Task Assignment Notification Summary
This document is a Task Assignment Notification Form for the Florida Department of Environmental Protection (FDEP) under contract HW553, issued April 12, 2021. The task assignment (DC006N) involves WSP USA, Inc. as the primary contractor, with Brandie Stringer serving as the FDEP Contract Manager and Perry Kelso as the WSP Contractor Representative. The work is being performed at the Cinderella Cleaners & Laundry site located at 1454 10th Street, Lake Park, Palm Beach County, Florida (Site ID: ERIC_5174), which is in the monitoring phase of environmental remediation.
The task encompasses annual groundwater monitoring and report preparation with a total assignment value of $10,138.70 on a fixed price basis with no retainage. WSP will conduct groundwater sampling from eight monitoring wells (MW001R, MW005, MW006, MW011, MW013, MW032, MW035, and IW014), collecting samples for volatile organic compound (VOC) analysis via EPA Method 8260, with one sample from MW005 also analyzed for Underground Injection Control parameter SM2120B. Subcontractors include Erwin Remediation for investigation-derived waste disposal ($100 per drum) and Advanced Environmental Laboratories for analytical services ($670 for VOC analysis and $10 for color analysis). Additional costs cover labor ($2,742.17 direct labor with 33.44% fringe and 49.90% overhead), vehicle rental ($194), meals and lodging ($358), field equipment ($387.66), and a 10% completion fee ($747.45). The final deliverable—Annual Groundwater Monitoring Report, Waste Manifest, and GIS/ADaPT data—is due May 14, 2021, with task completion by June 30, 2021.
View the file
Other files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DEP CONTRACT NO.
Task Assignment #: Module #: Grant #:
Contractor Name:
Contractor Representative:
DEP Contract Manager: Phone #:
DEP Site #:
Site Name:
Address(Street, City, County):
Phase:
Task Description [use additional pages if necessary]:
The Deliverable and Invoice Schedule is attached.
Final Deliverables:
Final Deliverable Due Date:
TASK ASSIGNMENT TYPE AND NOT TO EXCEED AMOUNTS:
FIXED FEE
RETAINAGE:
TOTAL TASK ASSIGNMENT VALUE: $0.00
DEP Task Manager:
DEP Contract Manager:
Contractual Authority:
Contractor Representative:
CC: Procurement Section (MS 93) Section Representative ________
TASK ASSIGNMENT NOTIFICATION FORM
COST PLUS FIXED FEE
COST REIMBURSEMENT
FIXED PRICE FEE SCHEDULE
Period of Performance:
Execution of Task Assignment through:
DEP will review the deliverables to verify that they meet the specifications of this contract and task description. DEP’s Contract Manager shall notify the Contractor of any deficiencies in the deliverable(s) and shall give the Contractor reasonable opportunity to correct noted deficiencies and provide a revised deliverable(s).
WCP TAFORM 01_18
HW553
D000 N/ADC006N
WSP
Perry Kelso
850-245-8970Brandie Stringer
ERIC_5174
Cinderella Cleaners & Laundry
1454 10th St, Lake Park, Palm Beach Co
Monitoring
WSP will conduct annual groundwater monitoring at the Cinderella Cleaners & Laundry site, as detailed in the revised March 29, 2021 WSP cost proposal. Groundwater samples will be collected from eight wells and analyzed for VOCs via EPA Method 8260. A sample from one well will be analyzed for 2120B for UIC. Depth-to-water will be gauged in select monitoring wells. Erwin Remediation will provide transportation & disposal of IDW. Advanced Environmental Laboratories will conduct all analyses.
Annual Groundwater Monitoring Report; Waste Manifest; GIS/ADaPT
05/14/2021
06/30/2021
$ 10,138.70 $ 0.00 $ 0.00 $ 0.00
$ 0.00
Brandie Stringer Digitally signed by Brandie Stringer Date: 2021.04.12 13:01:45 -04'00'
Brandie Stringer Digitally signed by Brandie Stringer Date: 2021.04.12 13:01:55 -04'00'
William E. Burns, Jr. Digitally signed by William E. Burns, Jr.
Date: 2021.04.16 10:34:29 -04'00'
Digitally signed by: J. Bradley Anders DN: CN = J. Bradley Anders email = banders@ene.com C = US O = Ecology and Environment Date: 2021.04.16 10:49:10 -05'00'
J. Bradley Anders
$ 10,138.70
Task Assignment Notification/Change Order Deliverables and Invoice Schedule Attachment
WCP TAFORM 04-2017
Contract Number:
Task Assignment #:
Deliverables:
Deliverable Deliverable Due Date
Invoice Schedule:
Requirements for Invoice Submittal Amount to be Invoiced
TOTAL COST
Annual Groundwater Monitoring Report; Waste Manifest; GIS/ADaPT 05/14/2021
FDEP approval of Annual Groundwater Monitoring Report; Waste Manifest;
GIS/ADaPT; Project Management $ 10,138.70
$ 10,138.70
HW553
DC006N
FLORIDA DEPARTMENT OF
Environmental Protection
Bob Martinez Center
2600 Blair Stone Road Tallahassee, FL 32399-2400
Ron DeSantis Governor
Jeanette Nuñez
Lt. Governor
Noah Valenstein Secretary
Memorandum
TO: Site # ERIC_5174
Cinderella Cleaners & Laundry Site File
FROM: Brandie Stringer, Contract Manager
SUBJECT: Negotiation Summary
HW553 DC006N
Annual Groundwater Monitoring
DATE: April 12, 2021
WSP will conduct annual groundwater monitoring at the Cinderella Cleaners & Laundry site, as detailed in the revised March 29, 2021 WSP cost proposal.
Groundwater samples will be collected from MW001R, MW005, MW006, MW011, MW013, MW032, MW035, and IW014 and analyzed for VOCs via EPA Method 8260.
One sample from MW005 will also be analyzed for Underground Injection Control (UIC) parameter SM2120B. Depth-to-water will be gauged in select monitoring wells. Erwin Remediation was the lowest bidder and will handle transportation and disposal of IDW.
Advanced Environmental Laboratories will conduct all analyses. WSP will provide an Annual Groundwater Monitoring Report as a final deliverable.
Total task amount is $10,138.70. One revision was required from WSP prior to processing this TA. Negotiations between FDEP and WSP resulted in saving the Department a total of $2,919.46. Final deliverable is due May 14, 2021. Task completion date is June 30, 2021.
FDEP Contract HW553 Cost Estimate
Contractor:
Date:
Task #: DC006N SubTask 1 Project Management (12.5% of direct labor costs) Site: SubTask 2 Annual Groundwater Monitoring and Report
Site ID #: ERIC-5174 SubTask 3 Activity/Phase: SubTask 4
Project Manager: SubTask 5
Labor Rate Category Totals 1 2 3 4 5
$47.79 PM 12.5% of direct labor costs 6.4 6.375 Principal
$60.47 Kelso 2.0 2.0 0.0 0.0 0.0 $63.94 Brown 0.0 0.0 0.0 0.0 0.0
Chief $45.65 Werth 0.0 0.0 0.0 0.0 0.0 $45.11 Elliott 0.0 0.0 0.0 0.0 0.0 $42.97 Huber 0.0 0.0 0.0 0.0 0.0 $47.50 Harter 0.0 0.0 0.0 0.0 0.0 $48.10 Moore 0.0 0.0 0.0 0.0 0.0
Senior $36.37 Krajewski 0.0 0.0 0.0 0.0 0.0 $34.46 Murak 0.0 0.0 0.0 0.0 0.0 $33.75 Chappell 2.0 2.0 0.0 0.0 0.0 $36.06 Anders 39.0 39.0 0.0 0.0 0.0 $36.54 Hammond 0.0 0.0 0.0 0.0 0.0 $39.09 Dillon 0.0 0.0 0.0 0.0 0.0 $39.09 Eucogno 0.0 0.0 0.0 0.0 0.0 $39.09 Percifull 0.0 0.0 0.0 0.0 0.0
Associate $28.09 Oien 28.0 28.0 0.0 0.0 0.0 $26.92 Kuhn 0.0 0.0 0.0 0.0 0.0 $28.09 Kowal 0.0 0.0 0.0 0.0 0.0 $28.09 Fowler 2.0 2.0 0.0 0.0 0.0 $28.09 Bender 0.0 0.0 0.0 0.0 0.0
Junior $24.47 Laitsch 0.0 0.0 0.0 0.0 0.0 $24.47 Williams 0.0 0.0 0.0 0.0 0.0 $21.00 Heuston 0.0 0.0 0.0 0.0 0.0 $24.47 Cooper 0.0 0.0 0.0 0.0 0.0 $24.47 Balke 0.0 0.0 0.0 0.0 0.0 $24.47 Slabaugh 0.0 0.0 0.0 0.0 0.0
Technician $18.00 Smith 0.0 0.0 0.0 0.0 0.0
Clerical $22.28 Dekle 0.0 0.0 0.0 0.0 0.0 $22.28 Rodriguez 0.0 0.0 0.0 0.0 0.0
Total Hours 79.4 6.4 73.0 0.0 0.0 0.0
1) Direct Labor $2,742.17 $304.69 $2,437.48 $0.00 $0.00 $0.00
2) Fringe (33.44% of Lines 1 ) $916.98 $101.89 $815.09 $0.00 $0.00 $0.00
3) Overhead (49.90% of Lines 1 + 2) $1,825.91 $202.88 $1,623.03 $0.00 $0.00 $0.00
4) Gen & Admin (36.27% of Lines 1 + 2 + 3) $1,989.43 $221.05 $1,768.38 $0.00 $0.00 $0.00
5) Total Labor (Sum Lines 1 thru 4) $7,474.49 $830.51 $6,643.98 $0.00 $0.00 $0.00
6) Other Direct Costs (5.0% of Line 1) $137.10 $15.23 $121.87 $0.00 $0.00 $0.00 Travel
7a) Vehicle Rental $194.00 $0.00 $194.00 $0.00 $0.00 $0.00 7b) Mileage Costs $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 7c) Air Fare $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 7d) Per diem + Hotel $358.00 $0.00 $358.00 $0.00 $0.00 $0.00 7e) Total Travel $552.00 $0.00 $552.00 $0.00 $0.00 $0.00
Subcontractor (Equipment Procurement) 8a) Provider - Task # $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 8b) Provider - Task # $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 8c) Provider - Task # $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 8d) Subcontractor Subtotal $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 8e) Procurement Fee $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 8f) Total Subcontractor Cost $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor (Services Procurement) 9a) Drilling (Conventional) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 9b) Drilling (Non-conventional) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 9c) Mobile Laboratory $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 9d) Surveying $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 9e) IDW $100.00 $0.00 $100.00 $0.00 $0.00 $0.00 9f) Utilities $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 9g) Other Sub 1 - Task # $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 9h) Other Sub 2- Task # $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 9i) Other Sub 3 - Task # $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 9j) Subcontractor Subtotal $100.00 $0.00 $100.00 $0.00 $0.00 $0.00 9k) Handling Fee $10.00 $0.00 $10.00 $0.00 $0.00 $0.00 9l) Total Subcontractor Cost $110.00 $0.00 $110.00 $0.00 $0.00 $0.00
Laboratory 10a) Analytical Costs (Fixed Lab) $670.00 $0.00 $670.00 $0.00 $0.00 $0.00 10b) Fast Turnaround Rate (%) (Fixed Lab) 0% 100% 0% 0% 0% 10c) Fast Turnaround Charges (Fixed Lab) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 10d) Sample Shipping $60.00 $0.00 $60.00 $0.00 $0.00 $0.00 10e) Total Laboratory $730.00 $0.00 $730.00 $0.00 $0.00 $0.00
Field Expenses 11a) Personal Protection $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 11b) Expendables $32.50 $0.00 $32.50 $0.00 $0.00 $0.00 11c) Equipment (Drilling Related) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 11d) Equipment (Analytical Related) $208.55 $0.00 $208.55 $0.00 $0.00 $0.00 11e) Equipment (IDW Related) $58.20 $0.00 $58.20 $0.00 $0.00 $0.00 11f) Equipment (Other) $88.41 $0.00 $88.41 $0.00 $0.00 $0.00 11g) Total Field Expenses $387.66 $0.00 $387.66 $0.00 $0.00 $0.00
Subtotal $9,391.25 $845.74 $8,545.51 $0.00 $0.00 $0.00 Completion Fee 12) (10.0% of Line 5) $747.45 $83.05 $664.40 $0.00 $0.00 $0.00
13) Total Estimated Cost $10,138.70 $928.79 $9,209.91 $0.00 $0.00 $0.00
March 25, 2021
* Equipment Procurement - 10.0% Per Subcontractor, maximum $2,500 per Subcontractor.
** Utilities fees are calculated based on $20 per utility bill per month.
*** Except for utilities fees, 10% of first $50,000, 7% of next $50,000, 5% over $100,000 per Subcontractor.
Ecology and Environment, Inc.
FDEP: B. Stringer / E & E: B. Anders
Cinderella Cleaners
2021 Annual GWM
DC006N 2021 GWS Cost 4/7/2021 Page 1
SITE: Cinderella Cleaners
SUBTASK NO.: 2 DESCRIPTION:
DATE: March 25, 2021 FACILITY ID NO.: ERIC-5174
TASK NO: DC006N
LABOR HOURS
Labor Category Work Description Hours Principal
Kelso Senior Review 2 Senior
Chappell CAD Figure Production 2
Anders 39
Associate
Oien 28
Fowler Editing/Publications 2 73.00
VEHICLE RENTAL
ITEM RATE UNIT USAGE TOTAL
Equipment Truck/Van $97.00 Day 2 $194.00 $194.00
MILEAGE AND AIRFARE
$0.00
MEALS AND LODGING
ITEM Labor Category RATE UNIT USAGE TOTAL
MEALS
Oien Associate $36.00 Day 2 $72.00 Anders Senior $36.00 Day 2 $72.00
Subtotal - Meals 0 $144.00
LODGING RATE* UNIT USAGE
Oien Associate $107.00 Day 1 $107.00 Anders Senior $107.00 Day 1 $107.00
Subtotal - Lodging $214.00 $358.00
EQUIPMENT PROCUREMENT
$0.00
SUBCONTRACTOR
Provider Name of Sub Description of Work RATE UNIT USAGE TOTAL IDW Erwin Remediation IDW Disposal $100.00 Drum 1 $100.00
$100.00 LABORATORY and SAMPLE SHIPMENTS
ANALYSIS/PARAMETER
FAST TURNAROUND
RATE (%)
No. for Fast
Turnaround Rate RATE Media No. of
Samples No. of
QA/QC
Fast Turn- Around Charges TOTAL
EPA 8260 VOCs 100% 0 $66.00 Water 8 2 $0.00 $660.00 SM2120B Color 100% 0 $10.00 Water 1 0 $0.00 $10.00 *Rate negotiated. Subtotal-Lab Analyses 9 2 $0.00 $670.00
SAMPLE SHIPMENTS
CONTAINER SIZE
Shipment Method
24 hr No. of
Containers Shipment Method
2 day No. of
Containers Ice No. of
Containers TOTAL Large (>50 lbs. < 70 lbs.) $104.00 0 $60.00 1 $5.00 0 $60.00
Subtotal-Sample Shipments $60.00 $730.00
FIELD EXPENSES
Personal Protection
SUBTOTAL - PERSONAL PROTECTION $0.00
Expendables
ITEM RATE UNIT USAGE TOTAL ITEM TOTAL
Expendables $32.50 Day 1 $32.50
SUBTOTAL - EXPENDABLES $32.50
Drilling Related Equipment
SUBTOTAL - DRILLING RELATED EQUIPMENT $0.00
Analytical Related Equipment
RATE ITEM UNIT NO OF ITEMS USAGE TOTAL ITEM
$208.55 day 1 1 $208.55
SUBTOTAL - ANALYTICAL RELATED EQUIPMENT $208.55
IDW Related Equipment
55-Gal Drum $58.20 1 1 $58.20
SUBTOTAL - IDW RELATED EQUIPMENT $58.20
Other Equipment
RATE ITEM UNIT NO OF ITEMS USAGE TOTAL ITEM
Peristaltic Tubing (Silicon 3/8 x 5/8) $3.20 ft 1 12 $38.41 HDPE Poly tubing (1/4 inch OD) $0.25 ft 1 200 $50.00
*Rate negotiated. SUBTOTAL - OTHER EQUIPMENT $88.41
$387.66FIELD EXPENSES
Annual Groundwater Monitoring and Report
TOTAL LABOR HOURS
TOTAL VEHICLE RENTAL
TOTAL MILEAGE AND AIRFARE
*Rate may be higher based on geographical location or special events.
TOTAL MEALS AND LODGING
TOTAL LABORATORY and SHIPMENTS
TOTAL EQUIPMENT PROCUREMENT
TOTAL SUBCONTRACTOR
Shallow GW Sampling Kit (WL ind., Per Pump, Multiprobe, turb meter, and
Field: Travel time (6-hours each way); warehouse mob/demob, groundwater sampling (8 wells), equipment calibration, DTW measurements, IDW management, sample shipping, Report: Report generation, figure development, PG Seal
Field: Travel time (6-hours each way); warehouse mob/demob, groundwater sampling (8 wells), equipment calibration, DTW measurements, IDW management, sample shipping, Report: data tabulation, GIS data tables
DC006N 2021 GWS Cost/2 Page 6
WSP USA
325 John Knox Road, Building F, Suite 140
Tallahassee, Florida 32303
Tel.: 850-523-0954 wsp.com
March 29, 2021
Ms. Brandie Stringer Florida Department of Environmental Protection 2600 Blair Stone Road Tallahassee, Florida 32399-2400
Re: Cost Estimate for 2021 Annual Groundwater Monitoring Activities at the Cinderella Cleaners Site, Lake Park, Palm Beach County, Florida (ERIC_5174, Task Assignment:
HW553-DC006N)
Dear Brandie:
WSP USA, Inc. (WSP) is submitting to the Florida Department of Environmental Protection (FDEP) this cost estimate for 2021 annual groundwater monitoring activities. This cost proposal package includes a cost estimate/level of effort table, a proposed schedule, and a figure showing monitoring well locations. A brief summary of the scope of work (SOW) is provided below.
Subtask 1: Project Management The costs associated with this subtask are automatically calculated based on 12.5% of the direct labor costs associated with the remaining tasks.
Subtask 2: Annual Groundwater Sampling Event and Annual Report During the 2021 annual groundwater monitoring event, groundwater samples will be collected as outlined in Table 1 for laboratory analysis. Well locations are provided on Figure 1. For QA/QC purposes, one field duplicate and one trip blank will be collected during the field event.
During the collection of groundwater samples, FDEP Standard Operating Procedures will be followed.
Additionally, field instrument calibration records (FDEP Form FD9000-8) and groundwater sampling logs (FDEP Form 9000-24) will be completed. Groundwater samples will be collected using a variable speed peristaltic pump and polyethylene tubing. During purging, the polyethylene tubing will be connected to a flow-through cell. A YSI Multiprobe Pro series will be inserted into the flow-through cell via an airtight fitting on the lid. The YSI Multiprobe Pro series, which will be calibrated prior to use, has the capability to measure temperature, pH, dissolved oxygen, conductivity, and oxidation-reduction potential. A calibrated Hach Turbidimeter 2100P will used for the collection of turbidity measurements. Upon completion of purging of each monitoring well, the flow-through cell will be disconnected and groundwater samples collected from the polyethylene tubing.
Purge water (investigation-derived waste [IDW]) will be containerized in a 55-gallon drum and stored at a secure location onsite. Once, groundwater analysis is complete, Erwin Remediation will pick up the drum and transport to a disposal facility.
The groundwater samples, one duplicate sample and one trip blank will be shipped to the Advanced Environmental Laboratories, Inc. and analyzed for volatile organic compounds using United States Environmental Protection Agency (USEPA) Method 8260. In addition, the groundwater sample from
Ms. Brandie Stringer March 29, 2021 monitoring well MW005 will be analyzed for the Underground Injection Control parameter color by Standard Method (SM) 2120B.
Depth-to-water will be gauged and recorded in select monitoring wells to determine groundwater elevations across the site and observe seasonal elevation fluctuations.
Following receipt of the laboratory analytical data, WSP will submit to FDEP Annual Groundwater Monitoring Report including the site description, investigative background, and a summary of the groundwater sampling. The report will include narrative, summary tables, figures, and attachments to convey the data, followed by conclusions and recommendations. An electronic copy of the report and updated geospatial information systems data tables will be submitted to FDEP via the FDEP File Transfer Protocol site or by electronic mail.
Schedule The proposed task schedule is as follows:
Initiate Annual Groundwater Sampling Event: April 23, 2021 Submittal of Annual Groundwater Monitoring Report: May 9, 2021 Completion Date May 31, 2021
The cost estimate to complete the above-described work is provided in the associated Excel worksheet.
If you have any questions or comments regarding this cost proposal, please contact me (banders@ene.com) at (850) 631-2443.
Sincerely, WSP USA, INC.
Brad Anders, P.G.
E & E Project Manager
Table
Table 1 2021 Annual Groundwater Monitoring
Cinderella Cleaners Site Lake Park, Palm Beach County, Florida
ERIC_5174; Task Assignment HW553-DC006N
Sampling Point Method Frequency Justification Groundwater Samples
MW001R VOCs (USEPA Method 8260);
Annual 1,2
MW005 VOCs (USEPA Method 8260); color
(SM2120B)
Annual 1,2
MW006 VOCs (USEPA Method 8260)
Annual 1,2
MW011 VOCs (USEPA Method 8260)
Annual 1,2
MW013 VOCs (USEPA Method 8260)
Annual 1,2
MW032 VOCs (USEPA Method 8260)
Annual 1,2
MW035 VOCs (USEPA Method 8260)
Annual 1,2
IW014 VOCs (USEPA Method 8260)
Annual 1,2
Justification: 1. Required by Rule 62-780;
2. Source area or downgradient well.
Figures
E
O
P
E
O
P
E
O
P
E
O
P
E
O
P
E
O
P
E
O
P
E
O
P
C I T
G O
MIAMI SUBS
E
O
P
E
O
P
E
O
P
E
O
P
E
O
P
E
O
P
EOP
EOP
EOP
EOP
EOP
EOP
EOP
E
O
P
E
O
P
E
O
P
EOP
E
O
P
E
O
P
E
O
P
E
O
P
E
O
P
E
O
P
E
O
P
EOP
E O
P
E
O
P
E
O
P
E
O
P
E
O
P
E
O
P
E
O
P
E
O
P
E
O
P
E
O
P
E
O
P
E
O
P
E
O
P
EOP
EOP
EOP
EOP
EOP
E
O
P
E
O
P
E
O
P
E
O
P
E
O
P
E
O
P
E
O
P
E
O
P
E
O
P
E
O
P
LB1
MW003
A
C
MW019
MW020
MW027
MW015
MW013
MW011
MW010
MW026
MW018
MW007
MW016
MW002
MW034
MW033
MW004
MW028
MW001R
MW006
MW012
MW014
MW032
MW005
CHEVRON
SHOPPING CENTER
E
O
P
E
O
P
E
O
P
EOP
E
O
P
E
O
P
E
O
P
EOP
E
O
P
E O
P
E
O
P
EOP
EOP
EOP
EOP
EOP
E O
P
E O
P
E O
P
EOP
EOP
EOP
EOP
EOP
EOP
E
O
P
E
O
P
E
O
P
E
O
P
EOP
EOP
EOP
EOP
EOP
EOP
EOP
EOP
EOP
EOP
EOP
EOP
EOP
EOP
EOP
E O
P
E O
P
E O
P
EOP
EOP
E
O
P
E
O
P
E
O
P
EOP
E O
P
E O
P
E O
P
E O
P
E O
P
EOP
EOP
EOP
EOP
EOP
MW008
MW009
IW014
IW013
MW035
MW036
PRP-1
KEY:
EOP
APPROXIMATE EDGE OF ROADWAY
SHALLOW WELL
DRY CLEANING MACHINE
BUILDING
INTERMEDIATE WELL
INJECTION WELL
RAILROAD
ABANDONED WELL
DATE ISSUED
C.A.D. FILE NO.
1003077.0187.01.dwg
FIGURE 1
SITE MAP
CINDERELLA CLEANERS - ERIC 5174
LAKE PARK, PALM BEACH COUNTY, FLORIDA
AutoCAD SHX Text
AMOCO #6304
AutoCAD SHX Text 10th STREET
AutoCAD SHX Text 10th COURT
AutoCAD SHX Text
PROSPERITY FARMS ROAD
AutoCAD SHX Text
PRONTI'S RESTAURANT
AutoCAD SHX Text
CARDELLO'S PLAZA
AutoCAD SHX Text
MOBIL LUBE EXPRESS
AutoCAD SHX Text
KENTUCKY FRIED CHICKEN
AutoCAD SHX Text
EYEGLASS WORLD
AutoCAD SHX Text
NORTHLAKE BOULEVARD
AutoCAD SHX Text
FAMILY FLOORING
AutoCAD SHX Text
CINDERELLA CLEANERS
AutoCAD SHX Text
HONG KONG TAILORING
AutoCAD SHX Text
VACANT
AutoCAD SHX Text
COASTAL BOAT WORKS
AutoCAD SHX Text
FOR LEASE
AutoCAD SHX Text
STORAGE
AutoCAD SHX Text
PALM BEACH AUTO TRIM
AutoCAD SHX Text
NORTHLAKE AUTO CARE
AutoCAD SHX Text
PRECISION AUTO WORKS
AutoCAD SHX Text
RON'S COMPLETE AUTO REPAIR
AutoCAD SHX Text
MARIE'S
AutoCAD SHX Text
A-1 PAINT & BODY
AutoCAD SHX Text
WEBB AIR
AutoCAD SHX Text
SIGN MASTER
AutoCAD SHX Text
GREEN GARDEN SUPPLY
AutoCAD SHX Text
FAIRHAVEN DRIVE
AutoCAD SHX Text
COMMERCIAL
AutoCAD SHX Text
RESIDENTIAL
AutoCAD SHX Text
PARK AVENUE
AutoCAD SHX Text
RESIDENTIAL
AutoCAD SHX Text
BUD'S CHICKEN
AutoCAD SHX Text
ALDRICH RENTAL
AutoCAD SHX Text
MAGNETIC
AutoCAD SHX Text
NORTHLAKE BOULEVARD
AutoCAD SHX Text
FAIRHAVEN COURT
AutoCAD SHX Text
SCALE IN FEET
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
Clark Environmental
Non-Hazardous 55-Gallon Drum Transport - $40/drum
Non-Hazardous 55-Gallon Drum Water Disposal - $60/drum
Low Volume Drum Stop (Less Than 6 Drums) - $50/stop
Total - $150
PermaFix
IDW Water 55-Gallon Drum - $120/drum
55-Gallon Drum Transport - $40/drum
Stop Fee - $75/Stop
Other Fees - $57.90
Total - $292.90
Erwin Remediation - Selected
Single 55-Gallon Drum Non-Hazardous Water - $100
Total - $100
408 Ditmar Street
Pensacola, FL 32503
ErwinRemediation@Gmail.com - P.O. Box 884 Gulf Breeze, FL 32562
(850) 292-6511
To: Mr. Brad Anders
WSP USA
325 John Knox Road Building F, Suite 140
Tallahassee, FL 32303
March 24, 2021
Re: Drum Disposal – 1454 10th St – Lake Park, FL
Mr. Anders:
The price for disposal of a single drum of non-hazardous groundwater located in Lake Park, FL will be $100.00 per drum, total, for both transportation and disposal.
Respectfully, Jonathan Erwin
Erwin Remediation, Inc.
Email: ErwinRemediation@Gmail.com
Office: (850) 292-6511 mailto:Remediation@Gmail.com
Perma-Fix of Florida, Inc. H:\House\WSP (formerly E&E Inc)\032621.1 ba-q.doc
March 26, 2021
WSP (formerly Ecology & Environment, Inc.)
325 John Knox Road, Building F, Suite 140 Tallahassee, FL 32303
(850) 631-2443
Attention: Brad Anders, LEP, PG
Subject: Waste Transportation & Disposal Quotation 2021-0173
Sent via email: brad.anders@wsp.com
Dear Brad:
On behalf of Perma-Fix Environmental Services, Inc. (Perma-Fix of Florida), I would like to thank you for the opportunity to provide you with this quotation outlining the costs associated with the drum transportation and disposal. Pricing is contingent upon review and plant approval of a signed Perma-Fix of Florida Waste Material Profile.
We appreciate the opportunity to address your waste disposal needs and are pleased to submit the following quotation.
Site Location: 1454 10th St., Lake Park, FL Disposal Quantity/Size Unit Price Est. Total
IDW Water (NRM) (PF #Pending) 1 x 55 gal. $120.00 $120.00 Disposal Subtotal $120.00 Transportation Quantity Unit Price Est. Total
LTL Transportation, per drum (55-gallon) 1 $40.00 $40.00 LTL Stop Fee 1 $75.00 $75.00
Transportation Subtotal $115.00 Other Fees Quantity Unit Price Est. Total
Florida Hazardous Waste Fee n/a 3.0% n/a Administration/ Insurance Fee $235.00 14.0% $32.90 Sales Tax (Materials only) -- 7.0% --e-Manifest Fee (not applicable if VSQG) n/a $35.00 n/a Profile Fee (Annual) 1 $25.00 $25.00
Other Fees Subtotal $57.90 Est. Total: $292.90
Pricing Notes:
• The terms and conditions in Perma-Fix Waste Transportation & Disposal Agreement, Rev. 1 dated
October 2020, apply upon acceptance/signature of this quote.
Perma-Fix of Florida, Inc. H:\House\WSP (formerly E&E Inc)\032621.1 ba-q.doc
• Demurrage: One hour free loading. $110.00 per hour thereafter.
• No-Load Charge: Stop + LTL Fees (includes cancellation with less than 48 hours’ notice).
We look forward to being of service to you. If you have any questions, or if I can be of further assistance, please call me at (352) 395-1342.
Sincerely, Mervin W. Dale
Mervin W. Dale, P.G.
Manager Support Services
PPEERRMMAA--FFIIXX EENNVVIIRROONNMMEENNTTAALL SSEERRVVIICCEESS,, IINNCC..
OOffffiiccee:: ((335522)) 339955--11334422 FFaaxx:: ((335522)) 443333--11887744 EEmmaaiill:: mmddaallee@@ppeerrmm--ffiixx..nneett
Quote Approval No. 2021-0173
Signature
Name, Printed
Date
| Task Assignment Notification |
| BWC Task Assignment Form (Rev 02_17).pdf |
| Task Assignment Notification |
| BWC Task Assignment Form - Page 2 (Rev 08_10) - Rev 1.pdf |
| Deliverable & Invoice Schedule |
File details come from the government source that posted it. Updated .