This performance work statement outlines requirements for park custodial services at Michigan Valley Park in Pomona, Kansas. The contractor will provide daily and weekly cleaning services for park facilities such as restrooms, picnic shelters, fire rings, and refuse collection from May through September 2024, with options to extend through 2026. Services include cleaning ceilings, walls, floors, fixtures, emptying trash, and removing debris from grounds. The contractor must furnish cleaning equipment and supplies while the government provides utilities and consumables. The contractor will have the option to utilize an on-site campsite. The solicitation seeks nine contractors to provide these custodial services across various Kansas state parks.

View the file

Other files

Show all 11

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

VENDOR INFORMATION SHEET

FY 24 Mass Solicitation / Park Custodial

W912DQ24Q1006

CUS-07 Michigan Valley Pomona

OFFEROR’S NAME: _______________________________________________

OFFEROR’S ADDRESS: _______________________________________________

OFFEROR’S PHONE #: _______________________________________________

OFFEROR’S EMAIL: _______________________________________________

OFFEROR’S SAM UEI: _______________________________________________

OFFEROR’S CAGE: _______________________________________________

OFFEROR’S SIGNATURE:______________________________________________

BID SCHEDULE

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

0001 1 Job Season Base

Michigan Valley Park Custodian Services – 2024 Base Period

FFP

The Government's payment for Michigan Valley Park Custodian Services shall constitute full compensation to the Contractor for furnishing all labor, equipment, and materials; and performing all operations required to complete the work in conformity with Performance Work Statement (PWS) located in section C.

FOB: Destination

PSC CD: M1PA

NET AMT BASE Year Only ____________________

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

0002 1 Job Season

OPTION

Michigan Valley Park Custodian Service – 2025 Option Period 1

FFP

The Government's payment for Michigan Valley Park Custodian Services shall constitute full compensation to the Contractor for furnishing all labor, equipment, and materials; and performing all operations required to complete the work in conformity with Performance Work Statement (PWS) located in section C.

FOB: Destination

PSC CD: M1PA

NET AMT OPTION Year 1 Only __________________

TOTAL AMOUNT ALL OPTIONS ____________________

Form PPQ-0 (9/30/11)

NAVFAC/USACE PAST PERFORMANCE QUESTIONNAIRE (Form PPQ-0)

CONTRACT INFORMATION (Contractor to complete Blocks 1-4)

1. Contractor Information

Firm Name: CAGE Code:

Address: DUNs Number:

Phone Number:

Email Address:

Point of Contact: Contact Phone Number:

2. Work Performed as: Prime Contractor Sub Contractor Joint Venture Other (Explain)

Percent of project work performed:

If subcontractor, who was the prime (Name/Phone #):

3. Contract Information

Contract Number:

Delivery/Task Order Number (if applicable):

Contract Type: Firm Fixed Price Cost Reimbursement Other (Please specify):

Contract Title:

Contract Location:

Award Date (mm/dd/yy):

Contract Completion Date (mm/dd/yy):

Actual Completion Date (mm/dd/yy):

Explain Differences:

Original Contract Price (Award Amount):

Final Contract Price (to include all modifications, if applicable):

Explain Differences:

4. Project Description:

Complexity of Work High Med Routine

How is this project relevant to project of submission? (Please provide details such as similar equipment, requirements, conditions, etc.)

CLIENT INFORMATION (Client to complete Blocks 5-8)

5. Client Information

Name:

Title:

Phone Number:

Email Address:

6. Describe the client’s role in the project:

7. Date Questionnaire was completed (mm/dd/yy):

8. Client’s Signature:

NOTE: NAVFAC/USACE REQUESTS THAT THE CLIENT COMPLETES THIS QUESTIONNAIRE AND SUBMITS DIRECTLY BACK

TO THE OFFEROR. THE OFFEROR WILL SUBMIT THE COMPLETED QUESTIONNAIRE TO USACE WITH THEIR PROPOSAL, AND MAY DUPLICATE THIS QUESTIONNAIRE FOR FUTURE SUBMISSION ON USACE SOLICITATIONS. CLIENTS ARE HIGHLY

ENCOURAGED TO SUBMIT QUESTIONNAIRES DIRECTLY TO THE OFFEROR. HOWEVER, QUESTIONNAIRES MAY BE

SUBMITTED DIRECTLY TO USACE. PLEASE CONTACT THE OFFEROR FOR USACE POC INFORMATION. THE GOVERNMENT

RESERVES THE RIGHT TO VERIFY ANY AND ALL INFORMATION ON THIS FORM.

ADJECTIVE RATINGS AND DEFINITIONS TO BE USED TO BEST REFLECT

YOUR EVALUATION OF THE CONTRACTOR’S PERFORMANCE

RATING DEFINITION NOTE

(E) Exceptional Performance meets contractual requirements and exceeds many to the Government/Owner’s benefit.

The contractual performance of the element or sub-element being assessed was accomplished with few minor problems for which corrective actions taken by the contractor was highly effective.

An Exceptional rating is appropriate when the Contractor successfully performed multiple significant events that were of benefit to the Government/Owner. A singular benefit, however, could be of such magnitude that it alone constitutes an

Exceptional rating. Also, there should have been NO significant weaknesses identified.

(VG) Very Good Performance meets contractual requirements and exceeds some to the Government’s/Owner’s benefit. The contractual performance of the element or sub-element being assessed was accomplished with some minor problems for which corrective actions taken by the contractor were effective.

A Very Good rating is appropriate when the

Contractor successfully performed a significant event that was a benefit to the

Government/Owner. There should have been no significant weaknesses identified.

(S) Satisfactory Performance meets minimum contractual requirements. The contractual performance of the element or sub-element contains some minor problems for which corrective actions taken by the contractor appear or were satisfactory.

A Satisfactory rating is appropriate when there were only minor problems, or major problems that the contractor recovered from without impact to the contract. There should have been NO significant weaknesses identified. Per DOD policy, a fundamental principle of assigning ratings is that contractors will not be assessed a rating lower than Satisfactory solely for not performing beyond the requirements of the contract.

(M) Marginal Performance does not meet some contractual requirements. The contractual performance of the element or sub-element being assessed reflects a serious problem for which the contractor has not yet identified corrective actions. The contractor's proposed actions appear only marginally effective or were not fully implemented.

A Marginal is appropriate when a significant event occurred that the contractor had trouble overcoming which impacted the

Government/Owner.

(U) Unsatisfactory Performance does not meet most contractual requirements and recovery is not likely in a timely manner. The contractual performance of the element or sub-element contains serious problem(s) for which the contractor's corrective actions appear or were ineffective.

An Unsatisfactory rating is appropriate when multiple significant events occurred that the contractor had trouble overcoming and which impacted the Government/Owner. A singular problem, however, could be of such serious magnitude that it alone constitutes an unsatisfactory rating.

(N) Not Applicable No information or did not apply to your contract Rating will be neither positive nor negative.

TO BE COMPLETED BY CLIENT

PLEASE CIRCLE THE ADJECTIVE RATING WHICH BEST REFLECTS

YOUR EVALUATION OF THE CONTRACTOR’S PERFORMANCE.

1. QUALITY:

a) Quality of technical data/report preparation efforts E VG S M U N

b) Ability to meet quality standards specified for technical performance E VG S M U N

c) Timeliness/effectiveness of contract problem resolution without extensive customer guidance

E VG S M U N

d) Adequacy/effectiveness of quality control program and adherence to contract quality assurance requirements (without adverse effect on performance)

E VG S M U N

2. SCHEDULE/TIMELINESS OF PERFORMANCE:

a) Compliance with contract delivery/completion schedules including any significant intermediate milestones. (If liquidated damages were assessed or the schedule was not met, please address below)

E VG S M U N

b) Rate the contractor’s use of available resources to accomplish tasks identified in the contract

E VG S M U N

3. CUSTOMER SATISFACTION:

a) To what extent were the end users satisfied with the project? E VG S M U N

b) Contractor was reasonable and cooperative in dealing with your staff

(including the ability to successfully resolve disagreements/disputes;

responsiveness to administrative reports, businesslike and communication)

E VG S M U N

c) To what extent was the contractor cooperative, businesslike, and concerned with the interests of the customer?

E VG S M U N

d) Overall customer satisfaction E VG S M U N

4. MANAGEMENT/ PERSONNEL/LABOR

a) Effectiveness of on-site management, including management of subcontractors, suppliers, materials, and/or labor force?

E VG S M U N

b) Ability to hire, apply, and retain a qualified workforce to this effort E VG S M U N

c) Government Property Control E VG S M U N

d) Knowledge/expertise demonstrated by contractor personnel E VG S M U N

e) Utilization of Small Business concerns E VG S M U N

f) Ability to simultaneously manage multiple projects with multiple disciplines E VG S M U N

g) Ability to assimilate and incorporate changes in requirements and/or priority, including planning, execution and response to Government changes

E VG S M U N

h) Effectiveness of overall management (including ability to effectively lead, manage and control the program)

E VG S M U N

5. COST/FINANCIAL MANAGEMENT

a) Ability to meet the terms and conditions within the contractually agreed price(s)?

E VG S M U N

b) Contractor proposed innovative alternative methods/processes that reduced cost, improved maintainability or other factors that benefited the client

E VG S M U N

c) If this is/was a Government cost type contract, please rate the Contractor’s timeliness and accuracy in submitting monthly invoices with appropriate back-up documentation, monthly status reports/budget variance reports, compliance with established budgets and avoidance of significant and/or unexplained variances (under runs or overruns)

E VG S M U N

d) Is the Contractor’s accounting system adequate for management and tracking of costs? If no, please explain in Remarks section.

