Task Assignment Notification Summary

This Task Assignment Notification Form documents a task assignment under DEP Contract No. HW553, awarded to Ecology and Environment, Inc. (E&E). The contract involves the Florida Department of Environmental Protection (FDEP), specifically the Brownfield Remediation Program, with Richard Stephens serving as the contractor representative and Carrie Kruchell as the DEP Contract Manager. The work is being performed at the Old Carrabelle Water Plant Site in Carrabelle, Franklin County, Florida, under the Statewide Remediation Program Module (SRPPM) as part of Grant SRP13.

Task Assignment BF004E covers Additional Soil and Groundwater Sampling activities, including the collection of up to six soil samples with duplicate samples and three groundwater samples with duplicate samples for confirmatory analysis via the TRPH FL-PRO method. The work also includes collection of DTW measurements from monitoring wells MW-01, MW-02, MW-03, and PZ-01. The final deliverable is an abbreviated PARM Annual Report with tables, figures, recommendations, and conclusions, due December 15, 2017, with task execution concluding December 30, 2017. The total task assignment value is $4,835.43 on a fixed-price basis with zero retainage. Labor costs total $3,024.37, laboratory and sample shipment costs total $1,033.00, and field expenses total $323.15, with a 10% completion fee of $302.44. The cost estimate was dated October 20, 2017, and the form was digitally signed on October 25, 2017.

View the file

Other files

File Type Posted
CN-370000-HW553-A3.pdf PDF
CN-370000-HW553-A6.pdf PDF
CN-370000-HW553-A8.pdf PDF
CN-370000-HW553-BF004F.pdf PDF
CN-370000-HW553-BF04BCO1.pdf PDF
CN-370000-HW553-BF04BCO2.pdf PDF
CN-370000-HW553-BF04C.pdf PDF
CN-370000-HW553-BF04DCO3.pdf PDF
CN-370000-HW553-BF04DCO5.pdf PDF
CN-370000-HW553-CS14BCO1.pdf PDF
CN-370000-HW553-CSS04C.pdf PDF
CN-370000-HW553-CSS06C.pdf PDF
CN-370000-HW553-CSS12AC1.pdf PDF
CN-370000-HW553-CSS12C.pdf PDF
CN-370000-HW553-CSS15A.pdf PDF
CN-370000-HW553-CSS15B.pdf PDF
CN-370000-HW553-CSS7BCO2.pdf PDF
CN-370000-HW553-DC007E.pdf PDF
CN-370000-HW553-DC009K.pdf PDF
CN-370000-HW553-DC014I.pdf PDF
CN-370000-HW553-DC016F.pdf PDF
CN-370000-HW553-DC01ACO1.pdf PDF
CN-370000-HW553-DC01ACO3.pdf PDF
CN-370000-HW553-DC020C.pdf PDF
CN-370000-HW553-DC022A.pdf PDF
CN-370000-HW553-DC022B.pdf PDF
CN-370000-HW553-DC02CCO4.pdf PDF
CN-370000-HW553-DC02CCO6.pdf PDF
CN-370000-HW553-DC02DCO2.pdf PDF
CN-370000-HW553-DC02E.pdf PDF
CN-370000-HW553-DC02F.pdf PDF
CN-370000-HW553-DC02HCO1.pdf PDF
CN-370000-HW553-DC02ICO1.pdf PDF
CN-370000-HW553-DC02J.pdf PDF
CN-370000-HW553-DC02K.pdf PDF
CN-370000-HW553-DC03BCO3.pdf PDF
CN-370000-HW553-DC03CCO1.pdf PDF
CN-370000-HW553-DC03E.pdf PDF
CN-370000-HW553-DC03FCO2.pdf PDF
CN-370000-HW553-DC04B.pdf PDF
CN-370000-HW553-DC04C.pdf PDF
CN-370000-HW553-DC04K.pdf PDF
CN-370000-HW553-DC04LCO1.pdf PDF
CN-370000-HW553-DC05C.pdf PDF
CN-370000-HW553-DC06A.pdf PDF
CN-370000-HW553-DC06ACO5.pdf PDF
CN-370000-HW553-DC06C.pdf PDF
CN-370000-HW553-DC06DCO1.pdf PDF
CN-370000-HW553-DC06ECO1.pdf PDF
CN-370000-HW553-DC06GCO1.pdf PDF
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FDEP Contract HW553 Cost Estimate

Contractor:

Date:

Task #: BF-004-E SubTask 1 PROGRAM MANAGEMENT Site: SubTask 2 Supplemental Sampling

Site ID #: Brownfield SubTask 3 Letter Report Activity/Phase: SubTask 4

Project Manager: SubTask 5

10OHBOA.3077.D1

Labor Rate Category Totals 1 2 3 4 5

$35.62 Project Manager - Richard Stephens 3.5 3.461 Principal

$45.95 Kelso 2.0 1.0 1.0 0.0 0.0 $58.85 Brown 0.0 0.0 0.0 0.0 0.0

Chief $35.62 Stephens 10.0 8.0 2.0 0.0 0.0 $36.78 Werth 0.0 0.0 0.0 0.0 0.0 $37.74 Moore 0.0 0.0 0.0 0.0 0.0 $41.84 Kennedy 0.0 0.0 0.0 0.0 0.0 $48.10 Xie 0.0 0.0 0.0 0.0 0.0

Senior $32.03 Krajewski 0.0 0.0 0.0 0.0 0.0 $35.21 Ramberg 0.0 0.0 0.0 0.0 0.0 $36.00 Huber 0.0 0.0 0.0 0.0 0.0 $36.54 Elliott 0.0 0.0 0.0 0.0 0.0 $37.00 Taravella 0.0 0.0 0.0 0.0 0.0 $37.10 Casey 0.0 0.0 0.0 0.0 0.0

Associate $21.91 Jacobs 0.0 0.0 0.0 0.0 0.0 $24.76 Percifull 0.0 0.0 0.0 0.0 0.0 $28.09 Fowler 0.0 0.0 0.0 0.0 0.0 $28.09 Vaughan 0.0 0.0 0.0 0.0 0.0 $28.09 Eucogco 4.0 0.0 4.0 0.0 0.0

Junior $21.19 Bender 0.0 0.0 0.0 0.0 0.0 $21.29 Oien 20.0 12.0 8.0 0.0 0.0 $22.28 Marks 0.0 0.0 0.0 0.0 0.0

Technician $18.72 N/A 0.0 0.0 0.0 0.0 0.0

Clerical $15.71 Benson 0.0 0.0 0.0 0.0 0.0

Total Hours 39.5 3.5 21.0 15.0 0.0 0.0

1) Direct Labor $1,109.54 $123.28 $586.39 $399.87 $0.00 $0.00

2) Fringe (33.44% of Lines 1 ) $371.04 $41.23 $196.09 $133.72 $0.00 $0.00

3) Overhead (49.90% of Lines 1 + 2) $738.81 $82.09 $390.46 $266.26 $0.00 $0.00

4) Gen & Admin (36.27% of Lines 1 + 2 + 3) $804.98 $89.44 $425.43 $290.11 $0.00 $0.00

5) Total Labor (Sum Lines 1 thru 4) $3,024.37 $336.04 $1,598.37 $1,089.96 $0.00 $0.00

6) Other Direct Costs (5.0% of Line 1) $55.47 $6.16 $29.32 $19.99 $0.00 $0.00 Travel

7a) Vehicle Rental $97.00 $0.00 $97.00 $0.00 $0.00 $0.00 7b) Mileage Costs $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 7c) Air Fare $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 7d) Per diem + Hotel $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 7e) Total Travel $97.00 $0.00 $97.00 $0.00 $0.00 $0.00

Subcontractor (Equipment Procurement) 8a) Provider - Task # $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 8b) Provider - Task # $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 8c) Provider - Task # $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 8d) Subcontractor Subtotal $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 8e) Procurement Fee $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 8f) Total Subcontractor Cost $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subcontractor (Services Procurement) 9a) Drilling (Conventional) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 9b) Drilling (Non-conventional) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 9c) Mobile Laboratory $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 9d) Surveying $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 9e) IDW $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 9f) Utilities $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 9g) Other Sub 1 - Task # $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 9h) Other Sub 2- Task # $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 9i) Other Sub 3 - Task # $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 9j) Subcontractor Subtotal $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

9k) Handling Fee $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 9l) Total Subcontractor Cost $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Laboratory 10a) Analytical Costs (Fixed Lab) $924.00 $0.00 $924.00 $0.00 $0.00 $0.00 10b) Fast Turnaround Rate (%) (Fixed Lab) 0% 100% 0% 0% 0% 10c) Fast Turnaround Charges (Fixed Lab) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 10d) Sample Shipping $109.00 $0.00 $109.00 $0.00 $0.00 $0.00 10e) Total Laboratory $1,033.00 $0.00 $1,033.00 $0.00 $0.00 $0.00

Field Expenses 11a) Personal Protection $56.00 $0.00 $56.00 $0.00 $0.00 $0.00 11b) Expendables $32.50 $0.00 $32.50 $0.00 $0.00 $0.00 11c) Equipment (Drilling Related) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 11d) Equipment (Analytical Related) $208.55 $0.00 $208.55 $0.00 $0.00 $0.00 11e) Equipment (IDW Related) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 11f) Equipment (Other) $26.10 $0.00 $26.10 $0.00 $0.00 $0.00 11g) Total Field Expenses $323.15 $0.00 $323.15 $0.00 $0.00 $0.00

October 20, 2017 Ecology and Environment, Inc.

FDEP: C. Kruchell / E & E: R. Stephens

Carrabelle Water Plant

Supplemental Sampling

Letter.xlsm 1/9/2018 Page 1

FDEP Contract HW553 Cost Estimate

Subtotal $4,532.99 $342.20 $3,080.84 $1,109.95 $0.00 $0.00 Completion Fee 12) (10.0% of Line 5) $302.44 $33.60 $159.84 $109.00 $0.00 $0.00

13) Total Estimated Cost $4,835.43 $375.80 $3,240.68 $1,218.95 $0.00 $0.00

* Equipment Procurement - 10.0% Per Subcontractor, maximum $2,500 per Subcontractor.

** Utilities fees are calculated based on $20 per utility bill per month.

*** Except for utilities fees, 10% of first $50,000, 7% of next $50,000, 5% over $100,000 per Subcontractor.

Letter.xlsm 1/9/2018 Page 2

SITE: Carrabelle Water Plant

SUBTASK NO.: 2 DESCRIPTION:

DATE: October 20, 2017 FACILITY ID NO.: Brownfield

TASK NO: BF-004-E

LABOR HOURS

Labor Category Work Description Hours

Principal Kelso QA/QC - Technical Review 1 Brown

Chief Stephens 8

Junior Bender Oien Warehouse setup, field sampling 12 Marks

21.00

VEHICLE RENTAL

ITEM RATE UNIT USAGE TOTAL

Automobile $68.00 Day 0 $0.00 Equipment Truck/Van $97.00 Day 1 $97.00 Equipment Truck/Van $420.00 Week 0 $0.00

$97.00 LABORATORY and SAMPLE SHIPMENTS

ANALYSIS/PARAMETER

FAST TURNAROUND

RATE (%)

No. for Fast

Turnaround Rate RATE Media No. of

Samples No. of

QA/QC

Fast Turn- Around Charges TOTAL

FLPRO TRPH 100% 0 $84.00 water 3 1 $0.00 $336.00 FLPRO TRPH 100% 0 $84.00 soil 6 1 $0.00 $588.00

*Rate negotiated. Subtotal-Lab Analyses 9 2 $0.00 $924.00

SAMPLE SHIPMENTS

CONTAINER SIZE

Shipment Method

24 hr No. of

Containers Shipment Method

2 day No. of

Containers Ice No. of

Containers TOTAL Small (<50 lbs.) $63.00 0 $35.00 0 $5.00 0 $0.00 Large (>50 lbs. < 70 lbs.) $104.00 1 $60.00 0 $5.00 1 $109.00

Subtotal-Sample Shipments $109.00 $1,033.00

FIELD EXPENSES

Personal Protection

ITEM RATE UNIT USAGE TOTAL

Level B $172.50 Per Man Day 0 $0.00 Level C $110.00 Per Man Day 0 $0.00 Level D $28.00 Per Man Day 2 $56.00

SUBTOTAL - PERSONAL PROTECTION $56.00

Expendables

ITEM RATE UNIT USAGE TOTAL ITEM TOTAL

Expendables $32.50 Day 1 $32.50

SUBTOTAL - EXPENDABLES $32.50

Analytical Related Equipment

RATE ITEM UNIT NO OF ITEMS USAGE TOTAL ITEM

Soil Sampling Kit (Corer, generator, auger, WL ind.) $834.20 week 0 0 $0.00 FID/PID Combination OVA $106.70 day 0 0 $0.00 Multiprobe 9000 (ph, cond, temp, do, redox) $126.10 day 0 0 $0.00 Multiprobe 9000 (ph, cond, temp, do, redox) $504.40 week 0 0 $0.00

$208.55 day 1 1 $208.55 Construction/O&M Supplies (Various items for work/repair) $63.05 day 0 0 $0.00 Turbidity Meter $24.25 day 0 0 $0.00

SUBTOTAL - ANALYTICAL RELATED EQUIPMENT $208.55

IDW Related Equipment

55-Gal Drum $58.20 0 $0.00

SUBTOTAL - IDW RELATED EQUIPMENT $0.00

Other Equipment

RATE ITEM UNIT NO OF ITEMS USAGE TOTAL ITEM

Peristaltic Tubing (Silicon 3/8 x 5/8) $3.20 ft 1 3 $9.60 Hand Augers $8.25 ea 1 2 $16.50

*Rate negotiated. SUBTOTAL - OTHER EQUIPMENT $26.10

$323.15FIELD EXPENSES

Supplemental Sampling

TOTAL LABOR HOURS

TOTAL VEHICLE RENTAL

TOTAL LABORATORY and SHIPMENTS field investigation

Shallow GW Sampling Kit (WL ind., Per Pump, Multiprobe, turb meter, and

Letter.xlsm/2 Page 6

SITE: Carrabelle Water Plant

SUBTASK NO.: 3 DESCRIPTION:

DATE: October 20, 2017 FACILITY ID NO.: Brownfield

TASK NO: BF-004-E

LABOR HOURS

Labor Category Work Description Hours

Principal Kelso QA/QC - Hyrdo Review 1 Brown

Chief Stephens 2

Associate Eucogco GIS Figures 4

Junior Oien Data Tables, Figures, report 8

15.00TOTAL LABOR HOURS

Report

Letter Report

Letter.xlsm/3 Page 7

BF004E Old Carrabelle Water Plant Site 10252017
Letter
Cost Estimate
2
3