Combined CDRLs.pdf

PDF 17 MB Posted

Attached to
F-15 FMS Aerospace Ground Equipment/Special Purpose Vehicles (AGE/SPV)
Solicitation number
FA857526RB004
Issued by

About this file

This document is a PDF portfolio cover page displaying an Adobe Acrobat interface prompt. The image shows a red and white binder or folder with the Adobe Acrobat logo and contains instructional text directing users to open the PDF portfolio using Acrobat X or Adobe Reader X, or later versions for optimal viewing experience. A "Get Adobe Reader Now!" button is featured prominently at the bottom of the page. This is not a federal contract opportunity document—it is merely a technical notice regarding PDF viewer requirements.

View the file

Other files

File Type Posted
Solicitation Amendment FA857526RB0040001 SF 30.pdf PDF
RFP Attachment 4 Cost-Price Model Amd 1.xlsx XLSX spreadsheet
RFP Attachment 7 - Relevancy Assessment Amd 1.pdf PDF
Quality Assurance Form 807 Amd 1.pdf PDF
AGE SPV Solicitation_Government Response to Industry v2.xlsx XLSX spreadsheet
NSN List Amd 1.xlsx XLSX spreadsheet
Solicitation Amendment - FA857526RB0040001.pdf PDF
AGE SPV Solicitation_Government Response to Industry.xlsx XLSX spreadsheet
Solicitation - FA857526RB004.pdf PDF
RFP Attachment 3-Clause and Provisions Checklist.pdf PDF
Section L.pdf PDF
RFP Attachment 01 - PWS.pdf PDF
RFP Attachment 4 Cost-Price Model.xlsx XLSX spreadsheet
RFP Attachment 6-Past Performance Information (PPI) for Offerors.pdf PDF
NSN List.pdf PDF
RFP Attachment 2-RFP Checklist.pdf PDF
RFP Attachment 8-Cross Reference Matrix.xlsx XLSX spreadsheet
RFP Attachment 9-Present and Past Performance Questionnaire.pdf PDF
RFP Attachment 10-Transmittal Letter.pdf PDF
RFP Attachment 12-Preaward Survey.pdf PDF
Government Furnished Property.pdf PDF
Government Furnished Property (Excel).xlsx XLSX spreadsheet
Section M.pdf PDF
RFP Attachment 5-Joint Venture-Critical Subcontractor Team.pdf PDF
RFP Attachment 7 - Relevancy Assessment.pdf PDF
RFP Attachment 11-Client Authorization Letter.pdf PDF
Quality Assurance Form 807.pdf PDF
Show all 27

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

For the best experience, open this PDF portfolio in

Acrobat X or Adobe Reader X, or later.

Get Adobe Reader Now!

http://www.adobe.com/go/reader

DD FORM 1423-1, FEB 2001

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item)

PREVIOUS EDITION MAY BE USED.

Form Approved OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

TDP ________ TM _______ OTHER

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE

7. DD 250 REQ

8. APP CODE

9. DIST STATEMENT

REQUIRED

10. FREQUENCY

11. AS OF DATE

12. DATE OF FIRST SUBMISSION

13. DATE OF SUBSEQUENT

SUBMISSION

14. DISTRIBUTION

a. ADDRESSEE

b. COPIES

Draft Final

Reg Repro

15. TOTAL

16. REMARKS

17. PRICE GROUP

18. ESTIMATED

TOTAL PRICE

G. PREPARED BY H. DATE I. APPROVED BY J. DATE

Page of Pages

16. REMARKS (Continued)

DD FORM 1423-1, FEB 2001 Page of Pages

INSTRUCTIONS FOR COMPLETING DD FORM 1423

(See DoD 5010.12-M for detailed instructions.)

FOR GOVERNMENT PERSONNEL

Item A. Self-explanatory.

Item B. Self-explanatory.

Item C. Mark (X) appropriate category: TDP - Technical Data Package;

TM - Technical Manual; Other - other category of data, such as "Provisioning,""Configuration Management," etc.

Item D. Enter name of system/item being acquired that data will support.

Item E. Self-explanatory (to be filled in after contract award).

Item F. Self-explanatory (to be filled in after contract award).

Item G. Signature of preparer of CDRL.

Item H. Date CDRL was prepared.

Item I. Signature of CDRL approval authority.

Item J. Date CDRL was approved.

Item 1. See DoD FAR Supplement Subpart 4.71 for proper numbering.

Item 2. Enter title as it appears on data acquisition document cited in Item 4.

Item 3. Enter subtitle of data item for further definition of data item (optional entry).

Item 4. Enter Data Item Description (DID) number, military specification number, or military standard number listed in DoD 5010.12-L (AMSDL), or one-time DID number, that defines data content and format requirements.

Item 5. Enter reference to tasking in contract that generates requirement for the data item (e.g., Statement of Work paragraph number).

Item 6. Enter technical office responsible for ensuring adequacy of the data item.

Item 7. Specify requirement for inspection/acceptance of the data item by the Government.

Item 8. Specify requirement for approval of a draft before preparation of the final data item.

Item 9. For technical data, specify requirement for contractor to mark the appropriate distribution statement on the data (ref. DoDD 5230.24).

Item 10. Specify number of times data items are to be delivered.

Item 11. Specify as-of date of data item, when applicable.

Item 12. Specify when first submittal is required.

Item 13. Specify when subsequent submittals are required, when applicable.

Item 14. Enter addressees and number of draft/final copies to be delivered to each addressee. Explain reproducible copies in Item 16.

Item 15. Enter total number of draft/final copies to be delivered.

Item 16. Use for additional/clarifying information for Items 1 through 15.

Examples are: Tailoring of documents cited in Item 4; Clarification of submittal dates in Items 12 and 13; Explanation of reproducible copies in Item 14.; Desired medium for delivery of the data item.

FOR THE CONTRACTOR

Item 17. Specify appropriate price group from one of the following groups of effort in developing estimated prices for each data item listed on the DD Form 1423.

a. Group I. Definition - Data which is not otherwise essential to the contractor's performance of the primary contracted effort (production, development, testing, and administration) but which is required by DD Form 1423.

Estimated Price - Costs to be included under Group I are those applicable to preparing and assembling the data item in conformance with Government requirements, and the administration and other expenses related to reproducing and delivering such data items to the Government.

b. Group II. Definition - Data which is essential to the performance of the primary contracted effort but the contractor is required to perform additional work to conform to Government requirements with regard to depth of content, format, frequency of submittal, preparation, control, or quality of the data item.

Estimated Price - Costs to be included under Group II are those incurred over and above the cost of the essential data item without conforming to Government requirements, and the administrative and other expenses related to reproducing and delivering such data item to the Government.

c. Group III. Definition - Data which the contractor must develop for his internal use in performance of the primary contracted effort and does not require any substantial change to conform to Government requirements with regard to depth of content, format, frequency of submittal, preparation, control, and quality of the data item.

Estimated Price - Costs to be included under Group III are the administrative and other expenses related to reproducing and

d. Group IV. Definition - Data which is developed by the contractor as part of his normal operating procedures and his effort in supplying these data to the Government is minimal.

Estimated Price - Group IV items should normally be shown on the DD Form 1423 at no cost.

Item 18. For each data item, enter an amount equal to that portion of the total price which is estimated to be attributable to the production or development for the Government of that item of data.

These estimated data prices shall be developed only from those costs which will be incurred as a direct result of the requirement to supply the data, over and above those costs which would otherwise be incurred in performance of the contract if no data were required. The estimated data prices shall not include any amount for rights in data. The Government's right to use the data shall be governed by the pertinent provisions of the contract.

DD FORM 1423-1 (BACK), FEB 2001

data_item: C003 title: Technical Report - Study/Services sub:

auth: DI-MISC-80508B/T ref: SEE BLK 16 req_ofc: AFLCMC/WAQI dd250: LT appcode: N/A dist: SEE BLK 16 freq: MTHLY asof: SEE BLK 16 firstsub: SEE BLK 16 subsub: SEE BLK 16 addressee1: AFLCMC/WAQI draft1: 0 reg1: 1 repro1: 0 addressee2: 320 Richard Ray Blvd draft2:

reg2:

repro2:

addressee3: Robins AFB GA 31098 draft3:

reg3:

repro3:

addressee4: robin.davis@us.af.mil draft4:

reg4:

repro4:

addressee5: keith.matthews@us.af.m draft5:

reg5:

repro5:

addressee6:

draft6:

reg6:

repro6:

addressee7: AFLCMC/WAQK draft7: 0 reg7: 1 repro7: 0 addressee8: Suite 19A draft8:

reg8:

repro8:

addressee9: 235 Byron St draft9:

reg9:

repro9:

addressee10: Robins AFB GA 31098 draft10:

reg10:

repro10:

addressee11: shiela.hodges@us.af.mil draft11:

reg11:

repro11:

addressee12:

draft12:

reg12:

repro12:

addressee13:

draft13:

reg13:

repro13:

addressee14:

draft14:

reg14:

repro14:

addressee15:

draft15:

reg15:

repro15:

addressee16:

draft16:

reg16:

repro16:

addressee17:

draft17:

reg17:

repro17:

addressee18:

draft18:

reg18:

repro18:

addressee19:

draft19:

reg19:

repro19:

addressee20:

draft20:

reg20:

repro20:

addressee21:

draft21:

reg21:

repro21:

addressee22:

draft22:

reg22:

repro22:

addressee23:

draft23:

reg23:

repro23:

addressee24:

draft24:

reg24:

repro24:

addressee25:

draft25:

reg25:

repro25:

addressee26:

draft26:

reg26:

repro26:

addressee27:

draft27:

reg27:

repro27:

addressee28:

draft28:

reg28:

repro28:

addressee29:

draft29:

reg29:

repro29:

addressee30:

draft30:

reg30:

repro30:

addressee31:

draft31:

reg31:

repro31:

addressee32:

draft32:

reg32:

repro32:

addressee33:

draft33:

reg33:

repro33:

addressee34:

draft34:

reg34:

repro34:

addressee35:

draft35:

reg35:

repro35:

addressee36:

draft36:

reg36:

repro36:

addressee37:

draft37:

reg37:

repro37:

addressee38:

draft38:

reg38x:

repro38:

total_draft: 0 total_reg: 2 total_repro: 0 remarks: DID Tailoring: The DID is changed from Distribution statement “A” to “D”.

Block 5: PWS para 3.6.1, 4.2, 4.7, 4.19

Block 9: Distribution authorized to Department of Defense and DoD Contractors only. (Administrative or Operational Use) (06 June 2023). Other requests for this document shall be referred to AFLCMC/WAQI, 235 Byron St. Suite 19A, Robins AFB, GA 31098.

Blocks 11, 12, and 13: The Contractor shall deliver the monthly trend analysis to the Government by the 15ᵗʰ day of the following month for which trend analysis is completed as an attachment to the Monthly Status Report (CDRL A002).

Block 14: CDRL distribution and notification shall be available via the vendor's subscribed/unsubscribed method. If for any reason the vendor's site is not available, email reports to addresses in Block 14.

group:

total_price:

prep_name:

line_item: 2009 exhibit: C xtdp: Off xtm: Off othercat: MISC system: F-15 AGE/SPV Repair Support ctr_no: FD2060-25-31659 contr: TBD remarksb:

Page2:

Reset:

2025-03-07T13:44:27-0500

DAVIS.ROBIN.H.1241437813

prep_date: 8 Mar 2025 app_by:

2025-03-08T13:27:05-0500

MONTIJO.JOHN.A.1170464784

app_date: 8 Mar 2025

Page:

of_pages:

app: Adobe Professional 8.0

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the conformance with Government requirements, and the required to perform additional work to conform to Government without conforming to Government requirements, and the contracted effort and does not require any substantial change to conform to Government requirements with regard to depth of otherwise be incurred in performance of the contract if no data were required. The estimated data prices shall not include any data_item: C004 title: Trip Travel Report sub:

auth: DI-MISC-81943/T ref: PWS para 4.2, 4.2.7 req_ofc: AFLCMC/WAQI dd250: LT appcode: N/A dist: SEE BLK 16 freq: SEE BLK 16 asof: SEE BLK 16 firstsub: SEE BLK 16 subsub: SEE BLK 16 addressee1: AFLCMC/WAQI draft1: 0 reg1: 1 repro1: 0 addressee2: 320 Richard Ray Blvd draft2:

reg2:

repro2:

addressee3: Robins AFB GA 31098 draft3:

reg3:

repro3:

addressee4: robin.davis@us.af.mil draft4:

reg4:

repro4:

addressee5: keith.matthews@us.af.m draft5:

reg5:

repro5:

addressee6:

draft6:

reg6:

repro6:

addressee7: AFLCMC/WAQK draft7: 0 reg7: 1 repro7: 0 addressee8: Suite 19A draft8:

reg8:

repro8:

addressee9: 235 Byron St draft9:

reg9:

repro9:

addressee10: Robins AFB GA 31098 draft10:

reg10:

repro10:

addressee11: shiela.hodges@us.af.mil draft11:

reg11:

repro11:

addressee12:

draft12:

reg12:

repro12:

addressee13:

draft13:

reg13:

repro13:

addressee14:

draft14:

reg14:

repro14:

addressee15:

draft15:

reg15:

repro15:

addressee16:

draft16:

reg16:

repro16:

addressee17:

draft17:

reg17:

repro17:

addressee18:

draft18:

reg18:

repro18:

addressee19:

draft19:

reg19:

repro19:

addressee20:

draft20:

reg20:

repro20:

addressee21:

draft21:

reg21:

repro21:

addressee22:

draft22:

reg22:

repro22:

addressee23:

draft23:

reg23:

repro23:

addressee24:

draft24:

reg24:

repro24:

addressee25:

draft25:

reg25:

repro25:

addressee26:

draft26:

reg26:

repro26:

addressee27:

draft27:

reg27:

repro27:

addressee28:

draft28:

reg28:

repro28:

addressee29:

draft29:

reg29:

repro29:

addressee30:

draft30:

reg30:

repro30:

addressee31:

draft31:

reg31:

repro31:

addressee32:

draft32:

reg32:

repro32:

addressee33:

draft33:

reg33:

repro33:

addressee34:

draft34:

reg34:

repro34:

addressee35:

draft35:

reg35:

repro35:

addressee36:

draft36:

reg36:

repro36:

addressee37:

draft37:

reg37:

repro37:

addressee38:

draft38:

reg38x:

repro38:

total_draft: 0 total_reg: 2 total_repro: 0 remarks:

DID Tailoring: The DID is changed from Distribution code “A” to “D”.

Block 9: Distribution authorized to Department of Defense and DoD Contractors only. (Administrative or Operational Use) (06 June 2023). Other requests for this document shall be referred to AFLCMC/WAQI, 235 Byron St. Suite 19A, Robins AFB, GA 31098.

Blocks 10, 11, 12, and 13: The Contractor shall to the maximum extent possible/ provide in the MSR a forecast of direct travel that is expected to occur within the next 30 days (a minimum 45 days for travel to the Kingdom to allow time for RSAF approval).

Block 14: CDRL distribution and notification shall be available via the vendor's subscribed/unsubscribed method. If for any reason the vendor's site is not available, email reports to addresses in Block 14.

group:

total_price:

prep_name:

line_item: 2009 exhibit: C xtdp: Off xtm: Off othercat: MISC system: F-15 AGE/SPV Repair Support ctr_no: FD2060-25-31659 contr: TBD remarksb:

Page2:

Reset:

2025-03-07T13:45:09-0500

DAVIS.ROBIN.H.1241437813

prep_date: 8 Mar 2025 app_by:

2025-03-08T13:32:45-0500

MONTIJO.JOHN.A.1170464784

app_date: 08 Mar 2025

Page:

of_pages:

app: Adobe Professional 8.0

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the conformance with Government requirements, and the required to perform additional work to conform to Government without conforming to Government requirements, and the contracted effort and does not require any substantial change to conform to Government requirements with regard to depth of otherwise be incurred in performance of the contract if no data were required. The estimated data prices shall not include any data_item: C005 title: Management Plan sub:

auth: DI-MGMT-80004A/T ref: PWS para 4.2, 4.4 req_ofc: AFLCMC/WAQI dd250: LT appcode: N/A dist: D freq: SEE BLK 16 asof: SEE BLK 16 firstsub: 30 DAYS ACA subsub: SEE BLK 16 addressee1: AFLCMC/WAQI draft1: 0 reg1: 1 repro1: 0 addressee2: 320 Richard Ray Blvd draft2:

reg2:

repro2:

addressee3: Robins AFB GA 31098 draft3:

reg3:

repro3:

addressee4: robin.davis@us.af.mil draft4:

reg4:

repro4:

addressee5: keith.matthews@us.af.m draft5:

reg5:

repro5:

addressee6:

draft6:

reg6:

repro6:

addressee7: AFLCMC/WAQK draft7: 0 reg7: 1 repro7: 0 addressee8: Suite 19A draft8:

reg8:

repro8:

addressee9: 235 Byron St draft9:

reg9:

repro9:

addressee10: Robins AFB GA 31098 draft10:

reg10:

repro10:

addressee11: shiela.hodges@us.af.mil draft11:

reg11:

repro11:

addressee12:

draft12:

reg12:

repro12:

addressee13:

draft13:

reg13:

repro13:

addressee14:

draft14:

reg14:

repro14:

addressee15:

draft15:

reg15:

repro15:

addressee16:

draft16:

reg16:

repro16:

addressee17:

draft17:

reg17:

repro17:

addressee18:

draft18:

reg18:

repro18:

addressee19:

draft19:

reg19:

repro19:

addressee20:

draft20:

reg20:

repro20:

addressee21:

draft21:

reg21:

repro21:

addressee22:

draft22:

reg22:

repro22:

addressee23:

draft23:

reg23:

repro23:

addressee24:

draft24:

reg24:

repro24:

addressee25:

draft25:

reg25:

repro25:

addressee26:

draft26:

reg26:

repro26:

addressee27:

draft27:

reg27:

repro27:

addressee28:

draft28:

reg28:

repro28:

addressee29:

draft29:

reg29:

repro29:

addressee30:

draft30:

reg30:

repro30:

addressee31:

draft31:

reg31:

repro31:

addressee32:

draft32:

reg32:

repro32:

addressee33:

draft33:

reg33:

repro33:

addressee34:

draft34:

reg34:

repro34:

addressee35:

draft35:

reg35:

repro35:

addressee36:

draft36:

reg36:

repro36:

addressee37:

draft37:

reg37:

repro37:

addressee38:

draft38:

reg38x:

repro38:

total_draft: 0 total_reg: 2 total_repro: 0 remarks:

DID tailoring: The DID is changed from Distribution Statement "A" to "D".

Block 9: The following information should be included on the deliverable: Distribution authorized to Department of Defense and DoD Contractors only. (Administrative or Operational Use)(06 June 2023). Other requests for this document shall be referred to AFLCMC/WAQI, 235 Byron St. Suite 19A, Robins AFB, GA 31098.

Blocks 10, 11, and 13: The Contractor shall deliver a Program Management Plan to the USG 30 days after contract award. If any changes to the Program Management Plan occur, the CDRL should be updated accordingly and resubmitted within 30 calendar days of the identified change.

Block 14: CDRL distribution and notification shall be available via the vendor's subscribed/unsubscribed method. If for any reason the vendor's site is not available, email reports to addresses in Block 14.

group:

total_price:

prep_name:

line_item: 2009 exhibit: C xtdp: Off xtm: Off othercat: MGMT system: F-15 AGE/SPV Repair Support ctr_no: FD2060-25-31659 contr: TBD remarksb:

Page2:

Reset:

2025-03-07T13:45:38-0500

DAVIS.ROBIN.H.1241437813

prep_date: 8 Mr 2025 app_by:

2025-03-08T13:33:24-0500

MONTIJO.JOHN.A.1170464784

app_date: 8 Mar 2025

Page:

of_pages:

app: Adobe Professional 8.0

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the conformance with Government requirements, and the required to perform additional work to conform to Government without conforming to Government requirements, and the contracted effort and does not require any substantial change to conform to Government requirements with regard to depth of otherwise be incurred in performance of the contract if no data were required. The estimated data prices shall not include any data_item: C006 title: Meeting Agenda sub:

auth: DI-ADMN-81249C/T ref: PWS para 4.2, 4.4.3 req_ofc: AFLCMC/WAQI dd250: LT appcode: N/A dist: SEE BLK 16 freq: QTRLY asof: SEE BLK 16 firstsub: SEE BLK 16 subsub: SEE BLK 16 addressee1: AFLCMC/WAQI draft1: 0 reg1: 1 repro1: 0 addressee2: 320 Richard Ray Blvd draft2:

reg2:

repro2:

addressee3: Robins AFB GA 31098 draft3:

reg3:

repro3:

addressee4: robin.davis@us.af.mil draft4:

reg4:

repro4:

addressee5: keith.matthews@us.af.m draft5:

reg5:

repro5:

addressee6:

draft6:

reg6:

repro6:

addressee7: AFLCMC/WAQK draft7: 0 reg7: 1 repro7: 0 addressee8: Suite 19A draft8:

reg8:

repro8:

addressee9: 235 Byron St draft9:

reg9:

repro9:

addressee10: Robins AFB GA 31098 draft10:

reg10:

repro10:

addressee11: shiela.hodges@us.af.mil draft11:

reg11:

repro11:

addressee12:

draft12:

reg12:

repro12:

addressee13:

draft13:

reg13:

repro13:

addressee14:

draft14:

reg14:

repro14:

addressee15:

draft15:

reg15:

repro15:

addressee16:

draft16:

reg16:

repro16:

addressee17:

draft17:

reg17:

repro17:

addressee18:

draft18:

reg18:

repro18:

addressee19:

draft19:

reg19:

repro19:

addressee20:

draft20:

reg20:

repro20:

addressee21:

draft21:

reg21:

repro21:

addressee22:

draft22:

reg22:

repro22:

addressee23:

draft23:

reg23:

repro23:

addressee24:

draft24:

reg24:

repro24:

addressee25:

draft25:

reg25:

repro25:

addressee26:

draft26:

reg26:

repro26:

addressee27:

draft27:

reg27:

repro27:

addressee28:

draft28:

reg28:

repro28:

addressee29:

draft29:

reg29:

repro29:

addressee30:

draft30:

reg30:

repro30:

addressee31:

draft31:

reg31:

repro31:

addressee32:

draft32:

reg32:

repro32:

addressee33:

draft33:

reg33:

repro33:

addressee34:

draft34:

reg34:

repro34:

addressee35:

draft35:

reg35:

repro35:

addressee36:

draft36:

reg36:

repro36:

addressee37:

draft37:

reg37:

repro37:

addressee38:

draft38:

reg38x:

repro38:

total_draft: 0 total_reg: 2 total_repro: 0 remarks:

DID Tailoring: The DID is changed from Distribution statement “A” to “D”.

Block 9: Distribution authorized to Department of Defense and DoD Contractors only. (Administrative or Operational Use) (06 June 2023). Other requests for this document shall be referred to AFLCMC/WAQI, 235 Byron St. Suite 19A, Robins AFB, GA 31098.

Blocks 11, 12, and 13: The Contractor shall host PMR meetings, as required, in support of the program to review project status, evaluate progress, discuss issues/problem areas, and all open service and repair actions via video teleconference or at a location designated by the PCO or USG PM quarterly.

Block 14: CDRL distribution and notification shall be available via the vendor's subscribed/unsubscribed method. If for any reason the vendor's site is not available, email reports to addresses in Block 14.

group:

total_price:

prep_name:

line_item: 2009 exhibit: C xtdp: Off xtm: Off othercat: ADMN system: F-15 AGE/SPV Repair Support ctr_no: FD2060-25-31659 contr: TBD remarksb:

Page2:

Reset:

2025-03-07T13:46:07-0500

DAVIS.ROBIN.H.1241437813

prep_date: 8 Mar 2025 app_by:

2025-03-08T13:34:19-0500

MONTIJO.JOHN.A.1170464784

app_date: 8 Mar 2025

Page:

of_pages:

app: Adobe Professional 8.0

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the conformance with Government requirements, and the required to perform additional work to conform to Government without conforming to Government requirements, and the contracted effort and does not require any substantial change to conform to Government requirements with regard to depth of otherwise be incurred in performance of the contract if no data were required. The estimated data prices shall not include any data_item: C007 title: Briefing Material sub:

auth: DI-MGMT-81605T ref: PWS para 4.2, 4.4.3 req_ofc: AFLCMC/WAQI dd250: LT appcode: N/A dist: SEE BLK 16 freq: ASREQ asof: SEE BLK 16 firstsub: SEE BLK 16 subsub: SEE BLK 16 addressee1: AFLCMC/WAQI draft1: 0 reg1: 1 repro1: 0 addressee2: 320 Richard Ray Blvd draft2:

reg2:

repro2:

addressee3: Robins AFB GA 31098 draft3:

reg3:

repro3:

addressee4: robin.davis@us.af.mil draft4:

reg4:

repro4:

addressee5: keith.matthews@us.af.m draft5:

reg5:

repro5:

addressee6:

draft6:

reg6:

repro6:

addressee7: AFLCMC/WAQK draft7: 0 reg7: 1 repro7: 0 addressee8: Suite 19A draft8:

reg8:

repro8:

addressee9: 235 Byron St draft9:

reg9:

repro9:

addressee10: Robins AFB GA 31098 draft10:

reg10:

repro10:

addressee11: shiela.hodges@us.af.mil draft11:

reg11:

repro11:

addressee12:

draft12:

reg12:

repro12:

addressee13:

draft13:

reg13:

repro13:

addressee14:

draft14:

reg14:

repro14:

addressee15:

draft15:

reg15:

repro15:

addressee16:

draft16:

reg16:

repro16:

addressee17:

draft17:

reg17:

repro17:

addressee18:

draft18:

reg18:

repro18:

addressee19:

draft19:

reg19:

repro19:

addressee20:

draft20:

reg20:

repro20:

addressee21:

draft21:

reg21:

repro21:

addressee22:

draft22:

reg22:

repro22:

addressee23:

draft23:

reg23:

repro23:

addressee24:

draft24:

reg24:

repro24:

addressee25:

draft25:

reg25:

repro25:

addressee26:

draft26:

reg26:

repro26:

addressee27:

draft27:

reg27:

repro27:

addressee28:

draft28:

reg28:

repro28:

addressee29:

draft29:

reg29:

repro29:

addressee30:

draft30:

reg30:

repro30:

addressee31:

draft31:

reg31:

repro31:

addressee32:

draft32:

reg32:

repro32:

addressee33:

draft33:

reg33:

repro33:

addressee34:

draft34:

reg34:

repro34:

addressee35:

draft35:

reg35:

repro35:

addressee36:

draft36:

reg36:

repro36:

addressee37:

draft37:

reg37:

repro37:

addressee38:

draft38:

reg38x:

repro38:

total_draft: 0 total_reg: 2 total_repro: 0 remarks:

DID Tailoring: The DID is changed from Distribution statement “A” to “D”.

DID Tailoring: Paragraph 3 of the DID is tailored to: All briefing material shall be submitted in Microsoft Power Point format version 97-2003 or later.

Block 9: Distribution authorized to Department of Defense and DoD Contractors only. (Administrative or Operational Use) (06 June 2023). Other requests for this document shall be referred to AFLCMC/WAQI, 235 Byron St. Suite 19A, Robins AFB, GA 31098.

Blocks 11, 12, and 13: Briefing materials shall be submitted , in conjunction with A002, no later than 5 business days prior to the meeting, and a final copy shall be provided to the USG no later than 10 business days after the meeting has concluded.

Block 14: CDRL distribution and notification shall be available via the vendor's subscribed/unsubscribed method. If for any reason the vendor's site is not available, email reports to addresses in Block 14.

group:

total_price:

prep_name:

line_item: 2009 exhibit: C xtdp: Off xtm: Off othercat: MGMT system: F-15 AGE/SPV Repair Support ctr_no: FD2060-25-31659 contr: TBD remarksb:

Page2:

Reset:

2025-03-07T13:46:34-0500

DAVIS.ROBIN.H.1241437813

prep_date: 8 Mar 2025 app_by:

2025-03-08T13:35:27-0500

MONTIJO.JOHN.A.1170464784

app_date: 8 Mar 2025

Page:

of_pages:

app: Adobe Professional 8.0

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the conformance with Government requirements, and the required to perform additional work to conform to Government without conforming to Government requirements, and the contracted effort and does not require any substantial change to conform to Government requirements with regard to depth of otherwise be incurred in performance of the contract if no data were required. The estimated data prices shall not include any data_item: C008 title: Meeting Minutes sub:

auth: DI-ADMN-81250C/T ref: PWS para 4.2, 4.4.3 req_ofc: AFLCMC/WAQI dd250: LT appcode: N/A dist: SEE BLK 16 freq: QTRLY asof: SEE BLK 16 firstsub: SEE BLK 16 subsub: SEE BLK 16 addressee1: AFLCMC/WAQI draft1: 0 reg1: 1 repro1: 0 addressee2: 320 Richard Ray Blvd draft2:

reg2:

repro2:

addressee3: Robins AFB GA 31098 draft3:

reg3:

repro3:

addressee4: robin.davis@us.af.mil draft4:

reg4:

repro4:

addressee5: keith.matthews@us.af.m draft5:

reg5:

repro5:

addressee6:

draft6:

reg6:

repro6:

addressee7: AFLCMC/WAQK draft7: 0 reg7: 1 repro7: 0 addressee8: Suite 19A draft8:

reg8:

repro8:

addressee9: 235 Byron St draft9:

reg9:

repro9:

addressee10: Robins AFB GA 31098 draft10:

reg10:

repro10:

addressee11: shiela.hodges@us.af.mil draft11:

reg11:

repro11:

addressee12:

draft12:

reg12:

repro12:

addressee13:

draft13:

reg13:

repro13:

addressee14:

draft14:

reg14:

repro14:

addressee15:

draft15:

reg15:

repro15:

addressee16:

draft16:

reg16:

repro16:

addressee17:

draft17:

reg17:

repro17:

addressee18:

draft18:

reg18:

repro18:

addressee19:

draft19:

reg19:

repro19:

addressee20:

draft20:

reg20:

repro20:

addressee21:

draft21:

reg21:

repro21:

addressee22:

draft22:

reg22:

repro22:

addressee23:

draft23:

reg23:

repro23:

addressee24:

draft24:

reg24:

repro24:

addressee25:

draft25:

reg25:

repro25:

addressee26:

draft26:

reg26:

repro26:

addressee27:

draft27:

reg27:

repro27:

addressee28:

draft28:

reg28:

repro28:

addressee29:

draft29:

reg29:

repro29:

addressee30:

draft30:

reg30:

repro30:

addressee31:

draft31:

reg31:

repro31:

addressee32:

draft32:

reg32:

repro32:

addressee33:

draft33:

reg33:

repro33:

addressee34:

draft34:

reg34:

repro34:

addressee35:

draft35:

reg35:

repro35:

addressee36:

draft36:

reg36:

repro36:

addressee37:

draft37:

reg37:

repro37:

addressee38:

draft38:

reg38x:

repro38:

total_draft: 0 total_reg: 2 total_repro: 0 remarks:

DID Tailoring: The DID is changed from Distribution statement “A” to “D”.

Block 9: Distribution authorized to Department of Defense and DoD Contractors only. (Administrative or Operational Use) (06 June 2023). Other requests for this document shall be referred to AFLCMC/WAQI, 235 Byron St. Suite 19A, Robins AFB, GA 31098.

Blocks 11, 12, and 13: The Contractor shall host PMR meetings, as required, in support of the program to review project status, evaluate progress, discuss issues/problem areas, and all open service and repair actions via video teleconference or at a location designated by the PCO or USG PM quarterly.

Block 14: CDRL distribution and notification shall be available via the vendor's subscribed/unsubscribed method. If for any reason the vendor's site is not available, email reports to addresses in Block 14.

group:

total_price:

prep_name:

line_item: 2009 exhibit: C xtdp: Off xtm: Off othercat: ADMN system: F-15 AGE/SPV Repair Support ctr_no: FD2060-25-31659 contr: TBD remarksb:

Page2:

Reset:

2025-03-07T13:46:59-0500

DAVIS.ROBIN.H.1241437813

prep_date: 8 Mar 2025 app_by:

2025-03-08T13:36:32-0500

MONTIJO.JOHN.A.1170464784

app_date: 8 Mar 2025

Page:

of_pages:

app: Adobe Professional 8.0

DD FORM 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED. Page of Pages Adobe Professional 8.0

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the

A. CONTRACT LINE ITEM NO.

B. EXHIBIT

C

C. CATEGORY:

TDP TM OTHER MGMT

D. SYSTEM/ITEM

F-15 AGE/SPV Repair Support

E. CONTRACT/PR NO.

FD2060-25-31659

F. CONTRACTOR

TBD

1. DATA ITEM NO.

C009

2. TITLE OF DATA ITEM

Contract Funds Report (CFSR)

3. SUBTITLE

4. AUTHORITY (Data Acquisition Document No.)

DI-MGMT-81468A/T

5. CONTRACT REFERENCE

PWS para 4.2, 4.9

6. REQUIRING OFFICE

AFLCMC/WAQI

LT

SEE BLK 16

MTHLY

N/A

DID tailoring: The DID is changed from Distribution Statement "A" to "D".

Block 4: DID Tailoring: Para. 3.3.1: Replace “fiscal year” with “calendar year”.

Block 9: The following information should be included on the deliverable: Distribution authorized to Department of Defense and DoD Contractors only. (Administrative or Operational Use)(06 June 2023). Other requests for this document shall be referred to AFLCMC/WAQI, 235 Byron St. STE 19, Robins AFB, GA 31098.

Blocks 11, 12 and 13: The CFSR report shall be delivered to the Government by the 15th day of the following month for which expenses were incurred.

Block 14: The Contractor shall provide all CDRLs electronically to the USG Program Manager and Procurement Contracting Officer. All email addresses will be provided within ten (10) days of contract award.

AFLCMC/WAQI 0 1 0

320 Richard Ray Blvd

Robins AFB GA 31098 robin.davis@us.af.mil keith.matthews@us.af.m

AFLCMC/WAQK 0 1 0

Suite 19A

235 Byron St shiela.hodges@us.af.mil

15. TOTAL 0 2 0

G. PREPARED BY

DAVIS.ROBIN.H.1241437813 Digitally signed by DAVIS.ROBIN.H.1241437813

Date: 2025.03.07 13:47:52 -05'00'

H. DATE

8 Mar 2025

I. APPROVED BY

MONTIJO.JOHN.A.11704647 Digitally signed by MONTIJO.JOHN.A.1170464784 84 Date: 2025.03.08 13:37:14 -05'00'

J. DATE

mailto:robin.davis@us.af.mil mailto:keith.matthews@us.af.m mailto:shiela.hodges@us.af.mil

Reset

C. CATEGORY: MGMT

TDP TM OTHER

conformance with Government requirements, and the required to perform additional work to conform to Government without conforming to Government requirements, and the contracted effort and does not require any substantial change to conform to Government requirements with regard to depth of production or development for the Government of that item of data.

These estimated data prices shall be developed only from those costs which will be incurred as a direct result of the requirement to supply the data, over and above those costs which would otherwise be incurred in performance of the contract if no data were required. The estimated data prices shall not include any

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the

F-15 AGESPV Repair Support

C00A

Data Accession List (DAL)

DI-MGMT-81453B/T

PWS para 4.2, 4.10

D

DID tailoring: The DID is changed from Distribution Statement "A" to "D".

Operational Use)(06 June 2023). Other requests for this document shall be referred to

Blocks 10, 11, 12, and 13: The Contractor shall deliver a Data Accession List (DAL) 60 days after contract award. If there are changes to the data listed on the DAL, the Contractor shall send an updated DAL by the 15th calendar day of the month.

Block 14: The Contractor shall provide all CDRLs electronically to the USG Program Manager and Procurement Contracting Officer. All email addresses will be provided within ten (10) days of contract award.

Date: 2025.03.07 13:48:24 -05'00'

MONTIJO.JOHN.A.1170464784 84 Date: 2025.03.08 13:37:59 -05'00'

F-15 AGESPV Repair Support

Item C. Mark (X) appropriate category: TDP - Technical Data Package; TM

- Technical Manual; Other - other category of data, such as

Item 2. Enter title as it appears on data acquisition document cited in Item 4.

Item 6. Enter technical office responsible for ensuring adequacy of the data item.

Item 13. Specify when subsequent submittals are required, when applicable.

submittal dates in Items 12 and 13; Explanation of reproducible copies in Item 14.; Desired medium for delivery of the data item.

groups of effort in developing estimated prices for each data item listed on the DD Form 1423.

a. Group I. Definition - Data which is not otherwise essential to the contractor's performance of the primary contracted effort conformance with Government requirements, and the required to perform additional work to conform to Government without conforming to Government requirements, and the contracted effort and does not require any substantial change to conform to Government requirements with regard to depth of content, format, frequency of submittal, preparation, control, and quality of the

Estimated Price - Group IV items should normally be shown on the DD Form 1423 at no cost.

production or development for the Government of that item of data.

These estimated data prices shall be developed only from those costs which will be incurred as a direct result of the requirement to supply the data, over and above those costs which would otherwise be incurred in performance of the contract if no data were required. The estimated data prices shall not include any amount for rights in data. The Government's right to use the data shall be governed by the pertinent provisions of the contract.

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the

TDP TM OTHER QCIC

C00B

Quality Program Plan (QPP)

DI-QCIC-81722/T

PWS para 4.2, 4.22

D

ASREQ

Operational Use) (06 June 2023). Other requests for this document shall be referred to

Blocks 10, 11, 12, and 13: The Quality Program Plan (QPP) is due within 60 days after contract award. The USG shall have 30 calendar days to review and comment on initial draft. The Contractor has 30 calendar days to submit final Quality Plan The USG shall have an additional 30 calendar days for review and approval of the resubmitted plan.

Subsequent submissions required only if there are changes to the Quality Plan.

Block 14: CDRL distribution and notification shall be available via the vendor's subscribed/unsubscribed method. If for any reason the vendor's site is not available, email reports to addresses in Block 14.

Date: 2025.03.07 13:48:59 -05'00'

MONTIJO.JOHN.A.1170464784 84 Date: 2025.03.08 13:38:37 -05'00'

C. CATEGORY: QCIC

conformance with Government requirements, and the required to perform additional work to conform to Government without conforming to Government requirements, and the contracted effort and does not require any substantial change to conform to Government requirements with regard to depth of production or development for the Government of that item of data.

These estimated data prices shall be developed only from those costs which will be incurred as a direct result of the requirement to supply the data, over and above those costs which would otherwise be incurred in performance of the contract if no data were required. The estimated data prices shall not include any

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the

C00C

Diminishing Manufacturing Sources and Material Shortages (DMSMS) Implementation Plan

DI-MGMT-81899/T

PWS para 4.2, 4.23

DID Tailoring: The DID is changed from Distribution statement “A” to “D”.

Block 9: Distribution authorized to Department of Defense and DoD Contractors only.

(Administrative or Operational Use) (06 June 2023). Other requests for this document shall be referred to AFLCMC/WAQI, 235 Byron St. STE 19, Robins AFB, GA 31098.

Blocks 10, 11, 12, and 13: The Contractor shall develop and deliver an Obsolescence Management Plan 60 business days after contract award. The USG shall have 30 calendar days to review and comment on initial draft. The Contractor has 30 calendar days to submit final Obsolescence Management Plan. The USG shall have an additional 30 calendar days for review and approval of the resubmitted plan. Subsequent submissions required only if there are changes to the DMSMS.

Block 14: CDRL distribution and notification shall be available via the vendor's subscribed/unsubscribed method. If for any reason the vendor's site is not available, email reports to addresses in Block 14.

DAVIS.ROBIN.H.1241437813 Digitally signed by

DAVIS.ROBIN.H.1241437813

Date: 2025.03.07 13:47:52 -05'00'

H. DATE I. APPROVED BY

MONTIJO.JOHN.A.1170464784 84 Date: 2025.03.08 13:39:34 -05'00'

08 Mar 2025

Item C. Mark (X) appropriate c

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .