows 6
DIVISION 09 � Finishes
• 09 29 00 � Gypsum Board 2
• 09 65 19 � Resilient Tile Flooring 6
• 09 90 00 � Paint 4
DIVISION 22 � Plumbing
• 22 40 00 � Plumbing Fixtures 4
DIVISION 23 � Heating, Ventilation & Cooling
• 23 81 43 � Air Cooled Heat Pumps 2
DIVISION 26 � Electrical
• 26 05 00 � Common Work Results for Electrical 10
• 26 05 19 � Low Voltage Electrical Conductors and Cables 6
• 26 05 26 � Grounding and Bonding for Electrical Systems 4
• 26 05 29 � Hangers and Supports for Electrical Systems 6
• 26 05 33 � Raceway and Boxes for Electrical Systems 8
• 26 05 53 � Identification for Electrical Systems 8
• 26 05 73.17 � Arc Flash short Circuit 10
• 26 24 16 � Panelboards 8
• 26 27 26 � Wiring Devices 8
• 26 28 16 � Enclosed Switches and Circuit Breakers 6
• 26 32 13 � Engine Generator 20
• 26 36 23 � Automatic Transfer Switch 8
• 26 43 13 � Surge Protective Devices for Low-Voltage Electrical Power Circuits 4
• 26 51 00 � Interior Lighting 8
• 26 56 00 � Exterior Lighting 6
Project No. 1007.008 Table of Contents Page 3
DIVISION 31 � Earthwork
• 31 20 00 � Earthwork 8
• 31 23 33 � Trenching, Backfilling and Compacting 14
DIVISION 33 � UTILITIES
• 33 10 00 � Water Piping & Fittings 6
• 33 31 00- Sanitary Sewer Pipe & Accessories 12
Project No. 1007.008 Table of Contents Page 4
PAGE LEFT INTENTIONALLY BLANK
CP Engineers, LLC 002000-1 1007.013
DIVISION 0 – Building and Contract Requirements Section 00 01 30 – Invitation to Bid
The Thompsontown Municipal Authority (OWNER) will receive sealed bids for the Water Filtration Building as defined in the Contract Documents and other associated parts of the work.
The General Construction Project is generally described as:
• Construction of a Concrete “Slab on Grade” Engineered Building
• Building is 30’0” x 50’0” outside to outside
• Building is designed to have wooden stud walls and trusses
• Three overhead roll up doors
• Metal Panel Roof System
• Interior of the building is to have a normial 12’6” x 20’6” Office/Lab for water testing
• and a single stall restroom
• with supporting systems and, as indicated in the Contract Documents.
Procedures for submitting bids and other pertinent information are contained in the Instructions to Bidders and other contract documents. The OWNER reserves the right to reject any or all bids, to waive any bid irregularities, and to negotiate contract amounts. Bids can be held for up to 60 days by OWNER and that time can be extended by PA Law if it is to allow the closing of project funding.
Sealed bids must be submitted electronically via the PennBid portal at https://pennbid.bonfirehub.com until 4:00 p.m., local prevailing time, on Thursday, August 14, 2025. The bids will be opened publicly and read aloud at 4:15 p.m., local prevailing time, on the same day.
A certified check or bank draft payable to the Thompsontown Municipal Authority or a satisfactory Bid Bond executed by the Bidder will serve as an acceptable surety in an amount equal to ten percent (10%) of the total of the Bid. Bid security and a fully completed Non-Collusion affidavit shall be submitted with each bid.
Procedures for submitting bids and other pertinent information are contained in the Instructions to Bidders and other contract documents. The OWNER reserves the right to reject any or all bids, to waive any bid irregularities, and to negotiate contract amounts. Bids can be held for up to 60 days by OWNER.
All questions regarding this project shall be submitted via the “Ask a Question” feature in PennBid no later than seven (7) days prior to the date for receipt of bids. Questions requiring a response will be issued by Addenda posted within PennBid’s Public Notices and “Supporting Documentation”. Bidders who have registered with and downloaded documents via PennBid will be notified by email when an addendum has been posted.
Bid documents are available at no cost on PennBid at https://pennbid.bonfirehub.com/ or for viewing at the Authority’s Office which shall be considered the issuing office at 121 North Mill Street, Thompsontown, PA 17094; subject to prior arrangements by calling Waynett Dunn, Secretary or Roger Stutts, Operator at 717-535-5292.
https://pennbid.bonfirehub.com/ https://pennbid.bonfirehub.com/
CP Engineers, LLC 002000-2 1007.013
CP Engineers, LLC 002000-1 1007.013
Section 000200 Instructions to Bidders
ARTICLE 1 - DEFINED TERMS
1.01 Terms used in these Instructions to Bidders will have the meanings indicated in the General Conditions and Supplementary Conditions. Additional terms used in these Instructions to Bidders have the meanings indicated below.
Issuing Office – The office from which the Bidding Documents are to be issued and where the bidding procedures are to be administered. The issuing office for the Thompsontown Municipal Authority, PO Box 154, 121 North Mill Street, Thompsontown, PA 17094.
Engineer – The project engineer is Brian L. Book, PE of CP Engineers Architecture & Environmental Services LLC.
Owner – The owner is the Thompsontown Municipal Authority.
Project – The project is generally defined by the Contract Documents which consist of the Plans and Specifications.
General Contractor – The General Contractor will be the successful low bidder who is to enter into a contract with the Owner for the general construction of the project.
Electrica Contractor – The Electrical Contractor will be the successful low bidder who is to enter into a contract with the Owner for the electrical construction of the project.
ARTICLE 2 - BIDS RECEIVED
2.01 Refer to Section 000130 – Invitation for Bids for information on receipt of Bids.
ARTICLE 3 - COPIES OF BIDDING DOCUMENTS
3.01 Complete sets of the Bidding Documents in the number and for the deposit sum, if any, stated in the advertisement or invitation to bid may be obtained from the Issuing Office.
3.02 Complete sets of the Bidding Documents shall be used in preparing Bids; neither Owner nor Engineer assumes any responsibility for errors or misinterpretations resulting from the use of incomplete sets of Bidding Documents.
3.03 No Alternative Bids will be considered.
3.04 Owner and Engineer have made copies of Bidding Documents available on the above terms only for the purpose of obtaining Bids for furnishing Goods and Special Services and do not authorize or confer a license for any other use.
3.05 Bidders are directed to comply with all Federal, State, and Local Laws and regulations.
3.06 Bid Documents include:
• Bid Form;
CP Engineers, LLC 002000-2 1007.013
• Bid Bond or Bid Security;
• Any acknowledgement of Addenda;
• and Non-Collusion Affidavit.
ARTICLE 4 - QUALIFICATIONS OF BIDDERS
4.01 To demonstrate Bidder’s qualifications to furnish Goods and Special Services, within five days of Owner’s request Bidder shall submit written evidence, such as financial data and previous experience.
4.02 Bidder is advised to carefully review those portions of the Bid Form requiring Bidder’s representations and certifications.
ARTICLE 5 - EXAMINATION OF BIDDING DOCUMENTS, OTHER RELATED DATA, AND POINT OF
DESTINATION
5.01 Upon request Owner will provide Bidder access to the Project Site(s) for inspection prior to bidding. Bidder may conduct such investigations, examinations, tests, and studies as Bidder deems necessary for submission of a Bid.
5.02 It is the responsibility of each Bidder before submitting a Bid to:
A. examine and carefully study the Bidding Documents, including any Addenda, and the related data identified in the Bidding Documents;
B. visit the site where the Goods are to be installed and Special Services are to be provided to become familiar with the local conditions if required by the Bidding Documents to do so, or if, in Bidder’s judgment, any local condition may affect cost, progress, or the furnishing of Goods and Special Services;
C. become familiar with and satisfy itself as to all Laws and Regulations that may affect cost, progress, or the furnishing of the Goods and Special Services;
D. carefully study, consider, and correlate the information known to Bidder; information commonly known to Contractors of similar goods doing business in the locality of the site where the Goods will be installed or where Special Services will be provided; information and observations obtained from Bidder’s visits, if any, to the site where the Goods are to be installed or Special Services are to be provided; and any reports and drawings identified in the Bidding Documents regarding the site where the Goods will be installed or where Special Services will be provided, with respect to the effect of such information, observations, and documents on the cost, progress, and performance of Contractor's obligations under the Contract Documents;
E. promptly give Engineer written notice of all conflicts, errors, ambiguities, or discrepancies that Bidder discovers in the Bidding Documents and confirm that the written resolution (if any) thereof by Engineer is acceptable to Bidder; and
F. determine that the Bidding Documents are generally sufficient to indicate and convey understanding of all terms and conditions for furnishing Goods and Special Services.
The submission of a Bid will constitute an incontrovertible representation by Bidder that
CP Engineers, LLC 002000-3 1007.013
Bidder has complied with every requirement of this Article 5, that without exception the Bid is premised upon furnishing Goods and Special Services required by the Bidding Documents, that Bidder has given Engineer written notice of all conflicts, errors, ambiguities and discrepancies that Bidder has discovered in the Bidding Documents and the written resolutions (if any) thereof by Engineer are acceptable to Bidder, and that the Bidding Documents are generally sufficient to indicate and convey understanding of all terms and conditions for furnishing Goods and Special Services.
ARTICLE 6 - INTERPRETATIONS AND ADDENDA
6.01 All questions about the meaning or intent of the Bidding Documents are to be submitted to Engineer in writing. Interpretations or clarifications considered necessary by Engineer in response to such questions will be issued by Addenda mailed or delivered to all parties recorded by Engineer as having received the Bidding Documents. Questions received less than ten days prior to the date for opening of Bids will not be answered. Only answers in the form of a written Addenda will be binding. Oral statements, interpretations, and clarifications may not be relied upon and will not be binding or legally effective.
6.02 Addenda may be issued to clarify, correct, or change the Bidding Documents as deemed advisable by Owner or Engineer.
ARTICLE 7 - BID SECURITY
7.01 A Bid must be accompanied by Bid security made payable to Owner in an amount of 10% percent of Bidder's maximum Bid price and in the form of a certified check, bank money order, or a Bid Bond issued by a surety meeting the requirements of Paragraph 4.01.B of the General Conditions.
7.02 The Bid security of the Successful Bidder will be retained until such Bidder has executed the Contract Documents, furnished the required contract security, and met the other conditions of the Notice of Award, whereupon the Bid security will be returned. If the Successful Bidder fails to execute and deliver the Contract Documents and furnish the required contract security within 15 days after the Notice of Award, Owner may consider Bidder to be in default, annul the Notice of Award, and the Bid security of that Bidder will be forfeited. The Bid security of other Bidders that Owner believes to have a reasonable chance of receiving the award may be retained by Owner until the earlier of 7 days after the Effective Date of the Agreement or 61 days after the Bid opening, whereupon Bid security furnished by such Bidders will be returned or considered null and void.
