This package of construction drawings and specifications is for the roof and counterpoise replacement project at the Syracuse VOR facility located in Clay, New York. The project involves removing the existing terne plate and asphalt roofing system down to the wood decking, then installing a new single-ply PVC membrane roof with metal mesh counterpoise. Additional work includes reinstalling the VOR antenna shelter, replacing sixteen monitor antenna mounting brackets, installing four grounding plates, and upgrading the facility grounding system. The Federal Aviation Administration will furnish the new antenna shelter and associated hardware. Bidders are advised to inspect the site prior to bidding due to the expected deterioration of existing materials. The pre-solicitation number for this opportunity is 6973GH-23-Q-00177 and it involves the Department of Transportation and Federal Aviation Administration.
View the file
Other files
Show all 17
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
For the best experience, open this PDF portfolio in
Acrobat X or Adobe Reader X, or later.
Get Adobe Reader Now!
http://www.adobe.com/go/reader
NY
AS
05/18/2020 19001788
SYR-19001788-E003
ENGINEERING SERVICES
NAVAIDS
VOR
ROOF REPLACEMENT
SYRACUSE
PROJECT ENGINEER MGR: ENGINEERING - CENTER B
s y r- -e
.d g n
DRAWING PRODUCED ON AEA RO CAD SYSTEM
ATO - TECHNICAL OPERATIONS EASTERN SERVICE AREA
C O
N S
T R
U
IO
GROUNDING DETAILS III
E D
M
IS
F
DT#20420
G O G O G O G O G O G O G O G O
O=ORANGE
G= GREEN
GROUND PLATE
SUPPLEMENTAL
1.
NOTES
FOR GENERAL NOTES AND ABBREVIATIONS, SEE DWG E001.
2.
3.
4.
1/2" DIA HARDWARE TO 65 FT-LBS AND TORQUE 3/8" DIA HARDWARE TO 40 FT-LBS.
FOR SUPPLEMENTAL GROUND PLATES PROVIDED UNDER THIS CONTRACT, TORQUE
HEX BOLT
WASHER
LOCK
BRACKET
WALL MOUNTING
WASHER
LOCK
HEX BOLT
INSULATOR
INSULATOR
WALL BRACKET
COVER
GROUND PLATE
NUTS
SELF-LOCKING
1" 1 1/2" 1/4"
3"
MOUNTING HOLE
7/16" DIA
(TYP)
8 SPACES @ 1"=8"
3/4"
1"
12"
1/2" TYPICAL
(TYPICAL)
3/8" HIGH BLACK LETTERING
AND ORANGE SLASHES AND
COVER W/ ALTERNATING GREEN
8"x12"x1/4" CLEAR PLEXIGLASS
1/4-20 HEX BOLTS
1/4" FLAT WASHER
LOCKWASHER
1/4" EXT TOOTH
1/4-20 HEX NUTS
2 HOLE LUG
METAL ENCLOSURE
GROUND PLATE/
GROUND WIRE
24" MIN
COPPER CLAD GND ROD
3/4" x 10' LONG
AS INDICATED)
(QUANTITY AND TYPE
GROUND CONDUCTOR
AS INDICATED)
(QUANTITY AND TYPE
GROUND CONDUCTOR
SEE PLANS
FOR CONT,
SEE PLANS
FOR CONT,
DRAWING E007)
(SEE DETAILS ON
EXOTHERMIC WELD
ALL GROUNDING HARDWARE IS BRASS EXCEPT WHERE NOTED OTHERWISE.
BURNISHED MOUNTING SURFACE TO REMOVE PAINT IN THE AREA OF LUG CONTACT.
WITH SELF-LOCKING NUT
3/8" NYLON THREADED ROD
FURNISHED AND INSTALLED
GRADE
GROUNDING PLATE INSTALLATION
NOT TO SCALE
A E003
COPPER GROUND PLATE SUPPORT
B
GROUND PLATE ASSEMBLY
SUPPLEMENTAL GROUND PLATE COVER
INDOOR GROUNDING CONNECTION (TYPICAL)
GROUND ROD INSTALLATION
MOUNTING FRAME
(SIZE VARIES)
CONDUCTOR
GROUND
(TYP, 2 PLACES)
LOAD DISTRIBUTION WASHER
TYPE CONNECTOR
NICKEL-BASED COMPRESSION
EXOTHERMIC WELD OR
NOT TO SCALEE003
G MECHANICAL CONNECTION DETAIL
OF METAL MEMBERS OF ALL PAINT
CLEAN ENTIRE BONDING AREA
IN TABLE C ON THIS SHEET
THE BOLTS USED AS INDICATED
AMOUNT OF LOAD FOR
STACK TO OBTAIN REQ'D
DISC SPRING WASHERS.
BOLT SPECIFICATION FOR STAINLESS STEEL 301 TYPE 18-8
PER INCH
THREADS
SS 18-8
(FT-LBS)
TORQUE
(LBS)
CLAMP LOAD
BOLT
(LBS)
FLAT LOAD
(SEE NOTE 2)
REQUIRED
WASHERS
1/4
(INCHES)
DIAMETER
BOLT
60020 6 1,510 3
5/16 18 11 2,120 31,000
3/8 16 19 3,150 22,100
7/16 14 31 N/A N/A
1/2 13 43 5,170
4,300
3,300 2
9/16 12 56 6,070 2,800 3
5/8 11 92 8,880 5,500 2
3/4 10 10,200 13,800 1127
7/8 9 13,310 14,400 1194
8 17,200 14,200 22861
NOTES:
FORMULA:
BOLT CLAMP LOAD. THE NUMBER OF WASHERS REQUIRED IS CALCULATED BY THE FOLLOWING
THE SUM OF THE INDIVIDUAL DISC WASHER FLAT LOAD RATINGS MUST EXCEED THE LISTED
Bolt Clamp Load
< W Number of Washers x F Washer Flat Load
THEREFORE 3 DISC WASHERS WILL BE NEEDED.
FOR EXAMPLE, A 1/4" SS BOLTED CONNECTION REQUIRES MINIMUM 1,510 LBS CLAMP LOAD,
USE BOLT ASSEMBLY'S MANUFACTURER'S RECOMMENDED TORQUE VALUES.
NOT TO SCALEE003
H CONNECTION TORQUE REQUIREMENTS FOR BOLTED BONDS TABLE
r-
/1
/2
:2
:3
P lo tt e d b
V
-C
G -E
H
8 7 6 5 4 3 2 1
12345678
REVDRAWING NO
DATE JCN
APPROVED BY
ISSUED BY
CHECKED
DRAWN
DESIGNED
SUBMITTED BY
REVIEWED BY
FEDERAL AVIATION ADMINISTRATION
DEPARTMENT OF TRANSPORTATION
REV
DATE
APPROVED
DESCRIPTION JCN
REDLINE
APVD
syr-19001788-e003
2023-05-19T07:52:27-0400
CHRISTOPHER H NASH
2023-05-18T16:52:02-0400
TIMMY KIM
05/07/2020 19001788
SYR-19001788-G001
SURV./WEATHER
COVER SHEET, ROOF SYSTEM, AND VICINITY MAP
r-
-g
DRAWING PRODUCED ON AEA RO MICROSTATION SYSTEM
AVIA
I
L
TRAT
SI
NI
T OF TRANSPO
T A
IC
OF
STATES
IT
TM
EN
VICINITY MAP
PVC MEMBRANE/ STAINLESS STEEL MESH ROOF SYSTEM
VORTAC FACILITY
SYRACUSE AIRPORT (SYR)
W
Y
CORNER
RODGER
EUCLID
VOR SITE
r-
:5 lo tt e syr-19001788-g001
2023-05-19T07:50:21-0400
CHRISTOPHER H NASH
2023-05-18T17:37:20-0400
YURIY DAVYDAN
SYR-19001788-G002
r-
DRAWING INDEX, ABBREVIATIONS, AND LEGEND
DRAWING INDEX
DRAWING TITLE
GENERAL:
DEMOLITION:
STRUCTURAL:
ABBREVIATIONS
PR
PNL
PLC
PAPI
OM
OFA
OC
OB
NWS
NTP
NOTAM
NIC
NEC
NDB
NAS
N/A
MSL
MP
MIN
MHZ
MAX
MASLR
MASLF
MALS
LOM
LOC
LIR
LHA
KVA
KV
KHZ
INSUL
IN
ILS
HZ
HH
GS
GRSC
GND
GFM
GFCI
GC
GALV
GA
FT
FOD
FDN
FBD
FAA
EXIST
EOR
EMT
EL
EES
DWG
DU
DPU
DME CO
DME
DISC
DEB
CW
COR
CO
CND
CKT
CFW
CDA
C-C
BSCU
BLD
AWG
ATCT
ASOS
ARP
AOA
ALS
AIP
AGL
A-G
ACM
ABBREVIATIONS CONTINUED
- PAIR
- PANEL
- PLACES
- PRECISION APPROACH PATH INDICATOR
- POWER
- OUTER MARKER (ILS)
- OBJECT FREE AREA
- ON CENTER
- OBSTRUCTION
- NATIONAL WEATHER SERVICE
- NOTICE TO PROCEED
- NOTICE TO AIRMEN
- NOT IN CONTRACT
- NATIONAL ELECTRIC CODE
- NON DIRECTIONAL BEACON
- NATIONAL AIRSPACE SYSTEM
- NOT APPLICABLE
- NEUTAL
- MEAN SEA LEVEL
- MULTI-POINT (GROUND)
- MINIMUM
- MEGAHERTZ
- MAXIMUM
- MALS WITH RUNWAY ALIGNMENT INDICATOR LIGHTS (MALS-RAIL)
- MALS WITH SEQUENCED FLASHERS
- MEDIUM INTENSITY APPROACH LIGHT SYSTEM
- LOCATOR OUTER MARKER (NDB & OM)
- LOCALIZER (ILS)
- LOW IMPACT RESISTANCE
- LAMP HOUSING ASSEMBLY (PAPI)
- KILOVOLT AMPERE
- KILOVOLT
- KILOHERTZ
- INSULATED
- INCH
- INSTRUMENT LANDING SYSTEM
- HERTZ
- HAND HOLE
- GLIDE SLOPE (ILS)
- GALVANIZED RIGID STEEL CONDUIT
- GROUND
- GOVERNMENT FURNISHED MATERIAL
- GROUND FAULT CIRCUIT INTERRUPTER
- GROUND CHECK (LOCALIZER)
- GALVANIZED
- GENERAL AVIATION
- FEET
- FOREIGN OBJECT DEBRIS
- FOUNDATION
- FIXED BASE OPERATOR
- FEDERAL AVIATION ADMINISTRATION
- EXISTING
- END OF RUNWAY
- ELECTRIC METALLIC TUBING
- ELEVATION
- EARTH ELECTRODE SYSTEM
- DRAWING
- DISTRIBUTION UNIT
- DATA PROCESSING UNIT
- DME CORPORATION
- DISTANCE MEASURING EQUIPMENT
- DISCONNECT
- DIAMETER
- DIRECT EARTH BURIAL
- COURSE WIDTH (LOCALIZER)
- CONTRACTING OFFICER'S REPRESENTATIVE (FAA)
- CONTRACTING OFFICER (FAA)
- CONDUIT (DUCT)
- CIRCUIT
- CENTERFIELD WIND
- COPPER DEVELOPMENT ASSOCIATION
- CENTER TO CENTER
- CONTROL
- BARE SOLID COPPER
- BUILDING
- AMERICAN WIRE GAUGE
- AIR TRAFFIC CONTROL TOWER
- AUTOMATED SURFACE OBSERVATION SYSTEM (NWS)
- AIRPORT REFERENCE POINT
- AIR APERATION AREA
- APPROACH LIGHT SYSTEM
- AIRPORT IMPROVEMENT PROGRAM (FAA)
- ABOVE GROUND/GRADE LEVEL
- AIR TO GROUND
- ASBESTOS CONTAINING MATERIAL
- AMP
XMTR
XFMR
WS
W/
VHF
UPS
TYP
TSA
TOS
TOC
TH
TELCO
TEL
TACAN
T/W
STA
SSC
SS
SP
SMO
SEC
SCH
RVR
RTR
RT
RSA
RRCS
RMC
RMMS
RMM
RLS
RF
REQ
REL
REIL
RAIL
R/W
PVC
PRIM
- TRANSMITTER
- TRANSFORMER
- WIND SOCK
- WITH
- VERY HIGH FREQUENCY OMNI RANGE
- VERY HIGH FREQUENCY
- VOLT
- UNINTERRUPTIBLE POWER SOURCE/SUPPLY
- TYPICAL
- TAXIWAY SAFETY AREA
- TOP OF STEEL
- TOP OF CONCRETE
- THRESHOLD
- TELEPHONE COMPANY
- TAXIWAY EDGE LIGHTS
- TACTICAL AIR NAVIGATION
- TAXIWAY
- TELEPHONE
- STATION
- SYSTEM SUPPORT CENTER (FAA)
- STAINLESS STEEL
- SINGLE-POINT (GROUND)
- SYSTEM MANAGEMENT OFFICE (FAA)
- SECONDARY
- SCHEDULE
- RUNWAY VISUAL RANGE
- REMOTE TRANSMITTER/RECEIVER
- REMOTE TRANSMITTER
- RUNWAY VISUAL RANGE
- REMOTE RADIO CONTROL SYSTEM
- REMOTE MONITORING SUBSYSTEM
- REMOTE MAINTENANCE MONITORING SYSTEM
- REMOTE MAINTENANCE MONITORING
- REGISTERED LAND SURVEYOR
- RADIO FREQUENCY
- REQUIRED
- RUNWAY EDGE LIGHTS
- RUNWAY END IDENTIFIER LIGHTS
- RUNWAY ALIGNMENT INDICATOR LIGHTS
- RUNWAY
- POLYVINYL CHLORIDE
- PRIMARY
X
XXXX
SYMBOLS LEGEND
SUBTITLE REFERENCE
SCALE: X = XX
XXXXXXXXXXX
ELEVATION REFERENCE LETTER
SECTION REFERENCE LETTER
SCALE
ELEVATION CALLOUT REFERENCE
SHEET NUMBER WHERE ELEVATION IS LOCATED.
SECTION CALLOUT REFERENCE
SHEET NUMBER WHERE SECTION IS LOCATED.
DETAIL CALLOUT REFERENCE
DETAIL REFERENCE NUMBER
SHEET NUMBER WHERE DETAIL IS LOCATED.
DRAWING PREFIXES
EXXX - ELECTRICAL/ELECTRONIC
SXXX - STRUCTURAL
AXXX - ARCHITECTURAL
DXXX - DEMOLITION
GXXX - GENERAL
ARCHITECTURAL:
ELECTRICAL:
SYR-19001788-E003
SYR-19001788-E002
SYR-19001788-E001
SYR-19001788-S002
SYR-19001788-S001
SYR-19001788-A004
SYR-19001788-A003
SYR-19001788-A002
SYR-19001788-A001
SYR-19001788-D001
SYR-19001788-G003
SYR-19001788-G002
SYR-19001788-G001
GROUNDING DETAILS III
GROUNDING DETAILS II
GROUNDING DETAILS I
ALTERNATE MONITOR ANTENNA SUPPORT ASSEMBLY
MONITOR ANTENNA SUPPORT ASSEMBLY
WALKWAY LAYOUT AND LADDER SUPPORTS
ANTENNA ENCLOSURE PLAN AND DETAILS
ROOF EDGE FLASHING DETAILS AND GROUNDING
ROOF PLAN LAYOUT/COUNTERPOISE REPLACEMENT AND GROUNDING
DEMOLITION PLAN
GENERAL NOTES AND GFM LIST
DRAWING INDEX, ABBREVIATIONS, AND LEGEND
COVER SHEET, ROOF SYSTEM, AND VICINITY MAP
(PLAN, DETAIL/ELEVATION, SECTION)
REFERENCE NUMBER/LETTER
ELEVATION, SECTION OR DETAIL IS/ARE LOCATED.
SHEET NUMBER(S) WHERE CALLOUT(S) TO PLAN,
DRAWING NO.
REFERENCE DRAWINGS:
DRAWING NO: DRAWING TITLE:
SYR-D-VOR-C005
SYR-D-VOR-C002
SYR-D-VOR-CO01
SITE PLAN AND LAYOUT
PLOT LAYOUT
PROPERTY LAYOUT
COORDINATES:
LONGITUDE: 76° 12' 16.416" E
LATITUDE: 43 9' 37.872" N
CLAY, NY 13090
8076 MORGAN RD.
PHYSICAL ADDRESS:
r-
:0 lo tt e syr-19001788-g002
2023-05-19T07:50:35-0400
CHRISTOPHER H NASH
2023-05-18T17:37:49-0400
YURIY DAVYDAN
SYR-19001788-G003
r-
GENERAL NOTES AND GFM LIST
DRAWING NOTES:
GFM MATERIAL LIST
DESCRIPTIONITEM NSN QUANTITY
1 EACH1
2 5825-00-867-4652
5985-01-573-31614
5340-01-623-01865
KEYSTONE ANGLE BRACKET
CL-1 HOLD DOWN CLAMPS
TEEPEE FASTENING STRIPS
TEEPEE LOWER AND UPPER GASKET MATERIAL
APPROVED BY THE FAA COR.
ALL DISTURBED AREAS SHALL BE RESTORED TO PRIOR CONDITION. FINAL CONDITION SHALL BE
VERIFIED IN THE FIELD BY THE CONTRACTOR.
DIMENSIONS, ELEVATIONS, CONTOURS AND HEIGHTS INDICATED ARE APPROXIMATE AND SHALL BE
REQUIREMENTS FOR FACILTIES AND ELECTRONIC EQUIPMENT".
"LIGHTNING AND SURGE PROTECTION, GROUNDING, BONDING AND SHIELDING
GROUNDING AND LIGHTNING PROTECTION SHALL MEET LATEST VERSIONS OF FAA STANDARD 019, AN IN NO CASE SHALL VIOLATE THE NATIONAL ELECTRIC CODE {NFPA 70, NEC}.
ALL ELECTRICAL WORK SHALL CONFORM TO LATEST VERSIONS OF FAA-C-1217 AND FAA-C-1391
ELECTRICAL WORK:
ELECTRICAL GROUNDING:
SITE WORK:
GOVERNMENT FURNISHED MATERIAL (GFM) NOTES:
G003
TABLE - GOVERNMENT FURNISHED MATERIAL (GFM)
8 EACH
18 EACH
16 EACH
NEW VOR ANTENNA SHELTER (TEEPEE).
5.
THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE GFM WHILE ON SITE.
SEE DRAWING NOTE 14.
GFM WILL BE DELIVERED TO THE SITE BY THE GOVERNMENT.
5411-01-325-1940
TACAN ANTENNA
RT2 TACAN ANTENNA HARNESS TO BE RETURNED TO FAA
LPTA TACAN ANTENNA HARNES TO BE RETURNED TO FAA
TACAN COLLAR
1 EACH
SHALL SUPPY OTHER STRAPS AND RIGGING TO EXECUTE THE PICK.
THE FAA WILL FURNISH THE TACAN ANTENNA HARNESS TO REMOVE AND REPLACE THE TACAN. CONTRACTOR
RIGGING TO REMOVE LOAD/UNLOAD AND INSTALL THE VOR SHELTER (TEEPEE).
THE NEW FIBERGLASS TEEPEE IS GFM. THE CONTRACTOR SHALL PROVIDE THE CRANE OPERATOR AND THE
STORED ON SITE.
TRANSFERRED VIA FORM FAA-4650-12, THE CONTRACTOR WILL BE RESPONSIBLE FOR THE GFM WHILE
THE GFM SHALL BE INVENTORIED BY THE CONTRACTOR AND THE FAA COR AT WHICH TIME THE GFM WILL BE
50 FT.
REFURBISHED MONITOR (MAILBOX) COVERS
R425-N HIGH DENSITY NEOPRENE WITH PSA (3/8" X 2 1/2" X 50')12
16 EACHKEYSTONE PLATES
18. WHERE CAULKING IS SPECIFIED, CONTRACTOR SHALL USE 3M 5200 CAULKING OR APPROVED EQUAL.
17. THE CONTRACTOR SHALL USE ANTI-SEIZE COMPOUND ON ALL THREADED PARTS.
16. NOT USED.
AND ONE TO INSTALL EQUIPMENT.
15. CONTRACTOR SHALL PLAN AT LEAST TWO DAYS FOR THE CRANE AND MAN LIFT, ONE TO REMOVE
CONTRACTOR SHALL PROPERLY SECURE NEW TEEPEE IF NOT INSTALLED UPON DELIVERY.
SITE OR LOADED ONTO AN FAA TRAILER FOR OFFSITE TRANSPORT, DEPENDING ON THE SCHEDULED ARRIVAL OF A NEW (GFM) TEEPEE.
EXISTING SHELTER (TEEPEE) MAY EITHER BE STORED ON DOWNS TO PROTECT TEEPEE AND TACAN ANTENNA WHILE STORED ON SITE.
14. CONTRACTOR SHALL SECURE THE TEEPEE AND TACAN ANTENNA, IF APPLICABLE, WITH CONTRACTOR-PROVIDED DUNNAGE AND TIE
NOT USED.13.
12. NOT USED.
SHALL NOTIFY THE CONTRACTING OFFICER (CO) AND COR PRIOR TO PROCEEDING WITH CONSTRUCTION.
11. IF CONDITIONS ARE DIFFERENT THAN THOSE INDICATED IN THE DRAWINGS OR SPECIFICATIONS, THE CONTRACTOR
THE FAA.
10. THE CONTRACTOR SHALL LEGALLY DISPOSE OF ALL MATERIALS AND EQUIPMENT NOT RETURNED TO OR RETAINED BY
SHALL PROVIDE ALL LABOR AND EQUIPMENT TO EXECUTE THE WORK, UNLESS OTHERWISE INDICATED.
9. THE CONTRACTOR SHALL PROVIDE ALL MATERIALS UNLESS DESIGNATED AS GFM. THE CONTRACTOR
SUSPEND THE PROJECT SHOULD HE OR SHE DETERMINE THAT AN UNSAFE CONDITION EXISTS.
8. THE CONTRACTOR SHALL COMPLY WITH OSHA REGULATIONS. THE C.O. AND/OR COR RESERVES THE RIGHT TO
THE TEEPEE FOR TRANSPORTATION.
THE TACAN ANTENNA OR TOP OF TEEPEE IF NO TACAN ANTENNA EXISTS. THE TACAN MOUNTING COLLAR MUST BE SEPARATED FROM
THE APPROXIMATE 800 LB TEEPEE. THE CONTRACTOR SHALL SUPPLY A 60 FOOT (MIN) TELESCOPING BOOM LIFT CAPABLE OF REACHING
EXECUTE THE WORK. THE CRANE SHALL SAFELY LIFT THE APPROXIMATE 800 LB TACAN ANTENNA (LOCATED ATOP THE TEEPEE) AND
ANTENNA SHELTER (TEEPEE). THE CONTRACTOR SHALL PROVIDE THE PROPER CRANE, OPERATOR, RIGGING, AND A MANLIFT TO
7. THE CONTRACTOR, WITH FAA ASSISTANCE, SHALL REMOVE THE EXISTING TACAN ANTENNA (OR DME), MOUNTING COLLAR, AND VOR
AND MONITOR ANTENNA LOCATIONS (SIGNED AND STAMPED) BY THE RLS.
6. CONTRACTOR TO PROVIDE A ROOF SKETCH OF FINAL FACILITY NORTH POINT (NORTH MONITOR BRACKET) RELATIVE TO TRUE NORTH
BRACKET, MAY BE REMOVED (WITH COR APPROVAL) PRIOR TO ESTABLISHING THE REQUIRED FACILITY NORTH REFERENCE.
MONITOR BRACKETS, OTHER THAN THE NORTH AZIMUTH MONITOR DECK BELOW. FOR ADDITIONAL INFORMATION SEE DRAWING D001.
LOCATED AROUND THE PERIMETER/EDGE OF THE ROOF. THE BRACKETS ARE BOLTED THROUGH THE ROOF MATERIALS AND THE WOOD
PRESERVE THE SIXTEEN VOR MONITOR ANTENNA MOUNTING (KEYSTONE) BRACKETS AND ASSOCIATED HARDWARE WHICH ARE
AFTER AN OFFSET FOR THE NORTH MONITOR BRACKET HAS BEEN ESTABLISHED BY AN RLS, THE CONTRACTOR SHALL REMOVE AND
5. THE FAA COR/RE WILL IDENTIFY THE NORTH MONITOR BRACKET WHICH SHALL BE USED BY THE CONTRACTOR TO CREATE AN OFFSET.
THE CONTRACTOR SHALL PROTECT ALL CABLE CONNECTIONS FROM WEATHER AND DAMAGE DURING CONSTRUCTION. EDGE OF ROOF.
EXISTING VOR TRANSMIT ANTENNAS, TACAN/DME CABLES (INSIDE TEEPEE) AND THE VOR MONITOR ANTENNAS ('MAILBOXES') ALONG
4. THE FACILITY (VOR AND TACAN/DME) WILL BE SHUT DOWN FOR THE DURATION OF THE CONSTRUCTION. THE FAA SHALL REMOVE THE
LEAST 1 WEEK IN ADVANCE.
SHUTDOWN OR OTHER PROVISIONS. COORDINATE ALL SUCH ACTIVITIES AND REQUIRED SHUTDOWNS WITH THE COR AT
3. ANY ACTIVITIES INVOLVING CRANES OR OTHER EQUIPMENT EXCEEDING 15 FEET IN HEIGHT MAY REQUIRE
PRIOR TO CONSTRUCTION START.
2. CONTRACTOR SHALL USE ACCESS ROUTES, STAGING AREAS, AND EMPLOYEE PARKING AREAS APPROVED
TO TACAN EQUIPMENT ARE ONLY AS APPLICABLE.
A FACILITY MAY OR MAY NOT HAVE A TACAN ANTENNA AND COLLAR INSTALLED ON TOP OF THE TEEPEE. ALL REFERENCES
1. THIS DRAWING PACKAGE INDICATES WORK REQUIRED FOR THE REPLACEMENT OF STANDARD VOR EQUIPMENT SHELTER ROOF.
r-
:0 lo tt e syr-19001788-g003
2023-05-19T07:50:44-0400
CHRISTOPHER H NASH
2023-05-18T17:37:59-0400
YURIY DAVYDAN
FOR CLARITY
CUT AWAY
FASCIA/DRIP
NEW ROOFING
(EXISTING) (GFM)
5/8" KEYSTONE
SYR-19001788-S001
r-
-s
ITEM 8
FLAT WASHER
ITEM 3
HEX NUT
ITEM 2
FLAT WASHER
HEX NUT
LOCK WASHER
ITEM 4
WOOD DECK
EXISTING
A-36 STEEL BAR
3/8"x 1 1/2"x 3 3/4"
ITEM 6
ROD
ITEM 7
2" 0 2" 4"
SCALE: 6" = 1'-0"
3" 0 3" 9"6"
SCALE: 3" = 1'-0"
1' 0 1'3"6"9"
SCALE: 1 1/2" = 1'-0"
ALL THREAD RODS
18-8 STAINLESS STEEL
NAILER
NEW WOOD
ITEM DESCRIPTION QUANTITY
64 EACH
3/8"-16 18-8 STAINLESS STEEL NUTS
3/8" X 1"O.D. 18-8 STAINLESS STEEL FLAT WASHERS
3/8" 18-8 STAINLESS STEEL LOCK WASHERS
256 EACH
32 EACH
64 EACH
NSN
1/4"-20 STAINLESS STEEL NUTS
3/8"-16 X 7" ALL THREAD 18-8 STAINLESS STEEL ROD
1/4"-20 X 1" FLATHEAD MACHINE SCREWS (SS) (PHILLIPS HEAD)
1/4" X 3/4" O.D. 18-8 STAINLESS STEEL FLAT WASHERS & LOCKWASHERS
6061-T6 OR 2024-T4 ALLOY
3/8" X 4" ALUMINUM BAR STOCK
NOT SHOWN FOR CLARITY
ALUMINUM SOFFIT PANEL
NEW NAILER
ITEM 5
3/8"-16 X 2" 18-8 STAINLESS STEEL BOLT
(EXISTING)
WITH FASCIA
2- 2X12 COVERED
FOR 3/8-16 S.S. ALL THREAD RODS (ITEM 7)
3/8" X 1 1/2" X 3 3/4" A-36 STEEL BAR, DRILLED AND TAPPED
2024-T4 ALLOY, DRILLED AND SLOTTED PER DETAIL
3/8" X 5 1/2" X 11" RECTANGULAR ALUMINUM PLATE, 6061-T6 OR
BRACKET (GFM)
KEYSTONE ANGLE
EXISTING FASCIA
(INSTALLED BY OTHERS)
ANTENNA MAST (GFM)
TUBULAR MONITOR
2"x 2" SQUARE
SCREWS
KEYSTONE PLATE
DECK
FLUSH WITH CDX PLYWOOD
ANCHOR SHALL BE MOUNTED
KEYSTONE RECEIVER
ANTENNA MAST
MONITOR
ITEM 1
BRACKET (GFM)
SOFFIT
RE-INSTALL
(SCALE: 1" = 2")
SEE NOTE 6
/4
1 1/2"
1 3/4" 1 3/4"
"64
1" 3" 1 1/2" 1 1/2" 3" 1"
11"
5"
TO SUPPORT SOFFIT
STRAPPING AS NEEDED
NAILER
NEW
STRAPPING
TRANSITION PLATE
MONITOR ANTENNA POLE
SIDE OF ASSEMBLY)
(MONITOR ANTENNA
KEYSTONE RECEIVER
ANGLE BRACKET ASSEMBLY
MOUNTED TO STRUCTURE
SIDE OF ASSEMBLY)
(KEYSTONE ANGLE BRACKET
ITEMS 8-10
K
/A
ID
I
IT
(SEE NOTE 4)
THREADED
1/2" FILLET
LC
6.
S001 SCALE: 6" = 1'-0"
S001
TRANSITION PLATE
MONITOR ANTENNA SUPPORT ASSEMBLY (FRONT)
(MONITOR MAST & KEYSTONE RCVR NOT SHOWN, FOR CLARITY)
MONITOR ANTENNA SUPPORT ASSEMBLY (SIDE)
MONITOR ANTENNA SUPPORT ASSEMBLY (BOTTOM)
DUAL STUD ANCHOR
S001 NOT TO SCALE
T&G PLYWOOD
3/4" PRESSURE-TREATED
/8
3/ 4"
1/
4" 3/4"
FACILITY NORTH.
RADIAL FROM CENTER OF ANTENNA PEDESTAL PLATE EVERY, 22.5 DEGREES FROM
ACCOMODATE FLIPPED ANGLE BRACKET CONFIGURATION.
INVERTED, AND RE-ATTACHED WITH NEW HARDWARE (WIDE END DOWN) TO
SHALL BE SEPARATED. THE KEYSTONE PLATE SHALL BE REMOVED FROM BRACKET,
TWO PART ANGLE BRACKET (SEE 3/D001) ASSEMBLY (REMOVED AT DEMOLITION)
CONTRACTOR SHALL USE ANTI-SEIZE COMPOUND ON ALL THREADED PARTS.
FAA SHALL INSTALL MONITOR ANTENNAS.
ASSEMBLIES AT LOCATIONS SET BY RLS.
CONTRACTOR SHALL FURNISH AND INSTALL SIXTEEN MONITOR ANTENNA SUPPORT
KEYSTONE ANGLE BRACKET AND KEYSTONE PLATE ARE GFM.
r-
:1 lo tt e syr-19001788-s001
2023-05-19T07:52:35-0400
CHRISTOPHER H NASH
2023-05-18T17:40:21-0400
YURIY DAVYDAN
3/8"
½
2½"
6"
2"
3?"1?"
(SEE DETAIL 4)
NECESSARY
SHIM AS
SEE NOTE 3
8"
¼
?" 2" ?"
3¾"
8"
SUPPORT ASSEMBLY
ALTERNATE MONITOR ANTENNA
NY SYRACUSE
02/27/2023 19001788
SYR-19001788-S002
r-
(2 PARTS) SEE NOTE 2
KEYSTONE ASSEMBLY
BACKING PLATE
FLAT WASHER &
FLAT WASHER &
r-lo tt e
1/2" X 3" STAINLESS STEEL LAG SCREWS WASHERS.
3. IF ACCESS TO NUTS ON BACK SIDE OF FACIA ISN'T AVAILABLE, USE
KEYSTONE PLATE TO KEYSTONE ANGLE BRACKET.
2. TO ACCOMODATE NEW ORIENTATION OF ANGLE BRACKET. RE-INSTALL
OVERHANG IS LESS THAN 5 INCHES.
1. ALTERNATE ANTENNA SUPPORT ASSEMBLY IS TYPICALLY USED WHEN SOFFIT
(SCALE: 1" = 2")
OVER 2 X 12
FASCIA
SEE NOTE 11 ON G003.
ANTENNA PEDESTAL PLATE.
ESTABILSHED FROM CENTER OF
PERPENDICULAR TO RADIAL
BRACKETS ARE SHIMMED TO BE
SIDE VIEW
S002 SCALE: 6" = 1'-0"
ALTERNATE MONITOR ANTENNA SUPPORT ASSEMBLY
GUSSET PLATE
(TYP 4)
3/4" DIA. HOLES
FRONT VIEW
TOP VIEW
BENT PLATE
5/16" THICK
STAINLESS STEEL
TYPE 304
ALTERNATE MONITOR ANTENNA SUPPORT ASSEMBLY (INSTALLED)
OPENINGS
SLOTTED
1 1/2" X 6"
GUSSET PLATES
5/16"
BRACKET BACKING PLATE
BACKING PLATE
3/8" THICK
STAINLESS STEEL
TYPE 304
SHIM DETAIL
syr-19001788-s002
2023-05-19T07:52:46-0400
CHRISTOPHER H NASH
2023-05-18T17:40:33-0400
YURIY DAVYDAN
SYR-19001788-A001
r-
-a
REPLACEMENT AND GROUNDING
ROOF PLAN LAYOUT/COUNTERPOISE
SEE NOTE 12
TYP 16
PERIMETER
TYPICAL AROUND ROOF
ROOF EDGE FLASHING
NOTE 3
NOTE 9
ROOF DIAMETER 52'-9" (+/-)
NOTE 3
SEE NOTE 7
TYP ALL AROUND
LAP SEAMS 6"
6" O.C. MIN
.C
.C
12" O.C. MIN
ANTENNA MOUNTING PLATE
PLYWOOD.
TONGUE AND GROOVE
PRESSURE-TREATED
SYSTEM) SEE NOTE 8.
MEMBRANE (TOP LAYER OF ROOF
NEW PVC SINGLE-PLY ROOF
ELD
EVERY
MI
PLATES
GROUNDING
(TYP 4)
SEE NOTE 1
SHIELD
BARRIER/ICE
NEW VAPOR
(TEEPEE)
ANTENNA ENCLOSURE
RECEPTACLE
120V
SEE NOTE 10
DOOR
PLYWOOD.
TONGUE AND GROOVE
PRESSURE-TREATED
12"
VAPOR BARRIER
=1 '-1
R=2 '-6
AND TAP PLATE FOR SCREWS.
STEEL HEX HEAD CAP SCREWS. DRILL
SEGMENTS TO ANTENNA PEDESTAL PLATE
ATTACH 4 TYPE 304 STAINLESS STEEL GROUNDING
A001
GROUNDING AROUND ANTENNA
NOT TO SCALENOT TO SCALE
STAINLESS STEEL GROUNDING SEGMENT
PRESSURE-TREATED PLYWOOD
FASTENER SPACING IN 3/4"
SINGLE PLY PVC MEMBRANE ROOF/EXPANDED
METAL MESH COUNTERPOISE ROOF
SEE NOTE 2
MESH (COUNTERPOISE)
FLATTENED EXPANDED METAL
NEW TYPE 304 STAINLESS STEEL
SHEET (4 REQUIRED)
22 GAUGE STAINLESS STEEL
FABRICATED FROM
SEGMENTS
WELDED TO STAINLESS STEEL
STAINLESS STEEL WIRE MESH
EXPANDED METAL MESH.
STRIP CENTERED UNDER SEAM IN
PLACE 6" 22 GA TYPE 304 STAINLESS STEEL
METAL MESH STAPLED TO DECK
FLATTENED EXPANDED
TYPE STAINLESS STEEL
3/4" DIAMOND x 13 GA
EVERY 3" MIN
METAL MESH TO BONDING SEGMENT
WELD TYPE 304 STAINLESS STEEL EXPANDED
STAINLESS STEEL MESH SEAM DETAIL
E001
A004
A002
A003
SEE PAGE D001.
REMOVING OLD ROOF SYSTEM.
ROOF SYSTEM) AFTER
(BOTTOM LAYER OF
EXISTING WOOD DECK
13.
12.
11.
10.
9.
8.
7.
INCHES ALONG BOTH SIDES OF SEAM.
AND PERFORM A 1/2-INCH WELD EVERY 6-
BUTT SEAM OF EXPANDED METAL MESH
LOCATIONS DETERMINED BY LOCAL FAA.
FURNISH AND INSTALL TWO SAFETY SIGNS READING "CAUTION-SLIPPERY WHEN WET" AT
FACILITY NORTH AND THEN EVERY 22.5 DEGREES, USING NEW FASTENERS AND BASE.
ANTENNA SUPPORT ASSEMBLIES, WITH EXISTING AZIMUTH MONITOR BRACKETS. BEGIN INSTALLATION AT
SIXTEEN MONITOR BRACKETS. SURVEY AND INSTALL SIXTEEN NEW (CONTRACTOR PROVIDED) MONITOR
SURVEY AND ESTABLISH NORTH AZIMUTH MONITOR BRACKET REFERENCE. REMOVE AND PRESERVE
AND ORIENTATION.
DELIVERY OF THE NEW ANTENNA SHELTER INSTALL NEW ANTENNA SHELTER IS SAME LOCATION
SO AS TO REMOVE OLD SEALANT AND GASKETING, STORE OR LOAD ONTO FAA TRUCK, UPON
OR CRANE. REMOVE, CLEAN AND SCRAPE THE UNDERSIDE BASE OF THE ANTENNA SHELTER
CONTRACTOR SHALL REMOVE THE TEEPEE WITH FAA ASSITANCE PROVIDING BUCKET TRUCK
REMOVE EXISTING RECEPTACLES, INCLUDING WIRING.
INSTALL A NEW LADDER SUPPORT IN LOCATION DETERMINED BY LOCAL FAA.
INSTALL SINGLE-PLY FULLY ADHERED, PVC ROOFING MEMBRANE WITH MINIMUM 15-YEAR WARRANTY.
INSTALL ROOF EDGE FLASHING AND BOTTOM RETAINING STRIP. SEE DETAILS ON PAGE A002.
PER DETAIL 4 ON THIS PAGE.
INSTALL 4' x 8' x 3/4" THICK PRESSURE-TREATED TONGUE AND GROOVE PLYWOOD
NOTES ON PAGE A003.
ANTENNA ENCLOSURE TO BE REINSTALLED IN SAME LOCATION AND ORIENTATION PER DETAILS AND
MONITOR ANTENNA SUPPORT ASSEMBLIES WITH GFM MONITOR ANTENNA, ANGLE BRACKETS. SEE DWG-S001.
BEFORE INSTALLING EDGE FLASHING, SURVEY AND INSTALL NEW (CONTRACTOR FURNISHED)
SEE DETAIL ON PAGE E001.
INSTALL TYPE 304 STAINLESS STEEL GROUNDING PLATES AT THE FOUR CORNERS OF THE BUILDING.
STAPLE MESH WITH AT LEAST ONE STAPLE PER EVERY 3 SQUARE FEET.
INSTALL 3/4" DIAMOND x 13 GAUGE TYPE 304 STAINLESS STEEL FLATTENED EXPANDED METAL MESH.
INSTALL BUTYL UNDERLAYMENT VAPOR BARRIER (GRACE ULTRA OR APPROVED EQUIVALENT).
r-
:1 lo tt e syr-19001788-a001
2023-05-19T07:50:56-0400
CHRISTOPHER H NASH
2023-05-18T17:38:16-0400
YURIY DAVYDAN
SYR-19001788-A002
r-
ROOF EDGE FLASHING DETAILS AND GROUNDING
TREATED PLYWOOD
3/4" PRESSURE-
SINGLE-PLY MEMBRANE
FULLY ADHERED
FLASHING STRIP
HOT WELD
ROOF EDGE
MONITOR ANTENNA
OF ROOF
FLASHING AROUND PERIMETER
HOT WELD
LAG SCREW 8" O.C
FASTENERS, WITH #3 PHILLIPS HEAD
#12x3 1/4" "BUILDEX" ROOFGRIP
IN PLYWOOD EDGE
3/4"x3/4" CHAMFER
TONGUE AND GROVE PLYWOOD
3/4" PRESSURE-TREATED
MEMBRANE
SINGLE-PLY ROOFING
MEMBRANE
SINGLE-PLY ROOFING
AND MONITOR BRACKETS
ACCOMMODATE FLASHING
ADD NAILER, SIZED AS NECESSARY TO
"SARNAFIL" SARNACLAD METAL
A002 NOT TO SCALE
A00
A002 SCALE: 1 1/2"=1'-0"
PLAN VIEW OF PORTION OF ROOF EDGE
SHOWING EDGE FLASHING SECTION
A002 NOT TO SCALE
SECTION THROUGH ROOF EDGE
r-lo tt e syr-19001788-a002
2023-05-19T07:51:09-0400
CHRISTOPHER H NASH
2023-05-18T17:38:30-0400
YURIY DAVYDAN
14'-3"
20'-2 3/4" (TYPICAL SLOPE = 1/4" PER FOOT = APPROX 5")
SYR-19001788-A003
ANTENNA ENCLOSURE PLAN AND DETAILS
r-
VARIES
DIM
08' 8'
SCALE: 1/8" = 1'-0"
16'
01' 1' 3'2'
SCALE: 3/4" = 1'-0"
ROOF LINE
2X6 DECKING
(S
Q
10'-0"
52'-9"
GALV STEEL
1/8" THICK
(2 PLACES)
5/8" DIA HOLE
(2 PLACES)
45 CHAMFER
D.
C.
B.
A.
TEEPEE INSTALLATION NOTES:
SCALE: 3/4" = 1'-0"
SECTION THRU ROOF
FASTENING STRIP (GFM)
SCALE: 1/8" = 1'-0"
ANTENNA ENCLOSURE (TEEPEE) PLAN
2" 4"2" 0
FASTENING STRIPS.
3/8"X 3", SS, HEX HEAD LAGS, SS WASHERS, AND THE (GFM)
FILL WITH CAULK PRIOR TO SECURING THE TEEPEE WITH
THE CONTRACTOR SHALL DRILL PILOT HOLES AND
WILL APPROVE THE FINAL LOCATION AND RADIAL ORIENTATION.
TEEPEE ON THE NEW ROOF. ONCE POSITIONED CORRECTLY, THE FAA
AND CENTERING THE TEEPEE. THE CONTRACTOR SHALL PLACE
THE CONTRACTOR SHALL MAKE REFERENCE MARKS FOR ORIENTING
CONTACT ADHESIVE TO BE USED AS/IF REQUIRED.
FIRMLY HOLD IN PLACE. THE CONTRACTOR SHALL SUPPLY THE
MAY REQUIRE THE APPLICATION OF CONTACT ADHESIVE TO
TYPICALLY COMES WITH PRESSURE SENSITIVE ADHESIVE, BUT
TO THE UNDERSIDE OF THE TEEPEE. NOTE: THE GASKET MATERIAL
THE CONTRACTOR WILL THEN APPLY THE TEEPEE GASKET MATERIAL
CLEANING AND REMOVING ANY OLD GASKET MATERIAL.
ATION OF THE (GFM) TEEPEE GASKET BY THOROUGHLY
PREPARE THE BOTTOM SURFACE OF THE TEEPEE FOR INSTALL-
JUST PRIOR TO SETTING THE TEEPEE, THE CONTRACTOR SHALL
TEEPEE INSTALLATION SEQUENCE:
METAL MESH
EXPANDED
ROOF STRUCTURE
MEMBRANE ROOFING. SEE DETAILS
PLYWOOD UNDERLAYMENT, SINGLE-PLY PVC
EXPANDED METAL MESH, 3/4" T & G CDX
NEW ROOF DECK (WHERE REQUIRED), VAPOR BARRIER,
NEW
VINYL SOFFIT AND PROVIDE
REMOVE OLD PERFORATED
FAA ASSITANCE
INSTALLED BY CONTRACTOR WITH
VOR ANTENNA SHELTER (TEEPEE)
AS NEEDED
NEW NAILER, FURR DOWN,
RE-INSTALL SOFFIT UNDER
SIDING
INSULATION (TYP.)
SPRAY FOAM
TRIM TO OUTLOOKERS (2 LOCATIONS)
CONTRACTOR SHALL RE-INSTALL
STRIP (GFM)
FASTENING
OF BONDING SEGMENT
END AT OUTER RADIUS
PLYWOOD UNDERLAYMENT
PVC MEMBRANE AND
(SEE 3/A001 AND 1/E001)
CONTRACTOR
INSTALLED BY
BONDING SEGMENT
BY FAA
INSTALLED
PEDESTAL
VOR ANTENNA
(TEEPEE)
ANTENNA ENCLOSURE
GASKET (TYP)
RUBATEX
(8 PLACES)
CLAMP (GFM)
HOLD DOWN
(CENTER POLE)
POLARIZER
12'-1/2" (TYPICAL FLAT)
PLYWOOD UNDERLAYMENT
PVC MEMBRANE AND
1/4"/FT TYP SLOPE (MAY VARY)
MEMBRANE AND TEEPEE
TO BE BONDED TO PVC
LIQUID APPLIED FLASHING
AND CLEATS
BLOCKING
BUILDING
STRAPPING
3/4" X 2"
CELING
3/8" PLYWOOD
ACCESS HOLE PATCH
AROUND EDGE
1X TRIM TYPICAL
BREAK METAL
ALUMINUM SOFFIT
REMOVE AND REUSE
MAST (SEE NOTE 6)
MONITORING ANTENNA
2 X 6 WOOD DECK
ROSIN PAPER
METAL TERNE ROOFING
CEILING
3/8" PLYWOOD
VINYL SIDING
BUILDING EXTERIOR WALL
C10 X 8.5
SLOPE 1/4"/FT (TYP.)
(REMOVE)
BACKER PLATE
BOLTED TO C10 VIA CLIP ANGLES
DOUBLE 2 X 12 PERIMETER BEAM
CONDUIT. SEE NOTE 11
REMOVE EXISTING
CONTRACTOR SHALL
COAX CABLE
FASCIA AND SOFFIT
ALUMINUM
(SOLDERED AND SCREWED). SEE NOTE 7
CLAMPS FROM ANTENNA PEDESTAL PLATE
REMOVE TERNE PLATE AND HOLD DOWN
REMOVE TERNE ROOFING
FASTENING STRIP AND WASHERS
VOR ANTENNA ENCLOSURE
MEMBRANE AND TEEPEE
TO BE BONDED TO PVC
LIQUID APPLIED FLASHING
INSULATION
VOR ANTENNA PEDESTAL PLATE
3" BATT INSULATION
1/2" LAG BOLTS
BOLTED TO C10 WITH
4" X 6" TAPERED NAILERS
ROSIN PAPER, BOARD INSULATION, AND SINGLE PLY MEMBRANE
ASPHALTIC SURFACED TERNE PLATE ROOF/COUNTERPOISE,
CONTRACTOR TO REMOVE:
SOFFIT AND REPLACE WITH NEW
REMOVE EXISTING PERFORATED VINYL
ROOF SECTION
2" X 6" T&G DECKING
PLACED IN A SPECIAL DUMPSTER FOR ASBESTOS ABATEMENT
CONTAINING TAR AND STONE ROOF. EVERYTHING SHOULD BE
UNDER THE INSULATION ARE REMNANTS OF AN ASBESTOS
ASSUME THE TERNEPLATE WILL BE ROTTED THROUGHOUT.
r-lo tt e syr-19001788-a003
2023-05-19T07:51:20-0400
CHRISTOPHER H NASH
2023-05-18T17:38:46-0400
YURIY DAVYDAN
3'-3" MIN
14"
KH 05/18/2020 19001788
SYR-19001788-A004
WALKWAY LAYOUT AND LADDER SUPPORTS
r-
ROOF DECK
ENTIRE ROOF SURFACE
ROOFING MATERIAL OVER
SINGLE-PLY PVC MEMBRANE
TO NEW LADDER SUPPORT
ALIGN NEW WALKWAY
(SEE NOTE 2)
MEMBRANE ROOFING
(OR EQUAL) TO PVC
ADHERE SARNATRED
3/4" PLYWOOD
HEADS WITH CAULKING (TYP)
FILL DEPRESSIONS AROUND BOLT
LONG
STEEL ANGLE 1'-9"
2"x 2"x 1/4" GALV
WASHERS SPACED TO CLEAR FLASHING
WITH NUT BETWEEN TWO FLAT SS
3/8" DIA. x 6" LONG SS BOLTS
AND WALKWAY WITH TEEPEE DOOR
ALIGN LADDER SUPPORT
2'-0"
MANUFACTURER. CONFIGURE TO PREVENT PONDING OR TRAPPED WATER.
SEAMS AND JOINTS WHERE ACCESSIBLE AND APPROVED BY PVC MEMBRANE
MAT WITH "SARNAFIL" SARNACOL 2170 ADHESIVE, OR EQUAL. HOT-AIR WELD ALL
1/4" SEAM AT JOINTS AND AROUND THE ANTENNA SHELTER. ATTACH WALKWAY
WALKWAY MAT MATERIAL SHALL BE "SARNAFIL" SARNATRED, OR EQUAL. ALLOW
TEL 800-892-8012.
"SAMSEL SUPPLY COMPANY", 1285 OLD RIVER ROAD, CLEVELAND, OHIO, 44113,
A YELLOW BACKGROUND AND BLACK LETTERS. SIGNS CAN BE PURCHASED FROM
STEEL AND FURNISHED WITH 1/4" EYELETS IN EACH CORNER. SIGN SHALL HAVE
CONSTRUCTED OF BUTYRATE PLASTIC BACKED WITH 20 GAUGE GALVANIZED
INSTALL ONE SAFETY SIGN AT THE LADDER SUPPORT. SIGNS SHALL BE
LADDER AT FACILITY
ADD BLOCK AS NEEDED
STEEL ANGLE 1'-9" LONG
2" x 2" x 1/4" GALV
INSIDE ANTENNA SHELTER
INSTALL SARNAFIL SARNATRED
A004 SCALE: 3/16"=1'-0"
WALKWAY LAYOUT 2
A004 SCALE: 3" = 1'-0"
LADDER SUPPORT
A004 SCALE: 3" = 1'-0"NOT TO SCALE
SIGNAGE LADDER SUPPORT - SIDE VIEW
SCALE: 3/16" = 1'-0"
8' 12'4'04'
SCALE: 3" = 1'-0"
9"6"3"3" 0
HARDWARE
IN PLYWOOD FOR
3/4" DIA THRU HOLE
LOCK WASHER, & NUT
HEX HEAD STAINLESS STEEL BOLT,
ATTACH WITH 3/8-16 x 1 1/4"
STEEL ANGLE 2'-2" LONG.
2"x 2"x 1/4" GALVANIZED
(OR EQUAL)
'SARNAFIL' SARNATRED
DIRECTLY TO DOORWAY
WALKWAY MAT MATERIAL
r-
:3 lo tt e syr-19001788-a004
2023-05-19T07:51:29-0400
CHRISTOPHER H NASH
2023-05-18T17:39:19-0400
YURIY DAVYDAN
SYR-19001788-D001
DEMOLITION PLAN
r-
-d
04' 4' 8' 12'
SCALE: 3/16" = 1'-0"
ROOF EDGE
36'-0" SQUARE
10'-0"
4'-0"
27' +/-
1'-9"
TO ROOF SURFACE
ANGLE BRACKET ATTACHED
EXISTING KEYSTONE
BE REMOVED (16 PL)
ANGLE BRACKET TO
EXISTING KEYSTONE
AND PROTECTED
TO BE REMOVED
ALUMINUM SOFFIT
BEYOND
ALUMINUM FASCIA
1" POLYISO INSULATION (TYP)
REMOVE EXISTING ROOF WITH
52'-9" DIAMETER
(SEE NOTE 8)
LADDER HOLD BOLTS
TEEPEE ENCLOSURE
FAA SHALL REMOVE
9 AND 10)
ANTENNAS (SEE NOTES
VOR AND TACAN
FAA WILL REMOVE
ASSEMBLIES (SEE NOTE 6)
SHALL REMOVE MOUNTING BRACKET
REMOVED BY FAA. CONTRACTOR
EXISTING VOR MONITOR ANTENNAS TO BE
PLACE IN SPECIAL DUMPSTER FOR LEAD TRASH
ROOFING/COUNTERPOISE
REMOVE ORIGINAL TERNE PLATE SHEET
(SEE NOTE 3)
REPAIR AS NEEDED
DECK BOARDS REMAIN
ORIGINAL 2" T&G
PERIMETER BEAMS BELOW
DOUBLE 2" X 12" STRUCTURAL
INSIDE TEEPEE
120V FLOOR RECEPTACLE
BELOW
BUILDING LINE
(16 PLACES) REMOVED BY FAA
VOR MONITOR ANTENNAS
SOFFIT AND REPLACE WITH NEW
REMOVE EXISTING PERFORATED VINYL
FASCIA
ALUMINUM
VINYL SIDING
ANTENNA POST
2X2 ALUMINUM
REMOVED BY FAA (APPROX. 800 LBS)
TACAN ANTENNA
REMOVED BY FAA (APPROX. 300 LBS)
TACAN COLLAR
(APPROX 800 LBS)
REMOVED BY FAA
VOR TEEPEE
ONLY FOR CLARITY) SEE NOTE 6
(16 PLACES, SHOWN AT SIDES
VOR MONITOR ANTENNAS
DIM VARIES
PLACED IN A SPECIAL DUMPSTER FOR ASBESTOS ABATEMENT
TAR AND STONE ROOF. EVERYTHING SHOULD BE
ARE REMNANTS OF AN ASBESTOS CONTAINING
THROUGHOUT. UNDER THE INSULATION
ASSUME THE TERNEPLATE WILL BE ROTTED
SCALE: 3/16" = 1'-0"D001
2 VORTAC FACILITY
D001
ROOF PLAN
TAPERED TO EDGE
C10'S WITH 4 X 6 NAILERS
STEEL ROOF FRAMING BELOW,
RUBBER WALKWAY
REMOVE
OBSTRUCTION LIGHTS.
FAA WILL CUT (DISCONNECT) THE OBSTRUCTION LIGHT CONDUIT AND CONTRACTOR SHALL REMOVE ALL CONDUIT AND
FAA WILL REMOVE 16 ANTENNAS AND CABLE AND CONTRACTOR SHALL REMOVE THE PVC CONDUIT THAT IS ATTACHED TO FASCIA.
CONTRACTOR SHALL COORDINATE TEEPEE REMOVAL WITH IAA FAA COR. SEE NOTES ON G003.
NOT USED.
CONTRACTOR SHALL REMOVE LADDER HOLD BOLTS THEN SEAL HOLES WITH CAULK.
THAN THREE ANTENNA HOLD-DOWN CLAMPS AT ONE TIME TO EXECUTE THE WORK.
CONTRACTOR SHALL TAKE PRECAUTIONS NOT TO MOVE ANTENNA BASE PLATE. THE CONTRACTOR SHALL NOT REMOVE MORE
RLS LICENSED IN THE STATE.
ESTABLISHING THE MONITOR BRACKET LOCATIONS. ALL LOCATION, MONUMENTATION, AND LAYOUT WORK SHALL BE DONE BY AN
MONITOR ANTENNA LOCATIONS. IN SOME CASES, ROTATION OF THE NORTH MONITOR BRACKET MAY BE SPECIFIED WHEN RE-
NOTE 5 ON G003. THE CONTRACTOR SHALL RE-ESTABLISH THE NORTH MONITOR BRACKET ON NEW ROOF AND USE TO LAY OUT
MONITOR SUPPORT BRACKET. THE NORTH MONITOR BRACKET SHALL BE LOCATED AND MARKED PRIOR TO ROOF DEMOLITION PER
A FACILITY NORTH RADIAL EXTENDS FROM VOR PEDASTAL PLATE CENTER POINT THROUGH THE CENTER OF THE NORTHERN MOST
FAA WILL DISCONNECT COAX CABLING AND REMOVE 16 MONITOR ANTENNAS.
NOT USED.
REPLACE ALL REMOVED WOOD DECK MATERIAL WITH PRESSURE TREATED 2" X 6" T & G TO MATCH EXISTING.
BOLTED INTO THE DECK.
OFFICER. EXPECT TO ESPECIALLY REPLACE THE WOOD DECKING AROUND THE PERIMETER WHERE THE KEYSTONE BRACKETS ARE
ROOF DECK WILL REQUIRE REPLACEMENT DUE TO ROT. IF QUANTITY EXCEEDS 500 SF, IMMEDIATELY NOTIFY CONTRACTING
REMOVE ALL ROOFING MATERIALS DOWN TO THE EXISTING WOOD DECK. IT IS EXPECTED THAT APPROXIMATELY 500 SF OF WOOD
MEMBRANE.
CONTAINS LEAD) TOPPED WITH AN ASPHALTIC ROOF COATING, 1" POLYISOCYANURATE INSULATION BOARD, AND AN EPDM ROOF
EXISTING ROOF OVER 2"X6" WOOD ROOF DECK MAY INCLUDE: ROSIN PAPER, TIN-COATED METAL (TERNE PLATE ROOFING WHICH r-
-d
:4 lo tt e syr-19001788-d001
2023-05-19T07:51:46-0400
CHRISTOPHER H NASH
2023-05-18T17:39:42-0400
YURIY DAVYDAN
SYR-19001788-E001
GROUNDING DETAILS I
r-
1' 0 1'3"6"9"
(SCALE: 1/2" = 1")
01" 1" 2"
SCALE: 1" = 1"
NEW WOOD BLOCKING
CRIMPED FITTING
HYDRAULIC COMPRESSION
SHALL BE 12 TON
USE NOALOX
SEE NOTE 2
1/4" HO
LES
1 1/
(M
IN)
4" MIN.
EXISTING DECKING
HOLE FOR GROUND LUG
VAPOR BARRIER
DURING INSTALLATION
(SEE NOTE 2) CAULK
HOLD-DOWN CLAMP (TYP 8)
HOLD DOWN CLAMP
ROOF OPENING GAP
ANTENNA PEDESTAL PLATE/
HOLD DOWN CLAMP
ALONG EDGES OF PLATE
GROUNDING PLATE
WELD MESH TO
NEW WOOD BLOCKING
(SEE NOTES 3 & 4)
GROUND PLATE (TYP 4)
GROUND LUG, FASTENED TO
WIRE IN NEW DOUBLE BOLT
NEW #2 BARE GROUND
DT#18865
NOT SHOWN FOR CLARITY)
(3/4" PLYWOOD AND PVC MEMBRANE
1 STAPLE PER 3 SQ FT OF MESH.
MESH STAPLED TO DECK. AT LEAST
FLATTENED EXPANDED METAL
3/4" DIAMOND X TYPE 304 STAINLESS STEEL
BONDING SEGMENTS
TYPE 304 STAINLESS STEEL
FOR CLARITY)
(3/4" PLYWOOD NOT SHOWN
TYPE 304 STAINLESS STEEL METAL MESH
NOT SHOWN FOR CLARITY)
(3/4" PLYWOOD AND PVC MEMBRANE
1 STAPLE PER 3 SQ FT OF MESH.
MESH STAPLED TO DECK. AT LEAST
STEEL FLATTENED EXPANDED METAL
3/4" DIAMOND X TYPE 304 STAINLESS STEEL
GROUNDING PLATE
4" WIDE x 14" LONG (FOUR REQUIRED)
16 GA STAINLESS STEEL SHEET 0.030 THICK
(LOCATED NEAR EACH CORNER OF BUILDING)
GROUNDING PLATE WITH NEW CONDUCTOR
GROUNDING PLATE - ISOMETRIC VIEW
GROUNDING PLATE INSTALLED
EVERY 3" MIN
MESH TO BONDING SEGMENT
WELD EXPANDED METAL
PLATE
ANTENNA
E002
EVERY 3", SEE NOTE 1
TO ANTENNA PEDESTAL PLATE
MECHANICALLY FASTEN
CONTRACTOR SHALL PROVIDE ALL LAG BOLTS TO SECURE THE TEEPEE TO THE ROOF.
ACTUAL ROOF DIMENSION.
THE 3" VERTICAL DIMENSION ON DEATIL 3 MAY NEED TO BE ADJUSTED FOR
THE CONTRACTOR SHALL PROVIDE NEW DOUBLE BOLT COPPER LUGS.
MAY VARY AND SHALL BE FIELD DETERMINED.
SHOWN IN DETAIL 3, THIS SHEET. THE 3-INCH VERTICAL DIMENSION
GROUNDING PLATE SHALL BE 16 GAUGE STAINLESS STEEL FABRICATED AS
PRIOR TO INSTALLATION OF LAG SCREWS.
THE CONTRACTOR SHALL DRILL A PILOT HOLE AND FILL WITH CAULK
BONDING SEGMENT.
(NOALOX OR EQUAL) PRIOR TO MECHANICALLY ATTACHING STAINLESS STEEL
SURFACE. COAT WITH NON-CORROSIVE, ELECTRICALLY CONDUCTIVE GREASE
PLATE, REMOVE PAINT, SOLDER, RUST, AND ANY OTHER IMPURITIES FROM
CONTRACTOR SHALL CLEAN AND PREPARE OVERLAP AREA OF ANTENNA PEDESTAL
PEDESTAL PLATE
TO EDGE OF VOR ANTENNA
3" (MIN) FROM EDGE OF
r-
:5 lo tt e syr-19001788-e001
2023-05-19T07:51:56-0400
CHRISTOPHER H NASH
2023-05-18T16:51:21-0400
TIMMY KIM
SYR-19001788-E002
GROUNDING DETAILS II
r-
04' 4' 8'
SCALE: 1/4" = 1'-0"
DT#18865
ENTRANCE BREAKER
HOOD
PROTECTION
AC POWER SURGE
HVAC
/C
/C
(BY TELCO)
TELE CONN RJ47S
EXCLUSION KEY
ANTENNA SWITCH BOX
AND VOR RF CABLES)
2" EMT (TACAN TRIG
PROTECTION
LIGHTNING SURGE
TELCO BOX
(TELE CABLE PH2)
1" EMT PH1
ANTENNA ACCESS
ANTENNA CABLES
4x4 SQUARE DUCT
(SEE NOTE 6)
TACAN FEED CABLE
POWER CABLES
SQUARE DUCT
1" EMT (GRD (4 PLACES)
CHK RF CABLES)
ANTENNA SPEED CONT
AND RCO COMM.
ENVIRONMENTAL SENSE
TACAN MONITOR CABLES
(BATTERY CABLES)
2" EMT
BATT RACK PH1
(MONITOR CABLES)
SQUARE DUCT
SWEEP ELL INTERFACE BOX
BATTERY
CABLES
TACAN MONITOR
#6 SYSTEM GROUND
POWER CABLES AND
1" EMT BCPS AC
PANEL D
"J" BOX (NOTE 4)
MON ANTENNA COAX
SWITCH CONT. CABLES)
3/4" EMT (ANTENNA
I.O.T.
I.O.T. CABLES
BCPS
EXTENSION
TACAN CABLE
AND CONT CABLES
4x4 SQUARE DUCT RF
DME
TACAN/
CAB FRONT
(TYP. OF 16)
MONITORING ANTENNA
EXIST.
CONCRETE PAD
TRANSFORMER ON
DUCT
SQUARE
EXHAUST PIPE
E/G
PAD
ON CONCRETE
TRANSFORMER
D002 SCALE: 1/4" = 1'-0"
BUILDING PLAN
NOTE 6
TACAN POLE (R)
OVERHEAD CABLES TO
BETWEEN ANTENNAS (R)
CONDULETS AROUND ROOF
1" CONDUITS AND
DME FEED CABLE
IL
36'-0" EXISTING BUILDING
SINGLE POINT GROUND PLATE WITH GREEN/YELLOW COLOR COVER,
REPRESENTIVE OF FAA RE, AND NOT WITHIN 24 HOURS OF RAINFALL.
10 OHMS. ALL EARTH GROUND TESTING SHALL BE DONE IN THE PRESENCE OF THE FAA
MAXIMUM RESISTANCE TO GROUND OF EACH EES OR AT ISOLATED LOCATIONS MUST NOT EXCEED
CONDUCT GROUND RESISTANCE TESTING ON EARTH ELECTRODE SYSTEMS USING 3 PROBE METHOD.
ALL LIQUID-TIGHT FLEXIBLE METALLIC CONDUIT SHALL BE UL LISTED FOR HI/LOW TEMPERATURE.
MATERIAL FROM CONTACT SURFACES.
PRIOR TO GROUNDING, REMOVE ANY NONCONDUCTIVE PAINT, ENAMEL, OXIDATION OR FOREIGN
GREEN WITH ORANGE TRACER OR LARGER INSULATED COPPER CONDUCTORS.
NECESSARY TO ASSURE ELECTRICAL CONTINUITY WITH #6 AWG INSULATED COLOR CODED IN
GROUND ALL ENCLOSURE, FITTINGS AND OTHER NON-CURRENT CARRYING METAL PARTS WHERE
MATCHING DIES.
MINIMUM COMPRESSION FORCE WITH A TOOL USING CONCENTRICALLY OR CIRUMFERENTIALLY
WITH THE LATEST VERSION OF FAA-STD-019, WITH HYDRAULIC CRIMPED TERMINATIONS USING 12-TON
ALL MECHANICAL GROUNDING CONNECTIONS SHALL BE DOUBLE BOLT, DOUBLE CRIMP IN COMPLIANCE
WITH A #2 AWG INSULATED COPPER CONDUCTOR GOING TO EES.
ALL EXTERNAL OBJECTS SUCH AS A PROTRUDING VENT HOOD, DAY TANK, SECURITY LIGHT, ETC.
PRIOR TO ENTERING THE GROUND AT NOT LESS THAN 18 INCHES ABOVE GRADE.
LIGHTNING DOWN CONDUCTOR SHALL BE EXOTHERMIC WELDED TO A #4/0 AWG BARE CONDUCTOR
CONNECTIONS TO UNDERGROUND METALLIC PIPES (EXCLUDING GAS LINES AND FUEL TANKS).
COPPER INTERCONNECTING CONDUCTORS, USING EXOTHERMIC WELDS, EXOTHERMIC WELDING
EARTH ELECTRODE SYSTEM (EES) CONSISTS OF DRIVEN COPPER GROUND RODS, BURIED #4/0 AWG
NOT BE GREATER THAN 10 OHMS.
EARTH ELECTRODE SYSTEM (EES) RESISTANCE TO EARTH SHALL BE AS LOW AS POSSIBLE, BUT SHALL
#4/0 AWG COPPER CONDUCTOR.
OR EXTERIOR FOOTING AND INTERCONNECTED USING EXOTHERMIC WELD BY A BURIED, BARE,
GROUND RODS SHALL BE PLACED MINIMUM 2 FEET TO MAXIMUM 6 FEET OUTSIDE THE FOUNDATION
19.
18.
17.
16.
15.
14.
13.
12.
SEE NOTE 12.
ORANGE COVER
PLATE WITH GREEN AND
SUPPLEMENTAL GROUND
ELECTODE SYSTEM #4/0
NEW EARTH
NOTE 11
SEE
NOTE 11
SEE NOTE 11
ALL UNDERGROUND CONNECTIONS SHALL BE EXOTHERMIC-WELDED WITH NO EXCEPTIONS.
EMT BETWEEN THE SERVICE DISCONNECT SWITCH AND NEWLY INSTALLED RAYVOSS SPD.
THE SERVICE DISCONNECT SWITCH AND 3-#2/0 AWG THHN 1-#4 AWG INSULATED GREEN IN 3 INCH
120-3Y-A1-4-06-A. FURNISH AND INSTALL DOUBLE BARREL TERMINAL LUG ON THE LOAD SIDE OF
REPLACE THE EXISTING SPD BY LIGHTNING PROTECTION CORP. WITH RAYVOSS SPD. MAKE NO.
#4/0 AWG GREEN INSULATED COPPER, COLOR CODED IN GREEN WITH ORANGE TRACER.
MAIN GROUND PLATE WITH GREEN / WHITE COLOR COVER PLATE.
#4/0 AWG INSULATED COPPER, COLOR CODED IN GREEN WITH YELLOW TRACER.
MULTI POINT GROUND PLATE WITH GREEN / ORANGE COLOR COVER PLATE.
#4/0 GREEN INSULATED COPPER. COLOR CODED IN GREEN WITH ORANGE TRACER.
DOWN CONDUCTOR LOCATION SEE DETAIL 4 SHEET E001.
NOTE 13
NOTE 14
NOTE 14
SEE NOTE 15
NOTE 16
IN 3" SCHEDULE 80 PVC
INSULATED COPPER,
500 KCMIL GREEN
SYSTEM #4/0
ELECTODE
NEW EARTH
COPPER GROUND ROD
EXISTING 3/4" X 10'
WELDED TO THE
TO BE EXOTHERMIC
NOTE 17
SEE NOTE 18
ASSOCIATED AC WIRINGS
WITH RAYVOSS SPD MODEL NO, 120-3Y-AI-4-06-A AND THE
REPLACE THE EXISTING SPD (LIGHTING PROTECTION CORP)
(TYP 6)
3/4" X 10' COPPER GROUND ROD
IN SCHEDULE 80 PVC
500 KCMIL GREEN INSULATED COPPER
(MINIMUM 2 FEET BELOW GRADE)
#4/0 AWG BARE COPPER
r-lo tt e syr-19001788-e002
2023-05-19T07:52:06-0400
CHRISTOPHER H NASH
2023-05-18T16:51:46-0400
TIMMY KIM
File details come from the government source that posted it. Updated .