Control_panels__OSDI_Participation_Memo_Questionnaire_3.9.26-MJC.pdf

PDF 594 KB Posted

Attached to
Fabrication of Industrial Control Panels/ Pump Control Panels (PCP)
Solicitation number
110581
Issued by
Prince George's County, Maryland

About this file

This is an OSDI Participation Memo Questionnaire related to a fabrication contract issued by the Washington Suburban Sanitary Commission (WSSC) in Maryland for the production of industrial control panels and pump control panels (PCP). WSSC is seeking sealed responses for the fabrication of standardized pump control panels designed for wastewater pumping stations that utilize either two or three constant-speed pumps. The contract encompasses the fabrication of these standardized panels along with any additional local control panels required by WSSC to maintain consistency across facilities and improve operational efficiency. Responses must be submitted via WSSC's eProcurement Portal at https://procurement.opengov.com/portal/wsscwater no later than 2:00 pm on Thursday, July 16, 2026, with late submissions not accepted.

The contract is designed to enhance operational reliability, reduce spare parts inventory, streamline maintenance activities, and simplify operator training through uniform design and functionality across WSSC facilities. By establishing standardized panel configurations, WSSC aims to create consistency in equipment across its wastewater pumping operations. The questionnaire appears to be a participation assessment tool related to OSDI (likely a diversity or small business initiative), which may indicate the presence of small business set-asides or participation goals for the contract award. Additional details regarding pricing terms, contract duration, renewal options, and specific funding amounts would be contained in the full solicitation documents.

View the file

Other files

File Type Posted
Fabrication_of_Industrial_Control_Panels_Pump_Control_Panels_(PCP)_(Addendum_#2_Revision).pdf PDF
Fabrication_of_Industrial_Control_Panels_Pump_Control_Panels_(PCP)_(Addendum_#1_Revision).pdf PDF
Fabrication_of_Industrial_Control_Panels_Pump_Control_Panels_(PCP).pdf PDF
New_OSDI_MEMO_#2026-162_Fabrication_of_Industrial_Control_Panel_Myles.pdf PDF
How_to_Find_Supplier_Number.pdf PDF
WSSC_Specification_16910_Control_Panels.docx DOCX document
WSSC_Specification_16750_Pump_Control_Panel_Testing.docx DOCX document
WSSC_Enclosure_DG-08_PCP-3PUMP_Drawing.pdf PDF
WSSC_Enclosure_DG-08_PCP-2PUMP_Drawing.pdf PDF
Control_Panel___OSDI_request_memo___3.9.26.pdf PDF
Control_Panel_-_Goods+and+Services+Goal+Setting+Worksheet.xls XLS spreadsheet
MONICA_(Control_panel___Appendix_A-_DG-08_PCP-2PMP_Dwgs).pdf PDF
Mid-Atlantic_Purchasing_Team_Intergovernmental_&_Cooperative_Purchasing_Clause.pdf PDF
MONICA_(Control_panel___Appendix_B_-DG-08_PCP-3PMP_Dwgs).pdf PDF
MONICA_(Control_Panel___Appendix_C_-_Spec_16750_Pump_Control_Panel_Testing).docx DOCX document
MONICA_(Control_Panel_Fabrication_-_SOW).docx DOCX document
MONICA_(Control_Panel_Fabrication_-_Pricing_List).xlsx XLSX spreadsheet
MONICA_(Control_Panel_Fabrication_-_Invitation_For_Bid).docx DOCX document
Monica_(Control_Panel___Appendix_C_-_Spec_16910_Control_Panels).docx DOCX document
Show all 19

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

OFFICE of SUPPLIER DIVERSITY & INCLUSION

Forecasting and Planning Participation Questionnaire

OSDI Form FPPQ - 2021 Office of Supplier Diversity & Inclusion

The following questions will assist you in responding to inquiries by the Office of Supplier Diversity & Inclusion

(OSDI) about your requested purchase(s)/acquisition(s). The information provided will further assist the OSDI in planning for the appropriate MBE participation. Please contact OSDI with any questions at extension 8800 or e-mail supplierdiversity@wsscwater.com.

SECTION 1: PURCHASING REQUIREMENT

1. What good or service is your Team/Office seeking to purchase/acquire?

(Use additional sheets, if required.)

a. Briefly Describe:

b. List the NAICS Code and Description:

c. List the Trade or A&E Discipline:

2. What is the estimated cost or upset limit for the good or service contract?

a. Cost: $

b. Upset Limit: $

3. What is the scope of the work/end-user request? (Use additional sheets, if required.)

4. What portion of the good or service may be subcontracted by trade or A&E

Discipline, if any? (Use additional sheets, if required.)

a. Briefly describe:

b. None, describe why:

c. Don’t Know/Not Sure:

5. What is your recommendation regarding this purchase/acquisition?

a. Unbundle: Explain Pro or Con:

b. Bundle: Explain Pro or Con:

c. Neither, a. or b.: Describe why neither:

d. No Recommendation mailto:supplierdiversity@wsscwater.com

OSDI Form FPPQ - 2021 Office of Supplier Diversity & Inclusion

6. Are you considering multiple awards for this Contract?

a. No:

b. Yes: Fill in the total number of awards:

If yes, what will be the upset limit for each award?

Award #1 Upset Limit: $

Award #2 Upset Limit: $

Award #3 Upset Limit: $

Award #4 Upset Limit: $

Award #5 Upset Limit: $

7. Who are the typical vendors, Primes or Suppliers that bid/propose on this type and size contract? (Use additional sheets, if required.)

1. 4.

2 5.

3. 6.

Check here if None/Don’t Know/Not Sure:

8. Who are the typical vendors, Primes or Suppliers that have been awarded this type and size contract in the past? (Use additional sheets, if required.)

1. 4.

2. 5.

3. 6.

Check here if None/Don’t Know/Not Sure:

9. For this good or service, can you forecast (i.e., plan for the purchase) this need?

a. Annually: Yes No

b. Per Fiscal Year: Yes No

c. Quarterly: Yes No

d. If you answered No to any option, please describe the reason below:

Office of Supplier Diversity & Inclusion 3

SECTION 2: PURCHASE/SPEND HISTORY

10. Has WSSCWater purchased/acquired this good or service prior to this request?

a. If no, proceed to Question 17

b. If yes, fill-in the following information and proceed to Question 11:

Most recent Purchase Order No.:

Most recent Contract No.:

Most recent Purchase Date (mm/yy):

Name of the Vendor:

Total Award:

Total Validated Payments:

Was there Subcontracting:

Yes No

If yes: % planned proffered: % validated as proffered

11. Is there an existing contract for this good or service?

a. If no, proceed to Question 16

b. If yes, fill-in the following information and proceed to Question 12

Current Purchase Order No.:

Current Contract No.:

12. Can the existing contract be:

a. Extended: Yes No

b. Option Years Exercised: Yes No

c. Placed on a Cooperative Agreement: Yes No

13. How much is/was spent on the purchase/acquisition of this good or service?

a. Annually: $

b. Per Fiscal Year:

c. By Commodity:

d. By Good or Service:

e. Don’t Know/Not Sure of spending amount:

Office of Supplier Diversity & Inclusion

14.) What is/was the timing of the purchase/acquisition of this good or service?

a. One-time spend: Yes

b. Routine spend: (i.e., regular schedule)

c. Periodic spend: (i.e., as needed only)

d. Not Sure of the timing:

15.) What is/was the typical method of procurement for this good or service?

a. Invitation for Bids (IFB):

b. Request for Proposal (RFP):

c. Request for Quote (RFQ):

d. Request for Qualifications (RFQU):

e. Procurement-Card (P-Card):

f. Cooperative Agreement:

16.) Which Team/Office is/was the Purchaser?

a. My Team/Office only:

b. Mine/Another Team/Office:

c. Another Team/Office only:

17.) Is this request related to a major project? Yes No

a. If yes, fill in the following:

Project Name:

Project/Job Number:

What is the total spending on Project: $

Don’t Know/Not Sure:

18.) What are the requirements for this good or service and job size?

a. Bonding Requirement: $

b. Insurance Requirement: $

19.) What Team/Office is using the same good or service for their needs?

a. List Name (Indicate “N/A” if Don’t Know/None):

No

Yes, how frequent?

Yes, how frequent?

Office of Supplier Diversity & Inclusion

SECTION 3: MARKET PLACE INFORMATION

20.) Are there multiple Suppliers or sources for this purchase/acquisition?

a. Yes:

b. No:

c. Don’t Know/Not Sure:

21.) Excluding the Incumbent, who are the alternative Suppliers or Sources for this purchase/acquisition? List Names: (Use additional sheets, if required.)

1. 3.

2. 4.

22.) To your knowledge what marketplace conditions may/will impact on the cost?

(Use additional sheets, if required.)

a. Describe conditions:

23.) Please describe the following as they relate to the marketplace: (Use additional sheets, if required.)

a. Risks:

b. Opportunities:

c. Competitive Environment:

d. None:

e. Don’t Know/Not Sure:

24.) Are there any special licensing, certificates, permits or specific conditions required for this project? (Use additional sheets, if required.) If yes, describe:

a. No:

b. Don’t Know/Not Sure:

25.) What is the experience level for this project by Primes?

a. Level of Experience :

b. Don’t Know/Not Sure:

Office of Supplier Diversity & Inclusion

26.) Are there complexities of which the Prime should be informed?

(Use additional sheets, if required.)

If yes, describe:

a Don’t Know/Not Sure:

Untitled

Check Box1: Yes
Text2: Control Panel Fabrication
Text3: 238210, 541512
Text4: Electrical, Instrumentaion and Control, Integrators
Text5: See attached
Text6:
Text7:
Text8: Not sure
Text9:
Text10:
Text11:
Text12: 400,000.00
Text13: 2,000,000.00
Check Box15: Yes
Text16:
Text17:
Text18:
Text19:
Text20:
Text21:
Text22: MC Dean
Text23: Wunderlich-Malec Engineering
Text24: Sherwood Logan & Associates
Check Box26: Off
Text27: Optimum Controls Corporation
Text28:
Text29:
Text30:
Text31:
Text32:
Text33:
Text34:
Text35:
Check Box36: Yes
Text37:
Text38:
Text39:
Text40: The purchase of new equipment is based on the need of maintenance, capital projects and cannot be forecasted
Check Box41: Off
Check Box42: Yes
Check Box43: Off
Check Box44: Yes
Check Box45: Off
Check Box46: Yes
Text47:
Text48:
Text49:
Text50:
Text51:
Text52:
Text53:
Check Box54: Off
Check Box55: Off
Text56:
Text57:
Text58:
Text59:
Check Box60: Off
Check Box61: Off
Check Box62: Off
Check Box63: Off
Check Box64: Off
Check Box65: Off
Text66:
Text67:
Text68:
Text69:
Check Box70: Off
Check Box72: Off
Check Box74: Off
Text75:
Text76:
Check Box77: Off
Check Box79: Off
Check Box80: Off
Check Box81: Off
Check Box82: Off
Check Box83: Off
Check Box84: Off
Check Box85: Off
Check Box86: Off
Text87:
Check Box88: Off
Text89:
Check Box90: Off
Check Box91: Yes
Text92:
Text93:
Text94:
Check Box96: Off
Text97: 0
Text98: 0
Text99: N/A
Check Box100: Yes
Text101: See item 7 above
Check Box102: Off
Text103:
Text104:
Check Box105: Off
Text106:
Text107:
Text108:
Text109:
Text110:
Text111:
Text112: Electronic component availability, Supply constrains from manufacturers, Labor market conditions, inflation affecting material and labor
Text113: Supplier partnership with preferred price, shorter lead time and less component cost
Text114: High demand from other industrial sectors such manufacturing, energy, and utilities.
Text115: The largest cost drivers are usually electronic component availability, panel enclosure material cost, skilled labor costs, and supply chain conditions.
Text116:
Text117: Please see attached SOW
Check Box118: Off
Check Box119: Off
Text120: The company shall have at least 5 years of experience as in fabrication of industrial control panels.
Text122: This includes control panel fabrications that meet the NFPA
Text123: and NEMA enclosures requirements for hazards and non-hazards conditions
Text124:
Text126:
Text121: