CR-8840-M7-FORM149-WRA-(Maintenance-Plumbing Services-WRA).pdf
PDF 28 MB Posted
- Attached to
- Bellevue Pond Dam Rehabilitation
- Solicitation number
- Not on record
- Issued by
- Middlesex County, Massachusetts
About this file
This is a maintenance plumbing services form (Form 149) related to multiple state and local contract opportunities in Massachusetts, including projects administered by the City of Newton's Water and Sewer Commission, the Worcester Development Authority (WRA), the Boston Water & Sewer Commission, the Town of West Springfield, and dam rehabilitation work requiring Massachusetts Department of Transportation (MassDOT) pre-qualification. The primary project involves water main rehabilitation construction comprising approximately 8,830 linear feet of 8-inch diameter ductile iron water main and approximately 610 linear feet of 6-inch diameter ductile iron water main, including associated valves, fittings, hydrants, water services, and temporary bypass piping across eleven streets in Newton, Massachusetts. Additional services include plumbing equipment servicing at Union Station managed by the WRA, professional cleaning services for Boston Water & Sewer Commission facilities, pre-engineered building construction in West Springfield, and repairs to the Bellevue Pond Dam structure including weir, spillway, culvert pipe, and walking path restoration. Bids for the Newton water main project are due October 15, 2026, with work specifications detailed in Project Manuals 27-17 and 27-19. No estimated contract value, incumbent contractor information, evaluation criteria, question deadlines, pre-bid meeting dates, or site visit schedules are identified in the posted materials.
The file indicates DCAMM certification requirements for plumbing trades, with the dam rehabilitation project requiring MassDOT Highway Division pre-qualification in Dam Construction. Bidders for West Springfield projects must submit current DCAMM Sub-Bidder Certificates of Eligibility and signed update statements. No specific pricing terms, set-asides, funding sources, or contract renewal options are detailed in the available documentation. The scope encompasses labor, materials, equipment, and supervision necessary for project execution across multiple jurisdictions and facility locations.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .