Contract Att06 - CB Test Readiness Notification_Template_02.03.2025.docx
DOCX document 301 KB Posted
- Solicitation number
- TSA25-04-0507
About this file
This document is a Test Readiness Notification (TRN) template for the Transportation Security Administration's Screening Equipment Deployment Services (SEDS) Checked Baggage (CB) program. The template is designed to document the readiness of checked baggage inspection systems (CBIS) for Initial System Acceptance Testing (ISAT), with detailed sections for system specifications, test results, and performance metrics. The template covers critical technical details including system type (Mini In-Line, Medium Volume, or High Volume), EDS quantity, design throughput requirements, baggage manipulation testing, system throughput testing, and various performance indicators such as suspect bag percentages, error rates, and system security assessments.
The document includes comprehensive test documentation fields for tracking system performance across different baggage handling system lines, with specific sections for recording test dates, manipulated bag sequences, test results, and observations. The template is marked as sensitive security information controlled under 49 CFR Parts 15 and 1520, indicating its confidential nature in the transportation security equipment deployment process. It is associated with a TSA solicitation (TSA25-04-0507) for Screening Equipment Deployment Services, with the agency anticipating a full RFP release in Q1 or Q2 of FY26.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| CB SEDS II Pricing Workbook_Template_08.06.2025.xlsx | XLSX spreadsheet | |
| Contract Att05 - Acquisitions Requirements Order Worksheet v2.2_Template_08.12.2025.xlsx | XLSX spreadsheet | |
| Contract Att02 - CDRL A004 - CB Weekly Status Report_ Template_08.12.2025.xlsx | XLSX spreadsheet | |
| Questions on Draft PWS SEDS CB.xlsx | XLSX spreadsheet | |
| Contract Att03 - CDRL A003 - CB Monthly Status Report_ Template_02.03.2025.docx | DOCX document | |
| Contract Att01 - CDRL B002 - OTA Invoice Review Report_Template_08.12.2025.docx | DOCX document | |
| CB SEDS II IDIQ SOW_08.19.2025.docx | DOCX document | |
| Contract Att04 - CDRL D001 - CB EDS Decommission Report and Checklist v4_Template_08.12.2025.xlsx | XLSX spreadsheet |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SENSITIVE SECURITY INFORMATION
IDIQ Contract No.
Task Order No.
TEST READINESS NOTIFICATION (TRN)
TO:
CC:
FROM:
DATE:
Airport:
Terminal(s) Designation:
Bag room/Node Designation:
CB SEDS TRR/Site Lead:
Cell Phone:
E-mail:
Recommendation:
|_| Proceed with ISAT |_| Do not proceed with ISAT
Comments:
| CB SEDS Site Lead obtained a copy of the CBIS’s final Programmable Logic Controller (PLC) code at END of TRR. |
| |_| Yes |
|_| No
PGDS version for CBIS design:
PGDS version for CBIS testing:
System Type:
|_| Mini In-Line |_| Medium Volume |_| High Volume
System Concept:
EDS Type(s):
EDS Quantity:
Design Throughput Requirement (BPH):
BMTT Setting:
GOVT Setting:
TTL Setting:
| ATR Manufacturer and Technology: |
| (I.e. laser, camera, hybrid, etc.) |
| BMA Manufacturer and Settings: |
| L:” W:” H:” |
| Secondary, Pre-EDS OH and OL Detection Settings: |
| OH:” |
OL:”
Planned CBIS ISAT Start Date: (By bag room)
Planned CBIS ISAT Finish Date: (by bag room)
TSA Accepted variances, if any, to the PGDS (attach documentation)
Time/Date Restrictions: (if other than M-F normal shift) (by bag room)
Physical Constraints (if any, by bag room):
I.e.: cutovers, access to ticket counters, overhead work, etc.)
Labor Constraints:
Date Received:
Table 1
| RFV/CCR Number/Subject |
| Referenced PGDS Section |
| Approval Status |
OBSERVATIONS, PERFORMANCE ISSUES, and NOTES
1) Reported Results and Performance Issues:
2) List any anomalies or unique conditions:
3) Issues with safety and/or operations:
Figure 1
XXX TRR Test Results Summary
Tests are listed below per PGDS v.7 Appendix D for XXX. Tests conducted for TRR are noted as Yes or No, with explanation for any failed tests provided below.
| # |
| Test Date |
| Test |
| Line |
| Zone |
| Point of Manipulation |
| Manipulated Bag/Comments |
| # of Bags |
| Sequence |
| Complete? |
Pass-No deficiencies/defects
Pass- Minor deficiencies/defects
Fail
Introductory and Detailed Test Notes
Miscellaneous Notes:
Failed Tests:
Miscellaneous Notes:
Other Observations:
System Mixed/Die-Back Bag Test Summary
| Test Name/Iteration |
| BHS Lines – EDS Serial # |
| Result – Data |
System Mixed/Die-Back Bag Test
BHS Lines:
EDS Serial #s:
Bag Induction Points:
Bag Removal Location(s):
Total Bags Inducted:
Total Bags at CBRA:
CBRA Arrivals:
Suspect Bags:
0.0%
OOG Bags:
0.0%
EDS Error Bags:
0.0%
BHS Unknown Bags:
0.0%
Clear Bags
0.0%
| System Secure: |
| |_| Yes |
| |_| No |
| Number of Suspect Bags & Images Match: |
| |_| Yes |
| |_| No |
Fail-Safe Event Rate:
Criteria <= 0.5%
| 0 |
| 0.0% |
Invalid Arrival Rate:
Criteria <=3%
| 0 |
| 0.0% |
Bag Jam Event Rate - pre-EDS:
Criteria <= 1%
| 0 |
| 0.0% |
| Bag Jam Event Rate - Overall: Criteria = N/A |
| 0 |
| 0.0% |
Laser Read Rate:
Criteria >= 98% 0.0%
RFID Read Rate:
Criteria >= 99% N/A
Upstream Tracking Rate:
Criteria >= 97% (Average of spur lines) 0.0%
Meets Criteria:
System Mixed Test Notes
Miscellaneous Notes:
System Throughput Test Summary
| Test Name/Iteration |
| BHS Lines – EDS Serial # |
| Result – Data |
System Throughput Test
BHS Lines:
EDS Serial #s:
Bag Induction Points:
Bag Removal Location(s):
Total Bags Inducted:
0.0%
Total Bags at CBRA:
0.0%
Valid CBRA Arrivals:
Suspect Bags:
0.0%
OOG Bags:
0.0%
EDS Unknown Bags:
0.0%
BHS Unknown Bags
0.0%
| System Secure: |
| |_| Yes |
| |_| No |
| Number of Suspect Bags & Images Match: |
| |_| Yes |
| |_| No |
Fail-Safe Event Rate:
Criteria <= 0.5%
| 0 |
| 0.0% |
Invalid Arrival Rate:
Criteria <= 3%
| 0 |
| 0.0% |
| Bag Jam Event Rate - pre-EDS: Criteria <= 1% |
| 0 |
| 0.0% |
| Bag Jam Event Rate - Overall: Criteria = N/A |
| 0 |
| 0.0% |
Laser Read Rate:
Criteria >= 98% 0.0%
RFID Read Rate:
Criteria >= 99% N/A
Upstream Tracking Rate:
Criteria >= 97% (Average of spur lines) 0%
| Number of Minutes (Minutes) |
| 00:00 |
| Throughput Observed (BPH) (5 Minute Peak) |
| 0000 |
Meets Criteria:
System Throughput Test Notes
Miscellaneous Notes:
- 1 -
WARNING: THIS RECORD CONTAINS SENSITIVE SECURITY INFORMATION THAT IS CONTROLLED UNDER 49 CFR PARTS 15 AND 1520. NO PART OF THIS RECORD MAY BE DISCLOSED TO PERSONS WITHOUT A “NEED TO KNOW”, AS DEFINED IN 49 CFR PARTS 15 AND 1520, EXCEPT WITH THE WRITTEN PERMISSION OF THE ADMINISTRATOR OF THE TRANSPORTATION SECURITY ADMINISTRATION OR THE SECRETARY OF TRANSPORTATION. UNAUTHORIZED RELEASE MAY RESULT IN CIVIL PENALTY OR OTHER ACTION. FOR U.S. GOVERNMENT AGENCIES, PUBLIC DISCLOSURE IS GOVERNED BY 5 U.S.C. 552 AND 49 CFR PARTS 15 AND 1520.