Task Assignment Notification Form Summary

This is a Task Assignment Notification Form for Contract HW553 issued by the Florida Department of Environmental Protection (FDEP) to Ecology and Environment, Inc. (E & E), an environmental consulting firm. The task assignment, designated CSS-14A under Module CERSI and Grant CER15, is managed by FDEP Contract Manager Ferda Yilmaz and assigned to the Blue Water Express Wash site located at 8714 Atlantic Boulevard in Jacksonville, Duval County, Florida (COMET Site ID #282005; Hazardous Waste Site ID #FLT070079090311116).

The contracted services consist of three subtasks: Project Management, Site Reconnaissance, and Work Plan and Health and Safety Plan development for a CERCLA Site Inspection. The deliverable, a Site Inspection Workplan and Health and Safety Plan, is due December 9, 2016, with task execution extending through January 9, 2017. The total task assignment value is $5,100.68 on a fixed-price basis, with no fee schedule, cost reimbursement, or retainage applied. Payment is structured as invoiced upon submission of the final draft work plan at 90% completion and the final work plan at 100% completion, with net 30-day payment terms. The cost estimate includes direct labor of $1,642.68, fringe benefits of $549.31, overhead of $1,093.80, general and administrative costs of $1,191.75, other direct costs of $82.14, vehicle rental of $68.00, field equipment of $25.25, and a completion fee of $447.75.

View the file

Other files

File Type Posted
CN-370000-HW553-0A107.pdf PDF
CN-370000-HW553-A10.pdf PDF
CN-370000-HW553-A2.pdf PDF
CN-370000-HW553-A5.pdf PDF
CN-370000-HW553-A7.pdf PDF
CN-370000-HW553-BF004E.pdf PDF
CN-370000-HW553-BF007A.pdf PDF
CN-370000-HW553-BF02C.pdf PDF
CN-370000-HW553-BF04B.pdf PDF
CN-370000-HW553-BF04CCO1.pdf PDF
CN-370000-HW553-BF04CCO2.pdf PDF
CN-370000-HW553-BF04D.pdf PDF
CN-370000-HW553-BF04DCO2.pdf PDF
CN-370000-HW553-BF05ACO1.pdf PDF
CN-370000-HW553-BF05BCO1.pdf PDF
CN-370000-HW553-BF05BCO2.pdf PDF
CN-370000-HW553-BF06A.pdf PDF
CN-370000-HW553-BF06ACO1.pdf PDF
CN-370000-HW553-CO1.pdf PDF
CN-370000-HW553-CS15BCO1.pdf PDF
CN-370000-HW553-CSS07A.pdf PDF
CN-370000-HW553-CSS07B.pdf PDF
CN-370000-HW553-CSS08A.pdf PDF
CN-370000-HW553-CSS11D.pdf PDF
CN-370000-HW553-CSS12BC1.pdf PDF
CN-370000-HW553-CSS12BC2.pdf PDF
CN-370000-HW553-CSS13A.pdf PDF
CN-370000-HW553-CSS14B.pdf PDF
CN-370000-HW553-DC001C.pdf PDF
CN-370000-HW553-DC002L.pdf PDF
CN-370000-HW553-DC004H.pdf PDF
CN-370000-HW553-DC006N.pdf PDF
CN-370000-HW553-DC009B.pdf PDF
CN-370000-HW553-DC014E.pdf PDF
CN-370000-HW553-DC014H.pdf PDF
CN-370000-HW553-DC019A.pdf PDF
CN-370000-HW553-DC01ACO4.pdf PDF
CN-370000-HW553-DC020D.pdf PDF
CN-370000-HW553-DC021A.pdf PDF
CN-370000-HW553-DC024C.pdf PDF
CN-370000-HW553-DC02CCO2.pdf PDF
CN-370000-HW553-DC02CCO3.pdf PDF
CN-370000-HW553-DC02D.pdf PDF
CN-370000-HW553-DC02DCO1.pdf PDF
CN-370000-HW553-DC02FCO2.pdf PDF
CN-370000-HW553-DC02GCO2.pdf PDF
CN-370000-HW553-DC02H.pdf PDF
CN-370000-HW553-DC02ICO3.pdf PDF
CN-370000-HW553-DC03BCO2.pdf PDF
CN-370000-HW553-DC03FCO1.pdf PDF
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

October 7, 2016

Padraic Conner Environmental Specialist III Bureau of Waste Cleanup CERCLA Site Screening Section Bob Martinez Center 2600 Blair Stone Road Tallahassee, Florida 32399-2400

Re: Cost Proposal to Prepare a CERCLA Site Inspection Work Plan for the Blue Water

Express Wash, Jacksonville, Duval County, Florida (COMET Site ID # 282005, and Hazardous Waste Site ID # FLT0700790903116)

Dear Padraic:

As requested by the Florida Department of Environmental Protection (FDEP), Ecology and Environment, Inc. (E & E) has prepared this cost proposal to develop a site inspection (SI) work plan package for the above-referenced site. The package will be developed under a single task, which will include:

• Performance of a site reconnaissance;

• Review of the site file and available historical photographs;

• Preparation of a work plan using the template provided by FDEP. This work plan incorporates the information in a standard work plan as well as the Quality Assurance Project Plan (QAPP); and

• Preparation of a health and safety plan for the SI field work.

E & E’s cost proposal has been based on the following assumptions:

• An electronic copy of the preliminary draft work plan (pdf and Word) will be uploaded to the FDEP File Transfer Protocol (FTP) site for internal department review; and

• An electronic copy of the final draft work plan (pdf and Word) will be uploaded to the

FDEP FTP for distribution;

E & E is prepared to begin work on this project upon receipt of FDEP’s notice to proceed. The total cost estimate to prepare the work plan is $5,100.68.

Attachment A presents a breakdown of the cost proposal. E & E will complete the work plan development on a fixed-price basis. An invoice will be submitted upon submittal of the final draft work plan (90% completion) and the final work plan (100% completion), with payment terms net 30 days.

If you have any questions or comments concerning the proposed costs or costing assumptions, please call me at 523-0954 Ext 3915.

Sincerely, ECOLOGY AND ENVIRONMENT, INC.

Richard A. Stephens Program Manager

RAS/ras

Attachments cc: Ferda Yilmaz, FDEP Steve Elliott, E & E - Pensacola

FDEP Contract HW553 Cost Estimate

TA14A Blue Water Workplan October 2016_v2 10/12/2016 Page 1

Contractor:

Date:

Task #: TA14A SubTask 1 PROGRAM MANAGEMENT Site: SubTask 2 Site Recon and File Review

Site ID #: FLT070079090 SubTask 3 Work Plan Package Development Activity/Phase: SubTask 4

Project Manager: SubTask 5

10OHBOA.3077.87

Labor Rate Category Totals 1 2 3 4 5

$35.10 Project Manager - Richard Stephens 5.2 5.200 Principal

$51.92 Powell 1.0 0.0 1.0 0.0 0.0 Chief

$35.10 Stephens 31.0 15.0 16.0 0.0 0.0 $38.50 Ringo 0.0 0.0 0.0 0.0 0.0 $38.61 Kennedy 0.0 0.0 0.0 0.0 0.0 $39.42 Harter 0.0 0.0 0.0 0.0 0.0 $42.15 Kelso 0.0 0.0 0.0 0.0 0.0

Senior $31.10 Maldonado 0.0 0.0 0.0 0.0 0.0 $31.25 Krajewski 0.0 0.0 0.0 0.0 0.0 $32.79 Meyers 0.0 0.0 0.0 0.0 0.0 $34.25 Elliott 0.0 0.0 0.0 0.0 0.0 $34.63 Moore 6.0 0.0 6.0 0.0 0.0 $35.58 Taravella 0.0 0.0 0.0 0.0 0.0

Associate $21.91 Rhyne 0.0 0.0 0.0 0.0 0.0 $26.49 Thanawastien 0.0 0.0 0.0 0.0 0.0 $27.43 Hammond 0.0 0.0 0.0 0.0 0.0 $28.09 Fowler 4.0 0.0 4.0 0.0 0.0 $28.09 Vaughan 0.0 0.0 0.0 0.0 0.0

Junior $20.80 Oien 0.0 0.0 0.0 0.0 0.0 $21.63 Marks 0.0 0.0 0.0 0.0 0.0 $22.12 Fluitt 0.0 0.0 0.0 0.0 0.0

Technician $18.72 N/A 0.0 0.0 0.0 0.0 0.0

Clerical $13.30 Diez 0.0 0.0 0.0 0.0 0.0 $15.33 Benson 0.0 0.0 0.0 0.0 0.0

Total Hours 47.2 5.2 15.0 27.0 0.0 0.0

1) Direct Labor $1,642.68 $182.52 $526.50 $933.66 $0.00 $0.00

2) Fringe (33.44% of Lines 1 ) $549.31 $61.03 $176.06 $312.22 $0.00 $0.00

3) Overhead (49.90% of Lines 1 + 2) $1,093.80 $121.53 $350.58 $621.69 $0.00 $0.00

4) Gen & Admin (36.27% of Lines 1 + 2 + 3) $1,191.75 $132.41 $381.97 $677.37 $0.00 $0.00

5) Total Labor (Sum Lines 1 thru 4) $4,477.54 $497.49 $1,435.11 $2,544.94 $0.00 $0.00

6) Other Direct Costs (5.0% of Line 1) $82.14 $9.13 $26.33 $46.68 $0.00 $0.00 Travel

7a) Vehicle Rental $68.00 $0.00 $68.00 $0.00 $0.00 $0.00 7b) Mileage Costs $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 7c) Air Fare $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 7d) Per diem + Hotel $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 7e) Total Travel $68.00 $0.00 $68.00 $0.00 $0.00 $0.00

Subcontractor (Equipment Procurement) 8a) Provider - Task # $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 8b) Provider - Task # $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 8c) Provider - Task # $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 8d) Subcontractor Subtotal $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 8e) Procurement Fee $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 8f) Total Subcontractor Cost $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subcontractor (Services Procurement) 9a) Drilling (Conventional) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 9b) Drilling (Non-conventional) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 9c) Mobile Laboratory $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 9d) Surveying $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 9e) IDW $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 9f) Utilities $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 9g) Other Sub 1 - Task # $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 9h) Other Sub 2- Task # $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 9i) Other Sub 3 - Task # $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 9j) Subcontractor Subtotal $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 9k) Handling Fee $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 9l) Total Subcontractor Cost $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Laboratory 10a) Analytical Costs (Fixed Lab) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 10b) Fast Turnaround Rate (%) (Fixed Lab) 0% 100% 0% 0% 0% 10c) Fast Turnaround Charges (Fixed Lab) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 10d) Sample Shipping $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 10e) Total Laboratory $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Field Expenses 11a) Personal Protection $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 11b) Expendables $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 11c) Equipment (Drilling Related) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 11d) Equipment (Analytical Related) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 11e) Equipment (IDW Related) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 11f) Equipment (Other) $25.25 $0.00 $25.25 $0.00 $0.00 $0.00 11g) Total Field Expenses $25.25 $0.00 $25.25 $0.00 $0.00 $0.00

Subtotal $4,652.93 $506.62 $1,554.69 $2,591.62 $0.00 $0.00 Completion Fee 12) (10.0% of Line 5) $447.75 $49.75 $143.51 $254.49 $0.00 $0.00

13) Total Estimated Cost $5,100.68 $556.37 $1,698.20 $2,846.11 $0.00 $0.00

October 5, 2016

* Equipment Procurement - 10.0% Per Subcontractor, maximum $2,500 per Subcontractor.

** Utilities fees are calculated based on $20 per utility bill per month.

*** Except for utilities fees, 10% of first $50,000, 7% of next $50,000, 5% over $100,000 per Subcontractor.

Ecology and Environment, Inc.

FDEP: P. Conner / E & E: R. Stephens

Blue Water Express Wash

Recon and Workplan

TA14A Blue Water Workplan October 2016_v2/2 Page 6

SITE: lue Water Express Wash

SUBTASK NO.: 2 DESCRIPTION:

DATE: October 5, 2016 FACILITY ID NO.: FLT070079090

TASK NO: TA14A

LABOR HOURS

Labor Category Work Description Hours

Principal Powell Brown

Chief Stephens 15 Ringo Kennedy Harter Kelso

15.00

VEHICLE RENTAL

ITEM RATE UNIT USAGE TOTAL

Automobile $68.00 Day 1 $68.00 Equipment Truck/Van $97.00 Day 0 $0.00 Equipment Truck/Van $420.00 Week 0 $0.00

$68.00 Other Equipment

RATE ITEM UNIT NO OF ITEMS USAGE TOTAL ITEM

Hand Held GPS $25.25 day 1 1 $25.25

*Rate negotiated. SUBTOTAL - OTHER EQUIPMENT $25.25 $25.25

Travel , File Review, Site Recon and Site Scoping Meetings

FIELD EXPENSES

Site Recon and File Review

TOTAL LABOR HOURS

TOTAL VEHICLE RENTAL

TA14A Blue Water Workplan October 2016_v2/3 Page 7

SITE: lue Water Express Wash

SUBTASK NO.: 3 DESCRIPTION:

DATE: October 5, 2016 FACILITY ID NO.: FLT070079090

TASK NO: TA14A

LABOR HOURS

Labor Category Work Description Hours

Principal Powell QA/QC Review 1 Brown

Chief Stephens 16

Senior Moore GIS, Maps graphics and aerials 6 Taravella

Associate Fowler Technical Editor and Production 4

27.00

Work Plan Package Development

TOTAL LABOR HOURS

Work plan Package devlopment

HW553-CSSS-14A Signed
Blue Water Express Wash Cost Proposal
Blue Water Recon and Work Plan Cost 10072016
TA14A Blue Water Workplan October 2016_v2
Cost Estimate
2
3

File details come from the government source that posted it. Updated .