This is Amendment A003 to solicitation 6982AF24B000022 for the Horsetooth Reservoir and Carter Lake project, modifying bid schedules and technical specifications. The amendment makes revisions to multiple sections including removing pay items for removal of pavement and sawcutting pavement, adding a new pay item for placed riprap mixed with topsoil, updating structural requirements for the extended detention basin components, and modifying specifications for CDS hydrodynamic separator stormwater treatment units.
The amendment includes detailed bid schedules for Base Schedule A and Optional Schedules X and Y, with comprehensive quantities and line items for various construction elements like mobilization, surveying, earthwork, drainage structures, paving, signage, and traffic control. Technical changes include updates to Section 604 regarding manholes and drainage structures, Section 725 for miscellaneous materials, and modifications to drainage facility details shown in the plan sheets. The amendment requires contractor acknowledgment and signature, with failure to acknowledge potentially resulting in bid rejection. The deadline remains 11.29.2024 and the project is being administered by the Federal Highway Administration's Central Federal Lands Highway Division.
View the file
Other files
Show all 19
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing items 8 and 15, and returning or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE
3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER
7. ADMINISTERED BY (If other than Item 6) CODE
STANDARD FORM 30 (REV. 11/2016)
Prescribed by GSA FAR (48 CFR) 53.243
FACILITY CODE
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED (SEE ITEM 13)
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.
12. ACCOUNTING AND APPROPRIATION DATA (If required) copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER
NUMBER IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
15C. DATE SIGNED
15A. NAME AND TITLE OF SIGNER (Type or print)
16C. DATE SIGNED
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
PAGE OF PAGES
6. ISSUED BY CODE
8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X)
CODE
15B. CONTRACTOR/OFFEROR
(Signature of person authorized to sign)
16B. UNITED STATES OF AMERICA
(Signature of Contracting Officer)
Previous edition unusable
2. AMENDMENT/MODIFICATION NUMBER
A003
FEDERAL HIGHWAY ADMINISTRATION
CENTRAL FEDERAL LANDS HIGHWAY DIVISION
12300 WEST DAKOTA AVENUE, SUITE 360
LAKEWOOD, COLORADO 80228
ATTENTION: LESLIE KARSTEN
9A. AMENDMENT OF SOLICITATION NUMBER
6982AF24B000022
5. PROJECT NUMBER (If applicable)
CO FLAP LAR 10(1)
11.29.2024
9B. DATED (SEE ITEM 11)
10.29.2024
0*
*See Item 14
HFLCEO240417PR
X
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
IFB
Remove and replace pages A-7 thru A-24, E-59, and E-60 with the attached corresponding pages. Add page E-83.
Plans Remove and replace pages A12, B1 thru B7, B14, T18, and T19 with the attached corresponding pages.
*FAILURE TO ACKNOWLEDGE THIS AMENDMENT IN BLOCK 19 OF THE SF 1442 BY THE DESIGNATED DATE AND HOUR SPECIFIED IN THE SOLICITATION MAY RESULT IN REJECTION OF YOUR BID (REFER TO ITEM 11.) Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
A - 7
Bidder/Offeror please note: Before preparing the bid, carefully read the Solicitation Provisions. Insert a unit bid price, in figures, for each pay item for which a quantity appears in the bid schedule. Multiply the unit price by the quantity for each pay item and show the amount bid. Should any mathematical check made by the Government show a mistake in the amount bid, the corrected unit price extension shall govern. When the word "LPSM" (Lump Sum) appears as a unit bid price, insert an amount for each lump sum pay item. When a sum based on a fixed rate appears for any pay item in the amount bid column, include the Government inserted amount bid for the item in the total bid amount. Total all of the amounts bid for each pay item and show the total bid amount.
Bid Schedule
Project No:CO FLAP LAR 10(1)
Project Name:Horsetooth Res and Carter Lake
Amendment A003 11.29.2024
A - 8
Amendment Item No. Pay Item No. Description Quantity Unit Unit Price Amount
A1000 15101-0000 MOBILIZATION
ALL LPSM $___LPSM_____ $____________
A1001 15206-0000 SLOPE, REFERENCE, AND CLEARING AND GRUBBING STAKE
1.520 MILE $____________ $____________
A1002 15215-3000 SURVEY AND STAKING, DRAINAGE STRUCTURE
22 EACH $____________ $____________
A1003 15215-7000 SURVEY AND STAKING, PARKING AREA
5 EACH $____________ $____________
A1004 15216-2000 SURVEY AND STAKING, GRADE FINISHING STAKES
3.040 MILE $____________ $____________
A1005 15301-0000 CONTRACTOR QUALITY CONTROL
ALL LPSM $___LPSM_____ $____________
A1006 15401-0000 CONTRACTOR TESTING
ALL LPSM $___LPSM_____ $____________
A1007 15501-0000 CONSTRUCTION SCHEDULE
ALL LPSM $___LPSM_____ $____________
A1008 15701-0000 SOIL EROSION CONTROL
ALL LPSM $___LPSM_____ $____________
A1009 15706-0200 SOIL EROSION CONTROL, CHECK DAM (Permanent)
65 EACH $____________ $____________
A1010 15720-0000 STORM WATER POLLUTION PREVENTION PLAN
ALL LPSM $___LPSM_____ $____________
A1011 15802-0000 WATERING FOR DUST CONTROL
ALL LPSM $___LPSM_____ $____________
A1012 20101-0000 CLEARING AND GRUBBING
17.7 ACRE $____________ $____________
A1013 20301-0100 REMOVAL OF BOLLARD
5 EACH $____________ $____________
Bid Schedule Schedule:A Schedule Type:Base
Project No:CO FLAP LAR 10(1)
Project Name:Horsetooth Res and Carter Lake
(Contractor-Furnished Lab)
A - 9
A1014 20301-0700 REMOVAL OF DELINEATOR
7 EACH $____________ $____________
A1015 20301-1600 REMOVAL OF MAILBOX
8 EACH $____________ $____________
A1016 20301-2400 REMOVAL OF SIGN
41 EACH $____________ $____________
A1017 20301-3400 REMOVAL OF WHEELSTOP
115 EACH $____________ $____________
A1018 20302-0500 REMOVAL OF CURB, CONCRETE
10 LNFT $____________ $____________
A1019 20302-0625 REMOVAL OF CURB, LOG
80 LNFT $____________ $____________
A1020 20302-2100 REMOVAL OF PIPE CULVERT
60 LNFT $____________ $____________
A1021 20302-2600 REMOVAL OF PAVEMENT MARKINGS
5,694 LNFT $____________ $____________
A1022 20303-0300 REMOVAL OF CONCRETE
183 SQYD $____________ $____________
A002 A1023 20303-1600 REMOVAL OF PAVEMENT, ASPHALT
1,045 SQYD $____________ $____________
A1024 20401-0000 ROADWAY EXCAVATION
22,000 CUYD $____________ $____________
A1025 20441-0000 WASTE
11,130 CUYD $____________ $____________
A1026 20820-0000 DEWATERING
ALL LPSM $___LPSM_____ $____________
A1027 21101-1000 ROADWAY OBLITERATION, METHOD 1
700 SQYD $____________ $____________
Bid Schedule Schedule:A Schedule Type:Base
Project No:CO FLAP LAR 10(1)
A - 10
A003 A1028 25101-0700 PLACED RIPRAP, METHOD A, CLASS 7 (mixed with topsoil)
110 CUYD $____________ $____________
A1029 25101-2200 PLACED RIPRAP, METHOD B, CLASS 2
55 CUYD $____________ $____________
A1030 25101-2300 PLACED RIPRAP, METHOD B, CLASS 3
30 CUYD $____________ $____________
A1031 25101-2400 PLACED RIPRAP, METHOD B, CLASS 4
33 CUYD $____________ $____________
A1032 25126-0000 REMOVE AND RESET BOULDER
159 EACH $____________ $____________
A1034 30101-0000 AGGREGATE BASE
14,000 TON $____________ $____________
A1035 30203-2120 ROADWAY AGGREGATE, METHOD 2, SURFACE COURSE, 4-INCH DEPTH
1,110 SQYD $____________ $____________
A002 A1036 40301-0100 ASPHALT CONCRETE PAVEMENT, TYPE 1
9,300 TON $____________ $____________
A1037 41201-0000 TACK COAT
20 TON $____________ $____________
A1038 41301-0600 ASPHALT PAVEMENT MILLING, 2-INCH DEPTH
1,460 SQYD $____________ $____________
A1039 50101-0600 MINOR CONCRETE PAVEMENT, REINFORCED, 6-INCH DEPTH
690 SQYD $____________ $____________
A1040 60201-0600 18-INCH PIPE CULVERT
620 LNFT $____________ $____________
A1041 60201-0800 24-INCH PIPE CULVERT
230 LNFT $____________ $____________
A1042 60201-0900 30-INCH PIPE CULVERT
22 LNFT $____________ $____________
Bid Schedule Schedule:A Schedule Type:Base
Project No:CO FLAP LAR 10(1)
A - 11
A1043 60201-1000 36-INCH PIPE CULVERT
25 LNFT $____________ $____________
A002 A1044 60201-1100 42-INCH PIPE CULVERT
34 LNFT $____________ $____________
A1045 60210-0600 END SECTION FOR 18-INCH PIPE CULVERT
9 EACH $____________ $____________
A1046 60210-0800 END SECTION FOR 24-INCH PIPE CULVERT
7 EACH $____________ $____________
A1047 60210-0900 END SECTION FOR 30-INCH PIPE CULVERT
2 EACH $____________ $____________
A1048 60210-1000 END SECTION FOR 36-INCH PIPE CULVERT
2 EACH $____________ $____________
A1049 60210-1100 END SECTION FOR 42-INCH PIPE CULVERT
1 EACH $____________ $____________
A1050 60212-0800 ELBOW, 24-INCH
2 EACH $____________ $____________
A1051 60401-0000 MANHOLE (CDS Model 3030-6)
1 EACH $____________ $____________
A1052 60401-0000 MANHOLE (CDS Model 3025-6)
2 EACH $____________ $____________
A1053 60401-0000 MANHOLE (CDS Model 3020-6)
1 EACH $____________ $____________
A1054 60401-0000 MANHOLE (with dome grate)
1 EACH $____________ $____________
A1055 60401-0000 MANHOLE (CDS MODEL 4030-8)
1 EACH $____________ $____________
A1056 60403-0000 INLET (CMP riser pipe)
5 EACH $____________ $____________
Bid Schedule Schedule:A Schedule Type:Base
Project No:CO FLAP LAR 10(1)
A - 12
A1057 60403-0000 INLET (Basin forebay)
1 EACH $____________ $____________
A1058 60415-0000 TRENCH DRAIN
3 EACH $____________ $____________
A1059 60420-0000 OUTLET STRUCTURE
1 EACH $____________ $____________
A1060 60704-0000 CLEANING CULVERT IN PLACE
6 EACH $____________ $____________
A1061 60801-0400 PAVED WATERWAY, TYPE 4
41 SQYD $____________ $____________
A1062 60901-1700 CURB, CONCRETE, 18-INCH DEPTH
200 LNFT $____________ $____________
A1063 60902-1000 CURB AND GUTTER, CONCRETE, 12-INCH DEPTH
2,360 LNFT $____________ $____________
A1064 60905-1000 GUTTER, CONCRETE (4' valley gutter)
240 LNFT $____________ $____________
A1065 60915-1000 WHEELSTOP, CONCRETE
170 EACH $____________ $____________
A1066 60920-0000 RESET WHEELSTOP
63 EACH $____________ $____________
A1067 61104-0400 VALVE, GATE (Flap)
5 EACH $____________ $____________
A1068 61114-8000 WATER SYSTEM ACCESSORY, REDUCER
1 EACH $____________ $____________
A1069 61501-0100 SIDEWALK, CONCRETE
550 SQYD $____________ $____________
A1070 61509-0000 DETECTABLE WARNING PANELS
22 SQYD $____________ $____________
Bid Schedule Schedule:A Schedule Type:Base
Project No:CO FLAP LAR 10(1)
A - 13
A1071 61904-0000 BOLLARD POST
1 EACH $____________ $____________
A1072 62302-1000 SPECIAL LABOR, HIRED TECHNICAL SERVICES
93 HOUR $____________ $____________
A1073 62302-1100 SPECIAL LABOR, HIRED SURVEY SERVICES
20 HOUR $____________ $____________
A1074 62401-0300 FURNISHING AND PLACING TOPSOIL, 4-INCH DEPTH
900 SQYD $____________ $____________
A1075 62405-0300 PLACING CONSERVED TOPSOIL, 4-INCH DEPTH
16,120 SQYD $____________ $____________
A1076 62511-2000 SEEDING, HYDRAULIC METHOD
17,020 SQYD $____________ $____________
A1077 63301-0000 SIGN SYSTEM
52 EACH $____________ $____________
A1078 63309-0000 DELINEATOR
5 EACH $____________ $____________
A1079 63316-1000 REMOVE AND RESET SIGN
41 EACH $____________ $____________
A1080 63401-0400 PAVEMENT MARKINGS, TYPE B, BROKEN
300 LNFT $____________ $____________
A1081 63402-0300 PAVEMENT MARKINGS, TYPE B, SOLID
13.3 MILE $____________ $____________
A1082 63405-0050 PAVEMENT MARKINGS, SYMBOLS (AND WORDS)
2 EACH $____________ $____________
A1083 63405-0500 PAVEMENT MARKINGS, TYPE B, TURN ARROW
2 EACH $____________ $____________
A1084 63405-0550 PAVEMENT MARKINGS, TYPE B, STRAIGHT ARROW
28 EACH $____________ $____________
Bid Schedule Schedule:A Schedule Type:Base
Project No:CO FLAP LAR 10(1)
A - 14
A1085 63405-0850 PAVEMENT MARKINGS, TYPE B, ACCESSIBILITY SYMBOL
15 EACH $____________ $____________
A1086 63501-0000 TEMPORARY TRAFFIC CONTROL
ALL LPSM $___LPSM_____ $____________
A1087 63502-2000 TEMPORARY TRAFFIC CONTROL, PORTABLE CHANGEABLE MESSAGE SIGN
2 EACH $____________ $____________
A1088 63601-3000 SYSTEM INSTALLATION, ELECTRICAL (two rectangular-rapid flashing beacons)
ALL LPSM $___LPSM_____ $____________
A1089 64603-0200 FIXTURE, MAILBOX
8 EACH $____________ $____________
A1090 64603-1000 FIXTURE, VAULT TOILET (Site preparation)
2 EACH $____________ $____________
A003 A1100 25101-0400 PLACED RIPRAP, METHOD A, CLASS 4 (mixed with topsoil)
80 CUYD $____________ $____________
Submitted by:____________________________________ Schedule Total:____________
Bid Schedule Schedule:A Schedule Type:Base
Project No:CO FLAP LAR 10(1)
Project Name:Horsetooth Res and Carter Lake
A1006 15401-0000 CONTRACTOR TESTING
ALL $___LPSM_____ $____________
(Government-Furnished Lab)
BID ALTERNATE ITEM SEE PAGE A-4
A - 15
X3000 15101-0000 MOBILIZATION
ALL LPSM $___LPSM_____ $____________
X3001 15206-0000 SLOPE, REFERENCE, AND CLEARING AND GRUBBING STAKE
0.440 MILE $____________ $____________
X3002 15215-3000 SURVEY AND STAKING, DRAINAGE STRUCTURE
3 EACH $____________ $____________
X3003 15215-7000 SURVEY AND STAKING, PARKING AREA
2 EACH $____________ $____________
X3004 15216-2000 SURVEY AND STAKING, GRADE FINISHING STAKES
0.880 MILE $____________ $____________
X3005 15301-0000 CONTRACTOR QUALITY CONTROL
ALL LPSM $___LPSM_____ $____________
X3006 15401-0000 CONTRACTOR TESTING
ALL LPSM $___LPSM_____ $____________
X3007 15501-0000 CONSTRUCTION SCHEDULE
ALL LPSM $___LPSM_____ $____________
X3008 15701-0000 SOIL EROSION CONTROL
ALL LPSM $___LPSM_____ $____________
X3009 15720-0000 STORM WATER POLLUTION PREVENTION PLAN
ALL LPSM $___LPSM_____ $____________
X3010 15802-0000 WATERING FOR DUST CONTROL
ALL LPSM $___LPSM_____ $____________
X3011 20101-0000 CLEARING AND GRUBBING
3.6 ACRE $____________ $____________
X3012 20301-2400 REMOVAL OF SIGN
9 EACH $____________ $____________
X3013 20301-3400 REMOVAL OF WHEELSTOP
65 EACH $____________ $____________
Bid Schedule Schedule:X Schedule Type:Options
Project No:CO FLAP LAR 10(1)
Project Name:Horsetooth Res and Carter Lake
A - 16
X3014 20301-3420 REMOVAL OF SPEED HUMP
5 EACH $____________ $____________
X3015 20302-0400 REMOVAL OF CURB, ASPHALT
120 LNFT $____________ $____________
X3016 20302-2600 REMOVAL OF PAVEMENT MARKINGS
2,333 LNFT $____________ $____________
A002 X3017 20303-1600 REMOVAL OF PAVEMENT, ASPHALT
90 SQYD $____________ $____________
A002 X3018 20315-0000 SAWCUTTING PAVEMENT
1,670 LNFT $____________ $____________
X3019 20401-0000 ROADWAY EXCAVATION
1,500 CUYD $____________ $____________
X3020 20421-0000 ROCK EXCAVATION
50 CUYD $____________ $____________
X3021 20441-0000 WASTE
210 CUYD $____________ $____________
X3022 20820-0000 DEWATERING
ALL LPSM $___LPSM_____ $____________
X3023 25126-0000 REMOVE AND RESET BOULDER
14 EACH $____________ $____________
X3024 30101-0000 AGGREGATE BASE
6,000 TON $____________ $____________
X3026 30402-5300 FULL DEPTH RECLAMATION, METHOD 2, 6-INCH DEPTH
23,400 SQYD $____________ $____________
X3027 40301-0100 ASPHALT CONCRETE PAVEMENT, TYPE 1
7,700 TON $____________ $____________
X3028 41201-0000 TACK COAT
20 TON $____________ $____________
Bid Schedule Schedule:X Schedule Type:Options
Project No:CO FLAP LAR 10(1)
A - 17
X3029 41301-0700 ASPHALT PAVEMENT MILLING, 2 1/2-INCH DEPTH
140 SQYD $____________ $____________
X3030 50101-0600 MINOR CONCRETE PAVEMENT, REINFORCED, 6-INCH DEPTH
429 SQYD $____________ $____________
X3031 60201-0600 18-INCH PIPE CULVERT
60 LNFT $____________ $____________
X3032 60401-0000 MANHOLE (CDS Model 4030-8)
1 EACH $____________ $____________
X3033 60401-0000 MANHOLE (CDS Model 5653-10)
1 EACH $____________ $____________
X3034 60404-1000 CATCH BASIN, FLH TYPE 1
1 EACH $____________ $____________
X3035 60704-0000 CLEANING CULVERT IN PLACE
1 EACH $____________ $____________
X3036 60902-1000 CURB AND GUTTER, CONCRETE, 12-INCH DEPTH
985 LNFT $____________ $____________
X3037 60905-1000 GUTTER, CONCRETE (2' valley gutter)
250 LNFT $____________ $____________
X3038 60920-0000 RESET WHEELSTOP
225 EACH $____________ $____________
X3039 61104-0400 VALVE, GATE (Flap)
2 EACH $____________ $____________
X3040 62302-1000 SPECIAL LABOR, HIRED TECHNICAL SERVICES
26 HOUR $____________ $____________
X3041 62302-1100 SPECIAL LABOR, HIRED SURVEY SERVICES
20 HOUR $____________ $____________
X3042 62401-0300 FURNISHING AND PLACING TOPSOIL, 4-INCH DEPTH
2,170 SQYD $____________ $____________
Bid Schedule Schedule:X Schedule Type:Options
Project No:CO FLAP LAR 10(1)
A - 18
X3043 62405-0300 PLACING CONSERVED TOPSOIL, 4-INCH DEPTH
1,800 SQYD $____________ $____________
X3044 62511-2000 SEEDING, HYDRAULIC METHOD
3,975 SQYD $____________ $____________
X3045 63301-0000 SIGN SYSTEM
12 EACH $____________ $____________
X3046 63309-0000 DELINEATOR
6 EACH $____________ $____________
X3047 63316-1000 REMOVE AND RESET SIGN
19 EACH $____________ $____________
X3048 63401-0450 PAVEMENT MARKINGS, TYPE B, DOTTED
1,066 LNFT $____________ $____________
X3049 63402-0300 PAVEMENT MARKINGS, TYPE B, SOLID
9.4 MILE $____________ $____________
X3050 63405-0050 PAVEMENT MARKINGS, SYMBOLS (AND WORDS)
11 EACH $____________ $____________
X3051 63405-0500 PAVEMENT MARKINGS, TYPE B, TURN ARROW
4 EACH $____________ $____________
X3052 63405-0550 PAVEMENT MARKINGS, TYPE B, STRAIGHT ARROW
30 EACH $____________ $____________
X3053 63405-0850 PAVEMENT MARKINGS, TYPE B, ACCESSIBILITY SYMBOL
7 EACH $____________ $____________
X3054 63501-0000 TEMPORARY TRAFFIC CONTROL
ALL LPSM $___LPSM_____ $____________
X3055 64620-0000 REMOVE AND RESET (backup spike)
1 EACH $____________ $____________
Bid Schedule Schedule:X Schedule Type:Options
Project No:CO FLAP LAR 10(1)
A - 19
Submitted by:____________________________________ Schedule Total:____________
Bid Schedule Schedule:X Schedule Type:Options
Project No:CO FLAP LAR 10(1)
Project Name:Horsetooth Res and Carter Lake
X3006 15401-0000 CONTRACTOR TESTING
ALL LPSM $___LPSM_____ $____________
(Government-Furnished Lab)
A - 20
Y5000 15101-0000 MOBILIZATION
ALL LPSM $___LPSM_____ $____________
Y5001 15206-0000 SLOPE, REFERENCE, AND CLEARING AND GRUBBING STAKE
0.230 MILE $____________ $____________
Y5002 15215-3000 SURVEY AND STAKING, DRAINAGE STRUCTURE
4 EACH $____________ $____________
Y5003 15215-7000 SURVEY AND STAKING, PARKING AREA
1 EACH $____________ $____________
Y5004 15216-2000 SURVEY AND STAKING, GRADE FINISHING STAKES
0.460 MILE $____________ $____________
Y5005 15301-0000 CONTRACTOR QUALITY CONTROL
ALL LPSM $___LPSM_____ $____________
Y5006 15401-0000 CONTRACTOR TESTING
ALL LPSM $___LPSM_____ $____________
Y5007 15501-0000 CONSTRUCTION SCHEDULE
ALL LPSM $___LPSM_____ $____________
Y5008 15701-0000 SOIL EROSION CONTROL
ALL LPSM $___LPSM_____ $____________
Y5009 15720-0000 STORM WATER POLLUTION PREVENTION PLAN
ALL LPSM $___LPSM_____ $____________
Y5010 15802-0000 WATERING FOR DUST CONTROL
ALL LPSM $___LPSM_____ $____________
Y5011 20101-0000 CLEARING AND GRUBBING
4.5 ACRE $____________ $____________
Y5012 20301-0700 REMOVAL OF DELINEATOR
1 EACH $____________ $____________
Y5013 20301-2400 REMOVAL OF SIGN
15 EACH $____________ $____________
Bid Schedule Schedule:Y Schedule Type:Options
Project No:CO FLAP LAR 10(1)
Project Name:Horsetooth Res and Carter Lake
A - 21
Y5014 20301-3400 REMOVAL OF WHEELSTOP
51 EACH $____________ $____________
Y5015 20301-3420 REMOVAL OF SPEED HUMP
1 EACH $____________ $____________
Y5016 20302-0500 REMOVAL OF CURB, CONCRETE
450 LNFT $____________ $____________
Y5017 20303-0300 REMOVAL OF CONCRETE
167 SQYD $____________ $____________
Y5018 20401-0000 ROADWAY EXCAVATION
2,400 CUYD $____________ $____________
Y5019 20441-0000 WASTE
1,200 CUYD $____________ $____________
Y5020 20820-0000 DEWATERING
ALL LPSM $___LPSM_____ $____________
Y5021 25126-0000 REMOVE AND RESET BOULDER
10 EACH $____________ $____________
Y5022 30101-0000 AGGREGATE BASE
5,500 TON $____________ $____________
Y5024 40301-0100 ASPHALT CONCRETE PAVEMENT, TYPE 1
3,700 TON $____________ $____________
Y5025 41201-0000 TACK COAT
10 TON $____________ $____________
Y5026 50101-0600 MINOR CONCRETE PAVEMENT, REINFORCED, 6-INCH DEPTH
222 SQYD $____________ $____________
Y5027 60201-0600 18-INCH PIPE CULVERT
130 LNFT $____________ $____________
Y5028 60401-0000 MANHOLE (CDS Model 5668-10)
1 EACH $____________ $____________
Bid Schedule Schedule:Y Schedule Type:Options
Project No:CO FLAP LAR 10(1)
A - 22
Y5029 60404-1000 CATCH BASIN, FLH TYPE 1
3 EACH $____________ $____________
Y5030 60902-1000 CURB AND GUTTER, CONCRETE, 12-INCH DEPTH
490 LNFT $____________ $____________
Y5031 60905-1000 GUTTER, CONCRETE (4' valley gutter)
440 LNFT $____________ $____________
Y5032 60920-0000 RESET WHEELSTOP
120 EACH $____________ $____________
Y5033 61104-0400 VALVE, GATE (Flap)
1 EACH $____________ $____________
Y5034 61501-0100 SIDEWALK, CONCRETE
25 SQYD $____________ $____________
Y5035 62302-1000 SPECIAL LABOR, HIRED TECHNICAL SERVICES
33 HOUR $____________ $____________
Y5036 62302-1100 SPECIAL LABOR, HIRED SURVEY SERVICES
20 HOUR $____________ $____________
Y5037 62401-0300 FURNISHING AND PLACING TOPSOIL, 4-INCH DEPTH
1,030 SQYD $____________ $____________
Y5038 62405-0300 PLACING CONSERVED TOPSOIL, 4-INCH DEPTH
645 SQYD $____________ $____________
Y5039 62511-2000 SEEDING, HYDRAULIC METHOD
1,675 SQYD $____________ $____________
Y5040 63301-0000 SIGN SYSTEM
11 EACH $____________ $____________
Y5041 63309-0000 DELINEATOR
1 EACH $____________ $____________
Y5042 63316-1000 REMOVE AND RESET SIGN
10 EACH $____________ $____________
Bid Schedule Schedule:Y Schedule Type:Options
Project No:CO FLAP LAR 10(1)
A - 23
Y5043 63401-0450 PAVEMENT MARKINGS, TYPE B, DOTTED
580 LNFT $____________ $____________
Y5044 63402-0300 PAVEMENT MARKINGS, TYPE B, SOLID
5.4 MILE $____________ $____________
Y5045 63405-0550 PAVEMENT MARKINGS, TYPE B, STRAIGHT ARROW
11 EACH $____________ $____________
Y5046 63405-0850 PAVEMENT MARKINGS, TYPE B, ACCESSIBILITY SYMBOL
8 EACH $____________ $____________
Y5047 63501-0000 TEMPORARY TRAFFIC CONTROL
ALL LPSM $___LPSM_____ $____________
Y5048 63503-1000 TEMPORARY TRAFFIC CONTROL, PLASTIC FENCE
1,200 LNFT $____________ $____________
Submitted by:____________________________________ Schedule Total:____________
Bid Schedule Schedule:Y Schedule Type:Options
Project No:CO FLAP LAR 10(1)
Project Name:Horsetooth Res and Carter Lake
Y5006 15401-0000 CONTRACTOR TESTING
ALL LPSM $___LPSM_____ $____________
(Government-Furnished Lab)
A - 24
Bid Schedule Summary
Schedule Bid Total
Schedule A - Base
Schedule X - Option
Schedule Y - Option
Total - Schedules
Submitted By: ________________________________
Bid Schedule
Project No:CO FLAP LAR 10(1)
E-59
CO FLAP LAR 10(1)
Horsetooth and Carter Lake Reservoirs
Section 604. — Manholes, Inlets, and catch basins
Description
604.01 Add the following:
This work also includes furnishing and installing CDS® hydrodynamic separator stormwater treatment units. and the extended detention basin structural components.
Material
604.02 Add the following to the material list:
CDS hydrodynamic separator 713.26 Hardware 718.06
Construction Requirements
604.03 Add the following:
Furnish and install complete CDS type hydrodynamic separator. CDS units shall be complete and operable per the manufacturer’s recommendations, and in accordance with the requirements of the plans.
(a) Furnish all labor, equipment and materials necessary to install the CDS storm water treatment device(s) (SWTD) and appurtenances specified in the plans.
(b) Do not damage the SWTD components prior to and during installation.
(c) Install the SWTD according to the manufacturer’s recommendations and the drawings.
Follow the manufacturer provide installation instructions.
(d) Fill all voids associated with lifting provisions provided by the manufacturer. Fill voids with non-shrinking grout providing a finished surface consistent with adjacent surfaces.
Trim all protruding lifting provisions flush with the adjacent concrete surface in a manner, which leaves no sharp points or edges.
(e) Remove all loose material and pooling water from the SWTD prior to the completion of construction.
(f) Add joint sealant between all structure sections. Grout pipes at the structure connection and all joints below pipe inverts.
(g) When dewatering is necessary, dewater according to Subsection 208.07.
E-60
Horsetooth and Carter Lake Reservoirs
604.04 Add the following:
Reinforcing steel is required for all extended detention basin concrete structures. Submit structural design/drawings for the energy dissipation baffle walls, forebay slab, forebay walls, trickle channel, wingwalls, overflow wall, and outlet structure according to Subsection 104.03. Furnish hardware according to Subsection 718.06. Furnish stainless steel components according to Subsection 725.10(h).
Measurement
604.10 Add the following:
Measure CDS (manhole) items by the each.
Do not measure reinforcing steel for extended detention basin concrete structures.
E-83
Horsetooth and Carter Lake Reservoirs
Section 725. — MISCELLANEOUS MATERIAL
725.10 Frames, Grates, Covers, and Ladder Rungs. Add the following:
(h) Stainless steel well screen, orifice plate, ASTM A276 and A666 and safety grate unknown
Existing aggregate base depth varies from 4" to 5"
Existing asphalt pavement depth left sides of roadway)
(Detail applies to both right and
Shoulder up with aggregate base
Construct 30° pavement edge (safety edge)
See Detail A Prime coat
Tack coat (between lifts) aggregate base, see note 4
6" Full depth reclamation and
V ariab le existin g slop e existing slope
Variable
Placed in two lifts
4" Asphalt concrete pavement, type 1 for structural section details
See mainline typical section
See Detail A Prime coat
Tack coat (between lifts)aggregate base, see note 4
6" Full depth reclamation and
V ariab le existin g slop e existing slope
Variable
Placed in two lifts
4" Asphalt concrete pavement, type 1aggregate base, see note 4
6" Full depth reclamation and Prime coat
Placed in two lifts
4" Asphalt concrete pavement, type 1
Tack coat (between lifts)
Slope stake limit
Slope stake limit
Slope stake limitSlope stake limit
Slope stake limit Slope stake limit
Clearing and construction limits
75' average existing width
Sta. 10+11 to 26+05
South Bay Access Road A
EXISTING TYPICAL SECTION
typical sections. Refer to T sheets for signing and striping begin and end stationing.
7. Signing and striping to begin and end at stations independent from stations shown on the second lift.
6. Place asphalt concrete pavement in two lifts. Apply tack coat to the first lift prior to placing
5. Pulverize the existing paved width or as directed by CO.
Summary. Final finished grade will be 6" above existing finished surface.
304. Assumed quantities for imported aggregate base are shown in the Surfacing with an additional 2" of aggregate base added to the section. Refer to Sections 302 and
6" Full depth reclamation is a composite section including 4" of pulverized existing material 4.
foreslopes as necessary, but not steeper than 1:2, to stay on the existing bench.
Construct a 1:4 or flatter foreslope unless otherwise directed by the CO. Steepen the 3.
Dimensions shown are approximate and may be varied by the CO.2.
Existing superelvated and widened sections are not shown.1.
:Note
No Scale
Sta. 18+47 to 26+19
South Bay Access Road A
TYPICAL SECTION
Match existing Match existing See not e 3
(applies to both sides of the roadway)
DETAIL A
and note 5
See C sheets
Varies and note 5
See C sheets
Varies
Sta. 13+40 to 18+47
South Bay Access Road A
TYPICAL SECTION
Match existing and note 5
See C sheets
Varies and note 5
See C sheets
Varies
Match existing
24'-125' (with landscaping island)
7"
Travel wayTravel way
Clearing and construction limits
3'(proect in place) width varies 5'-55'
Existing earthen swale, 3' 3' 3'
3' 3'
Clear zone Clear zone zone Clear
Clear zone Clear zonezone Clear
OPTION X
SOUTH BAY ACCESS ROAD A
TYPICAL SECTIONS9
:3
A
M
N o v e m b e r
S o u th
B a y
A c c e s s R d
F .0
C
F L H
D
H o rs e to o th a n d C a rt e r
L a k e R e s e rv o ir s \D
G N
\T Y
P L A
R (1 d g n
OFFICE OF FEDERAL LANDS HIGHWAY
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
STATE PROJECT
NUMBER
SHEET
CO
A12
HORSETOOTH & CARTER LAKE RES.
3 Updated callout
11.26.2024
Sheet and Description
B8-9 B10 B11-12 B13 B14 B15
Grading Surfacing Drainage
Survey & Staking, Misc. Earthwork, Topsoil & Seeding, Chek Dam
Removal, Riprap &
Boulder, Fence & Post
Curb, Gutter, Sidewalk, &
Wheelstop, Misc. Site Furnishings, Permanent and Temporary Traffic
Control
Allowance Bid
Schedule
A1000 15101-0000 MOBILIZATION LPSM ALL
A1001 15206-0000 SLOPE, REFERENCE, AND CLEARING AND GRUBBING STAKE MILE 1.520 1.520
A1002 15215-3000 SURVEY AND STAKING, DRAINAGE STRUCTURE EACH 22 22
A1003 15215-7000 SURVEY AND STAKING, PARKING AREA EACH 5 5
A1004 15216-2000 SURVEY AND STAKING, GRADE FINISHING STAKES MILE 3.040 3.040
A1005 15301-0000 CONTRACTOR QUALITY CONTROL LPSM ALL
A1006 15401-0000 CONTRACTOR TESTING LPSM ALL
A1007 15501-0000 CONSTRUCTION SCHEDULE LPSM ALL
A1008 15701-0000 SOIL EROSION CONTROL LPSM ALL
A1009 15706-0200 SOIL EROSION CONTROL, CHECK DAM (Permanent) Along Eagle
EACH 65 65 Campground Road
A1010 15720-0000 STORM WATER POLLUTION PREVENTION PLAN LPSM ALL
A1011 15802-0000 WATERING FOR DUST CONTROL LPSM ALL
A1012 20101-0000 CLEARING AND GRUBBING ACRE 17.2 0.5 17.7
A1013 20301-0100 REMOVAL OF BOLLARD EACH 5 5
A1014 20301-0700 REMOVAL OF DELINEATOR EACH 7 7
A1015 20301-1600 REMOVAL OF MAILBOX EACH 8 8
A1016 20301-2400 REMOVAL OF SIGN EACH 41 41
A1017 20301-3400 REMOVAL OF WHEELSTOP EACH 115 115
A1018 20302-0500 REMOVAL OF CURB, CONCRETE LNFT 10 10
A1019 20302-0625 REMOVAL OF CURB, LOG LNFT 72 8 80
A1020 20302-2100 REMOVAL OF PIPE CULVERT LNFT 60 60
A1021 20302-2600 REMOVAL OF PAVEMENT MARKINGS LNFT 5,694 5,694
A1022 20303-0300 REMOVAL OF CONCRETE SQYD 183 183
A002 A1023 20303-1600 REMOVAL OF PAVEMENT, ASPHALT SQYD 1,045 1,045
A1024 20401-0000 ROADWAY EXCAVATION CUYD 19,862 2,138 22,000
A1025 20441-0000 WASTE CUYD 10,854 276 11,130
A1026 20820-0000 DEWATERING LPSM ALL
A1027 21101-1000 ROADWAY OBLITERATION, METHOD 1 SQYD 620 80 700
A003 A1028 25101-0700 PLACED RIPRAP, METHOD A, CLASS 7 (mixed with topsoil) CUYD 104 6 110
A1029 25101-2200 PLACED RIPRAP, METHOD B, CLASS 2 CUYD 51 4 55
A1030 25101-2300 PLACED RIPRAP, METHOD B, CLASS 3 CUYD 25 5 30
A1031 25101-2400 PLACED RIPRAP, METHOD B, CLASS 4 CUYD 30 3 33
A1032 25126-0000 REMOVE AND RESET BOULDER EACH 159 159
A1034 30101-0000 AGGREGATE BASE TON 13,433 567 14,000
A1035 30203-2120 ROADWAY AGGREGATE, METHOD 2, SURFACE COURSE, 4-INCH
DEPTH SQYD 1,060 50 1,110
A002 A1036 40301-0100 ASPHALT CONCRETE PAVEMENT, TYPE 1 TON 9,043 257 9,300
A1037 41201-0000 TACK COAT TON 17 3 20
MileStone: Amendment A003
Amendment Review Date: 11/26/24
Report Date: 11/26/24
A
M
E
N
D
Line
Item
No.
Pay Item
Number
SUMMARY OF QUANTITIES - Schedule A -N o v -2
:2
P
M
Remarks and/or
Determination of
Estimated Quantity
Pay Item Description Unit
Estimated
Quantities
F
.0
C
F L H
D
H o rs e to o th a n d C a rt e r
L a k e R e s e rv o ir s
.0
H
R
C L P
D S \W o rk
O rd e r
\4
W o rk in g \S u p p o rt in g D o c s \E
E B A C S
A B S h e e ts
E E B A C S .x ls m
]S h e e t
STATE PROJECT
B1
CO FLAP LAR 10(1)
CO
SHEET
NUMBER
HORSETOOTH & CARTER LAKE RES.
Grading Surfacing Drainage
Survey & Staking, Misc. Earthwork, Topsoil & Seeding, Chek Dam
Removal, Riprap &
Boulder, Fence & Post
Curb, Gutter, Sidewalk, &
Wheelstop, Misc. Site Furnishings, Permanent and Temporary Traffic
Control
Allowance Bid
Schedule
A1039 50101-0600 MINOR CONCRETE PAVEMENT, REINFORCED, 6-INCH DEPTH SQYD 690 690
A1040 60201-0600 18-INCH PIPE CULVERT LNFT 593 27 620
A1041 60201-0800 24-INCH PIPE CULVERT LNFT 217 13 230
A1042 60201-0900 30-INCH PIPE CULVERT LNFT 21 1 22
A1043 60201-1000 36-INCH PIPE CULVERT LNFT 24 1 25
A002 A1044 60201-1100 42-INCH PIPE CULVERT LNFT 32 2 34
A1045 60210-0600 END SECTION FOR 18-INCH PIPE CULVERT EACH 9 9
A1046 60210-0800 END SECTION FOR 24-INCH PIPE CULVERT EACH 7 7
A1047 60210-0900 END SECTION FOR 30-INCH PIPE CULVERT EACH 2 2
A1048 60210-1000 END SECTION FOR 36-INCH PIPE CULVERT EACH 2 2
A1049 60210-1100 END SECTION FOR 42-INCH PIPE CULVERT EACH 1 1
A1050 60212-0800 ELBOW, 24-INCH EACH 2 2
A1051 60401-0000 MANHOLE (CDS Model 3030-6) EACH 1 1
A1052 60401-0000 MANHOLE (CDS Model 3025-6) EACH 2 2
A1053 60401-0000 MANHOLE (CDS Model 3020-6) EACH 1 1
A1054 60401-0000 MANHOLE (with dome grate) EACH 1 1
A1055 60401-0000 MANHOLE (CDS MODEL 4030-8) EACH 1 1
A1056 60403-0000 INLET (CMP riser pipe) EACH 5 5
A1057 60403-0000 INLET (Basin forebay) EACH 1 1
A1058 60415-0000 TRENCH DRAIN EACH 3 3
A1059 60420-0000 OUTLET STRUCTURE EACH 1 1
A1060 60704-0000 CLEANING CULVERT IN PLACE EACH 6 6
A1061 60801-0400 PAVED WATERWAY, TYPE 4 SQYD 41 41
A1062 60901-1700 CURB, CONCRETE, 18-INCH DEPTH LNFT 194 6 200
A1063 60902-1000 CURB AND GUTTER, CONCRETE, 12-INCH DEPTH LNFT 2,312 48 2,360
A1064 60905-1000 GUTTER, CONCRETE (4' valley gutter) LNFT 234 6 240
A1065 60915-1000 WHEELSTOP, CONCRETE EACH 167 3 170
A1066 60920-0000 RESET WHEELSTOP EACH 63 63
A1067 61104-0400 VALVE, GATE (Flap) EACH 5 5
A1068 61114-8000 WATER SYSTEM ACCESSORY, REDUCER EACH 1 1
A1069 61501-0100 SIDEWALK, CONCRETE SQYD 530 20 550
A1070 61509-0000 DETECTABLE WARNING PANELS SQYD 22 22
A1071 61904-0000 BOLLARD POST EACH 1 1
A1072 62302-1000 SPECIAL LABOR, HIRED TECHNICAL SERVICES HOUR 93
A1073 62302-1100 SPECIAL LABOR, HIRED SURVEY SERVICES HOUR 20
A1074 62401-0300 FURNISHING AND PLACING TOPSOIL, 4-INCH DEPTH SQYD 862 38 900
A1075 62405-0300 PLACING CONSERVED TOPSOIL, 4-INCH DEPTH SQYD 15,351 769 16,120
A1076 62511-2000 SEEDING, HYDRAULIC METHOD SQYD 16,213 807 17,020
A1077 63301-0000 SIGN SYSTEM EACH 52 52
SUMMARY OF QUANTITIES - Schedule A
A
M
E
N
D
Line
Item
No.
Pay Item
Number
F
.0
C
F L H
D
H o rs e to o th a n d C a rt e r
L a k e R e s e rv o ir s
.0
H
R
C L P
D S \W o rk
O rd e r
\4
W o rk in g \S u p p o rt in g D o c s \E
E B A C S
A B S h e e ts
E E B A C S .x ls m
]S h e e t
(2
Pay Item Description Unit
Estimated
Quantities Remarks and/or
Determination of
Estimated Quantity
-N o v -2
:2
P
M
MileStone: Amendment A003
Amendment Review Date: 11/26/24
Report Date: 11/26/24
STATE PROJECT
B2
CO FLAP LAR 10(1)
CO
SHEET
NUMBER
HORSETOOTH & CARTER LAKE RES.
Grading Surfacing Drainage
Survey & Staking, Misc. Earthwork, Topsoil & Seeding, Chek Dam
Removal, Riprap &
Boulder, Fence & Post
Curb, Gutter, Sidewalk, &
Wheelstop, Misc. Site Furnishings, Permanent and Temporary Traffic
Control
Allowance Bid
Schedule
A1079 63316-1000 REMOVE AND RESET SIGN EACH 41 41
A1080 63401-0400 PAVEMENT MARKINGS, TYPE B, BROKEN LNFT 300 300
A1081 63402-0300 PAVEMENT MARKINGS, TYPE B, SOLID MILE 13.3 13.3
A1082 63405-0050 PAVEMENT MARKINGS, SYMBOLS (AND WORDS) EACH 2 2
A1083 63405-0500 PAVEMENT MARKINGS, TYPE B, TURN ARROW EACH 2 2
A1084 63405-0550 PAVEMENT MARKINGS, TYPE B, STRAIGHT ARROW EACH 28 28
A1085 63405-0850 PAVEMENT MARKINGS, TYPE B, ACCESSIBILITY SYMBOL EACH 15 15
A1086 63501-0000 TEMPORARY TRAFFIC CONTROL LPSM All ALL
A1087 63502-2000 TEMPORARY TRAFFIC CONTROL, PORTABLE CHANGEABLE
MESSAGE SIGN EACH 2 2
A1088 63601-3000 SYSTEM INSTALLATION, ELECTRICAL (two rectangular-rapid flashing beacons) LPSM All ALL
A1089 64603-0200 FIXTURE, MAILBOX EACH 8 8
A1090 64603-1000 FIXTURE, VAULT TOILET (Site preparation) EACH 2 2
A003 A1100 25101-0400 PLACED RIPRAP, METHOD A, CLASS 4 (mixed with topsoil) CUYD 77 3 80
SUMMARY OF QUANTITIES - Schedule A
A
M
E
N
D
Line
Item
No.
Pay Item
Number
F
.0
C
F L H
D
H o rs e to o th a n d C a rt e r
L a k e R e s e rv o ir s
.0
H
R
C L P
D S \W o rk
O rd e r
\4
W o rk in g \S u p p o rt in g D o c s \E
E B A C S
A B S h e e ts
E E B A C S .x ls m
]S h e e t
(3
Pay Item Description Unit
Estimated
Quantities Remarks and/or
Determination of
Estimated Quantity
-N o v -2
:2
P
M
MileStone: Amendment A003
Amendment Review Date: 11/26/24
Report Date: 11/26/24
STATE PROJECT
B3
CO FLAP LAR 10(1)
CO
SHEET
NUMBER
HORSETOOTH & CARTER LAKE RES.
Grading Surfacing Drainage
Survey & Staking, Misc. Earthwork, Topsoil & Seeding, Chek Dam
Removal, Riprap &
Boulder, Fence & Post
Curb, Gutter, Sidewalk, &
Wheelstop, Misc. Site Furnishings, Permanent and Temporary Traffic
Control
Allowance Bid
Schedule
X3000 15101-0000 MOBILIZATION LPSM ALL
X3001 15206-0000 SLOPE, REFERENCE, AND CLEARING AND GRUBBING STAKE MILE 0.440 0.440
X3002 15215-3000 SURVEY AND STAKING, DRAINAGE STRUCTURE EACH 3 3
X3003 15215-7000 SURVEY AND STAKING, PARKING AREA EACH 2 2
X3004 15216-2000 SURVEY AND STAKING, GRADE FINISHING STAKES MILE 0.880 0.880
X3005 15301-0000 CONTRACTOR QUALITY CONTROL LPSM ALL
X3006 15401-0000 CONTRACTOR TESTING LPSM ALL
X3007 15501-0000 CONSTRUCTION SCHEDULE LPSM ALL
X3008 15701-0000 SOIL EROSION CONTROL LPSM ALL
X3009 15720-0000 STORM WATER POLLUTION PREVENTION PLAN LPSM ALL
X3010 15802-0000 WATERING FOR DUST CONTROL LPSM ALL
X3011 20101-0000 CLEARING AND GRUBBING ACRE 3.5 0.1 3.6
X3012 20301-2400 REMOVAL OF SIGN EACH 9 9
X3013 20301-3400 REMOVAL OF WHEELSTOP EACH 65 65
X3014 20301-3420 REMOVAL OF SPEED HUMP EACH 5 5
X3015 20302-0400 REMOVAL OF CURB, ASPHALT LNFT 116 4 120
X3016 20302-2600 REMOVAL OF PAVEMENT MARKINGS LNFT 2,333 2,333
A002 X3017 20303-1600 REMOVAL OF PAVEMENT, ASPHALT SQYD 90 90
A002 X3018 20315-0000 SAWCUTTING PAVEMENT LNFT 1,656 14 1,670
X3019 20401-0000 ROADWAY EXCAVATION CUYD 1,345 155 1,500
X3020 20421-0000 ROCK EXCAVATION CUYD 43 7 50
X3021 20441-0000 WASTE CUYD 202 8 210
X3022 20820-0000 DEWATERING LPSM ALL
X3023 25126-0000 REMOVE AND RESET BOULDER EACH 14 14
X3024 30101-0000 AGGREGATE BASE TON 5,783 217 6,000
X3026 30402-5300 FULL DEPTH RECLAMATION, METHOD 2, 6-INCH DEPTH SQYD 22,263 1,137 23,400
X3027 40301-0100 ASPHALT CONCRETE PAVEMENT, TYPE 1 TON 7,443 257 7,700
X3028 41201-0000 TACK COAT TON 15 5 20
X3029 41301-0700 ASPHALT PAVEMENT MILLING, 2 1/2-INCH DEPTH SQYD 136 4 140
X3030 50101-0600 MINOR CONCRETE PAVEMENT, REINFORCED, 6-INCH DEPTH SQYD 429 429
X3031 60201-0600 18-INCH PIPE CULVERT LNFT 59 1 60
X3032 60401-0000 MANHOLE (CDS Model 4030-8) EACH 1 1
X3033 60401-0000 MANHOLE (CDS Model 5653-10) EACH 1 1
X3034 60404-1000 CATCH BASIN, FLH TYPE 1 EACH 1 1
X3035 60704-0000 CLEANING CULVERT IN PLACE EACH 1 1
X3036 60902-1000 CURB AND GUTTER, CONCRETE, 12-INCH DEPTH LNFT 966 19 985
X3037 60905-1000 GUTTER, CONCRETE (2' valley gutter) LNFT 242 8 250
X3038 60920-0000 RESET WHEELSTOP EACH 221 4 225
X3039 61104-0400 VALVE, GATE (Flap) EACH 2 2
SUMMARY OF QUANTITIES - Option X
A
M
E
N
D
Line
Item
No.
Pay Item
Number
F
.0
C
F L H
D
H o rs e to o th a n d C a rt e r
L a k e R e s e rv o ir s
.0
H
R
C L P
D S \W o rk
O rd e r
\4
W o rk in g \S u p p o rt in g D o c s \E
E B A C S
A B S h e e ts
E E B A C S .x ls m
]S h e e t
(4
Pay Item Description Unit
Estimated
Quantities Remarks and/or
Determination of
Estimated Quantity
-N o v -2
:2
P
M
MileStone: Amendment A003
Amendment Review Date: 11/26/24
Report Date: 11/26/24
STATE PROJECT
B4
CO FLAP LAR 10(1)
CO
SHEET
NUMBER
HORSETOOTH & CARTER LAKE RES.
Grading Surfacing Drainage
Survey & Staking, Misc. Earthwork, Topsoil & Seeding, Chek Dam
Removal, Riprap &
Boulder, Fence & Post
Curb, Gutter, Sidewalk, &
Wheelstop, Misc. Site Furnishings, Permanent and Temporary Traffic
Control
Allowance Bid
Schedule
X3041 62302-1100 SPECIAL LABOR, HIRED SURVEY SERVICES HOUR 20
X3042 62401-0300 FURNISHING AND PLACING TOPSOIL, 4-INCH DEPTH SQYD 2,066 104 2,170
X3043 62405-0300 PLACING CONSERVED TOPSOIL, 4-INCH DEPTH SQYD 1,718 82 1,800
X3044 62511-2000 SEEDING, HYDRAULIC METHOD SQYD 3,784 191 3,975
X3045 63301-0000 SIGN SYSTEM EACH 12 12
X3046 63309-0000 DELINEATOR EACH 6
X3047 63316-1000 REMOVE AND RESET SIGN EACH 19 19
X3048 63401-0450 PAVEMENT MARKINGS, TYPE B, DOTTED LNFT 1,066 1,066
X3049 63402-0300 PAVEMENT MARKINGS, TYPE B, SOLID MILE 9.4 9.4
X3050 63405-0050 PAVEMENT MARKINGS, SYMBOLS (AND WORDS) "PREP" and "THRU"
EACH 11 11 markings
X3051 63405-0500 PAVEMENT MARKINGS, TYPE B, TURN ARROW EACH 4 4 CR 38E
X3052 63405-0550 PAVEMENT MARKINGS, TYPE B, STRAIGHT ARROW EACH 30 30
X3053 63405-0850 PAVEMENT MARKINGS, TYPE B, ACCESSIBILITY SYMBOL EACH 7 7
X3054 63501-0000 TEMPORARY TRAFFIC CONTROL LPSM All ALL
X3055 64620-0000 REMOVE AND RESET (backup spike) EACH 1 1 (South Bay)
SUMMARY OF QUANTITIES - Option X
A
M
E
N
D
Line
Item
No.
Pay Item
Number
F
.0
C
F L H
D
H o rs e to o th a n d C a rt e r
L a k e R e s e rv o ir s
.0
H
R
C L P
D S \W o rk
O rd e r
\4
W o rk in g \S u p p o rt in g D o c s \E
E B A C S
A B S h e e ts
E E B A C S .x ls m
]S h e e t
(5
Pay Item Description Unit
Estimated
Quantities Remarks and/or
Determination of
Estimated Quantity
-N o v -2
:2
P
M
MileStone: Amendment A003
Amendment Review Date: 11/26/24
Report Date: 11/26/24
STATE PROJECT
B5
CO FLAP LAR 10(1)
CO
SHEET
NUMBER
HORSETOOTH & CARTER LAKE RES.
Grading Surfacing Drainage
Survey & Staking, Misc. Earthwork, Topsoil & Seeding, Chek Dam
Removal, Riprap &
Boulder, Fence & Post
Curb, Gutter, Sidewalk, &
Wheelstop, Misc. Site Furnishings, Permanent and Temporary Traffic
Control
Allowance Bid
Schedule
Y5000 15101-0000 MOBILIZATION LPSM ALL
Y5001 15206-0000 SLOPE, REFERENCE, AND CLEARING AND GRUBBING STAKE MILE 0.230 0.230
Y5002 15215-3000 SURVEY AND STAKING, DRAINAGE STRUCTURE EACH 4 4
Y5003 15215-7000 SURVEY AND STAKING, PARKING AREA EACH 1 1
Y5004 15216-2000 SURVEY AND STAKING, GRADE FINISHING STAKES MILE 0.460 0.460
Y5005 15301-0000 CONTRACTOR QUALITY CONTROL LPSM ALL
Y5006 15401-0000 CONTRACTOR TESTING LPSM ALL
Y5007 15501-0000 CONSTRUCTION SCHEDULE LPSM ALL
Y5008 15701-0000 SOIL EROSION CONTROL LPSM ALL
Y5009 15720-0000 STORM WATER POLLUTION PREVENTION PLAN LPSM ALL
Y5010 15802-0000 WATERING FOR DUST CONTROL LPSM ALL
Y5011 20101-0000 CLEARING AND GRUBBING ACRE 4.4 0.1 4.5
Y5012 20301-0700 REMOVAL OF DELINEATOR EACH 1 1
Y5013 20301-2400 REMOVAL OF SIGN EACH 15 15
Y5014 20301-3400 REMOVAL OF WHEELSTOP EACH 51 51
Y5015 20301-3420 REMOVAL OF SPEED HUMP EACH 1 1
Y5016 20302-0500 REMOVAL OF CURB, CONCRETE LNFT 431 19 450
Y5017 20303-0300 REMOVAL OF CONCRETE SQYD 167 167
Y5018 20401-0000 ROADWAY EXCAVATION CUYD 2,225 175 2,400
Y5019 20441-0000 WASTE CUYD 1,126 74 1,200
Y5020 20820-0000 DEWATERING LPSM ALL
Y5021 25126-0000 REMOVE AND RESET BOULDER EACH 10 10
Y5022 30101-0000 AGGREGATE BASE TON 5,253 247 5,500
Y5024 40301-0100 ASPHALT CONCRETE PAVEMENT, TYPE 1 TON 3,549 151 3,700
Y5025 41201-0000 TACK COAT TON 7 3 10
Y5026 50101-0600 MINOR CONCRETE PAVEMENT, REINFORCED, 6-INCH DEPTH SQYD 222 222
Y5027 60201-0600 18-INCH PIPE CULVERT LNFT 128 2 130
Y5028 60401-0000 MANHOLE (CDS Model 5668-10) EACH 1 1
Y5029 60404-1000 CATCH BASIN, FLH TYPE 1 EACH 3 3
Y5030 60902-1000 CURB AND GUTTER, CONCRETE, 12-INCH DEPTH LNFT 484 6 490
Y5031 60905-1000 GUTTER, CONCRETE (4' valley gutter) LNFT 430 10 440
Y5032 60920-0000 RESET WHEELSTOP EACH 119 1 120
Y5033 61104-0400 VALVE, GATE (Flap) EACH 1 1
Y5034 61501-0100 SIDEWALK, CONCRETE SQYD 21 4 25
Y5035 62302-1000 SPECIAL LABOR, HIRED TECHNICAL SERVICES HOUR 33
Y5036 62302-1100 SPECIAL LABOR, HIRED SURVEY SERVICES HOUR 20
Y5037 62401-0300 FURNISHING AND PLACING TOPSOIL, 4-INCH DEPTH SQYD 983 47 1,030
Y5038 62405-0300 PLACING CONSERVED TOPSOIL, 4-INCH DEPTH SQYD 613 32 645
Y5039 62511-2000 SEEDING, HYDRAULIC METHOD SQYD 1,596 79 1,675
SUMMARY OF QUANTITIES - Option Y
A
M
E
N
D
Line
Item
No.
Pay Item
Number
F
.0
C
F L H
D
H o rs e to o th a n d C a rt e r
L a k e R e s e rv o ir s
.0
H
R
C L P
D S \W o rk
O rd e r
\4
W o rk in g \S u p p o rt in g D o c s \E
E B A C S
A B S h e e ts
E E B A C S .x ls m
]S h e e t
(6
Pay Item Description Unit
Estimated
Quantities Remarks and/or
Determination of
Estimated Quantity
-N o v -2
:2
P
M
MileStone: Amendment A003
Amendment Review Date: 11/26/24
Report Date: 11/26/24
STATE PROJECT
B6
CO FLAP LAR 10(1)
CO
SHEET
NUMBER
HORSETOOTH & CARTER LAKE RES.
Grading Surfacing Drainage
Survey & Staking, Misc. Earthwork, Topsoil & Seeding, Chek Dam
Removal, Riprap &
Boulder, Fence & Post
Curb, Gutter, Sidewalk, &
Wheelstop, Misc. Site Furnishings, Permanent and Temporary Traffic
Control
Allowance Bid
Schedule
Y5041 63309-0000 DELINEATOR EACH 1
Y5042 63316-1000 REMOVE AND RESET SIGN EACH 10 10
Y5043 63401-0450 PAVEMENT MARKINGS, TYPE B, DOTTED LNFT 580 580
Y5044 63402-0300 PAVEMENT MARKINGS, TYPE B, SOLID MILE 5.4 5.4
Y5045 63405-0550 PAVEMENT MARKINGS, TYPE B, STRAIGHT ARROW EACH 11 11
Y5046 63405-0850 PAVEMENT MARKINGS, TYPE B, ACCESSIBILITY SYMBOL EACH 8 8
Y5047 63501-0000 TEMPORARY TRAFFIC CONTROL LPSM ALL
Y5048 63503-1000 TEMPORARY TRAFFIC CONTROL, PLASTIC FENCE LNFT 1,130 70 1,200
SUMMARY OF QUANTITIES - Option Y
A
M
E
N
D
Line
Item
No.
Pay Item
Number
F
.0
C
F L H
D
H o rs e to o th a n d C a rt e r
L a k e R e s e rv o ir s
.0
H
R
C L P
D S \W o rk
O rd e r
\4
W o rk in g \S u p p o rt in g D o c s \E
E B A C S
A B S h e e ts
E E B A C S .x ls m
]S h e e t
(7
Pay Item Description Unit
Estimated
Quantities Remarks and/or
Determination of
Estimated Quantity
-N o v -2
:2
P
M
MileStone: Amendment A003
Amendment Review Date: 11/26/24
Report Date: 11/26/24
STATE PROJECT
B7
CO FLAP LAR 10(1)
CO
SHEET
NUMBER
HORSETOOTH & CARTER LAKE RES.
SUMMARIES
MISCELLANEOUS
:2
P
N o v e m b e r
M
IS
C
F
.0
C
F L
H D
H o rs e to o th a n d C a rt e r
L a k e
R e s e rv o ir s \D
G N
\S U
M
L A
R
(1 d g n
OFFICE OF FEDERAL LANDS HIGHWAY
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
STATE PROJECT
NUMBER
SHEET
CO
B14
Pay item number and quantity change
WATER QUALITY & DETENTION FACILITY
FOREBAY PLAN
SECTION A-A OVERFLOW SPILLWAY SECTION B-B OVERFLOW SPILLWAY
TYPE 4
PAVED WATERWAY,
PROFILE
FOREBAY
ELEVATION
BAFFLE BLOCK
PLAN VIEW
BAFFLE BLOCK
FOREBAY ELEVATION
FOREBAY NOTCH
6'-6"
2'
8"
8"
3'
4.3"1
Elevation = 5714.00'
Overflow spillway sill
15'
Overflow WSEL = 5714.49' f r e e b o a r d
WSEL = 5714.49'
Emergency overflow
Elevation = 5715.50'
Top of berm
1Detention basin
Elevation = 5714.00'
Overflow spillway sill
Elevation = 5715.50'
Top of embankment this sheet for details
Forebay notch, see
6"
6'-6"
2.5H:1 Max wall or berm of forebay to match top
Adjust slopes to slope
Varies, match
Finish grade
Wingwall
2% invert channel
Trickle channel trickle
Top of on all corners
3/4" Chamfer
6" base
Aggregate
Finished grade
Extend riprap 2' upstream of wall
SPECIAL
OFFICE OF FEDERAL LANDS HIGHWAY
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
:3
A p r il
B a s e .B
.U S
U s e r s \b r e n d a n \D
J
A P
C \A c ti v e P r o je c ts
D o c u m e n ts
\O p e n R o a d s \C o n f ig u r a ti o n \O r g a n iz a ti o n C iv il
\F L
H S u r v F t_ S ta n d a r d s W
S .9
.1 V
C F
L \c e ll
\C F
L B o r d e r s .c e l
STATE PROJECT
NUMBER
SHEET
CO
T18 m ax.
15% ditch invert
Match existing
4 (mixed with topsoil), typ.
Placed riprap, method A, class
(See plan for width and elevations)
Embankment 4' Typ.
3' Paved waterway, type 4
H :1
V , ty p
H :1
V ty p invert = 5711.5'
Paved waterway invert = 5710.92'
Paved waterway
Forebay
Micropool
Outlet structure pipe (RCP)
18"x25' culvert
.6
.7
.5
.2
V=2.02 ft/s, D=0.49 ft 15' Crest, Q=17.2 CFS Emergency Spillway
.7
Existing ditch invert
Top of existing ditch bank
E a g le C a m p g ro u n d R o a d
5712.5'
Bottom of basin =
5715.5'
Top of berm = to p s o il
5711.54'
Bottom of basin =
5715.5'
Top of berm =
5' top of bank
Tie spillway into
(RCP)
culvert pipe
24"x147'
B
A
B
A elevation = 5712.71
24" RCP, invert
4' top of bank
5' beyond
Extend riprap
0.
.4
(mixed with topsoil), typ.
Placed riprap, method A, class 4
4" Aggregate base
4" Aggregate base
4" Aggregate base
DETAILS
EAGLE CAMPGROUND EDB
U.S. CUSTOMARY SPECIAL
SHEET 1 OF 2
Ditch flow
H :1
V ty p for details this sheet block, see
Baffle
6'-6"
Notch invert = 5711.50'
604-I class 2 method B, Placed riprap, bottom
6" wide
1%1%
2%
1'-6"
1. See SCR Section 604 for rebar and structural requirements.
NOTE:
3 Revised details and notes
OUTLET STRUCTURE PLAN
SECTION G-GSECTION D-D
SECTION E-E
SECTION F-F
SECTION C-C: OUTLET STRUCTURE
D
E
F
6. See SCR Section 604 for rebar and structural requirements.
opening is smaller than the diameter of the outlet pipe.
B. Design safety grates such that the diagonal dimension of each with hinged and lockable or boltable access panels.
A. Mount all safety grates using high-strength hardware and provide
5. Overflow safety grates:
different open area/gross area ratio (R value).
trash rack size may need to be adjusted for materials having
A. Trash rack open areas are for specified trash rack materials. Total
4. EURV and WQCV trash racks:
hydrostatic head with zero head downstream of the rack.
3. Design trash rack and safety grate structural to accommodate full
2. Bolt orifice plate to concrete 12" max. on center.
concrete.
1. Provide continuous elastomeric seal between the orifice plate and
NOTE:
Micropool WSEL 5710.58' elevation 5710.92
Trickle channel invert center
Ladder rungs at 12" on
Elevation = 5708.08'
Elastomeric seal
18"
6'
Outlet pipe invert = 5710.33'
WSE = 5713.91'
EURV
Stainless steel orifice plate
Finished grade
WSEL = 5714.49'
Overflow
Elevation = 5715.50'
Top of embankment
SPECIAL
OFFICE OF FEDERAL LANDS HIGHWAY
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
:3
A p r il
B a s e .B
.U S
U s e r s \b r e n d a n \D
J
A P
C \A c ti v e P r o je c ts
D o c u m e n ts
\O p e n R o a d s \C o n f ig u r a ti o n \O r g a n iz a ti o n C iv il
\F L
H S u r v F t_ S ta n d a r d s W
S .9
.1 V
C F
L \c e ll
\C F
L B o r d e r s .c e l
STATE PROJECT
NUMBER
SHEET
CO
T19
18" RCP Outlet pipe
2'-6"
Pipe invert
Allow 1" gap under trash rack concrete bottom and sides of opening in wall.
welds to C8x18.75 steel channel formed into
Stainless steel well screen attached by intermittent
(bolted or locked to structure) with 5" max. clear between bars
Aluminum casting safety grate
Elevation = 5708.08'
.3 t y p
11/16" typ.
Diameter =
Elevation = 5710.58'
12" Width opening
High-strength steel bolts steel orifice plate
0.25" thick stainless
2'-6"
Flow Flow
No. 93 stainless steel
0.139"
0.090"
TE 0.073"x0.5", 1" O.C.
Stainless steel support bars
G
18" RCP
C
6'
6"
12'' 3'' 3''
LADDER RUNG
or square) casting (round
3/4" gray iron section formed into concrete
Stainless steel channel
Elevation = 5714.00'
U.S. CUSTOMARY SPECIAL
SHEET 2 OF 2
DETAILS
EAGLE CAMPGROUND EDB
4" Aggregate base
604-I elevation = 5714.00'
Overflow sill
Trash rack
7'
16"
R Value = (net open area)/(gross rack area) = 0.6 well screen
Stainless steel
Revised details and notes3
| E-59 and E-60 and E-83_A003.pdf |
| SPECIAL CONTRACT REQUIREMENTS |
| Section 101. — TERMS, FORMAT, AND DEFINITIONS |
| Section 103. — SCOPE OF WORK |
| Section 105. — CONTROL OF MATERIAL |
| Section 106. — ACCEPTANCE OF WORK |
| Section 107. - LEGAL RELATIONS AND RESPONSIBILITY TO THE PUBLIC |
| Section 108. — PROSECUTION AND PROGRESS |
| Section 109. — MEASUREMENT AND PAYMENT |
| Section 152. — CONSTRUCTION SURVEY AND STAKING |
| Section 153. — CONTRACTOR QUALITY CONTROL |
| Section 154. — CONTRACTOR SAMPLING AND TESTING |
| Section 155. — SCHEDULES FOR CONSTRUCTION CONTRACTS |
| Section 156. — PUBLIC TRAFFIC |
| Section 157. — SOIL EROSION AND SEDIMENT CONTROL |
| Section 157. — SOIL EROSION CONTROL, SEDIMENT CONTROL, AND STORMWATER POLLUTION PREVENTION PLAN |
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .