The document is a Florida Department of Environmental Protection (FDEP) permit verification letter for Walton County Public Works, specifically addressing the Mack Bayou Road Pedestrian Improvements Phase 1 project. The permit (File Nos. 0453753-001-EE/66 and 0453753-002-EE/66) verifies exemption for milling and resurfacing Mack Bayou Road from Ascension Sacred Heart Hospital to East Harborview Road, including roadway widening and construction of an 8-foot multi-use trail. The project spans approximately 2 miles along Mack Bayou Road in Santa Rosa Beach, with the trail running adjacent to the highway for part of the route. The permit was issued on November 14, 2024, and includes exemptions from regulatory permitting under specific Florida Administrative Code provisions.
The project is exempt from state water quality certification and does not require federal review. The permit outlines specific conditions, including requirements for erosion control, protection of aquatic species, and maintenance of water quality standards. The contractor must implement best management practices for sediment and erosion control, including temporary seeding, inlet protection, and silt fence installation. The project has a contract duration of 180 days for substantial completion, with an additional 30 days for punch list items. The total project length is approximately 10,845 linear feet, starting near Monarch Drive and ending at Harborview Road, and involves milling, resurfacing, and constructing a multi-use pedestrian path.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Mack_Bayou_Road_Pedestrian_Improvements_Phase_I_(Addendum_#7_Revision).pdf | ||
| Copy_of_MACK_BAYOU_ROAD_MULTI-USE_TRAIL_PHASE_1__Bid_Schedule_updated_.xlsx | XLSX spreadsheet | |
| UPDATED_Revised_Plans-Addendum.pdf | ||
| Contract_No._25-04.pdf | ||
| UNAUTHORIZED_ALIENS.pdf | ||
| TRENCH_SAFETY_COMPLIANCE.docx | DOCX document | |
| PUBLIC_ENTITY_CRIMES.pdf | ||
| BID_FORM.docx | DOCX document | |
| FDOT_Grant_No._G2R99.pdf | ||
| Public_Construction_Bond.doc | DOC document | |
| TE_No_.1.pdf | ||
| Mack_Bayou_Phase_1_Plans.pdf |
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FLORIDA DEPARTMENT OF
Environmental Protection
Northwest District
160 W. Government Street, Suite 308 Pensacola, Florida 32502-5794
Ron DeSantis Governor
Jeanette Nuñez
Lt. Governor
Shawn Hamilton Secretary
November 14, 2024
Walton County Public Works c/o Anna Hudson 117 Montgomery Circle DeFuniak Springs, FL 32435 hudanna@co.walton.fl.us
File No.: 0453753-001-EE/66, 0453753-002-EE/66 Walton County
Dear Ms. Hudson:
On October 2, 2024, we received your request for verification of exemption to perform the following activities:
To perform the milling and resurfacing of Mack Bayou Road from Ascension Sacred Heart Hospital to East Harborview Road, including the widening of the west side of the roadway by 2-ft and the modification of existing headwall extensions (Permit No. 0453753-001-EE/66). The roadway widening will incorporate the construction of an 8-ft wide multi-use trail for the first half of the project, the remaining length of the multi-use concrete path will run adjacent to the highway (Permit No. 453753-002-EE/66). The project is located within FDOT maintained rights-of-way along Driftwood Point Rd, W & E Shipwreck Rd, W & E Harborview Rd, and Mack Bayou Road in Mack Bayou, Class II Florida Waters, Mack Bayou Road/US Highway 98 W, Santa Rosa Beach, Section 24, Township 2 South, Range 21, Walton County.
Your request has been reviewed to determine whether it qualifies for (1) regulatory exemption,
(2) proprietary authorization (related to state-owned submerged lands), and (3) federal approval that may be necessary for work in wetlands or waters of the United States.
Your project did not qualify for the federal review of this verification request. Additional authorization may be required prior to commencement of the proposed activity. This letter does not relieve you from the responsibility of obtaining other federal, state, or local authorizations that may be required for the activity. Please refer to the specific section(s) dealing with that portion of the review below for advice on how to proceed.
State water quality certification is waived for activities that are exempt under rule 62-330.051, F.A.C.
mailto:hudanna@co.walton.fl.us
File Name: Mack Bayou Phase 1 FDEP File No.: 453753-001-002-EE/66
If you change the project from what you submitted, the authorization(s) granted may no longer be valid at the time of commencement of the project. Please contact us prior to beginning your project if you wish to make any changes.
If you have any questions regarding this matter, please contact Chris Bickham at the letterhead address or at 850-595-0607 and Chris.Bickham@FloridaDEP.gov.
1. Regulatory Review –Verified Based on the information submitted, the Department has verified that the activities as proposed are exempt, under Chapter 62-330.051(4)(c-d), Florida Administrative Code and Chapter 62- 330.051(10)(a-e), Florida Administrative Code from the need to obtain a regulatory permit under Part IV of Chapter 373 of the Florida Statutes.
This exemption verification is based on the information you provided the Department and the statutes and rules in effect when the information was submitted. This verification may not be valid if site conditions materially change, the project design is modified, or the statutes or rules governing the exempt activity are amended. In the event you need to re-verify the exempt status for the activity, a new request and verification fee will be required. Any substantial modifications to the project design should be submitted to the Department for review, as changes may result in a permit being required.
General Conditions for Exemptions
1. Activities shall not exceed a permitting threshold in section 1.2 of the applicable Volume II;
2. Construction, alteration, and operation shall not:
a. Adversely impound or obstruct existing water flow, cause adverse impacts to existing surface water storage and conveyance capabilities, or otherwise cause adverse water quantity or flooding impacts to receiving water and adjacent lands;
b. Cause an adverse impact to the minimum flows and levels established pursuant to Section 373.042, F.S.
c. Cause adverse impacts to a Work of the District established pursuant to Section 373.086, F.S.;
d. Adversely impede navigation or create a navigational hazard;
e. Cause or contribute to a violation of state water quality standards. Turbidity, sedimentation, and erosion shall be controlled during and after construction to prevent violations of state water quality standards, including any antidegradation provisions of paragraphs 62-4.242(1)(a) and (b), subsections 62-4.242(2) and (3) and Rule 62-302.300, F.A.C., and any special standards for Outstanding Florida Waters and Outstanding National Resource Waters due to construction-related activities. Erosion and sediment control best management practices shall be installed and maintained in accordance with the guidelines and specifications described in the State of Florida Erosion and Sediment Control Designer and Reviewer Manual (Florida Department of Environmental Protection and Florida Department of Transportation, June 2007), incorporated by reference herein (https://www.flrules.org/Gateway/reference.asp?No=Ref-02530), and the Florida Stormwater Erosion and Sedimentation Control Inspector’s Manual (Florida mailto:Chris.Bickham@FloridaDEP.gov https://www.flrules.org/Gateway/reference.asp?No=Ref-02530
Department of Environmental Protection, Nonpoint Source Management Section, Tallahassee, Florida, July 2008), incorporated by reference herein (https://www.flrules.org/Gateway/reference.asp?No=Ref-02531).
f. Allow excavated or dredged material to be placed in a location other than a self-contained upland disposal site, except as expressly allowed in an exemption in rule 62-330.051, F.A.C.
3. When performed in waters accessible to federally- or state-listed aquatic species, such as manatees, marine turtles, smalltooth sawfish, and Gulf sturgeon, all in-water work shall comply with the following.
a. All vessels associated with the project shall operate at “Idle Speed/No Wake” at all times while in the work area and where the draft of the vessels provides less than a four-foot clearance from the bottom. All vessels will follow routes of deep water whenever possible.
b. All deployed siltation or turbidity barriers shall be properly secured, monitored, and maintained to prevent entanglement or entrapment of listed species.
c. All in-water activities, including vessel operation, must be shut down if a listed species comes within 50 feet of the work area. Activities shall not resume until the animal(s) has moved beyond a 50-foot radius of the in-water work, or until 30 minutes elapses since the last sighting within 50 feet. Animals must not be herded away or harassed into leaving.
All on-site project personnel are responsible for observing water-related activities for the presence of listed species.
d. Any listed species that is killed or injured by work associated with activities performed shall be reported immediately to the Florida Fish and Wildlife Conservation Commission (FWC) Hotline at 1(888)404-3922 and ImperiledSpecies@myFWC.com. Copies of incorporated materials identified above may be obtained from the Agency, as described in subsection 62-330.010(5), F.A.C.
2. Proprietary Review- Granted The activity does not appear to be located on sovereign submerged lands, and does not require further authorization under chapter 253 of the Florida Statutes, or chapters 18-20 or 18-21 of the Florida Administrative Code.
3. Federal Review - Not Included Your proposed activity as outlined in your application and attached drawings does not qualify for Federal authorization pursuant to the State Programmatic General Permit VI-R1.
SEPARATE permit(s) or authorization may be required from the U.S. Army Corps of Engineers and/or Florida Department of Environmental Protection.
Authority for review - an agreement with the USACOE entitled “Coordination Agreement Between the U. S. Army Corps of Engineers (Jacksonville District) and the Florida Department of Environmental Protection (or Duly Authorized Designee), State Programmatic General Permit”, Section 10 of the Rivers and Harbor Act of 1899, and Section 404 of the Clean Water Act.
https://www.flrules.org/Gateway/reference.asp?No=Ref-02531 mailto:ImperiledSpecies@myFWC.com
3.2. Coastal Zone Management Presumed
The U.S. Army Corps of Engineers (Corps) or any designated federal, state or local agency administering general permits on behalf of the Corps under 33 C.F.R. Section 325.2(b)(2) may presume the verified exempt activities are consistent with the permitting Agency’s authorities within the FCMP, provided the activity receives any applicable authorization to use and occupy state-owned submerged lands under Chapter 253, F.S., and, as applicable, Chapter 258, F.S.
3.3. Water Quality Certification Waived
This permit also constitutes an express waiver of water quality certification under Section 401 of the Clean Water Act, 33 U.S.C. Section 1341. Pursuant to Rule 62-330.062, F.A.C. State Water Quality Certification is waived for activities that are exempt under rule 62-330.051 or 62- 330.0511, F.A.C.
Additional Information Please retain this letter. The activities may be inspected by authorized state personnel in the future to ensure compliance with appropriate statutes and administrative codes. If the activities are not in compliance, you may be subject to penalties under Chapter 373, F.S., and Chapter 18- 14, F.A.C.
NOTICE OF RIGHTS
This action is final and effective on the date filed with the Clerk of the Department unless a petition for an administrative hearing is timely filed under Sections 120.569 and 120.57, F.S., before the deadline for filing a petition. On the filing of a timely and sufficient petition, this action will not be final and effective until further order of the Department. Because the administrative hearing process is designed to formulate final agency action, the hearing process may result in a modification of the agency action or even denial of the application.
Petition for Administrative Hearing A person whose substantial interests are affected by the Department’s action may petition for an administrative proceeding (hearing) under Sections 120.569 and 120.57, F.S. Pursuant to Rules 28-106.201 and 28-106.301, F.A.C., a petition for an administrative hearing must contain the following information:
(a) The name and address of each agency affected and each agency’s file or identification number, if known;
(b) The name, address, any e-mail address, any facsimile number, and telephone number of the petitioner, if the petitioner is not represented by an attorney or a qualified representative; the name, address, and telephone number of the petitioner’s representative, if any, which shall be the address for service purposes during the course of the proceeding; and an explanation of how the petitioner’s substantial interests will be affected by the agency determination;
(c) A statement of when and how the petitioner received notice of the agency decision;
(d) A statement of all disputed issues of material fact. If there are none, the petition must so indicate;
(e) A concise statement of the ultimate facts alleged, including the specific facts that the petitioner contends warrant reversal or modification of the agency’s proposed action;
(f) A statement of the specific rules or statutes that the petitioner contends require reversal or modification of the agency’s proposed action, including an explanation of how the alleged facts relate to the specific rules or statutes; and
(g) A statement of the relief sought by the petitioner, stating precisely the action that the petitioner wishes the agency to take with respect to the agency’s proposed action.
The petition must be filed (received by the Clerk) in the Office of General Counsel of the Department at 3900 Commonwealth Boulevard, Mail Station 35, Tallahassee, Florida 32399- 3000, or via electronic correspondence at Agency_Clerk@dep.state.fl.us. Also, a copy of the petition shall be mailed to the applicant at the address indicated above at the time of filing.
Time Period for Filing a Petition In accordance with Rule 62-110.106(3), F.A.C., petitions for an administrative hearing by the applicant and persons entitled to written notice under Section 120.60(3), F.S., must be filed within 21 days of receipt of this written notice. Petitions filed by any persons other than the applicant, and other than those entitled to written notice under Section 120.60(3), F.S., must be filed within 21 days of publication of the notice or within 21 days of receipt of the written notice, whichever occurs first. You cannot justifiably rely on the finality of this decision unless notice of this decision and the right of substantially affected persons to challenge this decision has been duly published or otherwise provided to all persons substantially affected by the decision. While you are not required to publish notice of this action, you may elect to do so pursuant Rule 62- 110.106(10)(a).
The failure to file a petition within the appropriate time period shall constitute a waiver of that person's right to request an administrative determination (hearing) under Sections 120.569 and 120.57, F.S., or to intervene in this proceeding and participate as a party to it. Any subsequent intervention (in a proceeding initiated by another party) will be only at the discretion of the presiding officer upon the filing of a motion in compliance with Rule 28-106.205, F.A.C. If you do not publish notice of this action, this waiver will not apply to persons who have not received written notice of this action.
Extension of Time Under Rule 62-110.106(4), F.A.C., a person whose substantial interests are affected by the Department’s action may also request an extension of time to file a petition for an administrative hearing. The Department may, for good cause shown, grant the request for an extension of time.
Requests for extension of time must be filed with the Office of General Counsel of the Department at 3900 Commonwealth Boulevard, Mail Station 35, Tallahassee, Florida 32399- 3000, or via electronic correspondence at Agency_Clerk@dep.state.fl.us, before the deadline for filing a petition for an administrative hearing. A timely request for extension of time shall toll the running of the time period for filing a petition until the request is acted upon.
Mediation Mediation is not available in this proceeding.
mailto:Agency_Clerk@dep.state.fl.us
FLAWAC Review The applicant, or any party within the meaning of Section 373.114(1)(a) or 373.4275, F.S., may also seek appellate review of this order before the Land and Water Adjudicatory Commission under Section 373.114(1) or 373.4275, F.S. Requests for review before the Land and Water Adjudicatory Commission must be filed with the Secretary of the Commission and served on the Department within 20 days from the date when this order is filed with the Clerk of the Department.
Judicial Review Once this decision becomes final, any party to this action has the right to seek judicial review pursuant to Section 120.68, F.S., by filing a Notice of Appeal pursuant to Florida Rules of Appellate Procedure 9.110 and 9.190 with the Clerk of the Department in the Office of General Counsel (Station #35, 3900 Commonwealth Boulevard, Tallahassee, Florida 32399-3000) and by filing a copy of the Notice of Appeal accompanied by the applicable filing fees with the appropriate district court of appeal. The notice must be filed within 30 days from the date this action is filed with the Clerk of the Department.
EXECUTION AND CLERKING
Executed in Pensacola, Florida.
STATE OF FLORIDA DEPARTMENT OF ENVIRONMENTAL PROTECTION
Russell Sullivan Environmental Manager
Enclosures:
1. Rule 62-330.051(4)(c-d), F.A.C., Rule 62-330.051(10)(a-e), F.A.C.
2. Project drawings
CERTIFICATE OF SERVICE
The undersigned duly designated deputy clerk hereby certifies that this document and all attachments were sent on the filing date below to the following listed persons:
Russell Sullivan, DEP, Russell.Sullivan@FloridaDEP.gov Blake Chapman, DEP, Blake.A.Chapman@FloridaDEP.gov Chris Bickham. DEP, Chris.Bickham@floridadep.gov Anna Hudson, Applicant, hudanna@co.walton.fl.us Charles Cotton, Co-Applicant, cotcharles@co.walton.fl.us Aaron Harrison, Agent, aaron.harrison@halff.com Bay County, mark.shaeffer@pcbfl.gov, leah.bailey@pcbfl.gov, vicki.mudd@pcbfl.gov, nikki.richardson@pcbfl.gov USACE, Terry.S.Hayes@usace.army.mil
FILING AND ACKNOWLEDGMENT
FILED, on this date, pursuant to Section 120.52, F. S., with the designated Department Clerk, receipt of which is hereby acknowledged.
November 14, 2024 Clerk Date mailto:Russell.Sullivan@FloridaDEP.gov mailto:Blake.A.Chapman@FloridaDEP.gov mailto:chris.bickham@floridadep.gov mailto:hudanna@co.walton.fl.us mailto:cotcharles@co.walton.fl.us mailto:aaron.harrison@halff.com mailto:mark.shaeffer@pcbfl.gov mailto:leah.bailey@pcbfl.gov mailto:vicki.mudd@pcbfl.gov mailto:nikki.richardson@pcbfl.gov mailto:Terry.S.Hayes@usace.army.mil
62-330.051 Exempt Activities.
The activities meeting the limitations and restrictions below are exempt from permitting.
However, if located in, on, or over state-owned submerged lands, they are subject to a separate authorization under chapters 253 and 258, F.S., as applicable.
(4) Bridges, Driveways, and Roadways –
(a) The replacement and repair of existing open-trestle foot bridges and vehicular bridges in accordance with Section 403.813(1)(l), F.S.
(b) Construction, alteration, or maintenance, and operation, of culverted driveway or roadway crossings and bridges of wholly artificial, non-navigable drainage conveyances, provided:
1. The construction project area does not exceed one acre and is for a discrete project that is not part of a larger plan of development that requires permitting under this chapter. However, these limitations shall not preclude use of this exemption to provide access to activities that qualify for the general permit in section 403.814(12), F.S.;
2. The culvert or bridge shall be sized and installed to pass normal high water stages without causing adverse impacts to upstream or downstream property;
3. Culverts shall not be larger than one, 24-inch diameter pipe, or its hydraulic equivalent, and must not reduce the upstream hydraulic discharge capacity;
4. The crossing shall not:
a. Be longer than 30 feet from top-of-bank to top-of-bank;
b. Have a top width of more than 20 feet or a toe-to-toe width of more than 40 feet; and,
c. Have side slopes steeper than three feet horizontal to one foot vertical;
5. There are no more than two crossings on any total land area, with a minimum distance of 500 feet between crossings;
6. If dewatering is performed, all temporary work and discharges must not cause flooding or impoundment, downstream siltation, erosion, or turbid discharges that violate state water quality standards;
7. Any temporary work shall be completely removed and all upstream and downstream areas that were disturbed shall be restored to pre-work grades, elevations and conditions; and,
8. All work shall comply with subsection 62-330.050(9), F.A.C.
(c) Minor roadway safety construction, alteration, maintenance, and operation, provided:
1. There is no work in, on, or over wetlands other than those in drainage ditches constructed in uplands;
2. There is no reduction in the capacity of existing swales, ditches, or other systems legally in existence under chapter 403 or Part IV of chapter 373, F.S.;
3. All work is conducted in compliance with subsection 62-330.050(9), F.A.C.; and
4. The work is limited to:
a. Sidewalks having a width of six feet or less;
b. Turn lanes less than 0.25 mile in length, and other safety-related intersection improvements;
and
c. Road widening and shoulder paving that does not create additional traffic lanes and is necessary to meet current, generally accepted roadway design and safety standards.
(d) Resurfacing and repair of existing paved roads, and grading of existing unpaved roads, provided:
1. Travel lanes are not paved that are not already paved;
2. No substantive changes occur to existing road surface elevations, grades, or profiles; and
3. All work is conducted in compliance with subsection 62-330.050(9), F.A.C.
(e) Repair, stabilization, paving, or repaving of existing roads, and the repair or replacement of vehicular bridges that are part of the road, where:
1. They were in existence on or before January 1, 2002, and have:
a. Been publicly-used and under county or municipal ownership and maintenance thereafter, including when they have been presumed to be dedicated in accordance with section 95.361, F.S.;
b. Subsequently become county or municipally-owned and maintained; or
c. Subsequently become perpetually maintained by the county or municipality through such means as being accepted by the county or municipality as part of a Municipal Service Taxing Unit or Municipal Service Benefit Unit; and
2. The work does not realign the road or expand the number of traffic lanes of the existing road, but may include safety shoulders, clearing vegetation, and other work reasonably necessary to repair, stabilize, pave, or repave the road, provided that the work is constructed using generally accepted roadway design standards;
3. Existing bridges are not widened more than is reasonably necessary to properly connect the bridge with the road to match the width of the roadway travel lanes and safely accommodate the traffic expected;
4. No debris from the original bridge shall be allowed to remain in wetlands or other surface waters;
5. Roadside swales or other effective means of stormwater treatment are incorporated as part of the work;
6. No more dredging or filling of wetlands or water of the state is performed than is reasonably necessary to perform the work in accordance with generally accepted roadway design standards;
7. Notice of intent to use this exemption is provided to the Agency 30 days before performing any work; and
8. All work is conducted in compliance with subsection 62-330.050(9), F.A.C.
(f) The repair of existing concrete bridge pilings by the Florida Department of Transportation, counties, and municipalities, through the construction of pile jackets, provided the permanent outer form is composed of inert materials and the quantity of material shall not exceed 300 cubic yards of dredging or 300 cubic yards of filling per project. The following conditions shall also apply:
1. Although the bottom sediments within the forms may be removed by jetting or pumping, and may not be recoverable, erosion and sediment control best management practices, including turbidity curtains or similar devices, shall be used in accordance with the State of Florida Erosion and Sediment Control Designer and Reviewer Manual to prevent violations of state water quality standards.
2. Immediately following completion of any work that involves disturbance of the shoreline or banks of wetlands or other surface waters, the shoreline and banks shall be stabilized with native vegetation or riprap to prevent erosion; in areas where native wetland vegetation was disturbed, the stabilization shall consist of the same species planted in a manner to achieve stability and coverage of a similar wetland community as previously existed. Temporary erosion controls for all exposed soils within wetlands and other surface waters shall be completed within seven calendar days of the most recent construction activity. Prevention of erosion of exposed earth into wetlands and other surface waters is a construction priority and completed slopes shall not remain unstabilized while other construction continues.
3. Pilings shall not be installed or replaced to add additional traffic lanes.
4. All work is conducted in compliance with subsection 62-330.050(9), F.A.C.
Rulemaking Authority 373.026(7), 373.043, 373.4131, 373.4145, 403.805(1) FS. Law Implemented 373.406, 373.4131, 373.4145, 373.415, 403.813(1) FS. History–New 10-1-13, Amended 6-1-18.
62-330.051 Exempt Activities.
The activities meeting the limitations and restrictions below are exempt from permitting.
However, if located in, on, or over state-owned submerged lands, they are subject to a separate authorization under chapters 253 and 258, F.S., as applicable.
(10) The construction, alteration, maintenance, removal or abandonment of recreational paths for pedestrians, bicycles, and golf carts, provided:
(a) There is no work in, on, or over wetlands or other surface waters other than those in drainage ditches constructed in uplands;
(b) There is no reduction in the capacity of existing swales, ditches, or other stormwater management systems legally in existence under chapter 403 or part IV of chapter 373, F.S.;
(c) The paths have a width of eight feet or less for pedestrian paths, and 14 feet or less for multi-use recreational paths;
(d) The paths are not intended for use by motorized vehicles powered by internal combustion engines or electric-powered roadway vehicles, except when needed for maintenance or emergency purposes; and
(e) The paths comply with the limitations and restrictions in subsection 62-330.050(9), F.A.C.
Rulemaking Authority 373.026(7), 373.043, 373.4131, 373.4145, 403.805(1) FS. Law Implemented 373.406, 373.4131, 373.4145, 373.415, 403.813(1) FS. History–New 10-1-13, Amended 6-1-18.
General Conditions for All Projects:
1. The time limit for completing the work authorized ends on July 27, 2026.
2. You must maintain the activity authorized by this permit in good condition and in conformance with the terms and conditions of this permit. You are not relieved of this requirement if you abandon the permitted activity, although you may make a good faith transfer to a third party in compliance with General Condition 4 below. Should you wish to cease to maintain the authorized activity or should you desire to abandon it without a good faith transfer, you must obtain a modification of this permit from this office, which may require restoration of the area.
3. If you discover any previously unknown historic or archeological remains while accomplishing the activity authorized by this permit, you must immediately notify this office of what you have found. We will initiate the Federal and State coordination required to determine if the remains warrant a recovery effort or if the site is eligible for listing in the National Register of Historic Places.
4. If you sell the property associated with this permit, you must obtain the signature of the new owner on the enclosed form (Attachment 10) and forward a copy of the permit to this office to validate the transfer of this authorization.
5. If a conditioned water quality certification has been issued for your project, you must comply with the conditions specified in the certification as special conditions to this permit.
6. You must allow representatives from this office to inspect the authorized activity at any time deemed necessary to ensure that it is being or has been accomplished in accordance with the terms and conditions of your permit.
Further Information:
1. Limits of this authorization.
a. This permit does not obviate the need to obtain other Federal, State, or local authorizations required by law.
b. This permit does not grant any property rights or exclusive privileges.
c. This permit does not authorize any injury to the property or rights of others.
d. This permit does not authorize interference with any existing or proposed Federal projects.
2. Limits of Federal Liability. In issuing this permit, the Federal Government does not assume any liability for the following:
a. Damages to the permitted project or uses thereof as a result of other permitted or unpermitted activities or from natural causes.
b. Damages to the permitted project or uses thereof as a result of current or future activities undertaken by or on behalf of the United States in the public interest.
c. Damages to persons, property, or to other permitted or unpermitted activities or structures caused by the activity authorized by this permit.
d. Design or Construction deficiencies associated with the permitted work.
e. Damage claims associated with any future modification, suspension, or revocation of this permit.
3. Reliance on Applicant’s Data: The determination of this office that issuance of this permit is not contrary to the public interest was made in reliance on the information you provided.
4. Reevaluation of Permit Decision: This office may reevaluate its decision on this permit at any time the circumstances warrant. Circumstances that could require a reevaluation include, but are not limited to, the following:
a. You fail to comply with the terms and conditions of this permit.
b. The information provided by you in support of your permit application proves to have been false, incomplete, or inaccurate (see 3 above).
c. Significant new information surfaces which this office did not consider in reaching the original public interest decision.
5. Such a reevaluation may result in a determination that it is appropriate to use the suspension, modification, and revocation procedures contained in 33 CFR 325.7 or enforcement procedures such as those contained in 33 CFR 326.4 and 326.5. The referenced enforcement procedures provide for the issuance of an administrative order requiring you comply with the terms and conditions of your permit and for the initiation of legal action where appropriate. You will be required to pay for any corrective measures ordered by this office, and if you fail to comply with such directive, this office may in certain situations (such as those specified in 33 CER 209.170) accomplish the corrective measures by contract or otherwise and bill you for the cost.
6. When the structures or work authorized by this permit are still in existence at the time the property is transferred, the terms and conditions of this permit will continue to be binding on the new owner(s) of the property. To validate the transfer of this permit and the associated liabilities associated with compliance with its terms and conditions, have the transferee sign and date the enclosed form.
7. The Permittee understands and agrees that, if future operations by the United States require the removal, relocation, or other alteration, of the structures or work herein authorized, or if, in the opinion of the Secretary of the Army or his authorized representative, said structure or work shall cause unreasonable obstruction to the free navigation of the navigable waters, the Permittee will be required, upon due notice from the U.S. Army Corps of Engineers, to remove, relocate, or alter the structural work or obstructions caused thereby, without expense to the United States. No claim shall be made against the United States on account of any such removal, relocation or alteration.
FI
LE
N
AM
E:
A
:\4 s\
5\
4\
PW
\C
AD
D \S he et s\ Ph as e
1\ C ov er
-P ha se
.d w g D
AT
E:
O ct ob er
, 2
4, T
IM
E:
:1
AM
, U
SE
R
: a h5
INDEX OF SHEETS
SHEET No. SHEET DESCRIPTION
1 COVER SHEET
2 GENERAL NOTES
3 TYPICAL SECTIONS
4-27 PLAN & CROSS SECTIONS
28 GRAVITY WALL PLAN AND PROFILE
29-40 SIGNING AND PAVEMENT MARKING
41-52 SEDIMENT AND EROSION CONTROL PLAN
53 SWPPP
54 SWPPP DETAILS
55-56 CONSTRUCTION DETAILS
NOT TO SCALE
LOCATION MAP
OWNER/CLIENT: PREPARED BY:
PROJECT SITE
SURVEYED DATE:
12/2023
AVO: 47155.004 DATE: 10/2024
RYAN TRUBIA, E.I.
NORTH RICHARD JACKSON BLVD., SUITE 103
PANAMA CITY BEACH FLORIDA 32307
EMAIL: RTRUBIA@HALFF.COM
TEL: (850) 848-9420
S. STINSON & ASSOCIATES, INC.
147 JOHNNY RD.
LAMONT, FLORIDA 32336
TEL: (850) 509-3116
ENGINEER DESIGNER
SURVEYOR
Know what'sbelow.
before you dig.Call
R
THE INFORMATION SHOWN ON THESE DRAWINGS INDICATING SIZE, TYPE AND
LOCATION OF UNDERGROUND, SURFACE, AND AERIAL UTILITIES IS NOT GUARANTEED
TO BE EXACT OR COMPLETE. THE CONTRACTOR SHALL CONTACT THE "SUNSHINE
811" SYSTEM AT 1-800-432-4770 48 HOURS PRIOR TO BEGINNING ANY EXCAVATION
FOR EXISTING UTILITY LOCATIONS. THE CONTRACTOR SHALL ALSO BE FULLY
RESPONSIBLE FOR FIELD VERIFYING LOCATIONS AND ELEVATIONS OF ALL EXISTING
UTILITIES AFFECTED BY CONSTRUCTION FOR THIS PROJECT IN ORDER TO AVOID
DAMAGING THOSE UTILITIES, AND SHALL IMMEDIATELY ARRANGE FOR REPAIR AND
RESTORATION OF CONTRACTOR-DAMAGED UTILITIES TO THE UTILITY COMPANY'S
APPROVAL AT THE EXPENSE OF THE CONTRACTOR.
HALFF
CONTACT: DAVID W. HUTCHESON, P.E.
EMAIL: DHUTCHESON@HALFF.COM
TEL: (850) 848-9414
FIRM/ BUSINESS NO.: CA33380 STATE: FLORIDA
WALTON COUNTY
79 N 6TH STREET,
DEFUNIAK SPRINGS FLORIDA 32433
www.co.walton.fl.us
HALFF ASSOCIATES, INC.
2255 KILLEARN CENTER BLVD., SUITE 200
TALLAHASSEE FLORIDA 32309
TEL. (850) 224-4400
www.halff.com
PEDESTRIAN IMPROVEMENTS PHASE 1
FPID PROJECT NUMBER: 453227-1-54-01
100% PLANS
MACK BAYOU ROAD
MACK BAYOU ROAD / US HIGHWAY 98 W
10/2024
FLORIDA DEPARTMENT OF TRANSPORTATION FY 2024-25 STANDARD
PLANS AND APPLICABLE DESIGN STANDARDS REVISIONS (DSRs) AT
THE FOLLOWING WEBSITE:
https://www.fdot.gov/design/standardplans/current/default.shtm
FLORIDA DEPARTMENT OF TRANSPORTATION JANUARY 2023
STANDARD SPECIFICATIONS FOR ROAD AND BRIDGE CONSTRUCTION
AT THE FOLLOWING WEBSITE:
https://www.fdot.gov/programmanagement/implemented/specbooks/default.shtm
STATE OF FLORIDA EROSION AND SEDIMENT CONTROL
DESIGNER AND REVIEWER MANUAL, LATEST EDITION: JULY 2013
https://www.flrules.org/Gateway/reference.asp?No=Ref-04227
CERTIFICATE OF AUTHORIZATION 33380
HALFF ASSOCIATES, INC.
130 N. RICHARD JACKSON BLVD., SUITE 103
PANAMA CITY BEACH, FL 32407
AARON HARRISON, P.E. NO. 87629
THE ABOVE NAMED PROFESSIONAL ENGINEER SHALL
BE RESPONSIBLE FOR THIS REPORT IN ACCORDANCE
WITH RULE 61G15-23.004, F.A.C.
THIS ITEM HAS BEEN DIGITALLY
SIGNED AND SEALED BY
ON THE DATE ADJACENT TO THE SEAL
PRINTED COPIES OF THIS DOCUMENT ARE
NOT CONSIDERED SIGNED AND SEALED
AND THE SIGNATURE MUST BE VERIFIED
ON ANY ELECTRONIC COPIES.
STATE OF
No 87629
P R O
FESSIONAL ENGIN
EE
R
AARON M. HARRISON
F L O R I D A
L I C E N S E
PROJECT PLANS
SHEET NO SHEET DESCRIPTION
1 COVER SHEET
2 GENERAL NOTES
3 TYPICAL SECTIONS
4-27 PLAN & CROSS SECTIONS
28 GRAVITY WALL PLAN AND PROFILE
29-40 SIGNING AND PAVEMENT MARKING
41-52 SEDIMENT AND EROSION CONTROL PLAN
53 SWPPP
54 SWPPP DETAILS
55-56 CONSTRUCTION DETAILS
M
AC
K
BA
YO
U
R O
AD
P
ED
ES
TR
IA
N
IM
PR
O
VE
M
EN
TS
PH
AS
E
W
AL
TO
N
C O
U N
TY
, F
L.
FI
LE
N
AM
E:
A
:\4 s\
5\
4\
PW
\C
AD
D \S he et s\ Ph as e
1\ C ov er
-P ha se
.d w g D
AT
E:
O ct ob er
, 2
4, T
IM
E:
:1
AM
, U
SE
R
: a h5
HALFF ASSOCIATES, INC.
LICENSE NO.
10/2/2024
NAME
DATE
FIRM OR BUSINESS NO. STATE
THE RECORD COPY OF THIS DRAWING IS ON
FILE AT THE OFFICES OF:
THE SEAL ORIGINALLY APPEARING ON THIS
DOCUMENT WAS AUTHORIZED BY:
AARON HARRISON PE
87629
CA 33380 FL
SHEET TITLE:
CHECKED BY:
DRAWN BY:
PROJECT NO.:
ISSUED:
SCALE:
N O
D
AT
E
D
ES
C R
IP
TI
O N
R
EV
IS
IO
N
K
IL
LE
AR
N C
EN
TE
R B
LV
D
SU
IT
E
TA
LL
AH
AS
SE
E, F
LO
R
ID
A
TE
L.
(8
) 2
-4
GENERAL CONSTRUCTION NOTES:
1. ALL CONSTRUCTION AND MATERIALS SHALL BE IN ACCORDANCE WITH WALTON COUNTY AND
THE FLORIDA DEPARTMENT OF TRANSPORTATION STANDARD SPECIFICATIONS FOR ROAD AND
BRIDGE CONSTRUCTION, LATEST EDITION.
2. WHERE REFERENCED, FLORIDA DEPARTMENT OF TRANSPORTATION (FDOT) STANDARDS AND
SPECIFICATIONS, LATEST VERSION, SHALL BE THE IMPLEMENTED VERSIONS OF THESE
DOCUMENTS AS NOTED ON THE CONSTRUCTION PLAN COVER SHEET.
3. IT IS THE CONTRACTOR'S RESPONSIBILITY TO BECOME FAMILIAR WITH THE PERMIT AND
INSPECTION REQUIREMENTS SPECIFIED BY THE VARIOUS GOVERNMENTAL AGENCIES AND THE
OWNER OR OWNER'S DESIGNATED REPRESENTATIVE. CONTRACTOR SHALL OBTAIN ALL
NECESSARY PERMITS PRIOR TO CONSTRUCTION AND SCHEDULE INSPECTIONS ACCORDING
TO AGENCY INSTRUCTIONS.
4. IN ORDER TO LIMIT DISTURBANCE TO THE SURROUNDING NEIGHBORHOODS, CONTRACTOR
SHALL BE LIMITED TO CONSTRUCTION BETWEEN THE HOURS OF 7:00 A.M. TO 7:00 P.M. MONDAY
THROUGH FRIDAY AND FROM 9:00 A.M. TO 7:00 P.M. ON SATURDAY. CONSTRUCTION OUTSIDE
OF THESE HOURS MUST HAVE PRIOR WRITTEN CONSENT FROM THE OWNER OR OWNER'S
DESIGNATED REPRESENTATIVE.
5. CONTRACTOR SHALL CHECK PLANS FOR CONFLICTS AND DISCREPANCIES AND NOTIFY OWNER
OR OWNER'S DESIGNATED REPRESENTATIVE PRIOR TO CONSTRUCTION. CONTRACTOR SHALL
NOTIFY THE OWNER OR OWNER'S DESIGNATED REPRESENTATIVE OF ANY CONFLICTS BEFORE
PERFORMING WORK IN THE AFFECTED AREA.
6. CONTRACTOR IS RESPONSIBLE FOR REPAIRING ANY DAMAGE TO EXISTING FACILITIES, ABOVE
OR BELOW GROUND, WHICH MAY OCCUR AS A RESULT OF THE WORK PERFORMED BY THE
CONTRACTOR CALLED FOR IN THIS CONTRACT. SEE FDOT SPECIFICATION 455-1.1 FOR
ADDITIONAL INFORMATION REGARDING PROTECTION OF EXISTING STRUCTURES.
7. ALL SUBSURFACE CONSTRUCTION SHALL COMPLY WITH THE "TRENCH SAFETY ACT", CHAPTER
553.60 - 553.64, FLORIDA STATUTES. CONTRACTOR SHALL INSURE THAT THE METHOD OF
TRENCH PROTECTION AND CONSTRUCTION IS IN COMPLIANCE WITH ALL OCCUPATIONAL
SAFETY AND HEALTH ADMINISTRATION (OSHA) REGULATIONS.
8. PRIOR TO INSTALLATION, CONTRACTOR SHALL SUBMIT SHOP DRAWINGS ON ALL PRE-CAST
MATERIALS AND MANUFACTURED ITEMS TO THE OWNER OR OWNER'S DESIGNATED
REPRESENTATIVE FOR APPROVAL. FAILURE TO OBTAIN APPROVAL BEFORE INSTALLATION MAY
RESULT IN REMOVAL AND REPLACEMENT AT CONTRACTOR'S EXPENSE.
9. IT IS THE RESPONSIBILITY OF CONTRACTOR TO ESTABLISH THE FOLLOWING IN THE FIELD:
RIGHT OF WAY LINES, BENCHMARKS, CENTER LINES, BASELINES AND STATIONING AS MAY BE
REQUIRED TO CONSTRUCT THE PROJECT.
10.ALL CONSTRUCTION DEBRIS AND OTHER WASTE MATERIAL SHALL BE DISPOSED OF OFF-SITE
IN ACCORDANCE WITH APPLICABLE REGULATORY AGENCY REQUIREMENTS.
11.CONTRACTOR SHALL BE HELD ACCOUNTABLE DURING CONSTRUCTION FOR ALL PROJECT
IMPROVEMENTS. COMPLIANCE WITH FLORIDA STATUTES 553.5041 FS AND THE 2023 FLORIDA
BUILDING CODE - ACCESSIBILITY (FBC-A) IS MANDATORY. IF INCORRECT AT THE FINAL
INSPECTION, CONTRACTOR SHALL BE REQUIRED TO MODIFY CONSTRUCTION TO COMPLY WITH
FLORIDA STATUTUES (FS) AND FBC - A. THE FOLLOWING ITEMS TAKE PRECEDENCE AND
SUPERSEDE OTHER DETAILS ON PLANS:
12.RIGHT OF WAY MAY NOT BE USED FOR STORAGE OF NEW OR REMOVED MATERIAL. ANY SITE
WITHIN THE PROJECT LIMITS INTENDED FOR MATERIAL STORAGE MUST BE PRE-APPROVED BY
THE OWNER OR OWNER'S DESIGNATED REPRESENTATIVE. ANY SOIL, PIPE, UTILITIES,
CONCRETE, ASPHALT, VEGETATION OR SIGNAGE MATERIALS THAT ARE REMOVED AND ARE
NOT INTENDED FOR RE-USE SHALL BE REMOVED FROM THE PROJECT EACH WORK DAY AND
CANNOT REMAIN ONSITE. NEW OR EXISTING MATERIALS MUST BE REMOVED FROM THE RIGHT
OF WAY AT THE END OF EACH WORK DAY.
13.CONTRACTOR MAY STOCKPILE MATERIALS WITHIN THE LIMITS OF THE CURRENT
CONSTRUCTION PHASE. IF STOCKPILING IS NECESSARY, CONTRACTOR SHALL SITE THE
LOCATION AT HIS DISCRETION, USING THE APPROPRIATE EROSION AND SEDIMENTATION
CONTROL BMPs.
14.THE COST OF ALL INSPECTION FEES SHALL BE BORNE BY CONTRACTOR.
15.ONCE MOBILIZED, CONTRACTOR MUST WORK ON THE PROJECT CONTINUOUSLY WITHOUT
ABSENCES FROM THE SITE UNLESS APPROVED BY THE OWNER.
16.THE CONTRACTOR SHALL, PRIOR TO ANY CONSTRUCTION ACTIVITY, HOLD A
PRE-CONSTRUCTION MEETING WITH ALL PERMITTING AGENCIES INVOLVED, INCLUDING
WALTON COUNTY AND THE FLORIDA DEPARTMENT OF ENVIRONMENTAL PROTECTION (FDEP).
17.GEOTECHNICAL ENGINEERING SERVICES INCLUDING SOIL BORINGS HAVE BEEN PROVIDED BY
SOUTHERN EARTH SCIENCES. THE CONTRACTOR CAN OBTAIN A COPY OF THE REPORTS FROM
WALTON COUNTY. THE OWNER ASSUMES NO RESPONSIBILITY FOR THE CORRECTNESS,
COMPLETENESS OR ACCURACY OF THE GEOTECHNICAL DATA PROVIDED BY SOUTHERN EARTH
SCIENCES.
18.ALL SIDEWALKS AND MULIT-USE TRAILS TO BE A MINIMUM 3,000 PSI CONCRETE AND 4 IN.
THICK, EXCEPT AT DRIVEWAY CROSSINGS WHERE THEY SHALL BE 6 IN. THICK.
19.WHERE SIDEWALK AND/OR MULTI-USE TRAIL IS CONSTRUCTED WITHIN 10 FT. OF ANY CURB
INLET, THE SOIL UNDER THE PROPOSED SIDEWALK WITHIN 10 FT. OF THE INLET SHALL BE
COMPACTED TO 98% OF THE MODIFIED PROCTOR DENSITY. CONTRACTOR SHALL PROVIDE
QUALITY CONTROL SAMPLING AT A RATE OF ONE PER FIVE INSTANCES.
20.IF PREHISTORIC OR HISTORIC ARTIFACTS, SUCH AS POTTERY OR CERAMICS, PROJECTILE
POINTS, DUGOUT CANOES, METAL IMPLEMENTS, HISTORIC BUILDING MATERIALS, OR ANY
OTHER PHYSICAL REMAINS THAT COULD BE ASSOCIATED WITH NATIVE AMERICAN, EARLY
EUROPEAN, OR AMERICAN SETTLEMENT ARE ENCOUNTERED AT ANY TIME WITHIN THE
PROJECT SITE AREA, THE PERMITTED PROJECT SHALL CEASE ALL ACTIVITIES INVOLVING
SUBSURFACE DISTURBANCE IN THE VICINITY OF THE DISCOVERY. THE APPLICANT SHALL
CONTACT THE FLORIDA DEPARTMENT OF STATE, DIVISION OF HISTORICAL RESOURCES,
COMPLIANCE REVIEW SECTION AT (850)-245-6333. PROJECT ACTIVITIES SHALL NOT RESUME
WITHOUT VERBAL AND/OR WRITTEN AUTHORIZATION. IN THE EVENT THAT UNMARKED HUMAN
REMAINS ARE ENCOUNTERED DURING PERMITTED ACTIVITIES, ALL WORK SHALL STOP
IMMEDIATELY AND THE PROPER AUTHORITIES NOTIFIED IN ACCORDANCE WITH §872.05, FS.
SURVEY NOTES:
1. ALL VERTICAL ELEVATIONS REFER TO THE NORTH AMERICAN VERTICAL DATUM OF 1988 (NAVD
88) ESTABLISHED FROM FDOT RECORDED CONTROL POINT "60-06-AO1V" AND "60-07-DO28".
2. HORIZONTAL DATUM REFERS TO THE NORTH AMERICAN DATUM OF 1983 (NAD 83).
3. ANY PUBLIC LAND CORNER OR BENCH MARK WITHIN THE LIMITS OF CONSTRUCTION IS TO BE
PROTECTED. IF A CORNER MONUMENT IS IN DANGER OF BEING DESTROYED AND HAS NOT
BEEN PROPERLY REFERENCED, CONTRACTOR SHALL NOTIFY THE OWNER OR OWNER'S
DESIGNATED REPRESENTATIVE IMMEDIATELY. ANY MONUMENT OTHERWISE DESTROYED BY
CONTRACTOR SHALL BE RESET BY A FLORIDA PROFESSIONAL SURVEYOR AND MAPPER AT
CONTRACTOR'S EXPENSE.
4. IF ANY GEODETIC MONUMENT WITHIN THE LIMITS OF CONSTRUCTION ARE DISTURBED,
CONTRACTOR SHALL NOTIFY:
DENIS RIORDAN
REGIONAL GEODETIC ADVISOR
NATIONAL GEODETIC SURVEY
JACKSON, MS
(240) 678-2107
DENIS.RIORDAN@NOAA.GOV
5. ALL BENCHMARKS NOTED ON THE PLANS ARE TO BE MAINTAINED THROUGHOUT THE PROJECT.
DESTROYED BENCHMARKS SHALL BE REDEFINED BY A FLORIDA PROFESSIONAL SURVEYOR
AND MAPPER AT THE CONTRACTOR'S EXPENSE.
6. CONTRACTOR SHALL PROVIDE SIX (6) COPIES OF SIGNED AND SEALED AS-BUILT SURVEYS TO
THE OWNER OR OWNER'S DESIGNATED REPRESENTATIVE FOR FINAL CERTIFICATION OF THE
PROJECT. THE AS-BUILT SURVEY SHALL BE PREPARED AND CERTIFIED BY A PROFESSIONAL
SURVEYOR AND MAPPER LICENSED IN FLORIDA PURSUANT TO CHAPTER 472 FLORIDA
STATUTES.
7. IN ADDITION TO THE SIGNED AND SEALED SURVEY, CONTRACTOR SHALL PROVIDE TWO (2)
COPIES OF THE SURVEY IN CAD AND PDF FORMATS ON ELECTRONIC MEDIA.
SITEWORK NOTES:
1. CONTRACTOR SHALL CLEAR AND GRUB ONLY THOSE PORTIONS OF THE PROJECT NECESSARY
FOR CONSTRUCTION.
2. EXCESS SOIL THAT RESULTS FROM CLEARING AND GRUBBING OR SITE EXCAVATION IS TO BE UTILIZED ON-SITE IF IT IS OF SUITABLE MATERIAL. ALL SOILS MUST BE HANDLED ACCORDING
TO SECTION 4.07.00 OF THE WALTON COUNTY LAND DEVELOPMENT CODE. STOCKPILED
MATERIAL SHALL BE PROTECTED WITH SILT FENCING.
3. CONTRACTOR IS RESPONSIBLE FOR ACQUIRING ANY PERMITS THAT ARE NECESSARY FOR
REMOVING EXCESS EARTHWORK FROM THE PROJECT.
4. BURNING OF MATERIALS AND/OR DEBRIS AS A MEANS OF DISPOSAL IS PROHIBITED WITHIN THE
PROJECT LIMITS.
5. CONTRACTOR IS RESPONSIBLE FOR PROVIDING A LOCATION FOR STAGING AND STORAGE OF
MATERIALS. CONTRACTOR SHALL OBTAIN WRITTEN PERMISSION FROM THE PROPERTY OWNER
PRIOR TO STORING OR STAGING. A COPY OF THE WRITTEN PERMISSION SHALL BE PROVIDED
TO THE OWNER OR OWNER'S DESIGNATED REPRESENTATIVE PRIOR TO STORING OR STAGING.
EXCESS MATERIALS MAY NOT BE STORED ONSITE.
6. ALL ROCKS OR STONES LARGER THAN 6 IN. IN DIAMETER SHALL BE REMOVED FROM THE
BACKFILL MATERIAL. BACKFILL MATERIAL PLACED WITHIN 1 FT. OF PIPING AND
APPURTENANCES SHALL NOT CONTAIN ANY STONES LARGER THAN 2 IN. IN DIAMETER IN
ACCORDANCE WITH FDOT INDICES 500 AND 505.
7. ANY DAMAGE TO EXISTING TOPOGRAPHIC FEATURES NOT SPECIFICALLY RELATED TO THE
SCOPE OF WORK, SHALL BE REPAIRED TO THEIR ORIGINAL CONDITION AT CONTRACTOR'S
EXPENSE.
8. ALL IMPROVEMENTS SHOWN ARE TO BE WARRANTED BY THE CONTRACTOR TO WALTON
COUNTY FOR A PERIOD OF ONE YEAR FROM DATE OF FINAL COMPLETION.
9. THE CONTRACTOR SHALL SURVEY AND STAKE THE CLEARING LIMITS AS INDICATED BY THE
PLANS AND RECEIVE APPROVAL FROM THE OWNER OR THE OWNER'S DESIGNATED
REPRESENTATIVE PRIOR TO COMMENCING WITH THE CLEARING AND GRUBBING OPERATION.
(REFER TO TREE PROTECTION DETAILS AND NOTES.)
10.THE CONTRACTOR SHALL BE RESPONSIBLE FOR COMPLYING WITH ALL FEDERAL AND STATE
REGULATIONS CONCERNING SITE SAFETY AND HANDLING AND DISPOSAL OF CONTAMINATED
SOILS.
11.CLEARING AND GRUBBING INCLUDES THE REMOVAL OF ALL INCIDENTAL ITEMS INCLUDING BUT
NOT LIMITED TO STRUCTURES, CONCRETE, ASPHALT, GRAVEL, FENCING AND ANY OTHER
IMPROVEMENTS TO BE REMOVED. IT WILL BE THE RESPONSIBILITY OF THE CONTRACTOR TO
DISPOSE OF SUCH ITEMS OFF SITE.
12.THE CONTRACTOR IS RESPONSIBLE FOR MAINTAINING THE STORMWATER SYSTEM UNTIL
ACCEPTED BY THE OWNER OR THE OWNER'S DESIGNATED REPRESENTATIVE.
13.REFER TO THE SIGNING AND PAVEMENT MARKING PLANS FOR THE REMOVAL OF EXISTING
SIGNS.
14.THE CONTRACTOR SHALL BE AWARE OF AND BE RESPONSIBLE FOR ANY TEMPORARY DITCH
CROSSINGS REQUIRED FOR CONSTRUCTION. RESPONSIBILITIES INCLUDE, BUT ARE NOT
LIMITED TO PERMITTING, POLLUTION ABATEMENT, POTENTIAL FLOODING AND CONSTRUCTION
SAFETY REQUIREMENTS.
15.THE TOP 4 IN. TO 6 IN. OF SOIL SHALL BE REMOVED DURING CLEARING AND GRUBBING UNLESS
THERE IS THE PRESENCE OF LIMEROCK IN WHICH CASE THE LIMEROCK WILL BE LEFT
UNDISTURBED. THE REMOVED SOIL SHALL BE STOCKPILED AT A SITE DESIGNATED BY THE
OWNER OR OWNER'S DESIGNATED REPRESENTATIVE TO BE USED FOR LANDSCAPING
PURPOSES, UNLESS OTHERWISE DIRECTED BY THE OWNER OR OWNER'S DESIGNATED
REPRESENTATIVE. THE REMAINING EARTHWORK THAT RESULTS FROM CLEARING AND
GRUBBING OR SITE EXCAVATION IS TO BE UTILIZED ON-SITE IF THE WHITE SANDS
REQUIREMENT IS MET.
ENVIRONMENTAL CONTAMINATION AND MONITORING:
1. ANY KNOWN OR SUSPECTED HAZARDOUS MATERIAL FOUND ON THE SITE BY THE
CONTRACTOR SHALL BE IMMEDIATELY REPORTED TO THE OWNER OR OWNER'S DESIGNATED
REPRESENTATIVE, AND CONTRACTOR SHALL PROTECT THE AREA OF KNOWN OR SUSPECTED
HAZARDOUS MATERIAL FROM FURTHER ACCESS. THE OWNER OR OWNER'S DESIGNATED
REPRESENTATIVE WILL ARRANGE FOR INVESTIGATION, IDENTIFICATION AND REMEDIATION OF
THE MATERIAL AS NECESSARY TO PROTECT THE HEALTH, SAFETY AND WELFARE OF
CONSTRUCTION WORKERS AND ULTIMATELY THE GENERAL PUBLIC. THE CONTRACTOR WILL
NOT RETURN TO THE AREA OF SUSPECTED CONTAMINATION UNTIL APPROVAL IS PROVIDED IN
WRITING FROM THE OWNER OR OWNER'S DESIGNATED REPRESENTATIVE. CONTRACTOR
SHALL MOVE TO ANOTHER LOCATION ON THE SITE TO AVOID DELAYS.
2. CONTRACTOR SHALL COORDINATE WITH THE OWNER OR OWNER'S DESIGNATED
REPRESENTATIVE, WHICH MAY INCLUDE DAILY MEETINGS, TO ALERT CONSTRUCTION STAFF
TO NATURAL OR REGULATORY SITE CONDITIONS THAT REQUIRE SPECIAL ATTENTION IN THE
COURSE OF THE IMMEDIATE CONSTRUCTION TASK AT HAND.
ADA/PROWAG GENERAL NOTES:
1. EXISTING SIDEWALK TO BE REMOVED SHALL BE SAWCUT TO THE NEAREST JOINT.
2. ALL CURB RAMP AND DETECTABLE WARNING PANELS SHALL MEET THE REQUIREMENTS OF
THE AMERICANS WITH DISABILITIES GUIDELINES AND THE PEDESTRIAN RIGHT-OF-WAY
ACCESSIBILITY GUIDELINES (PROWAG).
3. RAMP RUNNING SLOPE SHALL BE A MAXIMUM OF 12:1 OR 8.3%. CURB RAMP LANDINGS SHALL HAVE A MINIMUM SIZE OF 4 FT. BY 4 FT. WITH A CROSS SLOPE OF 1.5% (+ OR - 0.5%) IN ANY DIRECTION (SLOPE 1.0% MIN. TO 2.0% MAX.) SIDEWALK CROSS SLOPE SHALL BE 1.5% (+ OR - 0.5%) (SLOPE: 1.0% TO 2.0% MAX.). SIDEWALK RUNNING SLOPE SHALL BE A MAXIMUM OF 5.0%
UNLESS MATCHING THE RUNNING SLOPE OF THE ADJACENT ROADWAY.
4. SIDEWALK AND RAMPS SHALL BE CONSTRUCTED TO MAXIMUM SLOPES (OR LESS). LIMITS OF
SIDEWALKS AND RAMPS SHOWN MAY NEED TO BE ADJUSTED TO BE WITHIN ALLOWABLE
MAXIMUM SLOPES. ALL SLOPES SHOWN ARE MAXIMUMS.
5. DETECTABLE WARNING PANES TO BE CONSTRUCTED PER FDOT STANDARD SPECIFICATIONS
AND DETAILS.
6. THERE MUST BE A 32" CLEAR SPACE FOR 2' AROUND SIDEWALK OBSTRUCTIONS, INCLUDING
LIGHT POLES AND FIRE HYDRANTS.
PAVING AND GRADING NOTES:
1. ALL DELETERIOUS SUBSURFACE MATERIAL (I.E. MULCH, PEAT, BURIED DEBRIS) IS TO BE
EXCAVATED IN ACCORDANCE WITH THESE PLANS OR AS DIRECTED BY THE OWNER OR
OWNER'S DESIGNATED REPRESENTATIVE. DELETERIOUS MATERIAL IS TO BE REMOVED FROM
THE SITE. EXCAVATED AREAS ARE TO BE BACKFILLED WITH APPROVED MATERIALS AND
COMPACTED AS SHOWN ON THESE PLANS AND IN ACCORDANCE WITH THE SOILS REPORT.
CONTRACTOR IS RESPONSIBLE FOR ACQUIRING ANY PERMITS THAT ARE NECESSARY FOR
REMOVING DELETERIOUS MATERIAL FROM THE SITE.
2. CONTRACTOR SHALL BE RESPONSIBLE FOR PROTECTING EXCAVATIONS AGAINST COLLAPSE
AND WILL PROVIDE BRACING, SHEETING OR SHORING AS NECESSARY. DEWATERING METHODS
SHALL BE USED AS REQUIRED TO KEEP TRENCHES DRY WHILE PIPE AND APPURTENANCES
ARE BEING PLACED.
3. ALL DISTURBED AREAS SHALL BE FINE GRADED AND SOD/SEED SHALL BE PLACES PER
WALTON COUNTY AND THE FLORIDA DEPARTMENT OF TRANSPORTATION SPECIFICATIONS.
AREAS OF SLOPE GREATER THAN 3:1 SHALL BE STABILIZED PRIOR TO SODDING AND SOD
SHALL BE PINNED TO PREVENT EROSION.
4. PROPOSED SPOT ELEVATIONS REPRESENT FINISHED PAVEMENT OR GROUND SURFACE
GRADE UNLESS OTHERWISE NOTED ON THE DRAWINGS.
5. CONTRACTOR SHALL TRIM, TACK AND MATCH EXISTING PAVEMENT AT LOCATIONS WHERE
NEW PAVEMENT MEETS EXISTING PAVEMENT.
6. CONTRACTOR TO PROVIDE A ½ IN. TO 1 IN. BITUMINOUS EXPANSION JOINT MATERIAL WITH
SEALER AT ABUTMENT OF CONCRETE AND OTHER CONCRETE ITEMS (BUILDINGS, CURBING,
SIDEWALKS, ETC.).
7. ALL UNDERGROUND UTILITIES MUST BE IN PLACE, TESTED OR INSPECTED, AND APPROVED
PRIOR TO SURFACE CONSTRUCTION.
8. EXISTING SIGNAGE TO REMAIN THAT WILL BE AFFECTED BY CONSTRUCTION SHALL BE
RELOCATED DURING CONSTRUCTION.
9. CONTRACTOR IS RESPONSIBLE FOR COORDINATING WITH AN INDEPENDENT TESTING
COMPANY TO VERIFY COMPACTION. UPON COMPLETION OF THE WORK, CONTRACTOR SHALL
HAVE ALL TEST RESULTS SIGNED AND SEALED BY A PROFESSIONAL ENGINEER REGISTERED IN
THE STATE OF FLORIDA PURSUANT TO CHAPTER 471 FLORIDA STATUTES AND SUBMITTED TO
THE OWNER OR OWNER'S DESIGNATED REPRESENTATIVE.
10. ALL FINAL PAVEMENT MARKINGS SHALL BE THERMOPLASTIC AND SHALL BE PLACED WITHIN 14
DAYS AFTER PLACEMENT OF FINAL ASPHALT SURFACE.
MAINTENANCE OF TRAFFIC GENERAL NOTES:
1. TRAFFIC SHALL BE MAINTAINED IN ACCORDANCE WITH THE FDOT STANDARD PLANS, INDEX
102-100 THROUGH 102-680.
2. IT IS THE RESPONSIBILITY OF CONTRACTOR TO MAINTAIN CLEAR ZONE REQUIREMENTS FOR
EQUIPMENT AND MATERIALS STORAGE AND WORK ZONE PROTECTION AS SPECIFIED IN FDOT
STANDARD PLANS 102-600.
3. THE OWNER OR OWNER'S DESIGNATED REPRESENTATIVE RESERVES THE RIGHT TO REQUIRE
ADDITIONAL DEVICES AND/OR CHANGES TO THE TRAFFIC CONTROL PLAN BASED UPON
CHANGING TRAFFIC CONDITIONS OR TRAFFIC SAFETY ISSUES.
TREE PROTECTION NOTES:
1. PRIOR TO ANY SITE CLEARING, ALL TREES SHOWN TO REMAIN AS INDICATED ON THE PLANS
SHALL BE PROTECTED IN ACCORDANCE WITH THE DETAILS CONTAINED IN…