CVHS - Pool Boiler Replacement Plan.pdf

PDF 3 MB Posted

Attached to
Purchase Pool Boilers for Chippewa Valley High School
Solicitation number
RFP-CVS-250000002007-3
Issued by
Macomb County, Clifford Village, Michigan

About this file

The documents represent a comprehensive mechanical, electrical, and architectural plan for a Pool Boiler Replacement project for Chippewa Valley Schools, specifically at Chippewa Valley High School, located in Michigan. The project involves replacing the existing boiler system, installing new boilers, heat exchangers, pumps, and associated mechanical and electrical infrastructure, with bid documents dated March 21, 2025. The project scope includes demolition of existing equipment, installation of two 2,000 MBH natural gas condensing boilers, a packaged pool heat exchanger skid, inline pumps, an expansion tank, and an air/dirt separator, along with necessary electrical connections and controls.

The project appears to be funded through the school district's capital improvement budget, with an estimated electrical and mechanical infrastructure investment. The mechanical design incorporates advanced features such as lead/lag boiler operation, building management system integration, variable frequency drive (VFD) pump controls, and a heating hot water reset schedule based on outside air temperature. The electrical scope includes providing new disconnects, conduit, and wiring for the new equipment, as well as emergency power shut-off stations. The design emphasizes system efficiency, redundancy, and modern control strategies to optimize the school's heating and pool heating systems.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

MECHANICAL ABBREVIATIONS MECHANICAL ABBREVIATIONSMECHANICAL ABBREVIATIONS MECHANICAL SYMBOLS

DRAWING NOTATION

MECHANICAL PIPING SYMBOLS

PIPING LEGEND

CW

HW

HWR

BHW

BCW

HW(140°F)

FOR

FOS

CHWR

CHWS

CD

CWR

CWS

G

GXHR

GXHS

CR

HHWR

HHWS

HPLR

HPLS

NPCW

DT

F

PCR

LPC

HPC

N

PSAN

RC

ORC

RL

RS

SAN

ST

STM

HPS

LPS

V

CA

VAC

O2

MA

PST

HGB

TW

APPLICABLE CODES

AND REGULATIONS

BIDS 03/21/2025

DATE:

DESIGN DEVELOPMENT

JOB NO.

SHEET NO.

CHECKED BY

REVISIONS

DRAWN BY

FINAL RECORD

CONSTRUCTION

PRELIMINARY

MARCH 21, 2025

FX: 586.573.0822

PH: 586.573.4100

SUITE 209

www.WakelyAIA.com

WARREN, MICHIGAN 48093

30500 VAN DYKE AVENUE

ARCHITECTS

WAKELY ASSOCIATES, INC.

MZ

UNIFIED BUILDING

SYSTEMS ENGINEERING

UBS PROJECT 007.25.02

69 S. GRATIOT AVE.

MT. CLEMENS, MI 48043

MPH

252068

C H

IP

PE

W A

VA

LL

EY

S

C H

O O

LS

C H

IP

PE

W A

VA

LL

EY

H

IG

H

S C

H O

O L

PO

O

L

BO

IL

ER

R

EP

LA

C

EM

EN

T

MECHANICAL GENERAL

INFORMATION

M0.00

DRAWING INDEX

SHT NO DESCRIPTION

M0.00 MECHANICAL GENERAL INFORMATION

M1.00 MECHANICAL COMPOSITE PLAN

M4.01 ENLARGED MECHANICAL DEMOLITION AND NEW WORK PLANS

M5.00 MECHANICAL DETAILS AND SCHEDULES

M6.00 MECHANICAL PIPING DIAGRAMS AND TEMPERATURE CONTROLS

1, 2 M4.01

1, 2 P4.01

GENERAL DEMOLITION NOTES

A

THESE DRAWINGS ARE DIAGRAMMATIC AND INDICATE THE GENERAL

EXTENT OF WORK TO BE PERFORMED. THE EXACT EXTENT OF

DEMOLITION SHALL BE DETERMINED BY THE NEW WORK.

B

ANY INTERRUPTIONS OF EXISTING SERVICES AND/OR EQUIPMENT SHALL

BE PERFORMED AT A TIME APPROVED IN ADVANCE BY OWNER'S

REPRESENTATIVE SO AS NOT TO INTERFERE WITH THE PRESENT

BUILDING'S OPERATION.

C

PRIOR TO COMMENCEMENT OF WORK, CONTRACTOR SHALL VISIT THE

SITE AND BECOME FAMILIAR WITH EXISTING SITE CONDITIONS,

SYSTEMS, AND UTILITIES. NOTIFY DESIGN PROFESSIONAL OF ANY

INTERFERENCES OR DISCREPANCIES.

D

ALL ITEMS INDICATED WITH CROSS-HATCHING SHALL BE REMOVED

COMPLETELY WITH ALL RELATED ITEMS INCLUDING HANGERS,

SUPPORTS, INSULATION, CONTROLS, ETC. CAP ALL OPEN-ENDED PIPES

AND DUCTS.

E

THE OWNER SHALL HAVE FIRST RIGHT OF REFUSAL ON ALL EQUIPMENT

BEING REMOVED. ALL ITEMS REMOVED SHALL BE LEGALLY DISPOSED OF.

GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR ALL EXISTING

RELOCATED AND OWNER-PROVIDED EQUIPMENT.

F

VERIFY DEPTH, SIZE, LOCATIONS, AND CONDITIONS OF EXISTING

UTILITIES IN THE FIELD, INCLUDING POINTS OF CONNECTION, PRIOR TO

STARTING WORK.

G

ALL ITEMS ON DEMOLITION PLAN SHALL BE CONSIDERED EXISTING

UNLESS OTHERWISE NOTED. ALL WORK INDICATED ON PLANS HAS BEEN

LOCATED PER EXISTING DRAWINGS AND/OR FIELD OBSERVATION AND

REQUIRES FIELD VERIFICATION.

H

ALL EXISTING WORK TO REMAIN SHALL BE PROTECTED FROM DAMAGE.

WHERE DUCT WORK PIPE INSULATION HAS BEEN DAMAGED DURING

DEMOLITION, THE CONTRACTOR SHALL REPAIR INSULATION AS

REQUIRED TO MATCH EXISTING.

PLUMBING GENERAL NOTES

A

THESE DRAWINGS ARE DIAGRAMMATIC AND INDICATE THE GENERAL

EXTENT OF WORK TO BE PERFORMED. THE EXACT EXTENT OF

DEMOLITION SHALL BE DETERMINED BY THE NEW WORK.

B

ANY INTERRUPTIONS OF EXISTING SERVICES AND/OR EQUIPMENT SHALL

BE PERFORMED AT A TIME APPROVED IN ADVANCE BY OWNER'S

REPRESENTATIVE SO AS NOT TO INTERFERE WITH THE PRESENT

BUILDING'S OPERATION.

C

PRIOR TO COMMENCEMENT OF WORK, CONTRACTOR SHALL VISIT THE

SITE AND BECOME FAMILIAR WITH EXISTING SITE CONDITIONS,

SYSTEMS, AND UTILITIES. NOTIFY DESIGN PROFESSIONAL OF ANY

INTERFERENCES OR DISCREPANCIES.

D

ALL ITEMS INDICATED WITH CROSS-HATCHING SHALL BE REMOVED

COMPLETELY WITH ALL RELATED ITEMS INCLUDING HANGERS,

SUPPORTS, INSULATION, CONTROLS, ETC. CAP ALL OPEN-ENDED PIPES

AND DUCTS.

E

THE OWNER SHALL HAVE FIRST RIGHT OF REFUSAL ON ALL EQUIPMENT

BEING REMOVED. ALL ITEMS REMOVED SHALL BE LEGALLY DISPOSED OF.

GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR ALL EXISTING

RELOCATED AND OWNER-PROVIDED EQUIPMENT.

F

VERIFY DEPTH, SIZE, LOCATIONS, AND CONDITIONS OF EXISTING

UTILITIES IN THE FIELD, INCLUDING POINTS OF CONNECTION PRIOR TO

STARTING WORK.

G

ALL ITEMS ON DEMOLITION PLAN SHALL BE CONSIDERED EXISTING

UNLESS OTHERWISE NOTED. ALL WORK INDICATED ON PLANS HAS BEEN

LOCATED PER EXISTING DRAWINGS AND/OR FIELD OBSERVATION AND

REQUIRES FIELD VERIFICATION.

H

ALL EXISTING WORK TO REMAIN SHALL BE PROTECTED FROM DAMAGE.

WHERE DUCT WORK PIPE INSULATION HAS BEEN DAMAGED DURING

DEMOLITION, THE CONTRACTOR SHALL REPAIR INSULATION AS

REQUIRED TO MATCH EXISTING.

J

INSTALL ALL SANITARY AND STORM PIPING 2 1/2" OR LESS AT 1/4" PER

FOOT AND 3" AND LARGER PIPING AT 1/8" PER FOOT MINIMUM UNLESS

NOTED OTHERWISE. MINIMUM UNDERGROUND PIPE SIZE SHALL BE 3".

K PROVIDE "INLINE" WATERLESS PRIMER TRAP SEAL PROTECTION ON ALL

FLOOR DRAINS AND TRAPS SUBJECT TO EVAPORATION.

L AT EACH CONNECTION OF GAS SUPPLY TO EQUIPMENT, PROVIDE A PIPE

UNION, GAS SHUT OFF VALVE, TEE, AND 6" LONG DIRT LEG WITH CAP.

M

THE CEILING SPACE IS USED AS A RETURN AIR PLENUM. NO PLASTIC

MATERIALS INCLUDING PVC PIPING, CONDUIT WIRING, ETC. SHALL BE

USED. ALL MATERIALS TO BE USED ARE TO BE PLENUM-RATED.

HVAC GENERAL NOTES

A

THESE DRAWINGS ARE DIAGRAMMATIC AND REPRESENT THE GENERAL

EXTENT OF WORK TO BE PERFORMED. PROVIDE AND EXECUTE ALL HVAC

SYSTEMS PER ENGINEER'S SPECIFICATION, AND LOCAL APPLICABLE

CODES INCLUDING AMENDMENTS, BULLETINS, ETC; AS WELL AS

STANDARDS OF INSTALLATION AND EQUIPMENT ESTABLISHED FOR THE

BUILDINGS, AND REQUIREMENTS OF OWNER.

B

EXCEPT FOR CHANGES AS MAY BE SPECIFICALLY APPROVED BY THE

ENGINEER OF RECORD, IN ACCORDANCE WITH ALTERNATES OF OPTIONS

AS STATED HEREINAFTER, ALL WORK MUST BE IN FULL ACCORDANCE

WITH THE INTENT OF THE PLANS AND SPECIFICATIONS. SYSTEMS ARE

TO BE COMPLETE, EFFICIENT, AND SATISFACTORY OPERATION WHEN

PROJECT IS DELIVERED TO THE OWNER.

C

THE CONTRACTOR AND EACH SUBCONTRACTOR COVENANTS AND

AGREES TO INDEMNIFY, DEFEND, AND HOLD HARMLESS THE

CONSULTING ENGINEER, ARCHITECT, AND OWNER FROM AND AGAINST

ANY LIABILITY, LOSS, DAMAGE, OR EXPENSE INCLUDING ATTORNEYS

ARISING FROM A FAILURE OR ALLEGED FAILURE ON THE PART OF THE

CONTRACTOR, SUBCONTRACTORS, AND THEIR AGENTS/EMPLOYEES

PROPERLY TO DISCHARGE THE OBLIGATIONS ASSUMED BY HIM/HER IN

THE PERFORMANCE OF THE WORK, INCLUDING ANY ACT OR OMISSION

ALLEGEDLY RESULTING IN DEATH, PERSONAL INJURY, PROPERTY

DAMAGE, OR IMPROPER CONSTRUCTION PROTOCOL.

D

CONTRACTOR SHALL OBTAIN ALL NECESSARY PERMITS AND APPROVAL

FROM GOVERNING AUTHORITIES, FILE NECESSARY FORMS, PAY ALL

INSPECTION FEES.

E

CONTRACTOR TO EXAMINE ALL ADJOINING WORK BEFORE

COMMENCEMENT OF HIS/HER SCOPE OF WORK. REPORT ANY

DISCREPANCIES TO THE CONSTRUCTION MANAGER FOR REVIEW AND

APPROVAL. COORDINATE ALL WORK WITH OTHER TRADES TO ENSURE

THAT INSTALLATION IS MADE IN ACCORDANCE WITH THE CONTRACT

DOCUMENTS.

F

PROVIDE REQUIRED CLEARANCE IN FRONT OF ELECTRICAL EQUIPMENT;

DUCTWORK/PIPING SHALL NOT INTERFERE WITH ELECTRICAL

EQUIPMENT CLEARANCE.

G

CONNECTION TO EQUIPMENT SHALL BE VERIFIED WITH

MANUFACTURER'S CERTIFIED DRAWINGS. ALL PIPING CONNECTIONS

SHALL BE MINIMUM 3/4" UNLESS NOTED OTHERWISE.

H FURNISH ADEQUATE LIABILITY INSURANCE AND BONDING DOCUMENTS

AS REQUIRED BY THE OWNER.

J

ALL SUPPORT ANCHORS SECURED TO THE BOTTOM OF FLOOR SLABS

SHALL BE DROP-IN OR SLEEVE ANCHOR TYPE. ALL SUPPORTING STEEL

SHALL BE PROVIDED BY THE CONTRACTOR.

K DUCTWORK/PIPING SHALL NOT BE INSTALLED IN A LOCATION THAT

RESTRICTS THE ACCESS TO MECHANICAL DEVICES REQUIRING ACCESS.

L THE CONTRACTOR SHALL PROVIDE ALL MISCELLANEOUS SUPPORTING

STEEL FOR THE PROPER INSTALLATION OF MECHANICAL SYSTEMS.

M

BRANCH DUCTWORK TO GRILLES, REGISTERS, AND DIFFUSERS SHALL BE

THE SAME SIZE AS TERMINAL DEVICE NECK SIZE WHERE NO DUCT SIZE

IS INDICATED.

BIDS 03/21/2025

DATE:

DESIGN DEVELOPMENT

JOB NO.

SHEET NO.

CHECKED BY

REVISIONS

DRAWN BY

FINAL RECORD

CONSTRUCTION

PRELIMINARY

MARCH 21, 2025

FX: 586.573.0822

PH: 586.573.4100

SUITE 209

www.WakelyAIA.com

WARREN, MICHIGAN 48093

30500 VAN DYKE AVENUE

ARCHITECTS

WAKELY ASSOCIATES, INC.

MZ

UNIFIED BUILDING

SYSTEMS ENGINEERING

UBS PROJECT 007.25.02

69 S. GRATIOT AVE.

MT. CLEMENS, MI 48043

MPH

252068

C H

IP

PE

W A

VA

LL

EY

S

C H

O O

LS

C H

IP

PE

W A

VA

LL

EY

H

IG

H

S C

H O

O L

PO

O

L

BO

IL

ER

R

EP

LA

C

EM

EN

T

MECHANICAL COMPOSITE

PLAN

M1.00

SCALE:

MECHANICAL COMPOSITE PLAN

1/32" = 1'-0"

(E)DWH-1

(E)ET-1

(E)12Ø

FLUE

(E)12Ø

FLUE

(E)12Ø

FLUE

(E)G

(E)G

(E)FD(E)HX-1

(E)CP-4

(E)AS-1

(E)CW

VFD-1 VFD-2

(E)6" GAS

THRU ROOF

3/4" 4"

(E)6" CW METER

ASSEMBLY

(E)FD

1 1 1

(E)2" POOL

HEATING

SUPPLY/RETURN

(E)HHWS

(E)HHWR

(E)HHWS

(E)HHWR

(E)HHWR

(E)HHWR

(E)HHWR

(E)HHWR

(E)CP-3

POOL EQUIPMENT

PIT

MECHANICAL ROOM

MEZZANINE

GENERAL DEMOLITION NOTES

A

THESE DRAWINGS ARE DIAGRAMMATIC AND INDICATE THE GENERAL

EXTENT OF WORK TO BE PERFORMED. THE EXACT EXTENT OF

DEMOLITION SHALL BE DETERMINED BY THE NEW WORK.

B

ANY INTERRUPTIONS OF EXISTING SERVICES AND/OR EQUIPMENT SHALL

BE PERFORMED AT A TIME APPROVED IN ADVANCE BY OWNER'S

REPRESENTATIVE SO AS NOT TO INTERFERE WITH THE PRESENT

BUILDING'S OPERATION.

C

PRIOR TO COMMENCEMENT OF WORK, CONTRACTOR SHALL VISIT THE

SITE AND BECOME FAMILIAR WITH EXISTING SITE CONDITIONS,

SYSTEMS, AND UTILITIES. NOTIFY DESIGN PROFESSIONAL OF ANY

INTERFERENCES OR DISCREPANCIES.

D

ALL ITEMS INDICATED WITH CROSS-HATCHING SHALL BE REMOVED

COMPLETELY WITH ALL RELATED ITEMS INCLUDING HANGERS,

SUPPORTS, INSULATION, CONTROLS, ETC. CAP ALL OPEN-ENDED PIPES

AND DUCTS.

E

THE OWNER SHALL HAVE FIRST RIGHT OF REFUSAL ON ALL EQUIPMENT

BEING REMOVED. ALL ITEMS REMOVED SHALL BE LEGALLY DISPOSED OF.

GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR ALL EXISTING

RELOCATED AND OWNER-PROVIDED EQUIPMENT.

F

VERIFY DEPTH, SIZE, LOCATIONS, AND CONDITIONS OF EXISTING

UTILITIES IN THE FIELD, INCLUDING POINTS OF CONNECTION, PRIOR TO

STARTING WORK.

G

ALL ITEMS ON DEMOLITION PLAN SHALL BE CONSIDERED EXISTING

UNLESS OTHERWISE NOTED. ALL WORK INDICATED ON PLANS HAS BEEN

LOCATED PER EXISTING DRAWINGS AND/OR FIELD OBSERVATION AND

REQUIRES FIELD VERIFICATION.

H

ALL EXISTING WORK TO REMAIN SHALL BE PROTECTED FROM DAMAGE.

WHERE DUCT WORK PIPE INSULATION HAS BEEN DAMAGED DURING

DEMOLITION, THE CONTRACTOR SHALL REPAIR INSULATION AS

REQUIRED TO MATCH EXISTING.

DEMOLITION KEYED NOTES

REMOVE BOILER AND ASSOCIATED PRIMARY PUMP COMPLETE INCLUDING ALL

CONTROLS, ACCESSORIES, FLUE, GAS VENT PIPING, AND HYDRONIC PIPING AS

INDICATED. CAP FLUE OPENING AND SEAL WEATHER TIGHT. PREPARE PIPING FOR

NEW CONNECTION.

2 REMOVE BASE PUMP COMPLETE INCLUDING ALL ACCESSORIES, ASSOCIATED VFD,

AND VIBRATION BASE. PREPARE PIPING FOR NEW CONNECTION.

3 REMOVE BLADDER EXPANSION TANK COMPLETE INCLUDING ALL HANGERS PIPING,

AND ACCESSORIES. PREPARE CONCRETE PAD FOR UNIT INSTALLATION.

4 REMOVE CHEMICAL SHOT FEEDER COMPLETE INCLUDING ALL PIPING AND

ACCESSORIES.

5 REMOVE SIDESTREAM FILTER COMPLETE INCLUDING ALL PIPING AND

ACCESSORIES.

REMOVE POOL HEAT EXCHANGER COMPLETE INCLUDING ALL HANGERS,

ACCESSORIES, AND CONTROLS. CAP PIPING AT HEATING HOT WATER MAIN.

PREPARE POOL HEATING PIPING FOR NEW CONNECTION.

X NEW WORK KEYED NOTES

INSTALL BOILER ON EXISTING HOUSEKEEPING PAD. EXTEND 8"Ø FLUE AND

COMBUSTION AIR PIPING THRU ROOF. COMBUSTION AIR PIPING SHALL BE

GOOSENECK WITH BIRDSCREEN AND OPENING SHALL BE MIN. 24" ABOVE ROOF.

FLUE SHALL TERMINATE A MINIMUM OF 3 FEET ABOVE THE ROOF OR 2 FEET

ABOVE ANYTHING WITHIN 10 FEET. PROVIDE GUY WIRES AS NECESSARY IF

RECOMMENDED BY THE FLUE MANUFACTURER. ROUTE 1-1/2" CONDENSATE

FROM BOILER TO NEARBY FLOOR DRAIN PROVIDE ACID NEUTRALIZER. PROVIDE

ALL ACCESSORIES REQUIRED FOR INSTALLATION.

INSTALL PACKAGED POOL HEAT EXCHANGER SKID PACKAGE ON EXISTING

HOUSEKEEPING PAD. POOL HEAT EXCHANGER IS A PACKAGED SKID

ASSEMBLY. CONNECT 3" HEATING HOT WATER PIPING TO SYSTEM

HEADER AND 2-1/2" POOL HEATING/RETURN PIPING TO SHELL AND

TUBE HEADER. TERMINATE ALL CONNECTIONS WITH ISOLATION VALVES.

3 INSTALL INLINE PUMP ON EXISTING CONCRETE PAD. PROVIDE NEW PIPE

SUPPORTS AS REQUIRED.

4 INSTALL EXPANSION TANK ON EXISTING HOUSEKEEPING PAD. CONFIRM EXACT

LOCATION WITH OWNER.

PRIOR TO FINAL TURNOVER, FLUSH ENTIRE HEATING HOT WATER

DISTRIBUTION SYSTEM WITH POLISH COMPOUND CLEANING MIXTURE

AND PROVIDE HVAC WATER TREATMENT.

X HVAC GENERAL NOTES

A

THESE DRAWINGS ARE DIAGRAMMATIC AND REPRESENT THE GENERAL

EXTENT OF WORK TO BE PERFORMED. PROVIDE AND EXECUTE ALL HVAC

SYSTEMS PER ENGINEER'S SPECIFICATION, AND LOCAL APPLICABLE

CODES INCLUDING AMENDMENTS, BULLETINS, ETC; AS WELL AS

STANDARDS OF INSTALLATION AND EQUIPMENT ESTABLISHED FOR THE

BUILDINGS, AND REQUIREMENTS OF OWNER.

B

EXCEPT FOR CHANGES AS MAY BE SPECIFICALLY APPROVED BY THE

ENGINEER OF RECORD, IN ACCORDANCE WITH ALTERNATES OF OPTIONS

AS STATED HEREINAFTER, ALL WORK MUST BE IN FULL ACCORDANCE

WITH THE INTENT OF THE PLANS AND SPECIFICATIONS. SYSTEMS ARE

TO BE COMPLETE, EFFICIENT, AND SATISFACTORY OPERATION WHEN

PROJECT IS DELIVERED TO THE OWNER.

C

THE CONTRACTOR AND EACH SUBCONTRACTOR COVENANTS AND

AGREES TO INDEMNIFY, DEFEND, AND HOLD HARMLESS THE

CONSULTING ENGINEER, ARCHITECT, AND OWNER FROM AND AGAINST

ANY LIABILITY, LOSS, DAMAGE, OR EXPENSE INCLUDING ATTORNEYS

ARISING FROM A FAILURE OR ALLEGED FAILURE ON THE PART OF THE

CONTRACTOR, SUBCONTRACTORS, AND THEIR AGENTS/EMPLOYEES

PROPERLY TO DISCHARGE THE OBLIGATIONS ASSUMED BY HIM/HER IN

THE PERFORMANCE OF THE WORK, INCLUDING ANY ACT OR OMISSION

ALLEGEDLY RESULTING IN DEATH, PERSONAL INJURY, PROPERTY

DAMAGE, OR IMPROPER CONSTRUCTION PROTOCOL.

D

CONTRACTOR SHALL OBTAIN ALL NECESSARY PERMITS AND APPROVAL

FROM GOVERNING AUTHORITIES, FILE NECESSARY FORMS, PAY ALL

INSPECTION FEES.

E

CONTRACTOR TO EXAMINE ALL ADJOINING WORK BEFORE

COMMENCEMENT OF HIS/HER SCOPE OF WORK. REPORT ANY

DISCREPANCIES TO THE CONSTRUCTION MANAGER FOR REVIEW AND

APPROVAL. COORDINATE ALL WORK WITH OTHER TRADES TO ENSURE

THAT INSTALLATION IS MADE IN ACCORDANCE WITH THE CONTRACT

DOCUMENTS.

F

PROVIDE REQUIRED CLEARANCE IN FRONT OF ELECTRICAL EQUIPMENT;

DUCTWORK/PIPING SHALL NOT INTERFERE WITH ELECTRICAL

EQUIPMENT CLEARANCE.

G

CONNECTION TO EQUIPMENT SHALL BE VERIFIED WITH

MANUFACTURER'S CERTIFIED DRAWINGS. ALL PIPING CONNECTIONS

SHALL BE MINIMUM 3/4" UNLESS NOTED OTHERWISE.

H FURNISH ADEQUATE LIABILITY INSURANCE AND BONDING DOCUMENTS

AS REQUIRED BY THE OWNER.

J

ALL SUPPORT ANCHORS SECURED TO THE BOTTOM OF FLOOR SLABS

SHALL BE DROP-IN OR SLEEVE ANCHOR TYPE. ALL SUPPORTING STEEL

SHALL BE PROVIDED BY THE CONTRACTOR.

K DUCTWORK/PIPING SHALL NOT BE INSTALLED IN A LOCATION THAT

RESTRICTS THE ACCESS TO MECHANICAL DEVICES REQUIRING ACCESS.

L THE CONTRACTOR SHALL PROVIDE ALL MISCELLANEOUS SUPPORTING

STEEL FOR THE PROPER INSTALLATION OF MECHANICAL SYSTEMS.

(E)DWH-1

(E)G

(E)G

(E)FD

(E)CW

(E)6" GAS

THRU ROOF

3/4"4"

(E)6" CW METER

ASSEMBLY

(E)FD

(E)2 1/2" POOL

HEATING

SUPPLY/RETURN

(E)HHWS

(E)HHWR

4"

4"

4"

4"

B-1

BP-1

BP-2

AS-1

ET-1

3/4"

1 1/4"

B-2

HX-12

CP-3

CP-4

2"

2"

HHWS

HHWR

CW

4"

3"

2 1/2"

CHEMICAL

SHOT FEEDER

3/4"

3/4"

POOL EQUIPMENT

PIT

MECHANICAL ROOM

MEZZANINE

BIDS 03/21/2025

DATE:

DESIGN DEVELOPMENT

JOB NO.

SHEET NO.

CHECKED BY

REVISIONS

DRAWN BY

FINAL RECORD

CONSTRUCTION

PRELIMINARY

MARCH 21, 2025

FX: 586.573.0822

PH: 586.573.4100

SUITE 209

www.WakelyAIA.com

WARREN, MICHIGAN 48093

30500 VAN DYKE AVENUE

ARCHITECTS

WAKELY ASSOCIATES, INC.

MZ

UNIFIED BUILDING

SYSTEMS ENGINEERING

UBS PROJECT 007.25.02

69 S. GRATIOT AVE.

MT. CLEMENS, MI 48043

MPH

252068

C H

IP

PE

W A

VA

LL

EY

S

C H

O O

LS

C H

IP

PE

W A

VA

LL

EY

H

IG

H

S C

H O

O L

PO

O

L

BO

IL

ER

R

EP

LA

C

EM

EN

T

ENLARGED MECHANICAL

DEMOLITION AND NEW WORK

PLANS

M4.01

SCALE:

ENLARGED MECHANICAL DEMOLITION PLAN - MECHANICAL ROOM

1/4" = 1'-0"

M1-00 SCALE:

ENLARGED MECHANICAL NEW WORK PLAN - MECHANICAL ROOM

1/4" = 1'-0"

M1-00

EXPANSION TANK SCHEDULE

UNIT ID SYSTEM SERVED TYPE MIN PSIG MAX PSIG MIN

(°F)

MAX

(°F)

TANK VOLUME

(GAL)

DIA

(IN) HEIGHT (IN) MODEL NO. REMARKS

ET-1 HEATING HOT

WATER BLADDER 55 125 50.0 220.0 106 30 49 NLA-400

NOTES:

1. MODEL NUMBER IS WESSELS.

2. PERFORMANCE BASED ON WATER.

AIR/DIRT SEPARATOR SCHEDULE

UNIT ID SYSTEM LOCATION

CONN.

SIZE

(IN.)

DRAIN

SIZE (IN.)

WEIGHT

(LBS) MODEL NO. REMARKS

AS-1 HEATING HOT

WATER

BOILER

ROOM 6" 1" 260 VDT-600

NOTES:

1. MODEL NUMBER IS SPIROTHERM UNLESS NOTED OTHERWISE.

2. PROVIDE COALESCING TYPE, CENTRIFUGAL NOT ACCEPTED.

3. VESSEL SHALL BE CERTIFIED FOR 150# WORKING PRESSURE AND BE FURNISHED WITH ANSI/ASME B16.5 OR B16.47 CLASS 150 STEEL

WELD NECK FLANGES.

4. UNIT SHALL INCLUDE STRUCTURED COALESCING MEDIA FILLING THE ENTIRE VESSEL.

5. UNIT SHALL REMOVE 100% OF FREE AND ENTRAINED AIR AND 99.6% OF DISSOLVED AIR AS TESTED BY INDEPENDENT LAB.

6. UNIT SHALL REMOVE 80% OF THE 30 MICRON PARTICLES IN 100 CIRCULATIONS. UNIT CAPABLE OF 5 MICRON PARTICLE SIZE

REMOVAL.

VARIABLE FREQUENCY DRIVE SCHEDULE

UNIT ID UNIT

SERVICE LOCATION

MOUNTING

REMARKS

SURFACE

MOTOR

CONTROL

CENTER

PACKAGED

WITH EQUIP.

UNISTRUT

SUPPORTED

VFD-1 CP-1 BOILER X

VFD-2 CP-2 BOILER X

NOTES:

1. VARIABLE SPEED DRIVE RATED HORSEPOWER SHALL MATCH THE REQUIREMENTS OF THE EQUIPMENT THAT IT SERVES.

COORDINATE WITH MANUFACTURER.

PUMP SCHEDULE

UNIT ID SYSTEM SERVED TYPE FLOW (GPM) HEAD (FT) IMPELLER DIA

(IN.)

MIN DUTY %

EFF

ELECTRICAL

MODEL NO. REMARKS

BHP HP RPM VOLTS PHASE

CP-3 HEATING HOT WATER SYSTEM INLINE SPLIT CASE 190 60.0 8.5 65.1 - 10.0 2910 480 3 GRUNDFOS: TP 65-410 INTEGRAL VFD (VFD-1)

CP-4 HEATING HOT WATER SYSTEM INLINE SPLIT CASE 190 60.0 8.5 65.1 - 10.0 2910 480 3 GRUNDFOS: TP 65-410 INTEGRAL VFD (VFD-2)

BP-1 B-1 INLINE 150 15.0 PROVIDED WITH BOILER 1.0 1800 480 3 PROVIDED WITH BOILER

BP-2 B-2 INLINE 150 15.0 PROVIDED WITH BOILER 1.0 1800 480 3 PROVIDED WITH BOILER

NOTES:

1. MODEL NUMBERS ARE BELL & GOSSETT UNLESS NOTED OTHERWISE.

2. PERFORMANCE BASED ON WATER, UNLESS OTHERWISE INDICATED.

3. PUMPS SHALL BE NON-OVERLOADING.

4. PUMPS PACKAGED WITH BUILT-IN VARIABLE FREQUENCY DRIVE.

5. PROVIDE WITH FLANGE MOUNTING SUPPORTS (CP-3, CP-4)

CONDENSING BOILER SCHEDULE

WATER ELECTRICAL DISCONNECT/STARTER

B-1 NAT GAS 2,000 1900 20:1 160 150 120 160 350 <5 120 1 16.0 SWITCH 26 26 26 BMK2000

B-2 NAT GAS 2,000 1900 20:1 160 150 120 160 350 <5 120 1 16.0 SWITCH 26 26 26 BMK2000

NOTES:

1. MODEL NUMBERS ARE AERCO.

2. PERFORMANCE DATA IS BASED ON WATER.

3. BOILER MUST HAVE INTEGRAL CASCADE CONTROL WITH BACNET MSTP INTERFACE, LEAD/LAG, EFFICIENCY OPTIMIZATION

AND CASCADE REDUNDANCY.

4. MANUFACTURER TO PROVIDE GE GAP GAS TRAIN.

5. PROVIIDE FLOW SWITCH.

6. PROVIDE ACID NEUTRALIZER KIT.

7. PROVIDE BOILER PRIMARY PUMP.

8. BOILER FLUE AND COMBUSTION AIR PIPING SHALL BE AL29-4C.

SPLIT

COUPLER

SYSTEM

INLET

SYSTEM

OUTLET

SUCTION

GUIDE

TRIPLE DUTY

VALVE

FLUSH

LINE

PRESSURE GAGE

AND PIPING

PET

COCK

(TYP)

DRAIN

CONNECTION STANCHION PLATE

(TYP)

NEOPRENE PAD

WITH DOUBLE NUT

SEE BLOW UP DETAIL

BELOW (TYP)

STRUCTURE

NEOPRENE PAD

EQUIPMENT FOOT

GROMMET

STEEL WASHER

DOUBLE NUT

PUMP MOTOR

SEE SPECIFICATIONS

FOR DETAILS

TYPICAL SEISMIC VERTICAL INLINE PUMP INSTALLATIONIN-LINE CIRCULATING PUMP PIPING DIAGRAM

1/4 GAUGE LINE (TYP)

IN-LINE CIRCULATING PUMP

UNION TYPE CONNECTION (TYP)

PROVIDE CLEARANCE FOR PUMP

AND MOTOR REMOVAL

MOTOR BOLTED TO PUMP HOUSING.

INSTALL MOTOR DEAD LEVEL WITH

LUBRICATION POINTS UP

RIGIDLY SUPPORT PIPING ADJACENT

TO PUMP TO ALLOW PUMP REMOVAL

WITHOUT DISTURBING PIPING SYSTEM

INSULATED PIPE HANGER DETAIL

RIGID PIPE OR FIBERGLASS

INSULATION (REFER TO SPEC)

20 GAGE GALVANIZED STEEL

NSULATION SHIELD

(REFER TO SPEC)

CLEVIS HANGER

VAPOR TIGHT SEAL AT JOINT

OF INSULATION TO PREVENT

MOISTURE PENETRATION &

SWEATING (TYP EA JOINT)

PIPE

RIGID PIPE OR FIBERGLASS INSULATION

(REFER TO SPEC)

20 GAGE GALVANIZED

STEEL INSULATION

SHIELD (REFER TO SPEC)

PIPE

CLEVIS HANGER

CONDENSING BOILER STACK DETAIL

1. PROVIDE STACK SUPPORTS, GUIDES AND EXPANSION SECTIONS AS REQUIRED PER

MANUFACTURER'S INSTRUCTIONS.

2. COORDINATE INSTALLATION OF STACK SUPPORTS DURING CONSTRUCTION.

ROOF

PRE-FABRICATED ROOF

CURB AND FLASHING FOR

SLOPED ROOF

STAINLESS STEEL DRAWBAND

AND CONTINUOUS SEALANT

STORM COLLAR

TALL CONE FLASHING

SEALANT

STACK SUPPORT

PLATE

M

IN

. 8

GOOSENECK DETAIL

SCREEN FRAME

ANGLE IRON REINF.

RIVETED OR WELDED

AS REQD.

1/2" BIRD

SCREEN

EXTEND BUILT UP ROOFING ON

ROOF DECK TO TOP OF CURB

CURB FASTENING FLANGE

BACK DRAFT DAMPER AS REQD.

HEAT EXCHANGER SKID SCHEDULE

UNIT ID SYSTEM

SERVED TYPE CAPACITY

(MBH)

SOURCE WATER SYSTEM WATER

MANUFACTURER/

MODEL NO.

SKID

MANUFACTUREREWT

(°F)

LWT

(°F)

FLOW

(GPM)

FOULING

FACTOR

MAX WPD

(FT HEAD)

EWT

(°F)

LWT

(°F)

FLOW

(GPM)

FOULING

FACTOR

MAX WPD (FT

HEAD)

NUMBER

OF PASSES

HX-1 POOL SHELL AND

TUBE 940.1 180 160 96.25 0.00025 2.5 82.0 97.0 125.7 0.00025 3.0 2 BELL AND GOSSETT /

QDWU-104-26 BELL & GOSSETT

NOTES:

1. SHALL BE PROVIDED AS FULL EQUIPMENT HEAT EXCHANGER PACKAGE WITH CONTROLS.

2. SHALL BE PROVIDED WITH CONTROL PANEL EQUIPPED WITH BACNET MSTP INTERFACE.

3. SHELL AND TUBE HEAT EXCHANGER SHALL BE DOUBLE WALL, 90/10 COPPER NICKEL TUBES.

BIDS 03/21/2025

DATE:

DESIGN DEVELOPMENT

JOB NO.

SHEET NO.

CHECKED BY

REVISIONS

DRAWN BY

FINAL RECORD

CONSTRUCTION

PRELIMINARY

MARCH 21, 2025

FX: 586.573.0822

PH: 586.573.4100

SUITE 209

www.WakelyAIA.com

WARREN, MICHIGAN 48093

30500 VAN DYKE AVENUE

ARCHITECTS

WAKELY ASSOCIATES, INC.

MZ

UNIFIED BUILDING

SYSTEMS ENGINEERING

UBS PROJECT 007.25.02

69 S. GRATIOT AVE.

MT. CLEMENS, MI 48043

MPH

252068

C H

IP

PE

W A

VA

LL

EY

S

C H

O O

LS

C H

IP

PE

W A

VA

LL

EY

H

IG

H

S C

H O

O L

PO

O

L

BO

IL

ER

R

EP

LA

C

EM

EN

T

MECHANICAL DETAILS AND

SCHEDULES

M5.00

HHWS

HHWS

FINISHED FLOOR

THERMOMETER

(TYP)

HEATING HOT WATER SYSTEM PIPING DIAGRAM

FROM BUILDING

TO BUILDING

ET-1

1 1/4

(E)6

4AAV

MAV

(E)FD

HHWR

HHWS

(E)G

8 FLUE

HH

W

R

HH

W

S

4 4

BP-1

FLOW CHECK

VALVE (TYP.)

Y-STRAINER (TYP.)

RELIEF

VALVE

(TYP.)

B-1

(E)8 FLUE

HH

W

R

HH

W

S

4 4

(E)G (E)6

AS-1

BP-2

HX-1

HH

W

R

HH

W

S

HHWR(POOL)

HHWS(POOL)

HHWR(POOL)

HHWS(POOL)

HHWS

HHWR

2 1/2

2 1/2

2 1/2

2 1/2

8 INTAKE

8 INTAKE

B-2

ACID NEUTRALIZER

(TYP.)

3/43/4

SIDESTREAM FILTER/SHOT FEEDER

MODEL: ENERCO 4FOS1

W/ PEDESTRAL

TRIPLE DUTY

VALVE (TYP)

FLOW MEASURING

DEVICE

HHWS

HHWS

FINISHED FLOOR

THERMOMETER

(TYP)

FROM BUILDING

TO BUILDING

AAV

MAV

(E)FD

HHWR

HHWS

HH

W

R

HH

W

S

BP-1

B-1

HH

W

R

HH

W

S

BP-2

HX-1

HHWR(POOL)

HHWS(POOL)

HHWR(POOL)

HHWS(POOL)

HHWS

HHWR

B-2

PACKAGED SKID

CONTROL PANEL

HEATING HOT WATER SYSTEM CONTROL DIAGRAM

HEATING HOT WATER SYSTEM SEQUENCE OF OPERATIONS:

NOTE: ALL SETPOINTS AND TIME INTERVALS SHALL BE ADJUSTABLE BY THE SYSTEM OPERATOR.

HEATING HOT WATER PLANT MANAGER

1. THE BUILDING MANAGEMENT SYSTEM (BMS) SHALL INCLUDE A HEATING HOT WATER PLANT MANAGER TO CONTROL THE SECONDARY

HEATING HOT WATER PUMPS AND STAGE THE BOILERS IN A LEAD/LAG OPERATION.

2. THE HEATING HOT WATER SYSTEM SHALL BE ENABLED TO RUN WHENEVER THE OUTSIDE AIR TEMPERATURE IS LESS THAN 60 DEG. F.

3. TO PREVENT SHORT CYCLING, THE HEATING HOT WATER SYSTEM SHALL RUN FOR AND BE OFF FOR A MINIMUM ADJUSTABLE TIME (BOTH

TIMES USER ADJUSTABLE).

SECONDARY PUMP CONTROL

1. WHEN THE HEATING HOT WATER SYSTEM IS ENABLED, THE LEAD HEATING HOT WATER PUMP SHALL BE ENABLED.

3. EACH PUMP WILL PROVE OPERATION TO THE BMS WITH ITS CURRENT SWITCH. IF A PUMP FAILS, AN ALARM WILL BE SENT TO THE BMS

AND THE LAG PUMP WILL BE ACTIVATED (IF NOT OPERATING).

4. THE PLANT MANAGER SHALL ALTERNATE PUMP OPERATION BASED ON RUN TIME HOURS OR AT THE BEGINNING OF EACH MONTH.

5. THE CONTROLLER SHALL MEASURE THE HEATING HOT WATER RETURN WATER TEMPERATURE AND MODULATE THE SECONDARY HEATING HOT WATER PUMP VFDS IN SEQUENCE TO MAINTAIN THE HEATING HOT WATER RETURN WATER SETPOINT. ALL SETPOINTS SHALL BE FIELD ADJUSTED DURING TESTING AND BALANCING TO MEET THE REQUIREMENTS OF THE ACTUAL FIELD CONDITIONS.

BOILER CONTROL:

1. WHEN THE BOILER IS STAGED ON BY THE PLANT MANAGER, THE BOILER'S INTERNAL CONTROLS SHALL START THE ASSOCIATED PRIMARY

HEATING HOT WATER PUMP. THE DDC SYSTEM SHALL MONITOR PRIMARY PUMP STATUS THROUGH CURRENT SWITCH.

HEAT EXCHANGER CONTROL:

1. THE PACKAGED HEAT EXCHANGER CONTROL PANEL SHALL MODULATE THE 3-WAY CONTROL VALVE TO MAINTAIN SYSTEM FLOW AND POOL

HEATING

UPON PROOF OF FLOW, THE BOILER'S INTERNAL CONTROLS WILL START THE BOILER AND ENERGIZE THE STAGES OF HEATING TO MAINTAIN THE BOILER DISCHARGE TEMPERATURE SETPOINT (SYSTEM SUPPLY TEMPERATURE SETPOINT). THE SUPPLY SETPOINT SHALL ADJUST BASED

ON THE SYSTEM RESET SCHEDULE.

MONITOR AND ALARM:

1. THE BMS SHALL MONITOR AND GRAPHICALLY SHOW, AT A MINIMUM, THE FOLLOWING POINTS. ALL POINTS SHALL BE ALARMED WHEN

OUT OF RANGE:

1.1. BOILER STATUS AND STAGING

1.2. BOILER RUN TIMES AND START/STOPS

1.3. BOILER ALARM

1.4. BOILER ENTERING AND LEAVING WATER TEMPERATURES (HIGH AND LOW ALARMS)

1.5. BOILER WATER SYSTEM SUPPLY AND RETURN WATER TEMPERATURES (HIGH AND LOW ALARMS)

1.6. SECONDARY PUMP SPEED

1.7. ALL PUMPS STATUS (ALARMS WHEN SCHEDULED ON, BUT NOT OPERATING)

2. DATA TRENDS SHALL BE ESTABLISHED TO RECORD AND TREND ALL POINTS INDICATED ABOVE.

3. ADDITIONAL BOILER INFORMATION AVAILABLE THROUGH THE BACNET INTEGRATION SHALL BE ACCESSIBLE THROUGH THE BMS FRONT

END SYSTEM, BUT DOES NOT NEED TO BE PRESENTED ON THE GRAPHIC DISPLAY.

110°F< 50°F

< 25°F 160°F

HEATING HOT WATER SUPPLY (HHWS)

RESET SCHEDULE

HHWS

TEMPERATURE

OUTSIDE AIR

TEMP.

< 10F 180°F

START/STOP

VFD SPEED

VFD FAULT

START/STOP

VFD SPEED

VFD FAULT

SETPOINT

FAULT

FAULT

SETPOINT

FAULT

FAULT

(E)EMERGENCY

SHUT-OFF

SWITCH

(E)DWH

OUTDOOR AIR

TEMPERATURE

SENSOR

BUILDING AUTOMATION SYSTEM NOTES:

1. CONFIGURATION AND ORDER OF CONTROLLER CONNECTION IS FOR REPRESENTATION PURPOSES ONLY. UPDATE

CONTROL SYSTEM

DRAWINGS TO REFLECT ACTUAL AS-BUILT CONDITIONS, INCLUDING ORDER IN WHICH CONTROLLERS ARE CONNECTED

WITHIN THE NETWORK.

2. PROVIDE NEW SOFTWARE FOR THE DISTRICT'S BUILDING AUTOMATION SYSTEM (AKA ENERGY MANAGEMENT SYSTEM) FRONT END SYSTEM. PROVIDE FOR BACNET OVER IP LICENSING FOR THE ENTIRE BUILDING. NEW SYSTEM SHALL BE OPEN PROTOCOL TRIDIUM NIAGARA AX SUPERVISOR VERSION N4 WITH CURRENT PATCHES AS OF AUGUST 2022.

BUILDING AUTOMATION SYSTEM RISER DIAGRAM

NO SCALE

BACNET OVER IP NETWORK TO

SUPERVISORY SYSTEM. PROVIDE

NEW WORK STATION.

HX-1 CP-1

(E) JACE

BUILDING

FRONT END

SYSTEM (JACE

VYKON J8000)

TRIDIUM

NIAGARA

CP-2

TO ADDITIONAL

EQUIPMENT

B-1 B-2

NO SCALE

NO SCALE

PACKAGED & PRE-PIPED

SKID ASSEMBLY

HH

W

R

HH

W

S

CP-3 CP-4

CP-3 CP-4

BIDS 03/21/2025

DATE:

DESIGN DEVELOPMENT

JOB NO.

SHEET NO.

CHECKED BY

REVISIONS

DRAWN BY

FINAL RECORD

CONSTRUCTION

PRELIMINARY

MARCH 21, 2025

FX: 586.573.0822

PH: 586.573.4100

SUITE 209

www.WakelyAIA.com

WARREN, MICHIGAN 48093

30500 VAN DYKE AVENUE

ARCHITECTS

WAKELY ASSOCIATES, INC.

MZ

UNIFIED BUILDING

SYSTEMS ENGINEERING

UBS PROJECT 007.25.02

69 S. GRATIOT AVE.

MT. CLEMENS, MI 48043

MPH

252068

C H

IP

PE

W A

VA

LL

EY

S

C H

O O

LS

C H

IP

PE

W A

VA

LL

EY

H

IG

H

S C

H O

O L

PO

O

L

BO

IL

ER

R

EP

LA

C

EM

EN

T

MECHANICAL PIPING

DIAGRAMS AND

TEMPERATURE CONTROLS

M6.00

ELECTRICAL ABBREVIATIONS

SECTION

DRAWING NOTATION

POWER SYMBOL LIST

FIRE ALARM SYMBOL LIST

AUXILIARY SYST. SYMBOL LIST

Z1 1A

APPLICABLE CODES

AND REGULATIONS

ERS

BIDS 03/21/2025

DATE:

DESIGN DEVELOPMENT

JOB NO.

SHEET NO.

CHECKED BY

REVISIONS

DRAWN BY

FINAL RECORD

CONSTRUCTION

PRELIMINARY

MARCH 21, 2025

FX: 586.573.0822

PH: 586.573.4100

SUITE 209

www.WakelyAIA.com

WARREN, MICHIGAN 48093

30500 VAN DYKE AVENUE

ARCHITECTS

WAKELY ASSOCIATES, INC.

UNIFIED BUILDING

SYSTEMS ENGINEERING

UBS PROJECT 007.25.02

69 S. GRATIOT AVE.

MT. CLEMENS, MI 48043

TJO

252068

C H

IP

PE

W A

VA

LL

EY

S

C H

O O

LS

C H

IP

PE

W A

VA

LL

EY

H

IG

H

S C

H O

O L

PO

O

L

BO

IL

ER

R

EP

LA

C

EM

EN

T

ELECTRICAL GENERAL

INFORMATION

E0.00

DRAWING INDEX

SHT NO DESCRIPTION

E0.00 ELECTRICAL GENERAL INFORMATION

E1.00 ELECTRICAL COMPOSITIE PLAN

EP4.01 ENLARGED ELECTRICAL POWER DEMOLITON AND NEW WORK PLANS

E6.00 ELECTRICAL PANEL SCHEDULES AND DETAILS

E7.00 ELECTRICAL ONE-LINE RISER DIAGRAMS

1, 2

EP4.01

LP-P

RP-P2

RP-P1

PDP-PP

GENERAL DEMOLITION NOTES

A

THESE DRAWINGS ARE DIAGRAMMATIC AND INDICATE THE GENERAL

EXTENT OF WORK TO BE PERFORMED. THE EXACT EXTENT OF

DEMOLITION SHALL BE DETERMINED BY THE NEW WORK.

B

ANY INTERRUPTIONS OF EXISTING SERVICES AND/OR EQUIPMENT SHALL

BE PERFORMED AT A TIME APPROVED IN ADVANCE BY OWNER'S

REPRESENTATIVE SO AS NOT TO INTERFERE WITH THE PRESENT

BUILDING'S OPERATION.

C

PRIOR TO COMMENCEMENT OF WORK, CONTRACTOR SHALL VISIT THE

SITE AND BECOME FAMILIAR WITH EXISTING SITE CONDITIONS,

SYSTEMS, AND UTILITIES. NOTIFY DESIGN PROFESSIONAL OF ANY

INTERFERENCES OR DISCREPANCIES.

D

ALL ITEMS INDICATED WITH CROSS-HATCHING SHALL BE REMOVED

COMPLETELY WITH ALL RELATED ITEMS INCLUDING HANGERS,

SUPPORTS, INSULATION, CONTROLS, ETC. CAP ALL OPEN-ENDED PIPES

AND DUCTS.

E

THE OWNER SHALL HAVE FIRST RIGHT OF REFUSAL ON ALL EQUIPMENT

BEING REMOVED. ALL ITEMS REMOVED SHALL BE LEGALLY DISPOSED OF.

GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR ALL EXISTING

RELOCATED AND OWNER-PROVIDED EQUIPMENT.

F

VERIFY DEPTH, SIZE, LOCATIONS, AND CONDITIONS OF EXISTING

UTILITIES IN THE FIELD, INCLUDING POINTS OF CONNECTION, PRIOR TO

STARTING WORK.

G

ALL ITEMS ON DEMOLITION PLAN SHALL BE CONSIDERED EXISTING

UNLESS OTHERWISE NOTED. ALL WORK INDICATED ON PLANS HAS BEEN

LOCATED PER EXISTING DRAWINGS AND/OR FIELD OBSERVATION AND

REQUIRES FIELD VERIFICATION.

H

ALL EXISTING WORK TO REMAIN SHALL BE PROTECTED FROM DAMAGE.

WHERE DUCT WORK PIPE INSULATION HAS BEEN DAMAGED DURING

DEMOLITION, THE CONTRACTOR SHALL REPAIR INSULATION AS

REQUIRED TO MATCH EXISTING.

POWER GENERAL NOTES

A

THESE DRAWINGS ARE DIAGRAMMATIC AND REPRESENT THE GENERAL

EXTENT OF THE WORK TO BE PERFORMED. PROVIDE AND EXECUTE ALL

HVAC SYSTEMS PER ENGINEER'S SPECIFICATION, AND LOCAL APPLICABLE

CODES INCLUDING AMENDMENTS, BULLETINS, ETC; AS WELL AS THE

STANDARDS OF INSTALLATION AND EQUIPMENT ESTABLISHED FOR THE

BUILDINGS, AND REQUIREMENTS OF THE OWNER.

B

EXCEPT FOR CHANGES AS MAY BE SPECIFICALLY APPROVED BY THE

ENGINEER OF RECORD IN ACCORDANCE WITH ALTERNATES OF OPTIONS

AS STATED HEREINAFTER, ALL WORK MUST BE IN FULL ACCORDANCE

WITH THE INTENT OF THE PLANS AND SPECIFICATIONS. SYSTEMS ARE

TO BE COMPLETE, EFFICIENT, AND SATISFACTORY OPERATION WHEN

PROJECT IS DELIVERED TO THE OWNER.

D

CONTRACTOR SHALL OBTAIN ALL NECESSARY PERMITS AND APPROVAL

FROM GOVERNING AUTHORITIES, FILE NECESSARY FORMS, PAY ALL

INSPECTION FEES.

E

ELECTRICAL CONTRACTOR SHALL COMPLY WITH THE LATEST NATIONAL

ELECTRICAL CODE, LIFE SAFETY CODE AND APPLICABLE STATE AND

LOCAL CODES AND ORDINANCES.

F

ELECTRICAL EQUIPMENT AND WIRING SHALL BE NEW AND SHALL BE

FURNISHED AND INSTALLED BY ELECTRICAL CONTRACTOR, UNLESS

OTHERWISE NOTED.

G WIRING SHALL BE IN CONDUIT. CONDUIT SHALL BE 3/4" CONDUIT

MINIMUM. CONDUITS IN FINISHED AREAS SHALL BE CONCEALED.

H

NEW WIRES SHALL BE TYPE THHN. MINIMUM SIZE SHALL BE #12 AWG,

UNLESS OTHERWISE NOTED. FINAL CONNECTIONS TO EQUIPMENT,

FURNISHED AND INSTALLED BY OTHERS, SHALL BE PROVIDED BY THIS

CONTRACTOR.

J ALL P.A. AND SPEAKER SCOPE BY OTHERS. REFER TO TECH DRAWINGS

FOR FURTHER INFORMATION.

NEW WORK KEYED NOTES

PROPOSED PATH FOR NEW CONDUITS FROM PDP-PP DISTRIBUTION

BOARD TO BOILER ROOM EQUIPMENT. ESTIMATED RUN IS 150 FEET

LONG.

X

ERS

BIDS 03/21/2025

DATE:

DESIGN DEVELOPMENT

JOB NO.

SHEET NO.

CHECKED BY

REVISIONS

DRAWN BY

FINAL RECORD

CONSTRUCTION

PRELIMINARY

MARCH 21, 2025

FX: 586.573.0822

PH: 586.573.4100

SUITE 209

www.WakelyAIA.com

WARREN, MICHIGAN 48093

30500 VAN DYKE AVENUE

ARCHITECTS

WAKELY ASSOCIATES, INC.

UNIFIED BUILDING

SYSTEMS ENGINEERING

UBS PROJECT 007.25.02

69 S. GRATIOT AVE.

MT. CLEMENS, MI 48043

TJO

252068

C H

IP

PE

W A

VA

LL

EY

S

C H

O O

LS

C H

IP

PE

W A

VA

LL

EY

H

IG

H

S C

H O

O L

PO

O

L

BO

IL

ER

R

EP

LA

C

EM

EN

T

ELECTRICAL COMPOSITIE

PLAN

E1.00

SCALE:

ELECTRICAL COMPOSITIE PLAN

1/32" = 1'-0"

(E)DWH-1

(E)CP-4

(E)VFD-1 (E)VFD-2

3 3 3

(E)CP-3

J J

4 4 4

J J J

RP-P2-8PDP-PPPDP-PP RP-P2-10 RP-P2-36

PDP-PP PDP-PP PDP-PP

POOL EQUIPMENT

PIT

MECHANICAL ROOM

MEZZANINE

GENERAL DEMOLITION NOTES

A

THESE DRAWINGS ARE DIAGRAMMATIC AND INDICATE THE GENERAL

EXTENT OF WORK TO BE PERFORMED. THE EXACT EXTENT OF

DEMOLITION SHALL BE DETERMINED BY THE NEW WORK.

B

ANY INTERRUPTIONS OF EXISTING SERVICES AND/OR EQUIPMENT SHALL

BE PERFORMED AT A TIME APPROVED IN ADVANCE BY OWNER'S

REPRESENTATIVE SO AS NOT TO INTERFERE WITH THE PRESENT

BUILDING'S OPERATION.

C

PRIOR TO COMMENCEMENT OF WORK, CONTRACTOR SHALL VISIT THE

SITE AND BECOME FAMILIAR WITH EXISTING SITE CONDITIONS,

SYSTEMS, AND UTILITIES. NOTIFY DESIGN PROFESSIONAL OF ANY

INTERFERENCES OR DISCREPANCIES.

D

ALL ITEMS INDICATED WITH CROSS-HATCHING SHALL BE REMOVED

COMPLETELY WITH ALL RELATED ITEMS INCLUDING HANGERS,

SUPPORTS, INSULATION, CONTROLS, ETC. CAP ALL OPEN-ENDED PIPES

AND DUCTS.

E

THE OWNER SHALL HAVE FIRST RIGHT OF REFUSAL ON ALL EQUIPMENT

BEING REMOVED. ALL ITEMS REMOVED SHALL BE LEGALLY DISPOSED OF.

GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR ALL EXISTING

RELOCATED AND OWNER-PROVIDED EQUIPMENT.

F

VERIFY DEPTH, SIZE, LOCATIONS, AND CONDITIONS OF EXISTING

UTILITIES IN THE FIELD, INCLUDING POINTS OF CONNECTION, PRIOR TO

STARTING WORK.

G

ALL ITEMS ON DEMOLITION PLAN SHALL BE CONSIDERED EXISTING

UNLESS OTHERWISE NOTED. ALL WORK INDICATED ON PLANS HAS BEEN

LOCATED PER EXISTING DRAWINGS AND/OR FIELD OBSERVATION AND

REQUIRES FIELD VERIFICATION.

H

ALL EXISTING WORK TO REMAIN SHALL BE PROTECTED FROM DAMAGE.

WHERE DUCT WORK PIPE INSULATION HAS BEEN DAMAGED DURING

DEMOLITION, THE CONTRACTOR SHALL REPAIR INSULATION AS

REQUIRED TO MATCH EXISTING.

DEMOLITION KEYED NOTES

BASE MOUNTED CIRCULATION PUMP AND ALL ASSOCIATED CONTROLS

BEING REMOVED COMPLETE BY MECHANICAL TRADES. ELECTRICAL

CONTRACTOR SHALL DISCONNECT AND MAKE SAFE. DEMO COMPLETE

INCLUDING ALL CONDUIT AND WIRING BACK TO RESPECTIVE VFD. REFER

TO NEW WORK PLANS FOR MORE INFORMATION.

VFD BEING REMOVED COMPLETE BY MECHANICAL TRADES. ELECTRICAL

CONTRACTOR SHALL DISCONNECT AND MAKE SAFE. DEMO COMPLETE

BACK TO SOURCE INCLUDING ALL CONDUIT AND WIRING. REFER TO NEW

WORK PLANS FOR MORE INFORMATION.

HEATING HOT WATER BOILER BEING REMOVED COMPLETE BY

MECHANICAL TRADES. ELECTRICAL CONTRACTOR SHALL DISCONNECT

AND MAKE SAFE. DEMO COMPLETE BACK TO SOURCE INCLUDING ALL

CONDUIT AND WIRING. REFER TO NEW WORK PLANS FOR MORE

INFORMATION.

PRIMARY PUMP BEING REMOVED COMPLETE BY MECHANICAL TRADES.

ELECTRICAL CONTRACTOR SHALL DISCONNECT AND MAKE SAFE. DEMO

COMPLETE BACK TO SOURCE INCLUDING ALL CONDUIT AND WIRING.

RETAIN BREAKER AS SPARE.

X NEW WORK KEYED NOTES

NEW BOILER BEING INSTALLED BY MECHANICAL TRADES. ELECTRICAL

CONTRACTOR SHALL PROVIDE DISCONNECT SWITCH AND FINAL

ELECTRICAL CONNECTIONS USING NEW CONDUIT AND WIRING.

NEW BOILER PRIMARY PUMP BEING INSTALLED BY MECHANICAL TRADES.

ELECTRICAL CONTRACTOR SHALL PROVIDE DISCONNECT AND FINAL

ELECTRICAL CONNECTIONS USING NEW CONDUIT AND WIRING.

NEW BOILER EMERGENCY POWER OFF. REFER TO EMERGENCY BOILER POWER

OFF WIRING DIAGRAM LOCATED ON ELECTRICAL DETAILS SHEET. LOCATION TO

BE ON MEZZANINE ABOVE MAIN FLOOR. COORDINATE THE EXACT LOCATION FOR

MOUNTING WITH THE OWNER PRIOR TO INSTALLATION.

NEW BOILER EMERGENCY POWER OFF. REFER TO EMERGENCY BOILER

POWER OFF WIRING DIAGRAM LOCATED ON ELECTRICAL DETAILS SHEET.

LOCATION TO BE ON MAIN FLOOR BELOW MEZZANINE ON LATCH SIDE OF

DOOR. COORDINATE EXACT LOCATION FOR MOUNTING WITH THE

OWNER PRIOR TO INSTALLATION.

NEW CIRCULATION PUMP BEING INSTALLED BY MECHANICAL TRADES.

ELECTRICAL CONTRACTOR SHALL PROVIDE DISCONNECT AND FINAL

ELECTRICAL CONNECTIONS USING NEW CONDUIT AND WIRING.

NEW HEAT EXCHANGER BEING INSTALLED BY MECHANICAL TRADES.

ELECTRICAL CONTRACTOR TO PROVIDE FINAL ELECTRICAL

CONNECTIONS OF CONTROL PANEL USING NEW CONDUIT AND WIRING.

X POWER GENERAL NOTES

A

THESE DRAWINGS ARE DIAGRAMMATIC AND REPRESENT THE GENERAL

EXTENT OF THE WORK TO BE PERFORMED. PROVIDE AND EXECUTE ALL

HVAC SYSTEMS PER ENGINEER'S SPECIFICATION, AND LOCAL APPLICABLE

CODES INCLUDING AMENDMENTS, BULLETINS, ETC; AS WELL AS THE

STANDARDS OF INSTALLATION AND EQUIPMENT ESTABLISHED FOR THE

BUILDINGS, AND REQUIREMENTS OF THE OWNER.

B

EXCEPT FOR CHANGES AS MAY BE SPECIFICALLY APPROVED BY THE

ENGINEER OF RECORD IN ACCORDANCE WITH ALTERNATES OF OPTIONS

AS STATED HEREINAFTER, ALL WORK MUST BE IN FULL ACCORDANCE

WITH THE INTENT OF THE PLANS AND SPECIFICATIONS. SYSTEMS ARE

TO BE COMPLETE, EFFICIENT, AND SATISFACTORY OPERATION WHEN

PROJECT IS DELIVERED TO THE OWNER.

D

CONTRACTOR SHALL OBTAIN ALL NECESSARY PERMITS AND APPROVAL

FROM GOVERNING AUTHORITIES, FILE NECESSARY FORMS, PAY ALL

INSPECTION FEES.

E

ELECTRICAL CONTRACTOR SHALL COMPLY WITH THE LATEST NATIONAL

ELECTRICAL CODE, LIFE SAFETY CODE AND APPLICABLE STATE AND

LOCAL CODES AND ORDINANCES.

F

ELECTRICAL EQUIPMENT AND WIRING SHALL BE NEW AND SHALL BE

FURNISHED AND INSTALLED BY ELECTRICAL CONTRACTOR, UNLESS

OTHERWISE NOTED.

G WIRING SHALL BE IN CONDUIT. CONDUIT SHALL BE 3/4" CONDUIT

MINIMUM. CONDUITS IN FINISHED AREAS SHALL BE CONCEALED.

H

NEW WIRES SHALL BE TYPE THHN. MINIMUM SIZE SHALL BE #12 AWG,

UNLESS OTHERWISE NOTED. FINAL CONNECTIONS TO EQUIPMENT,

FURNISHED AND INSTALLED BY OTHERS, SHALL BE PROVIDED BY THIS

CONTRACTOR.

J ALL P.A. AND SPEAKER SCOPE BY OTHERS. REFER TO TECH DRAWINGS

FOR FURTHER INFORMATION.

(E)DWH-1

B-1 B-2CP-3

CP-4

BP-1

BP-2

J J

1 1

230A 3P

600V30A 3P 600V

PDP-PPPDP-PP PDP-PP PDP-PP

HX-1

RP-P2-8

RP-P2-10

J

RP-P2-36

30A 3P 600V

30A 3P 600V

POOL EQUIPMENT

PIT

MECHANICAL ROOM

MEZZANINE

ERS

BIDS 03/21/2025

DATE:

DESIGN DEVELOPMENT

JOB NO.

SHEET NO.

CHECKED BY

REVISIONS

DRAWN BY

FINAL RECORD

CONSTRUCTION

PRELIMINARY

MARCH 21, 2025

FX: 586.573.0822

PH: 586.573.4100

SUITE 209

www.WakelyAIA.com

WARREN, MICHIGAN 48093

30500 VAN DYKE AVENUE

ARCHITECTS

WAKELY ASSOCIATES, INC.

UNIFIED BUILDING

SYSTEMS ENGINEERING

UBS PROJECT 007.25.02

69 S. GRATIOT AVE.

MT. CLEMENS, MI 48043

TJO

252068

C H

IP

PE

W A

VA

LL

EY

S

C H

O O

LS

C H

IP

PE

W A

VA

LL

EY

H

IG

H

S C

H O

O L

PO

O

L

BO

IL

ER

R

EP

LA

C

EM

EN

T

ENLARGED ELECTRICAL

POWER DEMOLITON AND

NEW WORK PLANS

EP4.01

SCALE:

ENLARGED ELECTRICAL POWER DEMOLITION PLAN - MECHANICAL ROOM

1/4" = 1'-0"

E1-00 SCALE:

ENLARGED ELECTRICAL POWER NEW WORK PLAN - MECHANICAL ROOM

1/4" = 1'-0"

E1-00

C

BOILER EMERGENCY POWER OFF PUSHBUTTON -

SAFETY TECHNOLOGY INTERNATIONAL

MODEL SS2081PO-EN OR EQUIVALENT

(TYPICAL)

BOILER EMERGENCY POWER OFF CONTACTOR

SQUARE D MODEL 8903LA1200V02 OR EQUIVALENT

120VAC COIL, (12) N.O. 600VAC RATED CONTACTS

CONTACT STATUS IS SHOWN

WITH THE COIL ENERGIZED (TYPICAL)

BOILER EMERGENCY POWER SHUT OFF WIRING DIAGRAM

L1

N

L1

N

ERS

BIDS 03/21/2025

DATE:

DESIGN DEVELOPMENT

JOB NO.

SHEET NO.

CHECKED BY

REVISIONS

DRAWN BY

FINAL RECORD

CONSTRUCTION

PRELIMINARY

MARCH 21, 2025

FX: 586.573.0822

PH: 586.573.4100

SUITE 209

www.WakelyAIA.com

WARREN, MICHIGAN 48093

30500 VAN DYKE AVENUE

ARCHITECTS

WAKELY ASSOCIATES, INC.

UNIFIED BUILDING

SYSTEMS ENGINEERING

UBS PROJECT 007.25.02

69 S. GRATIOT AVE.

MT. CLEMENS, MI 48043

TJO

252068

C H

IP

PE

W A

VA

LL

EY

S

C H

O O

LS

C H

IP

PE

W A

VA

LL

EY

H

IG

H

S C

H O

O L

PO

O

L

BO

IL

ER

R

EP

LA

C

EM

EN

T

ELECTRICAL PANEL

SCHEDULES AND DETAILS

E6.00

TO (E) MSB-H1

PDP

1600A, 480/277V, 3P, 4W

PDP-PP

800A, 480/277V, 3P, 4W

480V

208Y/120V

VSD

PARTIAL ONE-LINE DIAGRAM DEMOLITON WORK

(E)RF-1 (E)RF-2 (E)SF-1

(E)AHU-3

(E)CP-1 (E)CP-2(E)CP-4 (E)BC-1 (E)DRAIN

PUMP

(E)FILTER

PUMP

(E)STANDBY

FILTER PUMP(E)

U.V.GENERATOR

(E)CU-1

TO (E) RDP

VSD

(E)CP-10

SP

AC

E

SP

AC

E

(E)CP-7 (E)CP-8

VSD

(E)CP-3

(E)ERU-1 (E)DU-1 (E)CHILLER

(E)SF-2

TO (E) MSB-H1

PDP

1600A, 480/277V, 3P, 4W

PDP-PP

800A, 480/277V, 3P, 4W

480V

208Y/120V

PARTIAL ONE-LINE DIAGRAM DEMOLITON WORK

(E)RF-1 (E)RF-2 (E)SF-1

(E)AHU-3

(E)BC-1 (E)DRAIN

PUMP

(E)FILTER

PUMP

(E)STANDBY

FILTER PUMP(E)

U.V.GENERATOR

(E)CU-1

TO (E) RDP

VSD

(E)CP-7 (E)CP-8

(E)ERU-1 (E)DU-1 (E)CHILLER

(E)SF-2CP-3

10HP

CP-4

10HP

BP-1

1 HP

BP-2

1 HP

SPARESPARE

SPARESPARE

SPARE

4 WIRE WITH GROUND

FEEDER AND CONDUIT SIZES

3 WIRE WITH GROUNDSIZE

COND.FEEDER

(AMPS)

4#12, 1#12 GND IN 3/4"C3#12, 1#12 GND IN 3/4"C12

4#10, 1#10 GND IN 3/4"C3#10, 1#10 GND IN 3/4"C10

ERS

BIDS 03/21/2025

DATE:

DESIGN DEVELOPMENT

JOB NO.

SHEET NO.

CHECKED BY

REVISIONS

DRAWN BY

FINAL RECORD

CONSTRUCTION

PRELIMINARY

MARCH 21, 2025

FX: 586.573.0822

PH: 586.573.4100

SUITE 209

www.WakelyAIA.com

WARREN, MICHIGAN 48093

30500 VAN DYKE AVENUE

ARCHITECTS

WAKELY ASSOCIATES, INC.

UNIFIED BUILDING

SYSTEMS ENGINEERING

UBS PROJECT 007.25.02

69 S. GRATIOT AVE.

MT. CLEMENS, MI 48043

TJO

252068

C H

IP

PE

W A

VA

LL

EY

S

C H

O O

LS

C H

IP

PE

W A

VA

LL

EY

H

IG

H

S C

H O

O L

PO

O

L

BO

IL

ER

R

EP

LA

C

EM

EN

T

ELECTRICAL ONE-LINE RISER

DIAGRAMS

E7.00

Sheets and Views
M0.00 MECHANICAL GENERAL INFORMATION
M1.00 MECHANICAL COMPOSITE PLAN
M4.01 ENLARGED MECHANICAL DEMOLITION AND NEW WORK PLANS
M5.00 MECHANICAL DETAILS AND SCHEDULES
M6.00 MECHANICAL PIPING DIAGRAMS AND TEMPERATURE CONTROLS
E0.00 ELECTRICAL GENERAL INFORMATION
E1.00 ELECTRICAL COMPOSITIE PLAN
EP4.01 ENLARGED ELECTRICAL POWER DEMOLITON AND NEW WORK PLANS
E6.00 ELECTRICAL PANEL SCHEDULES AND DETAILS
E7.00 ELECTRICAL ONE-LINE RISER DIAGRAMS

File details come from the government source that posted it. Updated .