CRH 3rd DRFP Industry Comment Response Matrix 25 Sept 12

View the file

Other files

File Type Posted
3rd_DRFP_Industry_Response_Matrix_19_Oct_12_Unsecure.pdf PDF
3rd_DRFP_Industry_Response_Matrix_17_Oct_12_(Unsecure).pdf PDF
3rd_DRFP_Industry_Response_Matrix_11_Oct_12.pdf PDF
3rd_DRFP_Industry_Response_Matrix_3_Oct_12.pdf PDF
3rd_DRFP_Industry_Response_Matrix_1_Oct_12_Unsecure.pdf PDF
Combat_Rescue_Helicopter_Industry_Day_-_Redacted_Version.pdf PDF
CRH_Sept_Industry_Day_Sign-in_Sheet.pdf PDF
Sec J Attachment 12 - CLIN and SOW Matrix 14 Sept.pdf PDF
Sec J Attachment 28 - 2794-Contract Prime FRP 19 Jul.pdf PDF
Sec J Attachment 12 - CLIN and SOW Matrix 4 Sep.pdf PDF
Sec J Attachment 22 - 2794-Contract Prime EMD 19 Jul.pdf PDF
3rd DRFP Industry Question Format.xlsx XLSX spreadsheet
Sec L Attachment 13 - Past Performance Client Authorization Ltr 20 Jul.pdf PDF
Sec J Attachment 8 - Restrictions on Technical Data and Computer Software 21 Jun.pdf PDF
Sec L Attachment 9 - PAST PERFORMANCE QUESTIONNAIRE TRACKING RECORD.pdf PDF
Sec J Exhibit A CDRL Non-OMIT 07-12-2012.pdf PDF
Sec J Attachment 32 - Listing of Licenses for CLIN 0006.pdf PDF
Sec J Attachment 7 - VIQ Matrix_19 Jun.pdf PDF
Sec M -Eval Factors for Award MASTER 12 Sep Credit.pdf PDF
Sec J Attachment 3 - SOW 12 Sep 12 —
Sec J Attachment 31 - TMCR 9_04_2012.pdf PDF
Sec J Attachment 4 - DD Form 254 17 Feb 12 REV.pdf PDF
Sec J Attachment 14 - Aircraft Spares Listing - 19 Jun.pdf PDF
Sec J Attachment 29 - 2794-Contract Sub FRP 19 Jul.pdf PDF
Sec J Attachment 27 - 2794-Contract RDT LRIP 19 Jul.pdf PDF
Sec J Attachment 25 - 2794-Contract Prime LRIP 19 Jul.pdf PDF
Sec J Attachment 13 - Base Support Agreement 20 Jul.pdf PDF
Sec L Attachment 10 - PAST PERFORMANCE SAMPLE CONSENT LETTER.pdf PDF
Sec L Attachment 4 - CEO Certification Ltr 17Aug.pdf PDF
Sec J Attachment 26 - 2794-Contract Sub LRIP 19 Jul.pdf PDF
Sec J Attachment 23 - 2794-Contract Sub 19 Jul.pdf PDF
Sec J Attachment 10 - SE Mobility Package Kit Listing - 19 Jun.pdf PDF
Sec L Attachment 2 - CRH_Cross_Reference_Matrix_(CRM)_12SEPT2012.pdf PDF
Sec J Attachment 11 - QASP 3 May 12.pdf PDF
RFP - Section A through K 13 Sep.pdf PDF
Sec J Attachment 21 - Training System SE Listing- 24 Aug.pdf PDF
Sec J Exhibit B CDRL OMIT 07-12-2012.pdf PDF
Sec J Attachment 24 - 2794-Contract RDT EMD 19 Jul.pdf PDF
Sec J Attachment 20 - CRH IMP 20 Jul R1.pdf PDF
Sec J Attachment 30 - 2794-Contract RDT FRP 19 Jul.pdf PDF
Sec L Attachment 1 - TEP Workbook_(12 Sep) w Adjustment.xlsx XLSX spreadsheet
Sec L Attachment 11 - PAST_PERFORMANCE_SAMPLE_QUESTIONNAIRE_CORP COVER_LTR_19JUL.pdf PDF
Sec L Attachment 3 - Past Performance Information Tools 24 May 12.pdf PDF
Sec J Attachment 5 - AFMC Form 158.pdf PDF
Sec L Attachment 12 - PAST PRESENT PERFORMANCE QUESTIONNAIRE- 1 Jun.pdf PDF
Sec J Attachment 17 - RSP Kit Listing - 19 Jun.pdf PDF
Sec L - Instructions to Offerors_MASTER_12 Sep TEP Credit.pdf PDF
Sec J Attachment 15 - Aircraft SE Listing- 19 Jun.pdf PDF
Sec J Attachment 16 - Training System Spares Listing- 24 Aug.pdf PDF
Sec L Attachment 14 - DCMA 14 Point SHA Macro.pdf PDF
Show 40 more

Latest 50 of 176 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CRH 3rd DRFP Comment and Answer Matrix

RFP Section If Section J, list

Attach or Exhibit Paragraph Page Question or Comment Answer or Resolution

General Will this briefing be posted on FBO? If so, when? Yes, the briefing and list of the attendees for the 20 Sep industry briefing was posted on

FBO following the meeting.

General Does 112 aircraft include ANG or not? One buy profile does in FY 24-26 and all others do not. The quantity of 112 includes the ANG.

B CLIN 0504 56 Clause reads "The price for the CLIN is included in the FPIF CLIN 0521." Should read "The price for the CLIN is included in the FFP CLIN 0521."

Agree. Language Revised.

B CLIN 0505 57

Clause reads "The price for the CLIN is included in the FPIF CLIN 0521." Should read "The price for the CLIN is included in the FFP CLIN 0521."

Agree. Language Revised.

B CLIN 0604 67

Clause reads "The price for the CLIN is included in the FPIF CLIN 0521." Should read "The price for the CLIN is included in the FFP CLIN 0621."

Agree. Language Revised.

B CLIN 0605 68

Clause reads "The price for the CLIN is included in the FPIF CLIN 0521." Should read "The price for the CLIN is included in the FFP CLIN 0621."

Agree. Language Revised.

B CLIN 0704 80 Clause reads "The price for the CLIN is included in the FPIF CLIN 0521." Should read "The price for the CLIN is included in the FFP CLIN 0721."

Agree. Language Revised.

B CLIN 0705 80 Clause reads "The price for the CLIN is included in the FPIF CLIN 0521." Should read "The price for the CLIN is included in the FFP CLIN 0721."

Agree. Language Revised.

B CLIN 0804 90

Clause reads "The price for the CLIN is included in the FPIF CLIN 0521." Should read "The price for the CLIN is included in the FFP CLIN 0821."

Agree. Language Revised.

B CLIN 0805 90

Clause reads "The price for the CLIN is included in the FPIF CLIN 0521." Should read "The price for the CLIN is included in the FFP CLIN 0821."

Agree. Language Revised.

B CLIN 0904 101

Clause reads "The price for the CLIN is included in the FPIF CLIN 0521." Should read "The price for the CLIN is included in the FFP CLIN 0921."

Agree. Language Revised.

B CLIN 0905 102

Clause reads "The price for the CLIN is included in the FPIF CLIN 0521." Should read "The price for the CLIN is included in the FFP CLIN 0921."

Agree. Language Revised.

B CLIN 1004 113

Clause reads "The price for the CLIN is included in the FPIF CLIN 0521." Should read "The price for the CLIN is included in the FFP CLIN 1021."

Agree. Language Revised.

B CLIN 1005 114

Clause reads "The price for the CLIN is included in the FPIF CLIN 0521." Should read "The price for the CLIN is included in the FFP CLIN 1021."

Agree. Language Revised.

G G004 134

How does 1% schedule incentive get paid? Is USAF planning to ajust FPI CLINS or Add new CLINs for Incentive Fee? Adjusting FPI CLINS will alter FPI Geometry.

Schedule incentive will get paid when delivery is complete. If schedule incentive is earned, it will be provided in a contract modification establish a new CLIN to pay out the schedule incentive. The current FPI CLINs will only include the cost incentive.

H H019 143

During the 20 Sept 2012 Industry Day briefing, the government identified a potentially new addendum to the R&M H clause that would add subsystem reliability. Please provide additional detail and clarity for this new requirement. Is it for a single subsystem? What is the reason for the change

The potential addition of a subsystem reliability requirement was discussed as a change to the Statement of Work, not as a change to the R&M clause. The potential additions to the R&M H clause were discussed later in the Industry Day presentation, and include two new measures (MTBSA and MTBF), the inclusion of the definitions of the measures and defining the time period of data used in assessment.

I 52.227-01 152 Offeror requests that the addition of ALTERNATE I to FAR 52.227-01, Authorization and Consent. This clause protects the Contractor and the Government from issues with patent infringement claims under R&D contracts.

Alternate I is only used if the primary purpose of the contract is R&D. R&D is not the primary purpose of the contract as a whole so Alternate I will not be added.

I 52.247-21 154 Offeror requests that FAR clauses 52.247-14, -15, -17, and -21 be removed because they are applicable only to solicitations or contracts for transportation or for transportation-related services.

Agree to remove requested FAR clauses.

I 252.204-7002 154 CLINs 0118 and 0139 are missing from the Option CLIN list. Please add them. Agree to add CLINs to Option list.

J 1 COMs Requirement 38

Spec requires basic comms capabilities -- have quick SINCGARS, UHF-SATCOM, etc. However, HH-60G is acquiring new suite of multi-band radios that will also proide crypto modernization, full compliance with GATM (ED-23B), and advanced waveforms such as SRW and MUOS. Won't CRH be a step backwards from what will be fielded on HH-60G in FY14?

The Government has no intentions to change the specification from the current COMMs requirement.

J 1 Appendix F We sent in several classified questions in July that have not yet been answered, we suspect due to the pending changes to those documents. Does the government plan to answer those questions.

All clasified questions have beenaddressed. Updated document reflects answers.

Discovered that answers were not mailed out. Answers will be mailed this week.

J 1 Appendix F Has the Government Changed Appendix F and when can we expect it to be mailed based upon our formal request? It did not arrive with the Appendix D recently sent.

The only classified released with the 3rd DRFP was the portion that had changed (Appendix D only). No changes have been made to Appendix F.

3rd DRFP Industry Response Martix 25 Sep 12 (Unsecure)

If Section J, list

Attach or Exhibit Paragraph Page Question or Comment Answer or Resolution

3rd DRFP Industry Response Martix 25 Sep 12 (Unsecure)

J 3 & 20

The criteria in the IMP for RAA does not appear to match the criteria on page 75 of the SOW. The SOW requires the CRH training devices to be delivered, operational and ready for training. The IMP just says they are in place, could in place mean delivered but not ready for training? Does SOW take precedence over the IMP in the RFP?

IMP has been updated to match the SOW.

J 3 1.9.5.3.1.4 42

It is unclear how many aircraft the RSP and SE Mobility Package must support. In the above RFP extract, the Government references 4 aircraft for active, 5 aircraft for AFRC and ANG, and a 3 aircraft, 14-day deployment. A previous FBO / Government response on 20 March, 2012 indicated the following: “All the spares required to be included in a RSP kit. SOW para 1.9.5.3.1.4 will be changed to include the following:

"In order to develop deployment SE/TMDE and RSP lists, the contractor shall assume the requirement to support a 4 Primary Mission Aircraft Inventory (PMAI) aircraft shipset for 30 days with a 50-hour utilization rate per aircraft."

Please clarify.

The active duty four ship and ARC five ship RSP and SE mobility packages are identical. The 14-day deployment packages are subsets (listings) of the RSP and SE mobility packages.

J 3 and 31 SOW paras 1.9.5.2.2 and 1.6.1.1.1 ;

TMCR 2.17

The Contractor is required to support the Government’s Depot Maintenance Activation Planning (DMAP), and deliver all technical orders required for D-Level maintenance. The Government is also requiring that the Contractor provide an fixed price (FFP) value for the depot technical orders without being able to specify how the depot maintenance will be performed (tools, processes, procedures, facilities, etc.).

--Request the Government modify the requirement and create a separately priced CLIN for depot technical orders. Costs will be established as the depot activation requirements are identified through the DMAP/DMAWG process.

Depot Manuals will not be pulled out on to a separate CLIN to be priced later. The offeror shall propose CRH depot technical manuals based on existing maintenance processes and procedures for their weapon system.

J 31 2, Table 1, Item 13 7 Is it the Government’s intention not to have items a-h checked-off for On-Equipment Organizational Maintenance manual Set in the TMCR?

Yes.

J/L 12/1 L, para 5.2.1.5 Atch 12, Page

Section J, Att 12 shows that Live Fire Assets can be purchased in FY 13(CLIN 0007), FY 15 (CLIN 0107), FY 16 (CLIN 0207), and FY 17 (CLIN 0307). However, the TEP workbook shows the CLIN's PoP as FY 13 (CLIN0007), FY 14 (CLIN 0107), FY 15 (CLIN 0207), and FY 16 (CLIN 0307). Please clarify.

The TEP Workbook has beens corrected to match the CLIN/SOW Matrix (Attachment 12).

L 2.7.2 10

Per NISPOM 5-203, working papers must be market as final when they are transimitted outside the facility in which they were created. Please revise requirement consistent with NISPOM 5-203.

Generation of Classified Material b....working papers shall be marked in the same manner prescribed for a finished document at the same classification level when: (1) transmitted outside the facility...

Para 2.7.2 revised to read as follows: Any classified data generated in support of the proposal process shall be marked as working papers, IAW NISPOM paragraph 5-203(b).

Mark papers as Working Papers/(Classification Level) when transmitted ourside the facility. The marking will be valid for 180 days from generation of the document. The Government will provide an approved CRH Security Classification Guide, Section J, Attachment 18 within 180 days for official classification guidance, at which point the contractor shall update their classification markings. Offerors shall use the DRAFT guide as interim guidance to determine proper handling and storage requirements for documents written/products developed.

L 1 EMD Acquisition

Worksheet Cell Q23

"EMD Acquisition" tab cell Q23 does not include FY19 cell (K23) values. Request updated worksheet. The TEP Worksheet has been updated.

L 1 VIQ Matrix Worksheet

"VIQ Matrix" cell R15, is calculating SDTA CLIN 0102's at Unit Price instead of at Ceiling Price at stated in Section M paragraph 2.4.1.1.1 . Request updated worksheet.

The TEP Worksheet has been updated

L 1 LFT&E Worksheet Line 51

The cockpit is equipped with a single type of (seat) armor. Recommended the USAF update the LFT&E Worksheet to be consistent with the Systems Spec and remove refernces to cockpit/installed armor.

The LFT&E worksheet updated to reflect the requirements in the SS.

L 1 Fuel Costs worksheet N/A

Cell G6 of the “Fuel Costs” worksheet uses a fuel (JP-8) price per gallon of $3.82. This number, $3.82, was taken from the DLA Energy Website’s January 2012 price report. DLA's latest (July 2012) JP-8 price per gallon is $2.31.

(see the following link: http://www.energy.dla.mil/DLA_finance_energy/Pages/dlafp03.aspx.)

Does the Government intend to update the worksheet to the reflect the most current data available?

The Standard Price for JP-8 will be updated with the most current rate (from the DLA website) prior to release of the Final RFP.

M 2.3.1, Table 2 4 What is the basis or rationale for the 7% in the adjustment? Rationale: Government has determined that 7% is the amount the Government is willing to pay for the extra capabilities.

If Section J, list

Attach or Exhibit Paragraph Page Question or Comment Answer or Resolution

3rd DRFP Industry Response Martix 25 Sep 12 (Unsecure)

M 1.1.1.1 What is the basis for the $6.84B affordability gate? Where did the value get generated from? Rationale: Government has determined that $6.848B is the amount the Government is willing to pay for the CRH program.

M General

Will the USAF make an award without discussions? Due to dollar amount and complexity of this program, it is highly unlikely that awarding without discussions is realistic. Therefore, language has NOT been included in the RFP to allow for award without discussions. Still recommend to industry that they put their best foot forward in their initial proposal.

M 1.1 2 Is this considered Best Value or Lowest TEP for award? The Government considers this a BEST VALUE acquisition because there are still trades included within the evaluation between minimum and goal requirements.

M 2.3.3 5 What drove the removal of objective performance requirements for aircraft survivability? Affordability.

M 1.1.1.5 2

Step 3 seems to omit the price reasonable/balance aspect. The prices must be reasonable and balanced to be awarded. Other portions of Section M discuss the reasonableness and balance requirements that must be met. The picture is intended to be a summarization of the evaluation process in Section M.

M 1.6 (Deleted)

How is risk and benefit determined and evaluated without a TRA program? What is the acceptable risk level criteria? For example; if a component is TRL 5 at contract award is that acceptable?

Technology readiness is not being assessed as a separate subfactor. Technical risk will either be acceptable or unacceptable based on the definitions provided. The offeror proposing to insert technology into the program will need to be concerned on how much risk they are also inserting into the program. This will all be taken into account during the risk assessment for each technical subfactor as appropriate.

M 2.4.1.3 11

Can you describe for us how you're going to deal with SE/TE? The requirements for the offeror to use in proposing additional Government-owned Special Tooling and Special Test Equipment is contained in Section L, paragraph 5.2.3. The specific calculations are included in the Section L, Atch 1, TEP workbook, the "ST&TE" worksheet.

TEMP 1.3.3.2 12

Under paragraph 1.3.3.2 Special Test or Certification Requirements the TEMP states: "The CRH airframe will have either a FAA, FAA equivalent, of DoD airworthiness certification prior to contract award." This is not found anywhere else in the draft RFP instructions. Is it a requirement for the CRH airframe to have either a FAA, FAA equivalent, or DoD airworthiness certification prio to contract award?

TEMP is draft. Airworthiness certification is not required prior to contract award.

TEMP Figure 2-1 16

The schedule shown in the TEMP shows IOT&E starting around mid FY17 and completing early FY18. In the SOW, Annex E Projected CRH Air Vehicle Beddown, IOT&E is shown starting under FY18 and completing under FY19. When does the Government intend to conduct IOT&E?

The TEMP is draft. All schedules are projections. IOT&E will begin when the entry criteria for the event are met.

TEMP 3.1 17

The TEMP implies that the RTO will receive Type 1 training prior to Contractor Flight Testing. This is not mentioned in the SOW under 1.5.2.1 Type 1 Training. Is it the Government's intent to provide Type 1 Training to the DT&E Cadre (12 Test Pilots and 12 SMA's) prior to the start of Contractor DT&E?

The TEMP is draft. All schedules are projections. Type 1 training will occur in time to support AF DT.

TEMP 3.1 and 3.3.2 17 & 22

The TEMP implies that at least two EMD aircraft will be in a production representative configuration 6 months prior to IOT&E. This is not mentioned in the SOW. Is it the Government's intent to have at least two EMD aircraft in a production representative configuration 6 months prior to IOT&E?

The TEMP is draft. All schedules are projection. Having two EMD aircraft in production configuration 6 months prior to IOT&E is not required.

3rd DRFP comments