Complete SOW.pdf
PDF 126 KB Posted
- Solicitation number
- 19NA3025Q0002
- Issued by
-
Department of State
About this file
This Statement of Work (SOW) details requirements for swimming pool resurfacing and wooden pool deck repair at the U.S. Consulate in Curacao. The project involves comprehensive renovation of a 10m x 5.5m swimming pool and approximately 80m2 of wooden decking, with specific activities including draining and inspecting the pool, repairing wall degradation, adding water jets, applying new plaster and coating, replacing pool filter sand, installing new railings, and conducting extensive wooden deck repairs such as replacing damaged posts, applying waterproof sealers, treating for termites, and creating a new deck with proper drainage.
The project is scheduled to commence 30 days after contract award, with all work expected to be completed during November 2025. The contractor must comply with safety regulations including DOSAR, USACE, and OSHA standards, work between 8:00 a.m. and 5:00 p.m. daily, coordinate noisy work with the Consulate, and maintain a clean and secure work area. The solicitation is open from May 9 to June 30, 2025, with a mandatory site visit on May 23, 2025, and the award will be made to the lowest-priced, technically acceptable offer under the Department of State's procurement process.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Contract Model.pdf | ||
| Complete PWS.pdf | ||
| RFQ letter.pdf | ||
| Vendor Registration Form.pdf | ||
| SF18 Cover Page.pdf | ||
| Registration in System for Awards Management (SAM.gov).pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Statement of Work (SOW)
Swimming Pool Resurfacing and Pool Deck Repair – U.S. Consulate
1. Introduction
The U.S. Consulate requires renovation services for the compound swimming pool and adjacent wooden deck, located at J.B. Gorsiraweg 1. The objective is to restore the pool to a safe, functional, and visually appealing condition and to repair and refinish the surrounding wooden deck structure. Work includes resurfacing, plumbing and mechanical fixes, structural wood replacement, and final finishing.
2. Swimming Pool Resurfacing Scope
Summary
The U.S. Consulate requires a contractor to resurfacing of the compound pool. The
Contractor’s price will include all material and equipment’s needed to perform the work as describe below.
General Requirements
The Contractor shall provide personnel, material, equipment, and supervision to complete the technical requirements in this Statement of Work. The Contractor shall be responsible for hiring necessary labor and equipment and managing subcontractors. All personnel shall follow security and safety directives as explained by the Consulate.
The Contractor shall have limited access into the building and outside the areas designated for the project except with permission by the Consulate. The Contractor shall address the impact of the consequent disruption and provide for a continuing level of operation of the
U.S. Consulate functions caused by the proposed work.
The Contractor shall provide qualified or certified electrician per local law to perform any electrical work.
The Contractor is responsible for all permits related to this work to include crane, lifts, rigging, etc…
The Contractor should include a bar chart schedule with this bid showing the duration for the entire project and individual areas.
Scope of Work
The U.S. Consulate requires a contractor to resurfacing the compound swimming pool. Size
10 m to 5.5 meter.
This include but are not limited to the below action. Detailed project activities can be discussed during the job walk.
Project Activities:
• Drain the pool and inspect the pool wall for degradation.
• Inspect and repair outside pool wall degradation.
• Surface preparation, including chipping out old plaster, acid washing, cracks and void.
• Add 2 additional jets for better circulation of the water
• Apply new plaster and pool coating (finish coating)
• Curing and swimming pool commissioning
• Make the needed adjustment on the pool pump
• Replace pool filter sand
• Install 2 new railings
Inspection and Acceptance
After the work is done the swimming pool should be in perfect working condition with no leaks. Perform this demonstration after appropriate curing and drying times of coatings have elapsed and pool is in operation for at 24 hours and prior to invoicing for payment.
Alternative material specifications need to be provided with the quote.
Working Hours
The Contractor is allowed to work from 8:00 a.m. to 5:00 p.m. everyday. Noisy work will need to be coordinated with the Consulate.
Other Requirements
The Contractor must keep the entire working area clean all the times and well protected from other working areas and post all necessary warning signs in English. The contractor will be held responsible for any damage to the USG and private property.
3. Pool Deck Repair Scope
Summary
The U.S. Consulate requires a contractor to repair wooden swimming pool deck. The
Contractor’s price will include all material and equipment’s needed to perform the work as describe below.
General Requirements
The Contractor shall provide personnel, material, equipment, and supervision to complete the technical requirements in this Statement of Work. The Contractor shall be responsible for hiring necessary labor and equipment and managing subcontractors. All personnel shall follow security and safety directives as explained by the Consulate.
The Contractor shall have limited access into the building and outside the areas designated for the project except with permission by the Consulate. The Contractor shall address the impact of the consequent disruption and provide for a continuing level of operation of the
U.S. Consulate functions caused by the proposed work.
The Contractor shall provide qualified or certified electrician per local law to perform any electrical work.
The Contractor is responsible for all permits related to this work to include crane, lifts, rigging, etc…
The Contractor should include a bar chart schedule with this bid showing the duration for the entire project and individual areas.
Scope of Work
The U.S. Consulate requires a contractor to repair the wooden pool deck. +- 80m2 decking.
This include but are not limited to the below action. Detailed project activities can be discussed during the job walk.
Project Activities/ requirements:
• Inspect and replace damaged wooden post
• Inspect and repair damage footing
• Inspect and replace damage joist
• Create a new decking above the old decking
• Apply 2 coats of waterproof wood sealer on the old deck
• Apply 2 coats of waterproof wood sealers on new wooden deck
• Apply 2 coats of paint on all other wooden parts
• Sand all wooden parts before applying new paint
• Apply 1 coat of primer before painting
• Install a new deck with enough spacing to allow adequate drainage
• Drill drainage hole into the older deck
• Replace damage top and bottom rails and balusters.
• Termites’ treatment of all new installed wood (treatment to be approved by U.S.
Consulate representative)
• Termite treatment on old wood decking
Decking:
• Pressure treated wood or equivalent material, material specification to be provided with quotation.
• Deck board spacing between ¼ to 3/8 inch
Fasteners/brackets:
• AISI 305 or EN 1.4303 Stainless-steel (equivalent material to be approved by U.S.
Consulate representative)
Inspection and Acceptance
After the work is done the deck should have a uniform look and with seamless joints. Railing highs should conform requirements provided by the U.S. Consulate representative.
Alternative material specifications need to be provided with the quote.
Working Hours
The Contractor is allowed to work from 8:00 a.m. to 5:00 p.m. everyday. Noisy work will need to be coordinated with the Consulate.
Other Requirements
The Contractor must keep the entire working area clean all the times and well protected from other working areas and post all necessary warning signs in English. The contractor will be held responsible for any damage to the USG and private property.
4. Performance Period
The contractor shall commence work 30 days after the award of the contract or purchase order. All work is expected to be completed during the month of November 2025.
5. Safety and Compliance
The contractor shall comply with all safety and environmental regulations, including:
- DOSAR 652.236-70 – Accident Prevention
- USACE EM 385-1-1
- OSHA
The work area must be kept clean, safe, and secured always during the project.
END OF SOW