D - Keswick Drawings.pdf

PDF 26 MB Posted

Attached to
Keswick and Maxwell Substation Station Service Upgrades
Solicitation number
89503121BWA000028
Issued by

About this file

This document outlines a federal contract opportunity for station service upgrades at two substations in California. The Western Area Power Administration seeks a contractor to perform installation of 230-kV and 115-kV station service transformers and associated equipment at the Keswick and Maxwell substations. The work includes installation of automatic transfer switches, safety switches, distribution panels, yard panels, pad-mounted transformers, insulated conductors, conduit, concrete foundations and support structures. The contractor will also provide removal of existing equipment and structures after the station service cutovers are complete at each substation location. The project value is estimated between $750,000 to $2,500,000. The solicitation is available as a small business set-aside and will follow FAR Part 14 for sealed bidding procedures. Questions must be submitted to the contract specialist by email by the date specified, and bids are due on the date outlined in the solicitation documents available from the SAM website.

View the file

Other files

Show all 12

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PROJECT DRAWINGS

KESWICK SUBSTATION

STATION SERVICE UPGRADES

STATE

SECTION C

DESCRIPTION/SPECIFICATIONS

Spec. No. 986

CALIFORNIA

STATION SERVICE UPGRADES

PROJECT DRAWINGS

A. GENERAL:

CONSTRUCTION STANDARD DRAWINGS: A complete set of standard drawings are available at https://www.wapa.gov/DoingBusiness/SellingToWestern/Pages/what-western-buys.aspx.

Construction drawings are the specification drawings and any additional drawings required for use in construction. The construction drawings will be issued after contract award and may include amendment changes and other details, which make the drawings suitable to use for construction purposes.

PROJECT DRAWINGS: Project drawings included herein are reduced reproductions and are not to scale.

Some project drawings show details of fabrication and other information not a part of the work. Disregard information and details, which are not applicable.

STANDARD DRAWINGS: Where details shown on standard drawings included herein differ from project drawings or text, the details of project drawings or text shall govern.

INFORMATIONAL DRAWINGS: Some project drawings have the words “FOR INFORMATION ONLY” appearing above the title block. These drawings show some information, which may be required for bidding purposes. These drawings do not show items to be furnished or work to be performed.

EXISTING INSTALLATION DRAWINGS: Some project drawings have the words “EXISTING INSTALLATION” appearing above the title block. These drawings show the existing installations prior to modifications and may show some new work to be performed.

REFERENCE DRAWINGS: Reference drawings referred to on project drawings and not included herein, are not necessary for bidding purposes.

CONTRACTOR'S RESPONSIBILITY: Check all drawings and advise Western of any errors or omissions.

B. LIST OF DRAWINGS:

LOCATION MAP:

1. KE 0015 Rev. A – Location, Access Road & Vicinity

ELECTRICAL:

2. KE 0001 Rev. I (EI) – Switching Diagram

3. KE 0001 Rev. J – Switching Diagram

4. KE 1001 Rev. G (EI) – 230kV Bays Y3 Thru Y8 General Arrangement – Main and Lower Bus Plan (Existing

Installation)

5. KE 1001 Rev. H- 230kV Bays Y3 Thru Y8 General Arrangement – Main and Lower Bus Plan

6. KE 1002 Rev. F (EI) – 230kV Bays Y3 Thru Y8 Arrangement – Equipment Plan (Existing Installation)

7. KE 1002 Rev. G– 230kV Bays Y3 Thru Y8 Arrangement – Equipment Plan

8. KE 1005 Rev. D (EI) – 115kV Switchyard General Arrangement - Equipment Plan (Existing Installation)

9. KE 1005 Rev. E – 115kV Switchyard General Arrangement – Equipment Plan

10. KE 1010 Rev. B (EI) – 230kV Switchyard Electrical Installation Sectional Elevation Line Bay Y7 (Existing

Installation)

11. KE 1010 Rev. C – 230kV Switchyard Electrical Installation Sectional Elevation Line Bay Y7

12. KE 1014 Rev. D (EI) – 115kV Yard Electrical Installation Section B-B, Transformer Bay X3 (Existing Installation)

13. KE 1014 Rev. E - 115kV Yard Electrical Installation Section B-B, Transformer Bay X3

14. KE 1016 Rev. B (EI) – 115kV Yard Electrical Installation Grounding Plan (Existing Installation)

15. KE 1016 Rev. C – 115kV Yard Electrical Installation Grounding Plan

16. KE 1017 Rev. G (EI) – 230kV Bays Y3 Thru Y8 Conduit and Buried Cable Plan (Existing Installation)

17. KE 1017 Rev. H – 230kV Bays Y3 Thru Y8 Conduit and Buried Cable Plan

18. KE 1018 Rev. D (EI) – 115kV Switchyard Conduit and Buried Cable Plan (Existing Installation)

19. KE 1018 Rev. E – 115kV Switchyard Conduit and Buried Cable Plan

20. KE 1020 (EI) – 230kV Switchyard Electrical Installation AC and DC Power Cabinets Plan and Elevations

(Existing Installation)

21. KE 1020 Rev. A - 230kV Switchyard Electrical Installation AC and DC Power Cabinets Plan and Elevations

22. KE 1021 Rev. A (EI) – 115kV Switchyard Electrical Installation AC and DC Power Cabinets Plan and

Elevations (Existing Installation)

23. KE 1021 Rev. B - 115kV Switchyard Electrical Installation AC and DC Power Cabinets Plan and Elevations

24. KE 1022 Rev. B (EI) – 115kV Yard Electrical Installation Wiring Diagrams Lighting and OCB Power – Bays

X1 to X6 (Existing Installation)

25. KE 1022 Rev. C - 115kV Yard Electrical Installation Wiring Diagrams Lighting and Power – Bays X1 to X6

26. KE 1026 Rev. C (EI) – 230kV Bays Y3 Thru Y8 Grounding Plan (Existing Installation)

27. KE 1026 Rev. D – 230kV Bays Y3 Thru Y8 Grounding Plan

28. KE 1029 Rev D (EI) – 230kV Bays Y1, Y2, Y9, Y10, and Y11 Arrangement Equipment Plan (Existing Installation)

29. KE 1029 Rev E - 230kV Bays Y1, Y2, Y9, Y10, and Y11 Arrangement Equipment Plan

30. KE 1030 Rev. C (EI) – 230kV Bays Y1, Y2, Y9, Y10 and Y11 Conduit and Buried Cable Plan (Existing

Installation)

31. KE 1030 Rev. D - 230kV Bays Y1, Y2, Y9, Y10 and Y11 Conduit and Buried Cable Plan

32. KE 1036 (EI) – 115kV Yard Electrical Installation Unit Substation Plan, Grounding and Conduit (Existing

Installation)

33. KE 1037 Rev. B – 230kV Bays Y1, Y2, Y9, Y10 and Y11 Grounding Plan

34. KE 1038 Rev. A (EI) – 115kV Yard, Sections AA-AA, B-B and Transformer Bay X3 (Existing Installation)

35. KE 1038 Rev. B - 115kV Yard, Sections AA-AA, B-B and Transformer Bay X3

36. KE 1039 Rev. B (EI) – 230 and 115kV Bill of Material (Existing Installation) https://www.wapa.gov/DoingBusiness/SellingToWestern/Pages/what-western-buys.aspx

37. KE 1039 Rev. C – 230 and 115kV Bill of Material

38. KE 1040 Rev A – Grounding Plan Fence Addition

39. KE 1041 Rev. B (EI) – Station Service Unit Substation Wiring Diagram (Existing Installation)

40. KE 1102 Rev. A – Equipment Identification Signs

41. KE 1600 Rev. A (EI) – 230kV Switchyard, 230V 3 Phase Power (Existing Installation)

42. KE 1600 Rev. B – Station Service Equipment Location Plan

43. KE 1601 (EI) – Station Service System Single Line Diagram (Existing Installation)

44. KE 1601 Rev. A – Station Service System Single Line Diagram

45. KE 1602 – Station Service Main Pad Outline Drawing

46. KE 1603 – Station Service Main Pad Wiring Diagram

47. KE 1604 – 115kV Area AC Yard Panels K3, DZB, DZB1 Wiring Diagram

48. KE 1605 – 230kV Area AC Yard Panels K5, DZC, DZC1 Wiring Diagram

49. KE 1611 Rev. A (EI) – 230kV Switchyard Wiring Diagram Lighting and 120/240V Single Phase Power (Existing Installation)

50. KE 1611 Rev. B - 230kV Switchyard Wiring Diagram Lighting and 120/240V Single Phase Power

51. KE 1612 Rev. A (EI) – 230kV Switchyard Control and Power Cables (Existing Installation)

52. KE 1612 Rev. B – 230kV Switchyard Control and Power Cables

CIVIL AND SITE DRAWINGS:

53. KE 2000 Rev. A - 230kV Switchyard Grading and Paving Plan

54. KE 2001 Rev. A - 115kV Switchyard Grading and Paving Plan

55. KE 2003 Rev. A - Switchyard General Paving Plan

56. KE 2004 Rev. B - (FIO) Location and General Excavation (For Information Only)

57. KE 2005 Rev. E - Grading Plan

58. KE 2094 Rev. A (EI) - Oil Detention System Plan (Existing Installation)

59. KE 2094 Rev. B - Oil Detention System Plan

60. KE 2095 (FIO) - Oil Detention System Details (For Information Only)

61. 31 2043 – Substation Standards Bollard Details

FOUNDATION AND STRUCTURAL DRAWING INDEX:

62. KE 2009 Rev. E - Foundations - Designations and Quantities

CONCRETE:

63. KE 2007 Rev. D (EI) - 230kV Bays Y3 thru Y8 Concrete Structures and Foundation Plan (Existing

Installation)

64. KE 2007 Rev. E - 230kV Bays Y3 thru Y8 Concrete Structures and Foundation Plan

65. KE 2008 Rev. A (EI) - 230kV Bays Y1, Y2, Y9, Y10 and Y11 Concrete Structures and Foundation Plan

66. KE 2008 Rev. B - 230kV Bays Y1, Y2, Y9, Y10 and Y11 Concrete Structures and Foundation Plan

67. KE 2010 Rev. E (EI) - 115 kV Switchyard - Concrete Structures Foundations - General Plan (Existing Installation)

68. KE 2010 Rev. F - 115kV Switchyard - Concrete Structures and Foundation Plan

69. KE 2066 Rev. B (EI) - 115kV Switchyard - Foundations Outline and Reinforcement (Existing Installation)

70. KE 2300 - Foundations - Outline and Reinforcement

71. KE 2301 - Foundations - Outline and Reinforcement

72. KE 2302 - Foundations - Outline and Reinforcement

73. KE 2303 - Foundations - Outline and Reinforcement

74. KE 2304 - Foundations - Outline and Reinforcement

75. KE 2306 - Foundations - Outline and Reinforcement

76. KE 2550 - Anchor Bolts

CABLE TRENCH:

77. KE 2070 Rev. D (EI) - Type "C" Cable Trench Plan (Existing Installation)

78. KE 2070 Rev. E - Type "C" Cable Trench Plan

79. KE 2500 - Cable Trench for Station Service

STEEL STRUCTURES:

80. KE 2053 Rev. A (FIO) - 115kV Switchyard - Steel Structures Bus Structure Beam Assemblies and

Connections (For Information Only)

81. KE 2600 - Station Service Support Frames - Elevations

82. KE 2601 - Safety Switch Support Frames – Elevations

83. KE 2602 - Support Frames – Details

84. KE 2603 – Safety Switch Support Frames - Elevations

CONTROL BUILDING:

85. KE 3010 Rev. B (EI) – Control Building Structural Foundation Plan (Existing Installation)

86. KE 3010 Rev. C – Control Building Structural Foundation Plan

87. KE 3011 Rev. B (EI) – Control Building Structural Roof & 2nd Floor Plans & Details (Existing Installation)

88. KE 3011 Rev. C – Control Building Structural Roof & 2nd Floor Plans & Details

89. KE 3013 Rev. A (EI) – Control Building Structural Wall Sections (Existing Installation)

90. KE 3013 Rev. B – Control Building Structural Wall Sections

91. KE 3036 Rev. A (EI) – Switchyard Service Building Wiring Diagram (Existing Installation)

92. KE 3036 Rev. B – Switchyard Service Building Wiring Diagram 93.KE 3404 (EI) – Office (addition & Remodel) Electrical Panelboards A & B (Existing Installation) 94.KE 3404 Rev. A - Office (addition & Remodel) Electrical Panelboards A & B

95. KE 3405-2 (EI) – Office (Addition & Remodel) Electrical Station Service Diagram (Sh. 2 of 2)

96. KE 3405-2 Rev. A – Office (Addition & Remodel) Electrical Station Service Diagram (Sh. 2 of 2)

97. KE 4002 Rev. B (EI) – Control Building Power Distribution First Floor (Existing Installation)

98. KE 4002 Rev. C – Control Building Power Distribution First Floor

99. KE 4005 Rev. B (EI) – Control Building One Line Diagram, Aux, Schematics and Details (Existing Installation)

100. KE 4005 Rev. C – Control Building One Line Diagram, Aux, Schematics and Details

101. KE 4006 Rev. A (EI) – Electrical and Grounding Details (Existing Installation)

102. KE 4006 Rev. B – Electrical and Grounding Details

103. KE 4008 (EI) – Switchyard Service Building General Arrangement (Existing Installation)

104. KE 4008 Rev. A - Switchyard Service Building General Arrangement

CONTROL DRAWINGS:

105. KE T601 – Station Service RTU & Control Cable List

Lake B lvd

I 5

Lake Blvd

SH

A-

CW

#1

&2

0 k V

KE

-O

BN

#1

&2

0 k V

KE-AIR 230 kV FLN-KE 230 kV

KE-OBN 1&2 230 kV

FL

N-

KE

0 k V

SH

A-

CW

0 k

V

SH

A-

CW

0 k V

SCR-KE 230 kV

CAR-KE #1&2 230 kV Lake Blvd

Qu art z H ill

Rd

Keswick Dam Rd

Oasis Rd

Walkway

Harlan Dr Beltline Rd

Benton Dr

West St

Eastshore Rd

Panorama Dr

Wi ela nd St

Lost Ln

Placer St

Sc ho ol St

Chris Pl

Wright Dr

Ma rke t S t

Snow Ln

Lake Redding Dr Rio Dr

Royal Oaks Dr

Magnums Way

July Way

Ri ve r R idg e D r

Snavely Dr

Ba ke r R d

Pittim Dr

Pine Oaks Dr

Scenic Dr

Sp inn ak er

D r

E Keswick Dam Rd

Sunriver Ln

Pegs Pl

Sunset Dr

Bud Ln

McLeod Rd

Winding Way

Glenwood Dr

Co ms toc k L n

Wh ite

St ar

Dr

Ca ctu s L n

Tu rq uo ise

C t

Vin Knls

Stanford Dr

Be eh ive Rd

Ba y T re e L n Nugget Ln

Laurel St

Small Ln

Rio D r

Butte St

Walkway

Shasta St

N Court St

44299

Wintu

Redding Maintenance Facility

Keswick

Keswick Substation Shasta County

0 0.25 0.5 0.75 1 Miles

March 22, 1983 KE

WESTERN AREA POWER ADMINISTRATION

SIERRA NEVADA REGION - FOLSOM, CALIFORNIA

KESWICK SUBSTATION

CALIFORNIA

LOCATION & VICINITY MAP

G IS

CAR-KE #1 230 kV KE1-KE1 115 kV

KE2-KE2 230 kV

KE-AIR 230 kV FLN-KE 230 kVKE-OBN 230 kV

CAR-KE #2 230 kV

KE1-KE2 115 kV

KE-ODA #2 230 kV

SCR-KE 230 kV

KE1-KE3 115 kV

KE2-KE1 230 kV

KE2-KE3 230 kV

Keswick

Keswick Sub

Site Coordinates Lat: 40° 36' 37.094" N Long: 122° 26' 38.724" W

DESIGNED _______________ APPROVED __________________________J.P. Sharp R.M. McCafferty

UNITED STATES DEPARTMENT OF ENERGY

1:30,000 1 inch = 2,500 feet

WAPA/SNR Microwave Site Substation Structure WAPA Transmission Line WAPA Access Roads Transmission Line ROW Facility Boundary

Adjoining 7.5' Quadrangle Names Center quad is this site

1. Whiskeytown

2. Shasta Dam

3. Project City

4. IGO

5. Redding

6. Enterprise

7. ONO

8. Olinda

9. Cottonwood

1 2 3

5 6 8 9

From: Folsom, CA

1. Merge onto US-50 W 17.8 mi

2. Merge onto I-80BUS W 1.2 mi

3. Turn Right onto CA-16 W/CA-99 N 0.7 mi

4. Merge onto I-5 N 159.7 mi

5. Take exit 680 Left onto CA-299W/Lake Blvd E 2.4 mi

6. Turn Left onto Keswick Dam Rd 2.7 mi To: Keswick Substation 188 Miles, 2 hours 53 mins

A 12/18/13 N5 - ASF Revised and Redrawn in GIS

MAY BE EXEMPT FROM PUBLIC RELEASE UNDER THE FREEDOM OF

INFORMATION ACT (5 U.S.C. 552[b]) EXEMPTION NUMBER(S) 7(E) & (F):

LAW ENFORCEMENT - CRIME PREVENTION & PUBLIC SAFETY

WARNING: This document is to be controlled, stored, handled, transmitted, distributed, and disposed of in accordance with DOE and Western policies relating to OUO information and is not to be released to the public or other personnel who do not have a valid “need-to-know” without prior approval of an authorized Western offic ial.

NAME/ORG: DATE:

WESTERN REVIEW REQUIRED BEFORE DISSEMINATION OR PUBLIC RELEASE

This map and data are the property of WAPA/DOE and are intended for planning and analysis only. No reproduction or copying of this product is allowed without the sole consent of WAPA/DOE. To contact WAPA about this map, please call 1-866-767-9272.

This cartographic product and GIS data were prepared in accordance with professional practice standards. The data represented on this map has been developed from the best available sources. Although efforts have been made to ensure that the data is accurate and reliable, errors may be reflected in the data. Users must be aware of these conditions and bear responsibility for the appropriate use of this map. The data on this map is for reference use only.

OFFICIAL USE ONLY

HI QualiTROL

LO

LEVEL

25° LIQUID

HI QualiTROL

LO

LEVEL

25° LIQUID

HI QualiTROL

LO

LEVEL

25° LIQUID

STATION SERVICE XFMR

KX1E

115KV-480V 2.5MVA

TRANSFORMER KY7A

AY7A1

SURGE ARRESTER

STATION SERVICE

SSA

1200A 480V

STATION SERVICE

SSB

1200A 480V

STATION SERVICE

ATS

1200A 480V

STATION SERVICE

DZA

480V 3PH

STATION SERVICE XFMR

KY7A1

230KV - 480V 333KVA

STATION SERVICE

SSC

1200A 480V

STATION SERVICE XFMR

KY7A3

230KV - 480V 333KVA

STATION SERVICE XFMR

KY7A2

230KV - 480V 333KVA

TRANSFORMER KY7A

AY7A2

SURGE ARRESTER

TRANSFORMER KY7A

AY7A3

SURGE ARRESTER

STATION SERVICE XFMR

FUSE FX1E 115KV

STATION SERVICE

EZ7A

JUNCTION CABINET

STATION SERVICE

SSD

1200A 480V

STATION SERVICE XFMR

K4

480-240/120V 50KVA

STATION SERVICE XFMR

K3

480-240/120V 100KVA

STATION SERVICE XFMR

K6

480-208/120V 225KVA

STATION SERVICE XFMR

K5

480-240/120V 100KVA

STATION SERVICE XFMR

K1

480-208/120V 150KVA

STATION SERVICE XFMR

K2

480-208/120V 75KVA

STATION SERVICE XFMR

K7

480-208/120V 30KVA

STATION SERVICE

DZB

120/240V 1PH

STATION SERVICE

DZC

120/240V 1PH

STATION SERVICE

DZD

120/240V 1PH

STATION SERVICE

DZE

208/120V GAS CART

STATION SERVICE

DZF

208/120V GAS CART

STATION SERVICE XFMR

K8

480-208/120V 30KVA

STATION SERVICE

SSE

600A 208/120V

STATION SERVICE

DZB1

120/240V 1PH

STATION SERVICE

DZC1

120/240V 1PH

STATION SERVICE

SSF

60A 208V

STATION SERVICE

SSG

60A 208V

DHD

1-PH 120/240

ES A

3-PH 120/208V

WH B

3-PH 120/208V

ES B

3-PH 120/208V

WH A

3-PH 120/208V

� .. C

- -x �1 x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x

I

I

,---1- -,-- -,-----T-----,--- -1- - - -7(J

C

C, C

C

I 0

;;-, I

CD IX)

I

CD

0 I

I

IX)

IX)

I I I I

�-- t

I I I

L __ l

I I

I

_ l __

I I I I I I

I

_ _l __ _

I I

I

J _

I I

---t- "'""''

I

_ l __

I

I

I i

SE

NO E 1

I I

X x-x-x-x-x-x-x _J

"' X

I X

§ "- ,1- I

J ------� X i '� I � "--+ i : " X � +, I 6 "

X i \ t o + X

�i "�"-X--x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x_J No, 1-t

NO

C, ,_ N � "'.,,-:.:

0/ "' .C C "0 "- •-c 2 .8 .2 C ::,""' <£'] 20 0 20

40 60 c..

i

100 SQ FT RIP RAP � NOTE 3 -,

NOTE \

1. DEMO AND EXCAVATE ASPHALT, GRAVEL, SUBGRADE , AND/

SOIL AS NECESSARY FOR INSTALLATION OF STATION '\

SERVICE PAD AND ASSOCIATED CONDUITS AND DRAIN )PIPE. BACKFILL EXCAVATION AREAS AND REPAIR ( ASPHALT IN ALL AREAS AFFECTED BY CONSTRUCTION.

ALL REPAIRS SHALL MATCH EXISTING THICKNESSES AND

CONFORM TO WAPA CONSTRUCTION STANDARDS.

2. REPAIR ASPHALT TO EDGE OF STATION SERVICE PAD. <

3. PLACE RIPRAP AS DIRECTED. RIPRAP CONSISTS OF

1 '-0" MINIMUf.4 DEPTH, RIPRAP BEDDED IN 6" SAND AND

GRAVEL

REFERENCE DRAWINGS

115KV SWITCHYARD GRADING AND PAVING PLAN ___ KE 2001

SWITCHYARD GENERAL PAVING PLAN _________ KE 2003

EXPLANATION

'-'-;) INDICATES STATION SERVICE UPGRADE WORK

REVISED AND REDRAWN FOR STATION SERVICE WORK.

UNITED STATES DEPARTMENT OF ENERGY

WESTERN AREA POWER ADMINISTRATION

SIERRA NEVADA REGION - FOLSOM CALIFORNIA

KESWICK P0WERPLANT

CALIFORNIA

230KV SWITCHYARD

GRADING AND PAVING PLAN

DESIGNED .!!.:_C....:.... 1?.!_Lb.§i ______ APPROVED �A!!_�!:!QP�IL- ____ _

� � SCALE OF FEET

0,,, 1"=20'-0" KE 2000 ���xR-EF-is-i_, _____________________________________________________________________________ ....____.,......._ __ MA_Y_24_,_1_9_82 _ _._ __ ..:..:.::=-----'--==--':..:.-' denton For Information Only

E

OC)

I

N

.0 a, L,._

N

2:.

2:.

C

.0 a, c c i a, Cf)

!i

';j C

L,._ g

N a, u a, Cf) C in -" u a, f a, Cf)

E

XREFISJ:

I l

I

I

I

I r r

I

I

I l

I

I l

FOUNDATION DESIGNATION

STATION \ STAGE 02

SPECIFICATION

SERVICE / STAGE 03 SPECIFICATION

NO. DC-5535

UPGRADES \ NO. DC-7322

I

I I

I

J

I

I

\ BT1C

I CB1

' CB2

{ PTS1

j SS1R

\ SS2R

I

' TDIR

! TD1

' 2SS4, 2SS4R

I 2SS5

\ 2BP1, 2PB1R

I 2CT1R

' 2BF1, 2BF1R

} 2BF2

L 3BS1

) 3BS2

( 3CB3

I 3SS6

', 3SS7

; 3CTD2

·, 3TD1

I

' 3US1

( 3CTD3

! 3TD2

,...,,...._ ...... ,,,,.. ..... ,,,,. ..... ,,.. ...... ,,.. ....... i,,,,--..,,-...,, v-

CSSRlT1

CSSR)YPT1

CSSRlYPT2 CSSRlSSS1 CSSRlSSS2 CSSRlES1

CSSRlSSVT1

CSSR>SSE1

CSSRlCBT1

-"_.,. ..__ ,,,, ....... I_, _ _,..._..,...__... _...,_...,_,_ '-"-"- ,.. •

DRAWING INDEX CONCRETE

CKE)

UNIT

QUANTITIES

STRUCTURE/EQUIPMENT NAME

SPECIFICATION STEEL FORMED AUGER

NO. 1944

FOUNDATION

STRUCTURE (CU YD> (CU YD>

A 230KV BUS STRUCTURE TOWER 2012

B 230KV BUS STRUCTURE TOWER 2012

C 230KV CIRCUIT BREAKER 2012

D 230KV CAPACITOR TIE-DOWN 2012

E 230KV SWITCH SUPPORT 2012

F 230KV CURRENT TRANSFORMER 2012

G 230KV CAPACITOR TIE-DOWN 2012

H 230KV OIL CIRCUIT BREAKER 2305

J 230KV CURRENT TRANSFORMER 2013

M 115KV OIL CIRCUIT BREAKER 2015

N 115KV BUS STRUCTURE 2016

0 115KV CAPACITOR TIE-DOWN FRAME 2015

p 115KV SWITCH SUPPORT 2016

Q 115KV CAPACITOR TIE-DOWN 2015

R 115KV CURRENT TRANSFORMER PEDESTAL 2015

12000 GALLON OIL STORAGE TANK 2017

7500 GALLON OIL STORAGE TANK 2012

500 GALLON OIL STORAGE TANK 2012

230KV BUS TOWER 2019

230KV CIRCUIT BREAKER 2019

230KV CIRCUIT BREAKER 2019

230KV POTENTIAL TRANSFORMER SUPPORT 2019

230KV SWITCH SUPPORT - TYPE I 2019

230KV SWITCH SUPPORT - TYPE II 2019

230KV TIE-DOWN - TYPE I 2019

230KV TIE-DOWN - TYPE II 2019

230KV SWITCH SUPPORT - TYPE III 2014

230KV SWITCH SUPPORT - TYPE III 2014

BUS POLE - TYPE I 2014

230KV CURRENT TRANSFORMER SUPPORT - TYPE I 2014

BUS FRAME - TYPE I 2014

BUS FRAME - TYPE I 2014

230KV BUS STRUCTURE 2064

230KV BUS STRUCTURE 2065

230KV CIRCUIT BREAKER 2064

230KV SWITCH SUPPORT - TYPE I 2065

230KV SWITCH SUPPORT - TYPE II 2065

230KV CAPACITOR TIE-DOWN 2064

230KV TIE-DOWN - TYPE I 2064

UNIT SUBSTATION 2066

115KV CAPACITOR TIE-DOWN 2066

115KV TIE-DOWN - TYPE I 2066

....,-.... -,-..._, �,,,,..,,,,,...._,,..-..,,.. ...... ✓- ✓ - v-v - v - v -,-"'-"" ...... ,,,,.. ..... ,,.. ..... ,,.. .. ,,..--✓- v-v-

115KV/480V TRANSFORMER 2300 - 7.2* -

YARD PANEL TRANSFORMER CK3l 2300 - 0.7* -

YARD PANEL TRANSFORMER CK5> 2300 - 0.7* -

SAFETY SWITCH SUPPORT - TYPE I 2301 2601 & 2602 2.4* -

SAFETY SWITCH SUPPORT - TYPE II 2301 2601 & 2602 3.5* -

EQUIPMENT SUPPORT C230KV SA) 2302 - - 2*

230KV STATION SERVICE VOLTAGE TRANSFORMER 2302 - 4.2** -

STATION SERVICE EQUIPMENT 2303 & 2304 2600 8c 2602 16.6* -

CTRL BLDG XFMR CK6l & SWITCH SUPPORT - TYPE III 2306 2603 1.9* -

* QUANTITIES WILL BE REVISED UPON RECEIPT OF CONTRACTOR FURNISHED DESIGN INFORMATION.

** QUANTITIES WILL BE REVISED UPON RECEIPT OF GOVERNMENT FURNISHED DESIGN INFORMATION.

I

I .

NOTES

1. FOR FOUNDATIONS-GENERAL PLAN, SEE DWGS KE 2007,

2008 AND 2010.

2. LOCATION DIMENSIONS FOR IDENTICAL FOUNDATIONS

SHALL BE THE SAME WITH RESPECT TO THE SAME OR

PARALLEL REFERENCE LINES UNLESS OTHERWISE SHOWN.

3. FOR LOCATION AND DETAILS OF SMALL FOOTINGS

REQUIRED FOR FENCE, SWITCH OPERATING PLATFORMS,

AND EQUIPMENT CABINET PLATFORMS, SEE PERTINENT

REFERENCE DRAWINGS.

4. FOR BURIED CABLES AND CONDUITS AND FOR CONDUITS

AND GROUND WIRES EMBEDDED IN FOUNDATIONS, SEE

ELECTRICAL DRAWINGS.

5. EQUIPMENT INSTALLED ON CONCRETE FOUNDATIONS SHALL

BE GIVEN FULL AND EVEN BEARING BY BEING GROUTED

IN PLACE AS DIRECTED. (PRIOR TO STAGE 02).

6. CONSTRUCTION JOINT PERMITTED BETWEEN STEM AND PAD

OF FOUNDATION .

7. STRUCTURAL DESIGN FOR STAGE 02 SUBSEQUENT STAGES

IS BASED ON f'c OF 4000 PSI AND fy OF 60,000 PSI.

8. FOR SWITCHYARD OIL AND WATER PIPING, SEE

PERTAINING REFERENCE DRAWINGS.

REFERENCE DRAWINGS

LOCATION AND VICINITY MAP ____________ KE 0015

230KV BAYS Y3 THRU YB ARRANGEMENT-

EQUIPMENT PLAN _________________ KE 1002

LOCATION AND GENERAL EXCAVATION ________ KE 2004

INTERRUPTING SWITCHES ______________ KE 2006

230KV BAYS Y3 THRU YB

CONCRETE STRUCTURES AND FOUNDATION PLAN ___ KE 2007

230KV BAYS Y1, Y2, Y9, Y10 AND Y11

CONCRETE STRUCTURES AND FOUNDATION PLAN ___ KE 2008

115KV SWITCHYARD CONCRETE STRUCTURES

AND FOUNDATION PLAN ______________ KE 2010

OUTLINE AND REINFORCEMENT

FOUNDATIONS _____________ KE 2012 THRU 2019

OUTLINE AND REINFORCEMENT

DUCT BANK ______________ KE 2020 THRU 2024

OUTLINE AND REINFORCEMENT

MANHOLES _________________ KE 2025 & 2026

STUB AND ANCHOR BOLTS ______________ KE 2027

ANCHOR MATERIAL __________________ KE 2028

STRINGING ________________ KE 2059 THRU 2061

OUTLINE AND REINFORCEMENT

FOUNDATIONS _______________ KE 2064 & 2066

EQUIPMENT CABINET PLATFORMS _______ KE 2068 & 2069

CABLE TRENCH ________________ KE 2070 & 2071

ACCESS ROAD-PLAN AND PROFILE __________ KE 2092

OIL DETENTION SYSTEM-PLAN ____________ KE 2094

OIL DETENTION SYSTEM-SECTIONS __________ KE 2095

OIL DETENTION STRUCTURE _____________ KE 2096

OIL PIPING _____________________ KE 3019

SERVICE BUILDING-OUTLINE-PLAN AND DETAILS ___ KE 3031

7500 GALLON OIL STORAGE TANK ________ 214-D-12363

500 GALLON OIL STORAGE TANK _________ 214-D-12364

CONCRETE STANDARDS-

GENERAL OUTLINE NOTES _____________ Q1 2000

CONCRETE STANDARDS-REINFORCEMENT GENERAL

NOTES & MINIMUM REQUIREMENTS

FOR DRAFTING __________________ Q1 2003

SWITCH OPERATING PLATFORM ____________ 31 1075

s.l'A�if',I� �ffi�l!N'r�-� ..,� ----= �� �

"FlOLLARD DETAILS __________________ 3 204

( EQUIPMENT CABINET PLATFORMS ___________ 31 2044

...__...,_,-�-�- A-�-�-✓-✓,/..._✓-•

EXPLANATION

�;:; INDICATES STATION SERVICE UPGRADE WORK

E 12-1-21

A7-WE I

REVISED AND REDRAWN FOR STATION SERVICE

UPGRADES.

UNITED STATES DEPARTMENT OF ENERGY

WESTERN AREA POWER ADMINISTRATION

HEADQUARTERS - GOLDEN COLORADO

KESWICK SWITCHYARD

CALIFORNIA

FOUNDATIONS

DESIGNATIONS AND QUANTITIES

DESIGNED -�-:._P...:.... �� ______ APPROVED R. M. McCAFFERlY ______

DIRECTOR. DIVISION OF CIVIL DESIGN

CAE I APRIL 29, 1983 I KE I 2009

Existing Installation

C

C c g

C

*=4' -10 1/2"

EVERYWHERE IT APPEARS

'i' N

I

:2

CI---+-�-

a:, I

<O

1--___._,r----"_ l -��-�

1 '-0"

52' -0" 52' -0"

26'-0"

1 '-0"

52' -0" 52'-0"

26'-0" 26'-0"

I X it TWO 2'-0"

TYPE "C" CABLE TRENCH

20 0 20 40

SCALE OF FEET

NOTES

1. FOR GENERAL NOTES AND REFERENCE DRAWINGS, SEE DWG

NO. KE 2009.

2. FOOTINGS LOCATED BY DIMENSIONS IN ANY BAY ARE

IDENTICALLY LOCATED IN ALL OTHER BAYS IN WHICH

THEY OCCUR.

3. TYPES OF FOUNDATIONS INDICATED FOR VARIOUS

LOCATIONS ARE BASED ON ESTIMATED DEPTHS TO ROCK

AT THESE LOCATIONS. VARIATION OF ACTUAL ROCK

ELEVATIONS FROM THOSE ASSUMED MAY, AS DETERMINED

BY THE FIELD, PERMIT SUBSTITUTION OF THE

ALTERNATE TYPE OF FOUNDATION.

4. GENERAL YARD EXCAVATION EL. 600.00. ENTIRE YARD

TO BE COVERED WITH 4" GRAVEL TO EL. 600.33.

5. EQUIPMENT INSTALLED ON CONCRETE FOUNDATIONS SHALL

BE GROUTED IN PLACE TO INSURE FULL AND EVEN

BEARING. (PRIOR TO STATION SERVICE UPGRADES).

6. OIL CIRCUIT BREAKER FOUNDATION "H" MOVED TO

-��/'/'/-✓-✓-�-v-v-v/7. INSTALL 2 PROTECTIVE BOLLARDS, PER STANDARD DWG '

( 31-2D43, AROUND EXISTING FIRE HYDRANTS,

COORDINATE EXACT LOCATION WITH THE C0R.\ CONTRACTOR SHALL VERIFY LOCATION OF WATER MAIN f PIPES PRIOR TO INSTALLATION. PROTECTIVE BOLLARDS

\ SHALL BE GROUNDED. _,,

, ✓'-'-���t�:r'N6s"- ✓-✓

230KV BAYS Y3 THRU Y8 ______________ KE 1002

ARRANGEMENT-EQUIPMENT PLAN

LOCATION AND GENERAL EXCAVATI0N ________ KE 2004

230KV BAYS Y1.Y2,Y9,Y10, AND Y11

CONCRETE STUCTURES AND FOUNDATION PLAN ___ KE 2008

F.S)LJ��������m�-v=����

/BOLLARD lJETAfLS __________________ 31 2044 ,✓'-'-'-�-�-�-A-�-�-�-/-

EXPLANATION

,...,,...,, '-..._� INDICATES STATION SERVICE UPGRADE WORK

REDRAWN AND REVISED FOR STATION SERVICE

UPGRADES. ADDED NOTE 6.

SUPERSEDES DWG NO. 214-D-14417

KESWICK SWITCHYARD

CALIFORNIA

230KV BAYS Y3 THRU YB

CONCRETE STRUCTURES AND FOUNDATION PLAN

DESIGNED �R� ________ APPROVED §.!!.Rg: _________ _

���-------------------------------------------------------------------------1'_'=_20_ '_-_o'_' ______ ���--AP_R _IL_ 2 _9,_19_B_3_�-�K=E�--�2�O�O�7�

Denton For Information Only

ARCHITECTURE URBAN DESIGN RESEARCH

t: (530) 243-3000 f:(530)243-3049 i:www.trilogyarch.com

2055 PINE STREET, REDDING, CALIFORNIA 96001

Cover Page
Project Drawings List
ke_0015a
ke_0001i_ei
ke_0001j
ke_1000a_fio
ke_1001g_ei
ke_1001h
ke_1002f_ei
ke_1002g
ke_1005d_ei
ke_1005e
ke_1010b_ei
ke_1010c
ke_1014d_ei
ke_1014e
ke_1016b_ei
ke_1016c
ke_1017g_ei
ke_1017h
ke_1018d_ei
ke_1018e
ke_1020_ei
ke_1020a
ke_1021a_ei
ke_1021b
ke_1022b_ei
ke_1022c
ke_1026c_ei
ke_1026d
ke_1029d_ei
ke_1029e
ke_1030c_ei
ke_1030d
ke_1036_ei
ke_1037b
ke_1038a_ei
ke_1038b
ke_1039b_ei
ke_1039c
ke_1040a
ke_1041b_ei
ke_1102a
ke_1600a_ei
ke_1600b
ke_1601_ei
ke_1601a
ke_1602
ke_1603
ke_1604
ke_1605
ke_1611a_ei
ke_1611b
ke_1612a_ei
ke_1612b
ke_2000a
ke_2001a
ke_2003a
ke_2004b_fio
ke_2005e
ke_2094a_ei
ke_2094b
ke_2095_fio
31_2043
ke_2009e
ke_2007d_ei
ke_2007e
ke_2008a_ei
ke_2008b
ke_2010e_ei
ke_2010f
ke_2066b_ei
ke_2300
ke_2301
ke_2302
ke_2303
ke_2304
ke_2306
ke_2550
ke_2070d_ei
ke_2070e
ke_2500
ke_2053a_fio
ke_2600
ke_2601
ke_2602
ke_3010b_ei
ke_3010c
ke_3011b_ei
ke_3011c
ke_3013a_ei
ke_3013b
ke_3036a_ei
ke_3036b
ke_3404_ei
ke_3404a
ke_3405_2_ei
ke_3405_2a
ke_4002b_ei
ke_4002c
ke_4005b_ei
ke_4005c
ke_4006a_ei
ke_4006b
ke_4008_ei
ke_4008a
ke_SS20_ProjectDrawings_2-1-21.pdf
A. GENERAL:
B. LIST OF DRAWINGS:
ELECTRICAL:

File details come from the government source that posted it. Updated .