This file is a comprehensive Decommissioning Checklist Template for Explosive Detection System (EDS) equipment used by the Transportation Security Administration (TSA). The detailed Excel spreadsheet provides a systematic approach for decommissioning checked baggage screening equipment, requiring extensive documentation of equipment condition, serial numbers, and operational performance. The checklist includes multiple sections for evaluation criteria, such as operability verification, assessment and cleaning, disassembly, crating, and shipping procedures, with specific requirements for photographic documentation, component inventory, and condition assessment.

The template is designed for TSA Screening Equipment Deployment Services (SEDS) contractors to thoroughly document the decommissioning process of EDS equipment, including detailed inspections of components like conveyors, gantry, detectors, printers, and peripheral systems. It mandates comprehensive checks including radiation surveys, interlock and e-stop functionality, x-ray light verification, and decibel level testing, with provisions for recommending repairs, refurbishments, or replacements of equipment parts. The document requires contractors to complete all sections in full, provide comments for any negative or non-applicable responses, and submit a complete report with labeled photographic evidence to CBTPlanning@tsa.dhs.gov.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Decom Checklist

EDS Decommission Report and Checklist
Decommission at
Decommission Date:Airport Code:Prepared By:
Task Order:Terminal Location:Prepared For:
POC Information
NameTitlePhoneEmail
TSE Information
Installation ConfigurationOEMModelTunnel Configuration (S/L/XL)Pedestals (Yes/No)Seismic Anchoring (Yes/No)Entrance Conveyor (Sloped/Flat)OTK Kit (Yes/No)

O/S Image System Software Alg Controller Software Algorithm Software

TSE Identification
ComponentSerial NumberTSA BarcodeTSA Barcode last 9Recommended Condition Code*Comments
EDS(8004)855057000
UPS(8004)855057000
Infeed Conveyor(8004)855057000
Outfeed Conveyor(8004)855057000
A/C(8004)855057000
Tunnels(8004)855057000
Pedestals(8004)855057000
PVS 1 (All associated cables included)(8004)855057000
PVS 2 (If Applicable)(8004)855057000
SVS 1 (All associated cables included)(8004)855057000
SVS 2 (If Applicable)(8004)855057000
SVS 3 (If Applicable)(8004)855057000
*Condition Codes: 1 = New (never been installed), 4 = Used (installed at least once), 7 = Need Evaluation/Repair, or X = Final Disposition/Disposal)
Decommissioning Information
Ship To Location:Expected Date
of Arrival:TSALC Warehouse Impacts

(if applicable)

Ship to TSALC Warehouse?Expected Stay Time:
Ship to Rigger's Warehouse?Requires Testing?
Ship to an airport? If yes, list code:Redeployment Date:
Required Pictures
Picture Instructions
Required Pictures
Picture files are to be labeled with the site 3 letter code followed by increasing numerical number as pictures are taken(Ex. ABE1, ABE2)

Picture file names to be placed nex to coordinating comment on the decommission checklist

Pictures will be placed in a zip file labeled with site 3 letter code followed by the decommission date(Ex. ABE01012025) and e-mailed with the site decommission checklist to TSA DSD and PEO

Pictures required for any

-All parts requiring Repair / Refurbish / Replace / Clean -Scanner from all sides and peripherals showing condition at time of decommissioning -Entrance/Exit conveyor as applicable -Serial Numbers and Barcodes of each component -Image Quality Test (IQT) Results -Interior packaging and views of all 4 external sides and top of each crate -Inventory List/Component name on each crate -Close-up photos of shock and tip sensors on each crate

Instructions
All sections must be completed in full. If any section is marked No, Fail, or N/A a comment is requierd for.
Decommissioning
Evaluation CriteriaYes / NoComments / ConcernsPhoto File Name
Last Completed Radiation Survey Date (Radiation survey required for refurbishment)
Review Corrective Maintenance (provided by V2X)
Verify Condition of Gantry (excess noise or vibration)(List any missing or broken parts and record location of any physical damage)
Verify Overall Condition of EDS
Verify Condition of Input/Output Tunnels or Extensions (verify all sides, take picture of any visible issues)
Verify Condition of Infeed Conveyors including belts
Verify Condition of Exit Conveyors including belts
Verify Condition of UPS
Review PVS Data (FDRS) and Provide Last Month's Bag Count
Check Host/Algorithm Computers for Most Relevant Algorithms
Record X-Ray Tank Hours
Photograph Scanner Condition
Photograph SN and Barcode for Scanner & Ancillary Equipment
Document and photograph Any Scratches or Dents in the "Visual Inspection" Tab
Verify Cleanliness of System
Complete Pedestal Hardware Inventory (if applicable)
Verify Availability of All Keys (EDS and PVS/SVS Cabinets)
Verify Availability of All Test kits (OKT, Water Test)
Verify PM's(Ensure system has all applicable periodic Maintenance
Operability Verification
Evaluation CriteriaPass / FailComments / Concerns (additional comments required for any 'Fail')
Powerup
Interlock Check
Estop Check
X-Ray Lights check
Record Voltage Parameter Values
Record Disk Rotation Speed
Scan 20 bags
Run IQT/OTK 5 times
Collect 6 month maintenance history (V2X responsibility via TSA)
RBDM (Reveal only)
Water Calibration, if test kit is present (Reveal only)
Gantry Calibration (Reveal only)
Photograph Image Quality Test Results
Test Printer Operation
Collect Detector Array Condition (DAS)
Confirm Master Control Interface (MCI) screen is operational (Reveal only)
Decibel Level Test (Conduct test per Sound Decibel tab instructions)
Note any additional items of concern (ex: part failures)
Assessment and Cleaning Checklist
Task DescriptionYes / NoComments / ConcernsPhoto File Name
DAS bucket cleaning
Bearing assessment
Air conditioning coil cleaning
Slipring and antenna cleaning
Oil leakage and cleanup and identification
Gantry Cleaning (Wipe down all internal and external surfaces, vacuum debris)
Disassembly, Crating and Shipping Checklist
Task DescriptionYes / NoComments / ConcernsPhoto File Name
Prepare EDS for Disassembly
Disconnect and Remove PVS and SVS
Inventory PVS and SVS
Secure PVS and SVS Components
Secure Master Control Station (MCS) (Mini Inline only)
Disconnect Tunnels, if present
Disconnect Conveyors
Disconnect Air Conditioner, if present
Prepare A/C Unit
Install Gantry Bolts
Prepare Unit for Shipping
Retract all leveling feet (EDS, Extensions, Conveyors, and Pedestals)
Place mounting hardware with appropriate component
The following section to be completed by SEDS Contractor
Oversee Crating
Photograph Interior Packaging Before Closing Crates
Photograph All 4 Sides and Top of All Crates
Label Each Crate with Component Name
Adhere Inventory List to Side of Crate
Indicate Total Number of Crates
Indicate if Any Components are Crated with Other Components
Adhere Tilt and Shock Sensors to Crates
Take Close-Up Photographs of All Tilt and Shock Indicators
Oversee Rigging
Oversee Loading for Transport
Part Recommendation (All Repair/Refurbish/Replace require picture of part)
Please note any dents, dings, scratches, scuffs, or otherwise broken or damaged items that would contribute to the EDS or peripherals not appearing to be like-new. Please suggest any cleaning, repair/refurbishment, or replacement of parts to correct this on the Recommendation list.
Part NumberPart DescriptionParts Function (What is the parts function?) and reason for Repair / Refurbish / ReplaceP1 / P2 TicketRepair / Refurbish / Replace / CleanPicture File Name

OEM Additional Comments

TSA SEDS Contractor Additional Comments

Sign and date this Decommission Checklist and leave a copy with the unit
OEM Contact Information

Printed Name E-mail Address Company Name

SignaturePhone NumberDate
TSA SEDS Contractor Contact Information
By entering my name below, I hereby certify that the I have completed a full and thorough examination of the EDS and peripheral equipment specified in this checklist

Printed Name E-mail Address Company Name

SignaturePhone NumberDate
TSA HQ Information

Printed Name E-mail Address Date

SignaturePhone Number
E-mail completed decommissioned checklist and photo zip file to CBTPlanning@tsa.dhs.gov for review

Sound Decibel While system is in a non-powered position, conduct a decibel level test approximately 3 feet from main EDS unit with a dedicated decibel recording tool and record baseline. Power-on the system and conduct a decibel level test approximately 3 feet from the main EDS unit with a dedicated decibel recording tool and record in operational decibel level.

Decibel Range(0-120)
Base Environment Level
Operational Level

Capability Decibel Level

Base Environment Level Operational Level

Visual Inspection

EDS Decommission Visual Inspection
Serial Number0

&"Arial"&9&K000000 Leidos Proprietary&1#_x000D_

_x000D_&1#&"Arial"&8&K000000 The information in this document is proprietary to Leidos. It may not be used, reproduced, disclosed, or exported without the written approval of Leidos.

Instructions

SectionSubjectDetails / Instructions
Operability VerificationPowerupPerform all power checks in accordance with the latest installation manual. If the unit fails any of the power checks, note the component(s) which caused the failure on the Recommendation section. Please provide a picture of the failed test / failed test result to justify cleaning or replacement of the part.
Operability VerificationInterlock CheckEnsure all system interlocks are operable in accordance with the latest installation manual. With the unit on, one at a time, individually open each door, inspect the interlock indicator to ensure it illuminates, and close the door. Repeat this process for all access doors on the scanner, entrance tunnel, and exit tunnel to ensure that the x-ray source will not remain on and the gantry will not continue to spin with access doors open. If the unit fails any of the interlock checks, note the component(s) which caused the failure on the Recommendation section.
Operability VerificationE-Stop CheckEnsure all system e-stops are operable in accordance with the latest installation manual. With the system on, activate each e-stop, one at a time, ensuring the indicator illuminates as expected. After each test, reset the circuit per the instruction manual before testing the next e-stop. If the unit fails any of the e-stop checks, note the component(s) which caused the failure on the Recommendation section.
Operability VerificationX-Ray LightsWhile the system is warming up and scanning bags, ensure all X-RAY ON lights illuminate as expected per the procedures in the maintenance manual. If the unit fails any of the x-ray light checks, note the component(s) which caused the failure on the Recommendation section.
Operability VerificationOperating Parameter ValuesIn accordance with the latest installation manual, ensure that all operating parameters are within the required ranges. If something is outside of the expected range, determine the component at fault and list the component(s) which caused the failure on the Recommendation section.
Operability VerificationRadiation SurveyHas a radiation survey been performed within the last year? If so, did the unit pass? If the answer to either question is no, perform a new radiation survey and record the results. If the unit fails the radiation survey, identify the parts requiring replacement or repair/refurbishment in the recommendation section. Also during this step, please inspect the scanner's curtains for any damage, noting them for cleaning, repair/refurbishment, or replacement on the recommendation section.
Operability VerificationConveyor Belt(s) and ComponentsPerform all conveyor tests per the latest maintenance manual. This includes, but is not limited to, checking the belt tension and tracking. Inspect all conveyor belt components for damage, ensuring the belts themselves are free of rips or tears and that belts are tensioned to specification and aligned correctly. Ensure there are no abnormal vibrations or noises. If issues are found with any of the above tests/inspections, add a recommendation for cleaning, repair/refurbishment, or replacement on the recommendation section.
Operability VerificationPrinter OperationIf the unit has a printer, print a test sheet from the printer and validate that all test panels look as expected. If the printer fails the test sheet, perform a self-cleaning operation on the printer and ensure the ink is full. If the printer still does not pass the test sheet, ensure the printer is marked for potential repair/refurbishment or replacement on the recommendation section.
Operability VerificationDetector Array ConditionPerform tests to verify the performance of the detector array per the latest maintenance manual. This includes, but is not limited to, the DAS Health Check. If any test fails, perform a root cause analysis and add any recommended cleanings, part repairs/refurbishments, or part replacements to the recommendation section.
Operability VerificationGantry ConditionPerform tests to verify the gantry condition per the latest maintenance manual. This test includes, but is not limited to, the semi-annual bearing assessment. Additionally, check the tolerances on the gantry bearing and any unusual noises or vibrations coming from the gantry during operation. If any tests are failed or if the gantry bearing is out of spec or producing unusual noises/vibrations, include any recommended part cleaning, refurbishment, or replacements on the recommendation section.
Operability VerificationIQTK/OTKRun the Image Quality Test Kit (IQTK) or Operational Test Kit (OTK) 2 times in accordance with the latest installation manual. If the unit fails any of the passes, perform a root cause analysis and note the components at fault on the recommendation section and flag for potential replacement.
Operability VerificationEquipment and Component KeysEnsure all keys to unlock scanner and peripheral access panels, as well as the key to turn the system on, are available and function. If keys are missing or do not work, flag these as items for repair/refurbishment or replacement on the recommendation section.
Operability VerificationDecibel Level Test (Comment Baseline level and operational level)While system is in a non-powered position, conduct a decibel level test approximately 3 feet from main EDS unit with a dedicated decibel recording tool and record baseline. Power-on the system and conduct a decibel level test approximately 3 feet from the main EDS unit with a dedicated decibel recording tool and record in comment operational decibel level.
Part RecommendationComments/JustificationsIf applicable, add comments about the condition of the part including whether it required cleaning, repair/refurbishment, or replacement. Items for cleaning may have dirt/dust/grime impacting operation or are located in a visible area of the equipment. Item replacements are the result of a failed operability tests or from visible wear that could impede function or can be seen from the outside of the system (e.g. wire sheathing worn through, bent pins, tears, dead pixels, etc.). Items for repair or refurbishment result from the same circumstances as replacement items; however, the parts may be hard to replace or less expensive to repair (e.g. painting of scratched/scuffed parts, removal of dents, etc.).
Part RecommendationCleaning PartsIs dirt, dust, or grime impacting the function of this part? Is this part visible outside of the scanner? Does the part have any labels or markings outside of those placed by the manufacturer or TSA? Is this part recommended for repair/refurbishment or replacement? If yes to either of the first three question and the part is not being recommended for replacement, the part must be cleaned.
Part RecommendationRepair/Refurbishment of partsWas this part responsible for a failure of any of the operability verification tests? Does the part show visible wear that could impede it's function? (e.g. wire sheathing worn through, bent pins, tears, dead pixels, etc.) Do any parts show visible wear on the outside of the scanner or tunnels? (e.g. dents, scratches, dings). If yes, can the part be easily repaired, are new parts difficult to obtain, or is it less expensive to repair the part than to replace it? If yes to any of those three questions, the part should be marked for potential repair/refurbishment.
Part RecommendationReplacing PartsWas this part responsible for a failure of any of the operability verification tests? Does the part show visible wear that could impede it's function? (e.g. wire sheathing worn through, bent pins, tears, dead pixels, etc.) Do any parts show visible wear on the outside of the scanner or tunnels? (e.g. dents, scratches, dings) If yes to any of those questions, is the part hard to repair or is the part less expensive to repair than to replace. If yes to either of those questions, the part should be marked for potential replacement.
Part RecommendationComments/JustificationsPlease provide a comment or justification to explain why the part is being recommended to be replaced and what the photo of the part is showing. This could include pointing out broken/dirty parts or showing test results that indicate replacement is needed.

&"Arial"&9&K000000 Leidos Proprietary&1#_x000D_

_x000D_&1#&"Arial"&8&K000000 The information in this document is proprietary to Leidos. It may not be used, reproduced, disclosed, or exported without the written approval of Leidos.

Sheet3

Yes
No

&"Arial"&9&K000000 Leidos Proprietary&1#_x000D_

_x000D_&1#&"Arial"&8&K000000 The information in this document is proprietary to Leidos. It may not be used, reproduced, disclosed, or exported without the written approval of Leidos.

image1.jpeg image2.jpeg image3.png image4.png image20.png image5.jpeg

File details come from the government source that posted it. Updated .