CRFQ EBA26-01 - Exhibits B through D - Copy.pdf
PDF 17 MB Posted
- Solicitation number
- CRFQ-0439-EBA2600000001-2
- Issued by
- Mingo County, West Virginia
About this file
CRFQ EBA26-01 Summary
This Centralized Request for Quotation (CRFQ) issued by the West Virginia Department of Administration, General Services Division (GSD) pertains to roof replacement and building repairs at the West Virginia Public Broadcasting facility located at 1309 Sand Springs Road, Bruceton Mills, West Virginia 26525. The project involves removal and replacement of existing roofing systems, installation of new EPDM membrane roofing with a 20-year warranty, demolition and removal of an abandoned generator and associated equipment, infill of existing masonry openings, removal of an existing car canopy, installation of new concrete carport flooring, and related site restoration. The scope of work includes furnishing all labor, materials, equipment, and services necessary for complete project execution. The contract is structured as a single prime lump-sum general construction contract with a Notice to Proceed anticipated in 2020 and a Final Completion date of 270 calendar days from Notice to Proceed, with Substantial Completion required 30 calendar days prior to Final Completion.
The contract documents include comprehensive Division 01 General Requirements specifications covering project management coordination, submittal procedures, payment procedures, scheduling, quality requirements, temporary facilities and controls, and closeout procedures. Payment procedures require submission of Applications for Payment on AIA forms G702 and G703, with retainage provisions and conditions precedent including completion of all closeout submittals. The contractor must provide performance and payment bonds, certificates of insurance, and proof of security clearances for all personnel accessing the West Virginia State Capitol Building. Contract modifications are governed by formal change order procedures requiring GSD approval and processing through the State Purchasing Division. All work must comply with the West Virginia Building Code, applicable fire protection standards, and state environmental regulations; final warranties and project record documents must be submitted prior to final payment authorization.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
07/16/2025
WEST VIRGINIAWEST VIRGINIA
OHIOOHIO
CHARLESTON
PARKERSBURG
I-70
I-68
WV RT. 2
PROJECT LOCATION
I-77
I-64
WV RT. 2
I-64 I-77
I-79
I-81
US RT. 50
MATERIAL LEGEND
FIBER-REINFORCED CONCRETE
CONCRETE
CONCRETE MASONRY OR VCT
BRICK OR HMA
CARPET
WELL-GRADED STONE/GRAVEL
UNIFORM-GRADED STONE/GRAVEL
WOOD
WOOD
RIGID INSULATION
BATT INSULATION
STEEL
SOIL
BEDROCK OR HARDWOOD FLOOR
SAND, HMA, OR GYPSUM
CERAMIC TILE
WOOD SHEATHING
CEILING GRID
GLAZED CLAY TILE
UNGLAZED CLAY TILE
PROJECT LOCATION
WEST VIRGINIA PUBLIC BROADCASTING
1309 SAND SPRINGS RD
BRUCETON MILLS, WV26525
N
TRUETRUE
NORTHNORTH
PROJECTPROJECT
NORTHNORTH
ABBREVIATIONS ABBREVIATIONS CONT.
AC AIR CONDITIONING UNIT
ACT ACOUSTICAL CEILING TILE
ADD ADDITIONAL
ADJ ADJUSTABLE
AFC/F/G
ABOVE FINISHED
CEILING/ FLOOR/GRADE
AHU AIR HANDLING UNIT
ALUM ALUMINUM
APPX APPROXIMATELY
ARCH ARCHITECT(URAL)
BD BOARD
BIT BITUMINOUS
BL BUILDING LINE
BLDG BUILDING
BLK BLOCK
BLKG BLOCKING
BM BEAM/BENCH MARK
BOF/P BOTTOM OF FOOTER/PIPE
BOT BOTTOM
BRG BEARING
BUR BUILT-UP ROOFING
CB CATCH BASIN
CER CERAMIC
CIP CAST-IN-PLACE
CL CENTERLINE
CLG CEILING
CLR CLEARANCE
CLO CLOSET
CMU CONCRETE MASONRY UNIT
CJ CONSTRUCTION/CONTROL JOINT
CO CLEANOUT
COL COLUMN
CONC CONCRETE
CONN CONNECTION
CONST CONSTRUCTION
CONT CONTINUOUS
CUB COLUMN UTILITY BOX
DBO DESIGN BY OTHERS
DCBO
DESIGN & CONSTRUCTION BY
OTHERS
DET DETAIL
DN DOWN
D&R DEMOLISH & REMOVE
DR DOOR
DS DOWNSPOUT
DWG DRAWING
EA EACH
ED EDGE DISTANCE
EF EACH FACE
EJ EXPANSION JOINT
EL ELEVATION
ENC ENCLOSURE
EOP/W EDGE OF PAVEMENT/WALK
EQ EQUAL
EQUIP EQUIPMENT
ES EACH SIDE
EW EACH WAY/EYE WASH
EWC ELECTRIC WATER COOLER
EXH EXHAUST
EXIST EXISTING
EXT EXTERIOR
FBO FURNISHED BY OTHERS
FC FINISHED CEILING
FD FLOOR DRAIN/FIRE DAMPER
FDN FOUNDATION
FF FINISHED FLOOR
FFT FINISHED FLOOR TRANSITION
FH FIRE HYDRANT
FHC FIRE HOSE CABINET
FIXT FIXTURE
FLR FLOOR
FOC/F/M
FACE OF CONCRETE/
FINISH/MASONRY
FS FAR SIDE
FIN FINISHED
FR FIRE RATED
FTG FOOTING
FUB FLOOR UTILITY BOX
GA GAUGE/GAGE
GALV GALVANIZED
GL GLASS/GLAZING
GND GROUND
GWB GYPSUM WALL BOARD
HC
HOLLOW CORE/HANDICAP
ACCESSIBLE
HDW HARDWARE
HM HOLLOW METAL
HMA HOT-MIX-ASPHALT
HP HIGH POINT
HTR HEATER
I/ INSIDE OF
IBO INSTALLED BY OTHERS
ID INSIDE DIAMETER
INCL INCLUD(E)(ING)
INS INSULATION
INT INTERIOR
INV INVERT
ISO ISOLATION
JT JOINT
LAM LAMINATED
LLV LONG LEG VERTICAL
LP LOW POINT
LTG LIGHTING
MAS MASONRY
MAT MATERIAL
MEMB MEMBRANE
MFR MANUFACTURER
MH MANHOLE
MO MASONRY OPENING
MR MOISTURE RESISTANT
MTL METAL
NIC NOT IN CONTRACT
NOM NOMINAL
NS NEAR SIDE
NTS NOT TO SCALE
O/ OUTSIDE OF
OC ON CENTER
OD OUTSIDE DIAMETER
OH OVERHEAD/OVERHANG
OPNG OPENING
OPP OPPOSITE
PC PRECAST
PLC(S) PLACE(S)
PL(S) PLATE(S)
PLYWD PLYWOOD
PEMB PRE-ENGINEERED METAL BUILDING
PT PRETENSIONED
PTD PAINTED
PTN PARTITION
PVMT PAVEMENT
QT QUARRY TILE
QTY QUANTITY
REG REGISTER
REINF REINFORCING
REQD REQUIRED
RM ROOM
RO ROUGH OPENING
RS ROUGH SAWN
SCH SCHEDULE
SECT SECTION
SHT SHEET
SL STRUCTURE LINE
SP SPACE
SPEC SPECIFICATION(S)
SQ SQUARE
SS STAINLESS STEEL
STA STATION
STD STANDARD
STL STEEL
STOR STORAGE
STR STRUCTURAL
SUSP SUSPENDED
SW SIDEWALK/SHEAR WALL
T&B TOP AND BOTTOM
T&G TONGUE AND GROOVE
TBD TACKBOARD/TO BE DETERMINED
TD TRENCH DRAIN
TOB/F/M
/P/R/S /W
TOP OF BANK/
FOOTER/MASONRY/PIPE
/RAIL(ING)/STEEL/ WALL
TOS TOE OF SLOPE
TRT TREATED
UNO UNLESS NOTED OTHERWISE
VCB VINYL COVER BASE
VCT VINYL COMPOSTION TILE
VIF VERIFY IN FIELD
VP VENEER PLASTER
VWC VINYL WALL COVERING
WC WATER CLOSET
WD WOOD
WDW WINDOW
WPR WATERPROOFING
WUB WALL UTILITY BOX
WWF WELDED WIRE FABRIC
SYMBOL LEGENDSYMBOL LEGEND
CODED NOTE
REVISION TRIANGLE
SECTION
ELEVATION
DETAIL
MARK NUMBER
WALL TYPE
INTERIOR ELEVATION
SPOT ELEVATION
BEARING ELEVATION OR
TOP SURFACE ELEVATION
MANHOLE
CATCH BASIN
COLUMN GRID
XXX
XXX
SCALE:
SCALE:
DETAIL TITLEDETAIL TITLE
DRAWING TITLEDRAWING TITLE
DETAIL REFERENCE
TAG LOCATION
DRAWING REFERENCE
X"=1'-0"X000
X000
A
X000 X"=1'-0"X000
2 WORKING DAYS
BEFORE YOU DIG
UNDERGROUND UTILITIES
CALL TOLL FREE:
8 - 1 - 1
CONTRACTOR SHALL BE RESPONCIBLE FOR COMPLETE
IDENTIFICATION AND COORDINATION OF EXISTING UTILITIES
WITH OWNER AND THE RESPECTIVE UTILITY PROVIDER IF
APPLICABLE.
PROJECT LOCATIONPROJECT LOCATIONSITE CONTEXT MAPSITE CONTEXT MAP
TABLE ABBREVIATIONSTABLE ABBREVIATIONS DRAWING INDEXDRAWING INDEX
R ev
D es cr ip tio n B y D at e
D ra w in g D es cr ip tio n
NA
Ar ch ite cts
En gin ee rs
Su rv ey or s
Sheet Number Sheet Name
G000 DRAWING INDEX SHEET
S000 GENERAL NOTES
SD110 DEMOLITION PLAN
S110 FOUNDATION PLAN
S111 FRAMING PLAN
S300 CANOPY SECTION
S500 STRUCTURAL DETAILS
A000 ARCHITECTURAL GENERAL NOTES & SPECIFICATIONS
A001 ARCHITECTURAL GENERAL NOTES & SPECIFICATIONS
AD111 DEMOLITION PLANS
A111 FLOOR PLAN
A140 ROOF PLAN & SUPERSTRUCTURE
A200 BUILDING ELEVATIONS
A500 DETAILS
A501 EPDM ROOF DETAILS
E001 ELECTRICAL SPECIFICATIONS, ABBREVIATIONS AND
GROUNDING DETAILS
E100 ELECTRICAL GROUNDING INSTALLATION SITE PLAN
1.
UNIT PRICING REQUIRMENTS:UNIT PRICING REQUIRMENTS:
PROVIDE UNIT PRICING PER LINEAR FOOT
OF ROOF DECKING TO BE REPLACED.
IS
SU
E D
F O
R C
O N
ST
R
U C
T
IO
N
JR
T
/1 6/
E m er so n
A ve nu e
Pa rk er sb ur g, W es t V ir gi ni a
Ph on e:
4)
-5
Fa x:
4)
-4
Project:
Designed By:
Drawn By:
Checked By:
Scale:
Plot Date:
Revision:
Drawing Number:
D ra w in g D es cr ip tio n
R ev
D es cr ip tio n B y D at e
JRT
ALN
ALN
2226508
NA
G E
N E
R A
L N
O T
E S
W V
PB
C
C O
O
PE
R 'S
R O
C K
R O
O F
R E
PL
A
C E
M E
N T
PR
E
ST
O
N C
O U
N T
Y , W
V
W E
ST
V
IR
G
IN
IA
P U
B L
IC
B
R O
A D
C A
ST
IN
G
S000
07/16/25
E m er so n
A ve nu e
Pa rk er sb ur g, W es t V ir gi ni a
Ph on e:
4)
-5
Fa x:
4)
-4
Project:
Designed By:
Drawn By:
Checked By:
Scale:
Plot Date:
Revision:
Drawing Number:
D ra w in g D es cr ip tio n
R ev
D es cr ip tio n B y D at e
JRT
ALN
ALN
2226508
3/16" = 1'-0"
D E
M O
L
IT
IO
N
P L
A N
W V
PB
C
C O
O
PE
R 'S
R O
C K
R O
O F
R E
PL
A
C E
M E
N T
PR
E
ST
O
N C
O U
N T
Y , W
V
W E
ST
V
IR
G
IN
IA
P U
B L
IC
B
R O
A D
C A
ST
IN
G
SD110
07/16/25
IS
SU
E D
F O
R C
O N
ST
R
U C
T
IO
N
JR
T
/1 6/
E m er so n
A ve nu e
Pa rk er sb ur g, W es t V ir gi ni a
Ph on e:
4)
-5
Fa x:
4)
-4
Project:
Designed By:
Drawn By:
Checked By:
Scale:
Plot Date:
Revision:
Drawing Number:
D ra w in g D es cr ip tio n
R ev
D es cr ip tio n B y D at e
JRT
ALN
ALN
2226508
3/16" = 1'-0"
FO
U
N D
A T
IO
N
P L
A N
W V
PB
C
C O
O
PE
R 'S
R O
C K
R O
O F
R E
PL
A
C E
M E
N T
PR
E
ST
O
N C
O U
N T
Y , W
V
W E
ST
V
IR
G
IN
IA
P U
B L
IC
B
R O
A D
C A
ST
IN
G
S110
07/16/25
IS
SU
E D
F O
R C
O N
ST
R
U C
T
IO
N
JR
T
/1 6/
E m er so n
A ve nu e
Pa rk er sb ur g, W es t V ir gi ni a
Ph on e:
4)
-5
Fa x:
4)
-4
Project:
Designed By:
Drawn By:
Checked By:
Scale:
Plot Date:
Revision:
Drawing Number:
D ra w in g D es cr ip tio n
R ev
D es cr ip tio n B y D at e
JRT
ALN
ALN
2226508
3/16" = 1'-0"
FR
A
M
IN
G P
L A
N
W V
PB
C
C O
O
PE
R 'S
R O
C K
R O
O F
R E
PL
A
C E
M E
N T
PR
E
ST
O
N C
O U
N T
Y , W
V
W E
ST
V
IR
G
IN
IA
P U
B L
IC
B
R O
A D
C A
ST
IN
G
S111
07/16/25
IS
SU
E D
F O
R C
O N
ST
R
U C
T
IO
N
JR
T
/1 6/
E m er so n
A ve nu e
Pa rk er sb ur g, W es t V ir gi ni a
Ph on e:
4)
-5
Fa x:
4)
-4
Project:
Designed By:
Drawn By:
Checked By:
Scale:
Plot Date:
Revision:
Drawing Number:
D ra w in g D es cr ip tio n
R ev
D es cr ip tio n B y D at e
JRT
ALN
ALN
2226508
3/4" = 1'-0"
C A
N O
PY
S
E C
T
IO
N
W V
PB
C
C O
O
PE
R 'S
R O
C K
R O
O F
R E
PL
A
C E
M E
N T
PR
E
ST
O
N C
O U
N T
Y , W
V
W E
ST
V
IR
G
IN
IA
P U
B L
IC
B
R O
A D
C A
ST
IN
G
S300
07/16/25
IS
SU
E D
F O
R C
O N
ST
R
U C
T
IO
N
JR
T
/1 6/
E m er so n
A ve nu e
Pa rk er sb ur g, W es t V ir gi ni a
Ph on e:
4)
-5
Fa x:
4)
-4
Project:
Designed By:
Drawn By:
Checked By:
Scale:
Plot Date:
Revision:
Drawing Number:
D ra w in g D es cr ip tio n
R ev
D es cr ip tio n B y D at e
JRT
ALN
ALN
2226508
AS NOTED
ST
R
U C
T U
R A
L D
E T
A
IL
S
W V
PB
C
C O
O
PE
R 'S
R O
C K
R O
O F
R E
PL
A
C E
M E
N T
PR
E
ST
O
N C
O U
N T
Y , W
V
W E
ST
V
IR
G
IN
IA
P U
B L
IC
B
R O
A D
C A
ST
IN
G
S500
07/16/25
IS
SU
E D
F O
R C
O N
ST
R
U C
T
IO
N
JR
T
/1 6/
BUILDING CODE DATABUILDING CODE DATA
1.
2.
a.
b.
c.
d.
e.
f.
g.
h.
i.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
13.
14.
15.
16.
17.
18.
1.
2.
1.
1.
2.
3.
GENERAL NOTESGENERAL NOTES
A. MISCELLANEOUS
THE GOVERNING SPECIFICATIONS FOR THE PROJECT SHALL BE AS STATED IN THE
PROJECT DOCUMENTS. THE CONTRACT DOCUMENTS ARE THE GOVERNING
PROVISIONS APPLICABLE TO THE PROJECT.
ALL WORK SHALL CONFORM TO THE APPLICABLE REQUIREMENTS OF THE
GOVERNING AUTHORITIES HAVING JURISDICTION INCLUDING ALL APPLICABLE CODES,
SPECIFICATIONS, STANDARDS, AND GUIDELINES ADOPTED BY SUCH AUTHORITIES
WHICH MAY INCLUDE, BUT NOT BE LIMITED TO, THE FOLLOWING:
-WEST VIRGINIA BUILDING CODE
-NATIONAL FIRE PROTECTION ASSOCIATION (NFPA)
-INTERNATIONAL BUILDING CODE (IBC)
-INTERNATIONAL MECHANICAL/PLUMBING CODE
-AMERICAN SOCIETY FOR TESTING MATERIALS (ASTM)
-OCCUPATIONAL SAFETY AND HEALTH ADMINISTRATION (OSHA)
-NATIONAL ELECTRICAL CODE
-AMERICANS WITH DISABILITIES ACT (ADA)
-AIA GUIDELINES FOR DESIGN AND CONSTRUCTION OF HEALTH CARE
FACILITIES
DISCREPANCIES BETWEEN THE PLANS/REFERENCES AND VARIOUS CODES,
STANDARDS, SPECIFICATIONS, ETC. SHALL BE BROUGHT TO THE ATTENTION OF
THE ARCHITECT/ENGINEER FOR REMEDIATION.
THE CONTRACT DOCUMENTS SHALL SUPPLEMENT AND AMEND THE GOVERNING
SPECIFICATIONS AND SHALL RULE IN CASE OF CONFLICT.
ALL DIMENSIONS AND SITE CONDITIONS SHALL BE VERIFIED IN THE FIELD PRIOR
TO CONSTRUCTION. THE ARCHITECT/ENGINEER SHALL BE IMMEDIATELY NOTIFIED
OF ANY DISCREPANCIES.
ALL ADJACENT STRUCTURES, FINISHES, AND UTILITY SERVICES SHALL BE
PROTECTED FROM DAMAGE DURING CONSTRUCTION. ALL EXISTING FEATURES
DAMAGED BY CONSTRUCTION SHALL BE RESTORED TO A CONDITION BETTER THAN
OR EQUAL TO THE PRE-CONSTRUCTION CONDITION AND SATISFACTORY TO THE
OWNER.
ALL PHASES OF WORK ARE SUBJECT TO INSPECTION, TESTING AND ACCEPTANCE
BY THE ARCHITECT/ENGINEER OR OWNER.
ALL SITE LAYOUT INCLUDING BENCH MARKS, CENTERLINES, ETC. SHALL BE
COMPLETED IN ACCORDANCE WITH THE PROJECT DOCUMENTS.
A SAFE AND ORDERLY WORKSITE SHALL BE MAINTAINED AT ALL TIMES.
LOADING/UNLOADING AND HAULING OF ALL MATERIALS TO AND FROM THE
CONSTRUCTION SITE SHALL BE INCLUDED IN THE PROJECT.
ALL CONSTRUCTION WORK RELATED TO THESE DRAWINGS SHALL BE PROPERLY
COORDINATED/STAGED WITH THE OWNER AND OTHER CONTRACTORS THAT MAY BE
INVOLVED WITH THE PROJECT.
WORKING UTILITY SYSTEMS SHALL BE MAINTAINED THROUGHOUT THE WORK AREAS
AT ALL TIMES DURING CONSTRUCTION. SYSTEMS SHALL CONSIST OF EXISTING,
PROPOSED, TEMPORARY, OR A COMBINATION THEREOF.
ALL PROPERTY, BOTH PUBLIC AND PRIVATE, THAT HAS BEEN DAMAGED DURING
THE EXECUTION OF THE WORK SHALL BE RESTORED IN AN ACCEPTABLE MANNER.
THE SITE SHALL BE LEFT IN A NEAT AND PRESENTABLE CONDITION.
SUPPORT STRUCTURE(S) IS DESIGNED TO BE SELF-STANDING AND STABLE AFTER
CONSTRUCTION IS FULLY COMPLETED. ERECTION PROCEDURES/SEQUENCE (E.G.
CONSTRUCTION MEANS AND METHODS) SHALL BE DETERMINED/DESIGNED (BY
CONTRACTOR) TO ENSURE THE SAFETY OF THE STRUCTURE, ITS COMPONENT
PARTS, AND ALL WORKERS DURING ERECTION. THIS INCLUDES THE ADDITION OF
NECESSARY SHORING, SHEETING, TEMPORARY BRACING, GUYS, AND/OR TIEDOWNS.
SUCH MATERIALS SHALL REMAIN THE CONTRACTOR'S PROPERTY AFTER
COMPLETION OF THE PROJECT.
ALL WORK MUST MEET THE OWNER'S AND ARCHITECT'S/ENGINEER'S APPROVAL.
WHERE APPLICABLE, THE COST OF ALL INSPECTIONS, SAMPLING, AND TESTING
SHALL BE INCIDENTAL TO THE PROJECT BID.
NO ASBESTOS REMOVAL IS ANTICIPATED FOR PROJECT AREA(S). DEMOLITION
CONTRACTOR SHALL IMMEDIATELY NOTIFY SITE SUPERINTENDENT OF ANY
UNCOVERED MATERIALS THAT MAY CONTAIN ASBESTOS.
ALL EXISTING MATERIALS TO REMAIN THAT ARE DAMAGED DURING CONSTRUCTION
SHALL BE REPLACED AT CONTRACTOR'S EXPENSE.
B. PERMITS
ALL OUTSTANDING FEDERAL, STATE, AND LOCAL PERMITS ASSOCIATED WITH THE
PROJECT SHALL BE OBTAINED. THE COST OF ALL OUTSTANDING PERMITS SHALL
BE INCIDENTAL TO THE PROJECT BID. WEST VIRGINIA STATE FIRE MARSHAL
REVIEW SHALL BE INVOICED TO AND PAID FOR BY THE OWNER INDEPENDENT OF
THE PROJECT BID. WVSFM APPROVAL DOCUMENTATION SHALL BE PROVIDED BY
ARCHITECT/OWNER PRIOR TO COMMENCEMENT OF CONSTRUCTION.
PROPER PERMIT DOCUMENTATION SHALL BE KEPT ON SITE AT ALL TIMES AND ALL
CONSTRUCTION SHALL BE IN ACCORDANCE WITH THE RESPECTIVE PERMITS. ALL
PERMIT CONDITIONS SHALL BE PROPERLY COMPLETED (E.G. INSPECTION
SCHEDULING).
C. INSPECTIONS, SAMPLING, AND TESTING
ALL EXECUTION, INSPECTIONS, SAMPLING, AND TESTING OF WORK ITEMS SHALL
BE IN ACCORDANCE WITH MANUFACTURER SPECIFICATIONS, THE PROJECT
DOCUMENTS, AND AUTHORITIES HAVING JURISDICTION REQUIREMENTS/DIRECTIVES.
INSPECTION, SAMPLING, AND TESTING SHALL BE PERFORMED BY AN INDEPENDENT,
CERTIFIED TESTING AGENCY APPROVED BY THE OWNER AND EMPLOYED BY THE
CONTRACTOR. ALL RESULTS SHALL BE PROMPTLY REPORTED TO THE
ARCHITECT/ENGINEER. THE OWNER, AT HIS EXPENSE, MAY ALSO RETAIN A
QUALIFIED PROFESSIONAL TO PERFORM INDEPENDENT QUALITY
CONTROL/ASSURANCE CHECKS ON THE CONTRACTOR'S WORK. WHERE QC/QA
REQUIREMENT CONFLICTS EXIST, PROJECT MANUAL REQUIREMENTS SHALL RULE.
D. UTILITIES
THE INFORMATION SHOWN ON THESE DRAWINGS CONCERNING TYPE AND LOCATION
OF EXISTING UTILITIES IS NOT GUARANTEED TO BE ACCURATE OR ALL INCLUSIVE.
FIELD VERIFY ALL EXISTING UTILITIES WITHIN THE WORK AREA. EXTREME CARE
SHALL BE TAKEN TO AVOID DAMAGE TO EXISTING UTILITIES INCLUDING, BUT NOT
LIMITED TO, PROVIDING PROTECTIVE MEASURES DURING CONSTRUCTION.
CORRECTION OF ANY DAMAGE TO UTILITIES SHALL BE MADE AT NO ADDITIONAL
COST TO THE OWNER.
ALL UTILITY OWNERS SHALL BE NOTIFIED PRIOR TO CONSTRUCTION.
UTILITIES THAT COULD POSE CONFLICTS WITH CONSTRUCTION SHALL BE FIELD
LOCATED PRIOR TO COMMENCEMENT OF CONSTRUCTION, RECORDED, AND
SUBMITTED TO THE ARCHITECT/ENGINEER FOR REVIEW. "MINOR" UTILITIES SHALL
BE RELOCATED/MODIFIED AS REQUIRED. ALL ACTIVITIES, TIMING, AND DURATION
OF UTILITY WORK SHALL BE COORDINATED WITH THE OWNER AND THE UTILITY
PROVIDER INVOLVED.
ALL WORK HAS BEEN DESIGNED TO MEET OR EXCEED THE REQUIREMENTS OF THE
WEST VIRGINIA FIRE AND BUILDING CODES.
1.
2.
3.
4.
1.
2.
3.
1.
a.
1.
2.
3.
4.
5.
6.
7.
8.
9.
b.
2.
a.
b.
3.
a.
1.
2.
3.
4.
1.
2.
1.
2.
a.
b.
1.
2.
3.
4.
5.
c.
3.
a.
1.
2.
3.
4.
5.
1.
2.
3.
b.
c.
1.
E. DEMOLITION
THE OWNER SHALL BE CONSULTED CONCERNING DISPOSAL OF DEMOLISHED
MATERIALS. THE OWNER SHALL HAVE THE RIGHT TO RETAIN OWNERSHIP OR
RELINQUISH IT TO THE CONTRACTOR. MATERIAL THAT BECOMES THE PROPERTY
OF THE CONTRACTOR SHALL BE PROPERLY DISPOSED OF AT OFF-SITE
LOCATION(S) IN ACCORDANCE WITH THE AUTHORITIES HAVING JURISDICTION.
ALL CONCRETE AND MASONRY DESIGNATED TO BE REMOVED SHALL BE CUT
USING A CONCRETE/MASONRY SAW OR OTHER APPROVED METHOD. DAMAGED
PORTIONS OF CONCRETE/MASONRY TO REMAIN SHALL BE REPAIRED.
STRUCTURAL DEMOLITION PROCEDURES/SEQUENCE (E.G. MEANS AND METHODS)
SHALL BE DETERMINED/DESIGNED (BY CONTRACTOR) TO ENSURE THE SAFETY OF
THE STRUCTURE, ITS COMPONENT PARTS, AND ALL WORKERS/OCCUPANTS. THIS
INCLUDES THE ADDITION OF NECESSARY SHORING, SHEETING, TEMPORARY
BRACING, GUYS, AND/OR TIEDOWNS. SUCH MATERIALS SHALL REMAIN THE
CONTRACTOR'S PROPERTY AFTER COMPLETION OF THE PROJECT.
PROVIDE UNIT PRICING PER LINEAR FOOT OF ROOF DECKING TO REPLACE
DAMAGED DECK AS REQUIRED. NEW DECKING SHALL MATCH EXISTING.
F. WALLS
ALL NEW WALLS SHALL BE CONSTRUCTED WITH MATERIALS AS SHOWN ON
PLANS.
ALL EXISTING WALLS SHALL BE PATCHED AND PREPARED FOR NEW PAINT AS
REQUIRED.
WOOD BLOCKING SHALL BE PROVIDED IN WALL FOR ALL WALL MOUNTED DOOR
STOPS, PLUMBING FIXTURES, CASEWORK, COUNTERTOPS/WALL BRACKETS,
ACCESSORIES AND AS NOTED ON DRAWINGS.
G. ELASTOMERIC MEMRANE ROOFING
SECTION INCLUDES
FURNISH AND INSTALL ELASTOMERIC SHEET ROOFING SYSTEM, INCLUDING:
ROOFING MANUFACTURER'S REQUIREMENTS FOR THE SPECIFIED WARRANTY.
REMOVAL OF ENTIRE EXISTING ROOF MEMBRANE AND FLASHINGS.
REMOVAL OF ALL EXISTING INSULATION DOWN TO THE DECK.
PREPARATION OF ROOFING SUBSTRATES.
WOOD NAILERS FOR ROOFING ATTACHMENT.
ELASTOMERIC MEMBRANE ROOFING.
METAL ROOF EDGING AND COPINGS.
FLASHINGS.
OTHER ROOFING-RELATED ITEMS SPECIFIED OR INDICATED ON THE
DRAWINGS OR OTHERWISE NECESSARY TO PROVIDE A COMPLETE
WEATHERPROOF ROOFING SYSTEM.
COMPLY WITH THE PUBLISHED RECOMMENDATIONS AND INSTRUCTIONS OF THE
ROOFING MEMBRANE MANUFACTURER, AT HTTP://MANUAL.FSBP.COM.
SUBMITTALS
PRODUCT DATA: PROVIDE DATA INDICATING MEMBRANE MATERIALS, FLASHING
MATERIALS, INSULATION, AND FASTENERS.
MANUFACTURER'S INSTALLATION INSTRUCTIONS: INDICATE MEMBRANE SEAMING
PRECAUTIONS, SPECIAL PROCEDURES, AND PERIMETER CONDITIONS REQUIRING
SPECIAL ATTENTION.
QUALITY ASSURANCE
APPLICATOR QUALIFICATIONS: ROOFING INSTALLER SHALL HAVE THE
FOLLOWING:
CURRENT APPROVAL, LICENSE, OR AUTHORIZATION AS APPLICATOR BY
THE MANUFACTURER.
FULLY STAFFED OFFICE WITHIN 100 MILES OF THE JOB SITE.
AT LEAST FIVE YEARS’ EXPERIENCE IN INSTALLING SPECIFIED SYSTEM.
CAPABILITY TO PROVIDE PAYMENT AND PERFORMANCE BOND TO
BUILDING OWNER.
B. PRE-INSTALLATION CONFERENCE: BEFORE START OF ROOFING WORK,
CONTRACTOR SHALL HOLD A MEETING TO DISCUSS THE PROPER INSTALLATION OF
MATERIALS AND REQUIREMENTS TO ACHIEVE THE WARRANTY.
REQUIRE ATTENDANCE WITH ALL PARTIES DIRECTLY INFLUENCING THE
QUALITY OF ROOFING WORK OR AFFECTED BY THE PERFORMANCE OF
ROOFING WORK.
NOTIFY PICKERING ASSOC. WELL IN ADVANCE OF MEETING.
DO NOT INSTALL OR APPPLY ROOFING MEMBRANE DURING UNSUITABLE WEATHER,
OR TO DAMP OR FROZEN DECK SURFACE OR WHEN PRECIPITATION IS EXPECTED
OR OCCURING. DO NOT EXPOSE MATERIALS VULNERABLE TO WATER OR SUN
DAMAGE IN QUANTITITES GREATER THAN CAN BE WEATHERPROOFED THE SAME
DAY.
WARRANTY: FIRESTONE 20-YEAR PLATINUM LIMITED WARRANTY COVERING
MEMBRANE, ROOF INSULATION, AND MEMBRANE ACCESSORIES.
LIMIT OF LIABILITY: NO DOLLAR LIMITATION.
SCOPE OF COVERAGE: REPAIR LEAKS IN THE ROOFING SYSTEM CAUSED BY:
ORDINARY WEAR AND TEAR OF THE ELEMENTS.
UNINTENTIONAL DAMAGE DUE TO NORMAL ROOFTOP INSPECTIONS,
MAINTENANCE, OR SERVICE.
MANUFACTURING DEFECT IN FIRESTONE BRAND MATERIALS.
DEFECTIVE WORKMANSHIP USED TO INSTALL THESE MATERIALS.
DAMAGE DUE TO WINDS UP TO 72 MPH (116 KM/H).
METAL ROOF EDGING WITH FASCIA: PRE-FINISHED ALUMINUM TO MATCH
EXISTING OR AS SELECTED BY OWNER.
MANUFACTURERS
BASIS OF DESIGN - FIRESTONE BUILDING PRODUCTS CO., CARMEL, IN.
HYPERLINK "HTTP://WWW.FIRESTONEBPCO.COM"WWW.FIRESTONEBPCO.COM.
ROOFING SYSTEMS MANUFACTURED BY OTHERS ARE ACCEPTABLE PROVIDED
THE ROOFING SYSTEM IS COMPLETELY EQUIVALENT IN MATERIALS AND
WARRANTY CONDITIONS AND THE MANUFACTURER MEETS THE FOLLOWING
QUALIFICATIONS: SPECIALIZING IN MANUFACTURING
THE ROOFING SYSTEM TO BE PROVIDED.
MINIMUM TEN YEARS OF EXPERIENCE MANUFACTURING THE ROOFING
SYSTEM TO BE PROVIDED.
ABLE TO PROVIDE A NO DOLLAR LIMIT, SINGLE SOURCE ROOF SYSTEM
WARRANTY THAT IS BACKED BY CORPORATE ASSETS IN EXCESS OF ONE
BILLION DOLLARS.
ABLE TO PROVIDE ISOCYANURATE INSULATION THAT IS PRODUCED IN OWN
FACILITIES.
ROOFING SYSTEMS MANUFACTURED BY THE COMPANIES LISTED BELOW ARE
ACCEPTABLE PROVIDED THEY ARE COMPLETELY EQUIVALENT IN MATERIALS
AND WARRANTY CONDITIONS:
CARLISLE
GENFLEX
VERSICO
MANUFACTURER OF INSULATION AND COVER BOARDS: SAME MANUFACTURER
AS ROOF MEMBRANE.
MANUFACTURER OF METAL ROOF EDGING: SAME MANUFACTURER AS ROOF
MEMBRANE.
METAL ROOF EDGING PRODUCTS BY OTHER MANUFACTURERS ARE NOT
ACCEPTABLE.
d.
1.
a.
b.
c.
1.
2.
3.
4.
5.
6.
d.
1.
1.
2.
1.
e.
f.
g.
h.
1.
1.
2.
3.
4.
5.
6.
7.
2.
i.
2.
a.
b.
c.
d.
e.
f.
g.
1.
2.
3.
h.
i.
3.
a.
b.
c.
2. SHOP-FABRICATED METAL ROOF EDGINGS OF 0.040 KYNAR PAINTED ALUMINUM
ARE ACCEPTABLE. PROVIDE CONTINUOUS CLEAT ON BOTH FRONT AND BACK LEG.
FOLLOW SMACNA TABLE 3-1 COPING DESIGN STANDARDS.
SUBSTITUTION PROCEDURES: SEE INSTRUCTIONS TO BIDDERS.
3. SUBMIT EVIDENCE THAT THE PROPOSED SUBSTITUTION COMPLIES WITH THE
SPECIFIED REQUIREMENTS.
MATERIALS
ELASTOMERIC MEMBRANE ROOFING: ONE PLY MEMBRANE, FULLY ADHERED,
OVER INSULATION.
ACCEPTABLE INSULATION TYPES - CONSTANT THICKNESS APPLICATION: ANY
TYPE THAT MEETS REQUIREMENTS AND IS APPROVED BY MEMBRANE
MANUFACTURER FOR APPLICATION. MINIMUM 2 LAYERS OF POLYISOCYANURATE
BOARD WITH STAGGERED JOINTS.
ROOFING SYSTEM:
MEMBRANE: ETHYLENE PROPYLENE DIENE MONOMER (EPDM).
THICKNESS: 0.090
MEMBRANE ATTACHMENT: FULLY ADHERED.
COMPLY WITH APPLICABLE LOCAL BUILDING CODE REQUIREMENTS.
PROVIDE ASSEMBLY HAVING UNDERWRITERS LABORATORIES, INC. (UL)
CLASS A FIRE HAZARD CLASSIFICATION.
PROVIDE ASSEMBLY COMPLYING WITH FACTORY MUTUAL CORPORATION
(FM) ROOF ASSEMBLY CLASSIFICATION, FM DS 1-28 AND 1-29, AND
MEETING MINIMUM REQUIREMENTS OF FM 1-90 WIND UPLIFT RATING.
INSULATION:
BASE LAYER: 1.5 INCH POLYISOCYANURATE FOAM BOARD, NON-
COMPOSITE.
ATTACHMENT: MECHANICAL FASTENING OVER DECKS, ADHERED TO
WOOD DECKS.
TOP LAYER: 1.5 INCH POLYISOCYANURATE FOAM BOARD, NON-COMPOSITE.
ATTACHMENT: ADHERED TO BASE LAYER.
ALL FLASHING MEMRANES, FASTERNERS, SEALERS, LAP SPLICING, AND
BONDING ADHESIVES SHALL BE PROVIDED AS REQUIRED BY THE SAME ROOF
MEMRANE MANUFACTURER FOR SYSTEM AND WARRANTY REQUIRED.
METAL PLATES AND STRIPS USED FOR FASTENING MEMBRANE AND
INSULATION: STEEL WITH GALVALUME COATING; CORROSION-RESISTANCE
MEETING FM 4470 CRITERIA.
TERMINATION BARS: ALUMINUM BARS WITH INTEGRAL CAULK EDGE; 1.3
INCHES WIDE BY 0.10 INCH THICK; FIRESTONE TERMINATION BAR.
ROOF INSULATION:
POLYISOCYANURATE BOARD INSULATION: CLOSED CELL POLYISOCYANURATE
FOAM WITH BLACK GLASS REINFORCED MAT LAMINATED TO FACES,
COMPLYING WITH ASTM C 1289 TYPE II CLASS 1, WITH THE FOLLOWING
ADDITIONAL CHARACTERISTICS:
THICKNESS: AS INDICATED ELSEWHERE.
SIZE: 48 INCHES (1220 MM) BY 96 INCHES (2440 MM), NOMINAL
MECHANICAL FASTENED APPLICATIONS.
SIZE: 48 INCHES (1220 MM) BY 48 INCHES (1220 MM), NOMINAL
ADHERED APPLICATIONS.
COMPRESSIVE STRENGTH: 25 PSI (138 KPA) WHEN TESTED IN
ACCORDANCE WITH ASTM C 1289.
UL-CLASSIFIED AND FM-APPROVED FOR DIRECT TO STEEL DECK
APPLICATIONS.
OZONE DEPLETION POTENTIAL: ZERO; MADE WITHOUT CFC OR HCFC
BLOWING AGENTS.
RECYCLED CONTENT: 19 PERCENT POST-CONSUMER AND 15 PERCENT
POST-INDUSTRIAL, AVERAGE.
INSULATION FASTENERS: TYPE AND SIZE AS REQUIRED BY ROOF
MEMBRANE MANUFACTURER FOR ROOFING SYSTEM AND WARRANTY TO BE
PROVIDED; USE ONLY FASTENERS FURNISHED BY ROOF MEMBRANE
MANUFACTURER.
INSULATION COVERBOARD – HD POLYISO COVERBOARD 0.5 INCH. THICK.
INSTALLATION – GENERAL
INSTALL ROOFING, INSULATION, FLASHINGS, AND ACCESSORIES IN
ACCORDANCE WITH ROOFING MANUFACTURER'S PUBLISHED INSTRUCTIONS AND
RECOMMENDATIONS FOR THE SPECIFIED ROOFING SYSTEM. WHERE
MANUFACTURERS PROVIDE NO INSTRUCTIONS OR RECOMMENDATIONS, FOLLOW
GOOD ROOFING PRACTICES AND INDUSTRY STANDARDS. COMPLY WITH
FEDERAL, STATE, AND LOCAL REGULATIONS.
OBTAIN ALL RELEVANT INSTRUCTIONS AND MAINTAIN COPIES AT PROJECT SITE
FOR DURATION OF INSTALLATION PERIOD.
DO NOT START WORK UNTIL PRE-INSTALLATION NOTICE HAS BEEN SUBMITTED
TO MANUFACTURER AS NOTIFICATION THAT THIS PROJECT REQUIRES A
MANUFACTURER'S WARRANTY.
PERFORM WORK USING COMPETENT AND PROPERLY EQUIPPED PERSONNEL.
TEMPORARY CLOSURES, WHICH ENSURE THAT MOISTURE DOES NOT DAMAGE
ANY COMPLETED SECTION OF THE NEW ROOFING SYSTEM, ARE THE
RESPONSIBILITY OF THE APPLICATOR. COMPLETION OF FLASHINGS,
TERMINATIONS, AND TEMPORARY CLOSURES SHALL BE COMPLETED AS
REQUIRED TO PROVIDE A WATERTIGHT CONDITION.
INSTALL ROOFING MEMBRANE ONLY WHEN SURFACES ARE CLEAN, DRY,
SMOOTH AND FREE OF SNOW OR ICE; DO NOT APPLY ROOFING MEMBRANE
DURING INCLEMENT WEATHER OR WHEN AMBIENT CONDITIONS WILL NOT
ALLOW PROPER APPLICATION; CONSULT MANUFACTURER FOR RECOMMENDED
PROCEDURES DURING COLD WEATHER. DO NOT WORK WITH SEALANTS AND
ADHESIVES WHEN MATERIAL TEMPERATURE IS OUTSIDE THE RANGE OF 60 TO
80 DEGREES F (15 TO 25 DEGREES C).
PROTECT ADJACENT CONSTRUCTION, PROPERTY, VEHICLES, AND PERSONS
FROM DAMAGE RELATED TO ROOFING WORK; REPAIR OR RESTORE DAMAGE
CAUSED BY ROOFING WORK.
PROTECT FROM SPILLS AND OVERSPRAY FROM BITUMEN, ADHESIVES,
SEALANTS AND COATINGS.
PARTICULARLY PROTECT METAL, GLASS, PLASTIC, AND PAINTED SURFACES
FROM BITUMEN, ADHESIVES, AND SEALANTS WITHIN THE RANGE OF WIND-
BORNE OVERSPRAY.
PROTECT FINISHED AREAS OF THE ROOFING SYSTEM FROM ROOFING
RELATED WORK TRAFFIC AND TRAFFIC BY OTHER TRADES.
UNTIL READY FOR USE, KEEP MATERIALS IN THEIR ORIGINAL CONTAINERS AS
LABELED BY THE MANUFACTURER.
CONSULT MEMBRANE MANUFACTURER'S INSTRUCTIONS, CONTAINER LABELS,
AND MATERIAL SAFETY DATA SHEETS (MSDS) FOR SPECIFIC SAFETY
INSTRUCTIONS. KEEP ALL ADHESIVES, SEALANTS, PRIMERS AND CLEANING
MATERIALS AWAY FROM ALL SOURCES OF IGNITION.
QUALITY CONTROL AND PROTECTION
INSPECTION BY MANUFACTURER: PROVIDE FINAL INSPECTION OF THE ROOFING
SYSTEM BY A TECHNICAL REPRESENTATIVE EMPLOYED BY ROOFING SYSTEM
MANUFACTURER SPECIFICALLY TO INSPECT INSTALLATION FOR WARRANTY
PURPOSES (I.E. NOT A SALES PERSON).
PERFORM ALL CORRECTIONS NECESSARY FOR ISSUANCE OF WARRANTY.
WHERE CONSTRUCTION TRAFFIC MUST CONTINUE OVER FINISHED ROOF
MEMBRANE, PROVIDE DURABLE PROTECTION AND REPLACE OR REPAIR
DAMAGED ROOFING TO ORIGINAL CONDITION.
1.
a.
b.
1.
2.
c.
d.
2.
a.
3.
a.
4.
a.
b.
5.
a.
6.
a.
b.
c.
1.
d.
1.
e.
1.
2.
f.
g.
1.
2.
3.
h.
1.
2.
i.
1.
2.
j.
1.
2.
k.
1.
2.
3.
l.
1.
2.
H. SHEET METAL
DESCRIPTION
PROVIDE SHEET METAL AS REQUIRED TO COMPLETE THE WORK.
WORK INCLUDED:
ALL SHEET METAL WORK SHOWN OR REQUIRED IN CONJUNCTION WITH
ROOFING FLASHINGS, UNLESS INDICATED AS BEING FURNISHED ELSEWHERE.
MISCELLANEOUS GENERAL CONSTRUCTION SHEET METAL WORK SHOWN OR
REQUIRED TO COMPLETE THE PROJECT, INCLUDING BUT NOT LIMITED TO
FASCIAS, TRIM BOARDS, ETC. AND OTHER SPECIALLY FABRICATED SHEET
METAL SHALL BE FURNISHED HEREIN UNLESS INDICATED AS BEING
PROVIDED ELSEWHERE.
SEALING WHICH IS SHOWN OR REQUIRED TO MAKE THE WORK OF THIS
SECTION WEATHERPROOF. INCLUDE NOT ONLY THE SEALING BETWEEN SHEET
METAL COMPONENTS, BUT ALSO THE SEALING BETWEEN SHEET METAL AND
ADJACENT CONSTRUCTION.
ALL FASTENINGS AND ACCESSORIES REQUIRED TO COMPLETE THE ABOVE.
QUALITY ASSURANCE
THE WORKMANSHIP AND GAGES OF SHEET METAL COMPONENTS SHALL
CONFORM TO RECOGNIZED INDUSTRY STANDARDS OF SHEET METAL PRACTICE,
AS REPRESENTED BY THE ARCHITECTURAL SHEET METAL MANUAL PUBLISHED
BY THE SHEET METAL AND AIR CONDITIONING CONTRACTORS NATIONAL
ASSOCIATION, INC., AND REFERRED TO HEREIN AS "THE SMACCNA MANUAL".
SUBMITTALS
SHOP DRAWINGS: SHOW THE METHOD OF INSTALLATION AND SPLICING AND
SHOW THE SPECIAL FITTINGS AND TRANSITIONS WHICH WILL BE REQUIRED.
PROVIDE SPECIFIC DRAWINGS FOR TRANSITIONS WHICH CANNOT BE MADE
USING FACTORY ASSEMBLIES, THUS REQUIRING SPECIAL FIELD FABRICATION.
NON-EDITED MANUFACTURER'S PRINTED BROCHURE MATERIAL WILL NOT BE
ACCEPTED.
PRODUCT DELIVERY, STORAGE, AND HANDLING
DELIVER APPROVED PRODUCTS TO JOB IN SEALED, ORIGINAL BRAND LABELED
CONTAINER OR WRAPPER BEARING ALL NECESSARY IDENTIFICATION.
BE RESPONSIBLE FOR RECEIVING, CHECKING, STORING, PROTECTING, AND
DISTRIBUTING MATERIALS SPECIFIED IN THIS SECTION, AND FURNISHED BY
OTHER SECTIONS FOR INSTALLATION BY THIS SECTION.
WARRANTY
SHEET METAL WORK SHALL BE WARRANTED TO BE FREE OF DEFECTS IN
MATERIAL AND WORKMANSHIP FOR A PERIOD OF TWO (2) YEARS AFTER THE
DATE OF SUBSTANTIAL COMPLETION.
MATERIALS – GENERAL
ALUMINUM SHEET METAL SHALL BE ASTM 8209 ALLOY 5005 TEMPER H-16,
CONFORMING TO FED. SPEC. QQ-A-359D, .063" THICK, EXCEPT WHERE
NOTED OTHERWISE.
GALVANIZED SHEET METAL SHALL BE ZINC-COATED CARBON STEEL MEETING
THE REQUIREMENTS OF ASTM A525-G90, CLASS 24-GAGE, EXCEPT WHERE
NOTED OTHERWISE.
SOLDER: ASTM SPECIFICATION 832 WITH THE FOLLOWING PROPORTIONS OF
BLOCK TIN AND PIG LEAD.
USE 50-50 FOR TERNE COATED STAINLESS STEEL AND GALVANIZED
STEEL.
FLUX SHALL BE SUITABLE FOR THE METAL AND SOLDER BEING USED, AND
SHALL PROVIDE MAXIMUM ADHESION, BUT SHALL BE FREE OF HARMFUL
EFFECTS ON BUILDING MATERIALS WHEN PROPERLY USED.
USE ACID TYPE FLUX FOR GALVANIZED STEEL.
SCREWS, NAILS AND FASTENING DEVICES SHALL BE SUITABLE FOR THE
INTENDED USE AND SHALL BE OF SUFFICIENT LENGTH TO PENETRATE THE
SUBSTRATE MATERIAL A MINIMUM OF 7/8 INCH. NAILS SHALL HAVE LARGE
FLAT HEADS AND NEEDLE POINTS. SCREWS SHALL HAVE HEAD DESIGN
SUITABLE FOR THE APPLICATION. WHERE METAL WASHERS ARE NECESSARY,
THEY SHALL BE OF THE SAME MATERIAL AS THE FASTENER. WHERE FASTENER
IS EXPOSED TO WEATHER, PROVIDE A NEOPRENE WASHER UNDER THE METAL
WASHER. EXPANSION SHIELDS SHALL BE LEAD OR BRONZE. OTHER
FASTENINGS SHALL BE AS FOLLOWS:
FOR ALUMINUM, USE ALUMINUM OR STAINLESS STEEL FASTENERS.
FOR GALVANIZED STEEL, USE GALVANIZED OR CADMIUM PLATED
FASTENERS.
SEALANT SHALL BE TREMCO DYMERIC, COLOR AS SELECTED BY THE
ARCHITECT.
VALLEY FLASHING:
PROVIDE 24-GAGE GALVANIZED STEEL FLASHING AT ALL VALLEYS.
FORM FLASHING IN 8 TO 10 FOOT LONG SECTIONS AND LAP SECTIONS 8
INCHES.
INSTALL FLASHINGS AS INDICATED ON SMACNA PLATE 61, COMPLETE WITH
VALLEYS, FELTS, CLEATS, ETC.
GABLE AND ROOF EDGE FLASHING:
PROVIDE 24 GAGE GALVANIZED STEEL FLASHING AT GABLE END OF ALL
NEW ROOF.
FORM FLASHING TO PROFILE SHOWN ON DRAWINGS, IN 8 - 10 FOOT
LONG SECTIONS. LAP IN DIRECTION OF FLOW. NAIL TO CONTINUOUS WOOD
BLOCKING AT 18" C/C.
DRIP EDGE FLASHING
PROVIDE 30 GAGE GALVANIZED STEEL DRIP EDGE FLASHING AT EAVE END
OF ALL NEW AND ALTERED EXISTING ROOF CONDITIONS.
DRIP EDGE TO BE SIMILAR TO PRODUCTS MANUFACTURED BY ALUMAX
(800-347-2586) STYLE F-5.
METAL BASE FLASHING
PROVIDE METAL BASE FLASHINGS WHERE ROOF ABUTS VERTICAL SURFACES
IN FIBERGLASS SHINGLE ROOFING SUCH AS CHIMNEYS, DORMERS AND
OTHER LOCATIONS AS SHOWN ON THE DRAWINGS. FABRICATE FLASHING
FROM 24 GAGE GALVANIZED STEEL.
ON SLOPING FIBERGLASS SHINGLE ROOFS, BUILD IN BASE FLASHING WITH
EACH COURSE OF ROOFING MATERIAL. LAP EACH PIECE OF FLASHING
OVER UNDERLYING FLASHING AT LEAST 3" AND EXTEND UNDER THE CAP
FLASHING TO A HEIGHT OF 4" MEASURED PERPENDICULAR TO THE ROOF
SURFACE.
METAL CAP FLASHING - (COUNTER FLASHING)
PROVIDE 24 GAGE GALVANIZED STEEL CAP FLASHING AT TOPS OF ALL
METAL BASE FLASHINGS.
FORM FLASHING IN 8' LENGTHS, EXCEPT WHERE SHORTER PIECES ARE
REQUIRED, LAP END JOINTS 4". DO NOT SOLDER JOINTS. MAKE FLASHING
CONTINUOUS AT ANGLES AND CORNERS. OVERLAP BASE FLASHING A
MINIMUM OF 4"
EXTEND FLASHING UP UNDER EXTERIOR FINISH SYSTEMS OR WOOD SIDING.
VENT FLASHING AND RIDGE/HIP VENTS
FURNISH AND INSTALL NEW PREFABRICATED ALUMINUM AND NEOPRENE
FLASHINGS AROUND ALL VENTS PROTRUDING THROUGH NEW ROOFS.
FURNISH AND INSTALL HIP AND RIDGE VENTS. RIDGE VENT TO BE
RIDGEMASTER PLUS AND HIP VENTS TO BE HIPMASTER AS MANUFACTURED
BY MID-AMERICA (TEL. 1-800-521-8486)
ARCHITECTURAL ABBREVIATIONSARCHITECTURAL ABBREVIATIONS
ACT ACOUSTICAL CEILING TILE
AFF ABOVE FINISHED FLOOR
AHJ AUTHORITY HAVING JURISDICTION
ALT ALTERNATE
ALUM ALUMINUM
BATT FIBERGLASS BATT
B/ BOTTOM OF
BD BOARD
CONT CONTINUOUS
CPT CARPET
CT CERAMIC TILE
DBL DOUBLE
DS DOWNSPOUT
EA EACH
EM EMERGENCY
ENC EXISTING NO CHANGE
EXIST EXISTING
EXP EXPOSED
EQ EQUAL
F/ FACE OF
FT FIRE TREATED
FE FIRE EXTINGUISHER
FEC FIRE EXTINGUISHER AND CABINET
FP FIRE PROTECTION
GB GRAB BAR
GL GLASS
GYP BD GYPSUM BOARD
HD HIGH DENSITY
HDWR HARDWARE
HM HOLLOW METAL
HORIZ HORIZONTAL
INSUL INSULATED/INSULATION
LAM LAMINATED
LVT LUXURY VINYL TILE
MO MASONRY OPENING
MR MOLD RESISTANT
MTL METAL
OC ON CENTER
OTS OPEN TO STRUCTURE
PREFIN PRE-FINISHED, PRE-FABRICATED
P/T PRESSURE TREATED
PLAM PLASTIC LAMINATE
PT PAINT
POLYISO POLYISOCYANURATE INSULATION
PTD PAPER TOWEL DISPENSER
RB RESILIENT BASE
REV REVERSE
RO ROUGH OPENING
SBO SUPPLY BY OTHERS
SC SOLID CORE
SCHED SCHEDULE
SIM SIMILAR
SS SOLID SURFACE
T/ TOP OF
TTD TOILET TISSUE DISPENSER
TYP TYPICAL
UL UNDERWRITERS LABORATORY
UNO UNLESS NOTED OTHERWISE
VCT VINYL COMPOSITION TILE
VERT VERTICAL
VIF VERIFY IN FIELD
VTR VENT TO ROOF
WD WOOD
D es cr ip tio n B y D at e
D ra w in g D es cr ip tio ite cts
En gin ee rs
Su rv ey or s m.
1.
2.
3.
4.
n.
1.
2.
3.
4.
5.
7.
a.
b.
c.
d.
e.
8.
a.
1.
2.
3.
4.
5.
b.
c.
d.
e.
9.
a.
b.
c.
GUTTERS AND CONDUCTOR HEADS
PROVIDE GUTTERS ONLY WHERE INDICATED. FORM GUTTERS TO MATCH
PROFILE AND SIZE SHOWN ON DRAWINGS. FORM GUTTERS IN 8 TO 10
FOOT LONG SECTIONS. CONSTRUCT GUTTERS AND CONDUCTOR HEADS OF
24 GAGE GALVANIZED STEEL.
JOIN SECTIONS WITH LAPPED, INVERTED AND SOLDERED SEAMS.
FURNISH NECESSARY END PIECES, CAPS, OUTLET TUBES, AND MITERS.
SOLDER TO MAKE WATERTIGHT.
SUPPORT GUTTERS NOT OVER 48" APART. SET GUTTERS VIRTUALLY LEVEL.
PROVIDE MAXIMUM SLOPE OF 3/8" FROM HIGHPOINT TO DOWNSPOUT.
INSTALL GUTTER AS INDICATED ON SMACCNA PLATE 20, FIG. A (WITHOUT
CONTINUOUS CLEAT). INSTALL EXPANSION JOINTS WHERE SHOWN ON
DRAWINGS AND SMACCNA PLATE 7.
DOWNSPOUTS
DOWNSPOUTS, INCLUDING ALL NECESSARY ELBOWS AND HANGERS, SHALL
BE FURNISHED AND INSTALLED AT LOCATIONS SHOWN ON ARCHITECTURAL
DRAWINGS.
DOWNSPOUTS SHALL BE RECTANGULAR CORRUGATED, SIZE AS INDICATED
ON THE DRAWINGS, OF 26 GAGE GALVANIZED STEEL. FORM IN 8 TO 1O
FOOT LENGTHS.
DOWNSPOUTS SHALL BE HELD IN POSITION, CLEAR OF WALL BY ANCHORS
NOT MORE THAN 1O FEET ON CENTER, FASTENED SECURELY TO WALL.
HANGERS SHALL BE FABRICATED ON 1/16" X 1" FLAT STOCK GALVANIZED
STEEL. SECURE TO WALL WITH NON-CORROSIVE SCREWS. SEE SMACCNA
PLATE 31, FIG. 1 AND PLATE 34, FIG.G.
END JOINTS SHALL BE LAPPED A MINIMUM OF 1-1/2" IN THE DIRECTION
OF FLOW.
CAST IRON DOWNSPOUT BOOTS SHALL BE PROVIDED AT EACH DOWNSPOUT.
INSTALLATION - GENERAL
SCHEDULE AND COORDINATE SHEET METAL INSTALLATION WITH THE WORK OF
OTHER TRADES WHERE IT IS INTEGRAL OR CONTIGUOUS THEREWITH. MATERIALS
FURNISHED UNDER THIS SECTION, WHICH ARE TO BE BUILT IN BY OTHER
TRADES, SHALL BE DELIVERED TO THE SITE IN SUFFICIENT TIME TO AVOID
DELAYS TO CONSTRUCTION PROGRESS. COORDINATE WITH OTHER TRADES
REGARDING THE LOCATION AND PLACEMENT OF REGLETS, WOOD NAILERS AND
CLEATS.
SURFACES TO WHICH SHEET METAL IS TO BE APPLIED SHALL BE EVEN,
SMOOTH, SOUND, THOROUGHLY CLEAN AND DRY, AND FREE FROM PROJECTING
NAIL HEADS OR OTHER DEFECTS THAT WOULD AFFECT THE APPLICATION.
REPORT IN WRITING ANY UNSATISFACTORY SURFACES TO ARCHITECT.
PROVIDE ALL MISCELLANEOUS SHEET METAL ACCESSORIES OR OTHER ITEMS
ESSENTIAL TO THE COMPLETENESS OF THE SHEET METAL INSTALLATION EVEN
THOUGH NOT SPECIFICALLY SHOWN OR SPECIFIED. ALL SUCH ITEMS, UNLESS
OTHERWISE INDICATED, SHALL BE OF THE SAME KIND OF MATERIAL AS THE
ITEM TO WHICH IT IS APPLIED.
PROVIDE ALL SHEET METAL WORK SHALL BE FURNISHED AND INSTALLED AS
REQUIRED TO PROVIDE A COMPLETELY WEATHERPROOF INSTALLATION, SECURE
AGAINST LEAKS AND WEATHER DAMAGE THROUGH ALL SEVERE TEMPERATURE
AND WEATHER CONDITIONS. SEAMS SHALL OVERLAP IN THE DIRECTION OF
WATER FLOW.
SHEET METAL WORK EXPOSED TO VIEW FROM ANY POINT AROUND OR WITHIN
THE BUILDING SHALL, IN ADDITION TO THE WEATHERPROOFING REQUIREMENTS
SPECIFIED ABOVE, BE PROVIDED SO AS TO PRESENT A FINISHED APPEARANCE
WHICH IS NEAT, UNIFORM AND POSSESSING THE APPEARANCE
CHARACTERISTICS OF GOOD ARCHITECTURAL SHEET METAL WORK. CONCEAL
FASTENINGS WHERE POSSIBLE. WHERE EXPOSURE IS PERMITTED, FASTENINGS
SHALL BE NEAT, SYMMETRICALLY SPACED, AND OF BEST POSSIBLE
APPEARANCE.
JOINING AND FASTENING
EXCEPT WHERE OTHER METHODS OF JOINING ARE INDICATED, SECURE ALL
JOINTS, SEAMS, AND CONNECTIONS OF SHEET METAL WORK AS FOLLOWS:
CONNECTIONS OF ITEMS OF SHEET METAL SHALL BE MECHANICAL BY USE
OF FORMED AND LOCKED METAL, RIVETS, SCREWS, OR SIMILAR
TECHNIQUES.
REMOVE GREASE AND DIRT FROM METAL SURFACES USING CLEAN RAG
SOAKED IN SOLVENT. SMOOTH SURFACES TO BE SOLDERED SHALL BE
ROUGHENED WITH CLEAN EMERY CLOTH OR SANDPAPER (NOT STEEL
WOOL).
REMOVE ALL FLUX RESIDUE BY SCRUBBING, NEUTRALIZING WITH AMMONIA,
OR A 5% TO 10% SOLUTION OF WASHING SODA, FOLLOWED BY A CLEAR
WATER RINSE.
ASSEMBLE PARTS AND SOLDER THROUGH FULL CONTACT AREA. SOLDER
SHALL NOT SHOW ON EXPOSED FACES OF ARCHITECTURAL SHEET METAL
WORK.
TAKE ALL NECESSARY PRECAUTIONS TO PREVENT ACID FLUX OR RESIDUE
FROM RUNNING INTO CONCEALED PORTIONS OF THE WORK, PREVENTING
PROPER CLEANING.
WHERE CLEATS ARE NOT REQUIRED, USE SCREWS, NAILS, BOLTS, RIVETS, ETC.
FOR FASTENING SHEET METAL ITEMS TO OTHER CONSTRUCTION. SPACING OF
FASTENERS SHALL BE AS REQUIRED TO SECURE THE SHEET METAL IN PLACE
AND TO HOLD IT IN PROPER SHAPE. EXCEPT WHERE NOTED OTHERWISE,
INSTALL FASTENERS AT 6 INCH CENTERS.
WHERE DETAILED OR SPECIFIED, AND ELSEWHERE AS REQUIRED TO
ACCOMMODATE MOVEMENT, SECURE SHEET METAL ITEMS USING CLEATS.
CLEATS SHALL BE 2" WIDE AND APPROXIMATELY 3" LONG. LOCK ONE END
INTO THE SEAM OR INTO THE FOLDED EDGE OF THE SHEET, NAIL THE OTHER
END WITH 2 NAILS, AND BEND THE END BACK OVER THE NAIL HEADS. SPACE
CLEATS AT 12" CENTERS, EXCEPT WHERE NOTED OTHERWISE.
PROVIDE SHEET METAL WITH LINES, RIBS, SEAMS AND ANGLES SHARP AND
TRUE, WITH PLANE SURFACES FREE FROM OBJECTIONABLE WAVE, WARP OR
BUCKLE. COMERS SHALL BE MITERED. FOLD BACK EXPOSED EDGES OF SHEET
METAL TO FORM 1/2" WIDE HEM ON THE SIDE CONCEALED FROM VIEW.
MAKE PROVISION FOR EXPANSION AND CONTRACTION OF SHEET METAL, WITH
JOINTS MADE WATERPROOF AND COMPATIBLE WITH THE FUNCTION AND
APPEARANCE OF THE SHEET METAL ITEM. EXPANSION JOINTS SHALL
ACCOMMODATE MOVEMENT SO AS TO ELIMINATE EXCESSIVE STRESS AND
DEFORMATION. WHERE DESIGN OF EXPANSION JOINTS IS NOT DETAILED, THE
SMACCNA MANUAL SHALL BE USED AS A GUIDE. ALTHOUGH THE DRAWINGS
MAY INDICATE THE DESIGN INTENT, BE RESPONSIBLE FOR DETERMINING AND
DEVELOPING JUNCTURES AND PROCEDURES TO MAINTAIN THE FLEXIBILITY AND
WEATHERPROOF INTEGRITY OF THE CONSTRUCTION ACCORDING TO THE
MANUFACTURER'S BEST RECOMMENDATION FOR INSTALLATION.
PROTECTION FROM DISSIMILAR MATERIALS
PROVIDE PROTECTION COATINGS, AND/OR TREATMENT WHICH WILL
PERMANENTLY ISOLATE THE MATERIALS AND PREVENT ADVERSE REACTION,
WHERE SHEET METAL MEMBERS ARE IN CONTACT WITH DISSIMILAR METALS AND
OTHER MATERIALS WHICH MAY CAUSE GALVANIC CORROSION.
WHERE ALUMINUM OR GALVANIZED STEEL SURFACES COME IN CONTACT WITH
METALS OTHER THAN STAINLESS STEEL, ZINC, OR SMALL AREAS OF WHITE
BRONZE, OR COMES IN CONTACT WITH MORTAR, LASTER, CONCRETE, OR
MASONRY MATERIALS
WHERE SHEET METAL IS TO BE IN CONTACT WITH ROOFING OR FLASHING
MATERIALS, METAL SHALL BE COATED WITH PRIMER PRIOR TO THE APPLICATION
OF ANY OTHER MATERIAL.
10.
a.
b.
c.
11.
a.
1.
a.
b.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
a.
b.
c.
13.
14.
a.
1.
2.
b.
15.
a.
b.
c.
16.
17.
18.
19.
20.
a.
b.
21.
22.
23.
COUNTER-FLASHING
PROVIDE METAL COUNTER-FLASHING FOR ALL BASE FLASHINGS INSTALLED BY
SECTION 7510. FORM FLASHING IN 8 OR 10 FOOT LENGTHS, EXCEPT WHERE
SHORTER PIECES ARE REQUIRED. LAP END JOINTS A MINIMUM OF 3", DO NOT
SOLDER OR WELD JOINTS. MAKE FLASHING CONTINUOUS AT ANGLES,
EXTENDING 12" MINIMUM EACH WAY FROM THE CORNER. COUNTER-FLASHING
SHALL OVERLAP BASE FLASHING A MINIMUM OF 4". BOTTOM EDGE OF
FLASHING SHALL BE FOLDED BACK 1/2" ON UNDERSIDE. COUNTERFLASHING
SHALL BE CREASED LONGITUDINALLY AT CENTER OF EXPOSED SURFACE TO
PRODUCE SPRING ACTION THAT WILL HOLD BOTTOM EDGE FIRMLY AGAINST
BASE FLASHING. END TO BE INSERTED IN RECEIVER SHALL BE FORMED AS
DETAILED
INSTALL ALL COUNTER-FLASHING AT WALLS IN EITHER REGLETS OR RECEIVERS
SO AS TO PERMIT INSTALLATION OF REGLETS AND RECEIVERS AS WALLS ARE
BUILT, AND INSTALLATION OF COUNTER-FLASHING AFTER BASE FLASHINGS ARE
IN PLACE.
FOLLOWING INSTALLATION OF COUNTER-FLASHING, INSTALL FULL BEAD OF
SEALANT ALONG THE LINE WHERE THE SHEET METAL RECEIVER ENTERS THE
MASONRY JOINT AND WHERE SHEET METAL ENTERS REGLETS.
ROOF PENETRATIONS
PROVIDE METAL BASE AND CAP FLASHINGS AT ROOF PENETRATIONS FOR
PIPES, SLEEVES, CONDUIT, EQUIPMENT SUPPORTS, STRUTS, AND OTHER SMALL
DIMENSION ITEMS WHERE CURBS ARE NOT PROVIDED.
BASE FLASHING SHALL EXTEND A MINIMUM OF 8 INCHES HORIZONTALLY IN
EACH DIRECTION FROM THE VERTICAL SLEEVE. VERTICAL SLEEVE SHALL BE
WELDED TO FLAT BASE FLASHING, OR MECHANICALLY FASTENED AND MADE
ABSOLUTELY WATERPROOF WITH SOLDER. SLEEVE SHALL BE SUFFICIENTLY
LARGE SO AS TO FIT AROUND THE PENETRATING ITEM WITHOUT CONTACT.
SLEEVE SHALL EXTEND 8" MINIMUM ABOVE ROOF.
I. PAINTING
SAMPLES: SUBMIT THREE PAPER "DRAW DOWN" SAMPLES, 8-1/2 BY 11 INCHES
IN SIZE, ILLUSTRATING RANGE OF COLORS AVAILABLE FOR EACH FINISHING
PRODUCT SPECIFIED.
WHERE SHEEN IS SPECIFIED, SUBMIT SAMPLES IN ONLY THAT SHEEN.
WHERE SHEEN IS NOT SPECIFIED, SUBMIT EACH COLOR IN EACH SHEEN
AVAILABLE.
DELIVER PRODUCTS TO SITE IN SEALED AND LABELED CONTAINERS; INSPECT TO
VERIFY ACCEPTABILITY.
CONTAINER LABEL: INCLUDE MANUFACTURER'S NAME, TYPE OF PAINT, BRAND
NAME, LOT NUMBER, BRAND CODE, COVERAGE, SURFACE PREPARATION, DRYING
TIME, CLEANUP REQUIREMENTS, COLOR DESIGNATION, AND INSTRUCTIONS FOR
MIXING AND REDUCING.
PAINT MATERIALS: STORE AT MINIMUM AMBIENT TEMPERATURE OF 45 DEGREES F
AND A MAXIMUM OF 90 DEGREES F, IN VENTILATED AREA, AND AS REQUIRED BY
MANUFACTURER'S INSTRUCTIONS.
DO NOT APPLY MATERIALS WHEN SURFACE AND AMBIENT TEMPERATURES ARE
OUTSIDE THE TEMPERATURE RANGES REQUIRED BY THE PAINT PRODUCT
MANUFACTURER.
FOLLOW MANUFACTURER'S RECOMMENDED PROCEDURES FOR PRODUCING BEST
RESULTS, INCLUDING TESTING OF SUBSTRATES, MOISTURE IN SUBSTRATES, AND
HUMIDITY AND TEMPERATURE LIMITATIONS.
PROVIDE LIGHTING LEVEL OF 80 FT CANDLES (860 LX) MEASURED MID-HEIGHT AT
SUBSTRATE SURFACE.
PROVIDE ALL PAINT AND COATING PRODUCTS USED IN ANY INDIVIDUAL SYSTEM
FROM THE SAME MANUFACTURER; NO EXCEPTIONS.
PAINTS: BENJAMIN MOORE & CO, SHERWIN WILLIAMS, OR EQUAL
PRIMER SEALERS: SAME MANUFACTURER AS TOP COATS.
BLOCK FILLERS: SAME MANUFACTURER AS TOP COATS.
PAINTS AND COATINGS: READY MIXED, UNLESS INTENDED TO BE A FIELD-
CATALYZED COATING.
PROVIDE PAINTS AND COATINGS OF A SOFT PASTE CONSISTENCY, CAPABLE OF
BEING READILY AND UNIFORMLY DISPERSED TO A HOMOGENEOUS COATING,
WITH GOOD FLOW AND BRUSHING PROPERTIES, AND CAPABLE OF DRYING OR
CURING FREE OF STREAKS OR SAGS.
SUPPLY EACH COATING MATERIAL IN QUANTITY REQUIRED TO COMPLETE ENTIRE
PROJECT'S WORK FROM A SINGLE PRODUCTION RUN.
DO NOT REDUCE, THIN, OR DILUTE COATINGS OR ADD MATERIALS TO COATINGS
UNLESS SUCH PROCEDURE IS SPECIFICALLY DESCRIBED IN MANUFACTURER'S
PRODUCT INSTRUCTIONS.
PRIMERS: WHERE THE MANUFACTURER OFFERS OPTIONS ON PRIMERS FOR A
PARTICULAR SUBSTRATE, USE PRIMER CATEGORIZED AS "BEST" BY THE
MANUFACTURER.
VOLATILE ORGANIC COMPOUND (VOC) CONTENT:
PROVIDE COATINGS THAT COMPLY WITH THE MOST STRINGENT REQUIREMENTS
SPECIFIED IN THE FOLLOWING:
40 CFR 59, SUBPART D--NATIONAL VOLATILE ORGANIC COMPOUND
EMISSION STANDARDS FOR ARCHITECTURAL COATINGS.
ARCHITECTURAL COATINGS VOC LIMITS OF THE STATE OF OHIO/WEST
VIRGINIA.
DETERMINATION OF VOC CONTENT: TESTING AND CALCULATION IN ACCORDANCE
WITH 40 CFR 59, SUBPART D (EPA METHOD 24), EXCLUSIVE OF COLORANTS
ADDED TO A TINT BASE AND WATER ADDED AT PROJECT SITE; OR OTHER
METHOD ACCEPTABLE TO AUTHORITIES HAVING JURISDICTION.
COLORS: AS INDICATED ON DRAWINGS
ALLOW FOR MINIMUM OF THREE COLORS FOR EACH SYSTEM, UNLESS
OTHERWISE INDICATED, WITHOUT ADDITIONAL COST TO OWNER.
EXTEND COLORS TO SURFACE EDGES; COLORS MAY CHANGE AT ANY EDGE AS
DIRECTED BY ARCHITECT.
IN FINISHED AREAS, FINISH PIPES, DUCTS, CONDUIT, AND EQUIPMENT THE
SAME COLOR AS THE WALL/CEILING THEY ARE MOUNTED ON/UNDER.
DO NOT BEGIN APPLICATION OF COATINGS UNTIL SUBSTRATES HAVE BEEN
PROPERLY PREPARED.
VERIFY THAT SURFACES ARE READY TO RECEIVE WORK AS INSTRUCTED BY THE
PRODUCT MANUFACTURER.
EXAMINE SURFACES SCHEDULED TO BE FINISHED PRIOR TO COMMENCEMENT OF
WORK. REPORT ANY CONDITION THAT MAY POTENTIALLY AFFECT PROPER
APPLICATION.
TEST SHOP-APPLIED PRIMER FOR COMPATIBILITY WITH SUBSEQUENT COVER
MATERIALS.
MEASURE MOISTURE CONTENT OF SURFACES USING AN ELECTRONIC MOISTURE
METER. DO NOT APPLY FINISHES UNLESS MOISTURE CONTENT OF SURFACES ARE
BELOW THE FOLLOWING MAXIMUMS:
GYPSUM WALLBOARD: 12 PERCENT.
MASONRY, CONCRETE, AND CONCRETE UNIT MASONRY: 12 PERCENT.
CLEAN SURFACES THOROUGHLY AND CORRECT DEFECTS PRIOR TO COATING
APPLICATION.
PREPARE SURFACES USING THE METHODS RECOMMENDED BY THE MANUFACTURER
FOR ACHIEVING THE BEST RESULT FOR THE SUBSTRATE UNDER THE PROJECT
CONDITIONS.
REMOVE OR MASK SURFACE APPURTENANCES, INCLUDING ELECTRICAL PLATES,
HARDWARE, LIGHT FIXTURE TRIM, ESCUTCHEONS, AND FITTINGS, PRIOR TO
PREPARING SURFACES OR FINISHING.
24.
25.
26.
27.
28.
29.
30.
31.
32.
33.
34.
35.
36.
SEAL SURFACES THAT MIGHT CAUSE BLEED THROUGH OR STAINING OF TOPCOAT.
REMOVE MILDEW FROM IMPERVIOUS SURFACES BY SCRUBBING WITH SOLUTION OF
TETRA-SODIUM PHOSPHATE AND BLEACH. RINSE WITH CLEAN WATER AND ALLOW
SURFACE TO DRY.
CONCRETE AND UNIT MASONRY SURFACES TO BE PAINTED: REMOVE DIRT, LOOSE
MORTAR, SCALE, SALT OR ALKALI POWDER, AND OTHER FOREIGN MATTER. REMOVE
OIL AND GREASE WITH A SOLUTION OF TRI-SODIUM PHOSPHATE; RINSE WELL AND
ALLOW TO DRY. REMOVE STAINS CAUSED BY WEATHERING OF CORRODING METALS
WITH A SOLUTION OF SODIUM METASILICATE AFTER THOROUGHLY WETTING WITH
WATER. ALLOW TO DRY.
GALVANIZED SURFACES TO BE PAINTED: REMOVE SURFACE CONTAMINATION AND
OILS AND WASH WITH SOLVENT. APPLY COAT OF ETCHING PRIMER.
CORRODED STEEL AND IRON SURFACES TO BE PAINTED: PREPARE USING AT LEAST
SSPC-PC 2 (HAND TOOL CLEANING) OR SSPC-SP 3 (POWER TOOL CLEANING)
FOLLOWED BY SSPC-SP 1 (SOLVENT CLEANING).
UNCORRODED UNCOATED STEEL AND IRON SURFACES TO BE PAINTED: REMOVE
GREASE, MILL SCALE, WELD SPLATTER, DIRT, AND RUST. WHERE HEAVY COATINGS
OF SCALE ARE EVIDENT, REMOVE BY HAND OR POWER TOOL WIRE BRUSHING OR
SANDBLASTING; CLEAN BY WASHING WITH SOLVENT. APPLY A TREATMENT OF
PHOSPHORIC ACID SOLUTION, ENSURING WELD JOINTS, BOLTS, AND NUTS ARE
SIMILARLY CLEANED. PRIME PAINT ENTIRE SURFACE; SPOT PRIME AFTER REPAIRS.
SHOP-PRIMED STEEL SURFACES TO BE FINISH PAINTED: SAND AND SCRAPE TO
REMOVE LOOSE PRIMER AND RUST. FEATHER EDGES TO MAKE TOUCH-UP PATCHES
INCONSPICUOUS. CLEAN SURFACES WITH SOLVENT. PRIME BARE STEEL SURFACES.
RE-PRIME ENTIRE SHOP-PRIMED ITEM.
APPLY PRODUCTS IN ACCORDANCE WITH MANUFACTURER'S INSTRUCTIONS.
DO NOT APPLY FINISHES TO SURFACES THAT ARE NOT DRY. ALLOW APPLIED
COATS TO DRY BEFORE NEXT COAT IS APPLIED.
APPLY EACH COAT TO UNIFORM APPEARANCE.
SAND WOOD AND METAL SURFACES LIGHTLY BETWEEN COATS TO ACHIEVE
REQUIRED FINISH.
VACUUM CLEAN SURFACES OF LOOSE PARTICLES. USE TACK CLOTH TO REMOVE
DUST AND PARTICLES JUST PRIOR TO APPLYING NEXT COAT.
REINSTALL ELECTRICAL COVER PLATES, HARDWARE, LIGHT FIXTURE TRIM,
ESCUTCHEONS, AND FITTINGS REMOVED PRIOR TO FINISHING.
D es cr ip tio n B y D at e
D ra w in g D es cr ip ite cts
En gin ee rs
Su rv ey
GARAGE &GARAGE &
MAINTENANCE SHOPMAINTENANCE SHOP
TRANSMITTER RMTRANSMITTER RM
HEAT EXCHANGER RMHEAT EXCHANGER RM
OPERATIONS AREAOPERATIONS AREA
GENERATOR RMGENERATOR RM
UTILITYUTILITY
EXIST BLDG,
NOT IN SCOPE
+/- 9'-0"
22 3
EXIST BLDG,
NOT IN SCOPE
+/- 46'-3 5/8"
GENERAL NOTESGENERAL NOTES
A.
B.
C.
D.
E.
F.
G.
ALL MATERIALS SCHEDULED FOR DEMOLITION AND REMOVAL (UNLESS
DESIGNATED TO BE SALVAGED) SHALL BECOME PROPERTY OF THE
CONTRACTOR AND SHALL BE LEGALLY DISPOSED OF. COORDINATE
WITH OWNER TO VERIFY ALL ITEMS THAT SHALL BE SALVAGED
AND/OR TURNED OVER TO OWNER.
ANY EXISTING COMPONENTS OR FINISHES DAMAGED DURING
CONSTRUCTION ARE TO BE REPAIRED OR REPLACED WITH LIKE KIND
MATERIALS TO MEET OWNER'S APPROVAL.
WHEN INFILLING EXISTING MASONRY OPENINGS, REMOVE ADDITIONAL
BLOCK/BRICK @ EACH JAMB IN ORDER TO TOOTH-IN NEW BLOCK
OR BRICK.
CONTRACTOR TO CAREFULLY REMOVE AND SALVAGE ALL
WALL/CEILING MOUNTED EQUIPMENT AND ACCESSORIES AS REQUIRED
FOR NEW WORK. COORDINATE RELOCATION AND/OR REINSTALLATION
OF ALL EQUIPMENT AND ACCESSORIES WITH OWNER.
VERIFY ALL DIMENSIONS AND CONDITIONS IN FIELD PRIOR TO WORK.
NOTIFY ARCHITECT OF ANY DISCREPANCIES.
CONTRACTOR SHALL VERIFY ALL EXISTING MATERIALS AND COLORS
LISTED AS "T0 MATCH EXISTING".
CONTRACTOR SHALL FIELD VERIFY LOCATIONS OF ALL UNDERGROUND
UTILITIES PRIOR TO START OF WORK. NOTIFY ARCHITECT/ENGINEER
OF ANY CONFLICTING LOCATIONS OF UTILITIES WITH NEW WORK.
D es cr ip tio n B y D at e
D ra w in g D es cr ip ite cts
En gin ee rs
Su rv ey or s
SCALE: 1/8" = 1'-0"
FIRST FLOOR - DEMOLITIONFIRST FLOOR - DEMOLITION
PLANPLAN
CODED NOTESCODED NOTES
1. REMOVE EXISTING ABANDONED GENERATOR AND ALL ASSOCIATED
EQUIPMENT INCLUDING EXTERIOR LOUVER. ELECTRICALLY ISOLATE THE
GENERATOR, AUTOMATIC TRANSFER SWITCH, ELECTRICAL DISTRIBUTION
EQUIPMENT, AND ASSOCIATED ELECTRICAL AND CONTROL EQUIPMENT
AND REMOVE ALL EQUIPMENT. PATCH/PREPARE WALL FOR NEW CMU
INFILL AND PATCH/REPAIR WALL(S) AT AREAS OF REMOVED
EQUIPMENT.
2. REMOVE EXISTING EPDM ROOF AND INSULATION DOWN TO EXISTING
T&G DECKING. PATCH/REPAIR EXISTING DECKING WHERE REQURIED TO
PREPARE FOR NEW ROOF.
3. REMOVE EXISTING BALLASTED ROOF ENTIRELY DOWN TO EXISTING T&G
DECKING. PATCH/REPAIR EXISTING DECKING WHERE REQUIRED TO
PREPPARE FOR NEW ROOF.
4. REMOVE ENTIRE EXISTING CAR CANOPY AND CANOPY COLUMNS.
PATCH/REPAIR WALL AS REQUIRED.
5. REMOVE EXISTING ASPHALT SHINGLES. CLEAN/PREPARE SUBSTRATE
FOR NEW ROOF.
6. REMOVE EXISTING CONCRETE PAD AS REQUIRED FOR NEW WORK. AREA
SUPPORTING EXISTING MECHANICAL EQUIPMENT SHALL REMAIN IN
PLACE. COORDINATE DEMOLITION WITH STRUCTURAL DRAWINGS.
7. REMOVE POSTS AND CHAINLINK FENCE AS REQUIRED FOR DEMOLITION
AND NEW WORK. TEMPORARILY STORE AND REPLACE FENCING AFTER
WORK IS COMPLETED.
8. MECHANICAL EQUIPMENT SHALL REMAIN IN PLACE AND OPERATIONAL
DURING DURATION OF WORK. CARE SHALL BE TAKEN TO PROTECT
EQUIPMENT AND ALLOW CONTINUAL OPERATION OF EQUIPMENT.
9. REMOVE EXISTNG UPPER GRATING/PROTECTION OVER DUCTWORK.
PATCH/REPAIR WALL AND ROOF AS REQUIRED.
10. COORDINATE WITH OWNER ON RE-LOCATION AND RE-INSTALLATION OF
ALL ROOF AND WALL MOUNTED EQUIPMENT.
SCALE: 1/8" = 1'-0"
ROOF - DEMOLITION PLANROOF - DEMOLITION PLAN
1'-4"
4"
1/2" 2'-3"
3'-8 1/2"
TY
P
TYP.
3/8"∅
BOLTS
CUT FLOOR JOIST AND REPLACE END WITH STEEL
PLATES AND BLOCKING THE SAME SIZE AS JOIST
1/8" THICK STEEL PL. (BOTH
SIDES)
NOTE: PROPERLY SHORE JOISTS BEFORE CUTTING
THE DETERIORATED END OFF
(18) 3/16"∅ SCREWS TO SECURE
WOODEN BLOCK BETWEEN PLATES
1'-0"
1'-7 1/2"
8"
TYP.
1'-4"
1/2" 2'-3"
3'-8 1/2"
1'-0"
1'-5 3/16"
8"
TYP.
3/8"∅
BOLTS
1/8" THICK STEEL PL. (BOTH
SIDES)
NOTE: PROPERLY SHORE JOISTS BEFORE CUTTING
THE DETERIORATED END OFF
(12) 3/16"∅ SCREWS TO SECURE
WOODEN BLOCK BETWEEN PLATES
4"
TYP.
CUT FLOOR JOIST AND REPLACE END WITH STEEL
PLATES AND BLOCKING THE SAME SIZE AS JOIST
1'-4"
4"
1/2" 2'-3"
3'-8 1/2"
TY
P
TYP.
3/8"∅
BOLTS
CUT FLOOR JOIST AND REPLACE END WITH STEEL
PLATES AND BLOCKING THE SAME SIZE AS JOIST
1/8" THICK STEEL PL. (BOTH
SIDES)
NOTE: PROPERLY SHORE JOISTS BEFORE CUTTING
THE DETERIORATED END OFF
(18) 3/16"∅ SCREWS TO SECURE
WOODEN BLOCK BETWEEN PLATES
1'-1"
1'-7 1/2"
8"
TYP.
LOOSE ANGLE SIZE
3 1/2" x 3 1/2" x 5/16"
OPENING
0'-0" - 3'-0"
LINTEL SCHEDULE
3'-1" - 5'-0" 4" x 3 1/2" x 5/16"
6'-7" - 8'-0"
5'-1" - 6'-6"
6" x 4" x 3/8"
5" x 3 1/2" x 3/8"
8" x 4" x 1/2"8'-1" - 10'-0"
NOTE:
1. LOOSE LINTELS ARE FOR EACH 4" WIDTH OF MASONRY.
2. ALL ANGLES SHALL HAVE THEIR SHORT LEG OUTSTANDING AND 6"
MINIMUM BEARING.
3. LINTELS OVER OPENINGS IN INTERIOR MASONRY PARTITIONS NOT
OTHERWISE SPECIFIED SHALL BE PRECAST LIGHTWEIGHT CONCRETE LINTELS
WITH ONE
#5 BAR TOP AND BOTTOM FOR EACH 4" WIDTH.4. GALVANIZE LOOSE STEEL LINTELS LOCATED IN EXTERIOR WALLS
SCALE IN
FEET
0 1 2
SCALE IN
FEET
0 1 2
SCALE IN
FEET
0 1 2
A200 B
A200 A
A200 C
A200 D
HEAT EXCHANGER RMHEAT EXCHANGER RM
TRANSMITTER RMTRANSMITTER RM
OPERATIONS AREAOPERATIONS AREA
GARAGE &GARAGE &
MAINTENANCE SHOPMAINTENANCE SHOP
UTILITYUTILITY
GENERATOR RMGENERATOR RM
37'-3 5/8"
4 1
+/- 38'-9 5/8"
EXIST BLDG,
NOT IN SCOPE
GENERAL NOTESGENERAL NOTES
A.
B.
C.
VERIFY ALL DIMENSIONS AND CONDITIONS IN FIELD
PRIOR TO WORK. NOTIFY ARCHITECT OF ANY
DISCREPANCIES.
COORDINATE RE-LOCATION AND RE-INSTALLATION
OF ALL EQUIPMENT AND ACESSORIES WITH OWNER.
WHERE ANY MASONRY WORK IS DONE,
CONTRACTOR SHALL PAINT ENTIRE WALL, CORNER
TO CORNER, TO MATCH EXISTING ADJACENT WALLS.
D es cr ip tio n B y D at e
D ra w in g D es cr ip
FIRST FLOORFIRST FLOOR
CODED NOTESCODED NOTES
1. PROVIDE AND INSTALL NEW LINTEL AT EXISTING
MASONRY OPENING. SEE STRUCTURAL DRAWINGS
FOR MORE INFORMATION.
2. INFILL EXISTING OPENING WHERE GENERATOR
LOUVER WAS REMOVED. REPLACE ALL DAMAGED
CMU. TOOTH IN CMU INTO EXISTING OPENING. PAINT
ENTIRE WALL CORNER TO CORNER TO MATCH
EXISTING ADJACENT WALLS.
3. PAINT WALL CORNER TO CORNER TO MATCH
EXISTING ADJACENT WALLS.
4. MECHANICAL EQUIPMENT SHALL REMAIN IN PLACE
AND OPERATIONAL DURING DURATION OF WORK.
CARE SHALL BE TAKEN TO PROTECT EQUIPMENT
AND ALLOW CONTINUAL OPERATION OF EQUIPMENT.
5. NEW 6" CONCRETE CARPORT FLOOR. COORDINATE
WITH STRUCTURAL DRAWINGS.
Ar ch ite cts
En gin ee rs
Su rv ey
GENERAL NOTESGENERAL NOTES
A.
B.
C.
D.
E.
F.
G.
H.
I.
J.
THE DESIGN FOR THIS ROOF REPLACEMENT IS BASED ON THE RUBBERARD 090 MIL EPDM
MEMBRANE WITH 20 YEAR WARRANTY DETAILS BY FIRESTONE BUILDING PRODUCTS CO.
CARMEL INDIANA, WWW.FIRESTONEBPCO.COM. EQUIVALENT ROOFING SYSTEMS WITH EQUIVILANT
WARRANTY…
This is the start of the file's text. The full file is on GovTribe.