CRH 3rd DRFP Comment and Answer Matrix
RFP Section If Section J, list
Attach or Exhibit Paragraph Page Question or Comment Answer or Resolution
B CLIN 0413
CLIN 0413 (Option CLIN) Avionics Desktop Trainer (AVDTT) Descriptive Data: “Deliver and Install two CRH AVDTTs…” Destination: Two AVDTT to Nellis AFB_FB4852; one AVDTT to Kirtland AFB_FB4469 Please clarify the total quantity for delivery and the quantity for delivery to Nellis AFB and Kirtland AFB.
The one AVDTT to Kirtland has been removed.
J 3 1.2.3.5 7
Reference Industry Day Discussion on the CRH Mission Planning System. As part of Industry Day it was stated the contractor was responsible for only the onboard portion of the Mission Planning System. In Section J, Attachment 3 – SOW (dated 12 Sept 2012) it is stated the contractor shall develop and implement both the on-board and off-board Mission Planning System (MPS) to include the Mission Planning Environment. There appears to be a discrepancy between the Industry Day information and the Statement of Work. Note that in the System Specification the references to the off-board MPS are strictly from a compatibility perspective. Please clarify if the off-board MPS is part of the CRH procurement?
With regards to the initial mission planning system, the contractor is responsible for both the off-board and on-board system as called out in the SOW. With regards to the on-board portion of that system, the contractor is responsible for designing in compatibility with JMPS of the on-board system as defined in the System Specification.
J 7 VIQ Pricing Matrix
SDTA
The TEP worksheet for Variation in Quantity Pricing Matrix is dated 15 March 2012. Accordingly the spread sheet references a previous CLIN, specifically CLIN 0202 for SDTA.
Request that the CLIN be corrected to read “CLIN 0102” in cell address/block ‘B9’ in the RFP release.
Corrected.
3rd DRFP Industry Response Martix 17 Oct 12 (Unsecure)
3rd DRFP comments