Yes No

e) If this is/was a Government contract, has/was this contract been partially or completely terminated for default or convenience or are there any pending terminations? Indicate if show cause or cure notices were issued, or any default action in comment section below.

Yes No

f) Have there been any indications that the contractor has had any financial problems? If yes, please explain below.

Yes No

6. SAFETY/SECURITY

a) To what extent was the contractor able to maintain an environment of safety, adhere to its approved safety plan, and respond to safety issues?

(Includes: following the users rules, regulations, and requirements regarding housekeeping, safety, correction of noted deficiencies, etc.)

E VG S M U N

b) Contractor complied with all security requirements for the project and personnel security requirements.

E VG S M U N

7. GENERAL

a) Ability to successfully respond to emergency and/or surge situations

(including notifying COR, PM or Contracting Officer in a timely manner regarding urgent contractual issues).

E VG S M U N

b) Compliance with contractual terms/provisions (explain if specific issues) E VG S M U N

c) Would you hire or work with this firm again? (If no, please explain below) Yes No

d) In summary, provide an overall rating for the work performed by this contractor.

E VG S M U N

Please provide responses to the questions above (if applicable) and/or additional remarks. Furthermore, please provide a brief narrative addressing specific strengths, weaknesses, deficiencies, or other comments which may assist our office in evaluating performance risk (please attach additional pages if necessary):

RELATED EXPERIENCE FORM:

This form must be completed by all offerors in order to receive consideration for award. If additional space is needed, this form may be duplicated as necessary, no more than three submissions. Information describing the offeror’s complete contracting background and experience shall be provided. The contractor’s information should only describe experience that directly pertains to the type of work set forth in this in Section C of this solicitation. Include details of any training which would enable you to better perform the work outlined in the specifications. Reference information should include the names and current telephone numbers of all agencies/firms listed.

Experience

Contract Work/Type:

Agency/Firm for Whom the Work Was Performed:

Contact Person at the Site: Telephone:

Month/Year Work Began: Month/Year Work Ended:

Description of Duties/Work: (Please provide details)

Section C - Descriptions and Specifications

PERFORMANCE WORK STATEMENT

PARK CUSTODIAN

MICHIGAN VALLEY PARK PUBLIC USE AREA

POMONA LAKE

Performance Work Statement

C.1 General Information

C.1.1 Background. Pomona Lake is located approximately 7 miles west of Pomona, Kansas on highway 268. The dam was completed in 1963, which creates a reservoir of approximately 70,000 acre-feet of water. Recreational development at Pomona includes 6 parks and access areas managed by the U.S. Army Corps of Engineers. Park areas at Pomona Lake offer a wide variety of recreation facilities including boat launching ramps, campgrounds, marinas, picnic areas, sand swimming beaches, and a visitor center. Many routine maintenance items are contracted to the private sector. Mowing, fee collection, refuse collection, and facility cleanup are just a few of the activities that are performed by private contractors for the Corps of Engineers.

C.1.2 Scope of Work: The contractor will have the option to utilize a park campsite designated for this contract at no cost to the contractor. If contractor shall choose to utilize this option they shall move onto the site location a minimum of two (2) but not more than five (5) days prior to the start of the service period. The contractor shall remove his trailer and all personal property from government furnished campsite not later than seven (7) days after the end of the service period. The contractor shall maintain the area where the trailer is always parked in a clean and sanitary condition. The contractor will be required to mow their site. Government will provide push mower.

No dog pens, horse corrals, poultry cages or similar facilities for pets or raising of animals will be allowed. The contractor's pets shall be confined on a leash of 6 feet or less in length. The contractor shall furnish labor, equipment, and supplies to provide custodial services for Michigan Valley Park public use areas at Pomona Lake Project, near Pomona Kansas as described in the attached performance work statement (PWS) and elsewhere in the contract.

C.1.3 Dates of Performance:

The period of performance shall be for one (1) Base Year of 12 months and two (2) 12-month option years.

Actual services shall be performed from 01 May 2024 through 30 September 2024 of each year during the periods listed below.

The Period of Performance reads as follows:

Base Year – 01 May 2024 through 30 April 2025 Option Year 1 – 01 May 2025 through 30 April 2026

C.1.4 Schedule of Performance: Daily cleaning shall begin promptly at 7:00 a.m. and continue until such time as all work is completed. Contractor shall provide services 6- days each week with Wednesday as a regular day off.

C.1.5 Post-Award Conference: After award, but prior to commencement of work, the contractor shall contact the Contracting Officer’s Representative, to arrange a mutually agreeable time to meet at the Pomona Project Office to review the requirements and details of the work.

