This is a Task Assignment Notification Form for Contract HW553 issued by the Florida Department of Environmental Protection (FDEP) to Ecology & Environment, Inc. (E&E), a private environmental consulting firm. The task assignment authorizes work at the Prestige Cleaners site in Tallahassee, Leon County, Florida (ERIC_4873). The document establishes the scope of work, deliverables, invoicing schedule, and cost for an annual groundwater monitoring event to be performed in accordance with the January 17, 2020 Scope of Work and Cost Estimate.
The contract authorizes E&E to conduct an annual groundwater monitoring event consisting of three subtasks: Project Management (12.5% of direct labor costs), Annual Groundwater Monitoring Event (field sampling from nine monitoring wells with laboratory analysis for volatile organic compounds using USEPA Method 8021B, investigation-derived waste treatment and disposal), and Annual Groundwater Monitoring Report with ADaPT/GIS update. The total task assignment value is $6,702.00 on a fixed-price basis with no retainage. Invoicing is structured in two phases: $3,864.79 upon submittal and FDEP approval of the Groundwater Monitoring Field Documentation and Lab Report (due June 19, 2020), and $2,837.21 upon submittal and FDEP approval of the Annual Groundwater Monitoring Report and ADaPT/GIS update (due August 14, 2020). The task assignment execution period extends through December 31, 2020, with an estimated 49.8 labor hours required.
View the file
Other files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Task Assignment Notification/Change Order Deliverables and Invoice Schedule Attachment
Contract Number: HW553 Task Assignment #: DC002L
Deliverables:
Deliverable Deliverable Due Date Subtask 2: Groundwater Monitoring Field Documentation and Lab Report, IDW Treatment Documentation 19-Jun-20
Subtask 3: Annual Groundwater Monitoring Report and ADaPT/GIS update 14-Aug-20
Invoice Schedule:
Requirements for Invoice Submittal Amount to be Invoiced Subtask 2: Submittal and FDEP approval of Groundwater Monitoring Field Documentation and Lab Report, IDW Treatment Documentation
$3,864.79
Subtasks 1 & 3: Submittal and FDEP approval of Annual Groundwater Monitoring Report and ADaPT/GIS update $2,837.21
TOTAL COST $6,702.00
BWC TAFORM 01/18
Printed on recycled paper.
FLORIDA DEPARTMENT OF
Environmental Protection
Bob Martinez Center
2600 Blair Stone Road Tallahassee, FL 32399-2400
Ron DeSantis Governor
Jeanette Nuñez
Lt. Governor
Noah Valenstein Secretary
To: HW553 Contract Negotiation File Prestige Cleaners
Tallahassee, Leon County
ERIC_ 4873
From: Ben Grubbs, Project Manager Date: January 22, 2020 Subject: Negotiation Summary
HW553 DC002L
This Task Assignment authorizes E&E to conduct an annual groundwater monitoring event in accordance with the January 17, 2020, Scope of Work and Cost Estimate.
Subtask 1: Project Management An automatic calculation based upon total direct labor hours determines the labor hours within this subtask.
Subtask 2: Annual Groundwater Monitoring Event E&E will collect groundwater samples from monitoring wells MW001-MW005, MW006RR, MW7S, MW7I and MW7D. Prior to sampling, depth-to-water will be measured. The wells will then be purged, and field parameters will be recorded. The groundwater sample will be collected using low flow sampling methods and analyzed for chlorinated volatile organic compounds (VOCs). Investigation-derived waste (IDW) will be temporarily stored in a 55-gallon drum before being air-sparged and field screened using the Color-Tec method until there is no visual response through the Colorimetric tube. The treated IDW will then be disposed of on site.
Subtask 3: Annual Groundwater Monitoring Report E&E will submit the Annual Groundwater Monitoring Report and ADaPT/GIS deliverables to
FDEP.
The FDEP Project Manager agrees to the scope of work and final cost associated with this Task Assignment. The final cost for this Task Assignment is $6,072.00 with 49.8 labor hours.
E&E may invoice following the schedule established in the Deliverables and Invoice Schedule Attachment, which accompanies the Task Assignment Notification Form.
SITE: Prestige Cleaners
SUBTASK NO.: 2 DESCRIPTION:
DATE: January 17, 2020 FACILITY ID NO.: ERIC_4873
TASK NO: DC002L
LABOR HOURS
Labor Category Work Description Hours
Senior Chappell Collect groundwater samples (9 wells), DTW measurements, Delivery of samples to AEL, Warehouse mob/demob 12
Associate Oien 12
24.00
VEHICLE RENTAL
ITEM RATE UNIT USAGE TOTAL
Equipment Truck/Van $97.00 Day 1 $97.00
$97.00
MILEAGE AND AIRFARE
$0.00
MEALS AND LODGING
$0.00
EQUIPMENT PROCUREMENT
$0.00
SUBCONTRACTOR
$0.00 LABORATORY and SAMPLE SHIPMENTS
ANALYSIS/PARAMETER
FAST TURNAROUND
RATE (%)
No. for Fast
Turnaround Rate RATE Media No. of
Samples No. of
QA/QC
Fast Turn- Around Charges TOTAL
EPA 8021B VOCs 100% 0 $100.00 Water 9 2 $0.00 $1,100.00 *Rate negotiated. Subtotal-Lab Analyses 9 2 $0.00 $1,100.00
SAMPLE SHIPMENTS
CONTAINER SIZE
Shipment Method
24 hr No. of
Containers Shipment Method
2 day No. of
Containers Ice No. of
Containers TOTAL Small (<50 lbs.) $63.00 0 $35.00 1 $5.00 1 $40.00
Subtotal-Sample Shipments $40.00 $1,140.00
FIELD EXPENSES
Personal Protection
SUBTOTAL - PERSONAL PROTECTION $0.00
Expendables
ITEM RATE UNIT USAGE TOTAL ITEM TOTAL
Expendables $32.50 Day 1 $32.50
SUBTOTAL - EXPENDABLES $32.50
Drilling Related Equipment
SUBTOTAL - DRILLING RELATED EQUIPMENT $0.00
Analytical Related Equipment
RATE ITEM UNIT NO OF ITEMS USAGE TOTAL ITEM
$208.55 day 1 1 $208.55
SUBTOTAL - ANALYTICAL RELATED EQUIPMENT $208.55
IDW Related Equipment
55-Gal Drum $58.20 1 1 $58.20
SUBTOTAL - IDW RELATED EQUIPMENT $58.20
Other Equipment
RATE ITEM UNIT NO OF ITEMS USAGE TOTAL ITEM
HDPE Poly tubing (1/4 inch OD) $0.25 ft 1 750 $187.50 *Rate negotiated. SUBTOTAL - OTHER EQUIPMENT $187.50
$486.75
TOTAL EQUIPMENT PROCUREMENT
TOTAL SUBCONTRACTOR
Shallow GW Sampling Kit (WL ind., Per Pump, Multiprobe, turb meter, and
Collect groundwater samples (9 wells), DTW measurements, Delivery of samples to AEL, Warehouse mob/demob
FIELD EXPENSES
Annual Groundwater Monitoring Event
TOTAL LABOR HOURS
TOTAL VEHICLE RENTAL
TOTAL MILEAGE AND AIRFARE
TOTAL MEALS AND LODGING
TOTAL LABORATORY and SHIPMENTS
LOECEF_HW553_DC002L/2 Page 6
SITE: Prestige Cleaners
SUBTASK NO.: 3 DESCRIPTION:
DATE: January 17, 2020 FACILITY ID NO.: ERIC_4873
TASK NO: DC002L
LABOR HOURS
Labor Category Work Description Hours
Principal Kelso Senior Review 2
Senior Chappell CAD Figures 4 Anders Report Preparation, data evaluation, conclusions, recommendations, PG certification 8
Associate Oien Report Tables; GIS Tables 6 Fowler Document editing and production 2
22.00
VEHICLE RENTAL
$0.00
MILEAGE AND AIRFARE
$0.00
MEALS AND LODGING
$0.00
EQUIPMENT PROCUREMENT
$0.00
SUBCONTRACTOR
$0.00 LABORATORY and SAMPLE SHIPMENTS
$0.00
FIELD EXPENSES
$0.00FIELD EXPENSES
TOTAL EQUIPMENT PROCUREMENT
TOTAL SUBCONTRACTOR
TOTAL LABORATORY and SHIPMENTS
TOTAL MILEAGE AND AIRFARE
TOTAL MEALS AND LODGING
Annual Groundwater Monitoring Event
TOTAL LABOR HOURS
TOTAL VEHICLE RENTAL
LOECEF_HW553_DC002L/3 Page 7
FDEP Contract HW553 Cost Estimate
Contractor:
Date:
Task #: DC002L SubTask 1 Site: SubTask 2 Annual Groundwater Monitoring Event
Site ID #: ERIC_4873 SubTask 3 Annual Groundwater Monitoring Report Activity/Phase: SubTask 4
Project Manager: SubTask 5
10BP20E.0106.01
Labor Rate Category Totals 1 2 3 $47.79 PM 12.5% of direct labor costs 3.8 3.797
Principal $60.47 Kelso 2.0 0.0 2.0 $63.94 Brown 0.0 0.0 0.0
Chief $45.65 Werth 0.0 0.0 0.0 $45.11 Elliott 0.0 0.0 0.0 $43.01 Ringo 0.0 0.0 0.0 $31.25 Gebhart 0.0 0.0 0.0 $48.10 Moore 0.0 0.0 0.0
Senior $36.37 Krajewski 0.0 0.0 0.0 $34.46 Murak 0.0 0.0 0.0 $33.75 Chappell 16.0 12.0 4.0 $36.06 Anders 8.0 0.0 8.0 $39.09 Dillon 0.0 0.0 0.0 $39.09 Eucogno 0.0 0.0 0.0 $39.09 Guerrero 0.0 0.0 0.0 $39.09 Percifull 0.0 0.0 0.0
Associate $24.78 Oien 18.0 12.0 6.0 $28.09 Witherington 0.0 0.0 0.0 $28.09 Brighton 0.0 0.0 0.0 $28.09 Fowler 2.0 0.0 2.0 $28.09 Hammond 0.0 0.0 0.0
Junior $22.05 Kuhn 0.0 0.0 0.0 $22.73 Clapsaddle 0.0 0.0 0.0 $24.47 Beck 0.0 0.0 0.0 $24.47 Cooper 0.0 0.0 0.0 $24.47 Kowal 0.0 0.0 0.0 $24.47 Slabaugh 0.0 0.0 0.0
Technician $18.72 N/A 0.0 0.0 0.0
Clerical $16.40 Williams 0.0 0.0 0.0 $22.28 Rodriguez 0.0 0.0 0.0
Total Hours 49.8 3.8 24.0 22.0
1) Direct Labor $1,633.10 $181.46 $702.36 $749.28
2) Fringe (33.44% of Lines 1 ) $546.11 $60.68 $234.87 $250.56
3) Overhead (49.90% of Lines 1 + 2) $1,087.43 $120.83 $467.68 $498.92
4) Gen & Admin (36.27% of Lines 1 + 2 + 3) $1,184.81 $131.65 $509.56 $543.60
5) Total Labor (Sum Lines 1 thru 4) $4,451.45 $494.62 $1,914.47 $2,042.36
6) Other Direct Costs (5.0% of Line 1) $81.65 $9.07 $35.12 $37.46 Travel
7a) Vehicle Rental $97.00 $0.00 $97.00 $0.00 7b) Mileage Costs $0.00 $0.00 $0.00 $0.00 7c) Air Fare $0.00 $0.00 $0.00 $0.00 7d) Per diem + Hotel $0.00 $0.00 $0.00 $0.00 7e) Total Travel $97.00 $0.00 $97.00 $0.00
Subcontractor (Equipment Procurement) 8a) Provider - Task # $0.00 $0.00 $0.00 $0.00 8b) Provider - Task # $0.00 $0.00 $0.00 $0.00 8c) Provider - Task # $0.00 $0.00 $0.00 $0.00 8d) Subcontractor Subtotal $0.00 $0.00 $0.00 $0.00 8e) Procurement Fee $0.00 $0.00 $0.00 $0.00 8f) Total Subcontractor Cost $0.00 $0.00 $0.00 $0.00
Subcontractor (Services Procurement) 9a) Drilling (Conventional) $0.00 $0.00 $0.00 $0.00 9b) Drilling (Non-conventional) $0.00 $0.00 $0.00 $0.00 9c) Mobile Laboratory $0.00 $0.00 $0.00 $0.00 9d) Surveying $0.00 $0.00 $0.00 $0.00 9e) IDW $0.00 $0.00 $0.00 $0.00 9f) Utilities $0.00 $0.00 $0.00 $0.00 9g) Other Sub 1 - Task # $0.00 $0.00 $0.00 $0.00 9h) Other Sub 2- Task # $0.00 $0.00 $0.00 $0.00 9i) Other Sub 3 - Task # $0.00 $0.00 $0.00 $0.00 9j) Subcontractor Subtotal $0.00 $0.00 $0.00 $0.00 9k) Handling Fee $0.00 $0.00 $0.00 $0.00 9l) Total Subcontractor Cost $0.00 $0.00 $0.00 $0.00
Laboratory 10a) Analytical Costs (Fixed Lab) $1,100.00 $0.00 $1,100.00 $0.00 10b) Fast Turnaround Rate (%) (Fixed Lab) 0% 100% 0% 10c) Fast Turnaround Charges (Fixed Lab) $0.00 $0.00 $0.00 $0.00 10d) Sample Shipping $40.00 $0.00 $40.00 $0.00 10e) Total Laboratory $1,140.00 $0.00 $1,140.00 $0.00
Field Expenses 11a) Personal Protection $0.00 $0.00 $0.00 $0.00 11b) Expendables $32.50 $0.00 $32.50 $0.00 11c) Equipment (Drilling Related) $0.00 $0.00 $0.00 $0.00 11d) Equipment (Analytical Related) $208.55 $0.00 $208.55 $0.00 11e) Equipment (IDW Related) $58.20 $0.00 $58.20 $0.00 11f) Equipment (Other) $187.50 $0.00 $187.50 $0.00 11g) Total Field Expenses $486.75 $0.00 $486.75 $0.00
Subtotal $6,256.85 $503.69 $3,673.34 $2,079.82 Completion Fee 12) (10.0% of Line 5) $445.15 $49.46 $191.45 $204.24
13) Total Estimated Cost $6,702.00 $553.15 $3,864.79 $2,284.06
Project Management (12.5% of direct labor costs)
January 17, 2020
* Equipment Procurement - 10.0% Per Subcontractor, maximum $2,500 per Subcontractor.
** Utilities fees are calculated based on $20 per utility bill per month.
*** Except for utilities fees, 10% of first $50,000, 7% of next $50,000, 5% over $100,000 per Subcontractor.
Ecology and Environment, Inc.
FDEP: B. Grubbs / E & E: B. Anders
Prestige Cleaners
Annual Groundwater Sampling
LOECEF_HW553_DC002L 1/22/2020 Page 3
January 17, 2020
Mr. Benjamin Grubbs Florida Department of Environmental Protection 2600 Blair Stone Road Tallahassee, Florida 32399-2400
Re: Cost Proposal for 2020 Annual Groundwater Monitoring at the Prestige Cleaners Site, Tallahassee, Leon County, Florida (ERIC_4873; TA No. HW553-DC002L)
Dear Benjamin:
Ecology and Environment, Inc. (E & E) is submitting to the Florida Department of Environmental Protection (FDEP) this cost proposal for the 2020 annual groundwater monitoring event at the above-referenced site.
This cost proposal package includes a proposed field work and reporting schedule for the completion of subtasks and cost estimate (attached Excel file). A brief summary of the Scope of Work is provided below:
Task 1: Project Management Costs and hours associated with this subtask consists are calculated based on 12.5% of the direct labor cost.
Task 2: Annual Groundwater Monitoring Event During the annual groundwater monitoring event, groundwater samples will be collected from monitoring wells MW001, MW002, MW003, MW004, MW005, MW006RR, MW7S, MW7I and MW7D. For quality assurance/quality control (QA/QC) purposes a duplicate groundwater sample will be collected for analysis. Groundwater samples will be collected following the FDEP Standard Operating Procedures (SOPs). Groundwater samples will be collected using an electric submersible pump and polyethylene tubing. During purging, the polyethylene tubing will be connected to a flow-through cell. A YSI Multiprobe 556 will be inserted into the flow-through cell via an airtight fitting on the lid. The YSI Multiprobe 556, which will be calibrated prior to use, has the capability to measure temperature, pH, dissolved oxygen (DO), conductivity, and oxidation-reduction potential (ORP). A calibrated FDEP approved turbidimeter will be used for the collection of turbidity measurements.
The groundwater samples, duplicate groundwater sample, and a trip blank will be delivered to the Advanced Environmental Laboratories, Inc. for analysis of volatile organic compounds (VOCs) using United States Environmental Protection Agency (USEPA) Method 8021B.
Depth-to-water will be gauged and recorded in select monitoring wells to determine groundwater flow direction(s) across the site.
Mr. Benjamin Grubbs January 17, 2020
Purge water (investigation-derived waste [IDW]) will be containerized in a 55-gallon drum onsite. E & E will air sparge the drum for approximately 45 minutes to one hour to reduce potential concentrations of VOCs from the purge water. E & E will perform field screening of the IDW using Color-Tec method until there is not a visual response through the Colorimetric tube. Once air sparging is complete, E & E will dispose of the treated water on site.
Task 3: Annual Groundwater Monitoring Report
The Annual Groundwater Monitoring Report will include a professional certification, tabulations of current and historical field measured parameters, groundwater analytical results and water level elevations, a groundwater contaminant concentration figure, a groundwater elevation isopleth map, summary of the groundwater sampling event, conclusions, and recommendations.
Upon FDEP approval of the Annual Groundwater Monitoring Report, an electronic copy of the Annual Groundwater Monitoring Report and updated geospatial information systems (GIS) data tables will be submitted to FDEP via the FDEP File Transfer Protocol (FTP) site or by electronic mail (e-mail).
Schedule The proposed task schedule is as follows:
Annual Groundwater Monitoring Fieldwork: June 19, 2020 Annual Groundwater Monitoring Report Submittal: August 14, 2020 Task Assignment End Date: December 31, 2020
If you have questions regarding this cost estimate, or other matters pertaining to the project, please call me at (850) 631-2443 or via e-mail at banders@ene.com.
Sincerely, ECOLOGY AND ENVIRONMENT, INC.
J. Bradley Anders P.G.
Project Manager
ATTACHMENT A
Wells Sampled
Table 1 2020 Annual Groundwater Monitoring
Prestige Cleaners Site Tallahassee, Leon County, Florida
ERIC_4873, Task Assignment HW553-DC002L
Sampling Point Method Frequency Justification Groundwater Samples
MW001 VOCs (USEPA Method 8260) Annual 1,2 MW002 VOCs (USEPA Method 8260) Annual 1,2 MW003 VOCs (USEPA Method 8260) Annual 1,2 MW004 VOCs (USEPA Method 8260) Annual 1,2 MW005 VOCs (USEPA Method 8260) Annual 1,2
MW006RR VOCs (USEPA Method 8260) Annual 1,2 MW007S VOCs (USEPA Method 8260) Annual 1,2 MW007I VOCs (USEPA Method 8260) Annual 1,2 MW007D VOCs (USEPA Method 8260) Annual 1,2
Justification: 1. Required by Rule 62-782;
2. Source Area or Downgradient well.
ATTACHMENT B
Site Map
MW001
MW005
MW006RR
MW004
MW002
MW003
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
MW-7S
MW-7I
MW-7D
6.4
PCE
TCE
BDL
5.9PCE
3.2
2.8
PCE
TCE
9.7
PCE
TCE
CIS-1,2-DCE
0.91I
PCE
TCE
CIS-1,2-DCE
D
E
E
P
Z
O
N
E u g
L
C
E
S
H
A
L
L
W
N
E
E
7.6
7.2
PCE
TCE
PCE 2.8
D
E
E
N
E
E
S
H
A
L
L
W
N
E
E
BDL
LEGEND
X
APPROXIMATE PROPERTY BOUNDARY
FENCE
UNDERGROUND DRAINAGE PIPE
BUILDING
SHALLOW WELL LOCATION
DRYCLEANING MACHINE
INTERMEDIATE WELL LOCATION
DEEP WELL LOCATION
PCE
TETRACHLOROETHENE
TCE
TRICHLOROETHENE
CIS-1,2-DCE
CIS-1,2-DICHLOROETHENE
9.7
CONTAMINANT CONCENTRATION IN MICROGRAMS
PER LITER
CONTAMINANT CONCENTRATION EXCEEDS
GROUNDWATER CLEANUP TARGET LEVEL
BDL
ALL ANALYTES BELOW DETECTION LIMITS
3 ug/L PCE ISOCONCENTRATION LINE - SHALLOW
ZONE GROUNDWATER (DASHED WHERE INFERRED)
3 ug/L PCE ISOCONCENTRATION LINE - DEEP ZONE
GROUNDWATER (DASHED WHERE INFERRED)
DATE ISSUED
C.A.D. FILE NO.
11/9/2018
1003077.0179.01-H.DWG
FIGURE 1
GROUNDWATER CONTAMINANT CONCENTRATION MAP
JUNE 19 - 21, 2018 and OCTOBER 26, 2018
PRESTIGE CLEANERS SITE
TALLAHASSEE, LEON COUNTY, FLORIDA
F:\Prestige Cleaners - Tallahassee\November 2018\1003077.0179.01-H.DWG, 11/9/2018 11:38:02 AM, KrajewskiK
AutoCAD SHX Text
RETENTION AREA
AutoCAD SHX Text
GRASS AREA
AutoCAD SHX Text
WEST THARPE STREET
AutoCAD SHX Text
CONCRETE SLAB WITH FLAT GRATE INLET
AutoCAD SHX Text
ASPHALT PAVEMENT
AutoCAD SHX Text
ASPHALT PAVEMENT
AutoCAD SHX Text
ADJACENT 1 STORY MASONRY COMMERCIAL BUILDING
AutoCAD SHX Text
PRESTIGE CLEANERS
AutoCAD SHX Text
CONCRETE LOADING RAMP
AutoCAD SHX Text
AC PADS
AutoCAD SHX Text
CONCRETE SIDEWALK
AutoCAD SHX Text
CONCRETE SIDEWALK
AutoCAD SHX Text
ASPHALT PAVEMENT
AutoCAD SHX Text
ADJACENT 1 STORY MASONRY COMMERCIAL BUILDING
AutoCAD SHX Text
ADJACENT 1 STORY MASONRY COMMERCIAL BUILDING
AutoCAD SHX Text
ASPHALT PAVEMENT
AutoCAD SHX Text
ASPHALT PAVEMENT
AutoCAD SHX Text
ASPHALT PAVEMENT
AutoCAD SHX Text
FORMER
AutoCAD SHX Text
SCALE IN FEET
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
MAGNETIC
AutoCAD SHX Text
AutoCAD SHX Text ecology and environment, inc.
AutoCAD SHX Text International Specialists in the Environment
| Task Assignment Notification |
| Deliverable & Invoice Schedule |