Bid Tabulation CO FLAP LAR10(1).pdf

PDF 693 KB Posted

Attached to
CO FLAP LAR 10(1) Horsetooth Res and Carter Lake
Solicitation number
6982AF24B000022
Issued by

About this file

This is a bid tabulation report dated 12/16/24 for Project CO FLAP LAR 10(1) - Horsetooth Reservoir and Carter Lake improvements in Larimer County, Colorado. The report details bids from four contractors (FDT Water Infrastructure LLC, American West Construction LLC, T1-MW Joint Venture, and Siete Inc.) compared against the Engineer's Estimate for three schedules: Base Schedule A ($6.4M-$13.4M), Option X ($2.4M-$3.6M), and Option Y ($1.5M-$2.4M).

FDT Water Infrastructure LLC submitted the lowest responsive bid for Base Schedule A at $6,436,645, slightly below the Engineer's Estimate of $6,439,015. Siete Inc. submitted the lowest bids for both Option X at $2,435,328 and Option Y at $1,589,771. The work includes parking lot rehabilitation, road reconstruction, drainage improvements, pavement marking, concrete work, and traffic control across multiple locations at Horsetooth Reservoir and Carter Lake. Major line items include asphalt concrete pavement, aggregate base, roadway excavation, and mobilization. The project is managed by the Department of Transportation Federal Highway Administration's Central Federal Lands division.

View the file

Other files

Show all 19

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Tabulation of Bids Report Date: 12/16/24

1 out of 37

Project No: CO FLAP LAR 10(1)

Project Name: Horsetooth Res and Carter Lake

Contractor Responsive?

Engineer's Estimate

American West Construction, LLC

FDT Water Infrastructure, LLC

Siete, Inc.

T1-MW Joint Venture

Base Schedule A

$6,439,015.39

$6,990,890.00

$6,436,645.00

$13,461,215.80

$7,552,930.00

Option: X

$2,866,507.37

$3,313,733.00

$2,754,303.50

$2,435,328.25

$3,653,989.00

Option: Y

$1,877,887.31

$2,383,313.00

$1,845,087.50

$1,589,771.25

$2,456,772.00

Contractor Responsive?

Engineer's Estimate

American West Construction, LLC

FDT Water Infrastructure, LLC

Siete, Inc.

T1-MW Joint Venture

Total Base Schedule A and Option(s): X

$9,305,522.76

$10,304,623.00

$9,190,948.50

$15,896,544.05

$11,206,919.00

Total Base Schedule A and Option(s): XY

$11,183,410.07

$12,687,936.00

$11,036,036.00

$17,486,315.30

$13,663,691.00

Total Base Schedule A and Option(s): Y

$8,316,902.70

$9,374,203.00

$8,281,732.50

$15,050,987.05

$10,009,702.00

2 out of 37

Project No: CO FLAP LAR 10(1)

Project Name: Horsetooth Res and Carter Lake

Schedule: A

Schedule Type: Base

Solcitation No: 6982AF24B000022

Division: Central Federal Lands

State: CO County: Larimer

Federal Land: Opened at: Lakewood, CO

Opened by: Leslie Karsten

Date: 12/05/24

I certify that this Bid Tabulation accurately reflects the offers received for this solicitation.

Signed: _______________________________

Title: _______________________________

Date: _______________________________

Contract Awarded to: ____________________ Award Date: ____________________

Contractor Comment Bid Amount Responsive

FDT Water Infrastructure, LLC $6,436,645.00 1501 West Fountainhead Parkway Suite 550 Tempe, AZ 85282

American West Construction, LLC $6,990,890.00 275 E 64th Ave Denver, CO 80221

T1-MW Joint Venture $7,552,930.00 3201 Tremont Ave North Bend, OR 97459

Siete, Inc. $13,461,215.80 8155 Park Road Rye, CO 81069

Engineer's Estimate $6,439,015.39

Contracting Officer 12.16.2024

3 out of 37

Project No: CO FLAP LAR 10(1)

Project Name: Horsetooth Res and Carter Lake

Schedule: A

Schedule Type: Base

Line Item Pay Item No. Description Quantity Unit Unit Price Amount

Number

A1000 15101-0000 MOBILIZATION

FDT Water Infrastructure, LLC Lump Sum $349,594.60 American West Construction, LLC Lump Sum $690,000.00 T1-MW Joint Venture Lump Sum $390,000.00 Siete, Inc. Lump Sum $2,500,000.00 Engineer's Estimate ALL LPSM Lump Sum $700,036.39

A1001 15206-0000 SLOPE, REFERENCE, AND CLEARING AND GRUBBING STAKE

FDT Water Infrastructure, LLC $213,000.00 $323,760.00 American West Construction, LLC $29,000.00 $44,080.00 T1-MW Joint Venture $26,000.00 $39,520.00 Siete, Inc. $30,000.00 $45,600.00 Engineer's Estimate 1.520 MILE $18,000.00 $27,360.00

A1002 15215-3000 SURVEY AND STAKING, DRAINAGE STRUCTURE

FDT Water Infrastructure, LLC $1,805.00 $39,710.00 American West Construction, LLC $300.00 $6,600.00 T1-MW Joint Venture $1,300.00 $28,600.00 Siete, Inc. $5,000.00 $110,000.00 Engineer's Estimate 22 EACH $1,200.00 $26,400.00

A1003 15215-7000 SURVEY AND STAKING, PARKING AREA

FDT Water Infrastructure, LLC $4,625.00 $23,125.00 American West Construction, LLC $9,700.00 $48,500.00 T1-MW Joint Venture $10,500.00 $52,500.00 Siete, Inc. $50,000.00 $250,000.00 Engineer's Estimate 5 EACH $7,000.00 $35,000.00

A1004 15216-2000 SURVEY AND STAKING, GRADE FINISHING STAKES

FDT Water Infrastructure, LLC $6,500.00 $19,760.00 American West Construction, LLC $10,000.00 $30,400.00 T1-MW Joint Venture $17,600.00 $53,504.00 Siete, Inc. $50,000.00 $152,000.00 Engineer's Estimate 3.040 MILE $10,000.00 $30,400.00

A1005 15301-0000 CONTRACTOR QUALITY CONTROL

FDT Water Infrastructure, LLC Lump Sum $58,000.00 American West Construction, LLC Lump Sum $140,000.00 T1-MW Joint Venture Lump Sum $275,000.00 Siete, Inc. Lump Sum $850,000.00 Engineer's Estimate ALL LPSM Lump Sum $212,611.00

4 out of 37

Project No: CO FLAP LAR 10(1)

Project Name: Horsetooth Res and Carter Lake

Schedule: A

Schedule Type: Base

Line Item Pay Item No. Description Quantity Unit Unit Price Amount

Number

A1006 15401-0000 CONTRACTOR TESTING

FDT Water Infrastructure, LLC Lump Sum $8,000.00 American West Construction, LLC Lump Sum $141,000.00 T1-MW Joint Venture Lump Sum $48,000.00 Siete, Inc. Lump Sum $850,000.00 Engineer's Estimate ALL LPSM Lump Sum $132,882.00

A1007 15501-0000 CONSTRUCTION SCHEDULE

FDT Water Infrastructure, LLC Lump Sum $10,000.00 American West Construction, LLC Lump Sum $150,000.00 T1-MW Joint Venture Lump Sum $60,000.00 Siete, Inc. Lump Sum $100,000.00 Engineer's Estimate ALL LPSM Lump Sum $53,153.00

A1008 15701-0000 SOIL EROSION CONTROL

FDT Water Infrastructure, LLC Lump Sum $6,600.00 American West Construction, LLC Lump Sum $96,000.00 T1-MW Joint Venture Lump Sum $160,000.00 Siete, Inc. Lump Sum $200,000.00 Engineer's Estimate ALL LPSM Lump Sum $103,000.00

A1009 15706-0200 SOIL EROSION CONTROL, CHECK DAM (Permanent)

FDT Water Infrastructure, LLC $1,375.00 $89,375.00 American West Construction, LLC $1,100.00 $71,500.00 T1-MW Joint Venture $1,200.00 $78,000.00 Siete, Inc. $500.00 $32,500.00 Engineer's Estimate 65 EACH $55.00 $3,575.00

A1010 15720-0000 STORM WATER POLLUTION PREVENTION PLAN

FDT Water Infrastructure, LLC Lump Sum $80,000.00 American West Construction, LLC Lump Sum $14,000.00 T1-MW Joint Venture Lump Sum $15,000.00 Siete, Inc. Lump Sum $35,000.00 Engineer's Estimate ALL LPSM Lump Sum $6,000.00

A1011 15802-0000 WATERING FOR DUST CONTROL

FDT Water Infrastructure, LLC Lump Sum $41,000.00 American West Construction, LLC Lump Sum $27,000.00 T1-MW Joint Venture Lump Sum $165,000.00 Siete, Inc. Lump Sum $100,000.00 Engineer's Estimate ALL LPSM Lump Sum $20,000.00

5 out of 37

Project No: CO FLAP LAR 10(1)

Project Name: Horsetooth Res and Carter Lake

Schedule: A

Schedule Type: Base

Line Item Pay Item No. Description Quantity Unit Unit Price Amount

Number

A1012 20101-0000 CLEARING AND GRUBBING

FDT Water Infrastructure, LLC $3,500.00 $61,950.00 American West Construction, LLC $9,000.00 $159,300.00 T1-MW Joint Venture $11,000.00 $194,700.00 Siete, Inc. $25,000.00 $442,500.00 Engineer's Estimate 17.7 ACRE $6,000.00 $106,200.00

A1013 20301-0100 REMOVAL OF BOLLARD

FDT Water Infrastructure, LLC $370.00 $1,850.00 American West Construction, LLC $350.00 $1,750.00 T1-MW Joint Venture $190.00 $950.00 Siete, Inc. $1,000.00 $5,000.00 Engineer's Estimate 5 EACH $200.00 $1,000.00

A1014 20301-0700 REMOVAL OF DELINEATOR

FDT Water Infrastructure, LLC $325.00 $2,275.00 American West Construction, LLC $160.00 $1,120.00 T1-MW Joint Venture $40.00 $280.00 Siete, Inc. $30.00 $210.00 Engineer's Estimate 7 EACH $14.00 $98.00

A1015 20301-1600 REMOVAL OF MAILBOX

FDT Water Infrastructure, LLC $500.00 $4,000.00 American West Construction, LLC $160.00 $1,280.00 T1-MW Joint Venture $120.00 $960.00 Siete, Inc. $500.00 $4,000.00 Engineer's Estimate 8 EACH $115.00 $920.00

A1016 20301-2400 REMOVAL OF SIGN

FDT Water Infrastructure, LLC $150.00 $6,150.00 American West Construction, LLC $360.00 $14,760.00 T1-MW Joint Venture $50.00 $2,050.00 Siete, Inc. $1,000.00 $41,000.00 Engineer's Estimate 41 EACH $160.00 $6,560.00

A1017 20301-3400 REMOVAL OF WHEELSTOP

FDT Water Infrastructure, LLC $50.00 $5,750.00 American West Construction, LLC $140.00 $16,100.00 T1-MW Joint Venture $40.00 $4,600.00 Siete, Inc. $500.00 $57,500.00 Engineer's Estimate 115 EACH $150.00 $17,250.00

6 out of 37

Project No: CO FLAP LAR 10(1)

Project Name: Horsetooth Res and Carter Lake

Schedule: A

Schedule Type: Base

Line Item Pay Item No. Description Quantity Unit Unit Price Amount

Number

A1018 20302-0500 REMOVAL OF CURB, CONCRETE

FDT Water Infrastructure, LLC $40.00 $400.00 American West Construction, LLC $140.00 $1,400.00 T1-MW Joint Venture $95.00 $950.00 Siete, Inc. $100.00 $1,000.00 Engineer's Estimate 10 LNFT $9.00 $90.00

A1019 20302-0625 REMOVAL OF CURB, LOG

FDT Water Infrastructure, LLC $40.00 $3,200.00 American West Construction, LLC $26.00 $2,080.00 T1-MW Joint Venture $35.00 $2,800.00 Siete, Inc. $100.00 $8,000.00 Engineer's Estimate 80 LNFT $13.00 $1,040.00

A1020 20302-2100 REMOVAL OF PIPE CULVERT

FDT Water Infrastructure, LLC $65.00 $3,900.00 American West Construction, LLC $67.00 $4,020.00 T1-MW Joint Venture $70.00 $4,200.00 Siete, Inc. $150.00 $9,000.00 Engineer's Estimate 60 LNFT $40.00 $2,400.00

A1021 20302-2600 REMOVAL OF PAVEMENT MARKINGS

FDT Water Infrastructure, LLC $4.00 $22,776.00 American West Construction, LLC $8.00 $45,552.00 T1-MW Joint Venture $4.00 $22,776.00 Siete, Inc. $10.00 $56,940.00 Engineer's Estimate 5,694 LNFT $5.00 $28,470.00

A1022 20303-0300 REMOVAL OF CONCRETE

FDT Water Infrastructure, LLC $45.00 $8,235.00 American West Construction, LLC $76.00 $13,908.00 T1-MW Joint Venture $57.00 $10,431.00 Siete, Inc. $200.00 $36,600.00 Engineer's Estimate 183 SQYD $60.00 $10,980.00

A1024 20401-0000 ROADWAY EXCAVATION

FDT Water Infrastructure, LLC $20.50 $451,000.00 American West Construction, LLC $22.00 $484,000.00 T1-MW Joint Venture $21.00 $462,000.00 Siete, Inc. $50.00 $1,100,000.00 Engineer's Estimate 22,000 CUYD $48.00 $1,056,000.00

7 out of 37

Project No: CO FLAP LAR 10(1)

Project Name: Horsetooth Res and Carter Lake

Schedule: A

Schedule Type: Base

Line Item Pay Item No. Description Quantity Unit Unit Price Amount

Number

A1025 20441-0000 WASTE

FDT Water Infrastructure, LLC $26.00 $289,380.00 American West Construction, LLC $43.00 $478,590.00 T1-MW Joint Venture $27.00 $300,510.00 Siete, Inc. $20.00 $222,600.00 Engineer's Estimate 11,130 CUYD $35.00 $389,550.00

A1026 20820-0000 DEWATERING

FDT Water Infrastructure, LLC Lump Sum $15,000.00 American West Construction, LLC Lump Sum $8,500.00 T1-MW Joint Venture Lump Sum $5,000.00 Siete, Inc. Lump Sum $25,000.00 Engineer's Estimate ALL LPSM Lump Sum $4,000.00

A1027 21101-1000 ROADWAY OBLITERATION, METHOD 1

FDT Water Infrastructure, LLC $5.75 $4,025.00 American West Construction, LLC $22.00 $15,400.00 T1-MW Joint Venture $13.00 $9,100.00 Siete, Inc. $30.00 $21,000.00 Engineer's Estimate 700 SQYD $10.00 $7,000.00

A1029 25101-2200 PLACED RIPRAP, METHOD B, CLASS 2

FDT Water Infrastructure, LLC $165.00 $9,075.00 American West Construction, LLC $260.00 $14,300.00 T1-MW Joint Venture $470.00 $25,850.00 Siete, Inc. $500.00 $27,500.00 Engineer's Estimate 55 CUYD $235.00 $12,925.00

A1030 25101-2300 PLACED RIPRAP, METHOD B, CLASS 3

FDT Water Infrastructure, LLC $165.00 $4,950.00 American West Construction, LLC $280.00 $8,400.00 T1-MW Joint Venture $500.00 $15,000.00 Siete, Inc. $500.00 $15,000.00 Engineer's Estimate 30 CUYD $275.00 $8,250.00

A1031 25101-2400 PLACED RIPRAP, METHOD B, CLASS 4

FDT Water Infrastructure, LLC $165.00 $5,445.00 American West Construction, LLC $280.00 $9,240.00 T1-MW Joint Venture $550.00 $18,150.00 Siete, Inc. $500.00 $16,500.00 Engineer's Estimate 33 CUYD $300.00 $9,900.00

8 out of 37

Project No: CO FLAP LAR 10(1)

Project Name: Horsetooth Res and Carter Lake

Schedule: A

Schedule Type: Base

Line Item Pay Item No. Description Quantity Unit Unit Price Amount

Number

A1032 25126-0000 REMOVE AND RESET BOULDER

FDT Water Infrastructure, LLC $500.00 $79,500.00 American West Construction, LLC $390.00 $62,010.00 T1-MW Joint Venture $150.00 $23,850.00 Siete, Inc. $1,500.00 $238,500.00 Engineer's Estimate 159 EACH $340.00 $54,060.00

A1034 30101-0000 AGGREGATE BASE

FDT Water Infrastructure, LLC $58.00 $812,000.00 American West Construction, LLC $65.00 $910,000.00 T1-MW Joint Venture $44.00 $616,000.00 Siete, Inc. $60.00 $840,000.00 Engineer's Estimate 14,000 TON $46.00 $644,000.00

A1035 30203-2120 ROADWAY AGGREGATE, METHOD 2, SURFACE COURSE, 4-INCH DEPTH

FDT Water Infrastructure, LLC $45.00 $49,950.00 American West Construction, LLC $20.00 $22,200.00 T1-MW Joint Venture $20.00 $22,200.00 Siete, Inc. $30.00 $33,300.00 Engineer's Estimate 1,110 SQYD $30.00 $33,300.00

A1036 40301-0100 ASPHALT CONCRETE PAVEMENT, TYPE 1

FDT Water Infrastructure, LLC $190.00 $1,767,000.00 American West Construction, LLC $140.00 $1,302,000.00 T1-MW Joint Venture $180.00 $1,674,000.00 Siete, Inc. $175.00 $1,627,500.00 Engineer's Estimate 9,300 TON $140.00 $1,302,000.00

A1037 41201-0000 TACK COAT

FDT Water Infrastructure, LLC $900.00 $18,000.00 American West Construction, LLC $1,200.00 $24,000.00 T1-MW Joint Venture $1,600.00 $32,000.00 Siete, Inc. $600.00 $12,000.00 Engineer's Estimate 20 TON $760.00 $15,200.00

A1038 41301-0600 ASPHALT PAVEMENT MILLING, 2-INCH DEPTH

FDT Water Infrastructure, LLC $10.00 $14,600.00 American West Construction, LLC $12.00 $17,520.00 T1-MW Joint Venture $22.00 $32,120.00 Siete, Inc. $20.00 $29,200.00 Engineer's Estimate 1,460 SQYD $7.00 $10,220.00

9 out of 37

Project No: CO FLAP LAR 10(1)

Project Name: Horsetooth Res and Carter Lake

Schedule: A

Schedule Type: Base

Line Item Pay Item No. Description Quantity Unit Unit Price Amount

Number

A1039 50101-0600 MINOR CONCRETE PAVEMENT, REINFORCED, 6-INCH DEPTH

FDT Water Infrastructure, LLC $200.00 $138,000.00 American West Construction, LLC $150.00 $103,500.00 T1-MW Joint Venture $200.00 $138,000.00 Siete, Inc. $225.00 $155,250.00 Engineer's Estimate 690 SQYD $180.00 $124,200.00

A1040 60201-0600 18-INCH PIPE CULVERT

FDT Water Infrastructure, LLC $160.00 $99,200.00 American West Construction, LLC $140.00 $86,800.00 T1-MW Joint Venture $240.00 $148,800.00 Siete, Inc. $300.00 $186,000.00 Engineer's Estimate 620 LNFT $200.00 $124,000.00

A1041 60201-0800 24-INCH PIPE CULVERT

FDT Water Infrastructure, LLC $200.00 $46,000.00 American West Construction, LLC $215.00 $49,450.00 T1-MW Joint Venture $340.00 $78,200.00 Siete, Inc. $375.00 $86,250.00 Engineer's Estimate 230 LNFT $240.00 $55,200.00

A1042 60201-0900 30-INCH PIPE CULVERT

FDT Water Infrastructure, LLC $285.00 $6,270.00 American West Construction, LLC $320.00 $7,040.00 T1-MW Joint Venture $570.00 $12,540.00 Siete, Inc. $400.00 $8,800.00 Engineer's Estimate 22 LNFT $300.00 $6,600.00

A1043 60201-1000 36-INCH PIPE CULVERT

FDT Water Infrastructure, LLC $300.00 $7,500.00 American West Construction, LLC $300.00 $7,500.00 T1-MW Joint Venture $600.00 $15,000.00 Siete, Inc. $500.00 $12,500.00 Engineer's Estimate 25 LNFT $330.00 $8,250.00

A1045 60210-0600 END SECTION FOR 18-INCH PIPE CULVERT

FDT Water Infrastructure, LLC $900.00 $8,100.00 American West Construction, LLC $880.00 $7,920.00 T1-MW Joint Venture $2,000.00 $18,000.00 Siete, Inc. $4,000.00 $36,000.00 Engineer's Estimate 9 EACH $550.00 $4,950.00

10 out of 37

Project No: CO FLAP LAR 10(1)

Project Name: Horsetooth Res and Carter Lake

Schedule: A

Schedule Type: Base

Line Item Pay Item No. Description Quantity Unit Unit Price Amount

Number

A1046 60210-0800 END SECTION FOR 24-INCH PIPE CULVERT

FDT Water Infrastructure, LLC $1,150.00 $8,050.00 American West Construction, LLC $1,300.00 $9,100.00 T1-MW Joint Venture $2,500.00 $17,500.00 Siete, Inc. $5,000.00 $35,000.00 Engineer's Estimate 7 EACH $575.00 $4,025.00

A1047 60210-0900 END SECTION FOR 30-INCH PIPE CULVERT

FDT Water Infrastructure, LLC $1,800.00 $3,600.00 American West Construction, LLC $1,700.00 $3,400.00 T1-MW Joint Venture $3,000.00 $6,000.00 Siete, Inc. $6,000.00 $12,000.00 Engineer's Estimate 2 EACH $600.00 $1,200.00

A1048 60210-1000 END SECTION FOR 36-INCH PIPE CULVERT

FDT Water Infrastructure, LLC $2,200.00 $4,400.00 American West Construction, LLC $2,000.00 $4,000.00 T1-MW Joint Venture $3,500.00 $7,000.00 Siete, Inc. $7,000.00 $14,000.00 Engineer's Estimate 2 EACH $700.00 $1,400.00

A1049 60210-1100 END SECTION FOR 42-INCH PIPE CULVERT

FDT Water Infrastructure, LLC $3,000.00 $3,000.00 American West Construction, LLC $2,600.00 $2,600.00 T1-MW Joint Venture $4,000.00 $4,000.00 Siete, Inc. $10,000.00 $10,000.00 Engineer's Estimate 1 EACH $1,700.00 $1,700.00

A1050 60212-0800 ELBOW, 24-INCH

FDT Water Infrastructure, LLC $500.00 $1,000.00 American West Construction, LLC $2,000.00 $4,000.00 T1-MW Joint Venture $15,000.00 $30,000.00 Siete, Inc. $7,500.00 $15,000.00 Engineer's Estimate 2 EACH $1,400.00 $2,800.00

A1051 60401-0000 MANHOLE (CDS Model 3030-6)

FDT Water Infrastructure, LLC $84,000.00 $84,000.00 American West Construction, LLC $75,000.00 $75,000.00 T1-MW Joint Venture $128,000.00 $128,000.00 Siete, Inc. $125,000.00 $125,000.00 Engineer's Estimate 1 EACH $45,800.00 $45,800.00

11 out of 37

Project No: CO FLAP LAR 10(1)

Project Name: Horsetooth Res and Carter Lake

Schedule: A

Schedule Type: Base

Line Item Pay Item No. Description Quantity Unit Unit Price Amount

Number

A1052 60401-0000 MANHOLE (CDS Model 3025-6)

FDT Water Infrastructure, LLC $75,000.00 $150,000.00 American West Construction, LLC $70,000.00 $140,000.00 T1-MW Joint Venture $118,000.00 $236,000.00 Siete, Inc. $100,000.00 $200,000.00 Engineer's Estimate 2 EACH $42,000.00 $84,000.00

A1053 60401-0000 MANHOLE (CDS Model 3020-6)

FDT Water Infrastructure, LLC $72,000.00 $72,000.00 American West Construction, LLC $66,000.00 $66,000.00 T1-MW Joint Venture $115,000.00 $115,000.00 Siete, Inc. $100,000.00 $100,000.00 Engineer's Estimate 1 EACH $38,200.00 $38,200.00

A1054 60401-0000 MANHOLE (with dome grate)

FDT Water Infrastructure, LLC $25,000.00 $25,000.00 American West Construction, LLC $20,000.00 $20,000.00 T1-MW Joint Venture $18,800.00 $18,800.00 Siete, Inc. $40,000.00 $40,000.00 Engineer's Estimate 1 EACH $8,000.00 $8,000.00

A1055 60401-0000 MANHOLE (CDS MODEL 4030-8)

FDT Water Infrastructure, LLC $95,000.00 $95,000.00 American West Construction, LLC $86,000.00 $86,000.00 T1-MW Joint Venture $148,000.00 $148,000.00 Siete, Inc. $125,000.00 $125,000.00 Engineer's Estimate 1 EACH $52,600.00 $52,600.00

A1056 60403-0000 INLET (CMP riser pipe)

FDT Water Infrastructure, LLC $6,200.00 $31,000.00 American West Construction, LLC $2,900.00 $14,500.00 T1-MW Joint Venture $10,400.00 $52,000.00 Siete, Inc. $25,000.00 $125,000.00 Engineer's Estimate 5 EACH $1,750.00 $8,750.00

A1057 60403-0000 INLET (Basin forebay)

FDT Water Infrastructure, LLC $31,000.00 $31,000.00 American West Construction, LLC $21,000.00 $21,000.00 T1-MW Joint Venture $30,000.00 $30,000.00 Siete, Inc. $50,000.00 $50,000.00 Engineer's Estimate 1 EACH $10,000.00 $10,000.00

12 out of 37

Project No: CO FLAP LAR 10(1)

Project Name: Horsetooth Res and Carter Lake

Schedule: A

Schedule Type: Base

Line Item Pay Item No. Description Quantity Unit Unit Price Amount

Number

A1058 60415-0000 TRENCH DRAIN

FDT Water Infrastructure, LLC $3,000.00 $9,000.00 American West Construction, LLC $5,400.00 $16,200.00 T1-MW Joint Venture $7,700.00 $23,100.00 Siete, Inc. $10,000.00 $30,000.00 Engineer's Estimate 3 EACH $1,000.00 $3,000.00

A1059 60420-0000 OUTLET STRUCTURE

FDT Water Infrastructure, LLC $41,000.00 $41,000.00 American West Construction, LLC $50,000.00 $50,000.00 T1-MW Joint Venture $46,000.00 $46,000.00 Siete, Inc. $50,000.00 $50,000.00 Engineer's Estimate 1 EACH $17,000.00 $17,000.00

A1060 60704-0000 CLEANING CULVERT IN PLACE

FDT Water Infrastructure, LLC $2,423.90 $14,543.40 American West Construction, LLC $3,500.00 $21,000.00 T1-MW Joint Venture $4,500.00 $27,000.00 Siete, Inc. $2,000.00 $12,000.00 Engineer's Estimate 6 EACH $4,000.00 $24,000.00

A1061 60801-0400 PAVED WATERWAY, TYPE 4

FDT Water Infrastructure, LLC $300.00 $12,300.00 American West Construction, LLC $510.00 $20,910.00 T1-MW Joint Venture $680.00 $27,880.00 Siete, Inc. $500.00 $20,500.00 Engineer's Estimate 41 SQYD $400.00 $16,400.00

A1062 60901-1700 CURB, CONCRETE, 18-INCH DEPTH

FDT Water Infrastructure, LLC $75.00 $15,000.00 American West Construction, LLC $88.00 $17,600.00 T1-MW Joint Venture $110.00 $22,000.00 Siete, Inc. $135.00 $27,000.00 Engineer's Estimate 200 LNFT $70.00 $14,000.00

A1063 60902-1000 CURB AND GUTTER, CONCRETE, 12-INCH DEPTH

FDT Water Infrastructure, LLC $62.00 $146,320.00 American West Construction, LLC $85.00 $200,600.00 T1-MW Joint Venture $90.00 $212,400.00 Siete, Inc. $100.00 $236,000.00 Engineer's Estimate 2,360 LNFT $80.00 $188,800.00

13 out of 37

Project No: CO FLAP LAR 10(1)

Project Name: Horsetooth Res and Carter Lake

Schedule: A

Schedule Type: Base

Line Item Pay Item No. Description Quantity Unit Unit Price Amount

Number

A1064 60905-1000 GUTTER, CONCRETE (4' valley gutter)

FDT Water Infrastructure, LLC $85.00 $20,400.00 American West Construction, LLC $130.00 $31,200.00 T1-MW Joint Venture $170.00 $40,800.00 Siete, Inc. $200.00 $48,000.00 Engineer's Estimate 240 LNFT $115.00 $27,600.00

A1065 60915-1000 WHEELSTOP, CONCRETE

FDT Water Infrastructure, LLC $200.00 $34,000.00 American West Construction, LLC $240.00 $40,800.00 T1-MW Joint Venture $300.00 $51,000.00 Siete, Inc. $500.00 $85,000.00 Engineer's Estimate 170 EACH $340.00 $57,800.00

A1066 60920-0000 RESET WHEELSTOP

FDT Water Infrastructure, LLC $100.00 $6,300.00 American West Construction, LLC $140.00 $8,820.00 T1-MW Joint Venture $43.00 $2,709.00 Siete, Inc. $500.00 $31,500.00 Engineer's Estimate 63 EACH $185.00 $11,655.00

A1067 61104-0400 VALVE, GATE (Flap)

FDT Water Infrastructure, LLC $600.00 $3,000.00 American West Construction, LLC $930.00 $4,650.00 T1-MW Joint Venture $1,200.00 $6,000.00 Siete, Inc. $3,500.00 $17,500.00 Engineer's Estimate 5 EACH $250.00 $1,250.00

A1068 61114-8000 WATER SYSTEM ACCESSORY, REDUCER

FDT Water Infrastructure, LLC $3,000.00 $3,000.00 American West Construction, LLC $4,100.00 $4,100.00 T1-MW Joint Venture $3,600.00 $3,600.00 Siete, Inc. $10,000.00 $10,000.00 Engineer's Estimate 1 EACH $700.00 $700.00

A1069 61501-0100 SIDEWALK, CONCRETE

FDT Water Infrastructure, LLC $150.00 $82,500.00 American West Construction, LLC $190.00 $104,500.00 T1-MW Joint Venture $170.00 $93,500.00 Siete, Inc. $100.00 $55,000.00 Engineer's Estimate 550 SQYD $130.00 $71,500.00

14 out of 37

Project No: CO FLAP LAR 10(1)

Project Name: Horsetooth Res and Carter Lake

Schedule: A

Schedule Type: Base

Line Item Pay Item No. Description Quantity Unit Unit Price Amount

Number

A1070 61509-0000 DETECTABLE WARNING PANELS

FDT Water Infrastructure, LLC $690.00 $15,180.00 American West Construction, LLC $620.00 $13,640.00 T1-MW Joint Venture $600.00 $13,200.00 Siete, Inc. $800.00 $17,600.00 Engineer's Estimate 22 SQYD $370.00 $8,140.00

A1071 61904-0000 BOLLARD POST

FDT Water Infrastructure, LLC $2,000.00 $2,000.00 American West Construction, LLC $600.00 $600.00 T1-MW Joint Venture $3,700.00 $3,700.00 Siete, Inc. $7,500.00 $7,500.00 Engineer's Estimate 1 EACH $700.00 $700.00

A1072 62302-1000 SPECIAL LABOR, HIRED TECHNICAL SERVICES

FDT Water Infrastructure, LLC $200.00 $18,600.00 American West Construction, LLC $250.00 $23,250.00 T1-MW Joint Venture $180.00 $16,740.00 Siete, Inc. $165.00 $15,345.00 Engineer's Estimate 93 HOUR $150.00 $13,950.00

A1073 62302-1100 SPECIAL LABOR, HIRED SURVEY SERVICES

FDT Water Infrastructure, LLC $150.00 $3,000.00 American West Construction, LLC $250.00 $5,000.00 T1-MW Joint Venture $200.00 $4,000.00 Siete, Inc. $165.00 $3,300.00 Engineer's Estimate 20 HOUR $250.00 $5,000.00

A1074 62401-0300 FURNISHING AND PLACING TOPSOIL, 4-INCH DEPTH

FDT Water Infrastructure, LLC $17.00 $15,300.00 American West Construction, LLC $11.00 $9,900.00 T1-MW Joint Venture $12.00 $10,800.00 Siete, Inc. $50.00 $45,000.00 Engineer's Estimate 900 SQYD $15.00 $13,500.00

A1075 62405-0300 PLACING CONSERVED TOPSOIL, 4-INCH DEPTH

FDT Water Infrastructure, LLC $3.00 $48,360.00 American West Construction, LLC $1.50 $24,180.00 T1-MW Joint Venture $5.00 $80,600.00 Siete, Inc. $4.00 $64,480.00 Engineer's Estimate 16,120 SQYD $3.00 $48,360.00

15 out of 37

Project No: CO FLAP LAR 10(1)

Project Name: Horsetooth Res and Carter Lake

Schedule: A

Schedule Type: Base

Line Item Pay Item No. Description Quantity Unit Unit Price Amount

Number

A1076 62511-2000 SEEDING, HYDRAULIC METHOD

FDT Water Infrastructure, LLC $2.00 $34,040.00 American West Construction, LLC $2.00 $34,040.00 T1-MW Joint Venture $3.00 $51,060.00 Siete, Inc. $1.79 $30,465.80 Engineer's Estimate 17,020 SQYD $2.50 $42,550.00

A1077 63301-0000 SIGN SYSTEM

FDT Water Infrastructure, LLC $650.00 $33,800.00 American West Construction, LLC $460.00 $23,920.00 T1-MW Joint Venture $900.00 $46,800.00 Siete, Inc. $1,000.00 $52,000.00 Engineer's Estimate 52 EACH $600.00 $31,200.00

A1078 63309-0000 DELINEATOR

FDT Water Infrastructure, LLC $500.00 $2,500.00 American West Construction, LLC $60.00 $300.00 T1-MW Joint Venture $450.00 $2,250.00 Siete, Inc. $75.00 $375.00 Engineer's Estimate 5 EACH $40.00 $200.00

A1079 63316-1000 REMOVE AND RESET SIGN

FDT Water Infrastructure, LLC $350.00 $14,350.00 American West Construction, LLC $980.00 $40,180.00 T1-MW Joint Venture $630.00 $25,830.00 Siete, Inc. $1,500.00 $61,500.00 Engineer's Estimate 41 EACH $250.00 $10,250.00

A1080 63401-0400 PAVEMENT MARKINGS, TYPE B, BROKEN

FDT Water Infrastructure, LLC $0.80 $240.00 American West Construction, LLC $19.00 $5,700.00 T1-MW Joint Venture $2.00 $600.00 Siete, Inc. $15.00 $4,500.00 Engineer's Estimate 300 LNFT $3.50 $1,050.00

A1081 63402-0300 PAVEMENT MARKINGS, TYPE B, SOLID

FDT Water Infrastructure, LLC $6,500.00 $86,450.00 American West Construction, LLC $12,500.00 $166,250.00 T1-MW Joint Venture $7,900.00 $105,070.00 Siete, Inc. $9,750.00 $129,675.00 Engineer's Estimate 13.3 MILE $1,400.00 $18,620.00

16 out of 37

Project No: CO FLAP LAR 10(1)

Project Name: Horsetooth Res and Carter Lake

Schedule: A

Schedule Type: Base

Line Item Pay Item No. Description Quantity Unit Unit Price Amount

Number

A1082 63405-0050 PAVEMENT MARKINGS, SYMBOLS (AND WORDS)

FDT Water Infrastructure, LLC $285.00 $570.00 American West Construction, LLC $800.00 $1,600.00 T1-MW Joint Venture $450.00 $900.00 Siete, Inc. $625.00 $1,250.00 Engineer's Estimate 2 EACH $550.00 $1,100.00

A1083 63405-0500 PAVEMENT MARKINGS, TYPE B, TURN ARROW

FDT Water Infrastructure, LLC $200.00 $400.00 American West Construction, LLC $800.00 $1,600.00 T1-MW Joint Venture $450.00 $900.00 Siete, Inc. $625.00 $1,250.00 Engineer's Estimate 2 EACH $250.00 $500.00

A1084 63405-0550 PAVEMENT MARKINGS, TYPE B, STRAIGHT ARROW

FDT Water Infrastructure, LLC $162.00 $4,536.00 American West Construction, LLC $580.00 $16,240.00 T1-MW Joint Venture $450.00 $12,600.00 Siete, Inc. $450.00 $12,600.00 Engineer's Estimate 28 EACH $150.00 $4,200.00

A1085 63405-0850 PAVEMENT MARKINGS, TYPE B, ACCESSIBILITY SYMBOL

FDT Water Infrastructure, LLC $300.00 $4,500.00 American West Construction, LLC $610.00 $9,150.00 T1-MW Joint Venture $630.00 $9,450.00 Siete, Inc. $475.00 $7,125.00 Engineer's Estimate 15 EACH $115.00 $1,725.00

A1086 63501-0000 TEMPORARY TRAFFIC CONTROL

FDT Water Infrastructure, LLC Lump Sum $100,000.00 American West Construction, LLC Lump Sum $160,000.00 T1-MW Joint Venture Lump Sum $275,000.00 Siete, Inc. Lump Sum $700,000.00 Engineer's Estimate ALL LPSM Lump Sum $77,000.00

A1087 63502-2000 TEMPORARY TRAFFIC CONTROL, PORTABLE CHANGEABLE MESSAGE SIGN

FDT Water Infrastructure, LLC $30,000.00 $60,000.00 American West Construction, LLC $40,000.00 $80,000.00 T1-MW Joint Venture $50,000.00 $100,000.00 Siete, Inc. $50,000.00 $100,000.00 Engineer's Estimate 2 EACH $8,000.00 $16,000.00

17 out of 37

Project No: CO FLAP LAR 10(1)

Project Name: Horsetooth Res and Carter Lake

Schedule: A

Schedule Type: Base

Line Item Pay Item No. Description Quantity Unit Unit Price Amount

Number

A1088 63601-3000 SYSTEM INSTALLATION, ELECTRICAL (two rectangular-rapid flashing beacons)

FDT Water Infrastructure, LLC Lump Sum $60,000.00 American West Construction, LLC Lump Sum $18,000.00 T1-MW Joint Venture Lump Sum $107,000.00 Siete, Inc. Lump Sum $30,000.00 Engineer's Estimate ALL LPSM Lump Sum $30,000.00

A1089 64603-0200 FIXTURE, MAILBOX

FDT Water Infrastructure, LLC $2,000.00 $16,000.00 American West Construction, LLC $630.00 $5,040.00 T1-MW Joint Venture $1,000.00 $8,000.00 Siete, Inc. $3,000.00 $24,000.00 Engineer's Estimate 8 EACH $220.00 $1,760.00

A1090 64603-1000 FIXTURE, VAULT TOILET (Site preparation)

FDT Water Infrastructure, LLC $6,500.00 $13,000.00 American West Construction, LLC $15,000.00 $30,000.00 T1-MW Joint Venture $21,000.00 $42,000.00 Siete, Inc. $30,000.00 $60,000.00 Engineer's Estimate 2 EACH $2,000.00 $4,000.00

A1100 25101-0400 PLACED RIPRAP, METHOD A, CLASS 4 (mixed with topsoil)

FDT Water Infrastructure, LLC $175.00 $14,000.00 American West Construction, LLC $220.00 $17,600.00 T1-MW Joint Venture $400.00 $32,000.00 Siete, Inc. $500.00 $40,000.00 Engineer's Estimate 80 CUYD $275.00 $22,000.00

Total Schedule - All Items

FDT Water Infrastructure, LLC $6,436,645.00 American West Construction, LLC $6,990,890.00 T1-MW Joint Venture $7,552,930.00 Siete, Inc. $13,461,215.80 Engineer's Estimate $6,439,015.39

18 out of 37

Project No: CO FLAP LAR 10(1)

Project Name: Horsetooth Res and Carter Lake

Schedule: X

Schedule Type: Options

Solcitation No: 6982AF24B000022

Division: Central Federal Lands

State: CO County: Larimer

Federal Land: Opened at: Lakewood, CO

Opened by: Leslie Karsten

Date: 12/05/24

I certify that this Bid Tabulation accurately reflects the offers received for this solicitation.

Signed: _______________________________

Title: _______________________________

Date: _______________________________

Contract Awarded to: ____________________ Award Date: ____________________

Contractor Comment Bid Amount Responsive

Siete, Inc. $2,435,328.25 8155 Park Road Rye, CO 81069

FDT Water Infrastructure, LLC $2,754,303.50 1501 West Fountainhead Parkway Suite 550 Tempe, AZ 85282

American West Construction, LLC $3,313,733.00 275 E 64th Ave Denver, CO 80221

T1-MW Joint Venture $3,653,989.00 3201 Tremont Ave North Bend, OR 97459

Engineer's Estimate $2,866,507.37

19 out of 37

Project No: CO FLAP LAR 10(1)

Project Name: Horsetooth Res and Carter Lake

Schedule: X

Schedule Type: Options

Line Item Pay Item No. Description Quantity Unit Unit Price Amount

Number

X3000 15101-0000 MOBILIZATION

Siete, Inc. Lump Sum $50,000.00 FDT Water Infrastructure, LLC Lump Sum $120,000.00 American West Construction, LLC Lump Sum $330,000.00 T1-MW Joint Venture Lump Sum $295,000.00 Engineer's Estimate ALL LPSM Lump Sum $411,753.87

X3001 15206-0000 SLOPE, REFERENCE, AND CLEARING AND GRUBBING STAKE

Siete, Inc. $15,000.00 $6,600.00 FDT Water Infrastructure, LLC $20,000.00 $8,800.00 American West Construction, LLC $53,000.00 $23,320.00 T1-MW Joint Venture $25,000.00 $11,000.00 Engineer's Estimate 0.440 MILE $22,000.00 $9,680.00

X3002 15215-3000 SURVEY AND STAKING, DRAINAGE STRUCTURE

Siete, Inc. $3,500.00 $10,500.00 FDT Water Infrastructure, LLC $15,000.00 $45,000.00 American West Construction, LLC $1,200.00 $3,600.00 T1-MW Joint Venture $3,400.00 $10,200.00 Engineer's Estimate 3 EACH $1,800.00 $5,400.00

X3003 15215-7000 SURVEY AND STAKING, PARKING AREA

Siete, Inc. $30,000.00 $60,000.00 FDT Water Infrastructure, LLC $35,000.00 $70,000.00 American West Construction, LLC $11,000.00 $22,000.00 T1-MW Joint Venture $26,000.00 $52,000.00 Engineer's Estimate 2 EACH $10,000.00 $20,000.00

X3004 15216-2000 SURVEY AND STAKING, GRADE FINISHING STAKES

Siete, Inc. $25,000.00 $22,000.00 FDT Water Infrastructure, LLC $50,000.00 $44,000.00 American West Construction, LLC $20,000.00 $17,600.00 T1-MW Joint Venture $17,000.00 $14,960.00 Engineer's Estimate 0.880 MILE $14,000.00 $12,320.00

X3005 15301-0000 CONTRACTOR QUALITY CONTROL

Siete, Inc. Lump Sum $50,000.00 FDT Water Infrastructure, LLC Lump Sum $30,000.00 American West Construction, LLC Lump Sum $139,000.00 T1-MW Joint Venture Lump Sum $190,000.00 Engineer's Estimate ALL LPSM Lump Sum $91,759.00

20 out of 37

Project No: CO FLAP LAR 10(1)

