3-Addendum 1.pdf

PDF 1 MB Posted

Attached to
Water Filtration Building
Solicitation number
US.194462
Issued by
Lackawanna County, Troxelville CDP, Pennsylvania

View the file

Other files

File Type Posted
4-Addenda No.2.pdf PDF
2-Specs Book TMA Water Filtration Building 7-14-25.pdf PDF
5-Addenda No.3.pdf PDF
1-Project Drawings.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

2013 Sandy Drive, Suite 101 State College, PA 16803

814.753.4249

Sparta, NJ • Parsippany, NJ • State College, PA www.cpengineers.com

ADDENDA No. 1 August 11, 2025

Thompsontown Municipal Authority

Water Filtration Building General Construction Contract

Electrical Construction Contract

Engineer’s Project 1007.013

The following questions were posted on PennBID and responses are provided herein:

1. Question: Will there be a pre-bid meeting?

Answer: No

2. Question: Are the Plumbing and HVAC scopes to be included in the General Contract bid?

Answer: Yes

3. Question: Could you provide an estimate?

Answer: See question 4.

4. Question: Is there an estimated value for the GC contract?

Answer: $150,000 to $200,000 is the Engineer's estimate.

5. Question: 260500 Scope of Work 1.01 B 3 indicates Motor Controllers, Generator, ATS and SCADA are part of the EC Scope. Please confirm none of this is applicable to this project. I do not see any of those items on the drawings.

Answer: Confirmed

6. Question: When is the anticipated notice to proceed and what is the contract duration?

Answer: It is anticipated that NTP will be issued in late August of 2025. Contract to be substantially complete by June 30 of 2026.

Addenda No. 1 TMA – Water Filtration Building

7. Question: Will formal mechanical and plumbing drawings be provided? Or do we need to figure on providing design as well?

Answer: Mechanical and plumbing are both less than the bid threshold and are included as part of the general construction contract.

8. Question: Is there a division of responsibilities per contract listed anywhere? Since items shown on E-Series drawings with schedules for equipment included in that set are part of the GC scope (HVAC/Plumbing Items) it is difficult to delineate where one contracts work starts and the others starts.

Answer: General Contractor is responsible for all work and materials, except the electrical work.

Electrical Contractor is responsible for the work shown in Sheets E-1 through E-3, and specified in both Division 23 and Division 26.

9. Question: Is this project required to solicit bids from DBE/MBE/WBE companies?

Answer: Yes - these requirements apply.

10. Question: 1) Please confirm that Builder's Risk Insurance is the General Contractor's responsibility and that we should include this cost in our bids. 2) Please provide the anticipated notice to proceed and construction start dates. 3) Please confirm that the Building Permit fees are the General Contractor's responsibility and that we should include this cost in our bids.

Answer: 1) Insurance requirements are specified. 2) NTP is anticipated in late August and substantial completion is anticipated as June 30, 2026. 3) Yes.

11. Question: In spec 024100 paragraph 1.02 A mentions demo of an existing fire hydrant. I did not see that on the drawing where is it located and what is the extent of work involved with removing this? Please clarify.

Answer: No existing hydrant will require demo. This will be changed in a forthcoming addendum.

12. Question: 1) Is there any geo reports available for this site? 2) Is this classified or unclassified excavation? 3) If it is unclassified excavation please confirm we are only responsible for excavation to design depths. 4) Can you provide the cad files for the site?

Answer: 1) There are no geotech reports for this site. 2) This will be unclassified excavation. 4) Drawings have been provided.

13. Question: Will any paving patch be required where the water line for the build gets connected to the street? If so please provide a spec and details of what is required.

Answer: A forthcoming addendum will be issued.

14. Question: Can the municipal park behind the job site be used for parking and unloading of material?

Answer: Please see forthcoming addendum.

15. Question: Please confirm that the EC owns their own excavation, trenching and backfilling.

Answer: Confirmed.

16. Question: Can you provide a erosion and sediment plan to show where protections are required.

Answer: Contractor to comply with E&S measures shown on the drawings.

17. Question: Spec 033000 paragraph 3.08 A states the garage bay is to receive an epoxy floor. Can you please provide a spec so we know what product and thickness to provide.

Answer: Paragraph 3.08A to be removed via addenda.

18. Question: Spec 074010 call for vinyl soffit panels. Spec 074113 call for metal soffit panels. Which spec is correct?

Answer: Either would be acceptable.

19. Question: Drawing S4 Paragraph B, 1.d mentions over excavation being required. Please confirm if over excavation of foundations is required. If so what is the amount of over excavation that needs done?

Answer: There will not be any required over-excavation within this Project.

20. Question: 1) Can you please provide a detail and spec for the case work called out on drawing A1 office per note 24 so we know what to provide.

Answer: The only requirements for the casework within this project have been identified on the Drawings, within the Notes, on Sheet A1.

21. Question: 1) Is the window and door casing being stained or painted? 2) Are wood window sills required? 3) Is the wood base molding called for in spec 062000 only used in the office and the bathroom?

Answer: The window and door casing will be painted. Wooden window sills are not required.

Yes, the wood base molding referenced in Spec. Section 062000 will only be used within the office and the bathroom.

22. Question: 1) Spec 081113 is calling for hollow metal doors and frames. Drawing A1 is calling for reinforce plastic doors in aluminum frames and hollow core wood doors on pre-hung frames.

Which is correct? If the drawing is correct please provide a spec so we know what to provide. 2) Please provide a door hardware spec.

Answer: Drawing A1 is correct. Reinforced plastic doors within aluminum frames, and hollow core wood doors on pre-hung frames will be required. For exterior door(s), provide Kwik-Set nickel exterior entry door knob, with single cylinder deadbolt combination. For interior door(s), provide matching Kwik-Set nickel entry door knob, without neither integral lock cylinder, nor deadbolt lock. Provide two (2) key sets for each exterior lock combination. Specifications to be updated with forthcoming addenda.

23. Question: Is Division 23 in the General Contract?

Answer: This will be in the electrical contract.

24. Question: Can you provide a spec for the toilet accessories and toilet compartments so we now what to provide?

Answer: See Specification Section 224000, Part 2 - Products, under "Water Closet".

25. Question: Can you provide a spec for the spray foam insulation called out on note 15 drawing A1? So we know what type of foam to use.

Answer: The only requirements for the spray foam insulation within this project have been identified on the Drawings, within the Notes, on Sheet A1.

26. Question: 1) Can you provide a spec for the acoustical ceilings and grid? 2) Can you provide a reflective ceiling plan.

Answer: See Note 16, on Sheet A3, for General Contractor required-work. See Sheet E-3, for lighting plan in garage bays.

DRAWING REVISIONS

No drawing revisions as part of this Addendum.

SPECIFICATION REVISIONS

1) In Section 00 01 30 – INVITATION TO BID shall be revised as follows:

Sealed bids must be submitted electronically via the PennBid portal at https://pennbid.bonfirehub.com until 1:00 p.m., local prevailing time, on Wednesday, September 3rd. The bids will be opened publicly and read aloud at 1:15 p.m., local prevailing time, on the same day.

2) Add Section 00 73 39 – DBE Requirements (attached) in its entirety to the Project Manual

3) Add Section 00 80 50 – Pennsylvania Requirements (attached) in its entirety to the Project

Manual.

4) Specification Section 02 41 00, Paragraph 1.02A should be removed in its entirety.

5) Specification Section 03 30 00, Paragraph 3.08A should be removed in its entirety.

END OF ADDENDA

CP Engineers, LLC 007339 - 1 1007.013

SECTION 00 73 39— DISADVANTAGED BUSINESS ENTERPRISE REQUIREMENTS

PART 1 - GENERAL

1.1 SECTION INCLUDES

A. Duties and requirements of Contractor under federal Executive Orders 11246, 11625, 12138 and 12432 and EPA Regulations at 40 CFR Part 33, through the detailed documentation of solicitation of Disadvantage Business Enterprises (DBEs).

B. Duties and requirements of Contractor to meet Minority or Women Owned Business

Enterprises (MBE/WBE).

1.2 RELATED SECTIONS

A. Section 00 72 00 — General Conditions

1.3 MINORITY/WOMEN'S BUSINESS ENTERPRISE

A. PARTICIPATION LEVEL

1. The OWNER has established minimum participation levels (MPLs) of five percent

(5%) for minority and three percent (3%) for women business enterprises (MBE/WBE) for this Project.

2. These goals serve as a threshold in determining bidder responsibility. A bidder will not be rejected as not responsible solely because he/she fails to reach the MPLs, so long as it can demonstrate its efforts. To determine the participation level which has been reached, a bidder may divide the total dollar amount of the commitments by the total dollar amount of the bidder’s bid.

3. A firm which is both an MBE and a WBE will only receive credit toward MPLs as either an MBE or a WBE, but not both. Bidders must indicate on the MBE/WBE Contract Solicitation and Commitment Statement whether the firm is being listed as either an MBE or a WBE.

4. An MBE/WBE firm who is the prime bidder on a project will receive no credit toward the goal for its own work effort. MBE/WBE businesses bidding as a prime contractor must solicit other certified MBEs/WBEs participation for material and/or supplies.

5. MBE/WBE subcontractors must perform at least 75 percent of the cost of the subcontract, not including the cost of materials, with its own employees.

B. RESPONSIVENESS

1. Bidders must complete and submit a MBE/WBE Contract Solicitation and Commitment Statement with the bid. Failure to submit this form with the bid may result in the bid being rejected as non-responsive.

2. A bidder should only solicit MBE/WBE subcontractors, vendors, manufacturers, or suppliers whose services, material, or supplies are within the scope of Work and which the bidder reasonably believes it will choose to subcontract with or purchase from.

3. Bidders failing to meet the minimum levels of participation may be required to provide an explanation of why the MPLs have not been met. This explanation

CP Engineers, LLC 007339 - 2 1007.013 must demonstrate that the bidder has not engaged in discriminatory practices in solicitation and utilization of MBEs/WBEs to perform as subcontractors or suppliers of goods and services related to the performance of the contract. The evidence submitted by the bidder must demonstrate the following:

a. Indicate whether MBEs/WBEs were solicited for each type of Work the bidder expects to subcontract for and for all materials which the bidder expects to procure and, if not, the reason(s) why no such solicitation was made;

b. Indicate the reason why an MBE/WBE has not been committed for a type of subcontract Work or materials in any area where a quote was received from an MBE/WBE, and;

c. In any case where no quotations are received or commitments made to MBE or WBE firms, indicate on the MBE/WBE Contract Solicitation and Commitment Statement form that no quotes were received, and if there is another reason for no commitments being made, the reason for the lack of commitments.

4. If the bidder fails to submit such evidence, the bid submission may be considered non responsive and the bid rejected.

5. Information related to the above may be submitted on the Minority/Women Business Contract Solicitation and Commitment Statement form or on additional paper.

C. RESPONSIBILITY

1. The submittals of each bidder are subject to review to determine whether the bidder has discriminated in the selection of manufacturers, subcontractors and suppliers. If a bidder has met the MPLs for MBE/WBE participation, the bidder will be presumed not to have discriminated in their selections. Where the MPLs are not met, the OWNER will determine whether discrimination has occurred. If, after investigation, including a review of the MBE/WBE Contract Solicitation and Commitment Statement, it is found that discrimination has occurred, the reviewed bidder may be deemed to be not responsible and the bid may be rejected.

2. Documentation submitted and certified (Minority and Women Business Enterprise Bidder Certification) by the bidder should meet the following standards for review:

a. The bidder whose actions resulted in limited or no commitment to

MBEs/WBEs was not motivated by consideration of race or gender;

b. MBEs/WBEs were not treated less favorably than other businesses in the contract solicitation and commitment process; and

c. Solicitation and commitment decisions were not based upon policies which disparately affect MBEs/WBEs.

3. Commitments to MBE and WBE firms made at the time of bidding must be maintained throughout the term of the contract, unless a change in commitment to these firms is preapproved by the OWNER or the administering agency performing the evaluation of the Invitation for Bid.

D. ACCESS TO INFORMATION

1. OWNER may obtain documents and information from any bidder, contractor, subcontractor, supplier, or manufacturer that may be required in order to

CP Engineers, LLC 007339 - 3 1007.013 ascertain bidder or contractor responsibility. Failure to provide requested information may result in the contractor being declared not responsible.

E. MBE/WBE CERTIFICATION

1. Under the State Act of December 21, 1984, No. 230, P.L. 210, 18 PA. C.S.A. § 4107.2, a person commits a felony of the third degree if, in the course of business, he/she engages in deception relating to MBE/WBE certification. Only certified MBE’s and WBE’s will be reported on this project. The Pennsylvania Department of General Services (DGS) requires MBEs and WBEs to be certified by a third party in order to be on the DGS listing of Small Diverse Businesses.

F. RECORDKEEPING AND REPORTING

1. The contractor will keep such records as are necessary to determine compliance with his/her minority and women business enterprise commitments. These records must be in sufficient detail to indicate the number of minority and women businesses, the contract Work performed, and the percentage of minority and women businesses performing Work. Additionally, the contractor is required to maintain an open file for a specified period, during which time the OWNER may make periodic reviews of records pertaining to relevant contracts.

2. The prime contractor must provide the OWNER with a report of MBE/WBE subcontracting activity on a per project basis. The report shall reflect the names of and the total dollar amount paid to all MBE/WBE subcontractors (including suppliers) utilized under this contract.

1.4 NOTICE OF REQUIREMENTS FOR AFFIRMATIVE ACTION TO ENSURE EQUAL EMPLOYMENT

OPPORTUNITY (EXECUTIVE ORDER 11246):

A. The offeror's or bidder’s attention is called to the "Equal Employment Opportunity

Clause" and the "Standard Federal Equal Employment Opportunity Construction Contract Specifications" set forth therein.

B. The goals and timetables for minority and female participation, expressed in percentage terms for the CONTRACTOR’s aggregate workforce in each trade on all construction Work in the covered area, are as follows:

1. The goal for MBE Participation of Each Trade is 5%

The goal for WBE Participation of Each Trade is 3%

2. These goals are applicable to all the CONTRACTOR’s construction Work (whether or not it is federal or federally-assisted) performed in the covered area.

C. The CONTRACTOR’s compliance with the Executive Order and the regulations in 41 CFR Part 60 4 shall be based on its implementation of the Equal Employment Opportunity Clause, specific affirmative action obligations required by the specifications set forth in 41 CFR Part 60 4, paragraph 3(a), and its efforts to meet the goals established for the geographical area where the contract resulting from this solicitation is to be performed.

The hours of minority and female employment and training must be substantially uniform throughout the length of the contract, and in each trade, and the CONTRACTOR shall make a good faith effort to employ minorities and women evenly on each of its

CP Engineers, LLC 007339 - 4 1007.013 projects. The transfer of minority or female employees or trainees from contractor to contractor or from project to project for the sole purpose of meeting the CONTRACTOR’s goals shall be a violation of the contract, the Executive Order and the regulations in 41 CFR Part 60 4. Compliance with the goals will be measured against the total work hours performed.

D. The CONTRACTOR shall provide written notification to the Director of the Office of

Federal Contract Compliance Programs within ten (10) working days of award of any construction subcontract in excess of ten thousand ($10,000) dollars at any tier of construction Work under the contract resulting from this solicitation. The notification shall list the name, address, and telephone number of the subcontractor; employer identification number, estimated dollar amount of the subcontract; estimated starting and completion dates of the subcontract; and the geographical area in which the contract is to be performed.

E. As used in this Notice, and in the contract resulting from this solicitation, the "covered area" is the County in which the Work is undertaken.

1.5 STANDARD FEDERAL EQUAL EMPLOYMENT OPPORTUNITY CONSTRUCTION CONTRACT

SPECIFICATIONS (EXECUTIVE ORDER 11246)

A. As used in these specifications:

1. "Covered area" means the geographical area described in the solicitation from which this contract resulted;

2. "Director" means Director, Office of Federal Contract Compliance Program, United States Department of Labor, or any person to whom the Director delegates authority; and

3. "Employer Identification Number" means the Federal Social Security Number used on the Employer's Quarterly Federal Tax Return, U.S. Treasury Department Form 941.

4. "Minority" includes:

a. Black (all persons having origins in any of the Black African racial groups not of Hispanic origin);

b. Hispanic (all persons of Mexican, Puerto Rican, Cuban, Central or South

American or other Spanish Culture or origin, regardless of race);

c. Asian and Pacific Islander (all persons having origins in any of the original peoples of the Far East, Southeast Asia, and the Indian Subcontinent, or the Pacific Islands); and

d. American Indian or Alaskan Native (all persons having origins in any of the original peoples of North America and maintaining identifiable affiliations through membership and participation or community identification).

B. Whenever the CONTRACTOR, or any subcontractor at any tier, subcontracts a portion of the Work involving any construction trade, it shall physically include in each subcontract in excess of ten thousand ($10,000) dollars the provisions of these specifications, and the Notice which contains the applicable goals for minority and female participation and which is set forth in the solicitations from which this contract resulted.

CP Engineers, LLC 007339 - 5 1007.013

c. If the CONTRACTOR is participating (pursuant to 41 CFR Part 60 4.5) in a Hometown Plan approved by the U.S. Department of Labor in the covered area either individually or through an association, its affirmative action obligations on all Work in the Plan area (including goals and timetables) shall be in accordance with that Plan for those trades which have unions participating in the Plan. CONTRACTORS must be able to demonstrate their participation in and compliance with the provisions of any such Hometown Plan. Each contractor or subcontractor participating in an approved Plan is individually required to comply with its obligations under the Equal Employment Opportunity Clause, and to make a good faith effort to achieve each goal under the Plan in each trade in which it has employees. The overall good faith performance by other contractors or subcontractors toward a goal in an approved Plan does not excuse any covered contractor’s or subcontractor’s failure to take good faith efforts to achieve the Plan goals and timetables.

D. The CONTRACTOR shall implement the specific affirmative action standards provided in

Section G (below) of these specifications. The goals set forth in the solicitation from which this contract resulted are expressed as percentages of the total hours of employment and training of minority and female utilization that the CONTRACTOR should reasonably be able to achieve in each construction trade in which it has employees in the covered area. The CONTRACTOR is expected to make substantially uniform progress toward its goals in each craft during the period specified.

E. Neither the provisions of any collective bargaining agreement, nor the failure by a union with whom the CONTRACTOR has a collective bargaining agreement, to refer either minorities or women shall excuse the CONTRACTOR’s obligations under these specifications, Executive Order 11246, or the regulations promulgated pursuant thereto.

F. In order for the nonworking training hours of apprentices and trainees to be counted in meeting the goals, such apprentices and trainees must be employed by the CONTRACTOR during the training period, and the CONTRACTOR must have made a commitment to employ the apprentices and trainees at the completion of their training, subject to the availability of employment opportunities. Trainees must be trained pursuant to training programs approved by the U.S. Department of Labor.

G. The CONTRACTOR shall take specific affirmative actions to ensure equal employment opportunity. The evaluation of the CONTRACTOR’s compliance with these specifications shall be based upon its effort to achieve maximum results from its actions. The CONTRACTOR shall document these efforts fully, and shall implement affirmative action steps at least as extensive as the following:

1. Ensure and maintain a working environment free of harassment, intimidation, and coercion at all sites, and in all facilities at which the CONTRACTOR’s employees are assigned to work. The CONTRACTOR where possible, will assign two or more women to each construction project. The CONTRACTOR shall specifically ensure that all foremen, superintendents, and other on site supervisory personnel are aware of and carry out the CONTRACTOR’s obligation to maintain such a working environment, with specific attention to minority or female individuals working at such sites or in such facilities.

2. Establish and maintain a current list of minority and female recruitment sources, provide written notification to minority and female recruitment sources and to

CP Engineers, LLC 007339 - 6 1007.013 community organizations when the CONTRACTOR or its unions have employment opportunities available, and maintain a record of the organizations’ responses.

3. Maintain a current file of names, addresses, and telephone numbers of each minority and female off street applicant and minority or female referral from a union, a recruitment source or community organization and of what action was taken with respect to each such individual. If such individual was sent to the union hiring hall for referral and was not referred back to the CONTRACTOR by the union or, if referred, not employed by the CONTRACTOR, this shall be documented in the file with the reason therefore, along with whatever additional actions the CONTRACTOR may have taken.

4. Provide immediate written notification to the Director when the union or unions with which the CONTRACTOR has a collective bargaining agreement has not referred to the CONTRACTOR a minority person or woman sent by the CONTRACTOR, or when the CONTRACTOR has other information that the union referral process has impeded the CONTRACTOR’s efforts to meet his/her obligations.

5. Develop on the job training opportunities and/or participate in training programs for the area which expressly include minorities and women, including upgrading programs and apprenticeship and trainee programs relevant to the CONTRACTOR’s employment needs, especially those programs funded or approved by the Department of Labor. The CONTRACTOR shall provide notice of these programs to the sources compiled under 2) above.

6. Disseminate the CONTRACTOR’s EEO policy by providing notice of the policy to unions and training programs and requesting their cooperation in assisting the CONTRACTOR in meeting its EEO obligations; by including it in any policy manual and collective bargaining agreement; by publicizing it in the company newspaper, annual report, etc.; by specific review of the policy with all management personnel and with all minority and female employees at least once a year; and by posting the company EEO policy on bulletin boards accessible to all employees at each location where construction work is performed.

7. Review, at least annually, the company’s EEO policy and affirmative action obligations under these specifications with all employees having any responsibility for hiring, assignment, layoff, termination, or other employment decisions including specific review of these items with on site supervisory personnel such as Superintendents, General Foremen, etc., prior to the initiation of construction Work at any job site. A written record shall be made and maintained identifying the time and place of these meetings, persons attending, subject matter discussed, and in disposition of the subject matter.

8. Disseminate the CONTRACTOR’s EEO policy externally by including it in any advertising in the news media, specifically including minority and female news media, and providing written notification to and discussing the CONTRACTOR’s EEO policy with other contractors and subcontractors with whom the CONTRACTOR does or anticipates doing business.

9. Direct its recruitment efforts, both oral and written, to minority, female and community organizations, to schools with minority and female students and to minority and female recruitment and training organizations serving the CONTRACTOR’s recruitment area and employment needs. Not later than one

CP Engineers, LLC 007339 - 7 1007.013

(1) month prior to the date for the acceptance of applications for apprenticeship or other training by any recruitment sources, the CONTRACTOR shall send written notification to organizations such as the above, describing the openings, screening procedures, and tests to be used in the selection process.

10. Encourage present minority and female employees to recruit other minority persons and women, and where reasonable, provide after school, summer and vacation employment to minority and female youth both on the site and in other areas of a contractor’s workforce.

11. Validate all tests and other selection requirements where there is an obligation to do so under 41 CFR Part 60 3.

12. Conduct, at least annually, an inventory and evaluation at least of all minority and female personnel for promotional opportunities and encourage these employees to seek or to prepare for, through appropriate training, etc., such opportunities.

13. Ensure that seniority practices, job classifications, work assignments and other personnel practices, do not have a discriminatory effect by continually monitoring all personnel and employment related activities to ensure that the EEO policy and the CONTRACTOR’s obligations under these specifications are being carried out.

14. Ensure that all facilities and company activities are non-segregated except that separate or single user toilets and necessary changing facilities shall be provided to assure privacy between the sexes.

15. Document and maintain a record of all solicitation of offers for subcontracts from minority and female construction contractors and suppliers, including circulation of solicitations to minority and female contractor associations and other business associations.

16. Conduct a review, at least annually, of all supervisors' adherence to and performance under the CONTRACTOR’s EEO policies and affirmative action obligations.

H. Contractors are encouraged to participate in voluntary associations which assist in fulfilling one or more of their affirmative action obligations 3.4.7 (1 through 16). The efforts of a contractor association, joint contractor union, contractor community, or other similar group of which the CONTRACTOR is a member and participant, may be asserted as fulfilling any one or more of its obligations under 3.4.7 (1 through 16) of these specifications provided that the contractor actively participates in the group, makes every effort to assure that the group has a positive impact on the employment of minorities and women in the industry, ensures that the concrete benefits of the program are reflected in the CONTRACTOR’s minority and female workforce participation, makes a good faith effort to meet its individual goals and timetables, and can provide access to documentation which demonstrates the effectiveness of actions taken on behalf of the CONTRACTOR The obligation to comply, however, is the CONTRACTOR’s and failure of such a group to fulfill an obligation shall not be a defense for the CONTRACTOR’s noncompliance.

1. A single goal for minorities and a separate single goal for women have been established.

The CONTRACTOR, however, is required to provide equal employment opportunity and to take affirmative action for all minority groups, both male and female, and all women, both minority and non-minority. Consequently, the CONTRACTOR may be in violation of

CP Engineers, LLC 007339 - 8 1007.013 the Executive Order if a particular group is employed in a substantially disparate manner (for example, even though the CONTRACTOR has achieved its goals for women generally, the CONTRACTOR may be in violation of the Executive Order if a specific minority group of women is underutilized).

J. The CONTRACTOR shall not use the goals and timetables or affirmative action standards to discriminate against any person because of race, color, religion, sex, sexual orientation, gender identity, or national origin.

K. The CONTRACTOR shall not enter into any subcontract with any person or firm debarred from Government contracts pursuant to Executive Order 11246.

L. The CONTRACTOR shall carry out such sanctions and penalties for violation of these specifications and of the Equal Employment Opportunity Clause, including suspension, termination, and cancellation of existing subcontracts as may be imposed or ordered pursuant to Executive Order 11246 as amended, and its implementing regulations by the Office of Federal Contract Compliance Programs. Any contractor who fails to carry out such sanctions and penalties shall be in violation of these specifications and Executive Order 11246 as amended.

M. The CONTRACTOR, in fulfilling his/her obligations under these specifications, shall implement specific affirmative action steps, so as to achieve maximum results from its efforts to ensure equal employment opportunity. If the CONTRACTOR fails to comply with the requirements of the Executive Order, the implementing regulations, or these specifications, the Director shall proceed in accordance with 41 CFR Part 60 4 8.

N. The CONTRACTOR shall designate a responsible official to monitor all employment related activity to ensure that the company’s Equal Employment Opportunity policy is being carried out, to submit reports relating to the provisions hereof as may be required by the Government and to keep records. Records shall at least include for each employee the name, address, telephone numbers, construction trade, union affiliation, if any, employee identification number when assigned, social security number, race, sex, status (e.g., mechanic, apprentice, trainee, helper, or laborer), dates of changes in status, hours worked per week in the indicated trade, rate of pay, and locations at which the Work was performed. Records shall be maintained in an easily understandable and retrievable form; however, to the degree that existing records satisfy this requirement, contractors shall not be required to maintain separate records.

0. Nothing herein provided shall be construed as a limitation upon the application of other laws which establish different standards of compliance or upon the application or requirements for the hiring of local or other area residents (e.g., those under the Public Works Employment Act of 1977 and the Community Development Block Grant Program).

1.6 PENNSYLVANIA DEPARTMENT OF GENERAL SERVICES MBE/WBE CERTIFICATION

A. On August 31, 2012, the Pennsylvania Department of General Services (DGS) terminated its role in certifying Minority Business Enterprises (MBEs) and Women’s Business Enterprises (WBEs) (Small Diverse Businesses). As such, DGS requires new MBEs and

CP Engineers, LLC 007339 - 9 1007.013

WBEs to be certified by a third party, after which DGS maintains a listing of certified Small Diverse Businesses. MBEs and WBEs certified and listed by DGS before the August 31, 2012, deadline were permitted to “self-certify” during a grace period extending to December 31, 2012. This “self-certification” allowed these MBEs and WBEs up to 12 months from the date of self-certification to obtain a third party certification, submit it to DGS, and continue to be placed on the DGS list. Due to the expiration of this 12 month period, any “self-certified” MBEs and WBEs must have completed the previously specified protocol to be reported as an MBE or WBE on this project.

1.7 DUTIES AND REQUIREMENTS

A. This Project is being funded by state and federal sources. Contractor must comply with all funding requirements as described in the Project Manual, and submit all required documentation of compliance. In all cases, the most stringent requirements shall apply.

The Contractor must submit the following to the Engineer during the course of construction:

1. Pennsylvania Department of Environmental Protection “Disadvantaged Business Enterprise (DBE) Firm Utilization Report Form” Form 3800-FM-WSFR0141.

2. Due every April 1stt and October 1S t from time of Contract Award through Final Inspection.

B. Contractor must provide the Non-Collusion Affidavit (Section 00 45 19) to Subcontractors.

C. Contractor is required to pay Subcontractors for satisfactory performance no more than

30 days from the Contractor’s receipt of payment from the Owner.

D. Contractor shall notify the Owner in writing prior to the termination of a DBE Subcontractor for convenience by the Contractor.

E. If the Contractor utilizes a DBE Subcontractor and the DBE Subcontractor fails to complete the Work under the Subcontractors for any reason, the Contractor shall use the Six Good Faith Efforts when soliciting a replacement Subcontractor.

F. A Contractor is required to use the Six Good Faith Efforts when soliciting for

Subcontractors even if the Contractor has achieved its fair share objectives.

End of Section

CP Engineers, LLC 008050-1 1007.013

SECTION 008050

PENNSYLVANIA REQUIREMENTS

The Contractor shall comply with all federal, state and local laws including but not limited to the following:

PENNSYLVANIA HUMAN RELATIONS PROVISIONS

Pursuant to the provisions of Act 222 October 27, 1955, as amended by Act 19, February 28, 1961 and in accordance with the provisions of the Governor’s Code of Fair Practice, effective June 6, 1963, and the Contract Compliance Regulations of the Pennsylvania Human Relations Commission, 16 PA. Code Ch. 49, the Contract Documents for all public works projects will contain the following:

A. Non-Discrimination Clause- During the term of this Contract, Contractor agrees as follows;

(1) Contractor shall not discriminate against any employee, applicant for employment, independent contractor or any other person because of race, color, religious creed, ancestry, national origin, age or sex.

Contractor shall take affirmative action to ensure that applicants are employed, and that employees or agents are treated during employment without regard to their race, color, religious creed, ancestry, national origin, age or sex. Such affirmative action shall include, but is not limited to the following: employment, upgrading, demotion, or transfer; requirement or recruitment advertising;

layout or termination; rates of pay or other forms of compensation; and selection for training.

Contract shall post in conspicuous places, available to employees, agents, applicants for employment and other persons, a notice to be provided by the contracting agency setting forth the provision of this non-discrimination clause.

(2) Contract shall in advertisements or requests for employment placed by it or in its behalf state all qualified applications will receive consideration for employment without regard to race, color, religious creed, ancestry, national origin, age or sex.

(3) Contract shall send each labor union or worker’s representative with which it has a collective bargaining agreement or other contract or understanding, a notice advising said labor union or worker’s representative of its commitment to this non-discrimination clause. Similar notice shall be sent to every other source of recruitment regularly utilized by Contractor.

(4) It shall be no defense to a finding of noncompliance with the Contract Compliance

Regulations issued by the Pennsylvania Human Relations Commission or this

CP Engineers, LLC 008050-2 1007.013

Non-Discrimination Clause that Contractor had delegated some of its employment practices to any union, training program or other source of recruitment which prevents it from meeting its obligation, However, if the evidence indicated that the contractor was not on notice of the third party discrimination or made a good faith effort to correct it, such factor shall be considered in mitigation in determine appropriate sanctions.

(5) Where the practices of a union or of any training program or other source of recruitment will result in the exclusion of minority group persons, so that Contract will be unable to meet its obligations under the Contract Compliance Regulations issued by the Pennsylvania Human Relations Commission, or this Non- Discrimination Clause, Contractor shall then employ and fill vacancies through other non-discriminatory employment procedures.

(6) Contractor shall comply with the Contract Compliance Regulations of Pennsylvania

Human Relations Commission, 16 PA Code Chapter 49 and with all laws prohibiting discrimination in hiring or employment opportunities, IN the event of Contractor’s noncompliance with the Non- Discrimination Clause of this Contract or with any such laws, the Contract may, after hearing and adju8dication, be terminated or suspended, in whole or in part, and Contractor may be declared temporarily ineligible for further Commonwealth contracts, and such other sanctions may be imposed and remedies involved as provided by the Contract Compliance Regulations.

(7) Contractor shall furnish all necessary employment documents and records to, and permit access to its books, records and accounts by, the Contracting Agency and the Human Relations Commission, for purposes of investigation to ascertain compliance with the provisions of the Contract Compliance Regulations pursuant to 49.35 of these regulations, If Contractor does not possess documents or records reflecting the necessary information requested, it shall furnish such information on reporting forms supplied by the Contracting Agency or the Commission.

(8) Contractor shall actively recruit minority subcontractors or subcontractors with substantial minority representation among their employees.

(9) Contractor shall include the provisions of this Non-Discrimination Clause in every subcontract so that such provisions will be binding upon each subcontractor.

(10) The terms used in this Non-Discrimination Clause shall have the same meaning as in the Contract Compliance Regulations issued by the Pennsylvania Human Relations Commission, 16 PA Code Chapter 49.

(11) Contract obligations under this clause are limited to the Contractor’s facilities within

Pennsylvania, or, where the Contract is for purchase of goods manufactured outside of Pennsylvania, the facilities at which such goods are actually produced.

CP Engineers, LLC 008050-3 1007.013

B. It is hereby agreed that the failure to comply with the foregoing requirements shall constitute a substantial breach of this Contract.

SEDIMENT AND EROSION CONTROL

The Contractor shall comply with all provisions of the Pennsylvania Clean Streams Law (Title 35, Ch. S) Specific attention is directed to requirements regarding Sediment and Erosion Control.

The contractor shall exercise extreme care when working near existing streams, He shall prevent silt and other degrading or pollutant agents from entering streams and shall be responsible for maintaining water conditions in accordance with rules and regulations of the Commonwealth of Pennsylvania and in accordance with provisions set forth in the Anti-Pollution Measure Section of these Specifications.

In addition, the Contractor shall conform to the following:

1. Perform all earth-moving activities in compliance with the Sedimentation and Erosion Control Plan furnished by the Engineer prior to construction.

2. Reduce by the maximum extent practicable, the area and duration of exposing readily erodible soils.

3. Protect the soil by use of temporary vegetation, or seeding and mulch or by acceleration the establishment of permanent vegetation, Complete and protect segments of work as rapidly as is consistent with construction schedules.

4. Retard the rate of runoff from the construction site and control the disposal of runoff.

5. Trap sediment resulting from construction in temporary or permanent silt holding basins. This includes pumps discharges resulting from the dewatering operations.

6. Sprinkling or applying dust suppressors to keep dust within tolerable limits on haul road and at the site.

7. Use temporary bridges or culverts where fording streams is objectionable. Borrow areas should be located where pollution from the operation can be minimized. Location should be avoided where pollution would be inevitable.

8. Should construction operations be suspended for any appreciable length of time, temporary measures for the control of erosion must be utilized.

9. Provisions shall be made for protection against discharge of pollutants such as chemicals, fuels lubricants, sewage, etc. into the stream.

CP Engineers, LLC 008050-4 1007.013

10. The location of sanitary facilities over or adjacent to streams, wells or springs is prohibited.

11. All operations should be conducted in such a manner to minimize turbidity in the stream at and below the site of the structure. Contractor shall meet the requirements on turbidity as established by the Sanitary Water Board, Department of Environmental Resources.

PROTECTION OF EXISTING UTILITIES (ACT 199 COMPLIANCE)

1. The Contractor shall take all precautions and utilize all facilities required to protect existing utilities and structures. IN compliance with Act 1991-38 of the General Assembly of Pennsylvania, the Contractor shall advise each utility company at least 3 working days, but no more than 10 working days, in advance of intent to excavate, do demolition work or use explosives and give the location of the job site. The Contractor shall request cooperative steps of the utility company and suggestions for procedures to avoid damage to its lines.

2. The Contractor shall advise each person in physical control of powered equipment or explosives used in excavations or demolition work of the type and location of utility lines at the job site, the utility company assistance to expect and procedures to follow to prevent damage.

3. The Contractor shall immediately report any break, leak or other damage to the lines or protective coatings made or discovered during the work to the utility company and the Engineer and shall immediately alert the occupants of premises of any emergency created or discovered.

4. The contractor shall allow free access to utility company personnel at all times for purposed of maintenance, repair and inspection.

STEEL PRODUCTS PROCUREMENT ACT

The Contractor’s attention is directed to the provisions of Title 73, Section 1881 et. seq. enacted by the General Assembly of the Commonwealth of Pennsylvania and approved by the Governor on March 3, 1978, which specified that if any products are to be used or supplied in the performance of the Contract, only steel products produced in the United States shall be used in the performance of the Contract or any subcontract.

When unidentified steel products are supplied under a contract, before any payment will be made, the Contractor must provide documentation including, but not limited to invoices, bills of lading, and mill certification that the steel was melted and manufactured in the United States. If a steel product is identifiable from its face, the Contractor must submit certification which satisfies the Owner that the Contractor has fully complied with this

CP Engineers, LLC 008050-5 1007.013 provision, The owner shall not provide for or make any payments to any person who has not complied with the Steel products procurement Act (hereinafter referred to as the “SPPA”) Any such payments made to any person by the Owner which should not have been made as a result of the SPPA shall be recoverable directly from the Contractor, subcontractor, manufacturer, or supplier who did not comply with the SPPA.

In addition to the withholding of payments, any person who willfully violates any of the provisions of the SPPA shall be prohibited from submitting any bids to any public agency for a period of five years from the date of the determination that a violation has occurred. In the event the person whole violates the provisions of the SPPA is a subcontractor, manufacturer, or supplier, such person shall be prohibited from performing any work for, or supply any materials to, a public agency for a period of five years from the date of the determination that a violation has occurred.

The provisions of this act shall not be considered as waived under any circumstances unless the head of the public agency has determined, under authority granted in Section 4 (B) of the Act, that a certain steel product or products are not produced in the United States in sufficient quantities to meet the requirements of the Contract. Such a determination will be set forth in the proposals or in an addendum to the proposal.

Steel products are defined as a products rolled, formed, shaped, drawn, extruded, forged, cast, fabricated or otherwise similarly processed or processed by a combination of two or more of such operations from steel made in the United States by the open-hearth, basic oxygen, electric furnace, Bessemer or other steel making process and shall include cast iron products and shall include machinery and equipment listed in the United States Department of Commerce Standard Industrial “Classification 25 (furniture and fixtures), 35 (machinery, except electrical )and 37 (transportation equipment) and made of fabricated from or containing steel components. If a product contains both foreign and United States steel, such product shall be determined to be a United States steel product only if at least 75% of the cost of the articles, materials and supplies have been mined, produced or manufactured, as the case may be, in the United States. Transportation equipment shall be determined to be a United States steel product if it complies with section 165 Public Law 97-424 (96 Stat.

2136).

ANTI-POLLUTION MEASURES

Act No. 247 of the General Assembly of Pennsylvania, effective November 25, 1972 requires that the Owner advise bidders on Public Works Construction Contracts of the federal and state statues, rules and regulations dealing with the protection of environmental pollution and the preservation of public natural resources that apply to the project on which bids are being received.

The Bidder shall thoroughly acquaint himself with the terms of the statues, rules and regulations enumerated in this special supplement and shall include in the Bid all costs of complying with the terms of the listed statues, rules and regulations. No separate or additional payment will be made for such compliance.

CP Engineers, LLC 008050-6 1007.013

The Bidder shall determine what, if any, local ordinances, codes and regulations apply to his work, He shall comply with all such ordinances, codes and regulations.

All those submitting bids agree that if award a contract to construction all or any part of the project, they will undertake additional work which may be required by the enactment of new or the amendment of existing statues, rules or regulations occurring after submission of the Bid, and pertaining to the prevention of environmental pollution and the preservation of public natural resources.

If additional work is required by the enactment of new or the amendment of existing statues, rules or regulations, the Owner is authorized to issue a Change Order setting forth the additional work that must be undertaken and such Change Order shall not invalidate the previously awarded contract. The Owner reserves the right to contract with another party with regard to the additional work required by the enactment of new or the amendment of existing statues, rules and regulations occurring after the submission of the bids.

TRADE PRACTICES ACT

In ACCORDANCE WITH THE Trade Practices Act of July 23, 1968, P.L. 686 (71 P.S. Section 773.101 et seq.) the Contractor cannot and shall not use or permit to be used in the work any aluminum or steel products made in a foreign country which is listed below as a foreign country which discriminates against aluminum or steel products manufactured in Pennsylvania.

The countries of Argentine, Brazil, South Korea, and Span shall have been found to discriminate against certain products manufactured in Pennsylvania. Therefore, the purchase or use of those countries’ products, as listed below, is not permitted:

1. Argentina: carbon steel wire rod and cold-rolled carbon steel sheet.