Contract Discrepancy Report.pdf
PDF 243 KB Posted
- Attached to
- Local Civilian Range Support Federal contract opportunity
- Solicitation number
- N0018926QL016
About this file
This document is a Contract Discrepancy Report (CDR) template used by the Contracting Officer's Representative (COR) to formally document and address contractor performance issues.
The CDR template requires completion of seven key sections: contract number, contractor task manager or on-site representative name, COR name, date and time the discrepancy was observed, detailed description of the discrepancy or problem with any supporting attachments, determination of whether a written corrective action plan is required, and if required, the timeframe for the contractor to submit the plan (specified in days after CDR receipt). The form includes signature lines for both the COR and the contractor's task manager or on-site representative, along with corresponding dates. The COR may initiate a CDR at any time, including when monthly recorded defects for a performance standard exceed allowable limits, when unacceptable performance is determined to be critical in nature and requires formal corrective action, or when an unfavorable trend is detected in contractor performance.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Questions and Answers.pdf | ||
| Amendment Pricing Spreadsheet.xlsx | XLSX spreadsheet | |
| Amendment 1.pdf | ||
| Contract Administration.pdf | ||
| Sole Source Justification Redacted.pdf | ||
| Pricing Spreadsheet - final.xlsx | XLSX spreadsheet | |
| Solicitation - N0018926QL016.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CONTRACT DISCREPANCY REPORT (CDR)
1. Contract Number: <insert number>
2. TO: (Contractor Task Manager or on-site representative) <insert name>
3. FROM: (Name of COR) <insert name>
4. Date and time observed discrepancy:
5. DISCREPANCY OR PROBLEM:
<Describe in detail. Identify any attachments.>
5. Corrective action plan:
A written corrective action plan < is / is not > required.
< If a written corrective action plan is required include the following. > The written Corrective Action Plan will be provided to the undersigned not later than < # days after receipt of this
CDR. >
Prepared by: <Enter COR’s name>
Signature – Contracting Officer’s Representative Date
Received by:
Signature - Contractor Task Manager or on-site representative Date
The COR may initiate a CDR at any time, including whenever the number of monthly recorded defects for a performance standard exceeds the allowable number of defects; anytime unacceptable performance is determined critical in nature and requires formal corrective action; and whenever an unfavorable trend is detected in contractor performance.