D.1 ATTACHMENT 1 B.2 PRICE SCHEDULE.xlsx
XLSX spreadsheet 24 KB Posted
- Solicitation number
- 36C24822Q0084
About this file
This document contains a price schedule and statement of work for an exterior cleaning services contract opportunity with the Department of Veterans Affairs. The contractor shall provide exterior cleaning services for buildings, structures, rooftops, windows, and parking garages at four Orlando VA Healthcare System facilities located in Orlando and Viera, Florida. Services include cleaning of all exterior areas in their entirety according to approved industry standards. The base period of performance is January 1, 2022 through December 31, 2022 with four one-year optional periods of performance from 2023 through 2026. The solicitation was released by Network Contracting Office 8 in Orlando, Florida under solicitation number 36C24822Q0084. The contractor shall furnish all labor, transportation, supplies, and equipment needed to complete the services.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C24822Q0084 0002.docx | DOCX document | |
| 36C24822Q0084 0001.docx | DOCX document | |
| D.2 ATACHMENT 2 VAAR 852.219-77.pdf | ||
| WD 15-4555 Rev13 07-21-2021 Brevard.pdf | ||
| D.3 ATACHMENT 3 FAR 52.209-7.pdf | ||
| WD 15-4553 Rev16 07-21-2021 Orange.pdf | ||
| 36C24822Q0084_1.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Items
| Item Number | SLIN | Description | Contract Period | Pop Begin | Pop End | Quantity | Unit of Measure | Unit Price | Total Price | |
| 0001 | Orlando VAMC at Lake Nona | Base | 01/03/22 | 12/31/22 | ||||||
| 0001 | AA | Exterior Cleaning of all Buildings & Structures in accordance with the PWS | Base | 01/03/22 | 12/31/22 | 2 | EA | 0 | $ - 0 | |
| 0001 | AB | Exterior Cleaning of all Windows | ||||||||
| in accordance with the PWS | Base | 01/03/22 | 12/31/22 | 2 | EA | 0 | $ - 0 | |||
| 0001 | AC | Exterior Cleaning of all Rooftops | ||||||||
| in accordance with the PWS | Base | 01/03/22 | 12/31/22 | 2 | EA | 0 | $ - 0 | |||
| 0001 | AD | Parking Garage Levels & Stairwells | ||||||||
| in accordance with the PWS | Base | 01/03/22 | 12/31/22 | 2 | EA | 0 | $ - 0 | |||
| 0002 | Lake Baldwin VAMC | Base | 01/03/22 | 12/31/22 | ||||||
| 0002 | AA | Exterior Cleaning of all Buildings & Structures in accordance with the PWS | Base | 01/03/22 | 12/31/22 | 2 | EA | 0 | $ - 0 | |
| 0002 | AB | Exterior Cleaning of all Windows | ||||||||
| in accordance with the PWS | Base | 01/03/22 | 12/31/22 | 2 | EA | 0 | $ - 0 | |||
| 0002 | AC | Exterior Cleaning of all Rooftops | ||||||||
| in accordance with the PWS | Base | 01/03/22 | 12/31/22 | 2 | EA | 0 | $ - 0 | |||
| 0003 | Lakemont Campus | Base | 01/03/22 | 12/31/22 | ||||||
| 0003 | AA | Exterior Cleaning of all Buildings & Structures in accordance with the PWS | Base | 01/03/22 | 12/31/22 | 2 | EA | 0 | $ - 0 | |
| 0003 | AB | Exterior Cleaning of all Windows | ||||||||
| in accordance with the PWS | Base | 01/03/22 | 12/31/22 | 2 | EA | 0 | $ - 0 | |||
| 0003 | AC | Exterior Cleaning of all Rooftops | ||||||||
| in accordance with the PWS | Base | 01/03/22 | 12/31/22 | 2 | EA | 0 | $ - 0 | |||
| 0004 | Viera VAHCC | Base | 01/03/22 | 12/31/22 | ||||||
| 0004 | AA | Exterior Cleaning of all Buildings & Structures in accordance with the PWS | Base | 01/03/22 | 12/31/22 | 2 | EA | 0 | $ - 0 | |
| 0004 | AB | Exterior Cleaning of all Windows | ||||||||
| in accordance with the PWS | Base | 01/03/22 | 12/31/22 | 2 | EA | 0 | $ - 0 | |||
| 0004 | AC | Exterior Cleaning of all Rooftops | ||||||||
| in accordance with the PWS | Base | 01/03/22 | 12/31/22 | 2 | EA | 0 | $ - 0 | |||
| Base Year Total | $ - 0 |
| 1001 | Orlando VAMC at Lake Nona | Option 1 | 01/01/23 | 12/31/23 | ||||||
| 1001 | AA | Exterior Cleaning of all Buildings & Structures in accordance with the PWS | Option 1 | 01/01/23 | 12/31/23 | 2 | EA | 0 | $ - 0 | |
| 1001 | AB | Exterior Cleaning of all Windows | ||||||||
| in accordance with the PWS | Option 1 | 01/01/23 | 12/31/23 | 2 | EA | 0 | $ - 0 | |||
| 1001 | AC | Exterior Cleaning of all Rooftops | ||||||||
| in accordance with the PWS | Option 1 | 01/01/23 | 12/31/23 | 2 | EA | 0 | $ - 0 | |||
| 1001 | AD | Parking Garage Levels & Stairwells | ||||||||
| in accordance with the PWS | Option 1 | 01/01/23 | 12/31/23 | 2 | EA | 0 | $ - 0 | |||
| 1002 | Lake Baldwin VAMC | Option 1 | 01/01/23 | 12/31/23 | ||||||
| 1002 | AA | Exterior Cleaning of all Buildings & Structures in accordance with the PWS | Option 1 | 01/01/23 | 12/31/23 | 2 | EA | 0 | $ - 0 | |
| 1002 | AB | Exterior Cleaning of all Windows | ||||||||
| in accordance with the PWS | Option 1 | 01/01/23 | 12/31/23 | 2 | EA | 0 | $ - 0 | |||
| 1002 | AC | Exterior Cleaning of all Rooftops | ||||||||
| in accordance with the PWS | Option 1 | 01/01/23 | 12/31/23 | 2 | EA | 0 | $ - 0 | |||
| 1003 | Lakemont Campus | Option 1 | 01/01/23 | 12/31/23 | ||||||
| 1003 | AA | Exterior Cleaning of all Buildings & Structures in accordance with the PWS | Option 1 | 01/01/23 | 12/31/23 | 2 | EA | 0 | $ - 0 | |
| 1003 | AB | Exterior Cleaning of all Windows | ||||||||
| in accordance with the PWS | Option 1 | 01/01/23 | 12/31/23 | 2 | EA | 0 | $ - 0 | |||
| 1003 | AC | Exterior Cleaning of all Rooftops | ||||||||
| in accordance with the PWS | Option 1 | 01/01/23 | 12/31/23 | 2 | EA | 0 | $ - 0 | |||
| 1004 | Viera VAHCC | Option 1 | 01/01/23 | 12/31/23 | ||||||
| 1004 | AA | Exterior Cleaning of all Buildings & Structures in accordance with the PWS | Option 1 | 01/01/23 | 12/31/23 | 2 | EA | 0 | $ - 0 | |
| 1004 | AB | Exterior Cleaning of all Windows | ||||||||
| in accordance with the PWS | Option 1 | 01/01/23 | 12/31/23 | 2 | EA | 0 | $ - 0 | |||
| 1004 | AC | Exterior Cleaning of all Rooftops | ||||||||
| in accordance with the PWS | Option 1 | 01/01/23 | 12/31/23 | 2 | EA | 0 | $ - 0 | |||
| OY1 Total | $ - 0 |
| 2001 | Orlando VAMC at Lake Nona | Option 2 | 01/01/24 | 12/31/24 | ||||||
| 2001 | AA | Exterior Cleaning of all Buildings & Structures in accordance with the PWS | Option 2 | 01/01/24 | 12/31/24 | 2 | EA | 0 | $ - 0 | |
| 2001 | AB | Exterior Cleaning of all Windows | ||||||||
| in accordance with the PWS | Option 2 | 01/01/24 | 12/31/24 | 2 | EA | 0 | $ - 0 | |||
| 2001 | AC | Exterior Cleaning of all Rooftops | ||||||||
| in accordance with the PWS | Option 2 | 01/01/24 | 12/31/24 | 2 | EA | 0 | $ - 0 | |||
| 2001 | AD | Parking Garage Levels & Stairwells | ||||||||
| in accordance with the PWS | Option 2 | 01/01/24 | 12/31/24 | 2 | EA | 0 | $ - 0 | |||
| 2002 | Lake Baldwin VAMC | Option 2 | 01/01/24 | 12/31/24 | ||||||
| 2002 | AA | Exterior Cleaning of all Buildings & Structures in accordance with the PWS | Option 2 | 01/01/24 | 12/31/24 | 2 | EA | 0 | $ - 0 | |
| 2002 | AB | Exterior Cleaning of all Windows | ||||||||
| in accordance with the PWS | Option 2 | 01/01/24 | 12/31/24 | 2 | EA | 0 | $ - 0 | |||
| 2002 | AC | Exterior Cleaning of all Rooftops | ||||||||
| in accordance with the PWS | Option 2 | 01/01/24 | 12/31/24 | 2 | EA | 0 | $ - 0 | |||
| 2003 | Lakemont Campus | Option 2 | 01/01/24 | 12/31/24 | ||||||
| 2003 | AA | Exterior Cleaning of all Buildings & Structures in accordance with the PWS | Option 2 | 01/01/24 | 12/31/24 | 2 | EA | 0 | $ - 0 | |
| 2003 | AB | Exterior Cleaning of all Windows | ||||||||
| in accordance with the PWS | Option 2 | 01/01/24 | 12/31/24 | 2 | EA | 0 | $ - 0 | |||
| 2003 | AC | Exterior Cleaning of all Rooftops | ||||||||
| in accordance with the PWS | Option 2 | 01/01/24 | 12/31/24 | 2 | EA | 0 | $ - 0 | |||
| 2004 | Viera VAHCC | Option 2 | 01/01/24 | 12/31/24 | ||||||
| 2004 | AA | Exterior Cleaning of all Buildings & Structures in accordance with the PWS | Option 2 | 01/01/24 | 12/31/24 | 2 | EA | 0 | $ - 0 | |
| 2004 | AB | Exterior Cleaning of all Windows | ||||||||
| in accordance with the PWS | Option 2 | 01/01/24 | 12/31/24 | 2 | EA | 0 | $ - 0 | |||
| 2004 | AC | Exterior Cleaning of all Rooftops | ||||||||
| in accordance with the PWS | Option 2 | 01/01/24 | 12/31/24 | 2 | EA | 0 | $ - 0 | |||
| OY2 Total | $ - 0 |
| 3001 | Orlando VAMC at Lake Nona | Option 3 | 01/01/25 | 12/31/25 | ||||||
| 3001 | AA | Exterior Cleaning of all Buildings & Structures in accordance with the PWS | Option 3 | 01/01/25 | 12/31/25 | 2 | EA | 0 | $ - 0 | |
| 3001 | AB | Exterior Cleaning of all Windows | ||||||||
| in accordance with the PWS | Option 3 | 01/01/25 | 12/31/25 | 2 | EA | 0 | $ - 0 | |||
| 3001 | AC | Exterior Cleaning of all Rooftops | ||||||||
| in accordance with the PWS | Option 3 | 01/01/25 | 12/31/25 | 2 | EA | 0 | $ - 0 | |||
| 3001 | AD | Parking Garage Levels & Stairwells | ||||||||
| in accordance with the PWS | Option 3 | 01/01/25 | 12/31/25 | 2 | EA | 0 | $ - 0 | |||
| 3002 | Lake Baldwin VAMC | Option 3 | 01/01/25 | 12/31/25 | ||||||
| 3002 | AA | Exterior Cleaning of all Buildings & Structures in accordance with the PWS | Option 3 | 01/01/25 | 12/31/25 | 2 | EA | 0 | $ - 0 | |
| 3002 | AB | Exterior Cleaning of all Windows | ||||||||
| in accordance with the PWS | Option 3 | 01/01/25 | 12/31/25 | 2 | EA | 0 | $ - 0 | |||
| 3002 | AC | Exterior Cleaning of all Rooftops | ||||||||
| in accordance with the PWS | Option 3 | 01/01/25 | 12/31/25 | 2 | EA | 0 | $ - 0 | |||
| 3003 | Lakemont Campus | Option 3 | 01/01/25 | 12/31/25 | ||||||
| 3003 | AA | Exterior Cleaning of all Buildings & Structures in accordance with the PWS | Option 3 | 01/01/25 | 12/31/25 | 2 | EA | 0 | $ - 0 | |
| 3003 | AB | Exterior Cleaning of all Windows | ||||||||
| in accordance with the PWS | Option 3 | 01/01/25 | 12/31/25 | 2 | EA | 0 | $ - 0 | |||
| 3003 | AC | Exterior Cleaning of all Rooftops | ||||||||
| in accordance with the PWS | Option 3 | 01/01/25 | 12/31/25 | 2 | EA | 0 | $ - 0 | |||
| 3004 | Viera VAHCC | Option 3 | 01/01/25 | 12/31/25 | ||||||
| 3004 | AA | Exterior Cleaning of all Buildings & Structures in accordance with the PWS | Option 3 | 01/01/25 | 12/31/25 | 2 | EA | 0 | $ - 0 | |
| 3004 | AB | Exterior Cleaning of all Windows | ||||||||
| in accordance with the PWS | Option 3 | 01/01/25 | 12/31/25 | 2 | EA | 0 | $ - 0 | |||
| 3004 | AC | Exterior Cleaning of all Rooftops | ||||||||
| in accordance with the PWS | Option 3 | 01/01/25 | 12/31/25 | 2 | EA | 0 | $ - 0 | |||
| OY3 Total | $ - 0 |
| 4001 | Orlando VAMC at Lake Nona | Option 4 | 01/01/26 | 12/31/26 | ||||||
| 4001 | AA | Exterior Cleaning of all Buildings & Structures in accordance with the PWS | Option 4 | 01/01/26 | 12/31/26 | 2 | EA | 0 | $ - 0 | |
| 4001 | AB | Exterior Cleaning of all Windows | ||||||||
| in accordance with the PWS | Option 4 | 01/01/26 | 12/31/26 | 2 | EA | 0 | $ - 0 | |||
| 4001 | AC | Exterior Cleaning of all Rooftops | ||||||||
| in accordance with the PWS | Option 4 | 01/01/26 | 12/31/26 | 2 | EA | 0 | $ - 0 | |||
| 4001 | AD | Parking Garage Levels & Stairwells | ||||||||
| in accordance with the PWS | Option 4 | 01/01/26 | 12/31/26 | 2 | EA | 0 | $ - 0 | |||
| 4002 | Lake Baldwin VAMC | Option 4 | 01/01/26 | 12/31/26 | ||||||
| 4002 | AA | Exterior Cleaning of all Buildings & Structures in accordance with the PWS | Option 4 | 01/01/26 | 12/31/26 | 2 | EA | 0 | $ - 0 | |
| 4002 | AB | Exterior Cleaning of all Windows | ||||||||
| in accordance with the PWS | Option 4 | 01/01/26 | 12/31/26 | 2 | EA | 0 | $ - 0 | |||
| 4002 | AC | Exterior Cleaning of all Rooftops | ||||||||
| in accordance with the PWS | Option 4 | 01/01/26 | 12/31/26 | 2 | EA | 0 | $ - 0 | |||
| 4003 | Lakemont Campus | Option 4 | 01/01/26 | 12/31/26 | ||||||
| 4003 | AA | Exterior Cleaning of all Buildings & Structures in accordance with the PWS | Option 4 | 01/01/26 | 12/31/26 | 2 | EA | 0 | $ - 0 | |
| 4003 | AB | Exterior Cleaning of all Windows | ||||||||
| in accordance with the PWS | Option 4 | 01/01/26 | 12/31/26 | 2 | EA | 0 | $ - 0 | |||
| 4003 | AC | Exterior Cleaning of all Rooftops | ||||||||
| in accordance with the PWS | Option 4 | 01/01/26 | 12/31/26 | 2 | EA | 0 | $ - 0 | |||
| 4004 | Viera VAHCC | Option 4 | 01/01/26 | 12/31/26 | ||||||
| 4004 | AA | Exterior Cleaning of all Buildings & Structures in accordance with the PWS | Option 4 | 01/01/26 | 12/31/26 | 2 | EA | 0 | $ - 0 | |
| 4004 | AB | Exterior Cleaning of all Windows | ||||||||
| in accordance with the PWS | Option 4 | 01/01/26 | 12/31/26 | 2 | EA | 0 | $ - 0 | |||
| 4004 | AC | Exterior Cleaning of all Rooftops | ||||||||
| in accordance with the PWS | Option 4 | 01/01/26 | 12/31/26 | 2 | EA | 0 | $ - 0 | |||
| OY4 Total | $ - 0 | |||||||||
| Base & All Options Total Price | $ - 0 |
RefData
| Discount Type | YN | Options | Receipt Type | Line Item is | FOB | State Code | State Description |
| Percent | Yes | Base | Quantity | Priced | (none) | AK | Alaska |
| Amount | No | Option 1 | Amount | NSP | Origin | AL | Alabama |
| Option 2 | N/C | Destination | AR | Arkansas | |||
| Option 3 | AS | American Samoa | |||||
| Option 4 | AZ | Arizona | |||||
| Option 5 | CA | California | |||||
| Option 6 | CO | Colorado | |||||
| Option 7 | CT | Connecticut | |||||
| Option 8 | DC | District of Columbia | |||||
| Option 9 | DE | Delaware | |||||
| Option 10 | FL | Florida | |||||
| FM | Federal States of Micronesia | ||||||
| GA | Georgia | ||||||
| GU | Guam | ||||||
| HI | Hawaii | ||||||
| IA | Iowa | ||||||
| ID | Idaho | ||||||
| IL | Illinois | ||||||
| IN | Indiana | ||||||
| KS | Kansas | ||||||
| KY | Kentucky | ||||||
| LA | Louisiana | ||||||
| MA | Massachusetts | ||||||
| MD | Maryland | ||||||
| ME | Maine | ||||||
| MH | Marshall Islands | ||||||
| MI | Michigan | ||||||
| MN | Minnesota | ||||||
| MO | Missouri | ||||||
| MP | Northern Mariana Islands | ||||||
| MS | Mississippi | ||||||
| MT | Montana | ||||||
| NC | North Carolina | ||||||
| ND | North Dakota | ||||||
| NE | Nebraska | ||||||
| NH | New Hampshire | ||||||
| NJ | New Jersy | ||||||
| NM | New Mexico | ||||||
| NV | Nevada | ||||||
| NY | New York | ||||||
| OH | Ohio | ||||||
| OK | Oklahoma | ||||||
| OR | Oregon | ||||||
| PA | Pennsylvania | ||||||
| PR | Puerto Rico | ||||||
| PW | Palau | ||||||
| RI | Rhode Island | ||||||
| SC | South Carolina | ||||||
| SD | South Dakota | ||||||
| TN | Tennessee | ||||||
| TX | Texas | ||||||
| UT | Utah | ||||||
| VA | Virginia | ||||||
| VI | Virgin Islands | ||||||
| VT | Vermont | ||||||
| WA | Washington | ||||||
| WI | Wisconsin | ||||||
| WV | West Virginia | ||||||
| WY | Wyoming |
File details come from the government source that posted it. Updated .