This document provides an amendment to a solicitation for an Exterior Cleaning Program for buildings, rooftops, windows, and parking garages at four Department of Veterans Affairs facilities within the Orlando VA Healthcare System. The amendment responds to questions from potential offerors, lists companies that attended the related site visit, and extends the deadline for receipt of offers from December 15, 2021 to December 22, 2021. The solicitation seeks a contractor to plan, develop, and implement cleaning of all exterior areas of four VA locations, including over 1 million square feet of building rooftops and more than 5,400 windows. The contractor must furnish all labor, transportation, supplies and equipment to complete cleaning in accordance with industry standards throughout the base year and four optional one-year extensions.

View the file

Other files

File Type Posted
36C24822Q0084 0002.docx DOCX document
D.2 ATACHMENT 2 VAAR 852.219-77.pdf PDF
WD 15-4555 Rev13 07-21-2021 Brevard.pdf PDF
D.1 ATTACHMENT 1 B.2 PRICE SCHEDULE.xlsx XLSX spreadsheet
D.3 ATACHMENT 3 FAR 52.209-7.pdf PDF
WD 15-4553 Rev16 07-21-2021 Orange.pdf PDF
36C24822Q0084_1.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

5. PROJECT NUMBER (if applicable)

CODE

7.

ADMINISTERED BY

2. AMENDMENT/MODIFICATION NUMBER

CODE

6. ISSUED BY

8. NAME AND ADDRESS OF CONTRACTOR

4. REQUISITION/PURCHASE REQ. NUMBER

3. EFFECTIVE DATE

9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED

PAGE OF

PAGES

10A. MODIFICATION OF CONTRACT/ORDER NUMBER

10B. DATED

BPA NO.

1. CONTRACT ID CODE

FACILITY CODE

CODE

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

E. IMPORTANT:

is extended,

(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE

OF YOUR

ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.

12. ACCOUNTING AND APPROPRIATION DATA

(REV. 11/2016)

is required to sign this document and return ___________ copies to the issuing office.

is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.

15C. DATE SIGNED

B. THE ABOVE NUMBERE

D CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES

SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

RESULT IN REJECTION OF YOUR

OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendmen t, and is received prior to the opening hour and date specified.

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER

Contractor

16C. DATE SIGNED

14. DESCRIPTION OF AMENDMENT/MODIFICATION

16B. UNITED

STATES OF AMERICA

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER

16A. NAME AND TITLE OF

CONTRACTING OFFICER

15B. CONTRACTOR/OFFEROR

STANDARD FORM 30

PREVIOUS EDITION NOT USABLE

Prescribed by GSA - FAR (48 CFR) 53.243 (Type or print) (Type or print) (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

(Number, street, county, State and ZIP Code) (If other than Item 6) (Specify type of modification and authority) (such as changes in paying office, appropriation date, etc.)

(If required)

(SEE ITEM 11)

(SEE ITEM 13)

(X)

CHECK

ONE

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF

SOLICITATIONS

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

(Signature of person authorized to sign) (Signature of Contracting Officer) None 36C248 Department of Veterans Affairs Network Contracting Office 8 (NCO 8) Orlando VA Healthcare System 13800 Veterans Way Orlando FL 32827 36C248 Department of Veterans Affairs Network Contracting Office 8 (NCO 8) Orlando VA Healthcare System 13800 Veterans Way Orlando FL 32827 To all Offerors/Bidders

36C24822Q0084 12-10-2021

X X X

The purpose of this amendment is to provide responses to questions, list site visit attendees, and extend the hour and date specified for receipt of offers;

A. See the Continuation Pages for responses to questions.

B. Rep resentatives from: Sand Springs Development, Florida Softwash Pros, Orlando Roof Cleaning, Veterans Contract & Management, Simple Solutions Exterior Cleaning, Alex's Professional Cleaning Services, OurComm LLC, C&M Building Services, Jet Set Co mpany, PPL Direct, A1 Orange, IFOG, and Veterans Elite attended the site visit.

C. The hour and time specified for receipt of Offers is extended from 11:00 am on 12-15-2021 to 11:00 am on 12-22-2021.

Kurt Kramer Contracting Officer

CONTINUATION PAGE

Q1. Is this a new effort or was there an incumbent?

A1. The Government is treating this requirement as a new effort. The scope of work included in this solicitation has increased/expanded significantly when compared to work previously performed at the Lake Nona VAMC.

Q2. Can you please provide the current vendor that’s been providing service for this project?

A2. No vendor currently providing services.

Q3. Is this a new requirement, or is this identical to the past contract??

A18. see response for Q1.

Q4. How many elevators are available to gain access to the roof of the main building at Lake Nona VAMC?

A4. There are (2) elevators available to access the rooftop of the main building. The south elevator was used/shown to transport attendees of the site visit up to the rooftop and the west elevator was used/shown to return everyone to the ground floor.

Q5. Is there access to water for cleaning of the rooftops?

A5. Yes. Spigots and hydrants provide access to water. In areas where spigots are located inside the building(s), e.g. the 5th floor roof access area at Lake Nona, the contractor is to ensure hose connections are leak-free.

Q6. Rooftop square footage and window count.

A6. The VA provides the following information:

VA Facility
Rooftop

(estimated total sqft all bldgs) Window (estimated counts all bldgs)

Lake Nona VAMC
650,000
5,100
Viera VAHCC
147,000
100
Lake Baldwin VAMC
255,000
100
Lakemont Campus
52,000
350

Q7. At Lake Nona, when were the rooftop tiedowns last certified? When were the tiedowns last inspected?

A7. The suspended maintenance & rooftop fall protection anchorage system was last certified 09/04/2018. We are researching when the most recent annual inspection was completed. Further clarification will be provided.

Q8. Do all facilities have certified/ load tested and annually inspected anchors on the roof as required by OSHA 1910.27 Sub Part D, Walking Working Surfaces? Can these be provided?

A8. Only Lake Nona Campus has tie-downs and safety cables. See response for Q7 regarding certification & inspection dates for Lake Nona facility. The contractor may review certification(s) & inspection(s) prior to performance.

Q9. Are there anchors on the rooftops of the at the Lake Baldwin VAMC (4-story building) or the 3-story building at the Lakemont Campus?

A9. No.

Q10. All of the top sail is to be cleaned as well, correct?

A10. Yes.

Q11. Are there hooks or tiedowns on the super-structure (sail) at the Lake Nona VAMC?

A11. This area is equipped with tie-downs and safety cables.

Q12. There are several roofs with no tie offs, will these still be cleaned per the contract?

A12. Yes.

Q13. Are contractors expected to clean rooftops with terracotta roof tiles?

A13. Yes.

Q14. At the Lake Nona VAMC, is the Fisher House tile or metal roof and can it be walked on?

A14. The roof is tile & can be walked on.

Q15. Is your department requiring a certain cleaning solution that we apply to the exterior building and rooftop, or is it up to the contractor as long as it’s industry standard?

A15. Proposed cleaning solutions are up to contractor.

Q16. What type of chemicals can be used?

A16. Reference Section B.3 Performance Work Statement (PWS), paragraph 3.3.3. All products (i.e. cleaners) used must be eco-friendly.

Q17. It is our understanding that Chlorine-based products nor their derivatives are to be used on this project since it is a Leeds certified building. Therefore, we cannot use with the following chlorine derivatives, bleach, sodium hypochlorite, sodium chloride, sodium hydroxide, hydrogen peroxide with KOA activator, sodium bicarbonate, sodium magnesium, benzoyl peroxide, chlorine dioxide, Sodium chloride, brand names, soft wash, Joe Max, 30 Second-cleaner, Clorox, Mold Armor, simply Green Oxy, wash safe roof wash, coenzo2 clean.

A17. Yes, the Lake Nona facility is a LEEDS certified building. Chlorine derivative products are not to be used in performance of any work resulting from this solicitation.

Q18. Is the contractor expected to remove stains on buildings caused by the irrigation system?

A18. These areas will be included in the work and cleaned; however, the Government realizes the staining is a result and will continue with the current irrigation system. A best effort shall be made to lessen staining marks. (This question was asked at Lake Baldwin VAMC where there is noticeable staining of the building exterior due to the irrigation system.)

Q19. Is the contractor expected to clean the air handlers on rooftops?

A19. No, the contractor is not to clean air handlers on rooftops and shall take special care around equipment when performing services.

Q20. Viera - Are the air handlers and piping on the roof included in the scope of this contract. Normally, the installer/manufacturer is responsible for cleaning.

A20. see response for Q19.

Q21. Is it a squeegee finish for windows and does that apply to all windows?

A21. The Government will evaluate each contractor’s proposed approach to meet or exceed the requirements of the solicitation. A squeegee finish for windows is acceptable.

Q22. A substantial number of windows have over-spray from sealant that was applied to the exterior building. This over-spray sealant cannot be removed by standard window cleaning. Is this sealant to be removed or part of a separate one-time contract in the future?

A22. The Government will evaluate each contractor’s proposed approach to meet or exceed the requirements of the solicitation. A squeegee finish for windows is acceptable. Vendors may include separate pricing for restoration services to remove over-spray as an addendum (or added option of services) to their initial quote(s).

Q23. Does each facility have a designated point of contact?

A23. Upon award, Contracting Officer Representative(s) (COR) will be appointed to administer the contract within their authority. Each COR may be responsible for more than one site. A copy of the COR delegation letter, outlining each COR’s authority and area of responsibility, will be provide to the awardee.

Q24. What is the Limitation On Subcontracting (LOS).

A24. In the case of a contract for services (except construction), the contractor will not pay more than 50% of the amount paid by the government to it to firms that are not VIP-listed SDVOSBs as set forth in 852.219-10. Any work that a similarly situated VIP-listed subcontractor further subcontracts will count towards the 50% subcontract amount that cannot be exceeded. Please refer to applicable VAAR 852.219-77 and 13 CFR 125.6 for additional information.

Q25. Does the work include the perimeter fences?

A25. Yes, the exterior cleaning program includes perimeter fences as well as any block wall and concrete/block posts in line with the perimeter fence, see definitions within the PWS at paragraph 4.13 Structures ‘...surrounding walls/perimeter walls & columns...’ are to be included.

Q26. Does the work include the perimeter fences?

A26. see response for Q25.

Q27. It is our understanding the no walls or ceilings to be cleaned in the Garages, just the floor/road surfaces.

A27. The removal of cobwebs from the walls and ceilings of the (16) parking garage levels and (4) stairwells is required. Power washing work will only apply to the floor/road surfaces within the garage.

Q28. At Lake Nona, there appears to be a heavily soiled canvas on the interior roof sections is that to be cleaning as well?

A28. Yes.

Q29. It is our understanding that we can power clean roof with unit not to exceed 2,000psi, correct?

A29.Yes, 2000 psi or less is acceptable.

Q30. Lake Baldwin Facility - It is our understanding that the roofs cannot be power washed, correct?

A30. Correct due to material use on the roof, power washing cannot be performed.

Q31. Lakemont Campus - It is our understanding that the roofs cannot be power washed, correct?

A31. Correct due to material use on the roof, power washing cannot be performed.

Q32. It is our understanding that the outside of the buildings cannot be powered sprayed because the material is comprised of soft sandstone, correct?

A32. Correct, power washing cannot be performed.

Q33. The perimeter fence, front/back security entrances and all vertical columns are within the scope of this contract, correct?

A33. Yes. See response for Q25.

Q34. The new construction (Training Building) and the Fisher house are within the scope of this contract, correct?

A34. Yes, both buildings are within the scope of the contract.

Q35. Do sidewalks include curbs, road gutters, and car stops?

A35. All sidewalks, curbs, road gutters are to be cleaned. Car stops within the parking garages are to be cleaned. The cleaning of car stops in parking lots is not required.

Q36. Since it has been two years since the last cleaning, there will be a heavy accumulation of pigeon feces. That requires special removal requirements per OSHA since it is considered HAZMAT. Is that to be removed per the contract requirements?

A36. The intent of this requirement is to provide a (full) Exterior Building Cleaning Program which may require the removal of pigeon feces, as well as dirt, grimes, stains, and pollutants.

Q37. Bee/hornet is prevalent. Will these be removed prior to execution of this contract?

A37. The government regularly sprays for bees, hornets, & other insect nests at all facilities but our reach is only so high. In the event bees or similar pests hinder operations, the government is willing to discuss with the contractor possible solutions and equitable adjustment through a supplemental agreement and modification.

Q38. Lake Baldwin Facility - Bee/hornet is prevalent. Will these be removed prior to execution of this contract?

A38. See response for Q37

Q39. Lakemont Campus - Bee/hornet is prevalent. Will these be removed prior to execution of this contract?

A39. See response for Q37

Q40. Viera - Rust spots at entrance appear to be battery acid spillover. This requires special attention and may not be removable, is this in the scope of this contract?

A40. Clean to the best of your ability and we understand these areas may not be able to be removed.

Q41. Viera - The parking carports are all “topped” with solar panels. Are these in the scope of the contract? If so these need special attention per manufactures guidelines to ensure that warranty is not voided.

A41. Yes, they are part of the contract.

Q42. Lakemont Campus - Is the Sunshade Sail in the break area included in the scope of this contract?

A42. Yes, it is part of the contract.

Q43. Lakemont Campus - The parking lot is not included in the scope of this contract, correct? Only the entrance sidewalks that adjoin the facility are to be cleaned, correct?

A43. Asphalt parking lots are not part of the contract.

Q44. Is the contractor responsible for light poles, trash cans, landscape stones, fountains, signs around the property, flagpoles, monuments, outdoor chapel by the lake, dumpster pads, exit signs, basketball court, helicopter pads, café waterfall?

A44. Yes, the intent of the exterior cleaning program is to address all exterior areas on VA property. Light poles, trash cans, landscape stones, fountains, signs around the property, flagpoles, monuments, outdoor chapel by the lake, dumpster pads, exit signs, basketball court (maybe – depends on the material), helicopter pads, café waterfall. If it can be cleaned, we like it to be cleaned.

Q45. When we clean the roof top, is it the government’s responsibility to make sure the roof drains are not clogged before we start our services?

A44. Yes, the government will ensure roof drains are not clogged prior to services being rendered. When performing work, the contractor shall not sweep, spray, or wash any debris into roof drains. In the event of a clogged roof drain, the contractor shall notify the COR immediately for assistance.