7.03 Bid security of other Bidders that Owner believes do not have a reasonable chance of receiving the award will be returned within seven days after the Bid opening or destroyed.
ARTICLE 8 - CONTRACT TIMES
8.01 See applicable provisions in the Agreement.
ARTICLE 9 - LIQUIDATED DAMAGES
9.01 Any provisions for liquidated damages, such as those for Contractor’s failure to attain a Milestone, or to deliver the Goods or furnish Special Services within the Contract Times, are set forth in the Agreement.
CP Engineers, LLC 002000-4 1007.013
ARTICLE 10 - “OR-EQUAL” ITEM
10.01 The Contract, if awarded, will be on the basis of material and equipment specified or described in the Bidding Documents without consideration of possible “or-equal” items. Whenever it is specified or described in the Bidding Documents that an “or-equal” item of material or equipment may be furnished or used by Contractor if acceptable to Engineer, application for such acceptance will not be considered by Engineer until after the Effective Date of the Agreement. The procedure for submittal of any such application by Contractor and consideration by Engineer is set forth in the General Conditions and may be supplemented in the General Requirements.
10.02 The Contract, if awarded, will be on the basis of materials and equipment specified or described in the Bidding Documents, including the Addenda. Bidders may propose "or equal" materials and equipment, which if approved by Engineer will be identified by Addendum. The materials and equipment described in the Bidding Documents establish a standard of required type, function, and quality to be met by any proposed “or-equal” item. No item of material or equipment will be considered by Engineer as an “or-equal” unless written request for approval has been submitted by Bidder and has been received by Engineer at least 15 days prior to the date for receipt of Bids. Each such request shall conform to the requirements of Paragraph
5.04 of the General Conditions. The burden of proof of the merit of the proposed item is upon Bidder. Engineer’s decision of approval or disapproval of a proposed item will be final.
Bidders shall not rely upon approvals unless set forth in an Addendum.
ARTICLE 11 - PREPARATION OF BID
11.01 The Bid Form is included with the Bidding Documents. Additional copies of Bidding Documents may be obtained from the Issuing Office.
11.02 All blanks on the Bid Form shall be completed in ink and the Bid Form signed in ink. Erasures or alterations shall be initialed in ink by the person signing the Bid Form. A Bid price shall be indicated for each item listed therein. In the case of optional alternates, the words “No Bid,” “No Change,” or “Not Applicable” may be entered.
A Bid by a corporation shall be executed in the corporate name by the president or a vice-president or other corporate officer accompanied by evidence of authority to sign. The corporate seal shall be affixed and attested by the secretary or an assistant secretary. The corporate address and state of incorporation shall be shown.
11.03 A Bid by a partnership shall be executed in the partnership name and signed by a partner (whose title must appear under the signature), accompanied by evidence of authority to sign.
The official address of the partnership shall be shown.
11.04 A Bid by a limited liability company shall be executed in the name of the firm by a member and accompanied by evidence of authority to sign. The state of formation of the firm and the official address of the firm shall be shown.
11.05 A Bid by an individual shall show the Bidder’s name and official address.
11.06 A Bid by a joint venture shall be executed by each joint venturer in the manner indicated on the Bid Form. The official address of the joint venture shall be shown.
CP Engineers, LLC 002000-5 1007.013
11.07 All names must be typed or printed in ink below the signature.
11.08 The Bid shall contain an acknowledgment of receipt of all Addenda, the numbers of which shall be filled in on the Bid Form.
11.09 Each Bidder shall list the postal address, e-mail address, and telephone number for communications regarding the Bid.
ARTICLE 12 - BASIS OF BID; COMPARISON OF BIDS
12.01 Base Bid with Alternates
A. The “Base Bid” is the sum stated in the Bid for which the Bidder offers to furnish the Goods and Special Services described in the Bidding Documents as the base, for sums stated in Alternate Bids. An “Alternate Bid” (or Alternate) is an amount stated in the Bid to be [added to] [deducted from] the amount of the Base Bid if the corresponding change in the Goods and Special Services, as described in the Bidding Documents, is accepted.
No Alternatives Bids are identified for this project.
B. Bidder shall submit a Bid for the lump sum Base Bid, and include a separate Alternate Bid for each alternate described in the Bidding Documents as set forth in the Bid Form.
C. For determination of the apparent low Bid, Bids will be compared on the basis of the aggregate amount of the Base Bid by the Owner upon bid opening. If the addition of another Alternate Bid in the listed order of priority would make the aggregate amount exceed such available funds for all Bids, it will be skipped and the next subsequent Alternate Bid in a lower amount will be added if award thereon can be made within such funds.
D. The Base Bid will be considered for the determination of the apparent low Bid. After the determination of the apparent low Bid as stated, award in the best interest of the Project may be made to said Bidder on its Base Bid and any combination of its additive Alternate Bids for which Owner determines funds will be available at the time of award.
ARTICLE 13 - SUBMITTAL OF BID
13.01 With each copy of the Bidding Documents, a Bidder is furnished one separate unbound copy of the Bid Form, and, if required, the Bid Bond. The unbound copy of the Bid Form is to be completed and submitted with the Bid security. Also submit the following documents:
• Bid Form
• Bid Bond
• Acknowledgement of Addenda
• Non-Collusion Affidavit
13.02 A Bid shall be submitted no later than the date and time prescribed and at the place indicated in the advertisement or invitation to bid, and shall be enclosed in a plainly marked envelope with the Project title and the name and address of Bidder, and shall be accompanied by the Bid security and other required documents. Bidder must provide Federal Employer Identification Number and Principal’s Names and Social Security
CP Engineers, LLC 002000-6 1007.013
Numbers. If a Bid is sent by mail or other delivery system, the sealed envelope containing the Bid shall be enclosed in a separate package plainly marked on the outside with the notation “BID ENCLOSED". A mailed Bid shall be addressed to Thompsontown Municipal Authority, PO Box 154, 21720 Route 333, Thompsontown, PA 17094.
ARTICLE 14 - MODIFICATION OR WITHDRAWAL OF BID
14.01 A Bid may be modified or withdrawn by an appropriate document duly executed in the same manner that a Bid must be executed and delivered to the place where Bids are to be submitted prior to the date and time for the opening of Bids.
14.02 If, within 24 hours after Bids are opened, any Bidder files a duly signed written notice with Owner and promptly thereafter demonstrates to the reasonable satisfaction of Owner that there was a material and substantial mistake in the preparation of its Bid, that Bidder may withdraw its Bid, and the Bid security will be returned. Thereafter, if the Goods and Special Services are rebid, that Bidder will be disqualified from further bidding on the Goods and Special Services.
ARTICLE 15 - OPENING OF BIDS
15.01 Bids will be opened at the time and place indicated in the advertisement or invitation to bid and, unless obviously non-responsive, read aloud publicly. An abstract of the amounts of the Base Bids and Alternate Bids, if any, will be made available to plan holders of record after the opening of Bids.
ARTICLE 16 - BIDS TO REMAIN SUBJECT TO ACCEPTANCE
16.01 All Bids will remain subject to acceptance for the period of time stated in the Bid Form, but Owner may, in its sole discretion, release any Bid and return the Bid security prior to the end of this period.
ARTICLE 17 - EVALUATION OF BIDS AND AWARD OF CONTRACT
17.01 Owner reserves the right to reject any and all Bids, including without limitation, nonconforming, nonresponsive, unbalanced, or conditional Bids. Owner further reserves the right to reject the Bid of any Bidder that Owner finds, after reasonable inquiry and evaluation, to be nonresponsive. Owner may also reject the Bid of any Bidder if Owner believes that it would not be in the best interest of the Project to make an award to that Bidder. Owner also reserves the right to waive all informalities not involving price, time, or changes in the Goods and Special Services, and to negotiate contract terms with the Successful Bidder.
17.02 More than one Bid for the same Goods and Special Services from an individual or entity under the same or different names will not be considered. Reasonable grounds for believing that any Bidder has an interest in more than one Bid for the Goods and Special Services shall be cause for disqualification of that Bidder and the rejection of all Bids in which that Bidder has an interest.
17.03 In evaluating Bids, Owner will consider whether or not the Bids comply with the prescribed requirements, and such alternates, unit prices, and other data as may be requested in the Bid Form or may be requested from Bidders prior to a Notice of Award.
CP Engineers, LLC 002000-7 1007.013
17.04 Owner may conduct such investigations as Owner deems necessary to establish the responsibility, qualifications, and financial ability of Bidder.
17.05 If the Contract is to be awarded, Owner will award the Contract to the Bidder whose Bid represents the lowest responsible bid and whose bid is in the best interest of the Project.
ARTICLE 18 - CONTRACT SECURITY AND INSURANCE
18.01 Article 4 of the General Conditions and Article 4 of the Supplementary Conditions set forth Owner’s requirements as to performance and payment bonds and insurance. When the Successful Bidder delivers the executed Agreement to Owner, it must be accompanied by such bonds.
ARTICLE 19 - SIGNING OF AGREEMENT
19.01 When Owner issues a Notice of Award to the Successful Bidder, it shall be accompanied by the required number of unsigned counterparts of the Agreement with the other Contract Documents that are to be identified in the Agreement and attached thereto. Within 15 days thereafter, Successful Bidder shall sign and deliver the required number of counterparts of the Agreement and attached documents to Owner. Within 10 days thereafter, Owner shall deliver one fully signed counterpart to Successful Bidder with a complete set of Drawings with appropriate identification.
19.02 The Bidder to whom the award is made will need to complete a W-9 Form prior to issuance of the Notice to proceed.
ARTICLE 20 - SALES AND USE TAXES
20.01 Owner is exempt from state sales on materials and equipment to be incorporated in the Project. Said taxes shall not be included in the Bid. Refer to Paragraph 5.05 of the Supplementary Conditions for additional information.
ARTICLE 21 - RETAINAGE
21.01 Provisions concerning Contractor’s rights to deposit securities in lieu of retainage are set forth in the Agreement.
ARTICLE 22 – PREBID CONFERENCE
22.01 There is no Prebid Conference set for this project.
CP Engineers, LLC 002000-8 1007.013
END OF SECTION 002000
CP Engineers, LLC 000400-1 1007.013
Section 00 04 00 Bid Form - General
ARTICLE 1 - BID RECIPIENT
1.01 This Bid is submitted to:
Thompsontown Municipal Authority 121 North Mill Street, PO Box 154 Thompsontown, PA 17094
1.02 The undersigned Bidder proposes and agrees, if this Bid is accepted, to enter into a Contract with OWNER in the form included in the Bidding Documents to furnish the construction of a PROJECT as specified or indicated in the Bidding Documents, for the prices and within the times indicated in this Bid, and in accordance with the other terms and conditions of the Bidding Documents.
