Task Assignment Notification Form Summary
This is a Task Assignment Notification Form for Contract HW553 issued by the Florida Department of Environmental Protection (FDEP) to Ecology and Environment, Inc. (E & E), an environmental consulting firm. The task assignment, designated CSS-14A under Module CERSI and Grant CER15, is managed by FDEP Contract Manager Ferda Yilmaz and assigned to the Blue Water Express Wash site located at 8714 Atlantic Boulevard in Jacksonville, Duval County, Florida (COMET Site ID #282005; Hazardous Waste Site ID #FLT070079090311116).
The contracted services consist of three subtasks: Project Management, Site Reconnaissance, and Work Plan and Health and Safety Plan development for a CERCLA Site Inspection. The deliverable, a Site Inspection Workplan and Health and Safety Plan, is due December 9, 2016, with task execution extending through January 9, 2017. The total task assignment value is $5,100.68 on a fixed-price basis, with no fee schedule, cost reimbursement, or retainage applied. Payment is structured as invoiced upon submission of the final draft work plan at 90% completion and the final work plan at 100% completion, with net 30-day payment terms. The cost estimate includes direct labor of $1,642.68, fringe benefits of $549.31, overhead of $1,093.80, general and administrative costs of $1,191.75, other direct costs of $82.14, vehicle rental of $68.00, field equipment of $25.25, and a completion fee of $447.75.
View the file
Other files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
October 7, 2016
Padraic Conner Environmental Specialist III Bureau of Waste Cleanup CERCLA Site Screening Section Bob Martinez Center 2600 Blair Stone Road Tallahassee, Florida 32399-2400
Re: Cost Proposal to Prepare a CERCLA Site Inspection Work Plan for the Blue Water
Express Wash, Jacksonville, Duval County, Florida (COMET Site ID # 282005, and Hazardous Waste Site ID # FLT0700790903116)
Dear Padraic:
As requested by the Florida Department of Environmental Protection (FDEP), Ecology and Environment, Inc. (E & E) has prepared this cost proposal to develop a site inspection (SI) work plan package for the above-referenced site. The package will be developed under a single task, which will include:
• Performance of a site reconnaissance;
• Review of the site file and available historical photographs;
• Preparation of a work plan using the template provided by FDEP. This work plan incorporates the information in a standard work plan as well as the Quality Assurance Project Plan (QAPP); and
• Preparation of a health and safety plan for the SI field work.
E & E’s cost proposal has been based on the following assumptions:
• An electronic copy of the preliminary draft work plan (pdf and Word) will be uploaded to the FDEP File Transfer Protocol (FTP) site for internal department review; and
• An electronic copy of the final draft work plan (pdf and Word) will be uploaded to the
FDEP FTP for distribution;
E & E is prepared to begin work on this project upon receipt of FDEP’s notice to proceed. The total cost estimate to prepare the work plan is $5,100.68.
Attachment A presents a breakdown of the cost proposal. E & E will complete the work plan development on a fixed-price basis. An invoice will be submitted upon submittal of the final draft work plan (90% completion) and the final work plan (100% completion), with payment terms net 30 days.
If you have any questions or comments concerning the proposed costs or costing assumptions, please call me at 523-0954 Ext 3915.
Sincerely, ECOLOGY AND ENVIRONMENT, INC.
Richard A. Stephens Program Manager
RAS/ras
Attachments cc: Ferda Yilmaz, FDEP Steve Elliott, E & E - Pensacola
FDEP Contract HW553 Cost Estimate
TA14A Blue Water Workplan October 2016_v2 10/12/2016 Page 1
Contractor:
Date:
Task #: TA14A SubTask 1 PROGRAM MANAGEMENT Site: SubTask 2 Site Recon and File Review
Site ID #: FLT070079090 SubTask 3 Work Plan Package Development Activity/Phase: SubTask 4
Project Manager: SubTask 5
10OHBOA.3077.87
Labor Rate Category Totals 1 2 3 4 5
$35.10 Project Manager - Richard Stephens 5.2 5.200 Principal
$51.92 Powell 1.0 0.0 1.0 0.0 0.0 Chief
$35.10 Stephens 31.0 15.0 16.0 0.0 0.0 $38.50 Ringo 0.0 0.0 0.0 0.0 0.0 $38.61 Kennedy 0.0 0.0 0.0 0.0 0.0 $39.42 Harter 0.0 0.0 0.0 0.0 0.0 $42.15 Kelso 0.0 0.0 0.0 0.0 0.0
Senior $31.10 Maldonado 0.0 0.0 0.0 0.0 0.0 $31.25 Krajewski 0.0 0.0 0.0 0.0 0.0 $32.79 Meyers 0.0 0.0 0.0 0.0 0.0 $34.25 Elliott 0.0 0.0 0.0 0.0 0.0 $34.63 Moore 6.0 0.0 6.0 0.0 0.0 $35.58 Taravella 0.0 0.0 0.0 0.0 0.0
Associate $21.91 Rhyne 0.0 0.0 0.0 0.0 0.0 $26.49 Thanawastien 0.0 0.0 0.0 0.0 0.0 $27.43 Hammond 0.0 0.0 0.0 0.0 0.0 $28.09 Fowler 4.0 0.0 4.0 0.0 0.0 $28.09 Vaughan 0.0 0.0 0.0 0.0 0.0
Junior $20.80 Oien 0.0 0.0 0.0 0.0 0.0 $21.63 Marks 0.0 0.0 0.0 0.0 0.0 $22.12 Fluitt 0.0 0.0 0.0 0.0 0.0
Technician $18.72 N/A 0.0 0.0 0.0 0.0 0.0
Clerical $13.30 Diez 0.0 0.0 0.0 0.0 0.0 $15.33 Benson 0.0 0.0 0.0 0.0 0.0
Total Hours 47.2 5.2 15.0 27.0 0.0 0.0
1) Direct Labor $1,642.68 $182.52 $526.50 $933.66 $0.00 $0.00
2) Fringe (33.44% of Lines 1 ) $549.31 $61.03 $176.06 $312.22 $0.00 $0.00
3) Overhead (49.90% of Lines 1 + 2) $1,093.80 $121.53 $350.58 $621.69 $0.00 $0.00
4) Gen & Admin (36.27% of Lines 1 + 2 + 3) $1,191.75 $132.41 $381.97 $677.37 $0.00 $0.00
5) Total Labor (Sum Lines 1 thru 4) $4,477.54 $497.49 $1,435.11 $2,544.94 $0.00 $0.00
6) Other Direct Costs (5.0% of Line 1) $82.14 $9.13 $26.33 $46.68 $0.00 $0.00 Travel
7a) Vehicle Rental $68.00 $0.00 $68.00 $0.00 $0.00 $0.00 7b) Mileage Costs $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 7c) Air Fare $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 7d) Per diem + Hotel $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 7e) Total Travel $68.00 $0.00 $68.00 $0.00 $0.00 $0.00
Subcontractor (Equipment Procurement) 8a) Provider - Task # $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 8b) Provider - Task # $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 8c) Provider - Task # $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 8d) Subcontractor Subtotal $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 8e) Procurement Fee $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 8f) Total Subcontractor Cost $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor (Services Procurement) 9a) Drilling (Conventional) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 9b) Drilling (Non-conventional) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 9c) Mobile Laboratory $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 9d) Surveying $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 9e) IDW $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 9f) Utilities $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 9g) Other Sub 1 - Task # $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 9h) Other Sub 2- Task # $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 9i) Other Sub 3 - Task # $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 9j) Subcontractor Subtotal $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 9k) Handling Fee $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 9l) Total Subcontractor Cost $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Laboratory 10a) Analytical Costs (Fixed Lab) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 10b) Fast Turnaround Rate (%) (Fixed Lab) 0% 100% 0% 0% 0% 10c) Fast Turnaround Charges (Fixed Lab) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 10d) Sample Shipping $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 10e) Total Laboratory $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Field Expenses 11a) Personal Protection $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 11b) Expendables $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 11c) Equipment (Drilling Related) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 11d) Equipment (Analytical Related) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 11e) Equipment (IDW Related) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 11f) Equipment (Other) $25.25 $0.00 $25.25 $0.00 $0.00 $0.00 11g) Total Field Expenses $25.25 $0.00 $25.25 $0.00 $0.00 $0.00
Subtotal $4,652.93 $506.62 $1,554.69 $2,591.62 $0.00 $0.00 Completion Fee 12) (10.0% of Line 5) $447.75 $49.75 $143.51 $254.49 $0.00 $0.00
13) Total Estimated Cost $5,100.68 $556.37 $1,698.20 $2,846.11 $0.00 $0.00
October 5, 2016
* Equipment Procurement - 10.0% Per Subcontractor, maximum $2,500 per Subcontractor.
** Utilities fees are calculated based on $20 per utility bill per month.
*** Except for utilities fees, 10% of first $50,000, 7% of next $50,000, 5% over $100,000 per Subcontractor.
Ecology and Environment, Inc.
FDEP: P. Conner / E & E: R. Stephens
Blue Water Express Wash
Recon and Workplan
TA14A Blue Water Workplan October 2016_v2/2 Page 6
SITE: lue Water Express Wash
SUBTASK NO.: 2 DESCRIPTION:
DATE: October 5, 2016 FACILITY ID NO.: FLT070079090
TASK NO: TA14A
LABOR HOURS
Labor Category Work Description Hours
Principal Powell Brown
Chief Stephens 15 Ringo Kennedy Harter Kelso
15.00
VEHICLE RENTAL
ITEM RATE UNIT USAGE TOTAL
Automobile $68.00 Day 1 $68.00 Equipment Truck/Van $97.00 Day 0 $0.00 Equipment Truck/Van $420.00 Week 0 $0.00
$68.00 Other Equipment
RATE ITEM UNIT NO OF ITEMS USAGE TOTAL ITEM
Hand Held GPS $25.25 day 1 1 $25.25
*Rate negotiated. SUBTOTAL - OTHER EQUIPMENT $25.25 $25.25
Travel , File Review, Site Recon and Site Scoping Meetings
FIELD EXPENSES
Site Recon and File Review
TOTAL LABOR HOURS
TOTAL VEHICLE RENTAL
TA14A Blue Water Workplan October 2016_v2/3 Page 7
SITE: lue Water Express Wash
SUBTASK NO.: 3 DESCRIPTION:
DATE: October 5, 2016 FACILITY ID NO.: FLT070079090
TASK NO: TA14A
LABOR HOURS
Labor Category Work Description Hours
Principal Powell QA/QC Review 1 Brown
Chief Stephens 16
Senior Moore GIS, Maps graphics and aerials 6 Taravella
Associate Fowler Technical Editor and Production 4
27.00
Work Plan Package Development
TOTAL LABOR HOURS
Work plan Package devlopment
| HW553-CSSS-14A Signed |
| Blue Water Express Wash Cost Proposal |
| Blue Water Recon and Work Plan Cost 10072016 |
| TA14A Blue Water Workplan October 2016_v2 |
| Cost Estimate |
| 2 |
| 3 |
File details come from the government source that posted it. Updated .