CRH 3rd DRFP Industry Day Charts - REDACTED VERSION
View the file
Other files
Show 40 more
Latest 50 of 176 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Combat Rescue Helicopter
(CRH)
20 Sep 12
Air Force Life Cycle Management Center
Birthplace, Home & Future of Aerospace
Redacted version
All Session Schedule
• Welcome
• Administrative Announcements
• Overview of RFP Changes
• Path Forward Timeline - For Industry Planning Purpose
• Overview of 1-on-1 Sessions
• Q & A
Administrative Announcements
Today’s Purpose
• Review the changes in the RFP in preparation of the release of the Final Request For Proposal (RFP) ̶ Industry Day is NOT a solicitation nor does it guarantee a solicitation will be issued ̶ The Govt. will not reimburse costs associated with this Industry Day ̶ Responses will be treated as info only--will not be used as a proposal ̶ The Govt. does not intend to award a contract on the basis of Industry
Day
• Information presented today is DRAFT and subject to change
• If you believe there may be an Organizational Conflict of
Interest, please contact the Contracting Officer
• Government members will be reminded of their obligations to afford protection under the Trade Secrets Act, 18 U.S.C. 1905 ̶ The Government Team will utilize Contractor personnel hired to provide technical assistance for the Government's preparation of an acquisition strategy. All contractor members are required to protect all information by the terms of their contracts.
• All members of the Contractor’s team will be reminded of their obligation to protect any information to the maximum extent permitted or required by the Economic Espionage Act, 18 U.S.C. 1831 et seq., and other applicable statutes or regulations.
Disclaimer
• Utilize FedBizOps ̶ Search Key Term: CRH
• Draft Documents
• Briefings
• Questions and Answers (Q&A)
̶ Note: Questions you pose are subject to being posted on the Q&A list, so please identify proprietary questions
• Other Pertinent Information
Methods of Communication
Rules of Engagement
• No recording devices or cameras
• Please turn off cell phones
• Questions and discussion are CRH-specific
• Questions should be written on provided forms
• Today is a great opportunity to get your questions answered
• Tomorrow will be the opportunity to ask proprietary questions
Facility Information
Overview of RFP Changes
Overview of RFP Changes
• Model contract (Section A through K)
• Attachments/Exhibits
– SS
– TSS
– SOW
• Section L
• Section M
Bidder’s library – majority posted on FBO now, some updates anticipate, ie SEP
Model Contract – Section B
• Collapse of several EMD CLINs
• Total max quantity of aircraft able to be purchased is 112; ranges are for yearly flexibility
• New CLINs added:
– Support Equipment (SE) Mobility Packages
– Type 1 Training for Tech Order Cert & Verification (TOCV)
• Changed CLINs:
– ICS for Training Systems divided into ATD and MTD
– SE divided into AC and Training Systems
• T&M deleted
• FPIF arrangement modified
– 11% target profit for cost incentive, no other change
– 1% set aside for schedule incentive – see G004 11
Model Contract – Section F/G/H
• F004
– RAA changed to 60MAC versus 54MAC
– RAA criteria tied to specific CLINs
• G004
– Schedule incentive added: earn 1% if meet RAA of 54MAC, earn 0% if meet 60MAC, earn -1% if RAA 66MAC
• All SCRs scrubbed; specifically note
– H019: Equitable Adjustment for R&M (looking at adding MTBSA/MTBF, including definitions and defining time period)
– H022: Associate Contractor Agreements
– H026: Government Approval of Alternate
Standards
Model Contract – Section I/K
• Section I
– FAR 52.245-01 updated GFP listing
– DFARS 252.232-7007 revised funding information
– DFARS 252.211-7007 Reporting of GFP updated to Aug 2012
– DFARS 252.219-7003 Small Bus Subk Plan updated to Aug 2012
• Section K
– Removed DFARS 252.209-7002 Disclosure of Ownership or
Control by a Foreign Government
– Updated K001 with non-government advisor support
• NEW inclusions:
– BAE Systems Technology Solutions & Services Inc.
– Tecolote Research, Inc.
– Alion Science & Technology Corp
– WBB
– Mitre
Attachment 1 - SS
• REDACTED
Attachment 1 – SS (cont’d)
Attachment 1 – SS (cont’d)
Attachment 2 - TSS
Attachment 2 – TSS (cont’d)
Attachment 3 - SOW
• Para 1.1
– deliver Aircraft IAW with Annex E
• Para 1.2.3.5
– Deleted JMPS
• Para 1.2.3.7
– Added new item of GFP: Blue Force Tracker
• Para 1.2.11
– Considering a subsystem reliability requirement as it relates to the impact on system reliability
• Para 1.2.11.6
– Deleted FMECA
– Para 1.2.11.4: FMEA adding Criticality Analysis 19
Attachment 3 – SOW (cont’d)
• Para 1.2.16.3.1 and 1.2.16.3.2
– Combined into one ISP
• Para 1.5.2.1.2
– Deleted Type 1 Aircrew Continuation Training
• Para 1.5.2.1.5
– Added Type 1 TOCV Process Familiarization
Training
• Annex D, Training Table 4D
– Updated
• Annex E
– Updated for 60MAC RAA
• Annex G
– Updated definition of RAA 20
Section L - ITO
• ASC now is AFLCMC – Air Force Life Cycle Management Center
• Planned award – 4th quarter FY13
• Estimated award date – Sep 2013
• Contract length extended to 14 years
• Para 2.6.5 – flight manual in current format
• Para 2.7 – updated classified mailing address
• Para 2.7.2 – added directions for classifying documents until SCG is approved
• Para 4.2.1.1 – deleted subfactor 1.6
• Para 4.3/4.4 – updated for alternate standards
Section L – ITO (cont’d)
• Para 4.5.2, 4.5.7, and 4.6.1 – deleted
• Para 5.1.4/5.2.3/6.1.9 – added ST/TE adjustment
• Para 5.2.1 – removed “average”
• Para 5.2.1.3 – added, VIQ pricing narrative
• Para 5.2.1.5 – updated methodology for Live
Fire Test Assets evaluation
• Para 5.2.4 – added Goal Adjustment
• Para 6.2 – updated to identify alternate standards as part of CEO certification
• Para 7.1.1.3 – removed PP relevancy matrix
Section M – Evaluation Factors
• Read the WHOLE section – major rewrite
• Note the process flow in para 1.1.1
– Affordability Gate
– Technical Compliance: Acceptable/Unacceptable
– Technical Risk: Acceptable/Unacceptable
– Past Performance: Acceptable/Unacceptable
– Subtotal TEP = TPP + fuel adj + ST/TE adj
– TEP = Subtotal TEP – goal adj
• 4 goal requirements in Table 2
• Para 1.3/2.4.1.3 – added GFP ST/TE
• Removed technical subfactor 1.6
Section M – Evaluation Factors (cont’d)
• Para 2.1 – removed goal requirements from 1.1
• Para 2.2 – updated to reflect new relative order of importance
• All definitions revised
• Para 2.3.5 – changed RAA to 60MAC
• Para 2.3.6 – updated for Special Mission
Aviators
• Para 2.4.1.4 – added Goal Adjustment
• Para 2.5 – revised and removed Attachment 1
Path Forward Timeline- For Industry Planning Purpose
Path Forward Timeline- For Industry Planning Purpose
• Final RFP Release – ASAP (updating final documentation)
• Proposal Submittals – 60 days
• Award Contract – NLT Sep 2013
Now is the time for questions
Overview of 1-on-1 Sessions
Overview of 1-on-1 Sessions
• Location:
– Area B, Bldg 46, 1895 5th Street
– Commando Room, Room 114
– USG personnel will provide escort
• Sessions:
̶ 0830-0930 ̶ 1000-1100 ̶ 1300-1400
• 1 Hr timeframe for Q&A session
| Combat Rescue Helicopter �(CRH)�20 Sep 12 |
| All Session Schedule |
| Slide Number 3 |
| Today’s Purpose |
| Disclaimer |
| Methods of Communication |
| Rules of Engagement |
| Facility Information |
| Overview of RFP Changes |
| Overview of RFP Changes |
| Model Contract – Section B |
| Model Contract – Section F/G/H |
| Model Contract – Section I/K |
| Attachment 1 - SS |
| Attachment 1 – SS (cont’d) |
| Attachment 1 – SS (cont’d) |
| Attachment 2 - TSS |
| Attachment 2 – TSS (cont’d) |
| Attachment 3 - SOW |
| Attachment 3 – SOW (cont’d) |
| Section L - ITO |
| Section L – ITO (cont’d) |
| Section M – Evaluation Factors |
| Section M – Evaluation Factors (cont’d) |
| Slide Number 25 |
| Path Forward Timeline- For Industry Planning Purpose |
| Slide Number 27 |
| Overview of 1-on-1 Sessions |
File details come from the government source that posted it. Updated .