ARTICLE 2 - BIDDER’S ACKNOWLEDGMENTS
2.01 Bidder accepts all of the terms and conditions of the Instructions to Bidders, including without limitation those dealing with the disposition of Bid security. This Bid will remain subject to acceptance for 60 days after the Bid opening, or for such longer period of time that Bidder may agree to in writing upon request of Buyer.
ARTICLE 3 - BIDDER’S REPRESENTATIONS
3.01 In submitting this Bid, Bidder represents that:
A. Bidder has examined and carefully studied the Bidding Documents, the related data identified in the Bidding Documents, and the following Addenda, receipt of which is hereby acknowledged:
Addendum No. _____ Addendum Date ______ Addendum No. _____ Addendum Date ______ Addendum No. _____ Addendum Date ______
B. Bidder has visited the project site where the PROJECT is to be constructed and has become familiar with, and is satisfied as to, the observable local conditions that may affect cost, progress, or completion of construction. If required to do so by the Bidding Documents, or if, in Bidder’s judgment, any local condition may affect cost, progress, or the furnishing of the Project, the Bidder has included these costs in his/her bid.
C. Bidder is familiar with and is satisfied as to all Laws and Regulations in effect as of the date of the Bid that may affect cost, progress, and the Project.
D. Bidder has carefully studied, considered, and correlated the information known to Bidder; information commonly known to contractors doing business in the locality of the project will be installed; information and observations obtained from Bidder’s visits, if any, to the project site where the project will be installed; and any reports and drawings identified in the Bidding Documents regarding the project site, with respect to
CP Engineers, LLC 000400-2 1007.013 the effect of such information, observations, and documents on the cost, progress, and performance of Seller's obligations under the Bidding Documents.
E. Bidder has given Engineer written notice of all conflicts, errors, ambiguities, and discrepancies that Bidder has discovered in the Bidding Documents, and the written resolution (if any) thereof by Engineer is acceptable to Bidder.
F. The Bidding Documents are generally sufficient to indicate and convey understanding of all terms and conditions for furnishing the project for which this Bid is submitted.
ARTICLE 4 - BIDDER’S CERTIFICATIONS
4.01 Bidder certifies that:
A. This Bid is genuine and not made in the interest of or on behalf of any undisclosed individual or entity and is not submitted in conformity with any collusive agreement or rules of any group, association, organization, or corporation;
B. Bidder has not directly or indirectly induced or solicited any other Bidder to submit a false or sham Bid;
C. Bidder has not solicited or induced any individual or entity to refrain from bidding; and
D. Bidder has not engaged in corrupt, fraudulent, collusive, or coercive practices in competing for the Contract. For the purposes of this Paragraph 4.01.D:
1. “corrupt practice” means the offering, giving, receiving, or soliciting of any thing of value likely to influence the action of a public official in the bidding process;
2. “fraudulent practice” means an intentional misrepresentation of facts made (a) to influence the bidding process to the detriment of Buyer, (b) to establish bid prices at artificial non-competitive levels, or (c) to deprive Buyer of the benefits of free and open competition;
3. “collusive practice” means a scheme or arrangement between two or more Bidders, with or without the knowledge of Buyer, a purpose of which is to establish bid prices at artificial, non-competitive levels; and
4. “coercive practice” means harming or threatening to harm, directly or indirectly, persons or their property to influence their participation in the bidding process.
ARTICLE 5 - BASIS OF BID
5.01 Bidder will furnish the Goods and Special Services in accordance with the Contract Documents for the following price(s):
Total Lump Sum Bid Amount $
1. Bidder acknowledges that the Lump Sum Bid Items are all inclusive and represented in the Lump Sum.
CP Engineers, LLC 000400-3 1007.013
ARTICLE 6 - TIME OF COMPLETION
6.01 Bidder agrees that the furnishing of Goods and Special Services will conform to the schedule set forth in Article 5 of the Agreement.
6.02 Bidder accepts the provisions of the Agreement as to liquidated damages.
ARTICLE 7 - ATTACHMENTS TO THIS BID
7.01 The following documents are attached to and made a condition of this Bid:
A. Required Bid security in the form of __________________.
B. Acknowledgement of Addenda ____ to ____ Inclusive
C. Section 000490– Non-Collusion Affidavit
ARTICLE 8 - DEFINED TERMS
8.01 The terms used in this Bid with initial capital letters have the meanings stated in the Instructions to Bidders, the General Conditions, and the Supplementary Conditions.
ARTICLE 9 - BID SUBMITTAL
9.01 This Bid submitted by:
If Bidder is:
An Individual
Name (typed or printed):
By:
(Individual’s signature)
Doing business as:
Business address:
Phone: Facsimile:
E-mail address: _________________ ______________
CP Engineers, LLC 000400-4 1007.013
A Partnership
Partnership Name:
(SEAL)
By:
(Signature of general partner - attach evidence of authority to sign)
Name (typed or printed):
Business address:
Phone: Facsimile:
E-mail address: _______________________________
A Corporation
Corporation Name:
State of Incorporation:
Type (General Business, Professional, Service, other):
By:
(Signature - attach evidence of authority to sign)
Name (typed or printed):
Title:
(CORPORATE SEAL)
Attest
(Signature of Corporate Secretary)
Business address:
Phone: Facsimile:
E-mail address: _______________________________
A Limited Liability Company (LLC)
LLC Name:
State in which organized:
By:
(Signature - attach evidence of authority to sign)
Name (typed or printed):
Title:
Business address:
E-mail address: _______________________________
CP Engineers, LLC 000400-5 1007.013
A Joint Venture
First Joint Venturer Name: (SEAL)
By:
(Signature - attach evidence of authority to sign)
Name (typed or printed):
Title:
Business address:
Phone: Facsimile:
E-mail address: _______________________________ Second Joint Venturer Name: (SEAL)
By:
(Signature - attach evidence of authority to sign)
Name (typed or printed):
Title:
Business address:
Phone: Facsimile:
E-mail address: _______________________________
Phone and Facsimile Number, and Address for receipt of official communications to Joint Venture:
(Each joint venturer must sign. The manner of signing for each individual, partnership, corporation, and limited liability company that is a party to the joint venture should be in the manner indicated above.)
END OF SECTION
000400
CP Engineers, LLC 000400-6 1007.013
CP Engineers, LLC 000400-1 1007.013
Section 00 04 01 Bid Form - Electrical
ARTICLE 1 - BID RECIPIENT
1.01 This Bid is submitted to:
Thompsontown Municipal Authority 121 North Mill Street, PO Box 154 Thompsontown, PA 17094
1.02 The undersigned Bidder proposes and agrees, if this Bid is accepted, to enter into a Contract with OWNER in the form included in the Bidding Documents to furnish the construction of a PROJECT as specified or indicated in the Bidding Documents, for the prices and within the times indicated in this Bid, and in accordance with the other terms and conditions of the Bidding Documents.
ARTICLE 2 - BIDDER’S ACKNOWLEDGMENTS
2.01 Bidder accepts all of the terms and conditions of the Instructions to Bidders, including without limitation those dealing with the disposition of Bid security. This Bid will remain subject to acceptance for 60 days after the Bid opening, or for such longer period of time that Bidder may agree to in writing upon request of Buyer.
ARTICLE 3 - BIDDER’S REPRESENTATIONS
3.01 In submitting this Bid, Bidder represents that:
A. Bidder has examined and carefully studied the Bidding Documents, the related data identified in the Bidding Documents, and the following Addenda, receipt of which is hereby acknowledged:
Addendum No. _____ Addendum Date ______ Addendum No. _____ Addendum Date ______ Addendum No. _____ Addendum Date ______
B. Bidder has visited the project site where the PROJECT is to be constructed and has become familiar with, and is satisfied as to, the observable local conditions that may affect cost, progress, or completion of construction. If required to do so by the Bidding Documents, or if, in Bidder’s judgment, any local condition may affect cost, progress, or the furnishing of the Project, the Bidder has included these costs in his/her bid.
C. Bidder is familiar with and is satisfied as to all Laws and Regulations in effect as of the date of the Bid that may affect cost, progress, and the Project.
D. Bidder has carefully studied, considered, and correlated the information known to Bidder; information commonly known to contractors doing business in the locality of the project will be installed; information and observations obtained from Bidder’s visits, if any, to the project site where the project will be installed; and any reports and drawings identified in the Bidding Documents regarding the project site, with respect to
CP Engineers, LLC 000400-2 1007.013 the effect of such information, observations, and documents on the cost, progress, and performance of Seller's obligations under the Bidding Documents.
E. Bidder has given Engineer written notice of all conflicts, errors, ambiguities, and discrepancies that Bidder has discovered in the Bidding Documents, and the written resolution (if any) thereof by Engineer is acceptable to Bidder.
F. The Bidding Documents are generally sufficient to indicate and convey understanding of all terms and conditions for furnishing the project for which this Bid is submitted.
ARTICLE 4 - BIDDER’S CERTIFICATIONS
4.01 Bidder certifies that:
A. This Bid is genuine and not made in the interest of or on behalf of any undisclosed individual or entity and is not submitted in conformity with any collusive agreement or rules of any group, association, organization, or corporation;
B. Bidder has not directly or indirectly induced or solicited any other Bidder to submit a false or sham Bid;
C. Bidder has not solicited or induced any individual or entity to refrain from bidding; and
D. Bidder has not engaged in corrupt, fraudulent, collusive, or coercive practices in competing for the Contract. For the purposes of this Paragraph 4.01.D:
1. “corrupt practice” means the offering, giving, receiving, or soliciting of any thing of value likely to influence the action of a public official in the bidding process;
2. “fraudulent practice” means an intentional misrepresentation of facts made (a) to influence the bidding process to the detriment of Buyer, (b) to establish bid prices at artificial non-competitive levels, or (c) to deprive Buyer of the benefits of free and open competition;
3. “collusive practice” means a scheme or arrangement between two or more Bidders, with or without the knowledge of Buyer, a purpose of which is to establish bid prices at artificial, non-competitive levels; and
4. “coercive practice” means harming or threatening to harm, directly or indirectly, persons or their property to influence their participation in the bidding process.
ARTICLE 5 - BASIS OF BID
5.01 Bidder will furnish the Goods and Special Services in accordance with the Contract Documents for the following price(s):
Total Lump Sum Bid Amount $
1. Bidder acknowledges that the Lump Sum Bid Items are all inclusive and represented in the Lump Sum.
CP Engineers, LLC 000400-3 1007.013
ARTICLE 6 - TIME OF COMPLETION
6.01 Bidder agrees that the furnishing of Goods and Special Services will conform to the schedule set forth in Article 5 of the Agreement.
6.02 Bidder accepts the provisions of the Agreement as to liquidated damages.
ARTICLE 7 - ATTACHMENTS TO THIS BID
7.01 The following documents are attached to and made a condition of this Bid:
A. Required Bid security in the form of __________________.
B. Acknowledgement of Addenda ____ to ____ Inclusive
C. Section 000490– Non-Collusion Affidavit
ARTICLE 8 - DEFINED TERMS
8.01 The terms used in this Bid with initial capital letters have the meanings stated in the Instructions to Bidders, the General Conditions, and the Supplementary Conditions.
ARTICLE 9 - BID SUBMITTAL
9.01 This Bid submitted by:
If Bidder is:
An Individual
Name (typed or printed):
By:
(Individual’s signature)
Doing business as:
Business address:
E-mail address: _________________ ______________
CP Engineers, LLC 000400-4 1007.013
A Partnership
Partnership Name:
(SEAL)
By:
(Signature of general partner - attach evidence of authority to sign)
Name (typed or printed):
Business address:
Phone: Facsimile:
E-mail address: _______________________________
A Corporation
Corporation Name:
State of Incorporation:
Type (General Business, Professional, Service, other):
By:
(Signature - attach evidence of authority to sign)
Name (typed or printed):
Title:
(CORPORATE SEAL)
Attest
(Signature of Corporate Secretary)
Business address:
Phone: Facsimile:
E-mail address: _______________________________
A Limited Liability Company (LLC)
LLC Name:
State in which organized:
By:
(Signature - attach evidence of authority to sign)
Name (typed or printed):
Title:
Business address:
E-mail address: _______________________________
CP Engineers, LLC 000400-5 1007.013
A Joint Venture
First Joint Venturer Name: (SEAL)
By:
(Signature - attach evidence of authority to sign)
Name (typed or printed):
Title:
Business address:
Phone: Facsimile:
E-mail address: _______________________________ Second Joint Venturer Name: (SEAL)
By:
(Signature - attach evidence of authority to sign)
Name (typed or printed):
Title:
Business address:
Phone: Facsimile:
E-mail address: _______________________________
Phone and Facsimile Number, and Address for receipt of official communications to Joint Venture:
(Each joint venturer must sign. The manner of signing for each individual, partnership, corporation, and limited liability company that is a party to the joint venture should be in the manner indicated above.)
000400
CP Engineers, LLC 000400-6 1007.013
CP Engineers, LLC 000490-1 1007.013
Section 000490 Non-Collusion Affidavit
CP Engineers, LLC 000490-2 1007.013
End of Section 000490
CP Engineers, LLC 000520-1 1007.013
Section 000520 Agreement between Owner and General Contractor
This Agreement is by and between ______________________________________ (“Owner”) and _____________________________ (“ General Contractor”).
Terms used in this Agreement have the meanings stated in the General Conditions and the Supplementary Conditions.
Owner and Contractor hereby agree as follows:
ARTICLE 1—WORK
1.01 Contractor shall complete all Work as specified or indicated in the Contract Documents.
The Work is generally described as follows:
• Construction of a Concrete “Slab on Grade” Engineered Building
• Building is 30’0” x 50’0” outside to outside
• Building is designed to have wooden stud walls and trusses
• Three overhead roll up doors
• Metal Panel Roof System
• Interior of the building is to have a normal 12’6” x 20’6” Office/Lab for water testing
• and a single stall restroom
• with supporting systems and, as indicated in the Contract Documents.
ARTICLE 2—THE PROJECT
2.01 The Project, of which the Work under the Contract Documents is a part, is generally described in the following documents:
• The Project Manual for Construction of Water Filtration Building (Engineer’s Project Number 1007.013) dated July 2025.
o The Construction Drawings as listed below:
o G-001 - Title Sheet o C-001 - Existing Features Plan o C-002 - Land Development Plan o M-001 - Standard Construction Details o A1 - Floor Plan o A2 - Building Elevations o A3 - Building Selections o S1 - Foundation Plan o S2 - Roof Framing Plan o S3 - Roof Framing Details o S4 - General Structural Notes
CP Engineers, LLC 000520-2 1007.013 o E-1 - Electrical Site Plan o E-2 - Electrical Single Line Diagram o E-3 – Floor Plans and Schedules o Any addenda as acknowledged in the Bid Documents.
ARTICLE 3—ENGINEER
3.01 The Owner has retained CP Engineers, Architecture, & Environmental Services to act as Owner’s representative, assume all duties and responsibilities of Engineer, and have the rights and authority assigned to Engineer in the Contract.
3.02 The part of the Project that pertains to the Work has been designed by CP Engineers, Architecture, & Environmental Services.
ARTICLE 4—CONTRACT TIMES
4.01 Time is of the Essence
A. All time limits for Milestones, if any, Substantial Completion, and completion and readiness for final payment as stated in the Contract Documents are of the essence of the Contract.
4.02 Contract Times: Dates
A. The Work will be substantially complete on or before June 30, 2026, and completed and ready for final payment in accordance with Paragraph 15.06 of the General Conditions on or before August 15, 2026.
4.03 Liquidated Damages
A. Contractor and Owner recognize that time is of the essence as stated in Paragraph 4.01 above and that Owner will suffer financial and other losses if the Work is not completed and Milestones not achieved within the Contract Times, as duly modified. The parties also recognize the delays, expense, and difficulties involved in proving, in a legal or arbitration proceeding, the actual loss suffered by Owner if the Work is not completed on time. Accordingly, instead of requiring any such proof, Owner and Contractor agree that as liquidated damages for delay (but not as a penalty):
1. Substantial Completion: Contractor shall pay Owner $100.00 for each week that expires after the time (as duly adjusted pursuant to the Contract) specified above for Substantial Completion, until the Work is substantially complete.
2. Completion of Remaining Work: After Substantial Completion, if Contractor shall neglect, refuse, or fail to complete the remaining Work within the Contract Times (as duly adjusted pursuant to the Contract) for completion and readiness for final payment, Contractor shall pay Owner $100.00 for each week that expires after such time until the Work is completed and ready for final payment.
3. Liquidated damages for failing to timely attain Substantial Completion, and Final Completion are not additive, and will not be imposed concurrently.
B. If Owner recovers liquidated damages for a delay in completion by Contractor, then such liquidated damages are Owner’s sole and exclusive remedy for such delay, and
CP Engineers, LLC 000520-3 1007.013
Owner is precluded from recovering any other damages, whether actual, direct, excess, or consequential, for such delay, except for special damages (if any) specified in this Agreement.
ARTICLE 5—CONTRACT PRICE
5.01 Owner shall pay Contractor for completion of the Work in accordance with the Contract Documents, the amounts that follow, subject to adjustment under the Contract:
A. For all Work other than Unit Price Work, a lump sum of $______________ (the Lump
Sum Bid from Article 5 of Section 00400 – Bid Form). All specific cash allowances are included in the above price in accordance with Paragraph 13.02 of the General Conditions.
ARTICLE 6—PAYMENT PROCEDURES
6.01 Submittal and Processing of Payments
A. Contractor shall submit Applications for Payment in accordance with Article 15 of the General Conditions. Applications for Payment will be processed by Engineer as provided in the General Conditions.
6.02 Progress Payments; Retainage
A. Owner shall make progress payments on the basis of Contractor’s Applications for Payment on or about the 20th day of each month during performance of the Work as provided in Paragraph 6.02.A.1 below, provided that such Applications for Payment have been submitted in a timely manner and otherwise meet the requirements of the Contract. All such payments will be measured by the Schedule of Values established as provided in the General Conditions and in the case of Unit Price Work based on the number of units completed or, in the event there is no Schedule of Values, as provided elsewhere in the Contract.
1. Prior to Substantial Completion, progress payments will be made in an amount equal to the percentage indicated below but, in each case, less the aggregate of payments previously made and less such amounts as Owner may withhold, including but not limited to liquidated damages, in accordance with the Contract.
a. 90% percent of the value of the Work completed (with the balance being retainage) as long as less than 50% of the total value of the Work is complete.
b. 95% percent of the value of the Work completed (with the balance being retainage) after 50% of the total value of the Work is complete.
B. Upon Substantial Completion, Owner shall pay an amount sufficient to increase total payments to Contractor to 100% percent of the Work completed, less such amounts set off by Owner pursuant to Paragraph 15.01.E of the General Conditions, and less 150% percent of Engineer’s estimate of the value of Work to be completed or corrected as shown on the punch list of items to be completed or corrected prior to final payment.
6.03 Final Payment
A. Upon final completion and acceptance of the Work, Owner shall pay the remainder of the Contract Price in accordance with Paragraph 15.06 of the General Conditions.
6.04 Consent of Surety
CP Engineers, LLC 000520-4 1007.013
A. Owner will not make final payment, or return or release retainage at Substantial Completion or any other time, unless Contractor submits written consent of the surety to such payment, return, or release.
ARTICLE 7—CONTRACT DOCUMENTS
7.01 Contents
A. The Contract Documents consist of all of the following:
1. This Agreement.
2. Bonds:
a. Performance bond (together with power of attorney).
b. Payment bond (together with power of attorney).
3. General Conditions.
4. Supplementary Conditions.
5. Specifications as listed in the table of contents of the project manual.
6. Drawings (not attached but incorporated by reference) consisting of 13 sheets with each sheet bearing the following general title: Thompsontown Municipal Authority – Water Filtration Building.
8. Addenda numbers ______ to ________, inclusive.
9. The following which may be delivered or issued on or after the Effective Date of the Contract and are not attached hereto:
a. Notice to Proceed.
b. Work Change Directives.
c. Change Orders.
d. Field Orders.
e. Warranty Bond, if any.
B. The Contract Documents listed in Paragraph 7.01.A are attached to this Agreement (except as expressly noted otherwise above).
C. There are no Contract Documents other than those listed above in this Article 7.
D. The Contract Documents may only be amended, modified, or supplemented as provided in the Contract.
ARTICLE 8—REPRESENTATIONS, CERTIFICATIONS, AND STIPULATIONS
8.01 Contractor’s Representations
A. In order to induce Owner to enter into this Contract, Contractor makes the following representations:
1. Contractor has examined and carefully studied the Contract Documents, including
Addenda.
2. Contractor has visited the Site, conducted a thorough visual examination of the
CP Engineers, LLC 000520-5 1007.013
Site and adjacent areas, and become familiar with the general, local, and Site conditions that may affect cost, progress, and performance of the Work.
3. Contractor is familiar with all Laws and Regulations that may affect cost, progress, and performance of the Work.
4. Contractor has considered the information known to Contractor itself; information commonly known to contractors doing business in the locality of the Site;
information and observations obtained from visits to the Site; the Contract Documents; and the Technical Data identified in the Supplementary Conditions or by definition, with respect to the effect of such information, observations, and Technical Data on (a) the cost, progress, and performance of the Work; (b) the means, methods, techniques, sequences, and procedures of construction to be employed by Contractor; and (c) Contractor’s safety precautions and programs.
5. Based on the information and observations referred to in the preceding paragraph, Contractor agrees that no further examinations, investigations, explorations, tests, studies, or data are necessary for the performance of the Work at the Contract Price, within…