640-23-105 Drawings.pdf
PDF 20 MB Posted
- Solicitation number
- 36C26125R0092
View the file
Other files
Show all 17
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
© 2024 Microsoft Corporation © 2024 Maxar ©CNES (2024) Distribution Airbus DS
00-GN-001
TITLE SHEET
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Fi le
P at h 6/
/2
:3
9:
P M
FINAL BID DOCUMENTS
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
GDM OF OREGON
1000 W STEUBEN ST., UNIT 3
BINGEN, WA 98605
(541) 463-4723
CELYN DEZMAIN
WWW.GDM-AE.COM
DEMO B100 JONES HALL
MOUNTAIN VIEW
1776 OLD MIDDLEFIELD WAY, MOUNTAIN VIEW, CA 94043
640-23-105
Project Director
11/08/2024 CD DTRevisions: Date:
DEMOLITION - BUILDING 100
JONES HALL MOUNTAIN VIEW
MOUNTAIN VIEW, CALIFORNIA
PROJECT NUMBER: 640-23-105
CONTRACT NUMBER: 36C26123D0039
PALO ALTO HEALTH CARE SYSTEM - MOUNTAIN VIEW CENTER
1776 OLD MIDDLEFIELD WAY
MOUNTAIN VIEW, CA 94043
Feet 0 100 200
VICINITY MAP
SCALE: 1" = 200'
NORTH
Feet 0 500 1000
LOCATION MAP
SCALE: 1" = 500'
PROJECT
LOCATION
OLD MIDDLEFIELD WAY
US HWY 101
NORTH
Celyn Dezmain CJD Stamp
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Fi le
P at h 6/
/2
:3
9:
P M
FINAL BID DOCUMENTS
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
GDM OF OREGON
1000 W STEUBEN ST., UNIT 3
BINGEN, WA 98605
(541) 463-4723
CELYN DEZMAIN
WWW.GDM-AE.COM
DEMO B100 JONES HALL
MOUNTAIN VIEW
1776 OLD MIDDLEFIELD WAY, MOUNTAIN VIEW, CA 94043
640-23-105
Project Director
11/08/2024 CD DTRevisions: Date:
PROJECT SITE GENERAL NOTES:
SURVEY DATA PROVIDED BY BKF ENGINEERS/SURVEYORS/PLANNERS.
DESCRIPTION: NAVD 83 DATUM, CALIFORNIA STATE PLANE; ZONE III, US FOOT
VERTICAL DATUM: NAVD 88
1. CONSTRUCTION LAYOUT (ALL ACTUAL LINES AND GRADES) SHALL BE STAKED BY A PROFESSIONAL SURVEYOR, REGISTERED IN THE STATE OF CALIFORNIA, BASED ON COORDINATES, DIMENSIONS, BEARINGS, AND ELEVATIONS, AS SHOWN, ON THE PLANS.
2. PROJECT CONTROL SHALL BE FIELD VERIFIED AND CHECKED FOR RELATIVE HORIZONTAL POSITION
PRIOR TO BEGINNING CONSTRUCTION LAYOUT.
3. PROJECT CONTROL SHALL BE FIELD VERIFIED AND CHECKED FOR RELATIVE VERTICAL POSITION
BASED ON THE NEAREST ADJACENT COUNTY AND OR CITY BENCHMARK, PRIOR TO BEGINNING
CONSTRUCTION LAYOUT.
4. WHEN DIMENSIONS AND COORDINATE LOCATIONS ARE REPRESENTED - DIMENSIONS SHALL HOLD
OVER COORDINATE LOCATION. NOTIFY THE CONTRACTING OFFICER'S REPRESENTATIVE (COR)
IMMEDIATELY UPON DISCOVERY OF ANY DISCREPANCIES.
5. CONTRACTOR SHALL PRESERVE AND PROTECT FROM DAMAGE ALL EXISTING MONUMENTATION
DURING CONSTRUCTION. THE CONTRACTOR IS RESPONSIBLE FOR COORDINATING AND PAYING FOR
THE REPLACEMENT OF ANY MONUMENTS DAMAGED OR REMOVED DURING CONSTRUCTION. NEW
MONUMENTS SHALL BE REESTABLISHED BY A LICENSED SURVEYOR.
6. ALL CONSTRUCTION AND MATERIALS SHALL CONFORM TO THESE PLANS, THE PROJECT
SPECIFICATIONS, THE VA STANDARDS AND SPECIFICATION FOR CONSTRUCTION.
7. THE COMPLETED INSTALLATION SHALL CONFORM TO ALL APPLICABLE FEDERAL, STATE, AND LOCAL CODES, ORDINANCES AND REGULATIONS. ALL PERMITS, LICENSES AND INSPECTIONS REQUIRED BY
THE GOVERNING AUTHORITIES FOR THE EXECUTION AND COMPLETION OF WORK SHALL BE
SECURED BY THE CONTRACTOR PRIOR TO COMMENCING CONSTRUCTION.
8. THE LOCATION OF EXISTING UNDERGROUND UTILITIES SHOWN ON THE PLANS ARE FOR
INFORMATION ONLY AND ARE NOT GUARANTEED TO BE COMPLETE OR ACCURATE. CONTRACTOR
SHALL VERIFY ELEVATIONS, PIPE SIZE, AND MATERIAL TYPES OF ALL UNDERGROUND UTILITIES
PRIOR TO COMMENCING WITH CONSTRUCTION AND SHALL BRING ANY DISCREPANCIES TO THE
ATTENTION OF THE CO, 72 HOURS PRIOR TO START OF CONSTRUCTION TO PREVENT GRADE AND
ALIGNMENT CONFLICTS.
9. THE ENGINEER OR OWNER IS NOT RESPONSIBLE FOR THE SAFETY OF THE CONTRACTOR OR HIS CREW. ALL O.S.H.A. REGULATIONS SHALL BE STRICTLY ADHERED TO IN THE PERFORMANCE OF THE
WORK.
10. THE CONTRACTOR IS RESPONSIBLE FOR MAINTAINING ALL ROADWAYS, KEEPING THEM CLEAN AND FREE OF CONSTRUCTION MATERIALS AND DEBRIS, AND PROVIDING DUST CONTROL AS REQUIRED.
11. TRAFFIC CONTROL SHALL BE PROVIDED BY THE CONTRACTOR THROUGHOUT CONSTRUCTION.
CONTRACTOR SHALL PROVIDE A TRAFFIC CONTROL PLAN TO COR FOR REVIEW AND APPROVAL
PRIOR TO COMMENCING CONSTRUCTION.
12. CONTRACTOR SHALL MAINTAIN ALL UTILITIES SERVING ADJACENT BUILDINGS AT ALL TIMES DURING
CONSTRUCTION. FOR SERVICES THAT ARE TO BE REROUTED, CONTRACTOR SHALL INSTALL NEW
CONNECTION AND GAIN APPROVAL FROM COR PRIOR TO DISCONNECTING EXISTING SERVICE
13. THE CONTRACTOR SHALL BE RESPONSIBLE FOR COORDINATING AND SCHEDULING ALL WORK WITH
THE COR.
14. NOTIFY COR 2 WEEKS BEFORE STARTING WORK. A PRECONSTRUCTION MEETING WITH THE COR, THE ENGINEER AND CONTRACTOR SHALL BE REQUIRED.
14.1. SUBGRADE AND TRENCH BACKFILL SHALL BE COMPACTED TO AT LEAST 95% OF THE MAXIMUM
DRY DENSITY AS DETERMINED BY ASTM D-698. FLOODING OR JETTING THE BACKFILLED
TRENCHES WITH WATER IS NOT PERMITTED.
14.2. SPECIAL INSPECTION REQUIRED FOR ALL COMPACTION TESTING.
14.3. CONTRACTOR SHALL COMPACT BACKFILL EVERY 6" LIFT AND TEST COMPACTION EVERY 100 LF OF PIPE AND EVERY 12" ABOVE TOP OF PIPE. THE FIRST COMPACTION TEST SHALL BE 18" ABOVE TOP
OF PIPE.
UTILITIES
1. ADJUST ALL INCIDENTAL STRUCTURES, MANHOLES, VALVE BOXES, CATCH BASINS, FRAMES AND
COVERS, ETC. TO FINISHED GRADE.
2. CONTRACTOR SHALL ADJUST ALL EXISTING AND/OR NEW UTILITIES (WATER, TV, TELEPHONE, ELEC., ETC.) TO CLEAR ANY EXISTING OR NEW GRAVITY DRAIN UTILITIES (STORM DRAIN, SANITARY SEWER, ETC.) IF CONFLICT OCCURS.
3. CONTRACTOR SHALL COORDINATE WITH PRIVATE UTILITY COMPANIES FOR THE INSTALLATION OF
OR ADJUSTMENT TO GAS, ELECTRICAL, POWER AND TELEPHONE SERVICE.
4. BEFORE BACKFILLING ANY SUBGRADE UTILITY IMPROVEMENTS CONTRACTOR SHALL SURVEY AND
RECORD MEASUREMENTS OF EXACT LOCATION AND DEPTH AND SUBMIT TO ENGINEER AND COR.
5. WATER AND SANITARY SEWER UTILITIES SHALL BE INSTALLED IN ACCORDANCE TO VA
SPECIFICATIONS.
E. A STORMWATER POLLUTION PREVENTION PLAN (SWPPP) IS REQUIRED FOR THIS PROJECT.
IV. EROSION CONTROL MEASURES
A. MINIMUM EROSION CONTROL MEASURES SHALL INCLUDE:
1. CONSTRUCTION ENTRANCE (WHEN APPLICABLE)
2. PERIMETER EROSION/SEDIMENTATION CONTROL
3. PROTECTION OF CATCH BASINS
4. STABILIZATION OF EXPOSED SOILS
B. ALL EROSION CONTROL SHALL BE IN PLACE PRIOR TO CLEARING. THE CONTRACTOR SHALL CALL THE CO FOR INITIAL EROSION CONTROL INSPECTION PRIOR TO START OF WORK, AS DESCRIBED
BELOW.
C. EROSION CONTROL MEASURES SHALL BE MAINTAINED AT ALL TIMES TO THE APPROVAL OF THE CO.
D. CALL FOR INSPECTION UPON COMPLETION OF:
1. STAKING OF CLEARING LIMITS
2. INSTALLATION OF EROSION CONTROL AND PRIOR TO SITE GRADING
3. PRIOR TO REMOVAL OF EROSION CONTROL DEVICES
E. ALL MATERIAL REMOVED FROM SITE SHALL BE PLACED ONLY AT A PERMITTED SITE. VERIFY
LOCATION OF DESTINATION OF MATERIAL PRIOR TO EXPORTATION.
V. EARTHWORK AND COMPACTION
A. ALL ORGANIC AND OTHER UNSUITABLE MATERIAL SHALL BE REMOVED UNDER AREAS TO BE PAVED.
B. SUITABLE UTILITY TRENCH BACKFILL SHALL BE USED AND COMPACTED AS DIRECTED BY THE COR.
BACKFILL IN ACCORDANCE WITH VA EARTHWORK SPECIFICATIONS.
1. BEDDING MATERIAL COMPLYING WITH TO VA SPECIFICATIONS SHALL BE PLACED AT THE
BOTTOM OF THE TRENCH.
2. WHERE BACKFILLING A UTILITY TRENCH, PLACE BACKFILL EQUALLY ON OPPOSITE SIDES OF THE PIPE AT THE SAME TIME AND IN LAYERS, THE FIRST LAYER SHALL COME UP TO THE HALF
THE DIAMETER OF THE PIPE AND THEN NO GREATER THAN 6 INCHES DEEP FROM THE TOP OF
PIPE ONWARD.
3. ALL TRENCHES SHALL BE BACKFILLED AND COMPACTED TO 95% STANDARD PROCTOR ON
THIS PROJECT PER ASTM T-180. TESTING SHALL BE VERIFIED BY GEOTECHNICAL ENGINEER.
4. MAINTAIN AT LEAST 8 FEET OF COVER UNLESS TRIMMING FOR FINAL GRADE OR OTHERWISE
NOTED ON PLANS OR DETAILS.
5. MAINTAIN THE ALIGNMENT AND GRADE OF THE PIPE DURING THE BACKFILLING OPERATION.
C. IF WORKERS ENTER ANY TRENCH OR OTHER EXCAVATION FOUR FEET OR MORE IN DEPTH THAT DOES NOT MEET THE OPEN PIT REQUIREMENTS OF 29 CFR 1926 SUBPART P, IT SHALL BE SHORED AND CRIBBED. ALL TRENCH SAFETY SYSTEMS SHALL MEET THE REQUIREMENTS OF OSHA AND VA SAFETY REQUIREMENTS SECTION 01-35-26. THE CONTRACTOR ALONE SHALL BE RESPONSIBLE FOR ALL WORKER SAFETY. THE DESIGNER AND/OR ENGINEER OF RECORD, NOR THE VA ASSUMES ANY
RESPONSIBILITY.
D. VERTICAL STANDPIPES SHALL BE INSTALLED AT JOINTS AND FITTINGS TO ALLOW SURVEYOR TO
COLLECT ASBUILT DATA WHEN TRENCH MUST BE BACKFILLED PRIOR TO SURVEYOR VISIT.
E. CONTRACTOR SHALL RECEIVE WRITTEN APPROVAL TO BACKFILL TRENCH FROM COR PRIOR TO DOING SO. IF TRENCH MUST BE BACKFILLED PRIOR TO APPROVAL BY COR, CONTRACTOR IS AT RISK
TO EXCAVATE ANY PORTION OF THE TRENCH FOR VISUAL INSPECTION.
F. CONTRACTOR SHALL PREVENT SEDIMENTS AND SEDIMENT LADEN WATER FROM ENTERING THE
STORM DRAINAGE SYSTEM.
I. GENERAL NOTES:
A. THE FOLLOWING PROVISIONS ARE TO BE USED IN CONJUNCTION WITH VA AND ALL OTHER
APPLICABLE JURISDICTIONS.
B. ANY REVISIONS TO THESE PLANS MUST BE REVIEWED AND APPROVED BY THE CONTRACTING
OFFICER'S REPRESENTATIVE (COR).
C. CONTRACTORS SHALL FAMILIARIZE THEMSELVES WITH THE PROJECT SITE AND BRING ANY
DISCREPANCIES TO THE ATTENTION OF THE COR PRIOR TO UNDERTAKING OF THE AFFECTED
WORK.
D. ANY DISCREPANCIES IN THESE DRAWINGS, SPECIFICATIONS, NOTES, AND THE SITE CONDITIONS
SHALL BE REPORTED TO THE COR, WHO SHALL PROVIDE DIRECTION ON CORRECTING SUCH
DISCREPANCIES IN WRITING AFTER THOROUGHLY REVIEWING ANY CHANGES. ANY WORK DONE BY
THE CONTRACTOR AFTER THE DISCOVERY OF SUCH DISCREPANCIES SHALL BE DONE AT THE
CONTRACTOR'S RISK. THE CONTRACTOR SHALL VERIFY AND COORDINATE THE DIMENSIONS
AMONG ALL DRAWINGS PRIOR TO PROCEEDING WITH ANY WORK. IN CASE OF DIFFERENCE
BETWEEN DRAWINGS AND SPECIFICATIONS, THE SPECIFICATIONS SHALL GOVERN, PER FAR
52.236-21.
E. A PRE-CONSTRUCTION MEETING SHALL BE HELD AT THE SITE WITH THE CONTRACTOR, COR, AND
ALL APPLICABLE INSPECTORS PRIOR TO BEGINNING WORK.
F. PRIOR TO CONSTRUCTION, THE CONTRACTOR SHALL CALL 811 UTILITY LOCATE.
G. THE CONTRACTOR SHALL TAKE ALL NECESSARY PRECAUTIONS TO SAFEGUARD ALL EXISTING
STRUCTURES, UTILITIES, LANDSCAPING, AND SURVEY MARKERS. PROVIDE FALSEWORK, SHORING, UNDERPINNING, AND INCLINOMETERS AS IS REQUIRED TO PERFORM THE WORK.
H. ALL CONSTRUCTION SHALL BE DONE IN A SAFE MANNER AND IN STRICT COMPLIANCE WITH ALL
REQUIREMENTS OF FEDERAL OCCUPATIONAL SAFETY AND HEALTH ACT OF 1970, VA STANDARDS
AND ALL STATE AND LOCAL SAFETY CODES WHERE APPLICABLE.
I. THE CONTRACTOR IS TO PROVIDE LOCATES AS NEEDED TO PERFORM THE WORK.
J. THE CONTRACTOR SHALL NOTIFY THE COR AT LEAST 24 HOURS PRIOR TO CONSTRUCTION OF
ITEMS REQUIRING INSPECTIONS.
K. PRIOR TO CONSTRUCTION OR INSTALLATION, SHOP DRAWINGS SHALL BE SUBMITTED TO AND APPROVED BY THE CO FOR ANY MATERIALS OR STRUCTURES PROPOSED. THE CONTRACTOR SHALL
SUBMIT ALL ITEMS LISTED ON THE SUBMITTAL REGISTER FOR REVIEW AND APPROVAL.
L. THE EXISTING UNDERGROUND UTILITIES SHOWN HEREON ARE BASED UPON EXISTING RECORD
DRAWINGS AND ARE NOT GUARANTEED TO BE ACCURATE, NOR ALL INCLUSIVE.
M. ALL UTILITIES MUST BE VERIFIED PRIOR TO CONSTRUCTION.
N. IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO PROTECT, IN PLACE, ALL UTILITIES AND/OR
STRUCTURES WHETHER SHOWN OR NOT SHOWN ON THIS PLAN. PROVIDE FALSEWORK AS IS
REQUIRED TO TEMPORARILY SUPPORT ALL MATERIAL. DAMAGE DUE TO THE CONTRACTOR'S
OPERATIONS SHALL BE REPAIRED AT THE CONTRACTORS EXPENSE.
O. DO NOT CUT OR DAMAGE EXISTING UTILITIES, STRUCTURAL MEMBERS, OR BUILDING FOUNDATIONS.
HAND EXCAVATE IN LOCATIONS WHERE EXISTING UTILITIES ARE SUBJECT TO DAMAGE.
P. CONTRACTOR SHALL USE DYED CONCRETE FOR CONCRETE ENCASED CONDUITS. DYE COLOR
WAYS SHALL FOLLOW VA UNIFORM COLOR CODE FOR MARKING UNDERGROUND FACILITIES.
II. ADDITIONAL PERMITS
A. STATE AND VA SPECIFIC PERMITS MAY BE REQUIRED FOR ON-SITE WORK INCLUDING ALL GRADING, ISL AND EROSION CONTROL. ADHERENCE TO ALL CONDITIONS OF THESE PERMITS IS REQUIRED AS
A PART OF THIS PLAN. COORDINATE WITH CO.
B. CONTRACTOR IS RESPONSIBLE FOR OBTAINING APPROVAL FOR ANY CONSTRUCTION PERMIT, ETC.
REQUIRED FOR THE SCOPE OF WORK TO BE COMPLETED.
C. CONTRACTOR SHALL BE RESPONSIBLE FOR OBTAINING ANY AND ALL REQUIRED OSHA, EPA,
CALIFORNIA DEPARTMENT OF ENVIRONMENTAL PROTECTION, CALIFORNIA DEPARTMENT OF
HEALTH, AND ANY OTHER REQUIRED PERMITS FOR THE ABATEMENT OF HAZARDOUS MATERIALS
AND THE TRADITIONAL DEMOLITION OF THE REMAINING STRUCTURE.
D. CONTRACTOR SHALL BE RESPONSIBLE FOR COORDINATING, DECOMMISSIONING AND DE
ENERGIZING OF EXISTING PGE EQUIPMENT ONSITE WITHIN THE PROJECT SCOPE.
III. EROSION CONTROL NOTES
A. WHEN CONSTRUCTION OPERATIONS ARE SUCH THAT DEBRIS FROM THE WORK IS DEPOSITED ON THE STREETS, THE CONTRACTOR SHALL IMMEDIATELY REMOVE ANY DEPOSITS OR DEBRIS WHICH MAY ACCUMULATE ON THE ROADWAY SURFACE. IF THE CONTRACTOR FAILS TO KEEP THE STREETS FREE FROM DEPOSITS AND DEBRIS RESULTING FROM THE WORK, THE CONTRACTOR SHALL, UPON ORDER OF THE COR, PROVIDE FACILITIES FOR, AND REMOVE ALL CLAY, DIRT, OR OTHER DEPOSITS FROM THE TIRES OR BETWEEN WHEELS BEFORE TRUCKS OR OTHER EQUIPMENT WILL BE ALLOWED
TO TRAVEL OVER PAVED STREETS. SHOULD THE CONTRACTOR FAIL OR REFUSE TO CLEAN THE
STREETS IN QUESTION, OR THE TRUCKS OR EQUIPMENT IN QUESTION, COR MAY ORDER THE WORK
SUSPENDED AT THE CONTRACTORS RISK UNTIL COMPLIANCE WITH THE CONTRACTOR'S
OBLIGATIONS IS ASSURED, OR THE CO MAY ORDER THE STREETS IN QUESTION CLEANED BY
OTHERS AND SUCH COSTS INCURRED IN ACHIEVING COMPLIANCE WITH THESE REQUIREMENTS,
INCLUDING CLEANING OF THE STREETS, SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR.
B. THE CONTRACTOR SHALL PROTECT EXISTING DRAINAGE STRUCTURES USING ACCEPTABLE
METHODS AND MATERIALS AS SHOWN IN THE CONSTRUCTION DOCUMENTS. IF THE METHODS AND
MATERIALS AS SHOWN ON THE PLAN ARE NOT ADEQUATE, THE COR MAY REQUIRE
ADDITIONAL/ALTERNATIVE METHODS FOR EROSION CONTROL AND/OR PROTECTION OF EXISTING
DRAINAGE STRUCTURES. ANY DAMAGE CAUSED TO THE STORMWATER SYSTEM AS A RESULT OF
THE WORK OUTLINED ON THIS PLAN SHALL BE THE SOLE RESPONSIBILITY OF THE CONTRACTOR.
RESOLVING SAID DAMAGE MAY INCLUDE, BUT NOT BE LIMITED TO, THE CLEANING OF THE DRAINAGE
SYSTEM IN QUESTION BY THE CONTRACTOR.
C. WATERING PROVISIONS WHEN APPLICABLE MUST BE IN PLACE TO PREVENT DUST FROM BECOMING
AIR BORNE. VIOLATION OF THIS CONDITION WILL RESULT IN A STOP WORK ORDER UNTIL
CORRECTED. FURTHERMORE ALL TEMPORARY CONSTRUCTION FENCING SHALL BE INSTALLED WITH
WIND SCREENS TO REDUCE DUST FOR TRAVELING OUTSIDE THE WORK LIMITS.
D. FILL THAT WILL SUPPORT A STREET SECTION OR OTHER STRUCTURES SHALL BE PLACED UNDER THE INSPECTION OF A STATE LICENSED GEOTECHNICAL DESIGNATED REPRESENTATIVE HIRED BY THE GENERAL CONTRACTOR. SOIL TO BE PLACED SHALL BE TESTED AND COMPACTED TO 95% OF ITS MAXIMUM DENSITY. ENGINEER SHALL DOCUMENT EXISTING SITE CONDITIONS, SOIL AND ITS
PLACEMENT AND ALLOWABLE BEARING CAPACITY SUBMITTED.
VI. PAVING
A. GENERAL:
1. ALL UNDERGROUND UTILITIES SHALL BE COMPLETED PRIOR TO CONSTRUCTION OF
AGGREGATE BASE COARSE.
2. ALL EXISTING PAVEMENT, CUT OR DAMAGED BY CONSTRUCTION SHALL BE PROPERLY
RESTORED AT THE CONTRACTOR'S EXPENSE.
3. FOR ANY PROPOSED CONNECTIONS OR RESTORATIONS, THE EXISTING EDGE OF PAVEMENT
SHALL BE SAW CUT IN A CLEAN STRAIGHT MANNER. NO IRREGULAR SHAPES WILL BE
ACCEPTED.
4. ADDITIONAL REMOVAL AND REPLACEMENT OF PAVEMENT MAY BE REQUIRED TO PROVIDE
PROPER TRANSITION/CROWN AS DIRECTED BY COR.
5. PAVEMENT RESTORATION SHALL BE CONSTRUCTED IN ACCORDANCE WITH VA TECHNICAL
SPECIFICATIONS AND REQUIREMENTS.
6. FINAL RESTORATION LIMITS SHALL BE DETERMINED IN THE FIELD BY COR.
B. MATERIAL:
1. SUBBASE COURSE SHALL BE 12" COMPACTED THICKNESS - 3"-0 AGGREGATE.
2. BASE COURSE SHALL BE 6" MIN. COMPACTED THICKNESS MIN 1"-0 AGGREGATE BASE COURSE
WHERE ADDITIONAL MATERIAL IS REQUIRED TO MEET PROPOSED FINISHED GRADE,
ADDITIONAL THICKNESS CAN BE ADDED AND COMPACTED IN MAX 6" LIFTS TO 95% MAX
DENSITY.
3. ASPHALT SURFACES SHALL MEET CALL B CRITERIA PER AASHTO M 323, UNLESS OTHERWISE
SPECIFIED ON THE PLANS. THE CONTRACTOR SHALL BE RESPONSIBLE FOR COLLECTING ALL
TACK, PRIME, ASPHALT, AND CONCRETE TICKETS AND SUBMITTING THEM TO THE COR PRIOR
TO PROJECT CLOSEOUT.
C. INSTALLATION:
1. SPREAD THE SUBBASE MATERIAL EVENLY AND COMPACT TO AT LEAST 95% OF THE MAXIMUM
UNIT WEIGHT, AT A LESS-THAN-OPTIMUM MOISTURE CONTENT, FOR ITS ENTIRE THICKNESS.
PLACE THE SUBBASE IN LAYERS NO GREATER THAN 12 INCHES. WHERE THE REQUIRED DEPTH
IS MORE THAN 12 INCHES, PLACE THE MATERIAL IN LAYERS OF EQUAL THICKNESS.
CONSTRUCT THE SUBBASE TO PLAN GRADE WITHIN A TOLERANCE OF PLUS 1 INCH. DO NOT
PLACE SUBBASE ON FROZEN, SOFT, UNSTABLE, OR RUTTED SUBGRADE. IF SUBBASE
MATERIAL BECOMES MIXED WITH SUBGRADE MATERIAL, REMOVE, DISPOSE OF, AND REPLACE
THE SUBBASE MATERIAL AT NO ADDITIONAL COST TO THE GOVERNMENT.
2. COMPACT THE AGGREGATE LAYERS TO A UNIFORM THICKNESS, NO LESS THAN 3 INCHES AND NO GREATER THAN 6 INCHES. IF PLACING AGGREGATE BASE IN A LAYER LESS THAN 3 INCHES, BLEND THE NEW AGGREGATE BASE MATERIAL WITH THE LAYER BELOW TO ENSURE A TOTAL
OF 6 INCHES. BLENDING MUST BE PERFORMED TO ENSURE THAT THE NEW AGGREGATE BASE
MATERIAL IS UNIFORMLY MIXED WITH THE LAYER BELOW. COMPACT EACH LAYER OF
AGGREGATE BASE TO AT LEAST 95% OF THE MAXIMUM UNIT WEIGHT AT A MOISTURE
CONTENT NO GREATER THAN OPTIMUM FOR AGGREGATE BASE UNDER HOT MIX ASPHALT
(HMA) PAVEMENT. COMPACT EACH LAYER OF AGGREGATE BASE TO AT LEAST 95% OF THE
MAXIMUM UNIT WEIGHT AT A MOISTURE CONTENT NO GREATER THAN OPTIMUM FOR
AGGREGATE BASE UNDER CONCRETE PAVEMENT.
3. INSTALLATION OF THE WEARING SURFACE SHALL CONFORM WITH THE REQUIREMENTS OF
THE VA STANDARD SPECIFICATIONS.
D. HMA WEATHER LIMITATIONS.
1. PLACE HMA IN ACCORDANCE WITH THE FOLLOWING RESTRICTIONS:
a) DO NOT PLACE HMA OR APPLY BOND COAT WHEN MOISTURE ON THE EXISTING
SURFACE PREVENTS CURING.
b) DO NOT PLACE HMA UNLESS THE TEMPERATURE OF THE SURFACE BEING PAVED IS AT
LEAST 50°F FOR WEARING COURSES AND 40°F FOR BASE AND BONDING COURSES.
THERE SHALL BE NO FROST ON OR IN THE GROUND OR ON THE SURFACE BEING PAVED,
UNLESS OTHERWISE APPROVED BY THE CO IN WRITING.
E. TESTING:
1. THE FINISHED SURFACE OF THE BASE COURSE AND THAT OF THE WEARING SURFACE SHALL
NOT VARY MORE THAN 1/4" FROM THE TEMPLATE. ANY IRREGULARITIES EXCEEDING THIS
LIMIT SHALL BE CORRECTED.
2. DENSITY TESTS SHALL BE TAKEN BY AN INDEPENDENT TESTING LABORATORY, CERTIFIED BY
THE STATE OF CALIFORNIA OR VA, WHERE APPROVED BY THE COR.
F. PAVEMENT MARKINGS AND SIGNAGE SHALL BE IN ACCORDANCE WITH THE VA AND MUTCD LATEST
VERSION.
VII. CONCRETE AND FLAT WORK
A. CONCRETE SHALL BE IN ACCORDANCE WITH THE VA STANDARD SPECIFICATIONS.
B. ALL CONCRETE SHALL BE A MINIMUM OF 3,500 PSI WITHIN 28 DAYS UNLESS OTHERWISE SPECIFIED
ON THE PLANS OR DETAILS.
C. THE REMOVAL OF EXISTING CONCRETE SHALL BE SAWCUT AND RUBBLE DISPOSED OF.
D. CONCRETE SHALL NOT BE POURED IN COLD WEATHER CONDITIONS.
00-GN-002
GENERAL NOTES
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Fi le
P at h 6/
/2
:3
9:
P M
FINAL BID DOCUMENTS
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
GDM OF OREGON
1000 W STEUBEN ST., UNIT 3
BINGEN, WA 98605
(541) 463-4723
CELYN DEZMAIN
WWW.GDM-AE.COM
DEMO B100 JONES HALL
MOUNTAIN VIEW
1776 OLD MIDDLEFIELD WAY, MOUNTAIN VIEW, CA 94043
640-23-105
Project Director
11/08/2024 CD DTRevisions: Date:
D. ALL SIDEWALKS AND CURB RAMPS SHALL BE CONSTRUCTED IN ACCORDANCE WITH THE
FEDERAL ARCHITECTURAL BARRIERS ACT ACCESSIBILITY STANDARDS (ABAAS).
E. CONCRETE TICKETS SHALL BE COLLECTED AND COMPILED BY THE CONTRACTOR AND PRESENT
TO THE COR AND ENGINEER PRIOR TO COMPLETION OF THE PROJECT.
F. FORMWORK SHALL BE INSPECTED PRIOR TO POURING.
G. TESTING SHALL CONFORM TO THE USACE STANDARD SPECIFICATIONS.
H. FLOWABLE FILL IS NOT PERMITTED FOR CONDUIT ENCASEMENT. ALL CONDUIT ENCASEMENT IS
TO ACHIEVE 3000 PSI WITHIN 28 DAYS.
I. COLD WEATHER CONCRETE WORK. THE FOLLOWING REQUIREMENTS FOR PLACING CONCRETE
SHALL BE AS REQUIRED:
1. THE COR SHALL BE NOTIFIED AT LEAST 24 HOURS PRIOR TO ANY CONCRETE PLACEMENT
2. WHERE FORMS HAVE BEEN PLACED AND THE SUBGRADE HAS BEEN SUBJECTED TO
SEVERE FROST, NO CONCRETE SHALL BE PLACED UNTIL THE GROUND IS COMPLETELY
THAWED. AT THAT TIME, THE FORMS SHALL BE ADJUSTED AND SUBGRADE
RE-COMPACTED TO MEET DRY DENSITY COMPACTION REQUIREMENTS.
3. NO UNDERGROUND UTILITIES PRONE TO ADVERSE EFFECTS FROM THE COLD WEATHER
SHALL BE DURING CONSTRUCTION WHEN TEMPERATURES ARE BELOW FREEZING.
VIII. MAINTENANCE OF TRAFFIC
A. MAINTENANCE OF TRAFFIC PLAN, PROVIDED BY THE CONTRACTOR, SHALL INCLUDE PROVISIONS
FOR PEDESTRIAN AND VEHICULAR TRAFFIC. THE FOLLOWING ARE MINIMUM REQUIREMENTS.
1. THE SAFE WALK ROUTE FOR PEDESTRIANS WITHIN THE VICINITY OF THE CONSTRUCTION
ZONE SHALL BE MAINTAINED, IF THE CURRENT WALKING SURFACE CANNOT BE
MAINTAINED, THEN A TEMPORARY ROAD-ROCK COLD PATCH 4' WALKWAY SHALL BE
CREATED, AND SHALL MEET ABAAS STANDARDS.
2. THE SAFE WALK ROUTE SHALL BE SEPARATED FROM THE CONSTRUCTION ACTIVITY BY
THE 4' HIGH ORANGE CONSTRUCTION FENCE FOR THE ENTIRE LENGTH OF THE PROJECT
OR THE LENGTH OF THE WALK ROUTE, WHICHEVER IS LESS.
3. HOURS OF OPERATION SHALL BE DESIGNATED PRIOR TO START OF CONSTRUCTION AND
ALL CONSTRUCTION EQUIPMENT AROUND ANY DESIGNATED CROSSWALK SHALL CEASE TO
OPERATE AFTER HOURS OR DURING TIMES BLOCKS THAT ARE DESIGNATED PRIOR.
4. ALL CONSTRUCTION EQUIPMENT ADJACENT TO A DESIGNATED WALK ROUTE SHALL CEASE
OPERATING UNLESS SATISFACTORILY BARRICADED FROM THE WALK ROUTE. IN THE CASE
THAT A DESIGNATED CROSSING OR ANY PORTION OF THE DESIGNATED WALK ROUTE
CANNOT BE MAINTAINED, THEN THE CONTRACTOR SHALL NOTIFY THE APPROPRIATE
PARTIES, A MINIMUM OF TEN (10) WORKING DAYS PRIOR TO CLOSING THAT ROUTE IN
ORDER THAT AN ALTERNATE CROSSING/ROUTE CAN BE ESTABLISHED.
5. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO INSTALL ANY NECESSARY
TEMPORARY PAVEMENT, ROAD ROCK, PAVEMENT MARKING AND SIGNAGE AND/OR ANY
PEDESTRIAN SIGNALIZATION AND/OR SIGNAL MODIFICATION TO ACCOMMODATE AN
EXISTING OR ALTERNATE WALK ROUTE.
6. THE CONTRACTOR SHALL BE RESPONSIBLE FOR OBTAINING AN APPROVED MAINTENANCE
OF TRAFFIC PLAN (MOT).
7. THE CONTRACTOR SHALL PROVIDE AN EMERGENCY VEHICLE ACCESS PLAN IF ANY ROADS
OR ACCESS POINTS ARE PROPOSED TO BE CLOSED.
8. THE CONTRACTOR SHALL NOT LEAVE ANY TRENCHES OPEN, UNATTENDED, OR AFTER
HOURS. ALL OPENINGS SHALL BE BACKFILLED OR COVERED BY APPROPRIATE PLATES AND
REPAIRED AS DETERMINED BY THE COR.
9. PROVIDE TEMPORARY STAIRS, TEMPORARY RAMPS, TEMPORARY HANDRAILS, OR OTHER
PEDESTRIAN AIDS AS IS REQUIRED TO MAINTAIN EMERGENCY EGRESS ROUTES AND ADA
CONDITIONS AT ALL LOCATION AT ALL TIMES.
IX. PROJECT CLOSEOUT
A. CLEANING UP:
1. DURING CONSTRUCTION, THE PROJECT SITE AND ALL ADJACENT AREAS SHALL BE
MAINTAINED IN A NEAT AND CLEAN MANNER, AND UPON FINAL CLEAN-UP, THE PROJECT
SITE SHALL BE LEFT CLEAR OF ALL SURPLUS MATERIAL OR TRASH. THE PAVED AREAS
SHALL BE SWEPT BROOM CLEAN.
2. THE CONTRACTOR SHALL RESTORE OR REPLACE, WHEN AND AS DIRECTED, ANY PUBLIC
OR PRIVATE PROPERTY DAMAGED BY HIS WORK, EQUIPMENT, OR EMPLOYEES, TO A
CONDITION AT LEAST EQUAL TO THAT EXISTING IMMEDIATELY PRIOR TO THE BEGINNING
OF OPERATIONS. TO THE END, THE CONTRACTOR SHALL DO AS REQUIRED, ALL
NECESSARY ROADWAY, DRIVEWAY, WALK AND LANDSCAPING WORK. SUITABLE MATERIALS
AND METHODS SHALL BE USED FOR SUCH RESTORATION.
3. WHERE MATERIAL OR DEBRIS HAS WASHED OR FLOWED INTO OR HAVE BEEN PLACED IN
WATER COURSES, DITCHES, DRAINS, CATCH BASINS, OR ELSEWHERE AS A RESULT OF THE
CONTRACTOR'S OPERATIONS, SUCH MATERIAL OR DEBRIS SHALL BE REMOVED AND
SATISFACTORILY DISPOSED OF DURING THE PROGRESS OF THE WORK, AND THE AREA
KEPT IN CLEAN AND NEAT CONDITION.
B. ALL PROPERTY MONUMENTS OR PERMANENT REFERENCES, REMOVED OR DESTROYED BY THE
CONTRACTOR DURING CONSTRUCTION SHALL BE RESTORED BY A LICENSED AND REGISTERED
LAND SURVEYOR AT THE CONTRACTOR'S EXPENSE.
C. ALL UNPAVED SURFACES SHALL BE RESTORED TO A CONDITION EQUAL TO OR BETTER THAN
THAT WHICH EXISTED PRIOR TO CONSTRUCTION.
D. PROJECT RECORD DOCUMENTS
1. DURING THE DAILY PROGRESS OF THE JOB, THE CONTRACTOR SHALL RECORD ON HIS SET
OF CONSTRUCTION DRAWINGS THE EXACT LOCATION, LENGTH AND ELEVATION OF ALL
FITTINGS, VALVES, AND ANY FACILITY NOT BUILT EXACTLY ACCORDING TO PLANS.
2. THE CONTRACTOR SHALL COLLECT ALL TACK, PRIME, AND ASPHALT TICKETS (ALONG WITH VOLUMES USED) UPON DELIVERY OF MATERIAL AND MAINTAIN A RECORD OF THE TICKETS AND PRESENT THEM TO THE COR AND ENGINEER. THE CONTRACTOR SHALL ALSO MAINTAIN A RECORD OF ALL MATERIAL
PROCTOR TEST REPORTS, DENSITY TEST REPORTS, CONCRETE TEST REPORTS, CONCRETE MIX
DESIGN TICKS, SLUMP TESTS AND ANY OTHER OBLIGATORY TESTS THAT ARE PREFORMED AND SHALL
PRESENT THEM TO THE COR AND ENGINEER PRIOR TO CONSTRUCTION COMPLETION.
3. UPON COMPLETION OF CONSTRUCTION, AND PRIOR TO FINAL PAYMENT, THE CONTRACTOR SHALL SUBMIT TO THE COR AND ENGINEER OF RECORD ONE COMPLETE SET OF ALL "AS-BUILT" CONTRACT DRAWINGS. THESE DRAWINGS SHALL BE MARKED TO SHOW "AS-BUILT" CONSTRUCTION CHANGES AND
DIMENSIONS, LOCATIONS AND ELEVATIONS OF ALL IMPROVEMENTS.
4. "AS-BUILT" INFORMATION ON GRAVITY SEWERS MUST CONTAIN LOCATION OF SERVICE LATERALS.
STATIONING OF BOTH THE WYE AND THE SERVICE END MUST ALSO BE INCLUDED.
5. ALL "AS-BUILT" INFORMATION ON PLANS SHALL BE CERTIFIED BY A PROFESSIONAL SURVEYOR AND
MAPPER.
6. CONTRACTOR SHALL SUBMIT TO THE COR AND ENGINEER A RECORD OF SITE INSPECTIONS LOGBOOK INCLUDING CRITICAL TASKS PERFORMED, WEATHER CONDITIONS, CONFLICTS FOUND, MEANS AND
METHODS USED, AND STAFF AND EQUIPMENT PRESENT.
7. CONTRACTOR SHALL MAINTAIN RECORDS OF ANY AND ALL HAZARDOUS MATERIAL THAT IS ABATED
AND REMOVED FROM THE SITE. CONTRACTOR SHALL PROVIDE RECEIPT OF THE MATERIAL TEST
REPORTS, MATERIAL TYPES, TRUCK TYPE, ROUTES AND DUMP SITE.
8. CONTRACTOR SHALL PROVIDE PROOF OF CLOSE OUT ON ANY AND ALL PERMITS RELATED TO THIS
PROJECT.
A THIRD PARTY PREPARED A SET OF DRAWINGS DEPICTING REGULATED MATERIALS REMOVAL
OR DISTURBANCE. THESE DRAWINGS ARE PROVIDED SOLELY AS A REFERENCE AND FOR
INFORMATIONAL PURPOSES. THE ACCURACY AND COMPLETENESS OF THE INFORMATION
REGARDING REGULATED MATERIALS IS UNKNOWN. ANY RELIANCE ON THESE DRAWINGS IS AT
THE VIEWER'S OWN RISK. IT IS EXPRESSLY UNDERSTOOD AND AGREED THAT THE INCLUSION
OF THESE DRAWINGS IN THE PROJECT DOCUMENTS DOES NOT IMPOSE ANY RESPONSIBILITY
OR LIABILITY UPON GDM OR IT'S AGENTS, EMPLOYEES, OR REPRESENTATIVES WITH RESPECT
TO THE IDENTIFICATION, HANDLING, REMOVAL, OR DISTURBANCE OR REGULATED MATERIALS.
NOTE:
PIPING, SCREWED GATE VALVE
HYDRANT, FIRE
WATER VALVE
DRAIN LINED
PIPE LINE, CAST IRONCI
PIPE LINE, DUCTILE IRONDI
WASTE LINE, SANITARY SOIL (ABOVE FLOOR)SS
DRAIN LINE, STORM (ABOVE FLOOR)SD
DRAIN LINE, STORM (BELOW FLOOR)SD
PIPE LINE, REINFORCED CONCRETERCP
COMPRESSED AIR LINEA
GAS LINEG
CONDENSATE LINEC
POWER LINEP
CABLE TELEVISION LINECATV
CLOSED CIRCUIT TELEVISION LINECCTV
TELEPHONE LINET
UTILITY, WATER MANHOLEW
HYDRANT PAN, FIREFH
UTILITY, UTILITY POLE
UTILITY, SANITARY MANHOLES
UTILITY, SANITARY CLEANOUTCO
ELECTRICAL, GUY WIRE
UTILITY, ELECTRICAL MANHOLEE
WATER LINEW
STEAM MANHOLEST
STEAM LINEST
ELECTRICAL LINEE
COMMUNICATION LINECOM
COMMUNICATIONS MANHOLEC
PIV
AB ANCHOR BOLT
ABAN ABANDON
ABC AGGREGATE BASE COURSE
AC ASPHALTIC CONCRETE
ACP ASPHALTIC CONCRETE PAVING
AD AREA DRAIN
ADA AMERICANS WITH DISABILITIES ACT
ALNMT ALIGNMENT
ALT ALTERNATE OR ALTITUDE
ALUM ALUMINUM
APPD APPROVED
APPROX APPROXIMATE
ASCE AMERICAN SOCIETY OF CIVIL ENGINEERS
ASPH ASPHALT
ASSY ASSEMBLY
AVE AVENUE
AWG AMERICAN WIRE GAUGE
AWWA AMERICAN WATER WORKS ASSOCIATION
B&F BELL AND FLANGE
B&S BELL AND SPIGOT
BC BACK OF CURB
BCV BUTTERFLY CHECK VALVE
BDRY BOUNDARY
BFP BACKFLOW PREVENTER
BFV BUTTERFLY VALVE
BITUM BITUMINOUS
BKGD BACKGROUND
BL BASE LINE
BLDC BUILDING CORNER
BLDG BUILDING
BLT BUILT
BLVD BOULEVARD
BM BEAM OR BENCHMARK
BOW BOTTOM OF WALL
BRG BEARING
BSTR BOOSTER
BV BALL VALVE
BWG BIRMINGHAM WIRE GAUGE
C CONC
C TO C CENTER TO CENTER
CALC CALCULATE
CAP CAPACITY
CB CATCH BASIN OR CEMENT BASE
CCTV CLOSED CIRCUIT TELEVISION
CD CONSTRUCTION DOCUMENTS OR CONTRACT
DOCUMENTS
CF CONTRACTOR FURNISHED
CFS CUBIC FEET PER SECOND
CHKV CHECK VALVE
CI CAST IRON OR CURB INLET
CIP CAST-IN-PLACE OR CAST IRON PIPE
CJ CONSTRUCTION JOINT OR CONTROL JOINT
CL CENTER LINE, CLASS, OR CLOSE
CLASS CLASSIFICATION
CLF CHAIN LINK FENCE
CLR CLEAR
CMP CORRUGATED METAL PIPE
CMV CITY OF MOUNTAIN VIEW
CMU CONCRETE MASONRY UNIT
CND CONDUIT
CNR CORNER
CNTOR CONTACTOR
CO CERTIFICATE OF OCCUPANCY, CLEANOUT,
COMPANY, OR CUTOUT
COMM COMMUNICATION
CONC CONCENTRIC OR CONCRETE
CONC FLR CONCRETE FLOOR
COORD COORDINATE
COR CHANGE ORDER REQUEST
CORR CORRIDOR
COTG CLEANOUT TO GRADE
COTR CONTRACTING OFFICER'S TECHNICAL
REPRESENTATIVE
COV COVER OR CUT OFF VALVE
COV PL COVER PLATE
CP CONCRETE PIPE OR CONTROL PANEL
CRN CROWN
CSI CONSTRUCTION SPECIFICATIONS INSTITUTE
CSTL CAST STEEL
CTR CENTER, CONTOUR, OR COOLING TOWER RETURN
CTRL CONTROL
CTV CABLE TELEVISION
CU COPPER OR CUBIC
CU FT CUBIC FEET
CU IN CUBIC INCH
CU YD CUBIC YARD
CV CONTROL VALVE
MH MANHOLE
MIN MINIMUM
MISC MISCELLANEOUS
MON MONUMENT
N NORTH
NA NOT APPLICABLE
NIC NOT IN CONTRACT
NO NUMBER
NTP NOTICE TO PROCEED
NTS NOT TO SCALE
OC ON CENTER
OFD OVERFLOW DRAIN
P PAVEMENT
PB PULL BOX
PC POINT OF CURVE
PCC PRECAST CONCRETE
PCCP CONCRETE PAVEMENT
PED PEDESTAL
PERF PERFORATED
PH PHASE
PI POINT OF INTERSECTION
PIV POST INDICATOR VALVE
PL PROPERTY LINE
POTW POTABLE WATER
POW LN POWER LINE
PRCST PRECAST
PRELIM PRELIMINARY
PRKG PARKING
PROJ PROJECT
PROP PROPERTY
PRV PRESSURE REGULATOR VALVE OR PRESSURE
RELIEF VALVE
PS CONC PRESTRESSED CONCRETE
PSI POUNDS PER SQUARE INCH
PV PAVED
PV RD PAVED ROAD
PVC POLYVINYL CHLORIDE (PLASTIC)
R RADIUS OR RANGE
RAD RADIAN
RC REINFORCED CONCRETE
RCB REINFORCED CONCRETE BOX
RCCP REINFORCED CONCRETE CULVERT PIPE
RCP REINFORCED CONCRETE PIPE
RD ROAD OR ROOF DRAIN
RDC REDUCER
REBAR REINFORCING STEEL BARS
REQD REQUIRED
RFI REQUEST FOR INFORMATION
RFP REQUEST FOR PROPOSAL
ROW RIGHT OF WAY
RST REINFORCING STEEL
RT RIGHT
RV RELIEF VALVE
RW ROADWAY
RWL RAIN WATER LEADER
SD STORM DRAIN
SDCB STORM DRAIN CATCH BASIN
SDMH STORM DRAIN MANHOLE
SECT SECTION
SF SQUARE FOOT (FEET)
SMH STEAM MANHOLE
SOV SHUT OFF VALVE
SP STANDPIPE OR SUMP PIT
SP EL SPOT ELEVATION
SPEC SPECIFICATION
SPKLR SPRINKLER
SQ IN SQUARE INCH
SQ YD SQUARE YARD
SS SANITARY SEWER, STEAM SUPPLY, OR STORM
SEWER
SSCO SANITARY SEWER CLEAN OUT
SSP STAINLESS STEEL PIPE
ST STREET
STA STATION
STD STANDARD
STL-D DOUBLE STREET LIGHT
STM STEAM
SURF SURFACE
SURV SURVEY
SW SIDEWALK
SWR SEWER
SYM SYMBOL
TAN TANGENT
TC TOP OF CURB
TCP TRAFFIC CONTROL PLAN
TD TRENCH DRAIN
TE TOP ELEVATION
TEL TELEPHONE
TEMP TEMPORARY
THRU THROUGH
TMH TOP OF MANHOLE
TOC TOP OF CONCRETE
TOW TOP OF CONCRETE WALL
TOPO TOPOGRAPHY
TOS TOP OF SLAB
TP TELEPHONE POLE
TR TOP OF RIM
TYP TYPICAL
DA DRAINAGE AREA
DAT DATUM
D-B DESIGN-BUILD
DBA UNIT OF SOUND LEVEL
DBL DOUBLE
DDCV DOUBLE DETECTOR CHECK VALVE
DEG DEGREE
DEL DELETE
DEMO DEMOLITION
DEPT DEPARTMENT
DET DETAIL
DEV DEVELOPMENT
DI DROP INLET
DIA DIAMETER
DIFF DIFFERENCE OR DIFFERENTIAL
DIM DIMENSION
DIP DUCTILE IRON PIPE
DIST DISTANCE
DIV DIVISION
DR DRAIN OR DRIVE
DS DOWNSPOUT
DW DOMESTIC WATER
DWG DRAWING
E EAST
EA EACH
EC EDGE OF CURB
EL EASEMENT LINE OR ELEVATION
EP EDGE OF PAVEMENT (PAVING)
EPA ENVIRONMENTAL PROTECTION AGENCY
EPB ELECTRICAL PULL BOX
EPT EXTERNAL PIPE THREAD
ESMT EASEMENT
EST ESTIMATE
EW EACH WAY
EXIST EXISTING
EXST GR EXISTING GRADE
FD FLOOR DRAIN
FDC FIRE DEPARTMENT CONNECTION
FF EL FINISH FLOOR ELEVATION
FG FINISHED GRADE
FH FIRE HYDRANT
FIG FIGURE
FL FLOW LINE
FLR FLOOR
FN FENCE
FOC FACE OF CURB
FP FIRE PROTECTION OR FLAGPOLE
FPM FEET PER MINUTE
FPS FEET PER SECOND
FPW FIRE PROTECTION WATER SUPPLY
FSP FIRE STANDPIPE
FT FEET OR FOOT
FTG FOOTING
FW FIRE WATER
G GROUND OR NATURAL GAS
G LN GAS LINE
GA GAGE
GAL GALLON
GB GRADE BREAK
GC GENERAL CONTRACTOR
GI GALVANIZED IRON
GIP GALVANIZED IRON PIPE
GL GROUND LEVEL
GT GREASE TRAP
GTV GATE VALVE
GUT GUTTER
HAZ MAT HAZARDOUS MATERIALS
HB HOSE BIBB
HDPE HIGH DENSITY POLYETHYLENE
HDR HEADER
HDWL HEADWALL
HH HAND HOLE
HORIZ HORIZONTAL
HP HIGH PRESSURE
HT HEIGHT
HWY HIGHWAY
HYD HYDRANT
ID INSIDE DIAMETER OR INSIDE DIMENSION
IMH INLET MANHOLE
INCL INCLUDED
INV INVERT
INV EL INVERT ELEVATION
IP IRON PIPE
IPT IRON PIPE THREADED
IW IRRIGATION WATER
LAT LATITUDE
LF LINEAR FEET (FOOT)
LOC LOCATION
LPT LOW POINT
LS LUMP SUM
LSA LANDSCAPE ARCHITECT
UFC UNIFORM FIRE CODE
UGND UNDERGROUND
UP UTILITY POLE
UTIL UTILITY
VAR VARIES
VB VALVE BOX
VC VERTICAL CURVE
VERT VERTICAL
VIC VICINITY
VIF VERIFY IN FIELD
W WASTE, WEST, OR WIDE
WL WATER LINE
WTR WATER
WW WASTE WATER
WV WATER VALVE
00-GN-003
GENERAL NOTES
DEQ ASBESTOS NOTES:
1. NOTIFICATION:
FILE A DEQ NOTIFICATION FORM ASN 6 FOR REMOVAL OF NONFRIABLE ASBESTOS
MATERIALS AND PAY THE APPLICABLE FEE. THE NOTIFICATION MUST BE RECEIVED
BY THE DEQ BUSINESS OFFICE AT LEAST 5 DAYS PRIOR TO STARTING THE
REMOVAL PROJECT.
2. OPTIONS FOR REMOVING NONFRIABLE AC PIPE:
AC PIPE MUST BE REMOVED, HANDLED AND DISPOSED OF IN A MANNER THAT
KEEPS THE MATERIAL IN PREDOMINANTLY WHOLE PIECES TO BE CONSIDERED
NONFRIABLE. SANDING, SAWING, GRINDING, CHIPPING, OR THE USE OF POWER
TOOLS IS NOT ALLOWED. THE PIPE MUST BE KEPT WET DURING REMOVAL.
WETTING MINIMIZES ASBESTOS FIBERS FROM BEING RELEASED. ASBESTOS
PROGRAM DEQ RECOMMENDS THAT YOU USE THE FOLLOWING METHODS TO
REMOVE AC PIPE.
3. WASTE DISPOSAL:
PLACE THE AC PIPE IN A LEAK-TIGHT CONTAINER AND MARK IT WITH THE WARNING
STATEMENT "DANGER ASBESTOS-CONTAINING MATERIAL". LOCATE A LANDFILL
THAT IS AUTHORIZED TO ACCEPT ASBESTOS WASTE ANDBE SURE TO INQUIRE
ABOUT HOURS OF OPERATION AND ANY SPECIAL PACKAGING REQUIREMENTS
THEY MIGHTHAVE. FILL OUT A DEQ WASTE SHIPMENT REPORT ASN 4 AND GIVE IT
TO THE LANDFILL UPON ARRIVAL.
4. IF THE MATERIAL BECOMES FRIABLE:
IF THE AC PIPE BECOMES SHATTERED, DAMAGED, OR IS BADLY WEATHERED, IT IS
CONSIDERED FRIABLE AND MAY RELEASE ASBESTOS FIBERS. IF THE AC PIPE
BECOMES FRIABLE, STOP WORK IMMEDIATELY AND PROMPTLY CONTACT A DEQ
LICENSED ASBESTOS ABATEMENT CONTRACTOR. FRIABLE ASBESTOS MATERIALS
MUST BE REMOVED BY A DEQ LICENSED ASBESTOS CONTRACTOR USING DEQ
CERTIFIED WORKERS.
5. ALL ASBESTOS ABATEMENT RULES UNDER OAR:
340-248-0005 THROUGH -0280 MUST BE FOLLOWED. A DEQ NOTIFICATION FORM ASN
1 FOR THE REMOVAL OF FRIABLE ASBESTOS AND THE APPLICABLE FEE MUST BE
FILED. THE NOTIFICATION MUST BE RECEIVED BY THE DEQ BUSINESS OFFICE AT
LEAST 10 DAYS PRIOR TO STARTING THE REMOVAL PROJECT. FOR EMERGENCY
SITUATIONS A WAIVER OF THE 10-DAY PERIOD MAY BE GRANTED BY THE DEQ. FOR
MORE INFORMATION CONTACT DEQ.
AutoCAD SHX Text
SITE SYMBOLS - CIVIL UTILITIES
AutoCAD SHX Text
SITE ABBREVIATIONS - CIVIL PLANS
VAN
NO
PARKING
NO
PARKING
PB
PB
PB
PB
PB
PB
Feet 0 20 40
TEMPORARY POLLUTION PREVENTION PLAN
SCALE: 1" = 20'
NORTH
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Fi le
P at h 6/
/2
:3
9:
P M
FINAL BID DOCUMENTS
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
GDM OF OREGON
1000 W STEUBEN ST., UNIT 3
BINGEN, WA 98605
(541) 463-4723
CELYN DEZMAIN
WWW.GDM-AE.COM
DEMO B100 JONES HALL
MOUNTAIN VIEW
1776 OLD MIDDLEFIELD WAY, MOUNTAIN VIEW, CA 94043
640-23-105
Project Director
11/08/2024 CD DTRevisions: Date:
EROSION CONTROL NOTES:
1. CONTRACTOR TO COORDINATE ACCESS TO BUILDINGS, DRIVES, AND SIDEWALK WITH THE VA PRIOR TO INSTALLATION.
2. CONTRACTOR SHALL DOCUMENT EXISTING CONDITIONS PRIOR TO STAR OF CONSTRUCTION.
3. EROSION CONTROL MEASURE SHALL BE INSTALLED PRIOR TO START OF CONSTRUCTION.
4. ADDITIONAL EROSION CONTROL MEASURE MAY BE REQUIRED AT THE REQUEST OF THE VA.
5. ALL AREAS TO BE BLOCKED OFF SHALL BE COORDINATED WITH ALL EMERGENCY VEHICLES.
6. ANY LOCKED TEMPORARY GATES SHALL HAVE A KNOX BOX AND KEY THAT IS COORDINATED WITH THE EMERGENCY
SERVICES.
7. CONTRACTOR SHALL BE SOLELY RESPONSIBLE FOR MAINTAINING A CLEAN WORK SITE AND WILL BE REQUIRED TO CLEAN
ANY DEBRIS OR DEPOSITS FOUND ONSITE DURING CONSTRUCTION.
8. CONTRACTOR SHALL PROVIDE DUST CONTROL DURING THE ENTIRE LENGTH OF CONSTRUCTION AND WILL KEEP ANY
INTAKE VENTS, LOVERS, OR MECHANICAL EQUIPMENT PROTECTED FROM DUST AT ALL TIMES.
9. NO CONCRETE WASHOUT PERMITTED ON SITE.
00-CE-001
TEMPORARY POLLUTION PREVENTION
PLAN
DOUBLE WIDE TEMPORARY
CONSTRUCTION GATES WITH
KNOX BOX FOR EMERGENCY
VEHICLE ACCESS
TEMPORARY CONSTRUCTION
ENTRANCE WITH SOIL
TRACKING DEVICES
TEMPORARY CONSTRUCTION
FENCING WITH SCREEN
DOUBLE WIDE TEMPORARY
CONSTRUCTION GATES WITH
KNOX BOX FOR EMERGENCY
VEHICLE ACCESS
TEMPORARY CONSTRUCTION
ENTRANCE WITH SOIL
TRACKING DEVICES
TEMPORARY CONSTRUCTION
FENCING WITH SCREEN
INSTALL MIRAFI PAPER OVER EX CATCH
BASINS
INSTALL MIRAFI PAPER OVER EX CATCH
BASINS
MATCH LINE
SHEET 00-CE-002
EROSION CONTROL LEGEND:
TEMPORARY CONSTRUCTION FENCING WITH SCREEN
TEMPORARY CONSTRUCTION ENTRANCE WITH SOIL TRACKING DEVICES
AutoCAD SHX Text W
AutoCAD SHX Text
JP
AutoCAD SHX Text
JP
AutoCAD SHX Text
SSCO
AutoCAD SHX Text D
AutoCAD SHX Text Y
AutoCAD SHX Text H
AutoCAD SHX Text
SSCO
AutoCAD SHX Text
SSCO
AutoCAD SHX Text
SSCO
AutoCAD SHX Text D
AutoCAD SHX Text Y
AutoCAD SHX Text H
AutoCAD SHX Text C
AutoCAD SHX Text
WV
AutoCAD SHX Text
WV
AutoCAD SHX Text D
AutoCAD SHX Text Y
AutoCAD SHX Text H
AutoCAD SHX Text
SSCO
AutoCAD SHX Text
GV
AutoCAD SHX Text C
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text
TRANSFORMER PAD
AutoCAD SHX Text W
AutoCAD SHX Text W
AutoCAD SHX Text W
AutoCAD SHX Text W
AutoCAD SHX Text W
AutoCAD SHX Text W
AutoCAD SHX Text
SS
AutoCAD SHX Text
SS
AutoCAD SHX Text
SS
AutoCAD SHX Text
SS
AutoCAD SHX Text
SS
AutoCAD SHX Text
SS
AutoCAD SHX Text
SS
AutoCAD SHX Text
SS
AutoCAD SHX Text
SS
AutoCAD SHX Text
SS
AutoCAD SHX Text W
AutoCAD SHX Text W
AutoCAD SHX Text W
AutoCAD SHX Text W
AutoCAD SHX Text W
AutoCAD SHX Text W
AutoCAD SHX Text W
AutoCAD SHX Text W
AutoCAD SHX Text W
AutoCAD SHX Text W
AutoCAD SHX Text W
AutoCAD SHX Text W
AutoCAD SHX Text W
AutoCAD SHX Text W
AutoCAD SHX Text W
AutoCAD SHX Text W
AutoCAD SHX Text W
AutoCAD SHX Text W
AutoCAD SHX Text W
AutoCAD SHX Text W
AutoCAD SHX Text W
AutoCAD SHX Text W
AutoCAD SHX Text W
AutoCAD SHX Text W
AutoCAD SHX Text W
AutoCAD SHX Text W
AutoCAD SHX Text W
AutoCAD SHX Text W
AutoCAD SHX Text W
AutoCAD SHX Text W
AutoCAD SHX Text W
AutoCAD SHX Text W
AutoCAD SHX Text W
AutoCAD SHX Text W
AutoCAD SHX Text W
AutoCAD SHX Text W
AutoCAD SHX Text W
AutoCAD SHX Text
AutoCAD SHX Text W
AutoCAD SHX Text G
AutoCAD SHX Text G
AutoCAD SHX Text G
AutoCAD SHX Text G
AutoCAD SHX Text G
AutoCAD SHX Text G
AutoCAD SHX Text G
AutoCAD SHX Text G
AutoCAD SHX Text G
AutoCAD SHX Text G
AutoCAD SHX Text G
AutoCAD SHX Text G
AutoCAD SHX Text G
AutoCAD SHX Text G
AutoCAD SHX Text G
AutoCAD SHX Text G
AutoCAD SHX Text G
AutoCAD SHX Text G
AutoCAD SHX Text G
AutoCAD SHX Text G
AutoCAD SHX Text G
AutoCAD SHX Text G
AutoCAD SHX Text G
AutoCAD SHX Text G
AutoCAD SHX Text G
AutoCAD SHX Text G
AutoCAD SHX Text G
AutoCAD SHX Text G
AutoCAD SHX Text G
AutoCAD SHX Text
SS
AutoCAD SHX Text
SS
AutoCAD SHX Text
SS
AutoCAD SHX Text
SS
AutoCAD SHX Text
SSCO
AutoCAD SHX Text
EXISTING 1-STORY GARAGE BUILDING FINISHED FLOOR= 24.16
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text T
AutoCAD SHX Text T
AutoCAD SHX Text T
AutoCAD SHX Text T
AutoCAD SHX Text T
AutoCAD SHX Text T
AutoCAD SHX Text
FIBER OPTICS
AutoCAD SHX Text T
AutoCAD SHX Text T
AutoCAD SHX Text T
AutoCAD SHX Text T
AutoCAD SHX Text T
AutoCAD SHX Text T
AutoCAD SHX Text T
AutoCAD SHX Text T
AutoCAD SHX Text T
AutoCAD SHX Text T
AutoCAD SHX Text T
AutoCAD SHX Text
EXISTING 2-STORY OFFICE BUILDING FINISHED FLOOR= 25.06-25.16
AutoCAD SHX Text E
AutoCAD SHX Text
OHE
AutoCAD SHX Text
OHE
AutoCAD SHX Text
DIRT
AutoCAD SHX Text
DIRT
AutoCAD SHX Text
PAVEMENT
AutoCAD SHX Text
PAVEMENT
AutoCAD SHX Text
PAVEMENT
AutoCAD SHX Text
PAVEMENT
AutoCAD SHX Text
PAVEMENT
AutoCAD SHX Text
PAVEMENT
AutoCAD SHX Text
PAVEMENT
AutoCAD SHX Text
CONC SW
AutoCAD SHX Text
CONC SW
AutoCAD SHX Text
CONC SW
AutoCAD SHX Text
DIRT
AutoCAD SHX Text
6' TALL CLF
AutoCAD SHX Text
6' TALL CLF
AutoCAD SHX Text
GATE
AutoCAD SHX Text
SECURITY SHED
AutoCAD SHX Text
GRASS
AutoCAD SHX Text
GRASS
AutoCAD SHX Text
CURB STOPS (TYP)
AutoCAD SHX Text
WHEEL STOPS (TYP)
AutoCAD SHX Text
CURB STOPS (TYP)
AutoCAD SHX Text E
AutoCAD SHX Text
DEPTH 34"
AutoCAD SHX Text
CURB STOPS (TYP)
AutoCAD SHX Text
GRASS
AutoCAD SHX Text
ACCESSIBLE RAMP W/ HANDRAILING
AutoCAD SHX Text
FAUCET LOCATED ON WALL WASH AREA
AutoCAD SHX Text T
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
SS
AutoCAD SHX Text
SS
AutoCAD SHX Text
SS
AutoCAD SHX Text
WHEEL STOPS (TYP)
AutoCAD SHX Text
DEPTH 3'8"
AutoCAD SHX Text
CURB STOPS (TYP)
AutoCAD SHX Text
6' TALL CLF
AutoCAD SHX Text
6' TALL CLF
AutoCAD SHX Text
GATE
AutoCAD SHX Text
DEPTH 4'7"
AutoCAD SHX Text
6' TALL CLF
AutoCAD SHX Text T
AutoCAD SHX Text T
AutoCAD SHX Text T
AutoCAD SHX Text L/S
AutoCAD SHX Text
CONC SW
AutoCAD SHX Text
DEPTH 3'9"
AutoCAD SHX Text
CONC SW
AutoCAD SHX Text
GRASS
AutoCAD SHX Text
GAS UTILITY
AutoCAD SHX Text
DEPTH 23"
AutoCAD SHX Text
PAVEMENT
AutoCAD SHX Text
SS
AutoCAD SHX Text
SS
AutoCAD SHX Text
SS
AutoCAD SHX Text 4"
AutoCAD SHX Text 4"
AutoCAD SHX Text W
AutoCAD SHX Text W
AutoCAD SHX Text W
AutoCAD SHX Text W
AutoCAD SHX Text W
AutoCAD SHX Text W
AutoCAD SHX Text W
AutoCAD SHX Text W
AutoCAD SHX Text W
AutoCAD SHX Text W
AutoCAD SHX Text W
AutoCAD SHX Text W
AutoCAD SHX Text W
AutoCAD SHX Text W
AutoCAD SHX Text W
AutoCAD SHX Text W
AutoCAD SHX Text W
AutoCAD SHX Text W
AutoCAD SHX Text W
AutoCAD SHX Text W
AutoCAD SHX Text W
AutoCAD SHX Text W
AutoCAD SHX Text W
AutoCAD SHX Text W
AutoCAD SHX Text W
AutoCAD SHX Text W
AutoCAD SHX Text W
AutoCAD SHX Text W
AutoCAD SHX Text W
AutoCAD SHX Text W
AutoCAD SHX Text W
AutoCAD SHX Text W
AutoCAD SHX Text W
AutoCAD SHX Text W
AutoCAD SHX Text W
AutoCAD SHX Text W
AutoCAD SHX Text W
AutoCAD SHX Text W
AutoCAD SHX Text W
AutoCAD SHX Text W
AutoCAD SHX Text W
AutoCAD SHX Text W
AutoCAD SHX Text W
AutoCAD SHX Text W
AutoCAD SHX Text W
AutoCAD SHX Text W
AutoCAD SHX Text W
AutoCAD SHX Text
FW
AutoCAD SHX Text
FW
AutoCAD SHX Text
SSFM
AutoCAD SHX Text
SSFM
AutoCAD SHX Text
SS
AutoCAD SHX Text
SSFM
AutoCAD SHX Text
SSFM
AutoCAD SHX Text
AutoCAD SHX Text
4" SCH 80 @ 0.012
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text
DW
AutoCAD SHX Text
DW
AutoCAD SHX Text
DW
AutoCAD SHX Text
DW
AutoCAD SHX Text
SD
AutoCAD SHX Text
AutoCAD SHX Text
SD
AutoCAD SHX Text G
AutoCAD SHX Text
SD
AutoCAD SHX Text
SD
AutoCAD SHX Text
SD
AutoCAD SHX Text
SD
AutoCAD SHX Text E
AutoCAD SHX Text
TELE
AutoCAD SHX Text
TELE
AutoCAD SHX Text
TELE
AutoCAD SHX Text
TELE
AutoCAD SHX Text
TELE
AutoCAD SHX Text
TELE
AutoCAD SHX Text
TELE
AutoCAD SHX Text
TELE
AutoCAD SHX Text
TELE
AutoCAD SHX Text
TELE
AutoCAD SHX Text
TELE
AutoCAD SHX Text
TELE
AutoCAD SHX Text
TELE
AutoCAD SHX Text
AutoCAD SHX Text W
AutoCAD SHX Text
EXISTING 2-STORY OFFICE BUILDING FINISHED FLOOR= 24.50
AutoCAD SHX Text D
AutoCAD SHX Text Y
AutoCAD SHX Text H
AutoCAD SHX Text W
US HWY 101
PB
PB
PB
PB
Feet 0 20 40
TEMPORARY POLLUTION PREVENTION PLAN
SCALE: 1" = 20'
NORTH
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Fi le
P at h 6/
/2
:3
9:
P M
FINAL BID DOCUMENTS
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
GDM OF OREGON
1000 W STEUBEN ST., UNIT 3
BINGEN, WA 98605
(541) 463-4723
CELYN DEZMAIN
WWW.GDM-AE.COM
DEMO B100 JONES HALL
MOUNTAIN VIEW
1776 OLD MIDDLEFIELD WAY, MOUNTAIN VIEW, CA 94043
640-23-105
Project Director
11/08/2024 CD DTRevisions: Date:
EROSION CONTROL NOTES:
1. CONTRACTOR TO COORDINATE ACCESS TO BUILDINGS, DRIVES, AND SIDEWALK WITH THE VA PRIOR TO INSTALLATION.
2. CONTRACTOR SHALL DOCUMENT EXISTING CONDITIONS PRIOR TO STAR OF CONSTRUCTION.
3. EROSION CONTROL MEASURE SHALL BE INSTALLED PRIOR TO START OF CONSTRUCTION.
4. ADDITIONAL EROSION CONTROL MEASURE MAY BE REQUIRED AT THE REQUEST OF THE VA.
5. ALL AREAS TO BE BLOCKED OFF SHALL BE COORDINATED WITH ALL EMERGENCY VEHICLES.
6. ANY LOCKED TEMPORARY GATES SHALL HAVE A KNOX BOX AND KEY THAT IS COORDINATED WITH THE EMERGENCY
SERVICES.
7. CONTRACTOR SHALL BE SOLELY RESPONSIBLE FOR MAINTAINING A CLEAN WORK SITE AND WILL BE REQUIRED TO CLEAN
ANY DEBRIS OR DEPOSITS FOUND ONSITE DURING CONSTRUCTION.
8. CONTRACTOR SHALL PROVIDE DUST CONTROL DURING THE ENTIRE LENGTH OF CONSTRUCTION AND WILL KEEP ANY
INTAKE VENTS, LOVERS, OR MECHANICAL EQUIPMENT PROTECTED FROM DUST AT ALL TIMES.
9. NO CONCRETE WASHOUT PERMITTED ON SITE.
00-CE-002
TEMPORARY POLLUTION PREVENTION
PLAN
MATCH LINE
SHEET 00-CE-001
TEMPORARY
CONSTRUCTION FENCING
DOUBLE WIDE TEMPORARY CONSTRUCTION
GATES WITH KNOX BOX FOR EMERGENCY
VEHICLE ACCESS
STAGING AND
STOCKPILING AREA
EROSION CONTROL LEGEND:
TEMPORARY CONSTRUCTION FENCING WITH SCREEN
TEMPORARY CONSTRUCTION ENTRANCE WITH SOIL TRACKING DEVICES
AutoCAD SHX Text
WV
AutoCAD SHX Text
WV
AutoCAD SHX Text
WV
AutoCAD SHX Text
WV
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text
SD COVER FOR SD COLLECTOR
AutoCAD SHX Text
2.5' TALL HEADWALL
AutoCAD SHX Text
SD
AutoCAD SHX Text 12"
AutoCAD SHX Text
FLOWLINE 12" PIPE=18.46
AutoCAD SHX Text
FLOWLINE 12" PIPE=16.58
AutoCAD SHX Text
FLOWLINE 4" PIPE=19.34
AutoCAD SHX Text
SD
AutoCAD SHX Text
AutoCAD SHX Text
FLOWLINE 4" PIPE=19.95
AutoCAD SHX Text
SD
AutoCAD SHX Text 3"
AutoCAD SHX Text
AutoCAD SHX Text
FLOWLINE 3" PIPE=19.34
AutoCAD SHX Text W
AutoCAD SHX Text W
AutoCAD SHX Text W
AutoCAD SHX Text W
AutoCAD SHX Text W
AutoCAD SHX Text W
AutoCAD SHX Text W
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text W
AutoCAD SHX Text W
AutoCAD SHX Text W
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text
6' TALL CLF
AutoCAD SHX Text
6' TALL CLF
AutoCAD SHX Text
6' TALL CLF
AutoCAD SHX Text
DIRT
AutoCAD SHX Text
DIRT
AutoCAD SHX Text
DIRT
AutoCAD SHX Text
PAVEMENT
AutoCAD SHX Text
PAVEMENT
AutoCAD SHX Text
PAVEMENT
AutoCAD SHX Text
CONC
AutoCAD SHX Text
PAVEMENT
AutoCAD SHX Text
6' TALL CLF
AutoCAD SHX Text
6' TALL CLF
AutoCAD SHX Text
METAL STORAGE SHED (TYP)
AutoCAD SHX Text
SD UTILITY IN WIRE CAGE W/ SMALL HOLE IN FENCE
AutoCAD SHX Text
GRASS
AutoCAD SHX Text
GRASS
AutoCAD SHX Text
TC FLUSH WITH PAVEMENT (THIS SIDE ONLY)
AutoCAD SHX Text
DEPTH 3'
AutoCAD SHX Text W
AutoCAD SHX Text W
AutoCAD SHX Text W
AutoCAD SHX Text W
AutoCAD SHX Text W
AutoCAD SHX Text W
AutoCAD SHX Text W
AutoCAD SHX Text W
AutoCAD SHX Text W
AutoCAD SHX Text W
AutoCAD SHX Text W
AutoCAD SHX Text W
AutoCAD SHX Text W
AutoCAD SHX Text W
AutoCAD SHX Text
AutoCAD SHX Text G
AutoCAD SHX Text G
AutoCAD SHX Text
FW
AutoCAD SHX Text
DW
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
SD
AutoCAD SHX Text
FW
AutoCAD SHX Text
SD
AutoCAD SHX Text
AutoCAD SHX Text
TELE
AutoCAD SHX Text
TELE
AutoCAD SHX Text
TELE
AutoCAD SHX Text
TELE
AutoCAD SHX Text
TELE
AutoCAD SHX Text
TELE
AutoCAD SHX Text
AutoCAD SHX Text
SS
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Fi le
P at h 6/
/2
:3
9:
P M
FINAL BID DOCUMENTS
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
GDM OF OREGON
1000 W STEUBEN ST., UNIT 3
BINGEN, WA 98605
(541) 463-4723
CELYN DEZMAIN
WWW.GDM-AE.COM
DEMO B100 JONES HALL
MOUNTAIN VIEW
1776 OLD MIDDLEFIELD WAY, MOUNTAIN VIEW, CA 94043
640-23-105
Project Director
11/08/2024 CD DTRevisions: Date:
SWPP REQUIREMENTS
CONTROLS
THIS PLAN UTILIZES BEST MANAGEMENT PRACTICES TO CONTROL EROSION AND TURBIDITY CAUSED BY STORM WATER RUN OFF. AN EROSION AND TURBIDITY PLAN HAS BEEN PREPARED TO INSTRUCT THE CONTRACTOR ON PLACEMENT OF THESE CONTROLS. IT IS THE CONTRACTORS RESPONSIBILITY TO INSTALL AND MAINTAIN THE CONTROLS PER PLAN AS WELL AS ENSURING THE PLAN IS PROVIDING THE PROPER PROTECTION AS REQUIRED BY FEDERAL, STATE AND LOCAL LAWS. REFER TO 'CONTRACTORS RESPONSIBILITY' FOR A VERBAL DESCRIPTION OF
CONTROLS THAT MAY BE IMPLEMENTED.
STORM WATER MANAGEMENT
STORM WATER DRAINAGE WILL BE PROVIDED BY VA FACILITY.
TIMING OF CONTROL/MEASURES
REFER TO 'CONTRACTORS RESPONSIBILITY' FOR THE TIMING OF CONTROL/MEASURES
CERTIFICATION OF COMPLIANCE WITH FEDERAL, STATE AND LOCAL REGULATIONS
IN ACCORDANCE WITH FEDERAL, STATE AND LOCAL LAWS RELATED TO STORM WATER MANAGEMENT AND
EROSION AND TURBIDITY CONTROLS.
IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO PROVIDE ANY AND ALL PERMITS REQUIRED FOR EROSION
CONTROL.
CONTRACTOR'S REQUIREMENTS
GENERAL
THE CONTRACTOR SHALL AT A MINIMUM IMPLEMENT THE CONTRACTOR'S REQUIREMENTS OUTLINED BELOW AND THOSE MEASURES SHOWN ON THE EROSION AND TURBIDITY CONTROL PLAN. IN ADDITION THE CONTRACTOR SHALL UNDERTAKE ADDITIONAL MEASURES REQUIRED TO BE IN COMPLIANCE WITH APPLICABLE PERMIT CONDITIONS AND STATE WATER QUALITY STANDARDS.
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .