Construction Drawings--Project Number 570-21-800.pdf
PDF 12 MB Posted
- Solicitation number
- 36C26122R0010
About this file
This document provides details for a federal construction contract opportunity to replace an elevator at a Veterans Affairs medical center. The Veterans Health Administration Network Contracting Office 21 is soliciting proposals for Project Number 570-21-800 to replace the four-story freight elevator at the VA Central California Healthcare System campus in Fresno, California. The contractor will be responsible for all construction services, materials, labor, project management, and testing required to replace the elevator mechanics, motor, doors, cab, and add a new shaft penetration. The project cost is estimated between $1-2 million and shall be completed within 329 calendar days of receiving notice to proceed. Offerors must be classified as a small business for NAICS Code 238290 with an approved size standard of $16.5 million or less. Proposals are due by November 23, 2021, and the contract will be awarded as a small business set-aside in accordance with FAR Part 15.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C26122R0010 0004.docx | DOCX document | |
| Sign-in Sheet for 3rd Site Visit.pdf | ||
| Sign-in Sheet for 1st Site Visit.pdf | ||
| 36C26122R0010 0003.docx | DOCX document | |
| 36C26122R0010--RFI Reposnes--12.21.2021.pdf | ||
| 570-21-800_Good_Faith_Study.pdf | ||
| General Decision Number--CA20210018--12.17.2021.pdf | ||
| 36C26122R0010 0002.docx | DOCX document | |
| 36C26122R0010 0001.docx | DOCX document | |
| REQUEST FOR INFORMATION (RFI) FORM--36C26122R0010.docx | DOCX document | |
| Factor 3 - Past Performance (Questionnaire).docx | DOCX document | |
| Factor 1 - Prime Contractor Project Experience.xlsx | XLSX spreadsheet | |
| General Decision Number CA20210018.pdf | ||
| VHA_DIRECTIVE_1193_D_2021_08_13--Vaccination_Program.pdf | ||
| Responsibility - Contractor Certification Regarding Safety and Environmental.pdf | ||
| Specifications--Project Number 570-21-800 02.pdf | ||
| Factor 6 - Divisional Cost Breakdown.xlsx | XLSX spreadsheet | |
| 36C26122R0010_2.docx | DOCX document |
Show all 18
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
B-31
COMMUNITY
B-1
MAIN
B-3
ENGINEERING
PUMPHOUSE
B-7
GASOLINE PUMP
B-4
MAIN
B-19 B-19A
GENERATOR
B-2
BOILER PLANT
WAREHOUSE
B-32
OUTPATIENT
O P C
A N C
IL
LA
R Y
OPC
B-5
PUMPHOUSE
MENTAL
B-25
B-34
MENTAL HEALTH
HEALTH
FREEDOM
CLINIC
HOSPITAL B-24
LIBERTY
BLDG
LIVING
CENTER
VALOR BLDG
BLDG
STAGING AREA
G E N E R A
TO
R
G E N E R A
TO
R
G E N E R A
TO
R
G E N E R A
TO
R
G E N E R A
TO
R
B-27
MENTAL HEALTH
INDEPENDENCE BLDG
& TANKS
B-8
STORAGE SHEDS
B-36
BARN
B-24
AUDITORIUM
B-24
TOILETS
B-24
ELEVATOR
B-24 BREEZEWAY
& STAIRS
SWITCHGEARSWITCHGEAR
B-22
CHILLER
B-22A
CHILLER
T-5
ENGR. TRAILER
W A
LK
O F
H O N O R
S P E E D
B U M P
YIELD
YIELD
S P E E D
B U M P
MAIN ENTRANCE
SIGN
V A
M O N U M E N T S
IG
N
U
TI
LI
TY
V A U
LT
BUS
B U S
P A R K
IN
G
LO
T H
STORAGE CANOPY
M O N U M E N T S
IG
N
MODULAR 2
FUEL TANK #2FUEL TANK #1
LOT C
ELEVATOR
B-18
LIQUID OXYGEN
B-17
SHELTER
SMOKING
BUS
BBQ
P A R K
IN
G
LO
T H
PARKING LOT A
PARKING LOT B
P A R K
IN
G
LO
T C
PARKING LOT E
P A R K
IN
G
LO
T F
PARKING LOT G
PARKING LOT D
TANK
O2
TANK
O2
TANK
DIESEL
TANK
DIESEL
CLC
BUILDING
EL 308.5
EL 308.5
65 A B
74 A B
A B
VA CENTRAL CALIFORNIA HEALTH CARE SYSTEM - FRESNO CA
PROJECT NO. 570-21-800
REPLACE BUILDING 32
ELEVATOR FOR SAFETY
1 LOCATION PLAN
NOT TO SCALE 2 VICINITY PLAN
NOT TO SCALE
COVER SHEET
RM AJ
VA CENTRAL CALIFORNIA HEALTH CARE SYSTEM - FRESNO, CA
VA CENTRAL CALIFORNIA HEALTH CARE SYSTEM - FRESNO, CA
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Fi le
P at h 6/
/2
:3
9:
P M
FOR CONSTRUCTION
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD A/E:
STAMP
321 4 5 6 7 8 9 10
REPLACE BUILDING 32 ELEVATOR
FOR SAFETY
VA CENTRAL CALIFORNIA HEALTH CARE
SYSTEM - FRESNO, CA
570-21-800
Project Director
Revisions: Date:
SPEES DESIGN BUILD
625 1ST AVE #301
SEATTLE, WA, 98014
(206) 590 - 2118
RAY SPEES, PRESIDENT
BUILDING WITHIN SCOPE OF PROJECT
05/11/2021 G-001
AutoCAD SHX Text
MOTORCYCLES
AutoCAD SHX Text
HYDRONICS
AutoCAD SHX Text
UTILITY PAD
AutoCAD SHX Text
CLINTON AVENUE
AutoCAD SHX Text
HARVARD AVENUE
AutoCAD SHX Text
FRESNO STREET
AutoCAD SHX Text
SOLAR PANELS
AutoCAD SHX Text
SOLAR PANELS
AutoCAD SHX Text
NORTH ANGUS STREET
AutoCAD SHX Text
SOLAR PANELS
AutoCAD SHX Text
SOLAR PANELS
AutoCAD SHX Text
SOLAR PANELS
AutoCAD SHX Text
SOLAR PANELS
AutoCAD SHX Text
SOLAR PANELS
AutoCAD SHX Text
SOLAR PANELS
AutoCAD SHX Text
SOLAR PANELS
AutoCAD SHX Text
SOLAR PANELS
AutoCAD SHX Text
SOLAR PANELS
AutoCAD SHX Text
SOLAR PANELS
AutoCAD SHX Text
SOLAR PANELS
AutoCAD SHX Text
SOLAR PANELS
AutoCAD SHX Text
SOLAR PANELS
AutoCAD SHX Text
SOLAR PANELS
AutoCAD SHX Text
SOLAR PANELS
AutoCAD SHX Text
SOLAR PANELS
AutoCAD SHX Text
PANELS
AutoCAD SHX Text
SOLAR
AutoCAD SHX Text
PANELS
AutoCAD SHX Text
SOLAR
AutoCAD SHX Text
PANELS
AutoCAD SHX Text
SOLAR
AutoCAD SHX Text
SOLAR PANELS
AutoCAD SHX Text
SOLAR PANELS
AutoCAD SHX Text
SOLAR PANELS
AutoCAD SHX Text
SOLAR PANELS
AutoCAD SHX Text
SOLAR PANELS
AutoCAD SHX Text
SOLAR PANELS
AutoCAD SHX Text
SOLAR PANELS
AutoCAD SHX Text
SOLAR PANELS
AutoCAD SHX Text
SOLAR PANELS
AutoCAD SHX Text
SOLAR PANELS
AutoCAD SHX Text
SOLAR PANELS
AutoCAD SHX Text
SOLAR PANELS
AutoCAD SHX Text
SOLAR PANELS
AutoCAD SHX Text
SOLAR PANELS
AutoCAD SHX Text
SOLAR PANELS
AutoCAD SHX Text
PANELS
AutoCAD SHX Text
SOLAR
AutoCAD SHX Text
PANELS
AutoCAD SHX Text
SOLAR
AutoCAD SHX Text
PANELS
AutoCAD SHX Text
SOLAR
AutoCAD SHX Text
SOLAR PANELS
AutoCAD SHX Text
PANELS
AutoCAD SHX Text
SOLAR
AutoCAD SHX Text
PANELS
AutoCAD SHX Text
SOLAR
AutoCAD SHX Text
PANELS
AutoCAD SHX Text
SOLAR
AutoCAD SHX Text
PANELS
AutoCAD SHX Text
SOLAR
AutoCAD SHX Text
PANELS
AutoCAD SHX Text
SOLAR
PROJECT SUMMARY &
DRAWING INDEX
G-002
RM AJ
PROJECT SUMMARY DRAWING INDEX
PROPOSED DATE OF CONSTRUCTION: TBD
BUILDING WITHIN SCOPE: 32
ICRA CLASS REQUIREMENTS: CLASS II
DESIGN TEAM
ARCHITECTURAL/MECHANICAL/PLUMBING/FIRE
PROTECTION/ELECTRICAL
SPEES DESIGN BUILD
625 1st AVE #301
SEATTLE, WA 98104
STRUCTURAL
WSP USA
10525 VISTA SORRENTO PARKWAY, #350
SAN DIEGO, CA, 92121
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Fi le
P at h 6/
/2
:3
9:
P M
FOR CONSTRUCTION
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD A/E:
STAMP
321 4 5 6 7 8 9 10
REPLACE BUILDING 32 ELEVATOR
FOR SAFETY
VA CENTRAL CALIFORNIA HEALTH CARE
SYSTEM - FRESNO, CA
570-21-800
Project Director
Revisions: Date:
SPEES DESIGN BUILD
625 1ST AVE #301
SEATTLE, WA, 98014
(206) 590 - 2118
RAY SPEES, PRESIDENT
PAGE # SHEET # SHEET NAME
GENERAL
1 G-001 COVER SHEET
2 G-002 PROJECT SUMMARY & DRAWING INDEX
3 GC100 GROUND FLOOR ICRA PLAN
4 GC101 FIRST FLOOR AND BRIDGE CONNECTION ICRA PLAN
5 GC102 SECOND FLOOR AND BRIDGE CONNECTION ICRA PLAN
6 GC103 ROOF AND BRIDGE CONNECTION ICRA PLAN
7 FS100 GROUND FLOOR FIRE SAFETY PLAN
8 FS101 FIRST FLOOR AND BRIDGE CONNECTION FIRE SAFETY PLAN
9 FS102 SECOND FLOOR AND BRIDGE CONNECTION FIRE SAFETY PLAN
10 FS103 ROOF AND BRIDGE CONNECTION FIRE SAFETY PLAN
ARCHITECTURAL
11 AD100 GROUND FLOOR DEMOLITION PLAN
12 AD101 FIRST FLOOR AND BRIDGE CONNECTION DEMOLITION PLAN
13 AD102 SECOND FLOOR AND BRIDGE CONNECTION DEMOLITION PLAN
14 AD103 ROOF AND BRIDGE CONNECTION DEMOLITION PLAN
15 A-100 GROUND FLOOR PLAN
16 A-101 FIRST FLOOR PLAN AND BRIDGE CONNECTION
17 A-102 SECOND FLOOR PLAN AND BRIDGE CONNECTION
18 A-103 ROOF FLOOR PLAN AND BRIDGE CONNECTION
19 A-201 BUILDING ELEVATIONS
20 A-202 BUILDING ELEVATIONS
21 A-203 INTERIOR ELEVATIONS
STRUCTURAL
22 S-001 GENERAL NOTES
23 S-002 GENERAL NOTES
24 S-102 ELEVATOR ROOF PLAN
25 S-103 ELEVATOR ROOF PLAN
26 S-300 ELEVATOR PARTIAL ELEVATION
27 S-400 DETAILS
MECHANICAL
28 M-001 LEGENDS, SYMBOLS, ABBREVIATIONS, & NOTES - MECHANICAL
29 MD101 GROUND LEVEL FLOOR PLAN - MECHANICAL DEMO
30 MH101 GROUND LEVEL - MECHANICAL
31 M-501 MECHANICAL DETAILS & SCHEDULES
PLUMBING
32 P-001 LEGENDS, SYMBOLS, ABBREVIATIONS, NOTES & SCHEDULES -
PLUMBING
33 PL101 GROUND LEVEL PLAN - PLUMBING
34 PL102 FIRST FLOOR PLAN - PLUMBING
35 PL103 UPPER ELEVATOR SHAFT PLAN - PLUMBING
36 P-501 DETAILS - PLUMBING
FIRE PROTECTION
37 FD101 UPPER ELEVATOR SHAFT PLAN - FIRE SPRINKLER
ELECTRICAL
38 E-001 GENERAL NOTES, ABBREVIATIONS, AND LEGENDS
39 ES100 SITE ELECTRICAL PLAN
40 ED100 GROUND FLOOR - ELECTRICAL DEMOLITION PLAN
41 ED101 FIRST FLOOR - ELECTRICAL DEMOLITION PLAN
42 ED102 SECOND AND THIRD FLOOR - ELECTRICAL DEMOLITION PLAN
43 EP100 GROUND FLOOR - ELECTRICAL PLAN
44 EP101 FIRST FLOOR - ELECTRICAL PLAN
45 EP102 SECOND AND THIRD FLOOR - ELECTRICAL PLAN
46 E-401 ENLARGED PLANS
47 E-501 ELECTRICAL DETAILS
48 E-601 EXISTING PARTIAL ONE-LINE DIAGRAM
49 E-602 REVISED PARTIAL ONE-LINE DIAGRAM
50 E-603 ELECTRICAL LOAD SCHEDULES
51 E-604 ELECTRICAL SCHEDULES
05/11/2021 2 of 51
UP
FAS
FAS
FAS
CANTEEN STORAGE
RECORDS CAGE
IT STORAGE
PHARMACY VAULT
CORRIDOR
LOGISTICS STORAGE
UNFINISHED AREA
ELEVATOR
EQUIPMENT
RM
FLAMMABLE
STORAGE
INVENTORY MANAGEMENT
GROUND FLOOR
WAREHOUSE
STORAGE UNITS
STAIR
ELEVATOR
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Fi le
P at h 6/
/2
:3
9:
P M
FOR CONSTRUCTION
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD A/E:
STAMP
321 4 5 6 7 8 9 10
REPLACE BUILDING 32 ELEVATOR
FOR SAFETY
VA CENTRAL CALIFORNIA HEALTH CARE
SYSTEM - FRESNO, CA
570-21-800
Project Director
Revisions: Date:
SPEES DESIGN BUILD
625 1ST AVE #301
SEATTLE, WA, 98014
(206) 590 - 2118
RAY SPEES, PRESIDENT GC100
GROUND FLOOR
ICRA PLAN
05/11/2021 RM MC
LEGEND
CLASS II ICRA NOTES
KEY PLAN
1 GROUND FLOOR ICRA PLAN - BLDG 32
1/8" = 1'-0"
PROJECT CONSTRUCTION IS IDENTIFIED AS TYPE C
CONSTRUCTION ACTIVITY
PROJECT RISK FOR <OFFICE AND STORAGE AREAS> IS LOW
RISK
THIS COMBINATION INVOKES CLASS II ICRA PRECAUTIONS
CLASS II INFECTION CONTROL PRECAUTIONS REQUIRED
TAPE AND SEAL DOOR, EXIST HVAC AIR DUCTS, AND ANY
AREAS WHERE POTENTIAL DUST MAY BE EXPOSED
OUTSIDE OF CONSTRUCTION AREA.
ELEVATOR EQUIPMENT ROOM
ICRA CLASS II REQS
ELEVATOR ICRA CLASS II REQS
KEY NOTES (THIS SHEET ONLY)
PROVIDE ACTIVE MEANS TO PREVENT AIRBORNE DUST FROM
DISPERSING INTO ATMOSPHERE.
WATER MIST WORK SURFACES TO CONTROL DUST WHILE
CUTTING.
SEAL UNUSED DOORS WITH DUCT TAPE.
BLOCK OFF AND SEAL AIR VENTS.
PLACE DUST MAT AT ENTRANCE AND EXIT OF WORK AREA.
REMOVE OR ISOLATE HVAC SYSTEM IN AREAS WHERE WORK
IS BEING PERFORMED.
EXISTING CONDITION
AutoCAD SHX Text
WAREHOUSE
AutoCAD SHX Text B-32
AutoCAD SHX Text
MAIN HOSPITAL
AutoCAD SHX Text B-1
BRIDGE
DN.
DF
FEC
FEC
FEC
UP
SHELVING UNITS
BRIDGEBRIDGE
PIT
OPENINGOPENING
PIT
OPENING
PIT
LIFT
DOCK
LINE OF BRIDGE ABOVE
DEPUTY
WHSE
SUPV
WAREHOUSE
UNLOADING
PUBLIC
CHIEF
WHSE
OFFICE
LOUNGE
TOILET
DRUG
ROOM
WHSE
ROOM
REPRODUCTION
PROCESSING
MAILROOM
LOBBY
100A
STAIR
#1
ELEVATOR
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Fi le
P at h 6/
/2
:3
9:
P M
FOR CONSTRUCTION
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD A/E:
STAMP
321 4 5 6 7 8 9 10
REPLACE BUILDING 32 ELEVATOR
FOR SAFETY
VA CENTRAL CALIFORNIA HEALTH CARE
SYSTEM - FRESNO, CA
570-21-800
Project Director
Revisions: Date:
SPEES DESIGN BUILD
625 1ST AVE #301
SEATTLE, WA, 98014
(206) 590 - 2118
RAY SPEES, PRESIDENT GC101
FIRST FLOOR AND BRIDGE
CONNECTION ICRA PLAN
05/11/2021 RM MC
LEGEND
KEY NOTES (THIS SHEET ONLY)
KEY PLAN
1 FIRST FLOOR ICRA PLAN - BLDG 32 / FIRST FLOOR BRIDGE TO BLDG 1
1/8" = 1'-0"
CLASS II ICRA NOTES
PROJECT CONSTRUCTION IS IDENTIFIED AS TYPE C
CONSTRUCTION ACTIVITY
PROJECT RISK FOR <OFFICES AND STORAGE AREAS> IS LOW
RISK
THIS COMBINATION INVOKES CLASS II ICRA PRECAUTIONS
CLASS II INFECTION CONTROL PRECAUTIONS REQUIRED
ELEVATOR ICRA CLASS II REQS
TAPE AND SEAL DOOR, EXIST HVAC AIR DUCTS, AND ANY
AREAS WHERE POTENTIAL DUST MAY BE EXPOSED
OUTSIDE OF CONSTRUCTION AREA.
PROVIDE ACTIVE MEANS TO PREVENT AIRBORNE DUST FROM
DISPERSING INTO ATMOSPHERE.
WATER MIST WORK SURFACES TO CONTROL DUST WHILE
CUTTING.
SEAL UNUSED DOORS WITH DUCT TAPE.
BLOCK OFF AND SEAL AIR VENTS.
PLACE DUST MAT AT ENTRANCE AND EXIT OF WORK AREA.
REMOVE OR ISOLATE HVAC SYSTEM IN AREAS WHERE WORK
IS BEING PERFORMED.
EXISTING CONDITION
AutoCAD SHX Text
WAREHOUSE
AutoCAD SHX Text B-32
AutoCAD SHX Text
MAIN HOSPITAL
AutoCAD SHX Text B-1
ELEVATOR
OPEN TO
WAREHOUSE
BELOW
A&MM PROCUREMENT
OFFICES
STORAGE
DO
W N
SPWHMEZZ
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Fi le
P at h 6/
/2
:3
9:
P M
FOR CONSTRUCTION
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD A/E:
STAMP
321 4 5 6 7 8 9 10
REPLACE BUILDING 32 ELEVATOR
FOR SAFETY
VA CENTRAL CALIFORNIA HEALTH CARE
SYSTEM - FRESNO, CA
570-21-800
Project Director
Revisions: Date:
SPEES DESIGN BUILD
625 1ST AVE #301
SEATTLE, WA, 98014
(206) 590 - 2118
RAY SPEES, PRESIDENT GC102
SECOND FLOOR AND BRIDGE
CONNECTION ICRA PLAN
05/11/2021 RM MC
LEGEND
KEY NOTES (THIS SHEET ONLY)
KEY PLAN
1 SECOND FLOOR ICRA PLAN - BLDG 32 / SECOND FLOOR BRIDGE TO BLDG 1
1/8" = 1'-0"
CLASS II ICRA NOTES
PROJECT CONSTRUCTION IS IDENTIFIED AS TYPE C
CONSTRUCTION ACTIVITY
PROJECT RISK FOR <OFFICES AND STORAGE AREA> IS LOW
RISK
THIS COMBINATION INVOKES CLASS II ICRA PRECAUTIONS
CLASS III INFECTION CONTROL PRECAUTIONS REQUIRED
TAPE AND SEAL DOOR, EXIST HVAC AIR DUCTS, AND ANY
AREAS WHERE POTENTIAL DUST MAY BE EXPOSED
OUTSIDE OF CONSTRUCTION AREA.
ELEVATOR ICRA CLASS II REQS
PROVIDE ACTIVE MEANS TO PREVENT AIRBORNE DUST FROM
DISPERSING INTO ATMOSPHERE.
WATER MIST WORK SURFACES TO CONTROL DUST WHILE
CUTTING.
SEAL UNUSED DOORS WITH DUCT TAPE.
BLOCK OFF AND SEAL AIR VENTS.
PLACE DUST MAT AT ENTRANCE AND EXIT OF WORK AREA.
REMOVE OR ISOLATE HVAC SYSTEM IN AREAS WHERE WORK
IS BEING PERFORMED.
EXISTING CONDITION
AutoCAD SHX Text
WAREHOUSE
AutoCAD SHX Text B-32
AutoCAD SHX Text
MAIN HOSPITAL
AutoCAD SHX Text B-1
BRIDGE CORRIDOR
3/4" CONDENSATE DRAIN
RO
OF
RO
OF
ROOF ACCESS LADDER
ROOF ACCESS LADDER
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Fi le
P at h 6/
/2
:3
9:
P M
FOR CONSTRUCTION
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD A/E:
STAMP
321 4 5 6 7 8 9 10
REPLACE BUILDING 32 ELEVATOR
FOR SAFETY
VA CENTRAL CALIFORNIA HEALTH CARE
SYSTEM - FRESNO, CA
570-21-800
Project Director
Revisions: Date:
SPEES DESIGN BUILD
625 1ST AVE #301
SEATTLE, WA, 98014
(206) 590 - 2118
RAY SPEES, PRESIDENT GC103
ROOF AND BRIDGE
CONNECTION ICRA PLAN
05/11/2021 RM MC
LEGEND
KEY NOTES (THIS SHEET ONLY)
KEY PLAN
1 ROOF ICRA PLAN - BLDG 32 / THIRD FLOOR BRIDGE TO BLDG 1
1/8" = 1'-0"
CLASS II ICRA NOTES
PROJECT CONSTRUCTION IS IDENTIFIED AS TYPE C
CONSTRUCTION ACTIVITY
PROJECT RISK FOR <OFFICES AND STORAGE AREA> IS LOW
RISK
THIS COMBINATION INVOKES CLASS II ICRA PRECAUTIONS
CLASS II INFECTION CONTROL PRECAUTIONS REQUIRED
PROVIDE ACTIVE MEANS TO PREVENT AIRBORNE DUST FROM
DISPERSING INTO ATMOSPHERE.
WATER MIST WORK SURFACES TO CONTROL DUST WHILE
CUTTING.
SEAL UNUSED DOORS WITH DUCT TAPE.
BLOCK OFF AND SEAL AIR VENTS.
PLACE DUST MAT AT ENTRANCE AND EXIT OF WORK AREA.
REMOVE OR ISOLATE HVAC SYSTEM IN AREAS WHERE WORK
IS BEING PERFORMED.
TAPE AND SEAL DOOR, EXIST HVAC AIR DUCTS, AND ANY
AREAS WHERE POTENTIAL DUST MAY BE EXPOSED
OUTSIDE OF CONSTRUCTION AREA.
ELEVATOR ICRA CLASS II REQS
EXISTING CONDITION
AutoCAD SHX Text
WAREHOUSE
AutoCAD SHX Text B-32
AutoCAD SHX Text
MAIN HOSPITAL
AutoCAD SHX Text B-1
FAS
FAS
CANTEEN STORAGE
RECORDS CAGE
IT STORAGE
PHARMACY VAULT
CORRIDOR
LOGISTICS STORAGE
UNFINISHED AREA
ELEVATOR
EQUIPMENT
RM
FLAMMABLE
STORAGE
INVENTORY MANAGEMENT
GROUND FLOOR
WAREHOUSE
STORAGE UNITS
STAIR
ELEVATOR
T.O. SLAB
6" CH STUD AT 24"
O.C.
1" GWB
ALL PENETRATIONS
THROUGH BARRIER MUST
BE FIRE STOPPED
2 LAYERS OF 12"
GWB
UL FIRE RESISTANT
DIRECTORY # U437
BOTTOM OF INTERSTITIAL SLAB
ABOVE
HOISTWAY SIDE
J-SHAPED
RUNNER
SEAL OPENINGS WITH
A TEMPORARY 1HR
FIRE-RATED SHAFT
WALL CONSTRUCTION
(2/FS100).
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Fi le
P at h 6/
/2
:3
9:
P M
FOR CONSTRUCTION
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD A/E:
STAMP
321 4 5 6 7 8 9 10
REPLACE BUILDING 32 ELEVATOR
FOR SAFETY
VA CENTRAL CALIFORNIA HEALTH CARE
SYSTEM - FRESNO, CA
570-21-800
Project Director
Revisions: Date:
SPEES DESIGN BUILD
625 1ST AVE #301
SEATTLE, WA, 98014
(206) 590 - 2118
RAY SPEES, PRESIDENT FS100
GROUND FLOOR FIRE
SAFETY PLAN
05/11/2021 RM MC
LEGEND
GENERAL NOTES
KEY NOTES (THIS SHEET ONLY)
KEY PLAN
1 GROUND FLOOR FIRE SAFETY PLAN - BLDG 32
1/8" = 1'-0"
PATH OF TRAVEL
EXISTING RATED WALL ASSEMBLY
PATH OF TRAVEL FOR
DEMOLITION DEBRIS
AND NEW EQUIPMENT,
DEBRIS FROM UPPER
FLOORS TO BE MOVED
THROUGH HOISTWAY,
TYP.
EXISTING CONDITION
EGRESS FROM FURTHEST POINT =
46'-6"
EGRESS FROM FURTHEST POINT =
63'-6"
PATH OF TRAVEL - DEBRIS
2 TEMPORARY SHAFT WALL DETAIL
1/2" = 1'-0"
FS100
FS100
AutoCAD SHX Text
WAREHOUSE
AutoCAD SHX Text B-32
AutoCAD SHX Text
MAIN HOSPITAL
AutoCAD SHX Text B-1
FEC
FEC
FEC
UP
SHELVING UNITS
BRIDGEBRIDGE
PIT
OPENINGOPENING
PIT
OPENING
PIT
LIFT
DOCK
LINE OF BRIDGE ABOVE
DEPUTY
WHSE
SUPV
WAREHOUSE
UNLOADING
PUBLIC
CHIEF
WHSE
OFFICE
LOUNGE
TOILET
DRUG
ROOM
WHSE
ROOM
REPRODUCTION
PROCESSING
MAILROOM
LOBBY
100A
STAIR
#1
ELEVATOR
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Fi le
P at h 6/
/2
:3
9:
P M
FOR CONSTRUCTION
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD A/E:
STAMP
321 4 5 6 7 8 9 10
REPLACE BUILDING 32 ELEVATOR
FOR SAFETY
VA CENTRAL CALIFORNIA HEALTH CARE
SYSTEM - FRESNO, CA
570-21-800
Project Director
Revisions: Date:
SPEES DESIGN BUILD
625 1ST AVE #301
SEATTLE, WA, 98014
(206) 590 - 2118
RAY SPEES, PRESIDENT FS101
FIRST FLOOR AND BRIDGE
CONNECTION FIRE SAFETY PLAN
05/11/2021 RM MC
LEGEND
GENERAL NOTES
KEY NOTES (THIS SHEET ONLY)
KEY PLAN
1 FIRST FLOOR FIRE SAFETY PLAN - BLDG 32 / FIRST FLOOR BRIDGE TO BLDG 1
1/8" = 1'-0"
EGRESS
FROM
FURTHEST
POINT =
104'-6"
PATH OF TRAVEL
EXISTING RATED WALL ASSEMBLY
EXISTING CONDITION
FS100
FS100
AutoCAD SHX Text
WAREHOUSE
AutoCAD SHX Text B-32
AutoCAD SHX Text
MAIN HOSPITAL
AutoCAD SHX Text B-1
OPEN TO
WAREHOUSE
BELOW
A&MM PROCUREMENT
OFFICES
STORAGE
DO
W N
SPWHMEZZ
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Fi le
P at h 6/
/2
:3
9:
P M
FOR CONSTRUCTION
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD A/E:
STAMP
321 4 5 6 7 8 9 10
REPLACE BUILDING 32 ELEVATOR
FOR SAFETY
VA CENTRAL CALIFORNIA HEALTH CARE
SYSTEM - FRESNO, CA
570-21-800
Project Director
Revisions: Date:
SPEES DESIGN BUILD
625 1ST AVE #301
SEATTLE, WA, 98014
(206) 590 - 2118
RAY SPEES, PRESIDENT FS102
SECOND FLOOR AND BRIDGE
CONNECTION FIRE SAFETY PLAN
05/11/2021 RM MC
LEGEND
GENERAL NOTES
KEY NOTES (THIS SHEET ONLY)
KEY PLAN
1 SECOND FLOOR FIRE SAFETY PLAN - BLDG 32 / SECOND FLOOR BRIDGE TO BLDG 1
1/8" = 1'-0"
EGRESS FROM FURTHEST POINT =
26'-1"
PATH OF TRAVEL
EXISTING RATED WALL ASSEMBLY
EXISTING CONDITION
FS100
FS100
AutoCAD SHX Text
WAREHOUSE
AutoCAD SHX Text B-32
AutoCAD SHX Text
MAIN HOSPITAL
AutoCAD SHX Text B-1
BRIDGE CORRIDOR
3/4" CONDENSATE DRAIN
RO
OF
RO
OF
ROOF ACCESS LADDER
ROOF ACCESS LADDER
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Fi le
P at h 6/
/2
:3
9:
P M
FOR CONSTRUCTION
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD A/E:
STAMP
321 4 5 6 7 8 9 10
REPLACE BUILDING 32 ELEVATOR
FOR SAFETY
VA CENTRAL CALIFORNIA HEALTH CARE
SYSTEM - FRESNO, CA
570-21-800
Project Director
Revisions: Date:
SPEES DESIGN BUILD
625 1ST AVE #301
SEATTLE, WA, 98014
(206) 590 - 2118
RAY SPEES, PRESIDENT FS103
ROOF AND BRIDGE
CONNECTION FIRE SAFETY PLAN
05/11/2021 RM MC
LEGEND
GENERAL NOTES
KEY NOTES (THIS SHEET ONLY)
KEY PLAN
1 ROOF FIRE SAFETY PLAN - BLDG 32 / THIRD FLOOR BRIDGE TO BLDG 1
1/8" = 1'-0"
EGRESS FROM FURTHEST POINT =
60'-6"
PATH OF TRAVEL
EXISTING RATED WALL ASSEMBLY
EXISTING CONDITION
PROPOSED PATH FOR EGRESS FROM THE ROOF
PRIOR TO NEW HOISTWAY WILL BE A
CONSTRUCTION LADDER PROVIDED BY THE
CONTRACTOR.
FS100
FS100
AutoCAD SHX Text
WAREHOUSE
AutoCAD SHX Text B-32
AutoCAD SHX Text
MAIN HOSPITAL
AutoCAD SHX Text B-1
FAS
FAS
CANTEEN STORAGE
RECORDS CAGE
IT STORAGE
PHARMACY VAULT
CORRIDOR
LOGISTICS STORAGE
UNFINISHED AREA
ELEVATOR
EQUIPMENT
RM
FLAMMABLE
STORAGE
INVENTORY MANAGEMENT
GROUND FLOOR
WAREHOUSE
STORAGE UNITS
STAIR
ELEVATOR
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Fi le
P at h 6/
/2
:3
9:
P M
FOR CONSTRUCTION
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD A/E:
STAMP
321 4 5 6 7 8 9 10
REPLACE BUILDING 32 ELEVATOR
FOR SAFETY
VA CENTRAL CALIFORNIA HEALTH CARE
SYSTEM - FRESNO, CA
570-21-800
Project Director
Revisions: Date:
SPEES DESIGN BUILD
625 1ST AVE #301
SEATTLE, WA, 98014
(206) 590 - 2118
RAY SPEES, PRESIDENT AD100
GROUND FLOOR
DEMOLITION PLAN
05/11/2021 RM MC
LEGEND
GENERAL NOTES
KEY NOTES (THIS SHEET ONLY)
KEY PLAN
REMOVE EXISTING LOUVER.
REMOVE EXISTING VENT.
1 GROUND FLOOR DEMO PLAN - BLDG 32
1/8" = 1'-0"
DEMOLITION
EXISTING CONDITION
DEMO DOOR. DOOR FRAMES TO
REMAIN. SEE 3/A-203.
DEMO EXISTING ELEVATOR CAB
AND RELATED EQUIPMENT, SEE
SPEC SECTION 14 24 10.
A-203
A-203
DEMO EXISTING EQUIPMENT.5
AutoCAD SHX Text
WAREHOUSE
AutoCAD SHX Text B-32
AutoCAD SHX Text
MAIN HOSPITAL
AutoCAD SHX Text B-1
FEC
FEC
FEC
UP
SHELVING UNITS
BRIDGEBRIDGE
PIT
OPENINGOPENING
PIT
OPENING
PIT
LIFT
DOCK
LINE OF BRIDGE ABOVE
DEPUTY
WHSE
SUPV
WAREHOUSE
UNLOADING
PUBLIC
CHIEF
WHSE
OFFICE
LOUNGE
TOILET
DRUG
ROOM
WHSE
ROOM
REPRODUCTION
PROCESSING
MAILROOM
LOBBY
100A
STAIR
#1
ELEVATOR
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Fi le
P at h 6/
/2
:3
9:
P M
FOR CONSTRUCTION
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD A/E:
STAMP
321 4 5 6 7 8 9 10
REPLACE BUILDING 32 ELEVATOR
FOR SAFETY
VA CENTRAL CALIFORNIA HEALTH CARE
SYSTEM - FRESNO, CA
570-21-800
Project Director
Revisions: Date:
SPEES DESIGN BUILD
625 1ST AVE #301
SEATTLE, WA, 98014
(206) 590 - 2118
RAY SPEES, PRESIDENT AD101
FIRST FLOOR AND BRIDGE
CONNECTION DEMOLITION PLAN
05/11/2021 RM MC
LEGEND
GENERAL NOTES
KEY NOTES (THIS SHEET ONLY)
KEY PLAN
1 FIRST FLOOR DEMO PLAN - BLDG 32 / FIRST FLOOR BRIDGE TO BLDG 1
1/8" = 1'-0"
EXISTING CONDITION
DEMO DOOR. DOOR FRAMES TO
REMAIN. SEE 3/A-203.
DEMO EXISTING ELEVATOR CAB
AND RELATED EQUIPMENT, SEE
SPEC SECTION 14 24 10.
A-203
A-203
AutoCAD SHX Text
WAREHOUSE
AutoCAD SHX Text B-32
AutoCAD SHX Text
MAIN HOSPITAL
AutoCAD SHX Text B-1
OPEN TO
WAREHOUSE
BELOW
A&MM PROCUREMENT
OFFICES
STORAGE
DO
W N
SPWHMEZZ
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Fi le
P at h 6/
/2
:3
9:
P M
FOR CONSTRUCTION
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD A/E:
STAMP
321 4 5 6 7 8 9 10
REPLACE BUILDING 32 ELEVATOR
FOR SAFETY
VA CENTRAL CALIFORNIA HEALTH CARE
SYSTEM - FRESNO, CA
570-21-800
Project Director
Revisions: Date:
SPEES DESIGN BUILD
625 1ST AVE #301
SEATTLE, WA, 98014
(206) 590 - 2118
RAY SPEES, PRESIDENT AD102
SECOND FLOOR AND BRIDGE
CONNECTION DEMOLITION PLAN
05/11/2021 RM MC
LEGEND
GENERAL NOTES
KEY NOTES (THIS SHEET ONLY)
KEY PLAN
1 SECOND FLOOR DEMO PLAN - BLDG 32 / SECOND FLOOR BRIDGE TO BLDG 1
1/8" = 1'-0"
EXISTING CONDITION
DEMO DOOR. DOOR FRAMES TO
REMAIN. SEE SHEET A-203
DEMO EXISTING ELEVATOR CAB
AND RELATED EQUIPMENT, SEE
SPEC SECTION 14 24 10.
A-203
AutoCAD SHX Text
WAREHOUSE
AutoCAD SHX Text B-32
AutoCAD SHX Text
MAIN HOSPITAL
AutoCAD SHX Text B-1
BRIDGE CORRIDOR
3/4" CONDENSATE DRAIN
RO
OF
RO
OF
ROOF ACCESS LADDER
ROOF ACCESS LADDER
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Fi le
P at h 6/
/2
:3
9:
P M
FOR CONSTRUCTION
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD A/E:
STAMP
321 4 5 6 7 8 9 10
REPLACE BUILDING 32 ELEVATOR
FOR SAFETY
VA CENTRAL CALIFORNIA HEALTH CARE
SYSTEM - FRESNO, CA
570-21-800
Project Director
Revisions: Date:
SPEES DESIGN BUILD
625 1ST AVE #301
SEATTLE, WA, 98014
(206) 590 - 2118
RAY SPEES, PRESIDENT AD103
ROOF AND BRIDGE
CONNECTION DEMOLITION PLAN
05/11/2021 RM MC
LEGEND
GENERAL NOTES
KEY NOTES (THIS SHEET ONLY)
KEY PLAN
REMOVE CONCRETE BLOCK TO CREATE ROUGH
OPENING FOR A 8'-0" X 8'-0" ELEVATOR DOOR
DIRECTLY ACROSS FROM EXISTING 3RD FLOOR
ENTRY.
1 ROOF DEMO PLAN - BLDG 32 / THIRD FLOOR BRIDGE TO BLDG 1
1/8" = 1'-0"
CENTRAL HEAT PUMP
EXHAUST VENT
ROOF DRAIN
PIPE UP
DEMOLITION
EXISTING CONDITION
DEMO DOOR. DOOR FRAMES TO REMAIN. SEE
3/A-203.
DEMO EXISTING ELEVATOR CAB
AND RELATED EQUIPMENT, SEE
SPEC SECTION 14 24 10.
A-203
AutoCAD SHX Text
WAREHOUSE
AutoCAD SHX Text B-32
AutoCAD SHX Text
MAIN HOSPITAL
AutoCAD SHX Text B-1
FAS
FAS
CANTEEN STORAGE
RECORDS CAGE
IT STORAGE
PHARMACY VAULT
CORRIDOR
LOGISTICS STORAGE
UNFINISHED AREA
ELEVATOR
EQUIPMENT
RM
FLAMMABLE
STORAGE
INVENTORY MANAGEMENT
GROUND FLOOR
WAREHOUSE
STORAGE UNITS
STAIR
ELEVATOR
EXIST. CMU WALL
NEW CMU IN-FILL, PAINT
TO MATCH EXISTING
#4 REBAR DOWEL
REGLET @ HEAD
AND JAMBS
SEALANT, TYP.
EQUIP. PER MECH.
BATT INSUL. AT
DUCT/CONC.
GAP, TYP.
SEAL AT PERIMETER
CLEAT
24 GA. SHEET
METAL
FLASHING @
DUCT
PERIMETER.
SEAL TO DUCT
AND CONCRETE
WALL, TYP.
IN-FILL CMU
WALL
EXIST. CMU
WALL
UP
FAS
CORRIDOR
STAIR
ELEVATOR
2 - #4 PER SIDE EMB WITH SIMPSON SET XP
2 - #4 VERT AND HORZ.4" HORIZ MIN
EMBED VERT
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Fi le
P at h 6/
/2
:3
9:
P M
FOR CONSTRUCTION
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD A/E:
STAMP
321 4 5 6 7 8 9 10
REPLACE BUILDING 32 ELEVATOR
FOR SAFETY
VA CENTRAL CALIFORNIA HEALTH CARE
SYSTEM - FRESNO, CA
570-21-800
Project Director
Revisions: Date:
SPEES DESIGN BUILD
625 1ST AVE #301
SEATTLE, WA, 98014
(206) 590 - 2118
RAY SPEES, PRESIDENT A-100
GROUND
FLOOR PLAN
05/11/2021 RM MC
LEGEND
GENERAL NOTES
KEY NOTES (THIS SHEET ONLY)
KEY PLAN
IN-FILL AROUND NEW EQUIPMENT PER MECHANICAL.
IN-FILL TO MATCH EXISTING MATERIALS AND FINISHES.
1 GROUND FLOOR PLAN - BLDG 32
1/8" = 1'-0"
NEW CONSTRUCTION
EXISTING CONDITION
PAINT FRAME TO MATCH ADJACENT WALL.3
4 DUCT PENETRATION DETAIL
3"= 1'-0"
5 CONCRETE IN-FILL DETAIL - JAMB (HEAD AND SILL SIM.)
3"= 1'-0"
NEW ELEVATOR DOOR PER MANUFACTURER.4
NEW ELEVATOR AND RELATED EQUIPMENT, SEE OTHER
DISCIPLINES.
A-202
A-203
A-203
3 ENLARGED ELEVATOR PLAN - BLDG 32
1/2" = 1'-0"
A-203
A-100
NEW EQUIPMENT, SEE ELECTRICAL.6
2 CONCRETE IN-FILL DETAIL - JAMB (HEAD AND SILL SIM.)
1-1/2"= 1'-0"
AutoCAD SHX Text
WAREHOUSE
AutoCAD SHX Text B-32
AutoCAD SHX Text
MAIN HOSPITAL
AutoCAD SHX Text B-1
FEC
FEC
FEC
UP
SHELVING UNITS
BRIDGEBRIDGE
PIT
OPENINGOPENING
PIT
OPENING
PIT
LIFT
DOCK
LINE OF BRIDGE ABOVE
DEPUTY
WHSE
SUPV
WAREHOUSE
UNLOADING
PUBLIC
CHIEF
WHSE
OFFICE
LOUNGE
TOILET
DRUG
ROOM
WHSE
ROOM
REPRODUCTION
PROCESSING
MAILROOM
LOBBY
100A
STAIR
#1
ELEVATOR
01DN.
FEC
BRIDGE
STAIR
#1
ELEVATOR
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Fi le
P at h 6/
/2
:3
9:
P M
FOR CONSTRUCTION
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD A/E:
STAMP
321 4 5 6 7 8 9 10
REPLACE BUILDING 32 ELEVATOR
FOR SAFETY
VA CENTRAL CALIFORNIA HEALTH CARE
SYSTEM - FRESNO, CA
570-21-800
Project Director
Revisions: Date:
SPEES DESIGN BUILD
625 1ST AVE #301
SEATTLE, WA, 98014
(206) 590 - 2118
RAY SPEES, PRESIDENT A-101
FIRST FLOOR PLAN AND BRIDGE
CONNECTION
05/11/2021 RM MC
LEGEND
GENERAL NOTES
KEY NOTES (THIS SHEET ONLY)
KEY PLAN
1 FIRST FLOOR PLAN - BLDG 32 / FIRST FLOOR BRIDGE TO BLDG 1
1/8" = 1'-0"
EXISTING CONDITION
NEW ELEVATOR DOOR PER MANUFACTURER.
NEW ELEVATOR AND RELATED EQUIPMENT, SEE OTHER
DISCIPLINES.
A-202
A-203
A-203
2 ENLARGED ELEVATOR PLAN - BLDG 32
1/2" = 1'-0"
A-203
AutoCAD SHX Text
WAREHOUSE
AutoCAD SHX Text B-32
AutoCAD SHX Text
MAIN HOSPITAL
AutoCAD SHX Text B-1
OPEN TO
WAREHOUSE
BELOW
A&MM PROCUREMENT
OFFICES
STORAGE
DO
W N
SPWHMEZZ
ELEVATOR
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Fi le
P at h 6/
/2
:3
9:
P M
FOR CONSTRUCTION
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD A/E:
STAMP
321 4 5 6 7 8 9 10
REPLACE BUILDING 32 ELEVATOR
FOR SAFETY
VA CENTRAL CALIFORNIA HEALTH CARE
SYSTEM - FRESNO, CA
570-21-800
Project Director
Revisions: Date:
SPEES DESIGN BUILD
625 1ST AVE #301
SEATTLE, WA, 98014
(206) 590 - 2118
RAY SPEES, PRESIDENT A-102
SECOND FLOOR PLAN AND BRIDGE
CONNECTION
05/11/2021 RM MC
LEGEND
GENERAL NOTES
KEY NOTES (THIS SHEET ONLY)
KEY PLAN
1 SECOND FLOOR PLAN - BLDG 32 / SECOND FLOOR BRIDGE TO BLDG 1
1/8" = 1'-0"
A-202
EXISTING CONDITION
A-203
NEW ELEVATOR DOOR PER MANUFACTURER.
NEW ELEVATOR AND RELATED EQUIPMENT, SEE OTHER
DISCIPLINES.
2 ENLARGED ELEVATOR PLAN - BLDG 32
1/2" = 1'-0"
A-203
AutoCAD SHX Text
WAREHOUSE
AutoCAD SHX Text B-32
AutoCAD SHX Text
MAIN HOSPITAL
AutoCAD SHX Text B-1
BRIDGE CORRIDOR
GUARD RAIL
3' -6
4"
LANDING
RAMP
9'-2"3/4" CONDENSATE DRAIN
RO
OF
RO
OF
4"
ROOF ACCESS LADDER
ROOF ACCESS LADDER
ELEVATOR
4' -0
11'-2"
ELEVATOR
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Fi le
P at h 6/
/2
:3
9:
P M
FOR CONSTRUCTION
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD A/E:
STAMP
321 4 5 6 7 8 9 10
REPLACE BUILDING 32 ELEVATOR
FOR SAFETY
VA CENTRAL CALIFORNIA HEALTH CARE
SYSTEM - FRESNO, CA
570-21-800
Project Director
Revisions: Date:
SPEES DESIGN BUILD
625 1ST AVE #301
SEATTLE, WA, 98014
(206) 590 - 2118
RAY SPEES, PRESIDENT A-103
ROOF PLAN AND BRIDGE
CONNECTION
05/11/2021 RM MC
LEGEND
GENERAL NOTES
KEY NOTES (THIS SHEET ONLY)
KEY PLAN
NEW 8'-0" X 8'-0" ELEVATOR DOOR OPENING AND
DOOR.
NEW PRE-FABRICATED METAL ROOF ACCESS
RAMP.
1 ROOF PLAN - BLDG 32 / THIRD FLOOR BRIDGE TO BLDG 1
1/8" = 1'-0"
1. RAMP AT A 20% GRADE, DESIGNED PER OSHA REG.
1918.25 AND 1918.21
2. AWNING AT A 1/4:12 SLOPE INTO GUTTER
CENTRAL HEAT PUMP
EXHAUST VENT
ROOF DRAIN
PIPE UP
2 ENLARGED AWNING PLAN - BLDG 32
1/8" = 1'-0"
NEW CONSTRUCTION
EXISTING CONDITION
AWNING OVERHANG
NEW PRE-FABRICATED METAL AWNING.3
NEW ELEVATOR DOOR PER MANUFACTURER.4
NEW ELEVATOR AND RELATED EQUIPMENT, SEE OTHER
DISCIPLINES.
A-202
A-203
3 ENLARGED ELEVATOR PLAN - BLDG 32
1/2" = 1'-0"
A-203
AutoCAD SHX Text
WAREHOUSE
AutoCAD SHX Text B-32
AutoCAD SHX Text
MAIN HOSPITAL
AutoCAD SHX Text B-1
+25' - 6"
+13' - 6"
+0' - 0"
3RD FLOOR
2RD FLOOR
1ST FLOOR
EXISTING LOADING DOCK
INTEGRAL COLORED CMU
12" 2"
+25' - 6"
+13' - 6"
+0' - 0"
+36' - 0"
+42' - 0"
BOT. ROOF CANOPY
3RD FLOOR
2RD FLOOR
1ST FLOOR
-12'-11 12"
BOT. ROOF CANOPY
EXISTING LOADING
DOCK
INTEGRAL COLORED CMU
3' -6
NEW PRE-FABRICATED
AWNING AND DOWNSPOUT
2' -1
4"
6"
EXISTING BALLASTED ROOFING SYSTEM.
REMOVE AND REPLACE ROOF BALLAST
AS NEEDED TO INSTALL RAMP SYSTEM
NEW PRE-FABRICATED RAMP
WITH 36" H HANDRAILS AND
42" H GUARDRAILS ON
BOTH SIDES
EXISTING CRICKET, NO WORK
NEW RAMP LANDING
BRACING AS REQ'D
BY MANUFACTURER
EXISTING ROOF
ACCESS LADDER
NEW 18" X 18"
ACCESS PANEL
T.O. BRIDGE ROOF
1'-8"
1' -3
8" T.O. HOISTWAY ROOF
LOCATE TOP OF OPENING BETWEEN 1" TO 3" BELOW
EXISTING ROOF DECK LEDGER ANGLE
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Fi le
P at h 6/
/2
:3
9:
P M
FOR CONSTRUCTION
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD A/E:
STAMP
321 4 5 6 7 8 9 10
REPLACE BUILDING 32 ELEVATOR
FOR SAFETY
VA CENTRAL CALIFORNIA HEALTH CARE
SYSTEM - FRESNO, CA
570-21-800
Project Director
Revisions: Date:
SPEES DESIGN BUILD
625 1ST AVE #301
SEATTLE, WA, 98014
(206) 590 - 2118
RAY SPEES, PRESIDENT A-201
BUILDING
ELEVATIONS
05/11/2021 RM MC
LEGEND
GENERAL NOTES
KEY NOTES (THIS SHEET ONLY)
1. RAMP AT A 20% GRADE, DESIGNED PER OSHA REG.
1918.25 AND 1918.21
2 SOUTH EXTERIOR ELEVATION - BLDG 32
1/8" = 1'-0"
1 WEST EXTERIOR ELEVATION - BLDG 32
1/8" = 1'-0"
A-202
A-201
3 ENLARGED SOUTH EXTERIOR ELEVATION - BLDG 32
1/2" = 1'-0"
+0'-0"
-2'-8"
+26'-0"
+18'-0"
TOP OF CMU
+42'-0"
+9'-4"
+12'-0"
3' -6
"10
6"
13'-6"
2ND FLOOR
+36'-0"
BOTTOM ROOF
CANOPY
+25'-6"
3RD FLOOR
BRACING AS REQ'D
BY MANUFACTURER
NEW PRE-FABRICATED RAMP
WITH 36" H HANDRAILS AND
42" H GUARDRAILS ON
BOTH SIDES
NEW PRE-FABRICATED
AWNING AND DOWNSPOUT
NEW STEEL FRAMING,
SEE STRUCTURAL
+26'-0"
+18'-0"
+12'-0"
+42'-0"
L 4X4X1 " CORNER GUARDS
12" 2"
NEW PRE-FABRICATED
AWNING AND DOWNSPOUT
NEW PRE-FABRICATED RAMP
WITH 36" H HANDRAILS AND
42" H GUARDRAILS ON
BOTH SIDES
BRACING AS REQ'D
BY MANUFACTURER
+42'-0"
+40'-2"
+36'-6"
+25'-60"
3RD FLOOR
+13'-6"
2ND FLOOR
+0'-0"
1ST FLOOR
-12'-0"
LOADING DOCK (E)
-19'-6"
+0'-0"
-15'-0"
NEW ELEVATOR DOOR OPENING
8' -0
EXISTING ROOF CRICKET, NO WORK
STEEL LEDGER PER STRUCTURAL
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Fi le
P at h 6/
/2
:3
9:
P M
FOR CONSTRUCTION
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD A/E:
STAMP
321 4 5 6 7 8 9 10
REPLACE BUILDING 32 ELEVATOR
FOR SAFETY
VA CENTRAL CALIFORNIA HEALTH CARE
SYSTEM - FRESNO, CA
570-21-800
Project Director
Revisions: Date:
SPEES DESIGN BUILD
625 1ST AVE #301
SEATTLE, WA, 98014
(206) 590 - 2118
RAY SPEES, PRESIDENT A-202
BUILDING
ELEVATIONS
05/11/2021 RM MC
LEGEND
GENERAL NOTES
KEY NOTES (THIS SHEET ONLY)
1. RAMP AT A 20% GRADE, DESIGNED PER OSHA REG.
1918.25 AND 1918.21
2 NORTH EXTERIOR ELEVATION - BLDG 32
1/8" = 1'-0"
1 EAST EXTERIOR ELEVATION - BLDG 32
1/8" = 1'-0"
A-202
3 ELEVATOR HOISTWAY SECTION - BLDG 32
1/8" = 1'-0"
NOTE: THIS DETAIL IS REFERENCED ON THE FOLLOWING SHEETS:
A-100 A-101 A-102 A-103 A-201 A-202
3'-8"
NEW STAINLESS STEEL
PANEL WITH TEXTURED FINISH
NEW CAR OPERATING PANEL
NEW 2"X12" OAK BUMPERS
4'-0"
NEW STAINLESS STEEL
DIAMOND PLATE FLOOR FINISH
NEW ELEVATOR BARRIER
3'-8"
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Fi le
P at h 6/
/2
:3
9:
P M
FOR CONSTRUCTION
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD A/E:
STAMP
321 4 5 6 7 8 9 10
REPLACE BUILDING 32 ELEVATOR
FOR SAFETY
VA CENTRAL CALIFORNIA HEALTH CARE
SYSTEM - FRESNO, CA
570-21-800
Project Director
Revisions: Date:
SPEES DESIGN BUILD
625 1ST AVE #301
SEATTLE, WA, 98014
(206) 590 - 2118
RAY SPEES, PRESIDENT A-203
INTERIOR
ELEVATIONS
05/11/2021 RM MC
LEGEND
GENERAL NOTES
KEY NOTES (THIS SHEET ONLY)
3 ENLARGED INTERIOR DEMOLITION ELEVATION - LOBBY, TYP
1/2" = 1'-0"
1 ENLARGED INTERIOR ELEVATION - NORTH/SOUTH ELEVATOR CAB
1/2" = 1'-0"
2 ENLARGED INTERIOR ELEVATION - WEST/EAST ELEVATOR CAB
1/2" = 1'-0"
4 ENLARGED INTERIOR ELEVATION - LOBBY, TYP
1/2" = 1'-0"
EXISTING 12" BAFFLE
TO BE REMOVED
EXISTING 7'-0" X 8'-0" DOOR
TO BE REPLACED
EXISTING ELEVATOR
CALL BUTTONS TO BE REPLACED
NEW 8'-0" X 8'-0" DOOR
NEW ELEVATOR
CALL BUTTONS
EXISTING DOOR FRAME
TO REMAIN
NOTE: THIS DETAIL IS REFERENCED ON THE FOLLOWING SHEETS:
A-100 A-101 A-102 A-103
NOTE: THIS DETAIL IS REFERENCED ON THE FOLLOWING SHEETS:
AD100
AD101
AD102
AD103
NOTE: THIS DETAIL IS REFERENCED ON THE FOLLOWING SHEETS:
A-100 A-101 A-102 A-103
NOTE: THIS DETAIL IS REFERENCED ON THE FOLLOWING SHEETS:
A-100 A-101 A-102 A-103
OPEN TO HOISTWAY
CODES AND STANDARDS
1. 2018 INTERNATIONAL BUILDING CODE W/ VETERANS AFFAIRS AMENDMENTS
2. VA SEISMIC DESIGN REQUIREMENTS, H-18-8
3. ASCE 7-16 MINIMUM DESIGN LOADS FOR BUILDINGS AND OTHER STRUCTURES
4. ACI 318-14 BUILDING CODE REQUIREMENTS FOR STRUCTURAL CONCRETE
5. TMS 402-16 BUILDING CODE REQUIREMENTS FOR MASONRY STRUCTURES
6. AISC 360-16 SPECIFICATION FOR STRUCTURAL STEEL BUILDINGS
7. AISC 341-16 SEISMIC PROVISIONS FOR STEEL BUILDINGS
8. AWS D1.1 2015 STRUCTURAL WELDING CODE - STEEL
9. AWS D1.3 2008 STRUCTURAL WELDING CODE - SHEET STEEL
10. AWS D1.8 2016 STRUCTURAL WELDING CODE - SEISMIC SUPPLEMENT
11. RESEARCH COUNCIL ON STRUCTURAL CONNECTIONS SPECIFICATION FOR STRUCTURAL JOINTS USING HIGH-STRENGTH
BOLTS
12. AISI S100-16 NORTH AMERICAN SPECIFICATION FOR THE DESIGN OF COLD-FORMED STEEL STRUCTURAL MEMBERS
13. AISI S240-15 NORTH AMERICAN STANDARD FOR COLD-FORMED STEEL STRUCTURAL FRAMING
14. AISI S400-15 S1 NORTH AMERICAN STANDARD FOR SEISMIC DESIGN OF COLD-FORMED STEEL STRUCTURAL SYSTEMS WITH
SUPPLEMENT 1
GENERAL
1. CONTRACTOR SHALL BE RESPONSIBLE FOR MEANS, METHODS, TECHNIQUES, SEQUENCES, AND PROCEDURES REQUIRED
TO PERFORM THE WORK.
2. CONTRACTOR-INITIATED CHANGES REQUIRE BOTH DESIGNER OF RECORD AND GOVERNMENT APPROVAL AND SHALL BE SUBMITTED IN WRITING TO THE CONTRACTING OFFICER'S REPRESENTATIVE FOR APPROVAL PRIOR TO FABRICATION OR
CONSTRUCTION.
3. DIMENSIONS AND DETAILS SHALL BE VERIFIED BY THE CONTRACTOR PRIOR TO FABRICATION AND CONSTRUCTION. THIS INCLUDES, BUT IS NOT LIMITED TO, COORDINATING WITH THE CONTRACT DRAWINGS ON THE SIZE AND LOCATION OF OPENINGS THROUGH CONCRETE, VERIFYING SIZE AND LOCATION OF MECHANICAL AND ELECTRICAL OPENINGS WITH THE RESPECTIVE SUBCONTRACTOR, AS WELL AS COORDINATING INSERTS AND ATTACHMENTS FOR THE USE OF OTHER
TRADES.
4. DRAWINGS INDICATE GENERAL AND TYPICAL DETAILS OF CONSTRUCTION. TYPICAL DETAILS AND NOTES SHOWN ON DRAWINGS SHALL APPLY UNLESS NOTED OTHERWISE. TYPICAL DETAILS MAY NOT NECESSARILY BE INDICATED ON THE PLANS BUT SHALL STILL APPLY AS SHOWN OR DESCRIBED IN THE DETAILS. IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO CHOOSE THE APPROPRIATE TYPICAL DETAIL FROM THOSE PROVIDED. THE CONTRACTOR SHALL SUBMIT PROPOSED ALTERNATE DETAILS TO THOSE PROVIDED WITH RELATED CALCULATIONS TO THE ENGINEER FOR
APPROVAL PRIOR TO DETAILING OR USE.
5. SHOP DRAWING REVIEW: BY SUBMITTING THE SHOP DRAWINGS, THE CONTRACTOR REPRESENTS THAT THEY HAVE DETERMINED AND VERIFIED MATERIALS, FIELD MEASUREMENTS, AND RELATED FIELD CONSTRUCTION CRITERIA (MEANS, METHODS, TECHNIQUES, SEQUENCES, OPERATIONS OF CONSTRUCTION, AND SAFETY PRECAUTIONS AND PROGRAMS INCIDENTAL THERETO), AND THAT THE CONTRACTOR HAS CHECKED AND COORDINATED THE INFORMATION CONTAINED WITHIN THE SUBMITTAL WITH THE REQUIREMENTS OF THE WORK AND THE CONTRACT DOCUMENTS. REVIEW BY THE ENGINEER SHALL NOT RELIEVE THE CONTRACTOR FROM FULL RESPONSIBILITY FOR THE ACCURACY OF DIMENSIONS AND DETAILS. SUCH REVIEW SHALL NOT CONSTITUTE ACCEPTANCE BY THE ENGINEER OF THE CORRECTNESS OR ADEQUACY OF SUCH SUBMITTALS, NOR A WARRANTY THAT THE SUBMITTALS SATISFY THE REQUIREMENTS OF THE CONTRACT.
DEMOLITION AND SHORING
1. THE CONTRACTOR SHALL VERIFY EXISTING CONDITIONS BEFORE COMMENCING ANY DEMOLITION. THE CONTRACTOR SHALL VERIFY THE EXTENT AND LOCATIONS OF SITE UTILITIES. LOCATIONS OF EXISTING FOUNDATIONS AND UTILITIES KNOWN TO THE ENGINEER ARE INDICATED ON THE DRAWINGS. REPORT ANY DISCREPANCIES OR ENCOUNTERED OBSTRUCTIONS TO
THE CONTRACTING OFFICER REPRESENTATIVE IMMEDIATELY.
2. THE CONTRACTOR SHALL DESIGN AND INSTALL SHORING TO SUPPORT EXISTING CONSTRUCTION (VERTICALLY AND LATERALLY) AS REQUIRED AND IN A MANNER SUITABLE TO THE WORK SEQUENCES COORDINATED WITH THE OTHER DISCIPLINES. PRIOR TO CONSTRUCTION, THE CONTRACTOR SHALL PREPARE A PLAN TO MONITOR DAILY THE SHORING SYSTEMS FOR MOVEMENT AND SUBMIT IT FOR REVIEW BY THE CONTRACTING OFFICER REPRESENTATIVE.
3. EXISTING STRUCTURAL MEMBERS SHALL REMAIN UNLESS NOTED OTHERWISE ON THE PLANS. SAWCUTTING, IF AND WHERE USED, SHALL NOT CUT EXISTING REINFORCING THAT IS TO REMAIN. DEMOLITION DEBRIS SHALL NOT BE ALLOWED TO
DAMAGE OR OVERLOAD THE EXISTING STRUCTURE.
4. OPENINGS THROUGH EXISTING WALLS, SLABS, AND BEAMS SHALL BE ACCOMPLISHED BY SAWCUTTING OR CORING WHEREVER POSSIBLE AND AS SHOWN. WHEN SAWCUTTING, CORNERS SHALL INITIALLY BE CORED TO PREVENT OVERCUTTING. SMALL ROUND OPENINGS SHALL BE ACCOMPLISHED BY DRILLING, IF POSSIBLE.
5. THE CONTRACTOR SHALL DESIGN AND INSTALL SHORING TO SUPPORT NEW CONSTRUCTION (VERTICALLY AND LATERALLY) UNTIL STRUCTURAL COMPONENTS HAVE BEEN CONNECTED AS SHOWN ON THE STRUCTURAL DRAWINGS.
DESIGN LOADS
DEAD LOADS:
WEIGHT OF MATERIALS OF CONSTRUCTION AND PERMANENT EQUIPMENT.
LIVE LOADS
ROOF 20 PSF / 300 LB POINT LOAD
ROOF RAMP 20 PSF / 300 LB POINT LOAD
ROOF AWNING 20 PSF
RISK CATEGORY D
SNOW LOAD
GROUND SNOW LOAD 0 PSF
WIND LOADS
BASIC WIND SPEED (3-SECOND GUST), Vult 105MPH NOMINAL WIND SPEED, Vasd= Vult* sqrt(0.6)
WIND EXPOSURE C
SEISMIC LOADS
SEISMIC IMPORTANCE FACTOR, Ie 1.5
SITE LATITUDE AND LONGITUDE 36.7725795° N,-119.7779341° W
MAPPED SPECTRAL RESPONSE ACCELERATION PARAMETERS
SHORT PERIOD, Ss 0.584G
SDS 0.519G
1 SECOND PERIOD, S1 0.227G
SITE CLASS D
STRUCTURAL STEEL
1. STEEL CONSTRUCTION SHALL CONFORM TO AISC 360-16 SPECIFICATION FOR STRUCTURAL STEEL BUILDINGS AND AISC
341-16 SEISMIC PROVISIONS FOR STRUCTURAL STEEL BUILDINGS.
2. STEEL SHALL CONFORM TO THE FOLLOWING:
3. WORK SHALL BE IN ACCORDANCE WITH AISC 303, AS MODIFIED PER THE PROJECT SPECIFICATIONS.
4. HOLES IN STEEL CUT IN THE FIELD SHALL BE DRILLED, NOT BURNED.
5. CAMBER BEAMS AS NOTED ON THE FRAMING PLANS. WHERE NO CAMBER IS NOTED, FABRICATE BEAMS SO THAT THE CAMBER AS ROLLED (WITHIN ALLOWABLE TOLERANCES) IS POSITIVE. WIND GIRTS WITH INCIDENTAL CAMBER SHALL BE
INSTALLED WITH CAMBER POSITIVE TO THE BUILDING EXTERIOR.
6. STEEL BEAMS ARE EQUALLY SPACED BETWEEN DIMENSION POINTS UNO.
7. ALL STEEL EXPOSED TO WEATHER SHALL BE HOT DIPPED GALVANIZED UNO. REPAIR ANY DAMAGED GALVANIZED STEEL
DUE TO FILED WITH A GALVANIZING REPAIR PAINT ACCORDING TO ASTM A780.
8. ALL GALVANIZED STEEL SHALL CONFORM TO THE MINIMUMS ESTABLISHED BY ASTM A123 OR A153 CLASS D.
9. MINIMUM CONNECTION SHALL BE A TWO-BOLT CONNECTION USING 7/8-INCH DIAMETER A325 BOLTS (TYPE N) IN SINGLE
SHEAR.
10. HIGH-STRENGTH BOLTS SHALL BE INSTALLED, TIGHTENED, AND INSPECTED IN ACCORDANCE WITH IBC, RCSC, AND AISC SPECIFICATION FOR STRUCTURAL JOINTS USING ASTM A352 OR A490 BOLTS. THE CRITERIA FOR SNUG-TIGHT
CONNECTIONS SHALL APPLY TO CONNECTIONS UNLESS NOTED OTHERWISE AS SLIP-CRITICAL.
11. BOLTS IN BEAM-TO-BEAM/GIRDER MAY BE SNUG TIGHT, UNLESS SPECIFICALLY CALLED OUT AS SLIP CRITICAL.
CONTRACTOR SHALL SUBMIT TIGHTENING PROCEDURES TO THE ENGINEER/ARCHITECT FOR REVIEW AND APPROVAL.
12. HEADED STUD ANCHORS (HSA) FOR COMPOSITE AND NON-COMPOSITE CONSTRUCTION
A. HEADED STUD ANCHORS SHALL BE 3 4 INCH DIAMETER, TYPE B, CONFORMING TO AWS D1.1, UNLESS NOTED
OTHERWISE.
B. HEADED STUD ANCHORS SHALL BE AUTOMATICALLY END WELDED IN SHOP OR FIELD WITH EQUIPMENT
RECOMMENDED BY STUD MANUFACTURER.
C. WELDING, AND INSPECTION SHALL BE IN ACCORDANCE WITH AWS D1.1.
11. STEEL ANCHORS, TIES AND OTHER MEMBERS EMBEDDED IN CONCRETE OR MASONRY SHALL BE LEFT UNPAINTED AT
INTERIOR, UNEXPOSED CONDITIONS.
12. ITEMS EMBEDDED IN CONCRETE OR MASONRY AND EXPOSED TO EARTH OR WEATHER SHALL BE HOT-DIPPED GALVANIZED
(UNLESS NOTED OTHERWISE):
A. CONCRETE & MASONRY ACCESSORIES OF FERROUS MATERIAL INCLUDING: INSERTS, EMBEDS, AND BRACKETS.
B. PIPE GUARDS, BOLLARDS AND HARDWARE FOR SAME.
C. WHERE NOTED AS "GALV".
13. LOCATIONS OF EMBEDDED ITEMS SHALL BE COORDINATED WITH VENDOR'S SHOP DRAWINGS.
14. THE CONTRACTOR SHALL BE RESPONSIBLE FOR COORDINATING THE SELECTION OF OPTIONAL DETAILS SHOWN ON THE
DRAWINGS.
15. THE CONTRACTOR SHALL BE RESPONSIBLE FOR ERECTION AIDS THAT INCLUDE, BUT ARE NOT LIMITED TO, ERECTION ANGLES, LIFT HOLES, AND OTHER AIDS. REMOVE ERECTION AIDS, INCLUDING ERECTION BOLTS. PLUG WELD HOLES AND
GRIND SMOOTH.
16. MEANS AND METHODS OF ERECTION ARE THE SOLE RESPONSIBILITY OF THE CONTRACTOR. CONNECTIONS AND DETAILS
DO NOT NECESSARILY SHOW ERECTION AIDS REQUIRED.
STRUCTURAL STEEL WELDING
1. WELDING SHALL BE DONE BY CERTIFIED WELDERS AND IN ACCORDANCE WITH AWS D1.1 AND D1.8.
2. WELD SIZES SHOWN ON THE DRAWINGS ARE MINIMUM AND EFFECTIVE SIZES. INCREASE WELD SIZE TO AWS/AISC MINIMUM SIZES AS REQUIRED FOR CONNECTION MATERIAL. THE MINIMUM WELD SIZE SHALL BE 3/16 INCHES (EFFECTIVE).
3. FIELD WELDING SYMBOLS HAVE NOT NECESSARILY BEEN INDICATED ON THE DRAWINGS. WHERE NO FIELD WELDING IS DETAILED ON THE DRAWINGS, IT IS THE CONTRACTOR'S RESPONSIBILITY TO COORDINATE THE USE OF SHOP AND FIELD
WELDS.
4. PARTIAL JOINT PENETRATION (PJP) GROOVE WELDS SHOWN ON THE DRAWINGS REFER TO EFFECTIVE THROAT THICKNESS.
COMPLETE JOINT PENETRATION (CJP) WELDS SHALL BE ULTRASONICALLY TESTED (UT) UPON COMPLETION OF THE CONNECTION, EXCEPT PLATE LESS THAN OR EQUAL TO 5/16 INCH THICK SHALL BE MAGNETIC PARTICLE TESTED (MT).
5. WELDS SHALL BE MADE USING LOW HYDROGEN ELECTRODES WITH TENSILE STRENGTH PER AWS D1.1 AND D1.8 (MINIMUM
70 KSI).
6. WELDING SHALL BE PERFORMED IN STRICT ADHERENCE TO A WRITTEN WELDING PROCEDURE SPECIFICATION (WPS) PER AWS D1.1 AND D1.8. WELDING PROCEDURES SHALL BE SUBMITTED TO THE ENGINEER FOR REVIEW BEFORE STARTING FABRICATION OR ERECTION. COPIES OF THE WPS SHALL BE ON SITE AND AVAILABLE TO WELDERS AND THE SPECIAL
INSPECTOR.
7. WELDS THAT ARE PART OF THE SEISMIC FORCE-RESISTING SYSTEM SHALL HAVE A MINIMUM CHARPY V-NOTCH TOUGHNESS
OF 20 FOOT-POUNDS AT 0 DEGREES FAHRENHEIT.
SHAPE ASTM SPECIFICATION YIELD STRENGTH, Fy [KSI]
WIDE FLANGE A992 50
ANGLE & CHANNEL (UNO) A36 36
PLATE AND BAR STOCK A36 36
PIPE A53 GRADE B 35
STRUCTURAL TUBE (HSS) A500 GRADE B 46
ROUND STRUCTURAL TUBE (HSS) A500 GRADE B 42
OTHER STEEL UNO A572 50
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
F i l e
P a t h
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD A/E:
STAMP
321 4 5 6 7 8 9 10
REPLACE BUILDING 32 ELEVATOR
FOR SAFETY
VA CENTRAL CALIFORNIA HEALTH CARE
SYSTEM - FRESNO, CA
570-21-800
Project Director
Revisions: Date:
SPEES DESIGN BUILD
625 1ST AVE #301
SEATTLE, WA, 98014
(206) 590 - 2118
RAY SPEES, PRESIDENT
L a s t
S a v e d b y
U
S D
V o n
M a y
P
M
F i l e
C
U s e r s u s d v
W
S
O
S a
D e g
C
A D
D
P r o j e c t s
S
G
D
D
P r o j e c t s
C
A D
D D w g s
S d w g
RE
GI
ST
ER
ED PROFESSIONAL ENGINEER
STATE OF CA L I FORN I A
S T R U C T U R A L
DA
NTE VALDEZ
No. 5752
EXP. 6/30/21
FOR CONSTRUCTION
DELEGATED DESIGN
1. DEFERRED COMPONENT SUBMITTALS ARE INTENDED TO BE VENDOR DESIGNED AND HAVE NOT BEEN DESIGNED BY THE ARCHITECT/ENGINEER OF RECORD. THE COMPONENT DESIGNER IS RESPONSIBLE FOR CODE CONFORMANCE AND NECESSARY CONNECTIONS NOT CALLED OUT ON ARCHITECTURAL OR STRUCTURAL
DRAWINGS.
2. DELEGATED DESIGN INCLUDING CALCULATIONS SHALL BE STAMPED AND SIGNED BY A REGISTERED PROFESSIONAL ENGINEER. DEFERRED SUBMITTALS SHALL FIRST BE SUBMITTED TO THE ENGINEER OF RECORD
FOR A CURSURY REVIEW FOR LOADS IMPOSED ON THE BASIC STRUCTURE.
3. A SUBMITTAL MAY THEN BE MADE BY THE CONTRACTOR TO THE CONTRACTING OFFICER'S REPRESENTATIVE TO
SUBMIT TO THE AUTHORITY HAVING JURISDICTION FOR REVIEW AND APPROVAL.
4. THE LIST OF ITEMS FOR DELEGATED DESIGN INCLUDES THE FOLLOWING ITEMS:
A. PREFABRICATED ROOF RAMP
B. PREFABRICATED ROOF AWNING
5. SUBMITTAL SHALL INCLUDE:
A. CALCULATIONS
B. A DIAGRAM SHOWING LOAD MAGNITUDES AND LOCATIONS, SEPARATED INTO DEAD, LIVE, WIND AND/OR
SEISMIC COMPONENTS - THAT ARE APPLIED TO THE PRIMARY STRUCTURE.
ANCHORAGE TO CONCRETE AND MASONRY
1. EXCEPT WHERE INDICATED ON THE DRAWINGS, POST-INSTALLED ANCHORS SHALL CONSIST OF THE FOLLOWING
ANCHOR TYPES BELOW.
2. ANCHOR CAPACITY USED IN DESIGN SHALL BE BASED ON THE TECHNICAL DATA PUBLISHED IN THE ICC APPROVAL REPORT. SUBSTITUTION REQUESTS MUST INCLUDE ICC ESR REPORT SHOWING COMPLIANCE WITH RELEVANT BUILDING CODE AND INSTALLATION CATEGORY AND BE APPROVED IN WRITING BY THE CONTRACTING
OFFICER'S REPRESENTATIVE/ENGINEER OF RECORD PRIOR TO USE.
3. INSTALL ANCHORS PER THE MANUFACTURER INSTRUCTIONS, AS INCLUDED IN THE ANCHOR PACKAGING.
4. ANCHOR CAPACITY IS DEPENDENT UPON SPACING BETWEEN ADJACENT ANCHORS AND EDGE DISTANCE.
INSTALL ANCHORS IN ACCORDANCE WITH SPACING AND EDGE CLEARANCES INDICATED ON THE DRAWINGS.
5. EXISTING CONSTRUCTION: EXISTING REINFORCING BARS IN THE STRUCTURE MAY CONFLICT WITH SPECIFIC ANCHOR LOCATIONS. UNLESS NOTED OTHERWISE ON THE DRAWINGS, THE CONTRACTOR SHALL LOCATE THE
POSITION OF THE EXISTING REINFORCING BARS AND AVOID CUTTING.
DRILLED-IN SCREW ANCHORS INTO CONCRETE
1. HILTI KWIK HUS-EZ SCREW ANCHORS PER ICC ESR-3027
2. SIMPSON TITEN HD SCREW ANCHOR PER ICC ESR-2713
3. DEWALT WEDGE-BOLT+ PER ICC ESR-2526
DRILLED-IN EXPANSION ANCHORS INTO CONCRETE
1. HILTI KWIK-BOLT TZ EXPANSION ANCHOR PER ICC ESR-1917
2. SIMPSON STRONG BOLT 2 WEDGE ANCHOR PER ICC ESR-3037
3. DEWALT POWER-STUD+ SD1 MECHANICAL ANCHOR PER ICC ESR-2818
ADHESIVE ANCHORS AND REBAR DOWELING INTO CONCRETE
1. HILTI HIT-HY 200 ADHESIVE ANCHOR SYSTEM PER ICC ESR-3187
2. SIMPSON SET-XP ADHESIVE ANCHOR SYSTEM PER ICC ESR-2508
3. DEWALT PE1000+ ADHESIVE ANCHOR SYSTEM PER ICC ESR-2583
DRILLED-IN SCREW ANCHORS INTO SOLID-GROUTED MASONRY
1. HILTI KWIK HUS-EZ SCREW ANCHORS PER ICC ESR-3056
2. SIMPSON TITEN HD SCREW ANCHOR PER ICC ESR-2713
3. DEWALT SCREW-BOLT+ PER ICC ESR-4042
DRILLED-IN EXPANSION ANCHORS INTO SOLID-GROUTED MASONRY
1. HILTI KWIK-BOLT 3 EXPANSION ANCHOR PER ICC ESR-1385
2. SIMPSON STRONG BOLT 2 WEDGE ANCHOR PER UES ER-240
3. DEWALT POWER-STUD+ SD1 MECHANICAL ANCHOR PER ICC ESR-2966
ADHESIVE ANCHORS AND REBAR DOWELING INTO SOLID-GROUTED MASONRY
1. HILTI HIT-HY 270 ADHESIVE ANCHOR SYSTEM PER ICC ESR-4143
2. SIMPSON SET-XP ADHESIVE ANCHOR SYSTEM PER IAPMO UES ER-265
3. DEWALT AC100+GOLD ADHESIVE ANCHOR SYSTEM PER ICC ESR-3200
4. STEEL ANCHOR ELEMENT SHALL BE ASTM F1554 GRADE 55 THREADED ROD OR STEEL REINFORCEMENT PER
DRAWINGS
S-001 4/9/21
GENERAL NOTES
DV SB 22 of 51
STATEMENT OF STRUCTURAL SPECIAL INSPECTION
1. SPECIAL INSPECTION SHALL CONFORM TO SPECIFICATION SECTION 01 45 35 AND CHAPTER 17 OF THE IBC
2. SPECIAL INSPECTIONS AND ASSOCIATED TESTING SHALL BE PERFORMED BY AN INSPECTION AND TESTING AGENCY
MEETING THE REQUIREMENTS OF SPECIFICATION SECTION 01 45 35.
3. STRUCTURAL OBSERVATION FOR SEISMIC RESISTANCE IS NOT REQUIRED PER IBC SECTION 1704.6.1.
OR
STRUCTURAL OBSERVATION FOR SEISMIC RESISTANCE IS REQUIRED PER IBC SECTION 1704.6.1. PERFORM STRUCTURAL
OBSERVATIONS PER IBC SECTION 1704.6.
4. STRUCTURAL OBSERVATION FOR WIND RESISTANCE IS NOT REQUIRED PER IBC SECTION 1704.6.2.
OR
STRUCTURAL OBSERVATION FOR WIND RESISTANCE IS REQUIRED PER IBC SECTION 1704.6.2. PERFORM STRUCTURAL
OBSERVATIONS PER IBC SECTION 1704.6.
5. SPECIAL INSPECTION FOR WIND RESISTANCE IS NOT REQUIRED PER IBC SECTION 1705.11.
OR
SPECIAL INSPECTION FOR WIND RESISTANCE IS REQUIRED PER IBC SECTION 1705.11. PERFORM SPECIAL INSPECTION PER
IBC CHAPTER 17
& AND
@ AT
ADDL ADDITIONAL
ADJ ADJACENT
AFF ABOVE FINISHED FLOOR
ALT ALTERNATE
APPROX APPROXIMATE
AR ANCHOR RODS
ARCH ARCHITECT
ASTM AMERICAN SOCIETY FOR TESTING AND MATERIALS
AVG AVERAGE
BAL BALANCE
BLDG BUILDING
BLKG BLOCKING
BOT BOTTOM
BRG BEARING
BTWN BETWEEN
C CHANNEL
CFS COLD-FORMED STEEL
CG CENTER OF GRAVITY
CIP CAST IN PLACE
CJ CONTROL JOINT
CJP COMPLETE JOINT PENETRATION
CL CENTERLINE
CLR CLEAR
CMU CONCRETE MASONRY UNIT
COL COLUMN
CONC CONCRETE
CONN CONNECTION
CONSTR CONSTRUCTION
CONT CONTINUOUS
CONTR CONTRACTOR
COORD COORDINATE
CTR CENTER
db NOMINAL BAR DIAMETER
DBL DOUBLE
DEMO DEMOLISH
DET DETAIL
DIA OR Ø DIAMETER
DIAG DIAGONAL
DIM DIMENSION
DIST DISTANCE
DL DEAD LOAD
DWG DRAWING
E EAST
EA EACH
EF EACH FACE
EL ELEVATION
ELEC ELECTRIC
EMBED EMBEDMENT
ENGR ENGINEER
EQ EQUAL
EQUIV EQUIVALENT
EW EACH WAY
EXIST EXISTING
EXP EXPANSION
EXT EXTERIOR
f'c COMPRESSIVE STRENGTH OF CONCRETE
FD FLOOR DRAIN
FIN FINISH(ED)
FIN FLR FINISHED FLOOR
FLG FLANGE
FLR FLOOR
FND FOUNDATION
FOC FACE OF CONCRETE
FOM FACE OF MASONRY
FOS FACE OF STUD, FACE OF STEEL
FRMG FRAMING
FS FAR SIDE
FT FOOT, FEET
FTG FOOTING
Fu STEEL TENSILE STRENGTH
FV FIELD VERIFY
Fy STEEL YEILD STRENGTH
GA GAUGE
GALV GALVANIZED
HDG HOT-DIP GALVANIZED
HORIZ HORIZONTAL
HS HIGH…
This is the start of the file's text. The full file is on GovTribe.