Project Name: Horsetooth Res and Carter Lake

Schedule: X

Schedule Type: Options

Line Item Pay Item No. Description Quantity Unit Unit Price Amount

Number

X3006 15401-0000 CONTRACTOR TESTING

Siete, Inc. Lump Sum $50,000.00 FDT Water Infrastructure, LLC Lump Sum $8,000.00 American West Construction, LLC Lump Sum $141,000.00 T1-MW Joint Venture Lump Sum $50,000.00 Engineer's Estimate ALL LPSM Lump Sum $68,819.00

X3007 15501-0000 CONSTRUCTION SCHEDULE

Siete, Inc. Lump Sum $4,000.00 FDT Water Infrastructure, LLC Lump Sum $10,000.00 American West Construction, LLC Lump Sum $60,000.00 T1-MW Joint Venture Lump Sum $25,000.00 Engineer's Estimate ALL LPSM Lump Sum $22,940.00

X3008 15701-0000 SOIL EROSION CONTROL

Siete, Inc. Lump Sum $20,000.00 FDT Water Infrastructure, LLC Lump Sum $10,000.00 American West Construction, LLC Lump Sum $37,000.00 T1-MW Joint Venture Lump Sum $80,000.00 Engineer's Estimate ALL LPSM Lump Sum $44,000.00

X3009 15720-0000 STORM WATER POLLUTION PREVENTION PLAN

Siete, Inc. Lump Sum $5,000.00 FDT Water Infrastructure, LLC Lump Sum $45,000.00 American West Construction, LLC Lump Sum $7,200.00 T1-MW Joint Venture Lump Sum $15,000.00 Engineer's Estimate ALL LPSM Lump Sum $3,500.00

X3010 15802-0000 WATERING FOR DUST CONTROL

Siete, Inc. Lump Sum $7,500.00 FDT Water Infrastructure, LLC Lump Sum $15,000.00 American West Construction, LLC Lump Sum $15,000.00 T1-MW Joint Venture Lump Sum $110,000.00 Engineer's Estimate ALL LPSM Lump Sum $7,000.00

X3011 20101-0000 CLEARING AND GRUBBING

Siete, Inc. $4,500.00 $16,200.00 FDT Water Infrastructure, LLC $3,500.00 $12,600.00 American West Construction, LLC $9,000.00 $32,400.00 T1-MW Joint Venture $5,600.00 $20,160.00 Engineer's Estimate 3.6 ACRE $6,000.00 $21,600.00

21 out of 37

Project No: CO FLAP LAR 10(1)

Project Name: Horsetooth Res and Carter Lake

Schedule: X

Schedule Type: Options

Line Item Pay Item No. Description Quantity Unit Unit Price Amount

Number

X3012 20301-2400 REMOVAL OF SIGN

Siete, Inc. $150.00 $1,350.00 FDT Water Infrastructure, LLC $150.00 $1,350.00 American West Construction, LLC $330.00 $2,970.00 T1-MW Joint Venture $50.00 $450.00 Engineer's Estimate 9 EACH $160.00 $1,440.00

X3013 20301-3400 REMOVAL OF WHEELSTOP

Siete, Inc. $153.00 $9,945.00 FDT Water Infrastructure, LLC $50.00 $3,250.00 American West Construction, LLC $140.00 $9,100.00 T1-MW Joint Venture $40.00 $2,600.00 Engineer's Estimate 65 EACH $150.00 $9,750.00

X3014 20301-3420 REMOVAL OF SPEED HUMP

Siete, Inc. $2,000.00 $10,000.00 FDT Water Infrastructure, LLC $3,000.00 $15,000.00 American West Construction, LLC $1,700.00 $8,500.00 T1-MW Joint Venture $190.00 $950.00 Engineer's Estimate 5 EACH $125.00 $625.00

X3015 20302-0400 REMOVAL OF CURB, ASPHALT

Siete, Inc. $41.00 $4,920.00 FDT Water Infrastructure, LLC $35.00 $4,200.00 American West Construction, LLC $33.00 $3,960.00 T1-MW Joint Venture $93.00 $11,160.00 Engineer's Estimate 120 LNFT $10.00 $1,200.00

X3016 20302-2600 REMOVAL OF PAVEMENT MARKINGS

Siete, Inc. $6.00 $13,998.00 FDT Water Infrastructure, LLC $7.00 $16,331.00 American West Construction, LLC $8.00 $18,664.00 T1-MW Joint Venture $4.00 $9,332.00 Engineer's Estimate 2,333 LNFT $5.00 $11,665.00

X3019 20401-0000 ROADWAY EXCAVATION

Siete, Inc. $35.00 $52,500.00 FDT Water Infrastructure, LLC $40.00 $60,000.00 American West Construction, LLC $27.00 $40,500.00 T1-MW Joint Venture $55.00 $82,500.00 Engineer's Estimate 1,500 CUYD $48.00 $72,000.00

22 out of 37

Project No: CO FLAP LAR 10(1)

Project Name: Horsetooth Res and Carter Lake

Schedule: X

Schedule Type: Options

Line Item Pay Item No. Description Quantity Unit Unit Price Amount

Number

X3020 20421-0000 ROCK EXCAVATION

Siete, Inc. $600.00 $30,000.00 FDT Water Infrastructure, LLC $100.00 $5,000.00 American West Construction, LLC $150.00 $7,500.00 T1-MW Joint Venture $340.00 $17,000.00 Engineer's Estimate 50 CUYD $200.00 $10,000.00

X3021 20441-0000 WASTE

Siete, Inc. $10.00 $2,100.00 FDT Water Infrastructure, LLC $26.00 $5,460.00 American West Construction, LLC $43.00 $9,030.00 T1-MW Joint Venture $30.00 $6,300.00 Engineer's Estimate 210 CUYD $35.00 $7,350.00

X3022 20820-0000 DEWATERING

Siete, Inc. Lump Sum $5,000.00 FDT Water Infrastructure, LLC Lump Sum $15,000.00 American West Construction, LLC Lump Sum $8,500.00 T1-MW Joint Venture Lump Sum $5,000.00 Engineer's Estimate ALL LPSM Lump Sum $1,600.00

X3023 25126-0000 REMOVE AND RESET BOULDER

Siete, Inc. $500.00 $7,000.00 FDT Water Infrastructure, LLC $600.00 $8,400.00 American West Construction, LLC $390.00 $5,460.00 T1-MW Joint Venture $150.00 $2,100.00 Engineer's Estimate 14 EACH $340.00 $4,760.00

X3024 30101-0000 AGGREGATE BASE

Siete, Inc. $44.00 $264,000.00 FDT Water Infrastructure, LLC $55.00 $330,000.00 American West Construction, LLC $72.00 $432,000.00 T1-MW Joint Venture $50.00 $300,000.00 Engineer's Estimate 6,000 TON $46.00 $276,000.00

X3026 30402-5300 FULL DEPTH RECLAMATION, METHOD 2, 6-INCH DEPTH

Siete, Inc. $3.00 $70,200.00 FDT Water Infrastructure, LLC $3.00 $70,200.00 American West Construction, LLC $3.00 $70,200.00 T1-MW Joint Venture $4.00 $93,600.00 Engineer's Estimate 23,400 SQYD $5.00 $117,000.00

23 out of 37

Project No: CO FLAP LAR 10(1)

Project Name: Horsetooth Res and Carter Lake

Schedule: X

Schedule Type: Options

Line Item Pay Item No. Description Quantity Unit Unit Price Amount

Number

X3027 40301-0100 ASPHALT CONCRETE PAVEMENT, TYPE 1

Siete, Inc. $134.00 $1,031,800.00 FDT Water Infrastructure, LLC $155.00 $1,193,500.00 American West Construction, LLC $140.00 $1,078,000.00 T1-MW Joint Venture $180.00 $1,386,000.00 Engineer's Estimate 7,700 TON $140.00 $1,078,000.00

X3028 41201-0000 TACK COAT

Siete, Inc. $600.00 $12,000.00 FDT Water Infrastructure, LLC $800.00 $16,000.00 American West Construction, LLC $1,200.00 $24,000.00 T1-MW Joint Venture $1,500.00 $30,000.00 Engineer's Estimate 20 TON $760.00 $15,200.00

X3029 41301-0700 ASPHALT PAVEMENT MILLING, 2 1/2-INCH DEPTH

Siete, Inc. $5.00 $700.00 FDT Water Infrastructure, LLC $15.00 $2,100.00 American West Construction, LLC $33.00 $4,620.00 T1-MW Joint Venture $35.00 $4,900.00 Engineer's Estimate 140 SQYD $10.00 $1,400.00

X3030 50101-0600 MINOR CONCRETE PAVEMENT, REINFORCED, 6-INCH DEPTH

Siete, Inc. $170.00 $72,930.00 FDT Water Infrastructure, LLC $160.00 $68,640.00 American West Construction, LLC $160.00 $68,640.00 T1-MW Joint Venture $200.00 $85,800.00 Engineer's Estimate 429 SQYD $180.00 $77,220.00

X3031 60201-0600 18-INCH PIPE CULVERT

Siete, Inc. $200.00 $12,000.00 FDT Water Infrastructure, LLC $150.00 $9,000.00 American West Construction, LLC $130.00 $7,800.00 T1-MW Joint Venture $260.00 $15,600.00 Engineer's Estimate 60 LNFT $200.00 $12,000.00

X3032 60401-0000 MANHOLE (CDS Model 4030-8)

Siete, Inc. $50,000.00 $50,000.00 FDT Water Infrastructure, LLC $75,000.00 $75,000.00 American West Construction, LLC $86,000.00 $86,000.00 T1-MW Joint Venture $150,000.00 $150,000.00 Engineer's Estimate 1 EACH $52,600.00 $52,600.00

24 out of 37

Project No: CO FLAP LAR 10(1)

Project Name: Horsetooth Res and Carter Lake

Schedule: X

Schedule Type: Options

Line Item Pay Item No. Description Quantity Unit Unit Price Amount

Number

X3033 60401-0000 MANHOLE (CDS Model 5653-10)

Siete, Inc. $55,000.00 $55,000.00 FDT Water Infrastructure, LLC $128,000.00 $128,000.00 American West Construction, LLC $141,000.00 $141,000.00 T1-MW Joint Venture $205,000.00 $205,000.00 Engineer's Estimate 1 EACH $95,700.00 $95,700.00

X3034 60404-1000 CATCH BASIN, FLH TYPE 1

Siete, Inc. $10,000.00 $10,000.00 FDT Water Infrastructure, LLC $15,000.00 $15,000.00 American West Construction, LLC $14,000.00 $14,000.00 T1-MW Joint Venture $18,300.00 $18,300.00 Engineer's Estimate 1 EACH $8,000.00 $8,000.00

X3035 60704-0000 CLEANING CULVERT IN PLACE

Siete, Inc. $2,000.00 $2,000.00 FDT Water Infrastructure, LLC $5,000.00 $5,000.00 American West Construction, LLC $3,500.00 $3,500.00 T1-MW Joint Venture $3,000.00 $3,000.00 Engineer's Estimate 1 EACH $4,000.00 $4,000.00

X3036 60902-1000 CURB AND GUTTER, CONCRETE, 12-INCH DEPTH

Siete, Inc. $62.00 $61,070.00 FDT Water Infrastructure, LLC $61.00 $60,085.00 American West Construction, LLC $81.00 $79,785.00 T1-MW Joint Venture $90.00 $88,650.00 Engineer's Estimate 985 LNFT $80.00 $78,800.00

X3037 60905-1000 GUTTER, CONCRETE (2' valley gutter)

Siete, Inc. $100.00 $25,000.00 FDT Water Infrastructure, LLC $75.00 $18,750.00 American West Construction, LLC $74.00 $18,500.00 T1-MW Joint Venture $130.00 $32,500.00 Engineer's Estimate 250 LNFT $115.00 $28,750.00

X3038 60920-0000 RESET WHEELSTOP

Siete, Inc. $200.00 $45,000.00 FDT Water Infrastructure, LLC $100.00 $22,500.00 American West Construction, LLC $140.00 $31,500.00 T1-MW Joint Venture $42.00 $9,450.00 Engineer's Estimate 225 EACH $185.00 $41,625.00

25 out of 37

Project No: CO FLAP LAR 10(1)

Project Name: Horsetooth Res and Carter Lake

Schedule: X

Schedule Type: Options

Line Item Pay Item No. Description Quantity Unit Unit Price Amount

Number

X3039 61104-0400 VALVE, GATE (Flap)

Siete, Inc. $1,000.00 $2,000.00 FDT Water Infrastructure, LLC $1,000.00 $2,000.00 American West Construction, LLC $930.00 $1,860.00 T1-MW Joint Venture $1,200.00 $2,400.00 Engineer's Estimate 2 EACH $250.00 $500.00

X3040 62302-1000 SPECIAL LABOR, HIRED TECHNICAL SERVICES

Siete, Inc. $165.00 $4,290.00 FDT Water Infrastructure, LLC $150.00 $3,900.00 American West Construction, LLC $250.00 $6,500.00 T1-MW Joint Venture $180.00 $4,680.00 Engineer's Estimate 26 HOUR $150.00 $3,900.00

X3041 62302-1100 SPECIAL LABOR, HIRED SURVEY SERVICES

Siete, Inc. $165.00 $3,300.00 FDT Water Infrastructure, LLC $200.00 $4,000.00 American West Construction, LLC $250.00 $5,000.00 T1-MW Joint Venture $200.00 $4,000.00 Engineer's Estimate 20 HOUR $250.00 $5,000.00

X3042 62401-0300 FURNISHING AND PLACING TOPSOIL, 4-INCH DEPTH

Siete, Inc. $25.00 $54,250.00 FDT Water Infrastructure, LLC $14.45 $31,356.50 American West Construction, LLC $11.00 $23,870.00 T1-MW Joint Venture $12.00 $26,040.00 Engineer's Estimate 2,170 SQYD $15.00 $32,550.00

X3043 62405-0300 PLACING CONSERVED TOPSOIL, 4-INCH DEPTH

Siete, Inc. $3.00 $5,400.00 FDT Water Infrastructure, LLC $3.00 $5,400.00 American West Construction, LLC $2.00 $3,600.00 T1-MW Joint Venture $5.00 $9,000.00 Engineer's Estimate 1,800 SQYD $3.00 $5,400.00

X3044 62511-2000 SEEDING, HYDRAULIC METHOD

Siete, Inc. $1.79 $7,115.25 FDT Water Infrastructure, LLC $2.00 $7,950.00 American West Construction, LLC $2.00 $7,950.00 T1-MW Joint Venture $3.00 $11,925.00 Engineer's Estimate 3,975 SQYD $2.50 $9,937.50

26 out of 37

Project No: CO FLAP LAR 10(1)

Project Name: Horsetooth Res and Carter Lake

Schedule: X

Schedule Type: Options

Line Item Pay Item No. Description Quantity Unit Unit Price Amount

Number

X3045 63301-0000 SIGN SYSTEM

Siete, Inc. $650.00 $7,800.00 FDT Water Infrastructure, LLC $1,000.00 $12,000.00 American West Construction, LLC $525.00 $6,300.00 T1-MW Joint Venture $870.00 $10,440.00 Engineer's Estimate 12 EACH $600.00 $7,200.00

X3046 63309-0000 DELINEATOR

Siete, Inc. $45.00 $270.00 FDT Water Infrastructure, LLC $500.00 $3,000.00 American West Construction, LLC $60.00 $360.00 T1-MW Joint Venture $440.00 $2,640.00 Engineer's Estimate 6 EACH $65.00 $390.00

X3047 63316-1000 REMOVE AND RESET SIGN

Siete, Inc. $750.00 $14,250.00 FDT Water Infrastructure, LLC $350.00 $6,650.00 American West Construction, LLC $980.00 $18,620.00 T1-MW Joint Venture $610.00 $11,590.00 Engineer's Estimate 19 EACH $250.00 $4,750.00

X3048 63401-0450 PAVEMENT MARKINGS, TYPE B, DOTTED

Siete, Inc. $15.00 $15,990.00 FDT Water Infrastructure, LLC $1.00 $1,066.00 American West Construction, LLC $19.00 $20,254.00 T1-MW Joint Venture $2.00 $2,132.00 Engineer's Estimate 1,066 LNFT $0.50 $533.00

X3049 63402-0300 PAVEMENT MARKINGS, TYPE B, SOLID

Siete, Inc. $9,750.00 $91,650.00 FDT Water Infrastructure, LLC $6,000.00 $56,400.00 American West Construction, LLC $12,500.00 $117,500.00 T1-MW Joint Venture $2,300.00 $21,620.00 Engineer's Estimate 9.4 MILE $1,400.00 $13,160.00

X3050 63405-0050 PAVEMENT MARKINGS, SYMBOLS (AND WORDS)

Siete, Inc. $625.00 $6,875.00 FDT Water Infrastructure, LLC $215.00 $2,365.00 American West Construction, LLC $800.00 $8,800.00 T1-MW Joint Venture $440.00 $4,840.00 Engineer's Estimate 11 EACH $675.00 $7,425.00

27 out of 37

Project No: CO FLAP LAR 10(1)

Project Name: Horsetooth Res and Carter Lake

Schedule: X

Schedule Type: Options

Line Item Pay Item No. Description Quantity Unit Unit Price Amount

Number

X3051 63405-0500 PAVEMENT MARKINGS, TYPE B, TURN ARROW

Siete, Inc. $625.00 $2,500.00 FDT Water Infrastructure, LLC $200.00 $800.00 American West Construction, LLC $800.00 $3,200.00 T1-MW Joint Venture $440.00 $1,760.00 Engineer's Estimate 4 EACH $250.00 $1,000.00

X3052 63405-0550 PAVEMENT MARKINGS, TYPE B, STRAIGHT ARROW

Siete, Inc. $450.00 $13,500.00 FDT Water Infrastructure, LLC $150.00 $4,500.00 American West Construction, LLC $580.00 $17,400.00 T1-MW Joint Venture $440.00 $13,200.00 Engineer's Estimate 30 EACH $150.00 $4,500.00

X3053 63405-0850 PAVEMENT MARKINGS, TYPE B, ACCESSIBILITY SYMBOL

Siete, Inc. $475.00 $3,325.00 FDT Water Infrastructure, LLC $250.00 $1,750.00 American West Construction, LLC $610.00 $4,270.00 T1-MW Joint Venture $610.00 $4,270.00 Engineer's Estimate 7 EACH $115.00 $805.00

X3054 63501-0000 TEMPORARY TRAFFIC CONTROL

Siete, Inc. Lump Sum $50,000.00 FDT Water Infrastructure, LLC Lump Sum $40,000.00 American West Construction, LLC Lump Sum $65,000.00 T1-MW Joint Venture Lump Sum $89,000.00 Engineer's Estimate ALL LPSM Lump Sum $33,000.00

X3055 64620-0000 REMOVE AND RESET (backup spike)

Siete, Inc. $2,500.00 $2,500.00 FDT Water Infrastructure, LLC $5,000.00 $5,000.00 American West Construction, LLC $1,400.00 $1,400.00 T1-MW Joint Venture $940.00 $940.00 Engineer's Estimate 1 EACH $11,000.00 $11,000.00

Total Schedule - All Items

Siete, Inc. $2,435,328.25 FDT Water Infrastructure, LLC $2,754,303.50 American West Construction, LLC $3,313,733.00 T1-MW Joint Venture $3,653,989.00 Engineer's Estimate $2,866,507.37

28 out of 37

Project No: CO FLAP LAR 10(1)

Project Name: Horsetooth Res and Carter Lake

Schedule: Y

Schedule Type: Options

Solcitation No: 6982AF24B000022

Division: Central Federal Lands

State: CO County: Larimer

Federal Land: Opened at: Lakewood, CO

Opened by: Leslie Karsten

Date: 12/05/24

I certify that this Bid Tabulation accurately reflects the offers received for this solicitation.

Signed: _______________________________

Title: _______________________________

Date: _______________________________

Contract Awarded to: ____________________ Award Date: ____________________

Contractor Comment Bid Amount Responsive

Siete, Inc. $1,589,771.25 8155 Park Road Rye, CO 81069

FDT Water Infrastructure, LLC $1,845,087.50 1501 West Fountainhead Parkway Suite 550 Tempe, AZ 85282

American West Construction, LLC $2,383,313.00 275 E 64th Ave Denver, CO 80221

T1-MW Joint Venture $2,456,772.00 3201 Tremont Ave North Bend, OR 97459

Engineer's Estimate $1,877,887.31

29 out of 37

Project No: CO FLAP LAR 10(1)

Project Name: Horsetooth Res and Carter Lake

Schedule: Y

Schedule Type: Options

Line Item Pay Item No. Description Quantity Unit Unit Price Amount

Number

Y5000 15101-0000 MOBILIZATION

Siete, Inc. Lump Sum $50,000.00 FDT Water Infrastructure, LLC Lump Sum $100,000.00 American West Construction, LLC Lump Sum $235,000.00 T1-MW Joint Venture Lump Sum $281,000.00 Engineer's Estimate ALL LPSM Lump Sum $237,341.31

Y5001 15206-0000 SLOPE, REFERENCE, AND CLEARING AND GRUBBING STAKE

Siete, Inc. $15,000.00 $3,450.00 FDT Water Infrastructure, LLC $20,000.00 $4,600.00 American West Construction, LLC $54,000.00 $12,420.00 T1-MW Joint Venture $25,800.00 $5,934.00 Engineer's Estimate 0.230 MILE $26,000.00 $5,980.00

Y5002 15215-3000 SURVEY AND STAKING, DRAINAGE STRUCTURE

Siete, Inc. $3,500.00 $14,000.00 FDT Water Infrastructure, LLC $2,000.00 $8,000.00 American West Construction, LLC $1,100.00 $4,400.00 T1-MW Joint Venture $3,400.00 $13,600.00 Engineer's Estimate 4 EACH $18,000.00 $72,000.00

Y5003 15215-7000 SURVEY AND STAKING, PARKING AREA

Siete, Inc. $30,000.00 $30,000.00 FDT Water Infrastructure, LLC $55,000.00 $55,000.00 American West Construction, LLC $12,000.00 $12,000.00 T1-MW Joint Venture $26,000.00 $26,000.00 Engineer's Estimate 1 EACH $12,000.00 $12,000.00

Y5004 15216-2000 SURVEY AND STAKING, GRADE FINISHING STAKES

Siete, Inc. $25,000.00 $11,500.00 FDT Water Infrastructure, LLC $20,000.00 $9,200.00 American West Construction, LLC $24,000.00 $11,040.00 T1-MW Joint Venture $17,000.00 $7,820.00 Engineer's Estimate 0.460 MILE $18,000.00 $8,280.00

Y5005 15301-0000 CONTRACTOR QUALITY CONTROL

Siete, Inc. Lump Sum $50,000.00 FDT Water Infrastructure, LLC Lump Sum $30,000.00 American West Construction, LLC Lump Sum $130,000.00 T1-MW Joint Venture Lump Sum $130,000.00 Engineer's Estimate ALL LPSM Lump Sum $60,761.00

30 out of 37

Project No: CO FLAP LAR 10(1)

Project Name: Horsetooth Res and Carter Lake

Schedule: Y

Schedule Type: Options

Line Item Pay Item No. Description Quantity Unit Unit Price Amount

Number

Y5006 15401-0000 CONTRACTOR TESTING

Siete, Inc. Lump Sum $50,000.00 FDT Water Infrastructure, LLC Lump Sum $8,000.00 American West Construction, LLC Lump Sum $147,000.00 T1-MW Joint Venture Lump Sum $46,000.00 Engineer's Estimate ALL LPSM Lump Sum $45,571.00

Y5007 15501-0000 CONSTRUCTION SCHEDULE

Siete, Inc. Lump Sum $4,000.00 FDT Water Infrastructure, LLC Lump Sum $10,000.00 American West Construction, LLC Lump Sum $65,000.00 T1-MW Joint Venture Lump Sum $25,000.00 Engineer's Estimate ALL LPSM Lump Sum $15,190.00

Y5008 15701-0000 SOIL EROSION CONTROL

Siete, Inc. Lump Sum $20,000.00 FDT Water Infrastructure, LLC Lump Sum $31,000.00 American West Construction, LLC Lump Sum $57,000.00 T1-MW Joint Venture Lump Sum $44,000.00 Engineer's Estimate ALL LPSM Lump Sum $29,000.00

Y5009 15720-0000 STORM WATER POLLUTION PREVENTION PLAN

Siete, Inc. Lump Sum $5,000.00 FDT Water Infrastructure, LLC Lump Sum $25,000.00 American West Construction, LLC Lump Sum $8,300.00 T1-MW Joint Venture Lump Sum $15,000.00 Engineer's Estimate ALL LPSM Lump Sum $3,500.00

Y5010 15802-0000 WATERING FOR DUST CONTROL

Siete, Inc. Lump Sum $7,500.00 FDT Water Infrastructure, LLC Lump Sum $15,000.00 American West Construction, LLC Lump Sum $20,000.00 T1-MW Joint Venture Lump Sum $110,000.00 Engineer's Estimate ALL LPSM Lump Sum $7,000.00

Y5011 20101-0000 CLEARING AND GRUBBING

Siete, Inc. $4,500.00 $20,250.00 FDT Water Infrastructure, LLC $2,400.00 $10,800.00 American West Construction, LLC $9,000.00 $40,500.00 T1-MW Joint Venture $5,700.00 $25,650.00 Engineer's Estimate 4.5 ACRE $6,000.00 $27,000.00

31 out of 37

Project No: CO FLAP LAR 10(1)

Project Name: Horsetooth Res and Carter Lake

Schedule: Y

Schedule Type: Options

Line Item Pay Item No. Description Quantity Unit Unit Price Amount

Number

Y5012 20301-0700 REMOVAL OF DELINEATOR

Siete, Inc. $25.00 $25.00 FDT Water Infrastructure, LLC $200.00 $200.00 American West Construction, LLC $160.00 $160.00 T1-MW Joint Venture $40.00 $40.00 Engineer's Estimate 1 EACH $14.00 $14.00

Y5013 20301-2400 REMOVAL OF SIGN

Siete, Inc. $150.00 $2,250.00 FDT Water Infrastructure, LLC $150.00 $2,250.00 American West Construction, LLC $390.00 $5,850.00 T1-MW Joint Venture $50.00 $750.00 Engineer's Estimate…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .