11.05.2025 RFI Responses Solicitation 36C26125R0092.pdf

PDF 135 KB Posted

Attached to
Demolish Building 100 Jones Hall Mountain View CA
Solicitation number
36C26125R0092
Issued by

About this file

This document is a Request for Information (RFI) for Solicitation 36C26125R0092 for demolishing Building One-hundred Jones Hall at a VA facility. The RFI contains seven technical and procedural questions from a potential contractor, with detailed responses from the VA. Key details include confirmation of weed control fabric requirements (8oz Non-Woven Polypropylene filter Fabric), clarification on irrigation controller specifications, and verification of hazardous materials abatement for the building. The VA confirms the presence of asbestos and references specific specification sections for abatement. Additional responses address utility shutoff access, work hour and noise restrictions related to nearby medical operations, and a firm stance against alternative site visit dates for subcontractors.

View the file

Other files

Show all 17

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

36C26125R0092 Demolish Building One-hundred Jones Hall RFIs and Reponses

1. Section 32 90 00 / 3.07 / A indicates that mulch shall be placed on all weed control fabric. Please confirm whether weed control fabric is required under both the rock mulch and the recycled wood mulch shown on sheet L1.0. Additionally, please provide the specified material for the weed control fabric.

The weed control fabric shall only be placed under the rock mulch areas shown on the drawings. The weed barrier shall be 8oz Non-Woven Polypropylene filter Fabric; contractor shall submit a sample for approval.

2. Per the legend on sheet L2.0, the controller is identified as ICA6-HU6-12, while detail 8/L2.1 shows HCC_800-SS. Please confirm which controller shall be used for this project.

The irrigation controller shown in Detail 8/L2.1 HCC-800-SS is the correct controller.

3. Please provide the geotechnical (soil) report.

A record geotechnical report has been provided by the VA. See attached.

4. Are hazardous materials (e.g., asbestos) present in Building 100? If so, is abatement included in scope?

Yes. See abatement drawings in construction drawings. Also, see specification section 02 82 13.41 and 02 83 33.13.

5. Will the VA provide access to utility shutoff points prior to demolition.

Yes. See specification section 01 00 00 part 1.18. Temporary connections must be separate from building being demolished.

6. Are there restrictions on work hours or noise due to nearby medical operations?

See the Statement of Work section 6.7 and 6.8. Also, for noise requirements, see specification section 01 57 19 part 1.5,E.

7. Our subcontractor is unavailable on the scheduled site visit date (October 23, 2025). Would the government consider allowing an alternate walkthrough date for subcontractor access?

The VA will not be able to have an alternate walkthrough date for subcontractor access.