3rd_DRFP_Industry_Response_Matrix_17_Oct_12_(Unsecure).pdf

PDF 66 KB Posted

Attached to
Combat Rescue Helicopter (CRH)
Solicitation number
Not on record
Issued by

View the file

Other files

File Type Posted
3rd_DRFP_Industry_Response_Matrix_19_Oct_12_Unsecure.pdf PDF
3rd_DRFP_Industry_Response_Matrix_11_Oct_12.pdf PDF
3rd_DRFP_Industry_Response_Matrix_3_Oct_12.pdf PDF
3rd_DRFP_Industry_Response_Matrix_1_Oct_12_Unsecure.pdf PDF
Combat_Rescue_Helicopter_Industry_Day_-_Redacted_Version.pdf PDF
3rd_DRFP_Industry_Response_Matrix_25_Sep_12.pdf PDF
CRH_Sept_Industry_Day_Sign-in_Sheet.pdf PDF
Sec J Attachment 12 - CLIN and SOW Matrix 14 Sept.pdf PDF
Sec J Attachment 28 - 2794-Contract Prime FRP 19 Jul.pdf PDF
Sec J Attachment 12 - CLIN and SOW Matrix 4 Sep.pdf PDF
Sec J Attachment 22 - 2794-Contract Prime EMD 19 Jul.pdf PDF
3rd DRFP Industry Question Format.xlsx XLSX spreadsheet
Sec L Attachment 13 - Past Performance Client Authorization Ltr 20 Jul.pdf PDF
Sec J Attachment 8 - Restrictions on Technical Data and Computer Software 21 Jun.pdf PDF
Sec L Attachment 9 - PAST PERFORMANCE QUESTIONNAIRE TRACKING RECORD.pdf PDF
Sec J Exhibit A CDRL Non-OMIT 07-12-2012.pdf PDF
Sec J Attachment 32 - Listing of Licenses for CLIN 0006.pdf PDF
Sec J Attachment 7 - VIQ Matrix_19 Jun.pdf PDF
Sec M -Eval Factors for Award MASTER 12 Sep Credit.pdf PDF
Sec J Attachment 3 - SOW 12 Sep 12 —
Sec J Attachment 31 - TMCR 9_04_2012.pdf PDF
Sec J Attachment 4 - DD Form 254 17 Feb 12 REV.pdf PDF
Sec J Attachment 14 - Aircraft Spares Listing - 19 Jun.pdf PDF
Sec J Attachment 29 - 2794-Contract Sub FRP 19 Jul.pdf PDF
Sec J Attachment 27 - 2794-Contract RDT LRIP 19 Jul.pdf PDF
Sec J Attachment 25 - 2794-Contract Prime LRIP 19 Jul.pdf PDF
Sec J Attachment 13 - Base Support Agreement 20 Jul.pdf PDF
Sec L Attachment 10 - PAST PERFORMANCE SAMPLE CONSENT LETTER.pdf PDF
Sec L Attachment 4 - CEO Certification Ltr 17Aug.pdf PDF
Sec J Attachment 26 - 2794-Contract Sub LRIP 19 Jul.pdf PDF
Sec J Attachment 23 - 2794-Contract Sub 19 Jul.pdf PDF
Sec J Attachment 10 - SE Mobility Package Kit Listing - 19 Jun.pdf PDF
Sec L Attachment 2 - CRH_Cross_Reference_Matrix_(CRM)_12SEPT2012.pdf PDF
Sec J Attachment 11 - QASP 3 May 12.pdf PDF
RFP - Section A through K 13 Sep.pdf PDF
Sec J Attachment 21 - Training System SE Listing- 24 Aug.pdf PDF
Sec J Exhibit B CDRL OMIT 07-12-2012.pdf PDF
Sec J Attachment 24 - 2794-Contract RDT EMD 19 Jul.pdf PDF
Sec J Attachment 20 - CRH IMP 20 Jul R1.pdf PDF
Sec J Attachment 30 - 2794-Contract RDT FRP 19 Jul.pdf PDF
Sec L Attachment 1 - TEP Workbook_(12 Sep) w Adjustment.xlsx XLSX spreadsheet
Sec L Attachment 11 - PAST_PERFORMANCE_SAMPLE_QUESTIONNAIRE_CORP COVER_LTR_19JUL.pdf PDF
Sec L Attachment 3 - Past Performance Information Tools 24 May 12.pdf PDF
Sec J Attachment 5 - AFMC Form 158.pdf PDF
Sec L Attachment 12 - PAST PRESENT PERFORMANCE QUESTIONNAIRE- 1 Jun.pdf PDF
Sec J Attachment 17 - RSP Kit Listing - 19 Jun.pdf PDF
Sec L - Instructions to Offerors_MASTER_12 Sep TEP Credit.pdf PDF
Sec J Attachment 15 - Aircraft SE Listing- 19 Jun.pdf PDF
Sec J Attachment 16 - Training System Spares Listing- 24 Aug.pdf PDF
Sec L Attachment 14 - DCMA 14 Point SHA Macro.pdf PDF
Show 40 more

Latest 50 of 176 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CRH 3rd DRFP Comment and Answer Matrix

RFP Section If Section J, list

Attach or Exhibit Paragraph Page Question or Comment Answer or Resolution

B CLIN 0413

CLIN 0413 (Option CLIN) Avionics Desktop Trainer (AVDTT) Descriptive Data: “Deliver and Install two CRH AVDTTs…” Destination: Two AVDTT to Nellis AFB_FB4852; one AVDTT to Kirtland AFB_FB4469 Please clarify the total quantity for delivery and the quantity for delivery to Nellis AFB and Kirtland AFB.

The one AVDTT to Kirtland has been removed.

J 3 1.2.3.5 7

Reference Industry Day Discussion on the CRH Mission Planning System. As part of Industry Day it was stated the contractor was responsible for only the onboard portion of the Mission Planning System. In Section J, Attachment 3 – SOW (dated 12 Sept 2012) it is stated the contractor shall develop and implement both the on-board and off-board Mission Planning System (MPS) to include the Mission Planning Environment. There appears to be a discrepancy between the Industry Day information and the Statement of Work. Note that in the System Specification the references to the off-board MPS are strictly from a compatibility perspective. Please clarify if the off-board MPS is part of the CRH procurement?

With regards to the initial mission planning system, the contractor is responsible for both the off-board and on-board system as called out in the SOW. With regards to the on-board portion of that system, the contractor is responsible for designing in compatibility with JMPS of the on-board system as defined in the System Specification.

J 7 VIQ Pricing Matrix

SDTA

The TEP worksheet for Variation in Quantity Pricing Matrix is dated 15 March 2012. Accordingly the spread sheet references a previous CLIN, specifically CLIN 0202 for SDTA.

Request that the CLIN be corrected to read “CLIN 0102” in cell address/block ‘B9’ in the RFP release.

Corrected.

3rd DRFP Industry Response Martix 17 Oct 12 (Unsecure)

3rd DRFP comments

File details come from the government source that posted it. Updated .