CUS-05 OFMI Day Use.pdf
PDF 1 MB Posted
- Attached to
- Kansas Mass Park Custodials, W912DQ24Q1006
- Solicitation number
- W912DQ24Q1006
About this file
This document is a performance work statement for park custodial services at Milford Lake in Kansas. The contractor will provide day use area cleaning services at four public use areas from April to September each year, with an initial base year and two option years. Services include cleaning picnic shelters, comfort stations, vault toilets, sidewalks, charcoal grills and other facilities. The contractor will also remove litter and refuse from park areas, roadways, beaches and boat ramps totaling over 30 acres. The Army Corps of Engineers district office in Kansas City will oversee the contract. The contractor must furnish staff, supplies, a camper or RV, and vehicles to perform the work, while the government provides a campsite, utilities, and consumables. The performance requirements specify cleaning and litter removal standards.
View the file
Other files
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
VENDOR INFORMATION SHEET
FY 24 Mass Solicitation / Park Custodial
W912DQ24Q1006
CUS-05 Day Use Milford
OFFEROR’S NAME: _______________________________________________
OFFEROR’S ADDRESS: _______________________________________________
OFFEROR’S PHONE #: _______________________________________________
OFFEROR’S EMAIL: _______________________________________________
OFFEROR’S SAM UEI: _______________________________________________
OFFEROR’S CAGE: _______________________________________________
OFFEROR’S SIGNATURE:______________________________________________
BID SCHEDULE
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0001 1 Job Season Base
Day Use Public Use Areas Custodian Services – 2024 Base Period
FFP
The Government's payment for Day Use Public Use Areas Custodian Services shall constitute full compensation to the Contractor for furnishing all labor, equipment, and materials; and performing all operations required to complete the work in conformity with Performance Work Statement (PWS) located in section C.
FOB: Destination
PSC CD: M1PA
NET AMT BASE Year Only ____________________
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0002 1 Job Season
OPTION
Day Use Public Use Areas Custodian Services – 2025 Option Period 1
FFP
The Government's payment for Day Use Public Use Areas Custodian Services shall constitute full compensation to the Contractor for furnishing all labor, equipment, and materials; and performing all operations required to complete the work in conformity with Performance Work Statement (PWS) located in section C.
FOB: Destination
PSC CD: M1PA
NET AMT OPTION Year 1 Only __________________
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0003 1 Job Season
OPTION
Day Use Public Use Areas Custodian Services – 2026 Option Period 2
FFP
The Government's payment for Day Use Public Use Areas Custodian Services shall constitute full compensation to the Contractor for furnishing all labor, equipment, and materials; and performing all operations required to complete the work in conformity with Performance Work Statement (PWS) located in section C.
FOB: Destination
PSC CD: M1PA
NET AMT OPTION Year 2 Only __________________
TOTAL AMOUNT ALL OPTIONS ____________________
Form PPQ-0 (9/30/11)
NAVFAC/USACE PAST PERFORMANCE QUESTIONNAIRE (Form PPQ-0)
CONTRACT INFORMATION (Contractor to complete Blocks 1-4)
1. Contractor Information
Firm Name: CAGE Code:
Address: DUNs Number:
Phone Number:
Email Address:
Point of Contact: Contact Phone Number:
2. Work Performed as: Prime Contractor Sub Contractor Joint Venture Other (Explain)
Percent of project work performed:
If subcontractor, who was the prime (Name/Phone #):
3. Contract Information
Contract Number:
Delivery/Task Order Number (if applicable):
Contract Type: Firm Fixed Price Cost Reimbursement Other (Please specify):
Contract Title:
Contract Location:
Award Date (mm/dd/yy):
Contract Completion Date (mm/dd/yy):
Actual Completion Date (mm/dd/yy):
Explain Differences:
Original Contract Price (Award Amount):
Final Contract Price (to include all modifications, if applicable):
Explain Differences:
4. Project Description:
Complexity of Work High Med Routine
How is this project relevant to project of submission? (Please provide details such as similar equipment, requirements, conditions, etc.)
CLIENT INFORMATION (Client to complete Blocks 5-8)
5. Client Information
Name:
Title:
Phone Number:
Email Address:
6. Describe the client’s role in the project:
7. Date Questionnaire was completed (mm/dd/yy):
8. Client’s Signature:
NOTE: NAVFAC/USACE REQUESTS THAT THE CLIENT COMPLETES THIS QUESTIONNAIRE AND SUBMITS DIRECTLY BACK
TO THE OFFEROR. THE OFFEROR WILL SUBMIT THE COMPLETED QUESTIONNAIRE TO USACE WITH THEIR PROPOSAL, AND MAY DUPLICATE THIS QUESTIONNAIRE FOR FUTURE SUBMISSION ON USACE SOLICITATIONS. CLIENTS ARE HIGHLY
ENCOURAGED TO SUBMIT QUESTIONNAIRES DIRECTLY TO THE OFFEROR. HOWEVER, QUESTIONNAIRES MAY BE
SUBMITTED DIRECTLY TO USACE. PLEASE CONTACT THE OFFEROR FOR USACE POC INFORMATION. THE GOVERNMENT
RESERVES THE RIGHT TO VERIFY ANY AND ALL INFORMATION ON THIS FORM.
ADJECTIVE RATINGS AND DEFINITIONS TO BE USED TO BEST REFLECT
YOUR EVALUATION OF THE CONTRACTOR’S PERFORMANCE
RATING DEFINITION NOTE
(E) Exceptional Performance meets contractual requirements and exceeds many to the Government/Owner’s benefit.
The contractual performance of the element or sub-element being assessed was accomplished with few minor problems for which corrective actions taken by the contractor was highly effective.
An Exceptional rating is appropriate when the Contractor successfully performed multiple significant events that were of benefit to the Government/Owner. A singular benefit, however, could be of such magnitude that it alone constitutes an
Exceptional rating. Also, there should have been NO significant weaknesses identified.
(VG) Very Good Performance meets contractual requirements and exceeds some to the Government’s/Owner’s benefit. The contractual performance of the element or sub-element being assessed was accomplished with some minor problems for which corrective actions taken by the contractor were effective.
A Very Good rating is appropriate when the
Contractor successfully performed a significant event that was a benefit to the
Government/Owner. There should have been no significant weaknesses identified.
(S) Satisfactory Performance meets minimum contractual requirements. The contractual performance of the element or sub-element contains some minor problems for which corrective actions taken by the contractor appear or were satisfactory.
A Satisfactory rating is appropriate when there were only minor problems, or major problems that the contractor recovered from without impact to the contract. There should have been NO significant weaknesses identified. Per DOD policy, a fundamental principle of assigning ratings is that contractors will not be assessed a rating lower than Satisfactory solely for not performing beyond the requirements of the contract.
(M) Marginal Performance does not meet some contractual requirements. The contractual performance of the element or sub-element being assessed reflects a serious problem for which the contractor has not yet identified corrective actions. The contractor's proposed actions appear only marginally effective or were not fully implemented.
A Marginal is appropriate when a significant event occurred that the contractor had trouble overcoming which impacted the
Government/Owner.
(U) Unsatisfactory Performance does not meet most contractual requirements and recovery is not likely in a timely manner. The contractual performance of the element or sub-element contains serious problem(s) for which the contractor's corrective actions appear or were ineffective.
An Unsatisfactory rating is appropriate when multiple significant events occurred that the contractor had trouble overcoming and which impacted the Government/Owner. A singular problem, however, could be of such serious magnitude that it alone constitutes an unsatisfactory rating.
(N) Not Applicable No information or did not apply to your contract Rating will be neither positive nor negative.
TO BE COMPLETED BY CLIENT
PLEASE CIRCLE THE ADJECTIVE RATING WHICH BEST REFLECTS
YOUR EVALUATION OF THE CONTRACTOR’S PERFORMANCE.
1. QUALITY:
a) Quality of technical data/report preparation efforts E VG S M U N
b) Ability to meet quality standards specified for technical performance E VG S M U N
c) Timeliness/effectiveness of contract problem resolution without extensive customer guidance
E VG S M U N
d) Adequacy/effectiveness of quality control program and adherence to contract quality assurance requirements (without adverse effect on performance)
E VG S M U N
2. SCHEDULE/TIMELINESS OF PERFORMANCE:
a) Compliance with contract delivery/completion schedules including any significant intermediate milestones. (If liquidated damages were assessed or the schedule was not met, please address below)
E VG S M U N
b) Rate the contractor’s use of available resources to accomplish tasks identified in the contract
E VG S M U N
3. CUSTOMER SATISFACTION:
a) To what extent were the end users satisfied with the project? E VG S M U N
b) Contractor was reasonable and cooperative in dealing with your staff
(including the ability to successfully resolve disagreements/disputes;
responsiveness to administrative reports, businesslike and communication)
E VG S M U N
c) To what extent was the contractor cooperative, businesslike, and concerned with the interests of the customer?
E VG S M U N
d) Overall customer satisfaction E VG S M U N
4. MANAGEMENT/ PERSONNEL/LABOR
a) Effectiveness of on-site management, including management of subcontractors, suppliers, materials, and/or labor force?
E VG S M U N
b) Ability to hire, apply, and retain a qualified workforce to this effort E VG S M U N
c) Government Property Control E VG S M U N
d) Knowledge/expertise demonstrated by contractor personnel E VG S M U N
e) Utilization of Small Business concerns E VG S M U N
f) Ability to simultaneously manage multiple projects with multiple disciplines E VG S M U N
g) Ability to assimilate and incorporate changes in requirements and/or priority, including planning, execution and response to Government changes
E VG S M U N
h) Effectiveness of overall management (including ability to effectively lead, manage and control the program)
E VG S M U N
5. COST/FINANCIAL MANAGEMENT
a) Ability to meet the terms and conditions within the contractually agreed price(s)?
E VG S M U N
b) Contractor proposed innovative alternative methods/processes that reduced cost, improved maintainability or other factors that benefited the client
E VG S M U N
c) If this is/was a Government cost type contract, please rate the Contractor’s timeliness and accuracy in submitting monthly invoices with appropriate back-up documentation, monthly status reports/budget variance reports, compliance with established budgets and avoidance of significant and/or unexplained variances (under runs or overruns)
E VG S M U N
d) Is the Contractor’s accounting system adequate for management and tracking of costs? If no, please explain in Remarks section.
Yes No
e) If this is/was a Government contract, has/was this contract been partially or completely terminated for default or convenience or are there any pending terminations? Indicate if show cause or cure notices were issued, or any default action in comment section below.
Yes No
f) Have there been any indications that the contractor has had any financial problems? If yes, please explain below.
Yes No
6. SAFETY/SECURITY
a) To what extent was the contractor able to maintain an environment of safety, adhere to its approved safety plan, and respond to safety issues?
(Includes: following the users rules, regulations, and requirements regarding housekeeping, safety, correction of noted deficiencies, etc.)
E VG S M U N
b) Contractor complied with all security requirements for the project and personnel security requirements.
E VG S M U N
7. GENERAL
a) Ability to successfully respond to emergency and/or surge situations
(including notifying COR, PM or Contracting Officer in a timely manner regarding urgent contractual issues).
E VG S M U N
b) Compliance with contractual terms/provisions (explain if specific issues) E VG S M U N
c) Would you hire or work with this firm again? (If no, please explain below) Yes No
d) In summary, provide an overall rating for the work performed by this contractor.
E VG S M U N
Please provide responses to the questions above (if applicable) and/or additional remarks. Furthermore, please provide a brief narrative addressing specific strengths, weaknesses, deficiencies, or other comments which may assist our office in evaluating performance risk (please attach additional pages if necessary):
RELATED EXPERIENCE FORM:
This form must be completed by all offerors in order to receive consideration for award. If additional space is needed, this form may be duplicated as necessary, no more than three submissions. Information describing the offeror’s complete contracting background and experience shall be provided. The contractor’s information should only describe experience that directly pertains to the type of work set forth in this in Section C of this solicitation. Include details of any training which would enable you to better perform the work outlined in the specifications. Reference information should include the names and current telephone numbers of all agencies/firms listed.
Experience
Contract Work/Type:
Agency/Firm for Whom the Work Was Performed:
Contact Person at the Site: Telephone:
Month/Year Work Began: Month/Year Work Ended:
Description of Duties/Work: (Please provide details)
Section C - Descriptions and Specifications
PERFORMANCE WORK STATEMENT
PARK CUSTODIAN
DAY USE PUBLIC AREAS
MILFORD PROJECT
C.1 General Information
C.1.1 Background:
Milford Project is the largest lake in Kansas, with a shoreline of 163 miles at multipurpose pool. Recreational development is extensive. Twelve parks and access areas, managed by or leased from the U.S. Army Corps of Engineers, are conveniently located around the reservoir. Park areas at Milford offer a wide variety of recreation facilities including boat launching ramps, campgrounds, full service marinas, picnic areas, sand and swimming beaches. The Kansas Department of Wildlife, Parks and Tourism operate a fish hatchery and conservation education center in the Outlet area below the dam. Many routine maintenance items are contracted to the private sector.
Mowing, refuse collection, and facility cleanup are just a few of the activities that are performed by private contractors for the Corps.
C.1.2 Scope of Work The Contractor shall serve as a Park Custodian and must be over 21 years of age. The Contractor may reside off-site or at the Contractor’s option, may reside in a Contractor-furnished camper placed on a Government-furnished Park Custodial campsite. The Contractor shall furnish labor, equipment, and supplies to provide custodial services in the Day Use Park at North Overlook, South Outlet, North Outlet and East Rolling Hills Public Use Areas at Milford Project, near Junction City, Kansas as described in the attached performance work statement (PWS) and elsewhere in the contract.
C.1.3 Dates of Performance:
The period of performance shall be for one (1) Base Year of 12 months and two (2) 12-month option years.
Actual services shall be performed from 01 April 2024 through 30 September 2024 of each year during the periods listed below.
The Period of Performance reads as follows:
Base Year – 15 April 2024 through 14 April 2025 Option Year 1 – 15 April 2025 through 14 April 2026 Option Year 2 – 15 April 2026 through 14 April 2027
C.1.4 Hours of Operation
C.1.4.1 Services shall be performed in accordance with the following schedule, between the hours of 7:00 a.m. and 12:00 a.m. NOTICE: Cleanup of all PICNIC SHELTERS in East Rolling Hill, North Overlook Area and the Outlet shall be completed prior to 9:00 a.m.
C.1.5 Post-Award Conference After award, but prior to commencement of work, the Contractor shall contact the Contracting Officer’s Representative, to arrange a mutually agreeable time to meet at the Milford Project Office to review the requirements and details of the work.
C.1.6 Documents and Correspondence
C.1.6.1 The Contractor shall designate, in writing, a responsible on-site representative of each work crew who shall serve as the contact for matters involving quality and performance or nonperformance of the required work assigned to that crew.
C.1.6.2 As each item of work is completed, the Contractor's representative at the job shall enter the time that the item of work was completed on a Contractor's Daily Worksheet. Completed and signed worksheets shall be delivered each day work is performed, as directed by the Contracting Officer's Representative. Contractor Daily Worksheet forms shall be furnished by the Government.
C.1.7 Duties and Responsibilities
C.1.7.1 The government has the right to inspect and test all services called for by the contract, to the extent practicable at all times and places during the term of the contract. The government shall perform inspections and tests in a manner that shall not unduly delay the work.
C.1.7.2 If any of the services do not conform to contract requirements, the government may require the contractor to perform the services again in conformity with contract requirements, at no increase in contract amount. When the defects in services cannot be corrected by re-performance, the government may (1) require the contractor to take necessary action to ensure that future performance conforms to contract requirements and (2) reduce the contract price to reflect the reduced value of the services performed.
C.1.7.3 If the contractor fails to promptly perform the services again or to take the necessary action to ensure future performance in conformity with contract requirements, the government may (1) by contract, or otherwise, perform the services and charge to the contractor any cost incurred by the government that is directly related to the performance of such service or (2) terminate the contract for default.
C.1.8. WORKMANSHIP:
C.1.8.1 As each item of work is completed, the Contractor's representative at the job shall enter the time that the item of work was completed on a Contractor's Daily Worksheet. Completed and signed worksheets shall be delivered each day (to the Project Office) work is performed.
C.1.8.2 Day to day contact with Government personnel, and telephone communication shall normally provide adequate information exchange. The Government reserves the right to schedule meetings at the Project Office as necessary to insure strict compliance with the terms of this contract. Such meetings shall be scheduled, to the extent possible, at mutually convenient times. However, upon notice, the Contractor shall attend meetings regarding matters affecting this contract.
C.1.8.3 To assist the visiting public in reclaiming lost articles, all property left by visitors and found during cleanup operations shall be turned in to the Project Office.
C.1.8.4 Any evidence of vandalism, instances of facilities not operating properly or in need of repair shall be promptly reported to project personnel.
C.1.8.5 The Contractor shall remove any dead animals within the area serviced under this contract, to the extent that the dead animal is small enough to be removed by the Contractor's daily staff. Any large animal that would require additional staff or equipment to move shall be reported to the Contracting Officer's Representative as soon as possible. Disposal of dead animals shall be as directed by the Project Manager or his representative.
C.1.9 Contractor Personnel
C.1.9.1 All Contractor personnel shall be fully clothed, at all times, while performing these services. Clothing shall be clean and neat in appearance.
C.1.9.2 Contractor personnel shall utilize tact, diplomacy and courtesy at all times during contact with the public.
C.1.10. Safety Requirements Prior to beginning work on this contract the Contractor shall have an approved Accident Prevention Plan. This plan shall be in accordance with the most recent EM 385-1-1. The plan is intended to be a viable document and enhance the safety of Project staff and visitors. The Contractor will be expected to take a vital interest in safety, hazard, and educate their employees to work and plan their work safely. Proper driving techniques and defensive driving will be practiced to prevent vehicle accidents and property damage.
C.1.10.1 The contractor shall display a sign reading "CLOSED FOR CLEANING" at the entrance of all facilities during cleaning operations.
C.1.11 Other Contractors The Government may undertake or award other contracts for additional work, and the Contractor shall fully cooperate with such other contractors and Government employees. All work must be carefully planned and fitted not to interfere with such other work. The Contractor shall not commit or permit any act that will interfere with the performance of work by other contractors or by Government employees.
C.2 Definitions and Acronyms: The following definitions and descriptions apply wherever the word, phrase, or acronym is used in this performance work statement.
Clean: As used generally, means free of all foreign matter, film, spots, streaks, dirt or impurities. As used for acceptance of work means gleaming, free from dirt, contamination, or impurities, unsoiled, unstained, neat and tidy.
Contracting officer's representative means an individual designated and authorized in writing by the contracting officer to perform specific technical or administrative functions.
Debris: Any articles, or parts thereof, such as paper, gum, litter, strings, cigarette butts, leaves, and sand.
Dirt: Particles of sand, soil, grit, or pebbles; mud, dust, tar, liquid stains, vomit, and/or ashes.
Foreign Matter: Any articles, or parts thereof, not belonging to the place found.
Fully-Clothed: Deemed to mean that a sleeved shirt (or T-shirt), trousers, and shoes shall be worn at all times: except that this requirement shall not be construed to replace or eliminate the necessity for the wearing of appropriate protective clothing or devices as may be required for the application of various chemicals.
Performance-Based Contract: (FAR 2.101) Structuring all aspects of an acquisition around the purpose of the work to be performed with the contract requirements set forth in clear, specific, and objective terms with measurable outcomes as opposed to either the manner by which the work is to be performed or broad and imprecise.
Quality Control (QC): A method used by the Contractor to control the quality of goods and services provided.
Quality Assurance (QA): A method used by the Government to provide some measure of control over the quality of purchased goods and services received.
"Service contract" means a contract that directly engages the time and effort of a contractor whose primary purpose is to perform an identifiable task rather than to furnish an end item of supply. A service contract may cover services performed by either professional or nonprofessional personnel whether on an individual or organizational basis. Some of the areas in which service contracts are found include the following:
(a) Maintenance, overhaul, repair, servicing, rehabilitation, salvage, modernization, or modification of supplies, systems, or equipment.
(b) Routine recurring maintenance of real property.
(c) Housekeeping and base services.
(d) Operation of Government-owned equipment facilities, and systems.
C.3 Government Furnished Equipment, Materials and Supplies. Government-Furnished materials and supplies are provided to the Contractor only for use in performing work specified in this Contract.
C.3.1 The Government shall provide a campsite for the Contractor's trailer, and utility hookup consisting of water, electricity and sewer. In addition, the campsite shall include a storage building, picnic table, and refuse container.
Refuse collection service is provided at the park entrance.
C.3.2 The Government will furnish to the Contractor the following identified property to be used in performing the contract. When the property is delivered, the Contractor shall verify its quantity and condition in writing to the Contracting Officer or his authorized representative on Memorandum Receipt, ENG Form 4866, within 24 hours of receipt. Damages or loss while in the Contractor's possession shall be reported in writing, to the Contracting Officer or his authorized representative within 72 hours.
Approx.
Item (Description) Quantity Where Available Value
(1) Campsite with Utilities 1 Corps Campground N/A
(2) Storage Building 1 Campsite N/A
(3) Picnic Table 1 Campsite N/A
(4) Refuse Container 1 Campsite N/A
C.3.3 Government-Furnished Consumable Items - The following consumable items, shall be furnished to the Contractor by the Government from stock. The Government shall retain control of expendables, to be dispensed on an as-needed basis for use in performance of the contract.
1. Baseball cap and name tags
2. Water for cleaning
3. Contractor Daily Worksheets
4. Odor Control Product
C.4 Contractor Furnished Equipment and Supplies
The Contractor shall furnish all equipment and supplies not identified in section C.3 of this PWS as Government- Furnished supplies and equipment and as specifically identified in this section. All contractor-furnished equipment and supplies must be approved by the Project Manager prior to initial use.
C.4.1 A mobile travel trailer, motor home or approved equal, containing sanitary facilities and all equipment necessary for habitation. Tents or "Pop-Up" type tent campers shall not be permitted. The unit shall present a neat appearance when parked at a location designated by the Project Manager. If self-propelled units are utilized, they shall remain on jacks (blocked up for the duration of contract), and shall not be used as transportation.
C.4.2 Transportation vehicle(s), other than specified in C.4.1 above, for use in performing the requirements of this contract.
C.4.3 A pressure water pump and tank for water supply that is approved by the Project Manager. The pump shall be capable of delivering an adequate stream of water at 150 psi to flush/rinse facilities being serviced.
C.4.4 The Contractor shall also furnish a sign reading "CLOSED FOR CLEANING," which shall be displayed at the entrances of facilities while cleaning services are being performed.
C.5 Specific Tasks
C.5.1 General Information
Cleanup of facilities is directly related to public health and sanitation; therefore, it is essential that all facilities be serviced as specified. In the event that an area or facilities within an area are missed, or are not properly cleaned, the Contractor shall reclean the area or affected facilities immediately upon receipt of such notice from the Contracting Officer or his Authorized Representative. Failure to correct noted deficiencies may result in withholding payment for the work not performed.
Equipment breakdown shall not relieve the Contractor of the responsibility of performing the work as specified. The Contractor shall assure that he has, or can obtain on short notice, sufficient backup equipment to continue the services as specified without interruption in the event of mechanical failure of his primary equipment.
Three (3), 32-gallon refuse containers, located at the North Outlet Park beach, shall be emptied, washed with water and detergent as needed until clean and odor free, a new plastic bag installed, and the refuse deposited in the nearest dumpster.
Litter pickup at the Outlet Tube fishing area along (both sides) grouted rip-rap, wing walls, parking lot and playground area.
Litter pickup at the Spillway Parking Lot and mowed area on 244 Hwy. spur.
C.5.2 Service Facilities / Areas
EAST ROLLING NORTH N/S
HILLS OVERLOOK OUTLET TOTAL
PICNIC SHELTERS 8 2 1 11
W/TABLES
COMFORT STATION 1 0 0 1
VAULT TOILETS (Sets) 4 1 3 8
VAULT TOILETS (Single) 1 0 3 4
WATER FOUNTAINS 0 0 1 1
CHARCOAL GRILLS 8 2 1 11*
& FIRERINGS
LITTER PICKUP (acres) 15 2 15 32
* See page C.5.2.1.for additional requirements *
PLAYGROUNDS 3 1 2 6
* Total number of grills and firerings shall be subject to a variation of +/- 5 at no change in contract price.
C.5.3 Major Cleanups: Shower/latrines and vault and flush-type toilets:
C.5.3.1 Ceilings - Clean ceilings on inside and overhang on outside of buildings to remove spider webs, dust, bird and insect nests, dirt, and insect spots. If soap or disinfectant is used, rinse with clean water and wipe dry.
C.5.3.2 Walls, shower stalls, benches, partitions, stools (flush-type), wash basins, doors and refuse containers – Clean and disinfect to ensure a sanitary condition free of all dirt, oil, lotions, soap residue, calcium deposits or other foreign matter. All surfaces including soap trays, faucets, stool lids, handicap bars, etc. shall be present a dried polished appearance free of cleaning solution, disinfectant, water spots, etc. Exterior walls shall have spider webs, dust, bird and insect nests, debris and grass clippings removed.
C.5.3.3 Floors and floor drain plates – Shall be disinfected and free of all foreign matter, trash, and excess water.
C.5.3.4 Mirrors – Shall be free of dirt, dust, smudges and streaks.
C.5.3.5 Stools – Non-waterborne (vault-type) - Risers inside and outside, seats and lids shall be cleaned and disinfectant to provide a surface free of foreign matter. Seats shall present a dry appearance free of disinfectant and water spots
C.5.3.6. Light Fixtures - Remove all dirt, dust, bugs, cobwebs, smudges, and streaks from fixtures, bulbs and grill.
Reinstall grillwork.
C.5.3.7. Toilet Paper Dispensers - All toilet paper dispensers on structures serviced under this contract shall be kept fully supplied.
C.5.3.8. All paper shall be protected to prevent wetting during cleaning operations. Care shall be taken to avoid wetting of hand dryers, and electrical fixtures during cleaning.
C.5.3.9. Picnic Shelter: Note: Pressure water pump may be needed to obtain satisfactory results at picnic shelters
C.5.3.10. Ceiling, beams, trusses, and overhang shall be clean and free of all dirt, spider webs, dust, bird and insect nests, and foreign matter to provide a clean condition.
C.5.3.11. Table tops, seats, and floor slabs shall be cleaned and disinfected to ensure a condition free of all dirt, food particles, foreign matter, and excess water.
C.5.4. Refuse and litter handling (facilities):
C.5.4.1. All trash, litter, debris or residue (including but not limited to cigarette butts, match books, bottle caps, snap tabs and paper) within or immediately adjacent to the facility being services shall be removed. At no time shall trash or debris be swept or washed out of a facility and left.
C.5.4.2. Refuse containers located within the facility being serviced shall have all trash, litter, debris or residue removed.
The containers shall present a clean and odor free condition. Plastic liners shall be replaced.
C.5.4.3. Exterior refuse containers (excluding dumpsters) placed at various locations throughout the park area shall be cleaned and emptied and the refuse placed in centrally located dumpsters. A new plastic liner shall be installed in containers (as needed) and the lids reinstalled on the containers. Exterior refuse containers and holders shall present a clean odor free condition. When odor becomes prevalent in trash containers or they become full prior to regular scheduled major servicing the Contractor shall empty and wash containers and holders as needed to provide sanitary conditions for the public.
C.5.4.4 Refuse and litter handling (park areas, roadways, beaches, playgrounds, boat ramps, parking areas and floating fishing docks/piers):
C.5.4.4.1 All mowed park areas, on and adjacent to roadways, and parking areas, and on and adjacent roadways and parking areas, and on and adjacent to beach and boat ramp areas (including boat ramp riprap areas) shall be free of litter and debris. Litter and debris shall be placed in the nearest refuse container
C.5.4.5 Sidewalks:
C.5.4.5.1. All sidewalks shall be free of debris, stains, and residue (any) excess water shall be removed.
C.5.4.6. Water fountains: Shall be cleaned and disinfected to remove all residue and stains
C.5.4.7. Charcoal grills, firerings and picnic tables:
C.5.4.8. Grills, firerings and cooking surfaces shall be cleaned of debris, ashes, food particles, and other foreign matter.
Remove all debris, litter, ashes and coals on the ground in the immediate vicinity of grills and firerings. Grills and firerings containing live ashes or warm coals shall be not be cleaned but shall be cleaned at the next regularly scheduled cleaning.
C.5.4.9 Playground equipment shall be kept clean and free from cobwebs, bird droppings, insect nests foreign matter and debris.
C.5.4.10. Vault toilets having an obnoxious odor shall have an odor control chemical applied as needed. Approved odor control chemical will be supplied by the government.
C.5.5 Handicap Accessible Fishing Piers and Courtesy Fishing Docks including all handrails and walkways:
shall be kept free of dirt, debris, stains, residue, spider webs, insect nests, bird droppings, fish remains, litter, and leaves. Leaves or vegetation removed shall be disposed in a brush or wooded areas outside the normal park mowing or miscellaneous mowing areas. All litter on the docks or within "8 feet" the walkway and riprap area leading to the docks shall be removed and deposited, as directed by the Contracting Officer’s Representative, into a government furnished trash dumpster.
(Outlet Park, 2 fishing docks & 4 piers) (ERH 1 fishing dock)
C.6 Applicable Publications and Forms
C.6.1 MAP: Information on Milford Lake can be found on the Internet at https://www.nwk.usace.army.mil/Locations/District-Lakes/Milford-Lake/
C.6.2 Memorandum Receipt, ENG 4866 (Completed Sample form)
C.6.3 Contractor Daily Worksheet (Completed Sample Form)
C.6.4 Performance Requirements Summary
Performance Requirements Summary (PRS)
Section (Para)
Contract Requirement
Performance Standard Lot Description
ALP
Method of Surveillance
C.5.3
Comfort Stations
Clean walls, floor, toilets, sinks, shower and fixtures per definition in section C.2
Inspected weekly
4%
Random Sample, Validated
Customer Complaint
C.5.3
Vault Toilets
Clean walls, floor, toilets, sinks, shower and fixtures per definition in
C.5.3.9
Picnic Shelters
Clean floor, ceilings, tables, grills and trash receptacles per definition in
C.5.4.4.1
Refuse and litter handling
Roadways in and around facilities and in mowed areas are free of litter
Periodic inspections
Random Sample, Validated Customer Complaint
C.7 Anti-Terrorism and Operational Security The security requirements described below apply to all contract personnel (including employees of the prime Contractor (“Contractor”) and all subcontractor employees) supporting the performance requirements of this contract. The Contractor is responsible for compliance with these security requirements. Questions regarding security matters shall be addressed to the designated Government representative (e.g., Contracting Officer Representative (COR), Requiring Activity (RA) representative, or Contracting Officer (if a COR or other RA representative is not appointed)). Contract personnel are critical to the overall security and safety of US Army Corps of Engineers (USACE) installations, facilities and activities, and security awareness training contributes to those efforts. The Department of Defense (DoD) and Army security training requirements specified below, if applicable, are performance requirements; all applicable contract personnel shall complete initial training within 30 days of contract award or the date new contract personnel begin performance on the contract. Within five business days from the completion of training, the Contractor shall provide written documentation (e.g., email or memorandum) to the Government representative. The documentation shall include the names of contract personnel trained and which training they completed; the Contractor shall maintain training records as part of their contract files and be prepared to provide copies of training certificates to the Government representative. Contractor personnel and vehicles are subject to search when entering federal installations. Additionally, all contract personnel shall comply with Force Protection Condition (FPCON) measures, Random Antiterrorism Measures (commonly referred to as “RAMs”), and Health Protection Condition (HPCON) measures. The Contractor is responsible for meeting performance requirements during elevated FPCON and/or HPCON levels in accordance with applicable RA plans and procedures --this includes identifying mission essential and non-mission essential personnel. In addition to the changes otherwise authorized by the changes clause of this contract, should the FPCON or HPCON levels at any individual facility or installation change, the Government may implement security changes that affect contract personnel. The Contractor shall ensure all contract personnel are aware of their security responsibilities, including any site-specific requirements identified in local policies or procedures.
All contract personnel requiring physical access to a federal installation or facility shall comply with the access control procedures of that location. Contract personnel requiring unescorted access to meet contract performance requirements on a DoD installation in the US shall be vetted by the installation/facility Provost Marshal/Directorate of Emergency Services/Security Office using the National Crime Information Center-Interstate Identification Index (commonly referred to as “NCIC-III”) and Terrorist Screening Database (commonly referred to as “TSDB”). Contract personnel shall comply with all personal identity verification requirements specified in installation/facility policies and procedures. Contract personnel who do not meet requirements for unescorted access to USACE facilities shall coordinate escorted access with the Government representative, as needed. Contract personnel who receive keys, access cards, or lock combinations that provide access to government-owned property shall comply with key and lock control procedures of the RA.
All contract personnel shall receive initial and annual refresher training from the RA representative on the local suspicious activity reporting program. This locally developed training provides contract personnel with general information on suspicious behavior, and guidance on reporting suspicious activity to the project manager, security representative or law enforcement entity.
Contractors shall comply with the requirements set forth in FAR clause 52.222-54 Employment Eligibility Verification and FAR Subpart 22.18 in using the E-Verify Program at (https://www.e-verify.gov/) (website subject to change) to meet the contract employment eligibility requirements. Contractors are encouraged to cooperate with Federal and State agencies responsible for enforcing labor requirements to include eligibility for employment under United States immigration laws in accordance with FAR 22.102-1(i). An initial list of verified/eligible candidates shall be provided to the COR no later than three business days after the initial contract award. When contracts are with individuals, the individuals will be required to complete a Form I-9, Employment Eligibility Verification, and submit it to the Contracting Officer to become part of the official contract file.
Per the E-Verify Website the following exemptions apply:
Employers whose contracts are exempt from the E-Verify federal contractor rule are not required to enroll in E-Verify. A contract is considered exempt if any one of the following applies: (1) It is for fewer than 120 days.
(2) It is valued at less than Simplified Acquisition Threshold ($250,000), the simplified acquisition threshold. (3) All work is performed outside the United States. (4) It includes only commercially available off-the-shelf (COTS) items and related services. (Source: https://www.e-verify.gov/employers/federal-contractors/exemptions-and-exceptions).
File details come from the government source that posted it. Updated .