Control_panels__OSDI_Participation_Memo_Questionnaire_3.9.26-MJC.pdf
PDF 594 KB Posted
- Solicitation number
- 110581
- Issued by
- Prince George's County, Maryland
About this file
This is an OSDI Participation Memo Questionnaire related to a fabrication contract issued by the Washington Suburban Sanitary Commission (WSSC) in Maryland for the production of industrial control panels and pump control panels (PCP). WSSC is seeking sealed responses for the fabrication of standardized pump control panels designed for wastewater pumping stations that utilize either two or three constant-speed pumps. The contract encompasses the fabrication of these standardized panels along with any additional local control panels required by WSSC to maintain consistency across facilities and improve operational efficiency. Responses must be submitted via WSSC's eProcurement Portal at https://procurement.opengov.com/portal/wsscwater no later than 2:00 pm on Thursday, July 16, 2026, with late submissions not accepted.
The contract is designed to enhance operational reliability, reduce spare parts inventory, streamline maintenance activities, and simplify operator training through uniform design and functionality across WSSC facilities. By establishing standardized panel configurations, WSSC aims to create consistency in equipment across its wastewater pumping operations. The questionnaire appears to be a participation assessment tool related to OSDI (likely a diversity or small business initiative), which may indicate the presence of small business set-asides or participation goals for the contract award. Additional details regarding pricing terms, contract duration, renewal options, and specific funding amounts would be contained in the full solicitation documents.
View the file
Other files
Show all 19
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
OFFICE of SUPPLIER DIVERSITY & INCLUSION
Forecasting and Planning Participation Questionnaire
OSDI Form FPPQ - 2021 Office of Supplier Diversity & Inclusion
The following questions will assist you in responding to inquiries by the Office of Supplier Diversity & Inclusion
(OSDI) about your requested purchase(s)/acquisition(s). The information provided will further assist the OSDI in planning for the appropriate MBE participation. Please contact OSDI with any questions at extension 8800 or e-mail supplierdiversity@wsscwater.com.
SECTION 1: PURCHASING REQUIREMENT
1. What good or service is your Team/Office seeking to purchase/acquire?
(Use additional sheets, if required.)
a. Briefly Describe:
b. List the NAICS Code and Description:
c. List the Trade or A&E Discipline:
2. What is the estimated cost or upset limit for the good or service contract?
a. Cost: $
b. Upset Limit: $
3. What is the scope of the work/end-user request? (Use additional sheets, if required.)
4. What portion of the good or service may be subcontracted by trade or A&E
Discipline, if any? (Use additional sheets, if required.)
a. Briefly describe:
b. None, describe why:
c. Don’t Know/Not Sure:
5. What is your recommendation regarding this purchase/acquisition?
a. Unbundle: Explain Pro or Con:
b. Bundle: Explain Pro or Con:
c. Neither, a. or b.: Describe why neither:
d. No Recommendation mailto:supplierdiversity@wsscwater.com
OSDI Form FPPQ - 2021 Office of Supplier Diversity & Inclusion
6. Are you considering multiple awards for this Contract?
a. No:
b. Yes: Fill in the total number of awards:
If yes, what will be the upset limit for each award?
Award #1 Upset Limit: $
Award #2 Upset Limit: $
Award #3 Upset Limit: $
Award #4 Upset Limit: $
Award #5 Upset Limit: $
7. Who are the typical vendors, Primes or Suppliers that bid/propose on this type and size contract? (Use additional sheets, if required.)
1. 4.
2 5.
3. 6.
Check here if None/Don’t Know/Not Sure:
8. Who are the typical vendors, Primes or Suppliers that have been awarded this type and size contract in the past? (Use additional sheets, if required.)
1. 4.
2. 5.
3. 6.
Check here if None/Don’t Know/Not Sure:
9. For this good or service, can you forecast (i.e., plan for the purchase) this need?
a. Annually: Yes No
b. Per Fiscal Year: Yes No
c. Quarterly: Yes No
d. If you answered No to any option, please describe the reason below:
Office of Supplier Diversity & Inclusion 3
SECTION 2: PURCHASE/SPEND HISTORY
10. Has WSSCWater purchased/acquired this good or service prior to this request?
a. If no, proceed to Question 17
b. If yes, fill-in the following information and proceed to Question 11:
Most recent Purchase Order No.:
Most recent Contract No.:
Most recent Purchase Date (mm/yy):
Name of the Vendor:
Total Award:
Total Validated Payments:
Was there Subcontracting:
Yes No
If yes: % planned proffered: % validated as proffered
11. Is there an existing contract for this good or service?
a. If no, proceed to Question 16
b. If yes, fill-in the following information and proceed to Question 12
Current Purchase Order No.:
Current Contract No.:
12. Can the existing contract be:
a. Extended: Yes No
b. Option Years Exercised: Yes No
c. Placed on a Cooperative Agreement: Yes No
13. How much is/was spent on the purchase/acquisition of this good or service?
a. Annually: $
b. Per Fiscal Year:
c. By Commodity:
d. By Good or Service:
e. Don’t Know/Not Sure of spending amount:
Office of Supplier Diversity & Inclusion
14.) What is/was the timing of the purchase/acquisition of this good or service?
a. One-time spend: Yes
b. Routine spend: (i.e., regular schedule)
c. Periodic spend: (i.e., as needed only)
d. Not Sure of the timing:
15.) What is/was the typical method of procurement for this good or service?
a. Invitation for Bids (IFB):
b. Request for Proposal (RFP):
c. Request for Quote (RFQ):
d. Request for Qualifications (RFQU):
e. Procurement-Card (P-Card):
f. Cooperative Agreement:
16.) Which Team/Office is/was the Purchaser?
a. My Team/Office only:
b. Mine/Another Team/Office:
c. Another Team/Office only:
17.) Is this request related to a major project? Yes No
a. If yes, fill in the following:
Project Name:
Project/Job Number:
What is the total spending on Project: $
Don’t Know/Not Sure:
18.) What are the requirements for this good or service and job size?
a. Bonding Requirement: $
b. Insurance Requirement: $
19.) What Team/Office is using the same good or service for their needs?
a. List Name (Indicate “N/A” if Don’t Know/None):
No
Yes, how frequent?
Yes, how frequent?
Office of Supplier Diversity & Inclusion
SECTION 3: MARKET PLACE INFORMATION
20.) Are there multiple Suppliers or sources for this purchase/acquisition?
a. Yes:
b. No:
c. Don’t Know/Not Sure:
21.) Excluding the Incumbent, who are the alternative Suppliers or Sources for this purchase/acquisition? List Names: (Use additional sheets, if required.)
1. 3.
2. 4.
22.) To your knowledge what marketplace conditions may/will impact on the cost?
(Use additional sheets, if required.)
a. Describe conditions:
23.) Please describe the following as they relate to the marketplace: (Use additional sheets, if required.)
a. Risks:
b. Opportunities:
c. Competitive Environment:
d. None:
e. Don’t Know/Not Sure:
24.) Are there any special licensing, certificates, permits or specific conditions required for this project? (Use additional sheets, if required.) If yes, describe:
a. No:
b. Don’t Know/Not Sure:
25.) What is the experience level for this project by Primes?
a. Level of Experience :
b. Don’t Know/Not Sure:
Office of Supplier Diversity & Inclusion
26.) Are there complexities of which the Prime should be informed?
(Use additional sheets, if required.)
If yes, describe:
a Don’t Know/Not Sure:
Untitled
| Check Box1: Yes |
| Text2: Control Panel Fabrication |
| Text3: 238210, 541512 |
| Text4: Electrical, Instrumentaion and Control, Integrators |
| Text5: See attached |
| Text6: |
| Text7: |
| Text8: Not sure |
| Text9: |
| Text10: |
| Text11: |
| Text12: 400,000.00 |
| Text13: 2,000,000.00 |
| Check Box15: Yes |
| Text16: |
| Text17: |
| Text18: |
| Text19: |
| Text20: |
| Text21: |
| Text22: MC Dean |
| Text23: Wunderlich-Malec Engineering |
| Text24: Sherwood Logan & Associates |
| Check Box26: Off |
| Text27: Optimum Controls Corporation |
| Text28: |
| Text29: |
| Text30: |
| Text31: |
| Text32: |
| Text33: |
| Text34: |
| Text35: |
| Check Box36: Yes |
| Text37: |
| Text38: |
| Text39: |
| Text40: The purchase of new equipment is based on the need of maintenance, capital projects and cannot be forecasted |
| Check Box41: Off |
| Check Box42: Yes |
| Check Box43: Off |
| Check Box44: Yes |
| Check Box45: Off |
| Check Box46: Yes |
| Text47: |
| Text48: |
| Text49: |
| Text50: |
| Text51: |
| Text52: |
| Text53: |
| Check Box54: Off |
| Check Box55: Off |
| Text56: |
| Text57: |
| Text58: |
| Text59: |
| Check Box60: Off |
| Check Box61: Off |
| Check Box62: Off |
| Check Box63: Off |
| Check Box64: Off |
| Check Box65: Off |
| Text66: |
| Text67: |
| Text68: |
| Text69: |
| Check Box70: Off |
| Check Box72: Off |
| Check Box74: Off |
| Text75: |
| Text76: |
| Check Box77: Off |
| Check Box79: Off |
| Check Box80: Off |
| Check Box81: Off |
| Check Box82: Off |
| Check Box83: Off |
| Check Box84: Off |
| Check Box85: Off |
| Check Box86: Off |
| Text87: |
| Check Box88: Off |
| Text89: |
| Check Box90: Off |
| Check Box91: Yes |
| Text92: |
| Text93: |
| Text94: |
| Check Box96: Off |
| Text97: 0 |
| Text98: 0 |
| Text99: N/A |
| Check Box100: Yes |
| Text101: See item 7 above |
| Check Box102: Off |
| Text103: |
| Text104: |
| Check Box105: Off |
| Text106: |
| Text107: |
| Text108: |
| Text109: |
| Text110: |
| Text111: |
| Text112: Electronic component availability, Supply constrains from manufacturers, Labor market conditions, inflation affecting material and labor |
| Text113: Supplier partnership with preferred price, shorter lead time and less component cost |
| Text114: High demand from other industrial sectors such manufacturing, energy, and utilities. |
| Text115: The largest cost drivers are usually electronic component availability, panel enclosure material cost, skilled labor costs, and supply chain conditions. |
| Text116: |
| Text117: Please see attached SOW |
| Check Box118: Off |
| Check Box119: Off |
| Text120: The company shall have at least 5 years of experience as in fabrication of industrial control panels. |
| Text122: This includes control panel fabrications that meet the NFPA |
| Text123: and NEMA enclosures requirements for hazards and non-hazards conditions |
| Text124: |
| Text126: |
| Text121: |
File details come from the government source that posted it. Updated .