C.1.6 Quality Control:

C.1.6.1 The contractor will develop a Quality Control Plan designed to demonstrate how the contractor will meet the needs of the project. The Quality Control Plan will document how well the contractor is meeting these needs and will be submitted for approval prior to work on this contract. The contractor must provide and maintain an inspection system acceptable to the government covering the services under this contract. Complete records of all inspection work performed by the contractor must be maintained and made available to the government during contract performance.

C.1.6.2 The contractor shall designate, in writing, a responsible on-site representative of each work crew who shall serve as the contact for matters involving quality and performance or nonperformance of the required work assigned to that crew. The government reserves the right to discuss park custodian matters regarding quality, performance or nonperformance with any employee on-site and currently employed by the contractor.

C.1.7 Quality Assurance:

C.1.7.1 Quality Assurance Surveillance Plan: A Quality Assurance Surveillance Plan (QASP) will be used during the life of the contract to ensure that the Contractor is performing the services required by this PWS in an acceptable manner. The Government develops the QASP and the Project Office administers the Plan through Quality Assurance Evaluators (QAE)s.

C.1.7.2 The government has the right to inspect and test all services called for by the contract, to the extent practicable at all times and places during the term of the contract. The government shall perform inspections and tests in a manner that shall not unduly delay the work.

C.1.7.3 If any of the services do not conform to contract requirements the government may require the contractor to perform the services again in conformity with contract requirements at no increase in contract amount. When the defects in services cannot be corrected by re-performance the government may (1) require the contractor to take necessary action to ensure that future performance conforms to contract requirements and (2) reduce the contract price to reflect the reduced value of the services performed.

C.1.7.4 If the contractor fails to promptly perform the services again or to take the necessary action to ensure future performance is in conformity with contract requirements, the government may (1) by contract, or otherwise, perform the services and charge to the contractor any cost incurred by the government that is directly related to the performance of such service or (2) terminate the contract in whole or in part.

C.1.8 INSURANCE: The Contractor shall provide and maintain during the entire performance of this contract, at least the kinds and minimum amounts of insurance required below. Before commencing work under this contract, the Contractor shall notify the Contracting Officer in writing that the required insurance has been obtained and provide the Contracting Officer a current certificate of insurance.

REQUIRED INSURANCE SCHEDULE

Workmen’s Compensation Coverage complying with applicable

State Statute.

Employer’s Liability Minimum amount of $100,000.00

General Liability on Minimum limits of $100,000 per Comprehensive form of Policy occurrence for bodily injury which includes, but is not limited to, insurance for all work required herein

Comprehensive Automobile Minimum limits of $100,000 per Liability person and $200,000 per occurrence for bodily injury, and $20,000 per occurrence for property damage.

NOTE: Coverage required above are minimums. If higher limits of coverage are required by State Statute, the Contractor shall be responsible for obtaining such additional coverage.

IOWA: Iowa Insurance Division 515 281-5705 KANSAS: Insurance Commissioner, 1-800-432-2484

Division of Workers Compensation, 785-296-3441 MISSOURI: Division of Insurance, 314-751-3365 NEBRASKA State Insurance Department, 402-471-2201

C.1.9 Coordination with the Project Office:

C.1.9.1 As each item of work is completed, the contractor's representative at the job shall enter the time that the item of work was completed on a Contractor's Daily Worksheet. Completed and signed worksheets shall be provided as directed by the Contracting Officer's Representative. Contractor Daily Worksheet forms (section C.3.3) shall be furnished by the Government.

C.1.9.2 Day to day contact with government personnel and telephone communication shall normally provide adequate information exchange. The government reserves the right to schedule meetings at the Project Office as necessary to ensure strict compliance with the terms of this contract. Such meetings shall be scheduled, to the extent possible, at mutually convenient times. However, upon notice, the contractor shall attend meetings regarding matters affecting this contract.

C.1.9.3 To assist the visiting public in reclaiming lost articles, all property left by visitors and found during cleanup operations shall be turned in to the Project Office.

C.1.9.4 Any evidence of vandalism, instances of facilities not operating properly, or are in need of repair, shall be promptly reported to project personnel.

C.1.10 Contractor Personnel:

C.1.10.1 All Contractor personnel shall be fully clothed, at all times, while performing these services. Clothing shall be clean and neat in appearance.

C.1.10.2 Contractor personnel shall utilize tact, diplomacy, and courtesy at all times during contact with the public.

C.1.11 Safety Requirements:

C.1.11.1 Prior to beginning work on this contract, the contractor shall have an approved Accident Prevention Plan.

This plan shall be in accordance with the most recent EM 385-1-1. The plan is intended to be a viable document and enhance the safety of project staff and visitors. The contractor will be expected to take a vital interest in safety and educate their employees to work and plan their work safely. Proper driving techniques and defensive driving will be practiced preventing vehicle accidents and property damage.

C.1.11.2 The contractor shall display a sign reading "CLOSED FOR CLEANING" at the entrance of all facilities during cleaning operations.

C.1.12 Other Contractors: The government may undertake or award other contracts for additional work, and the contractor shall fully cooperate with such other contractors and government employees. All work must be carefully planned and fitted not to interfere with such other work. The contractor shall not commit or permit any act that will interfere with the performance of work by other contractors or by government employees.

C.2 Definitions and Acronyms: The following definitions and descriptions apply wherever the word, phrase, or acronym is used in this performance work statement.

Clean: As used generally means free of all foreign matter, film, spots, streaks, dirt or impurities. As used for acceptance of work means gleaming, free from dirt, contamination, or impurities, unsoiled, unstained, neat and tidy.

Contracting Officer's Representative: An individual designated and authorized in writing by the contracting officer to perform specific technical or administrative functions.

Debris: Any articles including but not limited to: paper, gum, litter, strings, cigarette butts, leaves, and sand.

Dirt: Particles of sand, soil, grit, or pebbles; mud, dust, tar, liquid stains, vomit, and/or ashes.

Foreign Matter: Any articles, or parts thereof, not belonging to the place found.

Fully-Clothed: Deemed to mean that a sleeved shirt (or T-shirt), trousers, and shoes shall be worn at all times except that this requirement shall not be construed to replace or eliminate the necessity for the wearing of appropriate protective clothing or devices as may be required for the application of various chemicals.

Performance-Based Contract: (FAR 2.101) Structuring all aspects of an acquisition around the purpose of the work to be performed with the contract requirements set forth in clear, specific, and objective terms with measurable outcomes as opposed to either the manner by which the work is to be performed or broad and imprecise requirements.

Performance Requirements Summary (PRS): The PRS shows contract requirements, the component requirements related to each contract requirement, the price of each work requirement as a percentage of the associated contract requirement (Fixed Price Contracts), the standard of performance, and the acceptable quality level (AQL) for each work requirement.

Quality Assurance Surveillance Plan (QASP): An organized written document used by government for quality assurance surveillance. The QASP contains sampling/ evaluation guides, checklists, and the performance requirements summary (PRS).

Quality Control (QC): A method used by the contractor to control the quality of goods and services provided.

Quality Assurance (QA): A method used by the government to provide some measure of control over the quality of purchased goods and services received.

"Service contract" means a contract that directly engages the time and effort of a contractor whose primary purpose is to perform an identifiable task rather than to furnish an end item of supply. A service contract may cover services performed by either professional or nonprofessional personnel whether on an individual or organizational basis. Some of the areas in which service contracts are found include the following:

Maintenance, overhaul, repair, servicing, rehabilitation, salvage, modernization, or modification of supplies, systems, or equipment.

(b) Routine recurring maintenance of real property.

(c) Housekeeping and base services.

(d) Operation of Government-owned equipment facilities, and systems.

C.3 Government Furnished Equipment, Materials and Supplies. Government furnished materials and supplies are provided to the contractor only for use in performing work specified in this contract.

C.3.1 Campsite: The government shall provide a campsite with full utility hookups for the contractor's trailer. The site is furnished with a tool storage shed. Refuse collection service is provided at the park entrance.

C.3.2 Government Furnished Consumable Items: The following consumable items shall be furnished to the contractor by the government from stock. The government shall retain control of expendables, to be dispensed on an as-needed basis for use in performance of the contract.

Water for cleaning Toilet paper Contractor daily worksheets Trash Bags

C.3.3 Government Furnished Property – The government will furnish to the contract the following identified property to be used in performing the contract. When the property is delivered, the contractor must verify its quantity and condition in writing to the Contracting Officer or his authorized representative on Memorandum Receipt ENG 4866, within 24 hours of receipt. Damage or loss while in the contractor’s possessions shall be reported in writing, within 24 hours, to the Contracting Officer or his authorized representative.

Item (description) Quantity

(1) Lawn Mower 1 each

C.4 Contractor Furnished Equipment and Supplies: The contractor shall furnish all equipment and supplies not identified in Section C.3 of this PWS as Government furnished supplies and equipment and as specifically identified in this section. All contractor furnished equipment and supplies must be approved by the Contracting Officer’s Representative prior to initial use.

C.4.1 If the contractor chooses to utilize their option to stay in the provided campsite they must furnish a mobile travel trailer, motor home or approved equal, containing sanitary facilities and all equipment necessary for habitation. Tents or "Pop-Up" type tent campers shall not be permitted. The unit shall present a neat appearance when parked at the designated park custodian site. If self-propelled units are utilized, they shall remain on jacks (blocked up for the duration of contract) and shall not be used as transportation.

C.4.2 Transportation vehicle(s), other than specified in C.4.1 above, for use in performing the requirements of this contract.

C.4.3 A pressure water pump and tank for water supply that is approved by the Contracting Officer’s Representative. The pump shall be capable of delivering an adequate stream of water to flush/rinse facilities being serviced. NOTE: The use of a pressure water pump does not relieve the contractor of the responsibility of cleaning the facilities by hand. It may be necessary to scrub some surfaces with a brush and cleanser to achieve the desired results.

C.4.4 All cleansers, chemicals, deodorant solutions (may be pine oil), brushes, towels, hand tools, and other supplies necessary to clean the facilities to the standard required by this contract.

C.5 Specific Tasks:

C.5.1 General Information Cleanup of facilities is directly related to public health and sanitation; therefore, it is essential that all facilities be serviced as specified. In the event that an area or facilities within an area are missed, or are not properly cleaned, the contractor shall re-clean the area or affected facilities immediately upon receipt of such notice from the Contracting Officer or his authorized representative. Failure to correct noted deficiencies may result in withholding payment for the work not performed. Equipment breakdown shall not relieve the contractor of the responsibility of performing the work as specified. The contractor shall assure that he has, or can obtain on short notice, sufficient backup equipment to continue the services as specified without interruption in the event of mechanical failure of his primary equipment.

C.5.2 Scheduled Services: All scheduled services shall begin on May 1 regardless of the day of the week. Services shall be performed through September 30.

C.5.3 Schedule of Duties:

C.5.3.1 Daily cleaning: Daily cleanings shall begin promptly at 7:00 a.m. and proceed continuously until all facilities have been cleaned. All park facilities shall be cleaned six (6) days each week with Wednesdays being the contractor’s day off. Contractor shall service grills and fire rings on Thursday of each week. If a federal holiday should fall on the regular day off, the contracting officer shall designate an alternate day off.

C.5.3.2 Weekend cleanings: In addition to the scheduled cleanings; on Friday, Saturday, and Sunday, check all waterborne facilities at mid-afternoon, and again in the evening between 7 p.m. and 9 p.m. At this time perform any minor cleaning tasks and replenish toilet paper supply as required.

C.5.3.3 Holiday cleanings: In addition to the daily scheduled cleanings, all waterborne facilities shall be cleaned a second time on Friday, Saturday, and Sunday of the holiday weekends. The first cleaning shall be a major and the second shall be a minor cleaning. The second cleaning shall begin in the late afternoon at a time designated by the Contracting Officer's Representative.

C.5.3.4 If a federal holiday should fall on the scheduled day-off the contracting officer shall designate an alternate day off. All work shall be accomplished within the time frames specified above. Services rendered outside the time periods specified will not be compensated unless specifically approved in writing by the Contracting Officer or his approved representative.

C.5.4 Service Facilities / Areas

FACILITY TOTAL

Single Picnic Shelter 1

Group Picnic Shelter 3

Grills at Shelters 4

Dump station 1

Single Restrooms 1

Double Restrooms 2

Shower Buildings 2

Single Vault Privy 2

Double Vault Privy 3

Water Fountain 2

Fishing Dock 2

Fire rings 96

*Total number of fire rings and grills shall be subject to a variation of +/- 10 at no change in contract price. Exterior refuse containers shall be subject to a variation of +/- 4 containers at no change in contract price.

C.5.5 Shower/latrines, vault and flush-type toilets, and change houses:

C.5.5.1 Ceilings - Clean ceilings on inside and overhang on outside of buildings to remove spider webs, dust, bird and insect nests, dirt, and insect spots. If soap or disinfectant is used, rinse with clean water and wipe dry.

C.5.5.2 Walls, shower stalls, benches, partitions, stools (flush-type), wash basins, doors and refuse containers

– Clean and disinfect to ensure free of all dirt, oil, lotions, soap residue, calcium deposits or other foreign matter. All surfaces including soap trays, faucets, stool lids, handicap bars, etc. shall present a dried polished appearance free of cleaning solution, disinfectant, water spots, etc. Exterior walls shall have spider webs, dust, bird and insect nests, debris and grass clippings removed.

C.5.5.3 Floors and floor drain plates – Shall be disinfected and free of all foreign matter, trash, and excess water.

C.5.5.4 Mirrors – Shall be free of dirt, dust, smudges and streaks.

C.5.5.5 Stools – Non-waterborne (vault-type) - Risers inside and outside, seats and lids shall be cleaned and disinfected to provide a surface free of foreign matter. Seats shall present a dry appearance free of disinfectant and water spots.

C.5.5.6 Washer and dryers – Both the inside and outside shall be maintained in a clean condition free of dirt or detergent residue. Lint screens of dryers shall be cleaned during each cleaning.

C.5.5.7 Light Fixtures - Remove all dirt, dust, bugs, cobwebs, smudges, and streaks from fixtures, bulbs and grill.

Reinstall grillwork.

C.5.5.8 Metal louvers – Maintain a clean appearance free of spider webs, dust, bird and insect nests, bird droppings, or other foreign matter.

C.5.5.9 Toilet Paper Dispensers - All toilet paper dispensers on structures serviced under this contract shall be kept clean and fully supplied. All paper shall be protected to prevent wetting during cleaning operations.

C.5.5.9.1 Care shall be taken to avoid wetting of hand dryers, and electrical fixtures during cleaning.

C.5.6 Picnic Shelter: Note: Pressure water pump and/or garden hose will be needed to obtain satisfactory results at picnic shelters

C.5.6.1 Ceiling, beams, trusses, and overhang shall be clean and free of all dirt, spider webs, dust, bird and insect nests, and foreign matter and provide a clean condition.

C.5.6.2 Table tops, seats, and floor slabs shall be cleaned and disinfected to ensure a condition free of all dirt, food particles, foreign matter, and excess water.

C.5.6.3 Refuse and litter handling (facilities):

C.5.6.3.1 All trash, litter, debris or residue (including but not limited to cigarette butts, match books, bottle caps, snap tabs and paper) within or immediately adjacent to the facility being services shall be removed. At no time shall trash or debris be swept or washed out of a facility and left.

C.5.6.3.2 Refuse containers located within the facility being serviced shall have all trash, litter, debris or residue removed. The containers shall present a clean and odor free condition. Plastic liners shall be replaced.

C.5.6.3.3 Exterior refuse containers (excluding dumpsters) placed at various locations throughout the park area shall be cleaned and emptied and the refuse placed in centrally located dumpsters. A new plastic liner shall be installed in containers (as needed) and the lids reinstalled on the containers. Exterior refuse containers and holders shall present a clean odor free condition. When odor becomes prevalent in trash containers or they become full prior to regular scheduled major servicing the contractor shall empty and wash containers and holders as needed to provide sanitary conditions for the public.

C.5.6.4 Refuse and litter handling (park areas, roadways, beaches, playgrounds, boat ramps, and parking areas):

C.5.6.4.1 All mowed park areas, on and adjacent to roadways, and parking areas, and on and adjacent to roadways and parking areas, and on and adjacent to beach and boat ramp areas (including boat ramp riprap areas) shall be free of litter and debris. Litter and debris shall be placed in the nearest refuse container

C.5.6.4.2 Campers are given trash bags and asked to deposit their trash in the trash dumpster located at the park entrance. There are occasions when some campers do not comply with this request. The contractor shall ensure that campsites are free of all trash and debris left on or near the site.

C.5.6.5 All sidewalks within 50 feet of a facility being serviced shall be kept free of debris, stains, and residue. Any excess water shall be removed. Cracks between sidewalk sections, and along buildings and/or graveled or paved areas shall be free of debris.

C.5.6.6 Water fountains shall be cleaned and disinfected to remove all residue and stains.

C.5.6.7 Water hydrants shall be cleaned to remove all cobwebs and debris from the fixtures and from the immediate vicinity.

C.5.6.8 Grills, fire rings, and cooking surfaces shall be cleaned of debris, ashes, food particles, and other foreign matter. Remove all debris, litter, ashes and coals on the ground in the immediate vicinity of grills and fire rings.

Grills, and fire rings containing live ashes or warm coals shall be left undisturbed and shall be cleaned at the next regularly scheduled cleaning.

C.5.6.9 Picnic tables on unoccupied campsites and unoccupied tables within visitor areas shall be checked each day services are performed to ensure that clean conditions exist. Tables shall be cleaned by removing all foreign matter to include cleaning solution residue. NOTE: Past experience indicates that an average of five (5) percent of the tables shall require cleaning on any given day depending on the amount of visitation.

C.5.6.10 Park benches, playground equipment, and bulletin boards shall be kept clean and free from cobwebs, bird droppings, insect nests foreign matter, and debris. The outside glass of visitor bulletin boards shall be free of dust, smudges and streaks.

C..5.6.11 ANTITERRORISM/OPERATION SECURITY REQUIREMENTS

The security requirements described below apply to all contract personnel (including employees of the prime Contractor (“Contractor”) and all subcontractor employees) supporting the performance requirements of this contract. The Contractor is responsible for compliance with these security requirements. Questions regarding security matters shall be addressed to the designated Government representative (e.g., Contracting Officer Representative (COR), Requiring Activity (RA) representative, or Contracting Officer (if a COR or other RA representative is not appointed)). Contract personnel are critical to the overall security and safety of US Army Corps of Engineers (USACE) installations, facilities and activities, and security awareness training contributes to those efforts. The Department of Defense (DoD) and Army security training requirements specified below, if applicable, are performance requirements; all applicable contract personnel shall complete initial training within 30 days of contract award or the date new contract personnel begin performance on the contract. Within five business days from the completion of training, the Contractor shall provide written documentation (e.g., email or memorandum) to the Government representative. The documentation shall include the names of contract personnel trained and which training they completed; the Contractor shall maintain training records as part of their contract files and be prepared to provide copies of training certificates to the Government representative.

Contractor personnel and vehicles are subject to search when entering federal installations. Additionally, all contract personnel shall comply with Force Protection Condition (FPCON) measures, Random Antiterrorism Measures (commonly referred to as “RAMs”), and Health Protection Condition (HPCON) measures. The Contractor is responsible for meeting performance requirements during elevated FPCON and/or HPCON levels in accordance with applicable RA plans and procedures --this includes identifying mission essential and non-mission essential personnel. In addition to the changes otherwise authorized by the changes clause of this contract, should the FPCON or HPCON levels at any individual facility or installation change, the Government may implement security changes that affect contract personnel. The Contractor shall ensure all contract personnel are aware of their security responsibilities, including any site-specific requirements identified in local policies or procedures.

All contract personnel requiring physical access to a federal installation or facility shall comply with the access control procedures of that location. Contract personnel requiring unescorted access to meet contract performance requirements on a DoD installation in the US shall be vetted by the installation/facility Provost Marshal/Directorate of Emergency Services/Security Office using the National Crime Information Center- Interstate Identification Index (commonly referred to as “NCIC-III”) and Terrorist Screening Database (commonly referred to as “TSDB”). Contract personnel shall comply with all personal identity verification requirements specified in installation/facility policies and procedures. Contract personnel who do not meet requirements for unescorted access to USACE facilities shall coordinate escorted access with the Government representative, as needed. Contract personnel who receive keys, access cards, or lock combinations that provide access to government-owned property shall comply with key and lock control procedures of the RA.

All contract personnel shall receive initial and annual refresher training from the RA representative on the local suspicious activity reporting program. This locally developed training provides contract personnel with general information on suspicious behavior, and guidance on reporting suspicious activity to the project manager, security representative or law enforcement entity.

Contractors shall comply with the requirements set forth in FAR clause 52.222-54 Employment Eligibility Verification and FAR Subpart 22.18 in using the E-Verify Program at (https://www.e-verify.gov/) (website subject to change) to meet the contract employment eligibility requirements. Contractors are encouraged to cooperate with Federal and State agencies responsible for enforcing labor requirements to include eligibility for employment under United States immigration laws in accordance with FAR 22.102-1(i). An initial list of

C.5.3.2 Check Facilities on

Weekends Check Waterborne Facilities and Service as

Necessary # facilities per servicing 2%

C.5.3.3 Second Cleaning on Holiday Weekends

Clean Waterborne Facilities to Standard set forth in Section C.2

# facilities per servicing 2%

C.5.6.4 Refuse and Litter Handling Collect Litter from Park Areas and Roadways # of services per month

4% verified/eligible candidates shall be provided to the COR no later than three business days after the initial contract award. When contracts are with individuals, the individuals will be required to complete a Form I-9, Employment Eligibility Verification, and submit it to the Contracting Officer to become part of the official contract file.

Per the E-Verify Website the following exemptions apply:

Employers whose contracts are exempt from the E-Verify federal contractor rule are not required to enroll in E-Verify. A contract is considered exempt if any one of the following applies: (1) It is for fewer than 120 days.

(2) It is valued at less than Simplified Acquisition Threshold ($250,000), the simplified acquisition threshold.

(3) All work is performed outside the United States. (4) It includes only commercially available off-the-shelf (COTS) items and related services. (Source: https://www.e-verify.gov/employers/federal-contractors/exemptions-and-exceptions).

C.6 Applicable Publications and Forms

C.6.1 MAP: Information on Pomona Lake can be found on the Internet at http://www.nwk.usace.army.mil/pomona/pomona_home.htm

Performance Requirements Summary (PRS)

Section (Para)

Contract Requirement Performance Standard Lot Description

ALP

C.5.3.1 Daily Cleanup Clean All Park Facilities to Standard Set Forth in

Section C.2 # facilities per servicing 2%

Performance Requirements Summary (PRS)

Section (Para)

Contract Requirement Performance Standard Lot Description

ALP

C.5.6.5 Clean Sidewalks Clean Sidewalks of Debris and Residue # Services per month 4%

C.5.6.6 C.5.6.7

Clean Water Fountains and Hydrants

Clean and Disinfect Water Fountains and Hydrants # Services per month

4%

C.5.6.8 Grills and Fire Rings Remove Ash and Debris from Grills and Fire Rings # of units serviced

4%

C.5.6.9 Picnic Tables Clean Picnic Tables as Necessary # of units serviced 4%