Combined Synopsis_Solicitation HT942525QE016.pdf
PDF 269 KB Posted
- Solicitation number
- HT9425-25-Q-E016
- Issued by
-
Defense Health Agency
About this file
This is a Combined Synopsis/Solicitation for Radiological Sample Analysis Services issued by the Defense Centers for Public Health - Aberdeen (DCPH-A), part of the Defense Health Agency (DHA). The solicitation seeks a non-personal services contract for analyzing radiological samples across various parameters to support the DCPH-A mission, with a single award anticipated under full and open competition. The contract will have a twelve-month base period and four twelve-month option periods, with a small business size standard of $19M under NAICS code 541380.
Key details include a quote submission deadline of 03 September 2025, a best value tradeoff award approach, and specific requirements for laboratory qualifications including ISO 17025:2017 accreditation and compliance with The NELAC Institute standards. The contractor must perform radiological analyses on environmental and biosurveillance samples, provide detailed results, and follow strict chain of custody procedures. Turnaround times are specified as 21 days for standard samples, 12 days for high priority, and 8 days for top priority samples. The government aims to evaluate quotes based on technical approach, past performance, small business participation, and price, with non-price factors being more important than price.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Combined Synopsis_Solicitation HT942525QE016 Amendment 1.pdf | ||
| Solicitation Amendment HT942525QE0160001 SF 30.pdf | ||
| Attachment 7 - Past Performance Information Sheet.docx | DOCX document | |
| Attachment 1 - QASP.docx | DOCX document | |
| Attachment 2 - Non-Disclosure Agreement.docx | DOCX document | |
| Attachment 6 - Electronic Data Deliverable (EDD) Specifications.docx | DOCX document | |
| Attachment 5 - Final Report and Electronic Data Deliverable (EDD) Requirements.docx | DOCX document | |
| Attachment 8 - Pricing Sheet.xlsx | XLSX spreadsheet | |
| Attachment 3 - Required Deliverables Schedule.docx | DOCX document | |
| Attachment 4 - Chemical Parameters_Matrix_Detection Limits.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
COMBINED SYNOPSIS/SOLICITATION # HT942525QE016
Issue Date: 18 AUGUST 2025 Offeror Question(s) Submissions Date: 25 AUGUST 2025, 10:00AM Eastern Daylight Time (EDT) Offeror Quote Due Date: 03 SEPTEMBER 2025 by 10:00AM EDT
The Defense Centers for Public Health - Aberdeen (DCPH-A) is part of the Defense Health Agency (DHA) and focuses on epidemiology, laboratory sciences, occupational health sciences, public health information and toxicology to enhance readiness and assure the quality and effectiveness of the Public Health Enterprise. The DCPH-A has a current non-personal services requirement for the analysis of radiological samples for various parameters in support of the DCPH-A mission.
This is a combined synopsis/solicitation for commercial products or commercial services prepared in accordance with Federal Acquisition Regulation (FAR) 12.6, in conjunction with the policies and procedures for solicitation, evaluation and award as prescribed in FAR Part 13, Simplified Acquisition Procedures, as supplemented with additional information included in this notice. This announcement constitutes the only solicitation; quotes are being requested, and a written solicitation will not be issued.
1. This solicitation is issued as a single award solicitation, by which, the Government intends to award one (1) contract for this requirement.
2. This solicitation document and incorporated provisions and clauses are those in effect through Federal Acquisition Circular 2025-05; 8/07/2025.
3. This solicitation is issued under full and open competition. North American Industry Classification System (NAICS) Code: 541380, Testing Laboratories and Services, is applicable to this requirement with a small business size standard of $19M.
4. The contract award will be made on a Best Value Tradeoff basis.
5. The solicitation is issued as a Request for Quote (RFQ). The Contract Line Items Number
(CLINs) and items, quantities, units of measure, and description are listed below.
6. The anticipated Period of Performance will consist of one (1) twelve-month base period and four
(4) twelve-month option periods.
7. FAR provision 52.212-1 Instruction to Offerors – Commercial Products and Commercial Services.
8. FAR provision 52.212-2 Evaluation – Commercial Products and Commercial Services applies to this acquisition including the Addendum contacted in the RFQ.
9. Offerors responding to this solicitation shall include a completed copy of the provisions at
FAR/DFARS with their quote: 52.212-3 (Alt I).
10. FAR Clause 52.212-4 Contract Terms and Conditions – Commercial Products and Commercial
Services applies to this acquisition. Additional contract requirements and terms and conditions are identified in the attached RFQ.
11. FAR clause 52.212-5, Contract Terms and Conditions Required to Implement Statue or Executive applies to this acquisition. Reference below for additional FAR clauses cited within 52.212-5 which are applicable to this acquisition.
12. The individual to contact for information regarding the solicitation is Brandon Roebuck (brandon.m.roebuck.civ@health.mil, (301) 619-7731).
Solicitation/Contract Form
Radiological Sample Analysis Services
Product Service Code: Q301 Date: 29 Jul 2025
HT942525QE016
Supplies or Services & Prices or Costs
Additional Information/Notes
Item Supplies / Services Quantity Unit Unit Price Amount
Radiological Sample Analysis Services Base Period - The contractor shall perform analyses on supplied materials and provide the results showing any radiological compounds in each sample in accordance with the Performance Work Statement
Product Service Code: Q301 Pricing Arrangement: Firm Fixed Price
1 Job
Option Line Item
Surge Radiological Sample Analysis Services Base Period - Surge (Maximum Quantity) to accommodate potential increased segments for additional testing within the scope.
Product Service Code: Q301 Pricing Arrangement: Firm Fixed Price
1 Job
Option Line Item
Option Period 01 Radiological Sample Analysis Services - The contractor shall perform analyses on supplied materials and provide the results showing any radiological compounds in each sample in accordance with the Performance Work Statement
Product Service Code: Q301 Pricing Arrangement: Firm Fixed Price
1 Job
Option Line Item
Option Period 01 Surge Radiological Sample Analysis Services - Surge (Maximum Quantity) to accommodate potential increased segments for additional testing within the scope.
Product Service Code: Q301 Pricing Arrangement: Firm Fixed Price
1 Job
Option Line Item
Option Period 02 Radiological Sample Analysis Services - The contractor shall perform analyses on supplied materials and provide the results showing any radiological compounds in each sample in accordance with the Performance Work Statement
Product Service Code: Q301 Pricing Arrangement: Firm Fixed Price
1 Job
Option Period 02 Surge Radiological Sample Analysis
Option Line Item
Services - Surge (Maximum Quantity) to accommodate potential increased segments for additional testing within the scope.
Product Service Code: Q301 Pricing Arrangement: Firm Fixed Price
1 Job
Option Line Item
Option Period 03 Radiological Sample Analysis Services - The contractor shall perform analyses on supplied materials and provide the results showing any radiological compounds in each sample in accordance with the Performance Work Statement
Product Service Code: Q301 Pricing Arrangement: Firm Fixed Price
1 Job
Option Line Item
Option Period 03 Surge Radiological Sample Analysis Services - Surge (Maximum Quantity) to accommodate potential increased segments for additional testing within the scope.
Product Service Code: Q301 Pricing Arrangement: Firm Fixed Price
1 Job
Option Line Item
Option Period 04 Radiological Sample Analysis Services - The contractor shall perform analyses on supplied materials and provide the results showing any radiological compounds in each sample in accordance with the Performance Work Statement
Product Service Code: Q301 Pricing Arrangement: Firm Fixed Price
1 Job
Option Line Item
Option Period 04 Surge Radiological Sample Analysis Services - Surge (Maximum Quantity) to accommodate potential increased segments for additional testing within the scope.
Product Service Code: Q301 Pricing Arrangement: Firm Fixed Price
1 Job
Description/Specifications/Statement of Work
PERFORMANCE WORK STATEMENT (PWS)
Radiological Sample Analysis Services
Part 1 General Information
1. General: This is a non-personal service(s) contract under which the personnel rendering the service(s) are not subject, either by the contract's terms or by the manner of its administration, to the supervision and control usually prevailing in relationships between the Government and its employees.
This is a non-personal service(s) contract to provide Radiological Sample Analysis in support of the 1.1 Description of Services/Introduction:
Military operating environments and military bases to ensure the safety and security of all who work there.
The Lab Sciences (LS) Directorate currently analyzes environmental and biosurveillance samples for various radiological 1.2 Background:
contaminates in support of the Defense Centers for Public Health - Aberdeen (DCPH-A) mission. However, the LS does not currently have the analytical capability and/or capacity to perform all radiological analyses required including analyses from various worldwide locations and from natural or man-made disaster locations.
The Contractor shall provide non-personal services(s). The Contractor shall provide radiological analyses on environmental and 1.3 Scope:
biosurveillance samples and provide the results of various compounds in each sample. The data obtained under this contract shall be used to comply with Federal and State requirements. The Contractor shall perform the analyses to the standards and acceptable quality level identified in this PWS and associated contract documents.
The objective of this contract is to: 1.4 Objectives:
- Provide quality sample analysis on environmental and biosurveillance samples for various radiological contaminates as identified in this PWS in accordance with the documented methodology.
- Use industry standard state-of-the-art instrumentation, technologies, and methodologies to analyze samples for any of the parameters listed in
.Attachment 4 - Chemical Parameters, Matrix and Detection Limits
- Receipt and storage of samples prior to analysis.
1.5 General Information:
RESERVED1.5.1 Quality Control Plan (QCP):
The Government will evaluate the Contractor's performance under this contract in accordance with the Quality Assurance 1.5.2 Quality Assurance:
Surveillance Plan (QASP) . This plan is primarily focused on what the Government must do to ensure that the Contractor has (Attachment 1) performed in accordance with the performance standards. It defines how the performance standards will be applied, the frequency of surveillance, and the acceptable quality levels (performance thresholds).
The following provides information on recognized holidays for the purpose of the PWS. If submittal of any 1.5.3 Recognized Holidays:
documentation (e.g. deliverables, submittals, etc.) deadlines fall on a holiday, the closest workday prior to the holiday will apply as the deadline for submittal.
: Work requested in this PWS is defined in Calendar Days. It is the Contractor's decision on which days their staff will be 1.5.3.1 U.S. Holidays working at their laboratory. Calendar days include U.S. federally recognized holidays. When a U.S. holiday occurs on a Saturday or a Sunday, the holiday is observed on the preceding Friday or following Monday, respectively. Those Holidays are as follows:
- New Year's Day January 1st
- M. L. King Memorial Day 3rd Monday in Jan
- Presidents' Day 3rd Monday in February
- Memorial Day last Monday in May
- Juneteenth June 19th
- Independence Day July 4th
- Labor Day 1st Monday in September
- Columbus Day 2nd Monday in October
- Veteran's Day November 11th
- Thanksgiving Day 4th Thursday in November
- Christmas Day December 25th
RESERVED1.5.3.2 Host Nation Holidays:
The Government facility office hours, facility operating hours, and the Contractor support hour requirements often coincide, 1.5.4 Operating Hours:
however, they may differ. Please refer to the following.
The Government facility office hours are 0800 to 1600 Monday through Friday except U.S. Holidays 1.5.4.1 Government Facility Office Hours:
identified in paragraph 1.5.3.1 above or when the Government facility is closed due to local or national emergencies, administrative closings, or similar Government directed facility closings.
The Government facility operating hours are 0800 to 1600 Monday through Friday except U.S. 1.5.4.2 Government Facility Operating Hours:
Holidays identified in paragraph 1.5.3.1 above. The Government facility is closed during local or national emergencies, administrative closings, or similar Government directed facility closings.
RESERVED1.5.4.3 Contractor Support Hours:
RESERVED1.5.4.3.1 Contractor Work Plan:
RESERVED1.5.5 Training Holidays:
The work to be performed under this contract will be performed at the Contractor's or Subcontractor's Laboratory. 1.5.6 Place of Performance:
The following information is provided on security related matters.1.6 Security Requirements:
RESERVED1.6.1 Security Program:
RESERVED1.6.2 Personnel Security Clearance Requirements:
Access to U.S. installations, buildings and controlled areas is limited to personnel who meet security criteria and are 1.6.3 Installation Access:
authorized. Failure to submit required information/data and obtain required documentation or clearances will be grounds for denying access to U.S.
installations, buildings and controlled areas. The Contractor shall ensure that any subcontractors used in performance of this contract complies with these requirements and that all employees, of both the Contractor and any subcontractor utilized by the Contractor, are made aware of and comply with these requirements.
RESERVED1.6.3.1 Installation Pass Log:
RESERVED1.6.3.2 Individual Termination or Expiration of Employment:
RESERVED1.6.3.3 Contract Termination or Cancellation:
RESERVED1.6.3.4 Common Access Cards (CAC) and CAC Log:
RESERVED1.6.4 Background Checks:
RESERVED1.6.4.1 U.S. Citizen:
RESERVED1.6.4.2 Local Nationals and Third Country Nationals:
RESERVED1.6.5 Physical Security:
Contractor personnel shall adhere to facility security policies and restrictions. The Contractor 1.6.6 Operations Security (OPSEC) Requirements:
shall immediately report suspicious activities to security personnel.
RESERVED 1.7 Key Control:
The Contractor shall attend any post award conference convened by the contracting 1.8 Post Award Conference/Periodic Progress Meetings:
activity or contract administration office in accordance with Federal Acquisition Regulation (FAR) Subpart 42.5. This post award conference should occur within seven (7) calendar days of contract award. The Contracting Officer (CO), Contracting Officer's Representative (COR), and other Government personnel, as appropriate, may meet periodically with the Contractor to review the Contractor's performance. At these meetings, the CO will apprise the Contractor of how the Government views the Contractor's performance and the Contractor shall apprise the Government of problems, if any, being experienced. Appropriate action shall be taken to resolve outstanding issues. These meetings shall be at no additional cost to the Government.
The Contractor shall attend, participate in, and furnish input to scheduled and unscheduled meetings, conferences, and briefings that relate to the 1.8.1 functions and services herein as required by the Government to provide effective communication and impart necessary information. The Contract Manager or designated representative shall attend meetings as requested by the Government. Meeting attendees shall at times include Contractor managerial, supervisory, and other personnel knowledgeable of the subject matter. Meetings may start or end outside of regular duty hours.
Refer to Part 2 of this PWS for the definition of a COR. As determined by the CO, a COR will be 1.9 Contracting Officer's Representative (COR):
appointed and identified by letter of designation, a copy of which will be provided to the Contractor by the CO. The designation letter states the responsibilities and limitations of the COR, especially with regard to changes in cost or price, estimates, or changes in delivery dates. The COR is not authorized to change any of the terms and conditions of the resulting contract. The COR monitors all technical aspects of the contract and assists in contract administration. The COR is not authorized to obligate the Government. If the work is not written in the contract, the COR is not authorized to request new work. The COR is authorized to perform the following functions: assure that the Contractor performs the technical requirements of the contract, perform inspections necessary in connection with contract performance, maintain written and oral communications with the Contractor concerning technical aspects of the contract, issue written interpretations of technical requirements, including Government drawings, designs, specifications, monitor Contractor's performance and notifies both the CO and Contractor of any deficiencies, coordinate availability of Government property, and coordinate site entry of Contractor personnel.
The following personnel are considered key personnel by the Government: Project Manager (PM). The Contractor shall provide 1.10 Key Personnel:
a PM who shall be responsible for the performance of the work. A Curriculum Vitae (CV) for the PM, shall be provided with the (Deliverable 1) solicitation and after contract award when the PM is replaced. The Contractor shall provide a new CV within 45 days of the PM stopping performance on this contract. Within the 45 days, the Contractor shall provide an interim PM to perform the work on this contract. All CVs shall be submitted to the CO via email prior to any work being performed. The CO will provide approval of the CV for the PM or interim PM to the Contractor within three
(3) business days. Qualifications for all key personnel are listed below:
a. Project Manager: The Project Manager shall provide a CV that meets the following minimum qualifications:
(1) 5 years of experience as a PM and;
(2) 5 years' experience (nonconsecutive) with high volume of analysis sample testing.
RESERVED 1.11 Identification of Contractor Employees:
RESERVED1.12
RESERVED1.13 Contractor Travel:
RESERVED1.14 Other Direct Costs (ODCs):
RESERVED1.15 Data Rights:
Performance under this contract may require the Contractor to access data and information proprietary to a 1.16 Non-Disclosure Requirements:
Government agency, another Government Contractor, or of such nature that its dissemination or use other than as specified in this work statement would be adverse to the interests of the Government or others. The Contractor and Contractor personnel, shall not divulge or release data or information developed, or obtained under performance of this PWS, except to authorized Government personnel or upon written approval of the CO.
The Contractor shall not use, disclose, or reproduce proprietary data, which bears a restrictive legend, other than as specified in this PWS. All documentation showing individual names or other personal information shall be controlled and protected under the provisions of the Privacy Act of 1974, Public Law 93-579, 5 United States Code (U.S.C.) Section 552a.
Per Public Use Notice of Limitations stated by Defense Imagery Management 1.17 Protection of Government and Contract Information:
Operations Center and contained at www.dimoc.mil/resources/limitations, the Contractor shall not cite any information (e.g., contract information, pictures, locations, etc.) obtained through this contract on any hard copy or digital marketing tools to include its company website.
The Contractor shall provide signed Non-Disclosure agreements to the 1.18 Non-Disclosure Statements (Deliverable 2, Attachment 2):
Government no later than the kickoff meeting prior to commencement of work under the contract. Disclosure of information by Contractor personnel may result in removal of Contractor personnel from performance under this contract.
RESERVED1.19 Organizational Conflict of Interest (OCI):
RESERVED1.20 Phase In /Phase Out Period:
RESERVED1.21 Safety:
RESERVED1.21.1 Safety Laws and Regulations:
RESERVED1.22 Environmental Compliance:
RESERVED1.22.1 Environmental Compliance Plan and Program:
The following provides information on training requirements.1.23 Required Training:
All contractor employees, to include subcontractor employees, requiring access Army installations, 1.23.1 Anti-Terrorism (AT) Level I Training:
facilities and controlled access areas shall complete AT Level I Awareness training within 15 calendar days after contract start date or effective date of incorporation of this requirement into the contract, whichever is applicable. The Contractor shall submit certificates of completion for each affected Contractor employee and subcontractor employee, to the COR or to the CO, if a COR is not assigned, within 15 calendar days after completion of training by all employees and subcontractor personnel. AT level I Awareness training is available at the following website: http://jko.jten.mil.
The Contractor shall submit certificates of completion for each affected Contractor employee and subcontractor employee to the COR (Deliverable 3) within five (5) calendar days after completion of this training by all employees and subcontractor personnel. Contractor personnel shall complete refresher training every twelve (12) months.(Deliverable 4)
RESERVED1.23.2 OPSEC Training:
The contractor and all associated subcontractors shall brief all employees on the local iWATCH Army program (training 1.23.3 iWATCH Training:
standards provided by the requiring activity Antiterrorism Officer (ATO)). This local developed training will be used to inform employees of the types of behavior to watch for and instruct employees to report suspicious activity to the COR. This training shall be completed within 15 calendar days of contract award and within 15 calendar days of new employees commencing performance with the results reported to the COR no later than 15 calendar days after contract award. Verification of the training shall be provided to the COR within five (5) calendar days after completion of the training . Training slides will be provided by the COR upon award. If the COR is not able to provide the slides, they can be found on (Deliverable 5) the Army OneSource website: http://www.myarmyonesource.com/familyprogramsandservices/iwatchprogram/default.aspx.
RESERVED1.23.4 Information Assurance (IA) Training:
RESERVED1.23.5 Personally Identifiable Information (PII):
The Contractor shall submit invoices to Wide Area Workflow (WAWF) with sufficient documentation for the WAWF acceptor to 1.24. Invoicing:
review and approve the work performed.
Part 2 Definitions & Acronyms
2. Definitions and Acronyms
2.1 Definitions: Although not inclusive of every term used within this PWS, the following provides a list of definitions used throughout this PWS and commonly used in the acquisition field.
Contracting Officer (CO) - Means a person with the authority to enter into, administer, and/or terminate contracts and make related determinations and findings on behalf of the Government. Note: The only individual who can legally bind the Government.
Contracting Officer's Representative (COR) - As defined in Defense Federal Acquisition Regulation Supplement (DFARS) 202.101, means an individual designated and authorized in writing by the CO to perform specific technical or administrative functions. DoD Instruction (DoDI) 5000.72, Part II Definitions states the following when defining a COR: "Defined in subpart 202.101 of Reference (f). Any individual delegated responsibilities pursuant to subpart 1.602-2 of Reference (e), regardless of local terminology, must be certified in accordance with this instruction. For example, local terminology can be COR, Contracting Officer's technical representative, technical point of contact, technical representative, alternate COR, administrative COR, assistant COR, line item manager, task order manager, quality assurance personnel, quality assurance evaluator, or COR management." In addition, Army Regulation 70-13, Chapter 2, paragraph 2-2g, states, in part, the following when providing other surveillance support personnel to assist the COR when needed, "...These other surveillance support personnel may serve as on-site representatives of the COR in performance of actual contract surveillance if they meet all COR requirements and have been appointed by the CO as alternate CORs."
Contractor - Means a supplier or vendor awarded a contract to provide specific supplies or service to the Government. The term used in this contract refers to the prime.
Day - Means, unless otherwise specified, a calendar day.
Defective Service - Means a service output that does not meet the standard of performance associated with the PWS.
Deliverable - Means anything that can be physically delivered but may include non-manufactured things such as meeting minutes or reports.
Physical Security - Means that part of security concerned with physical measures designed to safeguard personnel; to prevent unauthorized access to equipment, installations, material, and documents; and to safeguard against espionage, sabotage, damage, and theft.
Quality Assurance (or Government contract quality assurance) - Means the various functions, including, inspection, performed by the Government to determine whether a Contractor has fulfilled the contract obligations pertaining to quality and quantity.
Quality Assurance Surveillance Plan (QASP) - Means the key Government-developed surveillance process document and is applied to Performance-Based Service Contracting (PBSC). The QASP is used for managing Contractor performance assessment by ensuring that systematic quality assurance methods validate that Contractor quality control efforts are timely, effective, and are delivering the results specified in the contract or task order. The QASP directly corresponds to the performance objectives and standards (i.e., quality, quantity, timeliness) specified in the PWS. It provides specific details on how the Government will survey, observe, test, sample, evaluate, and document Contractor performance results to determine if the Contractor has met the required standards for each objective in the PWS. The QASP, with very few if any exceptions, is an internal to Government document.
Quality Control - Means all necessary measures taken by the Contractor to assure that the quality of an end product or service shall meet contract requirements.
Subcontractor - Means one that enters into a contract with a prime Contractor. The Government does not have privity of contract with the subcontractor.
Work Week - Monday through Friday, unless otherwise specified.
2.2 Acronyms: Although not inclusive of every term used within this PWS, or that may be included in an acquisition, the following provides a list of acronyms commonly used in the acquisition field.
AES Atomic Emission Spectrometer AT Antiterrorism ATO Antiterrorism Officer CLIN Contract Line Item Number CO Contracting Officer COC Chain of Custody COR Contracting Officer's Representative CV Curriculum Vitae DCPH-A Defense Centers for Public Health - Aberdeen DFARS Defense Federal Acquisition Regulation Supplement DHA Defense Health Agency DoD Department of Defense EDD Electronic Data Deliverable FAR Federal Acquisition Regulation GC Gas Chromatography HPLC High Pressure Liquid Chromatograph IC Ion Chromatograph ICP Inductively Coupled Plasma ID Identification LIMS Laboratory Information Management System LS Laboratory Sciences MS Mass Spectrometer OCI Organizational Conflict of Interest OPSEC Operations Security PM Project Manager POC Point of Contact PWS Performance Work Statement PT Proficiency Testing QA Quality Assurance QASP Quality Assurance Surveillance Plan QC Quality Control RA Requiring Activity SOP Standard Operation Procedures TAT Turn Around Time TEM Transmission Electron Microscope TNI The NELAC Institute USC United States Code XRF X-Ray Fluorescence
Part 3 Government Property (GP) and Services
3.1 Services: The Government will provide environmental and biosurveillance samples to the Contractor for sample analysis for radiological contamination identification purposes. The Government will also provide Outsource Documentation (also called pick-up order document) that will accompany each set of samples to identify the project name, requested turnaround time, requested priority, methods to be reported and sample identification information.
3.2 Facilities: RESERVED
3.3 Utilities: RESERVED
3.4 Equipment: RESERVED
3.5 Special Tooling and Test Equipment: RESERVED
3.6 Materials: RESERVED
3.7 Training: RESERVED
3.8 Common Access Cards (CAC): RESERVED
Part 4 Contractor Furnished Items and Services
4. Contractor Furnished Property and Services
4.1 General: RESERVED
4.2 Secret Facility Clearance: RESERVED
4.3 Materials: RESERVED
4.4. Vehicles and Equipment: RESERVED
4.5 Background Checks: RESERVED
Part 5 Specific Tasks
5.1 Basic Services: The Contractor shall provide services for the analysis of environmental and biosurveillance samples for radiological contamination as identified in the PWS. The Contractor shall follow Chain-Of-Custody (COC) procedures as defined in the Contractor's COC Standard Operating Procedure (SOP).
Tasks consist of the following:5.2 Tasks:
The Government will provide samples for analysis to the Contractor facility. Each 5.2.1 Receipt and Storage of Samples Prior to Analysis.
container contains specific parameters for which the sample must be analyzed. The Contractor is responsible for storing and handling the samples in accordance with any applicable analytical method specifications.
Samples will be provided to the Contractor either through a Contractor-provided courier, shipment from DCPH-A, or shipment directly from the field.
All shipping costs are paid by the Government outside of this contract award.
If applicable, the Contractor's courier shall be responsible for pickup (from DCPH-A), 5.2.1.1 Sample Pickup Protocol from the DCPH-A lab.
packaging and delivery of samples. Samples shall be picked up by the Contractor's courier within 24 hours of notification by the DCPH-A COR or a designated representative. The courier is responsible for packaging and transporting the samples under conditions dictated in the applicable methodology. At the time of sample pickup by the Contractor, the samples and required tests will be identified by the DCPH-A COR on an Government provided Outsource Document. This document shall be signed and dated by the DCPH-A COR or designee to document the date and time of sample transfer to the contract lab. The Contractor courier shall date and sign the Outsource Document to conclude the transfer of possession of the sample(s). A Contractor Representative/Project Manager shall document the transfer of possession from the courier to the contract lab facility including sample receipt temperature. The Contractor shall immediately report in writing to the COR all samples lost or broken in transit.
DCPH-A shall pay the shipping costs, outside of this contract, for transportation of the 5.2.1.2 Sample Shipment Protocol from the DCPH-A lab.
samples to the Contractor's facility. The Contractor and DCPH-A shall store and/or ship samples in accordance with the preservation guidelines as noted in the applicable analytical method until samples are analyzed, and thereafter until results are approved by the COR. The Contractor shall immediately report all samples lost or broken in shipment, with as much detail as possible (to include but not limited to photographs, etcetera), to the COR within 4 hours of identification of the breakage. In addition, the sample receipt temperature must be reported to the COR, as applicable, within 24 hours of sample receipt .(Deliverable 6)
If holding times are of concern, there may be a necessity to ship the samples 5.2.1.3 Direct shipment of samples from the field to the Contractor.
to the contract lab directly from the field following collection. The DCPH-A sample submitter will ship the samples and a corresponding field COC document to the contract lab.
When the contract lab receives the samples and corresponding field COC forms, the Contractor's PM shall sign the COC forms documenting receipt of samples and immediately (within the same business day of receipt) forward the field COC to the COR for review, accountability and Laboratory Information Management System (LIMS) login at DCPH-A Lab. The Contractor's PM shall also report to the COR the condition of the samples upon receipt (to include receipt temperature) in the Contractor lab. The DCPH-A COR shall use project planning information and the information on the COC form to generate an Outsource Sample Shipment Document containing all applicable information (i.e., DCPH-A lab ID, DCPH-A field ID, analyses requested, matrix, points-of-contact, etc.). The generated Outsource Document will be forwarded electronically to the contract laboratory.
The Contractor shall then begin sample analysis. The contract laboratory PM shall assure that the contract laboratory analyzes the sample within holding times specified in applicable methodology. If paperwork from the COR is pending, the contract lab should obtain guidance from the COR to proceed with analysis to meet holding times.
The Government will designate samples as either "STANDARD", 5.2.2 Perform Sample Analysis within the stated Turnaround Time (TAT).
"HIGH PRIORITY", or "TOP PRIORITY". TATs are calculated from the date of Contractor receipt of samples to the date of receipt of technically acceptable analysis results acceptance by the Government.
For each sample designation, the Contractor shall complete the sample analysis, final reporting and Electronic Data Deliverable (EDD) transmission within the following TAT timeframes:
STANDARD: 21 days from date of sample receipt.
HIGH PRIORITY: 12 days from the date of sample receipt.
TOP PRIORITY: 8 days from the date of sample receipt.
TAT is defined as the intervening time between the date of sample receipt in the Contractor's laboratory (or Outsource Document for Direct Shipped Samples) to the date of receipt of a complete and technically acceptable data package (Final PDF copy + EDD ) by (Deliverable 7) (Deliverable 8) the DCPH-A laboratory. Technical acceptability will be determined by a thorough review by qualified DCPH-A technical Subject Matter Experts and communicated to the COR for any required actions with the Contractor. Holidays and weekends are considered 'calendar' days.
Approximately 5% of the total samples forwarded to the Contractor per year shall be designated High Priority and 5% of the total samples NOTE:
sent to the Contractor shall be designated Top Priority.
5.2.3 Provide analytical results (the complete data package) to the COR.
5.2.3.1 The Contractor shall submit the results of all analyses within the TAT timelines as defined on the Outsource Sample Shipment The results shall be submitted electronically to the COR and include the information requested in the format Document for each set of samples.
outlined in the Final Reporting Requirements (Attachment 5 - Final Report and Electronic Data Deliverable (EDD) Requirements & . The Contractor shall at least report at or below the limits identified in Attachment 6 - Electronic Data Deliverable (EDD) Specifications)
. Attachment 4 - Chemical Parameters, Matrix and Detection Limits
Extensions for matrix issues and sample analysis anomalies may be negotiated with the COR on a case-by-case basis. However, these issues must be communicated to the COR when they occur, prior to the due date and when the lab believes a delay is possible, not after the data package is overdue.
5.2.3.2 Use industry standard state-of-the-art instrumentation, technologies, and methodologies to analyze samples for any of the parameters Any special analyses or additional testing requirements will be listed in Attachment 4 - Chemical Parameters, Matrix and Detection Limits.
stated on the sample. It is anticipated that the Contractor will perform between 2,000 and 10,000 analyses per year. Natural disasters or military mobilization may alter these estimates.
When the contract laboratory is performing sample analyses using the methodologies specified in Attachment 4 - Chemical Parameters, Matrix the contract laboratory shall follow quality control guidelines specified in that method.and Detection Limits, Quality control data shall be analyzed and, where they are found to be outside pre-defined criteria, planned actions 5.2.3.3 Quality Control Data:
shall be taken to correct the problem and to prevent incorrect results from being reported. If additional quality assurance/quality control protocol is designated in the methodologies, these guidelines shall also be strictly followed.
Analyze samples within the maximum holding times specified in the method, even if these times are less than the 21 day for 5.2.3.4 Holding times:
Standard, 12 day for High Priority or eight (8) day Top Priority report delivery TATs required in this contract.
If a sample is not processed within the specified holding time per method, the sample will be considered "lost", unable to analyze and require recollection by the DCPH-A client/Project Officer. When this occurs, the Contractor shall not bill the Government for tests performed on samples beyond their holding times and be assessed liquidated damages (for example late penalties) in accordance with the "Liquidated Damages" clause incorporated into this contract. The Contractor shall not be liable if time remaining on the holding times, upon receipt of samples at Contractor, is less than 48 hours. Extenuating circumstances can be negotiated on a case-by-case basis with the DCPH-A COR. (Examples may include - Weekends /Holidays, late arrivals, unannounced arrivals.)
5.2.4 Disposal of unused sample volumes and return of Government shipping containers.
Unless otherwise instructed by the COR, the Contractor shall be required to dispose of unused sample volumes and used 5.2.4.1 Disposal.
Radiological sampling media (excluding carbon disulfide which shall be disposed immediately) no earlier than 60 days following submission of analytical data to DCPH-A COR. Sample disposal and disposal of unused sample bottles/containers is the responsibility of the Contractor and should be done in accordance with all applicable laws and regulations governing disposal of such materials.
The Contractor shall return all Government shipping containers, unless otherwise specified, to the COR within three (3) 5.2.4.2 Shipping Containers.
business days of receipt at the cost of the Government who will provide applicable shipping labels for each container.
The contractor shall perform analyses on supplied matrices and provide the results showing any radiological compounds in 5.2.5 Surge Capacity.
each sample, IAW with the PWS. Potential exists to have other projects unexpectedly come up that will require additional sample analyses. A CLIN will be present in the event there is a surge in needed services to execute those requirements. If the Government elects to exercise a surge CLIN, the Government may elect to incrementally fund or fully fund the CLIN based on the Government's needs and/or the availability of funding
5.2.6 Liquidated Damages
The Contractor shall submit Final and Preliminary reports in an electronic format. If the Contractor does not submit data packages on time and5.2.6.1 /or submits incomplete/technically deficient/unacceptable data packages, the Contractor may be required to pay liquidated damages (late penalties) to the Government as follows: - 5% per day late to a maximum of 100% of the total invoice price.
Extensions for matrix issues and sample analysis anomalies may be negotiated with the COR on a case-by-case basis. However, these issues 5.2.6.2 must be made known to the COR when they occur and when the lab believes a delay is possible, not after the data package is overdue.
Contractor shall manage all assigned projects from initial receipt until project completion. The Contractor 5.2.7 Contractor Project Management.
shall ensure all projects are completed in accordance with the terms and conditions of the PWS.
RESERVED5.2.8 Facilities Engineering Services.
RESERVED5.3 . Service Contract Reporting
5.4 Laboratory Qualifications and Capabilities
5.4.1 Laboratory Instrumentation/Technology Requirements: The Contractor must have the following instrumentation/technologies (at a minimum) to ensure the Contractors ability to process sample analyses within a timely manner based on the anticipated volume:
5.4.1.1 Instrumentation/Technology (minimum requirements to perform the required testing methods):
5.4.1.1.1 Gas Chromatographs (GC) with various detectors as required for each method
5.4.1.1.2 High Pressure Liquid Chromatographs (HPLC)
5.4.1.1.3 Ion Chromatographs (IC)
5.4.1.1.4 Inductively Coupled Plasma (ICP)
5.4.1.1.5 Atomic Emission Spectrometers (AES)
5.4.1.1.6 Mass Spectrometers (MS)
5.4.1.1.7 Transmission Electron Microscope (TEM)
5.4.1.1.8 Microscopes
5.4.1.1.9 X-Ray Fluorescence (XRF)
5.4.1.2 Laboratory Facilities (minimum requirements):
5.4.1.2.1 5000 sq. ft. of laboratory space
5.4.1.2.2 Adequate electrical service
5.4.1.2.3 Reagent water to meet ASTM Type II classification
5.4.1.2.4 Class A volumetric glassware for all analyses
5.4.1.2.5 Adequate fume hood system to provide safe storage of hazardous materials
5.4.2 Laboratory Certifications and Qualifications for Radiological Sample Analyses:
5.4.2.1 The laboratory where the work is performed shall be ISO 17025:2017 accredited and in compliance with The NELAC Institute (TNI) .Volume 1 Management and Technical Requirements for Laboratories Performing Environmental Analysis: 2016
5.4.2.2 The Contractor is required to notify the COR, in writing, within 48 hours of changes that result in the loss of any of the required laboratory certifications (to include loss of accreditation in individual methods or analytes). The Contractor shall cease performance of any sample analysis impacted by the loss of laboratory accreditation, until accreditation is restored and evidence of such is provided to the COR. If accreditation is not restored within 30 calendar days from notification, the contract may be terminated for default. The Contractor shall provide the COR with the most current accreditation certificates that relate to this contract within five (5) business days of receipt of the update accreditation certificates.
5.4.2.3 Required Laboratory Certifications: The Contractor is required to have the following required Certifications:
5.4.2.3.1 - International Organization for Standardization and the Electrotechnical Commission (IEC) ISO/IEC 17025 Accreditation (ISO/IEC) 17025:
2017 General requirements for the competence of testing calibration laboratories. The Contractor must also have documentation that they have been assessed against and have demonstrated compliance to the 2016 TNI Environmental Testing Laboratory Standard .(Deliverable 11)
5.4.2.3.2 - Department of Defense (DoD) Environmental Laboratory Accreditation Program (ELAP) Ensures that laboratories performing environmental testing for the DoD meet strict quality assurance, data integrity, and technical competence standards when analyzing for example, soil, air, water for DoD contracts. DoD ELAP requires labs to follow the DoD Quality Systems Manual (QSM) and conform to ISO/IEC 17025 standards
5.4.3 Quality Documentation: At a minimum, the contract laboratory shall have, in writing, documented procedures (e.g., SOPs) for the following at time of award:
5.4.3.1 Sample receipt, handling, storage and control.
5.4.3.2 Security, chain of custody and document control.
5.4.3.3 Hazardous waste/sample disposal.
5.4.3.4 Sample analysis (to include types of analyses required, sample preparation, modifications to established methods, peculiarities of instrumentation, etc.)
5.4.3.5 Calibration of standards, traceability (show traceability of standards to National Measurement Systems (e.g., National Institute of Standards and Technology))
5.4.3.6 Ongoing or routine laboratory operations (including maintenance of instrumentation, procurement of supplies, scheduling of calibration for balances, thermometers, etc.)
5.4.3.7 Laboratory Safety and Chemical Hygiene (should address wearing of coats, gloves, goggles, handling of hazardous materials, eye lavaging, storage of hazardous materials, safety showers, fire safety, etc.)
5.4.3.8 Lab QA/QC (to include procedures for conducting in house audits; procedures for allowing technicians and chemists to have an independent means of checking the quality of their results; procedures for the development and implementation of contingency plans; and procedures for the initiation of corrective action
5.4.3.9 Data production, reduction, transcription, verification, review, distribution and in house storage
5.4.3.10 Determination of Reporting Limits. (Contractor must document the criteria under which the reporting limits are established/re-established for each analytical process. Must also include acceptance criteria for such reporting limit evaluation)
5.4.4 Analytical Training Records: All Contractor personnel performing sample handling/processing/analysis in support of this Government contract shall have records demonstrating proficiency in performing the methodologies detailed in Attachment 4 - Chemical Parameters, Matrix
.and Detection Limits
5.4.5 On-site Inspections: The Government reserves the right to conduct on-site inspections of the Contractor's and subcontractor's laboratories to ensure that appropriate processes and quality assurance procedures are being followed in order to ensure that samples are being analyzed in accordance with the standards listed in this PWS, the requirements found in the published method identified by the Contractor, as well as the requirements in the applicable NELAC Volume 1 Management and Technical Requirements for Laboratories Performing Environmental
.Analysis: 2016 Modules and corresponding checklist(s)
5.4.6 Subcontracting: The following section discusses any Sample analysis performed at a separate location other than the prime contractor's laboratory location.
5.4.6.1 The Contractor shall be responsible for any subcontract management necessary to integrate work performed on this contract and shall be responsible and accountable for subcontractor performance. The prime Contractor will manage work distribution to ensure there are no Organizational Conflicts of Interest (OCI) considerations. A notification must be sent to the CO and COR within 30 days of the agreement between the prime and the subcontractor.
5.4.6.2 Due to the need to maintain the integrity of the sampling and the laboratory certifications, the Contractor may subcontract with no more than three (3) other laboratories. The subcontractor laboratories and personnel shall hold the same qualifications and certifications as required by the prime. The prime Contractor shall not subcontract more than half of the methods listed in Attachment 4 - Chemical Parameters, Matrix and
.Detection Limits
5.4.6.3 The Government reserves the right to conduct on-site inspections of the Contractor's and subcontractor's laboratories to ensure that appropriate processes and quality assurance procedures are being followed in order to ensure that samples are being analyzed in accordance with the standards listed in this PWS, the requirements found in the published method, as well as the requirements in the applicable accreditation and corresponding checklist(s). The lab(s) use for subcontracting must first be audited to the same standards as the prime and approved by DCPH-A prior to submitting samples. No exceptions to this requirement will be accepted.
5.4.6.4 Sending samples to any location for analysis other than the physical location that is placing the bid is considered subcontracting even if it is within the same corporation.
5.4.6.5 Subcontractor(s) shall adhere to the same quality requirements as the oversight Contractor, to include all applicable sections of this PWS. It should be noted that every time the term "Contractor" is used throughout this PWS, the term "subcontractor" is also applicable.
5.5 Management Reports and Plans
5.5.1 Monthly Financial Tracking Report . The Contractor shall provide a spreadsheet with detail of real time expenditure levels of (Deliverable 9) every contract line-item number (CLIN). The initial report is due 30 days after contract award and by the first of each month thereafter.
5.5.2 Results Status Report . The Contractor shall provide a weekly summary of all DCPH-A analysis currently being analyzed by (Deliverable 10) the Contractor (to include analysis sent to the subcontractor). The summary shall be provided to the DCPH-A COR on the first business day each week and contain the following information at a minimum. If there are no samples in-house, there is no summary status report is required.
5.5.2.1 Outsource Sample Shipment Number
5.5.2.2 Pick Up Order Number
5.5.2.3 DCPH-Aberdeen assigned Contractor Due date.
5.5.2.4 Status of the Report - i.e., on-time, delayed, etc.
5.5.2.5 If the report will be provided after the DCPH-A assigned due date, a projected completion date must be provided.
Part 6 Applicable Publications
6. : Applicable Publications (Current Editions) The following publications, manuals, regulations, are listed below.
Department of Defense and Department of Energy Quality Systems Manual for Environmental Laboratories (most current version)
U.S. Environmental Protection Agency (EPA) Methods
Required Laboratory Certifications. The Contractor is required to have the following required Certifications:
International Organization for Standardization and the Electrotechnical Commission (IEC) ISO/IEC 17025 Accreditation (ISO/IEC) 17025:
2017 General requirements for the competence of testing calibration laboratories. The Contractor must also have documentation that they have been assessed against and have demonstrated compliance to the 2016 TNI Environmental Testing Laboratory Standard.
Department of Defense (DoD) Environmental Laboratory Accreditation Program (ELAP) Ensures that laboratories performing environmental testing for the DoD meet strict quality assurance, data integrity, and technical competence standards when analyzing for example, soil, air, water for DoD contracts. .DoD ELAP requires labs to follow the DoD Quality Systems Manual (QSM) and conform to ISO/IEC 17025 standards
Requirements The Defense Centers for Public Health - Aberdeen (DCPH-A) Lab Sciences (LS) Directorate has a requirement for the providing of radiological analyses on environmental and biosurveillance samples and provide the results of various compounds in each sample. The data obtained under this contract shall be used to comply with Federal and State requirements.
Packaging and Marking
Inspection and Acceptance
Overall Contract Inspection/Acceptance Locations
Inspection and Acceptance Location
Both Destination Instructions: See Performance Work Statement (PWS) for Inspection/Acceptance Criteria.
DoDAAC: HT1240 CountryCode: USA
DEFENSE CENTERS FOR PUB HLTH - MM
8300 RICKETTS POINT ROAD, BLDG E2850
ABERDEEN PROVING GROU, MD 21010-5000
UNITED STATES
Arlinda Adderley Email: arlinda.c.adderley.civ@health.mil
Option Line Item
Inspection and Acceptance Location
Both Destination Instructions: See Performance Work Statement (PWS) for Inspection/Acceptance Criteria.
DoDAAC: HT1240 CountryCode: USA
DEFENSE CENTERS FOR PUB HLTH - MM
8300 RICKETTS POINT ROAD, BLDG E2850
ABERDEEN PROVING GROU, MD 21010-5000
UNITED STATES
Arlinda Adderley Email: arlinda.c.adderley.civ@health.mil
Option Line Item
Inspection and Acceptance Location
Both Destination Instructions: See Performance Work Statement (PWS) for…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .