Cost Breakdown.docx
DOCX document 15 KB Posted
- Solicitation number
- 36C26125R0092
About this file
The document is a Cost Breakdown template for a demolition project at Jones Hall in Mountain View, California. The template provides a structured format for presenting project costs by division, with sections for general requirements, other expenses, subtotals, bonds and insurance, overhead, and profit, culminating in a total project bid amount.
This cost breakdown is associated with a Veterans Affairs solicitation (36C26125R0092) for demolishing Building 100 at the Palo Alto Health Care System campus. The procurement is 100% set aside for Service-Disabled Veteran-Owned Small Businesses (SDVOSB) under VISN 21 MACC Group 2. Key dates include a site visit on October 23, 2025, at 10:00 AM PST, RFIs due by October 28th at 8:00 AM PST, and offers due by November 17th, 2025, at 8:00 AM PST. The contract will be awarded based on price, with the contractor expected to minimize construction impact on daily VA operations.
View the file
Other files
Show all 17
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DIVISIONAL COST BREAK-OUT
CLIN 0001
Demolish Building One-hundred Jones Hall, Mountain View, California
Provide complete Divisional Cost Break-Out for complete project. If necessary, add additional lines for each Division applicable to this project.
| REF |
| DESCRIPTION |
| TOTAL |
010000
DIVISION 1 - GENERAL REQUIREMENTS
OTHER
| OTHER |
| $ |
| OTHER |
| OTHER |
| $ |
SUB TOTAL:
BONDS & INSURANCE
OVERHEAD
PROFIT
TOTAL PROJECT BID AMOUNT: