About this file
The document is a Florida Department of Transportation (FDOT) bid schedule for the Mack Bayou Road Multi-Use Trail Phase 1 project in Walton County, Florida. The project involves constructing a multi-use path approximately 10,845 linear feet long, spanning from Monarch Drive to Harborview Road in Santa Rosa Beach. The contract duration is 180 days for substantial completion with an additional 30 days for punch list items. The bid schedule details comprehensive infrastructure improvements including clearing and grubbing, excavation, embankment, road stabilization, asphalt work, concrete installations, sidewalks, pedestrian/bicycle railings, crosswalk enhancements, signage, pavement markings, and landscaping.
The bid schedule includes detailed line items with specific quantities and unit prices across multiple project categories such as multi-use path, roadway, and miscellaneous infrastructure elements. Key quantitative highlights include 1,555 square yards of base stabilization, 657 tons of asphalt friction course, 1,979 square yards of 4-inch concrete sidewalks, 633 linear feet of pedestrian/bicycle aluminum railing, and 4 solar-powered rectangular rapid flashing beacons for crosswalk safety. The estimated construction cost is not explicitly totaled in the provided document, but the comprehensive bid schedule suggests a significant infrastructure investment aimed at improving pedestrian and transportation infrastructure in the Santa Rosa Beach area.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Mack_Bayou_Road_Pedestrian_Improvements_Phase_I_(Addendum_#7_Revision).pdf | ||
| UPDATED_Revised_Plans-Addendum.pdf | ||
| Contract_No._25-04.pdf | ||
| UNAUTHORIZED_ALIENS.pdf | ||
| TRENCH_SAFETY_COMPLIANCE.docx | DOCX document | |
| PUBLIC_ENTITY_CRIMES.pdf | ||
| BID_FORM.docx | DOCX document | |
| FDOT_Grant_No._G2R99.pdf | ||
| Public_Construction_Bond.doc | DOC document | |
| TE_No_.1.pdf | ||
| 01_Final_Permit_453753-001-002-EE.pdf | ||
| Mack_Bayou_Phase_1_Plans.pdf |
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
OPC (FDOT)
| BID SCHEDULE |
| WALTON COUNTY |
| MACK BAYOU ROAD MULTI-USE TRAIL PHASE 1 |
| PAY ITEM NO. | PAY ITEM DESCRIPTION | QUANTITY | UNIT | UNIT | |
| PRICE | PAY ITEM |
AMOUNT
MACK BAYOU ROAD
| 0101 | 1 | MOBILIZATION (10%) | 1 | LS | |
| 0102 | 1 | MAINTENANCE OF TRAFFIC (ESTIMATED FOR 90 DAYS) | 1 | LS | |
| Subtotal | |||||
| MULTI-USE PATH | |||||
| 0110 | 1 | 1 | CLEARING & GRUBBING | 1.40 | AC |
| 0104 | 11 | SEDIMENT BARRIER | 10617.00 | LF | |
| 0120 | 1 | REGULAR EXCAVATION | 184.0 | CY | |
| 0120 | 6 | EMBANKMENT | 1224 | CY | |
| 0160 | 4 | TYPE B STABILIZATION | 1555 | SY | |
| 0285 | 7 | 04 | OPTIONAL BASE, BASE GROUP 04 | 1555 | SY |
| 0327 | 70 | 1 | MILLING EXIST ASPHALT PAVT, 1" AVG DEPTH | 6476 | SY |
| 0337 | 7 | 81 | ASPHALT CONCRETE FRICTION COURSE,TRAFFIC B, FC-12.5, PG 76-22 (1.5") | 657 | TN |
| 0339 | 1 | MISCELLANEOUS ASPHALT PAVEMENT | 35.0 | TN | |
| 0286 | 2 | TURNOUT CONSTRUCITON-ASPHALT / DRIVEWAY BASE - ASPHALT MATERIAL | 5.0 | TN | |
| 0520 | 2 | 4 | CONCRETE CURB, TYPE D | 1412 | LF |
| 0522 | 1 | CONCRETE SIDEWALK AND DRIVEWAYS, 4" THICK | 1979 | SY | |
| 0522 | 2 | CONCRETE SIDEWALK AND DRIVEWAYS, 6" THICK | 75 | SY | |
| 0400 | 0 | 11 | CONCRETE CLASS NS, GRAVITY WALL INDEX 400-01 1 | 129 | CY |
| HEADWALL EXTENSION | 1 | LS | |||
| 0515 | 23 | 11 | PEDESTRIAN / BYCICLE RAILING, ALUMINUM ONLY, 42" TYPE 1 | 633 | LF |
| 0515 | 1 | 42 | PIPE HANDRAIL - GUIDERAIL, RELOCATE, ALUMINUM | 45 | LF |
| 0425 | 6 | VALVE BOXES, ADJUST | 57 | EA | |
| 0110 | 7 | 1 | MAILBOX, F&I SINGLE | 7 | EA |
| 0570 | 1 | 2 | PERFORMANCE TURF, SOD | 1506 | SY |
| 0654 | 2 | 21 | MIDBLOCK CROSSWALK: RECTANGULAR RAPID FLASHING BEACON, FURNISH & INSTALLED - SOLAR, COMPLETE SIGN ASSY - SINGLE DIRECTION | 4 | AS |
| 0700 | 1 | 111 | SINGLE COLUMN GROUND SIGN ASSEMBLY, F&I GROUND MOUNT, LESS THAN 12 SF | 31 | AS |
| 0700 | 1 | 500 | SINGLE POST SIGN, RELOCATE | 5 | AS |
| 0705 | 11 | 2 | DELINEATOR, NON-FLEXIBLE (ZICLA ZEBRA 9) | 428 | EA |
| 0710 90 |
PAINTED PAVEMENT MARKINGS, FINAL SURFACE
| PAINTED PAVEMENT MARKINGS, STANDARD, WHITE, SOLID, 6" | 1 | LS | ||||
| PAINTED PAVEMENT MARKINGS, STANDARD, WHITE, SOLID FOR CROSSWALK AND ROUNDABOUT, 12" | ||||||
| PAINTED PAVEMENT MARKINGS, STANDARD, WHITE, SOLID FOR STOP LINE OR CROSSWALK, 24" | ||||||
| PAINTED PAVEMENT MARKINGS, STANDARD, WHITE, 2-4 DOTTED GUIDELINE/ 6-10 DOTTED EXTENSION, 6" | ||||||
| 0711 | 11 | 123 | THERMOPLASTIC, STANDARD, WHITE, SOLID, 12" FOR CROSSWALK AND ROUNDABOUT | 57 | LF | |
| 0711 | 11 | 125 | THERMOPLASTIC, STANDARD, WHITE, SOLID, 24" FOR STOP LINE AND CROSSWALK | 1116 | LF | |
| 0711 | 11 | 141 | THERMOPLASTIC, STANDARD, WHITE, 2-4 DOTTED GUIDELINE/ 6-10 GAP EXTENSION, 6" | 0.030 | GM | |
| 0711 | 16 | 101 | THERMOPLASTIC, STANDARD-OTHER SURFACES, WHITE, SOLID, 6" | 1.260 | GM | |
| 0527 | 2 | DETECTABLE WARNINGS | 605 | SF | ||
| Subtotal | ||||||
| ROADWAY | ||||||
| 0327 | 70 | 1 | MILLING EXIST ASPHALT PAVT, 1" AVG DEPTH | 27627 | SY | |
| 0337 | 7 | 81 | ASPHALT CONCRETE FRICTION COURSE,TRAFFIC B, FC-12.5, PG 76-22 (1.5") | 2284 | TN | |
| 0286 | 2 | TURNOUT CONSTRUCITON-ASPHALT / DRIVEWAY BASE - ASPHALT MATERIAL | 43.0 | TN | ||
| 0710 90 |
PAINTED PAVEMENT MARKINGS, FINAL SURFACE
| PAINTED PAVEMENT MARKINGS, STANDARD, WHITE, SOLID, 6" | 1 | LS | ||||
| PAINTED PAVEMENT MARKINGS, STANDARD, WHITE, 2-4 DOTTED GUIDELINE/ 6-10 DOTTED EXTENSION, 6" | ||||||
| PAINTED PAVEMENT MARKINGS, STANDARD, YELLOW, SOLID, 6" | ||||||
| PAINTED PAVEMENT MARKINGS, STANDARD, YELLOW, SKIP, 6" | ||||||
| 546 | 71 | 1 | RAISED RUMBLE STRIP SET-PERMANENT | 8 | EA | |
| 0706 | 1 | 3 | RAISED PAVEMENT MARKER, TYPE B | 487 | EA | |
| 0711 | 11 | 141 | THERMOPLASTIC, STANDARD, WHITE, 2-4 DOTTED GUIDELINE/ 6-10 GAP EXTENSION, 6" | 0.318 | GM | |
| 0711 | 16 | 101 | THERMOPLASTIC, STANDARD-OTHER SURFACES, WHITE, SOLID, 6" | 3.524 | GM | |
| 0711 | 16 | 201 | THERMOPLASTIC, STANDARD-OTHER SURFACES, YELLOW, SOLID, 6" | 3.763 | GM | |
| Subtotal |
Estimated Construction Cost Mack Bayou Phase 1 - Total