BPS - 2025 Pavement Program - Transportation Center - Proj. Plans Only compressed.pdf

PDF 26 MB Posted

Attached to
2025 Pavement Replacement Transportation Center
Solicitation number
RFP-BPS-250000001238-3
Issued by
Macomb County, Blissfield Village, Michigan

About this file

This is a set of construction plans prepared by Engineering Group and Structure Tec Group for Birmingham Public Schools' Bus Transportation Facility repaving project in Birmingham, Oakland County, Michigan. The project involves repaving approximately 3.91 acres of existing asphalt, with 3.52 acres of new asphalt installation and converting 0.39 acres to greenspace. The scope includes reducing parking capacity from 114 to 86 employee spaces (including ADA spaces) and from 89 to 84 bus parking spaces. The plans detail three bid alternates: a 2" pavement resurfacing option, rolled concrete curb and gutter replacement, and existing concrete pavement removal and replacement.

The project includes significant drainage improvements with the installation of a new underground detention system with approximately 49,000 cubic yard capacity, including pretreatment units and an overflow control structure. The site will maintain existing lighting fixtures and illumination patterns, and all replaced asphalt will be restored to pre-development grades except in ADA parking areas to ensure compliance. The plans include detailed specifications for soil erosion control, utility modifications, and emergency vehicle access requirements, with minimum vertical clearance of 13.5 feet maintained throughout the site.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

BIRMINGHAM PUBLIC SCHOOLS

FOR

CONSTRUCTION PLANS

CITY OF BIRMINGHAM, OAKLAND COUNTY, MICHIGAN

OVERALL SITE MAP

PREPARED BY:PREPARED FOR:

NO.

SHEET

SHEET INDEX

DESCRIPTION

PROPERTY DESCRIPTION:

PART OF NE QUARTER, SECTION 31

INDEMNIFICATION STATEMENT

LOCATION MAP

3121 E. GRAND RIVER AVE.

HOWELL, MI. 48843

517.546.4836 FAX 517.548.1670

Engineers Surveyors Planners Landscape Architects Engineering

STRUCTURE TEC GROUP

4777 CAMPUS DRIVE

KALAMAZOO, MI 49008

CONTACT: MR. PAUL GLUSZAK

PHONE:800-745-7832

EMAIL:

paul.gluszak@structuretec.com CONTACT: MARK DEFRIEZ

BUS TRANSPORTATION FACILITY RE-PAVING

SITE

LOCATION

G:\24-130\DWG\SP\24-130_SHEETS-SP.dwg, 1/30/2025 3:11:55 PM, AutoCAD PDF (General Documentation).pc3

BI

RM

IN

GH

AM

P

UB

LI

C

SC

HO

OL

S

BU

S

TR

AN

SP

OR

TA

TI

ON

F

AC

IL

IT

Y

0-

5-

KA

LA

MA

ZO

O, M

I 4

C

AM

PU

S

DR

IV

E

ST

RU

CT

UR

E

TE

C

GR

OU

P

Engineering

E . G

RA

ND

R

IV

ER

A

VE

HO

W

EL

L, M I.

7.

6.

F

AX

.5

.1

En gin ee rs

S ur ve yo rs P lan ne rs L an ds ca pe

A rch ite cts

E n g in ee ri n g

T

T

PAD

E

TVC

G

A

PB

E

BM

XXX.XX

T/C

GE

NE

RA

L

NO

TE

S

LE

GE

ND

G:\24-130\DWG\SP\24-130_SHEETS-SP.dwg, 1/30/2025 3:11:57 PM, AutoCAD PDF (General Documentation).pc3

E n g in ee ri n g

E . G

RA

ND

R

IV

ER

A

VE

HO

W

EL

L, M I.

7.

6.

F

AX

.5

.1

En gin ee rs

S ur ve yo rs P lan ne rs L an ds ca pe

A rch ite cts

Engineering3

EX

IS

TI

NG

C

ON

DI

TI

ON

S

PL

AN

G:\24-130\DWG\SP\24-130_BASE-SP.dwg, 1/30/2025 3:11:58 PM, AutoCAD PDF (General Documentation).pc3

IN

GH

AM

P

UB

LI

C

SC

HO

OL

S

BU

S

TR

AN

SP

OR

TA

TI

ON

F

AC

IL

IT

Y

0-

5-

KA

LA

MA

ZO

O, M

I 4

C

AM

PU

S

DR

IV

E

ST

RU

CT

UR

E

TE

C

GR

OU

P

Engineering

E . G

RA

ND

R

IV

ER

A

VE

HO

W

EL

L, M I.

7.

6.

F

AX

.5

.1

En gin ee rs

S ur ve yo rs P lan ne rs L an ds ca pe

A rch ite cts

E n g in ee ri n g

MATCH LINE

MATCH LINE

SCALE: 1 INCH = 40 FEET

040 20 40

DE

MO

LI

TI

ON

P

LA

N

G:\24-130\DWG\SP\24-130_SHEETS-SP.dwg, 1/30/2025 3:12:03 PM, AutoCAD PDF (General Documentation).pc3

IN

GH

AM

P

UB

LI

C

SC

HO

OL

S

BU

S

TR

AN

SP

OR

TA

TI

ON

F

AC

IL

IT

Y

0-

5-

KA

LA

MA

ZO

O, M

I 4

C

AM

PU

S

DR

IV

E

ST

RU

CT

UR

E

TE

C

GR

OU

P

Engineering

E . G

RA

ND

R

IV

ER

A

VE

HO

W

EL

L, M I.

7.

6.

F

AX

.5

.1

En gin ee rs

S ur ve yo rs P lan ne rs L an ds ca pe

A rch ite cts

E n g in ee ri n g

MATCH LINE

MATCH LINE

SCALE: 1 INCH = 40 FEET

040 20 40

XXX.XX

T/C

SITE STATISTICAL DATA:

ZONING: MU - MIXED USE DISTRICT

DEVELOPMENT TYPES / USE: SCHOOL BUS TRANSPORTATION FACILITY

1-STORY STRUCTURE

GROSS & NET SITE AREA: 1.33 AC (57,812 SQFT.)

BUILDING SQUARE FOOTAGE (FOOTPRINT): 3,357 SQ FT GROSS EXISTING =

TOTAL (0.08 AC) (5.8%)

IMPERVIOUS SURFACE (EXCLUSIVE OF BUILDING): 0.32 ACRES (24.1%)

PERVIOUS SURFACE: 0.93 ACRES (70.1%)

MIN. PARKING SETBACKS REQUIRED:

FRONT: 0-FT

REAR: 10-FT (ADJACENT MIXED USE DISTRICT)

SIDES: 0-FT

EXISTING ASPHALT TO BE REMOVED: 3.91 AC

PROPOSED ASPHALT: 3.52 AC

ASPHALT TO CONVERTED TO GREENSPACE = 0.39 AC

PARKING INFORMATION

EXISTING:

EMPLOYEE / STANDARD PARKING SPACES = 114, INCLUDING 16 ADA SPACES

BUS PARKING SPACES = 89

PROPOSED:

EMPLOYEE / STANDARD PARKING SPACES = 86, INCLUDING 14 ADA SPACES

BUS PARKING SPACES = 84

SITE PLAN NOTES

1. A MINIMUM VERTICAL CLEARANCE OF 13.5' SHALL BE

MAINTAINED THROUGHOUT THE SITE FOR EMERGENCY VEHICLE

ACCESS.

2. ALL DRIVEWAYS AND PARKING LOT AISLES SHALL BE

ACCESSIBLE AT ALL TIMES FOR EMERGENCY VEHICLES -

REGULAR SNOW REMOVAL, NO PARKING.

3. WASTE MANAGEMENT WILL BE THROUGH DUMPSTER TYPE

CONTAINERS LOCATED IN THE REAR OF THE BUILDINGS. WORK

4. PROPOSED ASPHALT TO BE INSTALLED TO PRE-REMOVAL

GRADES, EXCEPT AS PROPOSED IN ADA PARKING AREA (SEE

SHEET 7).

5. ALL STRIPPING TO BE RESTORED TO PRE-REMOVAL

CONFIGURATION, EXCEPT FOR ADA PARKING, AS SHOWN.

SITE LIGHTING NOTE

1. LIGHT POLES AND OTHER SITE LIGHTING FIXTURES ARE TO

REMAIN UNDISTURBED AND WILL MAINTAIN EXISTING

ILLUMINATION PATTERNS.

SI

TE

P

LA

N

PROTECT EXISTING STORM, SANITARY, AND WATER

STRUCTURES, CONCRETE COLLARS, LIGHTPOLES,

SIGNS, BOLLARDS, FENCING AND OTHER SITE

FEATURES UNLESS NOTED FOR REPLACEMENT.

BID ALTERNATE 3

REMOVE & REPLACE EXISTING

CONCRETE PAVEMENT

BID ALTERNATE 1

PROPOSED 2" PAVEMENT

RESURFACING

BID ALTERNATE 2

PROPOSED ROLLED CONCRETE

CURB & GUTTER (SEE SHEET 15)

G:\24-130\DWG\SP\24-130_SHEETS-SP.dwg, 1/30/2025 3:12:07 PM, AutoCAD PDF (General Documentation).pc3

SCALE: 1 INCH = 40 FEET

040 20 40

BI

RM

IN

GH

AM

P

UB

LI

C

SC

HO

OL

S

BU

S

TR

AN

SP

OR

TA

TI

ON

F

AC

IL

IT

Y

0-

5-

KA

LA

MA

ZO

O, M

I 4

C

AM

PU

S

DR

IV

E

ST

RU

CT

UR

E

TE

C

GR

OU

P

Engineering

E . G

RA

ND

R

IV

ER

A

VE

HO

W

EL

L, M I.

7.

6.

F

AX

.5

.1

En gin ee rs

S ur ve yo rs P lan ne rs L an ds ca pe

A rch ite cts

E n g in ee ri n g

PRE-DEVELOPMENT DRAINAGE:

STORMWATER RUNOFF FLOWS GENERALLY FROM NORTH TO SOUTH

THROUGH A SERIES OF EXISTING STORM STRUCTURES. ROOF DRAINAGE

FROM EXISTING BUILDINGS IS CAPTURED AND ROUTED TO DOWNSPOUTS

WHICH DRAIN TO-GRADE AND ARE COLLECTED BY THE EXISTING

STORMWATER MANAGEMENT SYSTEM. NO EXISTING DETENTION OR

RETENTION SYSTEM EXISTS ON SITE, AND ALL SITE SURFACE WATER

RUNOFF CAPTURED BY THE EXISTING SYSTEM IS ULTIMATELY ROUTED

INTO THE COMBINED STORM AND SANITARY SYSTEM IN A MANHOLE JUST

SOUTHWEST OF THE PROPERTY CORNER.

POST-DEVELOPMENT DRAINAGE:

IN THE POST DEVELOPMENT CONDITION, THERE WILL BE A REDUCTION IN

THE TOTAL IMPERVIOUS SURFACE WITH THE REMOVAL OF

APPROXIMATELY 0.3 AC OF ASPHALT PARKING LOT IN THE SOUTHEAST

PORTION OF THE SITE. ALL REPLACED ASPHALT WILL BE RESTORED TO

PRE-DEVELOPMENT GRADES, SO NO CHANGES IN CURRENT SURFACE

DRAINAGE PATTERNS ARE EXPECTED.

TO COMPLY WITH CURRENT CITY AND COUNTY DRAINAGE STANDARDS, AN

UNDERGROUND DETENTION SYSTEM (UDS) WITH A CAPACITY OF

APPROXIMATELY 49,000CY WILL BE INSTALLED UNDER THE EXISTING

EMPLOYEE PARKING LOT. DRAINAGE THAT PREVIOUSLY WAS ROUTED

THROUGH CB-9 TO CB-13 WILL INSTEAD BE ROUTED INTO A

PRETREATMENT UNIT AND THEN INTO THE PROPOSED UDS. DRAINAGE

FROM THE SOUTHEAST OF THE SITE THAT WAS PREVIOUSLY ROUTED INTO

CB-17 TO CB-16 WILL INSTEAD BE ROUTED INTO A PRETREATMENT

STRUCTURE AND THEN INTO THE PROPOSED UDS. THE DISCHARGE OF

THE UDS WILL PASS THROUGH AN OVERFLOW CONTROL STRUCTURE (OCS)

AND INTO CB-16. DIRECT RUNOFF COLLECTED AT CATCH BASINS CB-13

AND CB-15 FROM THEIR ASSOCIATED DRAINAGE AREAS WILL NOT BE

REQUIRED TO BE ROUTED THROUGH THE PROPOSED UDS.

THE DETENTION BASIN HAS BEEN SIZED PER OAKLAND COUNTY

REQUIREMENTS AND RELEASES STORMWATER AT A CONTROLLED RATE TO

THE THE EXISTING COMBINED STORM-SANITARY SYSTEM.

DR

AI

NA

GE

P

LA

N

G:\24-130\DWG\SP\24-130_SHEETS-SP.dwg, 1/30/2025 3:12:10 PM, AutoCAD PDF (General Documentation).pc3

IN

GH

AM

P

UB

LI

C

SC

HO

OL

S

BU

S

TR

AN

SP

OR

TA

TI

ON

F

AC

IL

IT

Y

0-

5-

KA

LA

MA

ZO

O, M

I 4

C

AM

PU

S

DR

IV

E

ST

RU

CT

UR

E

TE

C

GR

OU

P

Engineering

E . G

RA

ND

R

IV

ER

A

VE

HO

W

EL

L, M I.

7.

6.

F

AX

.5

.1

En gin ee rs

S ur ve yo rs P lan ne rs L an ds ca pe

A rch ite cts

E n g in ee ri n g

SCALE: 1 INCH = 40 FEET

040 20 40

XXX.XX

T/C

SCALE: 1 INCH = 10 FEET

010 5 10

GR

AD

IN

G

PL

AN

NOTE: PROPOSED ASPHALT GRADES IN ADA PARKING

STALLS DIFFER FROM EXISTING PAVEMENT GRADES

TO ENSURE ADA COMPLIANCE.

G:\24-130\DWG\SP\24-130_SHEETS-SP.dwg, 1/30/2025 3:12:13 PM, AutoCAD PDF (General Documentation).pc3

SCALE: 1 INCH = 50 FEET

050 25 50

BI

RM

IN

GH

AM

P

UB

LI

C

SC

HO

OL

S

BU

S

TR

AN

SP

OR

TA

TI

ON

F

AC

IL

IT

Y

0-

5-

KA

LA

MA

ZO

O, M

I 4

C

AM

PU

S

DR

IV

E

ST

RU

CT

UR

E

TE

C

GR

OU

P

Engineering

E . G

RA

ND

R

IV

ER

A

VE

HO

W

EL

L, M I.

7.

6.

F

AX

.5

.1

En gin ee rs

S ur ve yo rs P lan ne rs L an ds ca pe

A rch ite cts

E n g in ee ri n g

SO

IL

E

RO

SI

ON

A

ND

S

ED

IM

EN

T

CO

NT

RO

L

PL

G:\24-130\DWG\SP\24-130_SHEETS-SP.dwg, 1/30/2025 3:12:16 PM, AutoCAD PDF (General Documentation).pc3

SCALE: 1 INCH = 50 FEET

050 25 50

BI

RM

IN

GH

AM

P

UB

LI

C

SC

HO

OL

S

BU

S

TR

AN

SP

OR

TA

TI

ON

F

AC

IL

IT

Y

0-

5-

KA

LA

MA

ZO

O, M

I 4

C

AM

PU

S

DR

IV

E

ST

RU

CT

UR

E

TE

C

GR

OU

P

Engineering

E . G

RA

ND

R

IV

ER

A

VE

HO

W

EL

L, M I.

7.

6.

F

AX

.5

.1

En gin ee rs

S ur ve yo rs P lan ne rs L an ds ca pe

A rch ite cts

E n g in ee ri n g

UTILITY NOTES:

1. ALL WORK SHALL BE IN ACCORDANCE WITH THE STANDARDS AND SPECIFICATIONS OF

LYON TOWNSHIP OAKLAND COUNTY, AND THE STATE OF MICHIGAN.

2. CONTRACTOR TO VERIFY DEPTH AND LOCATION OF ALL EXISTING UTILITIES PRIOR TO

COMMENCING ANY WORK.

3. ALL PIPE LENGTHS SHOWN ARE FROM CL TO CL OF STRUCTURE OR FROM OPEN END OF

FLARED END SECTION.

4. ALL PROPOSED STORM SEWER PIPE SHALL BE RCP, UNLESS OTHERWISE NOTED.

4. ALL CB RIMS ARE AT FLOW LINE.

5. CONTRACTOR SHALL MAINTAIN MIN. 18-IN VERTICAL CLEARANCE BETWEEN ALL

UTILITY CROSSINGS.

6. THE PROPOSED DRAINAGE SYSTEM IS TO BE OWNED AND PROPERLY MAINTAINED BY

THE PROPERTY OWNER.

UT

IL

IT

Y

PL

G:\24-130\DWG\SP\24-130_SHEETS-SP.dwg, 1/30/2025 3:12:20 PM, AutoCAD PDF (General Documentation).pc3

SCALE: 1 INCH = 20 FEET

020 10 20

SCALE: 1 INCH = 40 FEET

040 20 40

Engineering

E . G

RA

ND

R

IV

ER

A

VE

HO

W

EL

L, M I.

7.

6.

F

AX

.5

.1

En gin ee rs

S ur ve yo rs P lan ne rs L an ds ca pe

A rch ite cts

E n g in ee ri n g

BI

RM

IN

GH

AM

P

UB

LI

C

SC

HO

OL

S

BU

S

TR

AN

SP

OR

TA

TI

ON

F

AC

IL

IT

Y

0-

5-

KA

LA

MA

ZO

O, M

I 4

C

AM

PU

S

DR

IV

E

ST

RU

CT

UR

E

TE

C

GR

OU

P

ST

OR

M

PR

OF

IL

ES

10' C76 CL IV RCP

88' C76 CL IV RCP

9' C76 CL IV RCP

44' C76 CL IV RCP

(PROFILES)

G:\24-130\DWG\SP\24-130_PROFILES CP.dwg, 1/30/2025 3:12:28 PM, AutoCAD PDF (General Documentation).pc3

E-ONE Emergency One Ocala FL

46.333

12.833 18.417 4.833 20.833

E-ONE Emergency One Ocala FL Overall Length 46.333ft Overall Width 8.333ft Overall Body Height 11.833ft Min Body Ground Clearance 1.393ft Track Width 8.333ft Lock-to-lock time 6.00s Max Wheel Angle 45.00°

E-ONE Emergency One Ocala FL

BI

RM

IN

GH

AM

P

UB

LI

C

SC

HO

OL

S

BU

S

TR

AN

SP

OR

TA

TI

ON

F

AC

IL

IT

Y

0-

5-

KA

LA

MA

ZO

O, M

I 4

C

AM

PU

S

DR

IV

E

ST

RU

CT

UR

E

TE

C

GR

OU

P

Engineering

E . G

RA

ND

R

IV

ER

A

VE

HO

W

EL

L, M I.

7.

6.

F

AX

.5

.1

En gin ee rs

S ur ve yo rs P lan ne rs L an ds ca pe

A rch ite cts

E n g in ee ri n g

SCALE: 1 INCH = 40 FEET

040 20 40

FIRE DEPARTMENT NOTES

1. OWNER TO ENSURE A BOX/KNOX BOX SHALL BE LOCATED NEAR

THE FRONT ENTRY (COORDINATE WITH FIRE MARSHALL).

2. A MINIMUM VERTICAL CLEARANCE OF 13.5' SHALL BE MAINTAINED

THROUGHOUT THE SITE FOR EMERGENCY VEHICLE ACCESS.

3. ALL DRIVEWAYS AND PARKING LOT AISLES SHALL BE ACCESSIBLE

AT ALL TIMES FOR EMERGENCY VEHICLES - REGULAR SNOW

REMOVAL, NO PARKING.

EM

ER

GE

NC

Y

CI

RC

UL

AT

IO

N

PL

G:\24-130\DWG\SP\24-130_SHEETS-SP.dwg, 1/30/2025 3:12:33 PM, AutoCAD PDF (General Documentation).pc3

IN

GH

AM

P

UB

LI

C

SC

HO

OL

S

BU

S

TR

AN

SP

OR

TA

TI

ON

F

AC

IL

IT

Y

0-

5-

KA

LA

MA

ZO

O, M

I 4

C

AM

PU

S

DR

IV

E

ST

RU

CT

UR

E

TE

C

GR

OU

P

Engineering

E . G

RA

ND

R

IV

ER

A

VE

HO

W

EL

L, M I.

7.

6.

F

AX

.5

.1

En gin ee rs

S ur ve yo rs P lan ne rs L an ds ca pe

A rch ite cts

E n g in ee ri n g

DE

TE

NT

IO

N

BA

SI

N

DE

TA

IL

S

G:\24-130\DWG\SP\24-130_SHEETS-SP.dwg, 1/30/2025 3:12:36 PM, AutoCAD PDF (General Documentation).pc3

IN

GH

AM

P

UB

LI

C

SC

HO

OL

S

BU

S

TR

AN

SP

OR

TA

TI

ON

F

AC

IL

IT

Y

0-

5-

KA

LA

MA

ZO

O, M

I 4

C

AM

PU

S

DR

IV

E

ST

RU

CT

UR

E

TE

C

GR

OU

P

Engineering

E . G

RA

ND

R

IV

ER

A

VE

HO

W

EL

L, M I.

7.

6.

F

AX

.5

.1

En gin ee rs

S ur ve yo rs P lan ne rs L an ds ca pe

A rch ite cts

E n g in ee ri n g

PR

ET

RE

AT

ME

NT

C S-

DE

TA

IL

G:\24-130\DWG\SP\24-130_SHEETS-SP.dwg, 1/30/2025 3:20:52 PM, DWG To PDF.pc3

IN

GH

AM

P

UB

LI

C

SC

HO

OL

S

BU

S

TR

AN

SP

OR

TA

TI

ON

F

AC

IL

IT

Y

0-

5-

KA

LA

MA

ZO

O, M

I 4

C

AM

PU

S

DR

IV

E

ST

RU

CT

UR

E

TE

C

GR

OU

P

Engineering

E . G

RA

ND

R

IV

ER

A

VE

HO

W

EL

L, M I.

7.

6.

F

AX

.5

.1

En gin ee rs

S ur ve yo rs P lan ne rs L an ds ca pe

A rch ite cts

E n g in ee ri n g

PR

ET

RE

AT

ME

NT

C S-

DE

TA

IL

G:\24-130\DWG\SP\24-130_SHEETS-SP.dwg, 1/30/2025 3:21:16 PM, DWG To PDF.pc3

IN

GH

AM

P

UB

LI

C

SC

HO

OL

S

BU

S

TR

AN

SP

OR

TA

TI

ON

F

AC

IL

IT

Y

0-

5-

KA

LA

MA

ZO

O, M

I 4

C

AM

PU

S

DR

IV

E

ST

RU

CT

UR

E

TE

C

GR

OU

P

Engineering

E . G

RA

ND

R

IV

ER

A

VE

HO

W

EL

L, M I.

7.

6.

F

AX

.5

.1

En gin ee rs

S ur ve yo rs P lan ne rs L an ds ca pe

A rch ite cts

E n g in ee ri n g

TYPICAL & BARRIER FREE PARKING SPACES

(NOT TO SCALE)

CL

(M

IN

.0

.0

(M

IN

TWO-WAY TRAFFIC

9.0'

7.

0'2.

0'

SIDEWALKCURB & GUTTER

(M

IN

(T

YP

E A1

/ M

DO

T R-

-E

TY

PE

C

9.0' 8.0' 9.0'

STRIPE PARKING 4"

WIDE WHITE PAINT

BARRIER-FREE PARKING

STRIPING TO BE PAINTED BLUE

BARRIER-FREE PARKING SIGNS

MIN. 3' OFF BACK OF CURB

INSIDE AND OUT

SHALL BE PLASTERED

COMPLETE STRUCTURE

MASONRY BLOCK THE

IF CONSTRUCTED OF

CO

NS

TR

UC

TI

ON

D

ET

AI

LS

5.0'

SIGN BOLLARD, 1' OFF EDGE OF

SIDEWALK OR WALKING PATHWAY

1.0'

G:\24-130\DWG\SP\24-130_SHEETS-SP.dwg, 1/30/2025 3:23:36 PM, DWG To PDF.pc3

IN

GH

AM

P

UB

LI

C

SC

HO

OL

S

BU

S

TR

AN

SP

OR

TA

TI

ON

F

AC

IL

IT

Y

0-

5-

KA

LA

MA

ZO

O, M

I 4

C

AM

PU

S

DR

IV

E

ST

RU

CT

UR

E

TE

C

GR

OU

P

Engineering

E . G

RA

ND

R

IV

ER

A

VE

HO

W

EL

L, M I.

7.

6.

F

AX

.5

.1

En gin ee rs

S ur ve yo rs P lan ne rs L an ds ca pe

A rch ite cts

E n g in ee ri n g

PA

VE

ME

NT

P

LA

N

DE

TA

IL

G:\24-130\DWG\SP\24-130_SHEETS-SP.dwg, 1/30/2025 3:12:56 PM, AutoCAD PDF (General Documentation).pc3

IN

GH

AM

P

UB

LI

C

SC

HO

OL

S

BU

S

TR

AN

SP

OR

TA

TI

ON

F

AC

IL

IT

Y

0-

5-

KA

LA

MA

ZO

O, M

I 4

C

AM

PU

S

DR

IV

E

ST

RU

CT

UR

E

TE

C

GR

OU

P

Engineering

E . G

RA

ND

R

IV

ER

A

VE

HO

W

EL

L, M I.

7.

6.

F

AX

.5

.1

En gin ee rs

S ur ve yo rs P lan ne rs L an ds ca pe

A rch ite cts

E n g in ee ri n g

OC

W

RC

S

TO

RM

D

RA

IN

D

ET

AI

LS

G:\24-130\DWG\SP\24-130_SHEETS-SP.dwg, 1/30/2025 3:13:02 PM, AutoCAD PDF (General Documentation).pc3

IN

GH

AM

P

UB

LI

C

SC

HO

OL

S

BU

S

TR

AN

SP

OR

TA

TI

ON

F

AC

IL

IT

Y

0-

5-

KA

LA

MA

ZO

O, M

I 4

C

AM

PU

S

DR

IV

E

ST

RU

CT

UR

E

TE

C

GR

OU

P

Engineering

E . G

RA

ND

R

IV

ER

A

VE

HO

W

EL

L, M I.

7.

6.

F

AX

.5

.1

En gin ee rs

S ur ve yo rs P lan ne rs L an ds ca pe

A rch ite cts

E n g in ee ri n g

OC

W

RC

S

ES

C

DE

TA

IL

G:\24-130\DWG\SP\24-130_SHEETS-SP.dwg, 1/30/2025 3:13:09 PM, AutoCAD PDF (General Documentation).pc3

Sheets and Views
1 COVER SHEET
2 GENERAL NOTES & LEGEND
3 EXISTING CONDITIONS PLAN
4 DEMOLITION PLAN
5 SITE PLAN
6 DRAINAGE PLAN
7 GRADING PLAN
8 SOIL EROSION AND SEDIMENT CONTROL PLAN
9 UTILITY PLAN
10 STORM PROFILES
11 EMERGENCY CIRCULATION PLAN
12 DETENTION BASIN DETAILS
16 PAVEMENT PLAN DETAILS
17 OCWRC STORM DRAIN DETAILS
18 OCWRC SESC DETAILS

File details come from the government source that posted it. Updated .