Contractor Fillable Bid Form.xlsx

XLSX spreadsheet 78 KB Posted

Attached to
2025 Pavement Replacement Transportation Center
Solicitation number
RFP-BPS-250000001238-3
Issued by
Macomb County, Blissfield Village, Michigan

About this file

This is a contractor bid form for a Transportation Center 2025 Pavement Replacement Program, with bids due on February 25, 2025, at 2:00 PM. The project involves extensive pavement replacement work across multiple areas (P-1 through P-6.4), including milling of existing pavement, excavation of subbase material, installation of new pavement, stormwater system improvements, and various concrete work. The scope includes approximately 122,690 SF of 5-inch milling, 44,585 SF of 4-inch milling, installation of Portland cement stabilization, underdrain systems, and new HMA pavement courses. The project also includes the installation of a 78-inch CMP stormwater detention system and various precast concrete storm structures.

The bid form includes a base bid with 47 line items and three alternate bids. A $60,000 contingency allowance is built into the base bid. The project includes both administrative submittals and scheduling requirements for the base bid and each alternate. Required submissions include a bid bond, familial disclosure form, compliance with school safety initiative legislation, Iran Economic Sanctions Act compliance, and non-collusive affidavit. The form includes provisions for RAP (Recycled Asphalt Pavement) credit and requires acknowledgment of Addendum No. 1.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Transportation Center Bid Form

ERROR:#VALUE!ENGINEERS ESTIMATE
2020 BOND, 2025 PAVEMENT REPLACEMENT PROGRAM

TRANSPORTATION CENTER - BID DUE 02/25/2025 @ 2:00 PM

ADDENDA ACKNOWLEDGED
ADDENDUM No. 1 - ACKNOWLEDGED:
BASE BID: P-2, P-3, P-3.1, P-4, P-5 & P-5.1
ITEMDESCRIPTIONUNITQUANTITYUNIT PRICEEXTENDED PRICE
1.0General Conditions & MobilizationLS1$ - 0
2.0Performance & Payment BondsLS1$ - 0
3.0Contingency AllowanceLS1$ 60,000.00$ 60,000.00
4.0Construction Survey & StakingLS1$ - 0
5.0Soil Erosion & Sedimentation ControlLS1$ - 0
6.0Milling 5” +/- Full Depth to Remove All Existing Pavement at Areas P-2, P-5 & P-5.1 as shown on Sheet 16 per Detail on Sheet-15SF122,690$ - 0
7.0Milling 4” +/- Full Depth to Remove Existing Pavement at Areas P-3, P-3.1 & P-4 as shown on Sheet 16 per Detail on Sheet-15SF44,585$ - 0
8.0Excavate/ Remove 6" of Existing Subbase Material at Areas P-2 & P-5SF118,955$ - 0
9.0Excavate/ Remove 8" of Existing Subbase Material at Areas P-3, P-4 & P-5.1SF31,125$ - 0
10.0Allowance – Undercut Insufficient Subbase Areas as RequiredSF3,500$ - 0
11.0Provide Portland Cement Stabilization at Areas P-2 & P-5 as shown on Sheet 16 per Detail on Sheet-15SF118,955$ - 0
12.0Furnish & Install 6" Underdrain as Shown on Plans per Detail on Sheet-15LF500$ - 0
13.0Furnish & Install Geotextile Stabilization Fabric at Areas P-3 & P-3.1SY3,927$ - 0
14.0Provide 6" of MI-DOT 21AA Dense Graded Limestone Aggregate Base C.I.P at Areas P-2 & P-5SF118,955$ - 0
15.0Provide 8" of MI-DOT 21AA Dense Graded Limestone Aggregate Base C.I.P at Area P-3 & P-3.1SF35,340$ - 0
16.0Demolish Existing Parking Island in Area P-3 Where Shown on the PlansSF960$ - 0
17.0Demolish Existing Curb & Backfill in Area P-4LF42$ - 0
18.0Demolish Existing 7’ x 7’ Concrete Catch Basin Collar at CB 17 & Replace in Kind with a 8’ x 8’ Concrete Collar in Area P-3 per Detail on Sheet 15EA1$ - 0
19.0Install 8’ x 8’ Concrete Collar at CB 1 in Area P-5, MH 16 in Area P-2, CB 18 in Area P-3, and CS 6 & CS 8 in Area P-3.1 per Detail on Sheet 15EA5$ - 0
20.0Demolish Existing 10’ W x 18’ L Concrete Collar & Replace in Kind at C.B.’s 3 & 4, 9 & 9A, 11 & 12 in Area P-5 Detail on Sheet-15EA3$ - 0
21.0Finish Grade & Compact to Ensure Positive Drainage & Density at Areas P-2, P-3, P-3.1 & P-5SF154,295$ - 0
22.0Provide 3" HMA MI-DOT (PG 64-22) 3C Base Course at Areas P-2 & P-5 per Detail on Sheet-15SF118,955$ - 0
23.0Provide 2.5" HMA MI-DOT (PG 64-22) 3C Base Course at Area P-3 & P-3.1 per Detail on Sheet-15SF35,340$ - 0
24.0Provide 2" HMA MI-DOT (PG 64-22) 4C Surface Course at Areas P-2 & P-5 per Detail on Sheet-15SF118,955$ - 0
25.0Provide 1.5" HMA MI-DOT (PG 64-22) 4C Surface Course at Area P-3 & P-3.1 per Detail on Sheet-15SF35,340$ - 0
26.0Furnish & Install 2’ x 2’ x 8” D Concrete Collar Around Water Valve at Holland Ave. in Area P-2 per Detail on Sheet 15EA1$ - 0
27.0Vertical Adjustment on Utility Gate Valve Box Assembly at Holland Ave. in Area P-2EA1$ - 0
28.0Vertical Adjustment on Sanitary Manhole in Area P-3EA1$ - 0
29.0Allowance – Vertical Reconstruction of Existing Storm Structures Campus Wide per Detail on Sheet-15VF7$ - 0
30.0Furnish & Install 6” Deep Flush Concrete Sidewalk in Area P-3 Where Shown on the PlansSF960$ - 0
31.0Remove Existing ADA Signage in Area P-3 Where Shown on the PlansEA14$ - 0
32.0Furnish & Install 6” Bollards, Sleeve, Post & ADA Signage Assembly Where Shown on the Plans in Area P-3 per Detail on Sheet-15EA12$ - 0
33.0Furnish & Install Topsoil (Full Depth) & Seed to Areas P-4 & P-5.1 per Detail on Sheet-17SF12,980$ - 0
34.0Site Restoration: Topsoil, Seed & Mulch Campus WideLS1$ - 0
35.0Paint Striping in Kind & ColorLS1$ - 0
36.0Recycled Asphalt Pavement “RAP” CreditTON1,743$ - 0
PAVEMENT REPLACEMENT TOTAL:$60,000.00
STORMWATER SYSTEM
37.0Demolish Existing 24” Storm Sewer Pipe Between CB 9A & CB 13 in Areas P-2 & P-5LF165$ - 0
38.0Demolish Existing 15” Storm Sewer Pipe Between MH 16 & CB 17 in Areas P-2 & P-3LF60$ - 0
39.0Remove & Replace Curb & Gutter, Type S, per Detail on Sheet 15LF35$ - 0
40.0Furnish & Install 24” C76 Class IV Sewer Pipe in Areas P-3 & P-5 per Detail on Sheet 17LF98$ - 0
41.0Furnish & Install 15” C76 Class IV Sewer Pipe in Areas P-2 & P-3 per Detail on Sheet 17LF44$ - 0
42.0Furnish & Install 12” C76 Class IV Sewer Pipe in Area P-3 per Detail on Sheet 17LF9$ - 0
43.0Furnish & Install 78” CMP Stormwater Detention System in Area P-3.1 per Plans and Details (See Sheets 10, 12-14) Includes Excavation, Bedding, Backfill, & Ancillary HardwareLS1$ - 0
44.0Furnish & Install 4’ Dia. Precast Concrete Storm Structure CB 9A in Area P-5 Where Shown on the Plan per Detail on Sheet 17EA1$ - 0
45.0Furnish & Install 4’ Dia. Precast Concrete Manhole Structure MH 16 in Area P-2 Where Shown on the Plan per Detail on Sheet 17EA1$ - 0
46.0Furnish & Install 4’ Dia. Precast Concrete Catch Basin Structure CB 17 in Area P-3 Where Shown on the Plan per Detail on Sheet 17EA1$ - 0
47.0Replace Existing Frame & Cover with New Type E Inlet Cover per Detail on Sheet 17EA1$ - 0
STORMWATER TOTAL:$0.00
BASE BID TOTAL$60,000.00
ALTERNATE BID 1: P-1
48.0Milling 2” +/- Partial Depth to Remove Existing Pavement at Area P-1 to Meet 2” Pavement Cross Section per Detail on Sheet 15SF4,735$ - 0
49.0Provide 2.0" HMA MI-DOT (PG 64-22) 4C Surface Course at Area P-1 per Detail on Sheet 15SF4,735$ - 0
50.0Remove & Replace Existing ADA Signage in Area P-1 Where Shown on the Plans per Detail on Sheet 15EA2$ - 0
ALTERNATE BID 1 TOTAL:$0.00
ALTERNATE BID 2: P-3 & P-5
51.0Furnish & Install Rolled Concrete Curb at North & East edge of Area P-3 and Southeast Edge of Area P-5 per Detail on Sheet 15LF348$ - 0
ALTERNATE BID 2 TOTAL:$0.00
ALTERNATE BID 3: P-6.3 & P-6.4
52.0Demolish Existing Concrete Pavement at Areas P-6.3 & P-6.4SF1,080$ - 0
53.0Furnish & Install 8” D Fiber Reinforced Concrete Pavement at Areas P-6.3 & P-6.4 per Detail on Sheet 15SF1,080$ - 0
54.0Demolish Cement Block Masonry Wall in Area P-6.4LF20$ - 0
55.0Furnish & Install Galvanized Chain Link Fence in Area P-6.4 per Detail on Sheet 15LF20$ - 0
ALTERNATE BID 3 TOTAL:$0.00
GRAND TOTAL (BASE + ALTERNATES):$60,000.00
ADMINISTRATIVE SUBMITTALS
BID BOND (REQUIRED)
AFFIDAVIT OF BIDDER (FAMILIAL DISCLOSURE FORM)
AFFIDAVIT OF BIDDER (COMPLIANCE WITH SCHOOL SAFETY INITIATIVE LEGISLATION)
AFFIDAVIT OF COMPLIANCE - IRAN ECONOMICS SANCTIONS ACT
NON-COLUSIVE AFFADAVIT
BASE BID - SCHEDULE
PROJECT START DATE (WEATHER PERMITTING)
PROJECT WORKING DAYS
PROJECT WORKING DAYS
SUBSTANTIAL COMPLETION
FINAL COMPLETION
ALTERNATE BID 1 - SCHEDULE
PROJECT START DATE (WEATHER PERMITTING)
PROJECT WORKING DAYS
FINAL COMPLETION
ALTERNATE BID 2 - SCHEDULE
PROJECT START DATE (WEATHER PERMITTING)
PROJECT WORKING DAYS
SUBSTANTIAL COMPLETION
FINAL COMPLETION
ALTERNATE BID 3- SCHEDULE
PROJECT START DATE (WEATHER PERMITTING)
PROJECT WORKING DAYS
SUBSTANTIAL COMPLETION
FINAL COMPLETION