CO FLAP LAR 10(1) Horsetooth and Carter Lake Reservoirs.JOFOC. Final_FLAT_Redacted.pdf

PDF 254 KB Posted

Attached to
CO FLAP LAR 10(1) Horsetooth Res and Carter Lake
Solicitation number
6982AF24B000022
Issued by

About this file

This document is a Justification for Other Than Full and Open Competition (JOFOC) for a federal contract opportunity. The contract opportunity is for the rehabilitation and reconstruction of various parking lots and access routes at the Horsetooth and Carter Lake Reservoirs in Colorado, which are managed by Larimer County and owned by the U.S. Bureau of Reclamation.

The justification cites the statutory authority to limit competition to a single source, as the name brand products specified are required for compatibility with the existing stormwater treatment systems at the reservoirs. No market research was conducted, as the proposed products match the existing and future improvements at the sites. The contracting officer will perform a cost analysis to ensure the anticipated costs are fair and reasonable. There are no other vendors that have expressed interest in this acquisition, and no actions can be taken to remove the barriers to competition, as this is a one-time purchase to match the existing systems.

View the file

Other files

Show all 19

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

4. Statutory authority permitting other than full and open competition

The authority to enter into a contract for this effort without full and open competition is 6.302-1, Only one responsible source and no other supplies or services will satisfy agency requirements.

5. Demonstration that the proposed contractor’s unique qualifications or the nature of the acquisition requires use of the authority cited

The name brand products are being prescribed for compatibility with existing CDS Hydrodynamic Separator Stormwater Treatment Units and systems at the reservoirs.

Using these products standardizes, optimizes, and approves efficiency of the operations and maintainace of system by the maintaining agencies. Other products would not meet the system compatibility, operating processes, and maintainace requirements for the systems at the Horsetooth and Carter Lake Reservoirs.

6. Description of efforts made to ensure that offers are solicited from as many potential sources as is practicable, including whether a notice was or will be publicized

The Justification for Other than Full and Open Competition will be posted with the solicitation as required by FAR 5.102(a)(6).

7. Determination by the Contracting Officer that the anticipated cost to the

Government will be fair and reasonable

The FHWA will ensure that all costs associated with the proposed contract are fair and reasonable. The FHWA will perform a thorough analysis of the Offeror’s proposal by comparison to an Independent Government Estimate (IGE) to substantiate this determination.

8. Description of the market research conducted and the results or a statement of the reason market research was not conducted

No market research was conducted. The decision to select these products are based on feedback from the maintaining partners and their standard specifications. The proposed product matches the existing and future improvements at the reservoirs.

9. Other facts supporting the use of other than full and open competition

N/A

10. Listing of the sources, if any, that expressed, in writing, an interest in the acquisition.

There are no vendors that have expressed interest in this acquisition.

11. Statement of the actions, if any, the agency may take to remove or overcome any barriers to competition before any subsequent acquisition for the supplies or services required.

The purchase of the above listed products is a single purchase as part of the project to match existing systems at the reservoirs. There are no actions available to remove or overcome the barriers.

12. Certification

I certify that the information provided in this justification is complete and accurate to the best of my knowledge and belief.

Neil Ogden Date

Project Manager/COR

Leslie Karsten Date Contracting Officer

Jack Gilbert Date Division Counsel

NEIL THOMAS OGDEN

Digitally signed by NEIL THOMAS

OGDEN

Date: 2024.08.15 11:34:33 -06'00'

Digitally signed by LESLIE N KARSTEN Date: 2024.08.15 12:27:36 -06'00'

JACK F GILBERT Digitally signed by JACK F GILBERT Date: 2024.08.15 12:52:40 -06'00'

File details come from the government source that posted it. Updated .