Crystal_Beach_Green_Infrastructure_Rec_Report_FINAL_20250702.pdf

PDF 52 MB Posted

Attached to
Crystal Beach Drainage and Roadway Improvements (PID 003896A)
Solicitation number
25-0731-RFQ-CCNA
Issued by
Pinellas County, Clewiston City, Florida

About this file

The file "Crystal_Beach_Green_Infrastructure_Rec_Report_FINAL_20250702.pdf" is a document related to a state and local contract opportunity for Pinellas County, Florida, involving professional engineering services for the Crystal Beach Drainage and Roadway Improvements project (PID 003896A). The project seeks a consultant to provide full design services for comprehensive infrastructure improvements, including developing engineering design plans and specifications at 30%, 60%, 90%, and 100% completion stages. Proposals are due by August 5, 2025, at 3:00 PM Eastern Time, with an anticipated contract award on September 1, 2025. The total project duration is estimated at 548 consecutive calendar days from the Notice to Proceed, with design phases scheduled from October 2025 to October 2027.

The project is funded through multiple sources, including Penny for Pinellas, the Florida Department of Environmental Protection (FDEP) Resilient Florida Grant, and FDEP State Appropriations, with a total budget of $12,069,000 ($1,000,000 for design and $11,069,000 for construction). The contract will be structured as a lump sum agreement with a three-year term and an option to extend. The evaluation process will award up to 2,000 points, with key scoring categories including team qualifications, project experience, previous county work volume, minority business status, and Small Business Enterprise status. The project offers specific opportunities for local and small businesses, with additional points awarded to firms located in Pinellas, Manatee, Hillsborough, or Pasco counties, and those participating in the Small Business Enterprise program. The project area covers approximately 10.23 acres in the Crystal Beach neighborhood, focusing on strategic objectives of preserving the community's coastal "Old Florida" character while addressing flooding issues and implementing resilient infrastructure solutions.

View the file

Other files

File Type Posted
Crystal_Beach_Potable_Water_Assessment_Report.pdf PDF
Crystal_Beach_Green_Infrastructure_Rec_Report_FINAL_20250702.pdf PDF
Crystal_Beach_Draft_Scope_Tasks_Only_20250626.pdf PDF
Grant_Provisions_LPA0365.pdf PDF
Crystal_Beach_Topographic_Survey.pdf PDF
Crystal_Beach_Topographic_Survey.pdf PDF
Crystal_Beach_Drainage_and_Roadway_Imps_Project_Location_Map.pdf PDF
Crystal_Beach_15%_Plans_October2023.pdf PDF
ATTACHMENT_C_DESIGN_SUBMITTAL_CHECKLISTS.pdf PDF
Sample_Agreement.pdf PDF
25-0731-RFQ-CCNA.pdf PDF
Crystal_Beach_DRAFT_PER_October2023.pdf PDF
CrystalBeach15_Plans_October2023_Rev.pdf PDF
Crystal_Beach_Geotech_Final_Report_April_2025.pdf PDF
DES_229018_Additional_Pavt_Cores_4-18-2023.pdf PDF
Crystal_Beach_Community_Overlay.pdf PDF
Crystal_Beach_Geotech_2019.pdf PDF
Crystal_Beach-Topographic_Survey.pdf PDF
Crystal_Beach_003896A_REVISED_DRAFT_Design_Scope_20250521.docx DOCX document
Crystal_Beach_Drainage_and_Roadway_Imps_Project_Location_MapPID_003896A-R1.pdf PDF
003896A_Crystal_Beach_Design_ITB_CCNA_RFP_20250519.pdf PDF
ATTACHMENT_C_DESIGN_SUBMITTAL_CHEKLISTS.pdf PDF
Draft_Staff_Report_Crystal_Beach_RFQ_003896A.pdf PDF
Non-Competitive_Oversight_Committee_Justification_Form.docx DOCX document
Show all 24

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .