CN-370000-HW553-0A107.pdf

PDF 624 KB Posted

Attached to
Master Agreement FL|HW553|a65ff82906642c2458d9d92f26cd546e
Contract number
HW553
Issued by
Florida

About this file

Document Summary

This is a Task Assignment Notification Form for Florida Department of Environmental Protection (FDEP) Contract HW553, issued by the State of Florida. The contract involves WSP USA as the contractor, with Brandie Stringer serving as the DEP Contract Manager and Perry Kelso as the Contractor Representative. The task is assigned to the Silver Springs Shores Well Field Study Area in Ocala, Marion County, Florida, with DEP Site #ERIC_6461.

WSP USA will conduct groundwater monitoring activities at the Silver Springs Shores Well Field Study Area during the assessment phase. The scope of work includes sampling from two public supply wells, one point of entry, and nine existing monitoring wells; transportation and disposal of investigation-derived waste; and preparation of a groundwater monitoring report. The task consists of four subtasks: Project Management (12.5% of direct labor), public supply well and monitoring well sampling, investigation-derived waste disposal, and report preparation. The total task assignment value is $16,352.69 on a fixed-price basis with no retainage. Deliverables include field notes, logs, analytical data due January 7, 2021, and a groundwater monitoring report with waste manifest due January 15, 2021. The period of performance extends through March 31, 2021. Payment is contingent upon FDEP approval of deliverables in two invoicing milestones: $8,940.66 upon approval of field data and $7,412.03 upon approval of the monitoring report and project management completion.

View the file

Other files

File Type Posted
CN-370000-HW553-A10.pdf PDF
CN-370000-HW553-A2.pdf PDF
CN-370000-HW553-A5.pdf PDF
CN-370000-HW553-A7.pdf PDF
CN-370000-HW553-BF004E.pdf PDF
CN-370000-HW553-BF007A.pdf PDF
CN-370000-HW553-BF02C.pdf PDF
CN-370000-HW553-BF04B.pdf PDF
CN-370000-HW553-BF04CCO1.pdf PDF
CN-370000-HW553-BF04CCO2.pdf PDF
CN-370000-HW553-BF04D.pdf PDF
CN-370000-HW553-BF04DCO2.pdf PDF
CN-370000-HW553-BF05ACO1.pdf PDF
CN-370000-HW553-BF05BCO1.pdf PDF
CN-370000-HW553-BF05BCO2.pdf PDF
CN-370000-HW553-BF06A.pdf PDF
CN-370000-HW553-BF06ACO1.pdf PDF
CN-370000-HW553-CO1.pdf PDF
CN-370000-HW553-CS15BCO1.pdf PDF
CN-370000-HW553-CSS07A.pdf PDF
CN-370000-HW553-CSS07B.pdf PDF
CN-370000-HW553-CSS08A.pdf PDF
CN-370000-HW553-CSS11D.pdf PDF
CN-370000-HW553-CSS12BC1.pdf PDF
CN-370000-HW553-CSS12BC2.pdf PDF
CN-370000-HW553-CSS13A.pdf PDF
CN-370000-HW553-CSS14B.pdf PDF
CN-370000-HW553-DC001C.pdf PDF
CN-370000-HW553-DC002L.pdf PDF
CN-370000-HW553-DC004H.pdf PDF
CN-370000-HW553-DC006N.pdf PDF
CN-370000-HW553-DC009B.pdf PDF
CN-370000-HW553-DC014E.pdf PDF
CN-370000-HW553-DC014H.pdf PDF
CN-370000-HW553-DC019A.pdf PDF
CN-370000-HW553-DC01ACO4.pdf PDF
CN-370000-HW553-DC020D.pdf PDF
CN-370000-HW553-DC021A.pdf PDF
CN-370000-HW553-DC024C.pdf PDF
CN-370000-HW553-DC02CCO2.pdf PDF
CN-370000-HW553-DC02CCO3.pdf PDF
CN-370000-HW553-DC02D.pdf PDF
CN-370000-HW553-DC02DCO1.pdf PDF
CN-370000-HW553-DC02FCO2.pdf PDF
CN-370000-HW553-DC02GCO2.pdf PDF
CN-370000-HW553-DC02H.pdf PDF
CN-370000-HW553-DC02ICO3.pdf PDF
CN-370000-HW553-DC03BCO2.pdf PDF
CN-370000-HW553-DC03FCO1.pdf PDF
CN-370000-HW553-DC03FCO3.pdf PDF
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DEP CONTRACT NO.

Task Assignment #: Module #: Grant #:

Contractor Name:

Contractor Representative:

DEP Contract Manager: Phone #:

DEP Site #:

Site Name:

Address(Street, City, County):

Phase:

Task Description [use additional pages if necessary]:

The Deliverable and Invoice Schedule is attached.

Final Deliverables:

Final Deliverable Due Date:

TASK ASSIGNMENT TYPE AND NOT TO EXCEED AMOUNTS:

FIXED FEE

RETAINAGE:

TOTAL TASK ASSIGNMENT VALUE: $0.00

DEP Task Manager:

DEP Contract Manager:

Contractual Authority:

Contractor Representative:

CC: Procurement Section (MS 93) Section Representative ________

TASK ASSIGNMENT NOTIFICATION FORM

COST PLUS FIXED FEE

COST REIMBURSEMENT

FIXED PRICE FEE SCHEDULE

Period of Performance:

Execution of Task Assignment through:

DEP will review the deliverables to verify that they meet the specifications of this contract and task description. DEP’s Contract Manager shall notify the Contractor of any deficiencies in the deliverable(s) and shall give the Contractor reasonable opportunity to correct noted deficiencies and provide a revised deliverable(s).

WCP TAFORM 01_18

HW553

N/A N/ASI-0A107

WSP USA

Perry Kelso

850-245-8970Brandie Stringer

ERIC_6461

Silver Springs Shores Well Field Study Area

Ocala, Marion County, Florida

Assessment

WSP will conduct groundwater monitoring at the Silver Springs Shores Well Field Study Area as outlined in the October 13, 2020 revised WSP proposal. Activities to include sampling public supply wells and monitoring wells, transportation and disposal of investigation derived waste, and a groundwater monitoring report.

Groundwater Monitoring Report & Waste Manifest

01/15/2021

03/31/2021

$ 16,352.69 $ 0.00 $ 0.00 $ 0.00

$ 0.00

Karlee Fowler Digitally signed by Karlee Fowler Date: 2020.10.15 16:33:44 -04'00'

Brandie Stringer Digitally signed by Brandie Stringer Date: 2020.10.15 16:38:03 -04'00'

David Phillips Digitally signed by David Phillips Date: 2020.10.16 08:29:01 -04'00'

Digitally signed by: Perry Kelso DN: CN = Perry Kelso email = perry.kelso@wsp.com C = AD O = WSP USA Date: 2020.10.16 11:22:38 -04'00'Perry Kelso

$ 16,352.69

Task Assignment Notification/Change Order Deliverables and Invoice Schedule Attachment

WCP TAFORM 04-2017

Contract Number:

Task Assignment #:

Deliverables:

Deliverable Deliverable Due Date

Invoice Schedule:

Requirements for Invoice Submittal Amount to be Invoiced

TOTAL COST

Field Notes, Logs, & Analytical Data - Subtask 2 01/07/2021

Groundwater Monitoring Report; Waste Manifest - Subtasks 1, 3-4 01/15/2021

FDEP approval of Field Notes, Logs, & Analytical Data - Subtask 2 $ 8,940.66

FDEP approval of Groundwater Monitoring Report & Waste Manifest; Project Management - Subtasks 1, 3-4 $ 7,412.03

$ 16,352.69

HW553

SI-0A107

FLORIDA DEPARTMENT OF

Environmental Protection

Bob Martinez Center

2600 Blair Stone Road Tallahassee, FL 32399-2400

Ron DeSantis Governor

Jeanette Nuñez

Lt. Governor

Noah Valenstein Secretary

Memorandum

TO: Site # ERIC_6461

Silver Springs Shores Well Field Area Study

FROM: Brandie Stringer, Contract Manager

SUBJECT: Negotiation Summary

HW553 SI-0A107

DATE: October 15, 2020

WSP will conduct groundwater monitoring activities at the Silver Springs Shores Well Field Area in Marion County, FL, as detailed in the October 13, 2020 revised WSP proposal. Samples will be collected from monitoring wells, public supply wells, and the point of entry. Also included are costs for transportation and disposal (T&D) of IDW.

WSP will provide field notes, logs, analytical data, IDW Manifest, and a Groundwater Monitoring Report as deliverables.

One revision to the Cost Estimate Form was required prior to processing this task.

Total task amount is $16,352.69. WSP’s time, labor, and subcontractor costs for these activities have been reviewed and are appropriate. The level-of-effort and cost estimate are reasonable for the scope of services. Final deliverable is due January 15, 2021. Task completion date is March 31, 2021.

FDEP Contract HW553 Cost Estimate

Contractor:

SubTask 1 Project Management (12.5% of direct labor costs) Site: SubTask 2 Public supply well and monitoring well sampling

Site ID #: 747-1; ERIC_6461 SubTask 3 IDW disposal Activity/Phase: SubTask 4 Report

Project Manager: SubTask 5

10BP20E.0184.01

Labor Rate Category Totals 1 2 3 4 $47.79 PM 12.5% of direct labor costs 9.0 9.038

Principal $60.47 Kelso 4.0 0.0 0.0 4.0 $63.94 Brown 0.0 0.0 0.0 0.0

Chief $45.65 Werth 0.0 0.0 0.0 0.0 $45.11 Elliott 0.0 0.0 0.0 0.0 $42.97 Huber 0.0 0.0 0.0 0.0 $47.50 Harter 0.0 0.0 0.0 0.0 $48.10 Moore 0.0 0.0 0.0 0.0

Senior $36.37 Krajewski 0.0 0.0 0.0 0.0 $34.46 Murak 0.0 0.0 0.0 0.0 $33.75 Chappell 46.0 36.0 2.0 8.0 $36.06 Anders 0.0 0.0 0.0 0.0 $36.54 Hammond 0.0 0.0 0.0 0.0 $39.09 Dillon 0.0 0.0 0.0 0.0 $39.09 Eucogno 8.0 0.0 0.0 8.0 $39.09 Percifull 0.0 0.0 0.0 0.0

Associate $28.09 Oien 44.0 36.0 0.0 8.0 $26.92 Kuhn 0.0 0.0 0.0 0.0 $28.09 Kowal 0.0 0.0 0.0 0.0 $28.09 Fowler 4.0 0.0 0.0 4.0 $28.09 Bender 0.0 0.0 0.0 0.0

Junior $24.47 Laitsch 0.0 0.0 0.0 0.0 $24.47 Williams 0.0 0.0 0.0 0.0 $21.00 Heuston 0.0 0.0 0.0 0.0 $24.47 Cooper 0.0 0.0 0.0 0.0 $24.47 Balke 0.0 0.0 0.0 0.0 $24.47 Slabaugh 0.0 0.0 0.0 0.0

Technician $18.00 Smith 0.0 0.0 0.0 0.0

Clerical $22.28 Dekle 0.0 0.0 0.0 0.0 $22.28 Rodriguez 0.0 0.0 0.0 0.0

Total Hours 115.0 9.0 72.0 2.0 32.0

1) Direct Labor $3,887.35 $431.93 $2,226.24 $67.50 $1,161.68

2) Fringe (33.44% of Lines 1 ) $1,299.93 $144.44 $744.45 $22.57 $388.47

3) Overhead (49.90% of Lines 1 + 2) $2,588.44 $287.61 $1,482.37 $44.94 $773.52

4) Gen & Admin (36.27% of Lines 1 + 2 + 3) $2,820.25 $313.36 $1,615.12 $48.97 $842.80

5) Total Labor (Sum Lines 1 thru 4) $10,595.97 $1,177.34 $6,068.18 $183.98 $3,166.47

6) Other Direct Costs (5.0% of Line 1) $194.37 $21.60 $111.31 $3.38 $58.08 Travel

7a) Vehicle Rental $291.00 $0.00 $291.00 $0.00 $0.00 7b) Mileage Costs $0.00 $0.00 $0.00 $0.00 $0.00 7c) Air Fare $0.00 $0.00 $0.00 $0.00 $0.00 7d) Per diem + Hotel $678.00 $0.00 $678.00 $0.00 $0.00 7e) Total Travel $969.00 $0.00 $969.00 $0.00 $0.00

Subcontractor (Equipment Procurement) 8a) Provider - Task # $0.00 $0.00 $0.00 $0.00 $0.00 8b) Provider - Task # $0.00 $0.00 $0.00 $0.00 $0.00 8c) Provider - Task # $0.00 $0.00 $0.00 $0.00 $0.00 8d) Subcontractor Subtotal $0.00 $0.00 $0.00 $0.00 $0.00 8e) Procurement Fee $0.00 $0.00 $0.00 $0.00 $0.00 8f) Total Subcontractor Cost $0.00 $0.00 $0.00 $0.00 $0.00

Subcontractor (Services Procurement) 9a) Drilling (Conventional) $0.00 $0.00 $0.00 $0.00 $0.00 9b) Drilling (Non-conventional) $0.00 $0.00 $0.00 $0.00 $0.00 9c) Mobile Laboratory $0.00 $0.00 $0.00 $0.00 $0.00 9d) Surveying $0.00 $0.00 $0.00 $0.00 $0.00 9e) IDW $1,500.00 $0.00 $0.00 $1,500.00 $0.00 9f) Utilities $0.00 $0.00 $0.00 $0.00 $0.00 9g) Other Sub 1 - Task # $0.00 $0.00 $0.00 $0.00 $0.00 9h) Other Sub 2- Task # $0.00 $0.00 $0.00 $0.00 $0.00 9i) Other Sub 3 - Task # $0.00 $0.00 $0.00 $0.00 $0.00 9j) Subcontractor Subtotal $1,500.00 $0.00 $0.00 $1,500.00 $0.00

9k) Handling Fee $150.00 $0.00 $0.00 $150.00 $0.00 9l) Total Subcontractor Cost $1,650.00 $0.00 $0.00 $1,650.00 $0.00

Laboratory 10a) Analytical Costs (Fixed Lab) $0.00 $0.00 $0.00 $0.00 $0.00 10b) Fast Turnaround Rate (%) (Fixed Lab) 0% 100% 0% 0% 10c) Fast Turnaround Charges (Fixed Lab) $0.00 $0.00 $0.00 $0.00 $0.00 10d) Sample Shipping $0.00 $0.00 $0.00 $0.00 $0.00 10e) Total Laboratory $0.00 $0.00 $0.00 $0.00 $0.00

Field Expenses 11a) Personal Protection $0.00 $0.00 $0.00 $0.00 $0.00 11b) Expendables $97.50 $0.00 $97.50 $0.00 $0.00

Date: October 13, 2020 Task #: SI-0A107

WSP USA

FDEP: K. Fowler / E & E: P. Kelso

Silver Springs Shores

GW Monitoring

SSS GW Monitor_Cost_Rev 10/15/2020 Page 1

FDEP Contract HW553 Cost Estimate

11c) Equipment (Drilling Related) $0.00 $0.00 $0.00 $0.00 $0.00 11d) Equipment (Analytical Related) $363.75 $0.00 $363.75 $0.00 $0.00 11e) Equipment (IDW Related) $698.40 $0.00 $0.00 $698.40 $0.00 11f) Equipment (Other) $724.10 $0.00 $724.10 $0.00 $0.00 11g) Total Field Expenses $1,883.75 $0.00 $1,185.35 $698.40 $0.00

Subtotal $15,293.09 $1,198.94 $8,333.84 $2,535.76 $3,224.55 Completion Fee 12) (10.0% of Line 5) $1,059.60 $117.73 $606.82 $18.40 $316.65

13) Total Estimated Cost Per Event $16,352.69 $1,316.67 $8,940.66 $2,554.16 $3,541.20

* Equipment Procurement - 10.0% Per Subcontractor, maximum $2,500 per Subcontractor.

** Utilities fees are calculated based on $20 per utility bill per month.

*** Except for utilities fees, 10% of first $50,000, 7% of next $50,000, 5% over $100,000 per Subcontractor.

SSS GW Monitor_Cost_Rev 10/15/2020 Page 2

SITE: Silver Springs Shores

SUBTASK NO.: 2 DESCRIPTION:

DATE: October 13, 2020 FACILITY ID NO.: 47-1; ERIC_6461

TASK NO: SI-0A107

LABOR HOURS

Labor Category Work Description Hours

Chappell mobilization/demob, travel (3 hrs OW - combined with Sanford), PSW + MW sampling and IDW transfer (3 - 11 hr days) 36 Associate

Oien mobilization/demob, travel (3 hrs OW - combined with Sanford), PSW + MW sampling and IDW transfer (3 - 11 hr days) 36 72.00

VEHICLE RENTAL

ITEM RATE UNIT USAGE TOTAL

Equipment Truck/Van $97.00 Day 3 $291.00 $291.00

MEALS AND LODGING

ITEM Labor Category RATE UNIT USAGE TOTAL

MEALS

LC Senior $36.00 Day 3 $108.00 EO Associate $36.00 Day 3 $108.00

Subtotal - Meals 0 $216.00

LODGING RATE* UNIT USAGE

LC Senior $77.00 Day 3 $231.00 EO Associate $77.00 Day 3 $231.00

Subtotal - Lodging $462.00 $678.00

EQUIPMENT PROCUREMENT

Provider List of Equipment RATE UNIT USAGE TOTAL Provider - Task # $0.00 0 $0.00 Provider - Task # $0.00 0 $0.00 Provider - Task # $0.00 0 $0.00

$0.00

SUBCONTRACTOR

Provider Name of Sub Description of Work RATE UNIT USAGE TOTAL Drilling (Conventional) $0.00 Lump Sum 0 $0.00 Drilling (Non-conventional) $0.00 Lump Sum 0 $0.00 Mobile Laboratory $0.00 Lump Sum 0 $0.00 Surveying $0.00 Lump Sum 0 $0.00 IDW $0.00 Drum 0 $0.00 Utilities $0.00 0 $0.00 Other Sub 1- Task # $0.00 0 $0.00 Other Sub 2- Task # $0.00 0 $0.00 Other Sub 3 - Task # $0.00 0 $0.00

$0.00 LABORATORY and SAMPLE SHIPMENTS

ANALYSIS/PARAMETER

FAST TURNAROUND

RATE (%)

No. for Fast

Turnaround Rate RATE Media No. of

Samples No. of

QA/QC

Fast Turn- Around Charges TOTAL

EPA 6010 Lead 100% 0 $11.50 Water 0 0 $0.00 $0.00 EPA 9040 pH 100% 0 $8.00 Water 0 0 $0.00 $0.00 EPA 6010 Lead 100% 0 $11.50 Soil 0 0 $0.00 $0.00 EPA 6010 Lead 100% 0 $11.50 SPLP 0 0 $0.00 $0.00 TCLP/SPLP Bottle extraction 100% 0 $40.00 Soil 0 0 $0.00 $0.00 Digestion 100% 0 $6.00 Soil 0 0 $0.00 $0.00

*Rate negotiated. Subtotal-Lab Analyses 0 0 $0.00 $0.00

SAMPLE SHIPMENTS

CONTAINER SIZE

Shipment Method

24 hr No. of

Containers Shipment Method

2 day No. of

Containers Ice No. of

Containers TOTAL Small (<50 lbs.) $63.00 0 $35.00 0 $5.00 0 $0.00 Large (>50 lbs. < 70 lbs.) $104.00 0 $60.00 0 $5.00 0 $0.00

Subtotal-Sample Shipments $0.00 $0.00

FIELD EXPENSES

Personal Protection

ITEM RATE UNIT USAGE TOTAL

Level B $172.50 Per Man Day 0 $0.00 Level C $110.00 Per Man Day 0 $0.00 Level D $28.00 Per Man Day 0 $0.00

SUBTOTAL - PERSONAL PROTECTION $0.00

Expendables

ITEM RATE UNIT USAGE TOTAL ITEM TOTAL

Expendables $32.50 Day 3 $97.50

SUBTOTAL - EXPENDABLES $97.50

Drilling Related Equipment

RATE UNIT USAGE

Well Locks $3.40 ea 0 $0.00 2" Well Caps $10.20 ea 0 $0.00 4" Well Caps $14.55 ea 0 $0.00

SUBTOTAL - DRILLING RELATED EQUIPMENT $0.00

Analytical Related Equipment

RATE ITEM UNIT NO OF ITEMS USAGE TOTAL ITEM

Soil Sampling Kit (Corer, generator, auger, WL ind.) $834.20 week 0 0 $0.00 FID/PID Combination OVA $106.70 day 0 0 $0.00 Multiprobe 9000 (ph, cond, temp, do, redox) $97.00 day 1 3 $291.00

Public supply well and monitoring well sampling

TOTAL LABOR HOURS

TOTAL VEHICLE RENTAL

*Rate may be higher based on geographical location or special events.

TOTAL MEALS AND LODGING

TOTAL LABORATORY and SHIPMENTS

TOTAL EQUIPMENT PROCUREMENT

TOTAL SUBCONTRACTOR

SSS GW Monitor_Cost_Rev/2 Page 6

Multiprobe 9000 (ph, cond, temp, do, redox) $504.40 week 0 0 $0.00 $208.55 day 0 0 $0.00

Construction/O&M Supplies (Various items for work/repair) $63.05 day 0 0 $0.00 Turbidity Meter $24.25 day 1 3 $72.75

SUBTOTAL - ANALYTICAL RELATED EQUIPMENT $363.75

IDW Related Equipment

55-Gal Drum $58.20 0 $0.00

SUBTOTAL - IDW RELATED EQUIPMENT $0.00

Other Equipment

RATE ITEM UNIT NO OF ITEMS USAGE TOTAL ITEM

Total GPS Station (Trimble Pro XRS; Trimble GeoX) $566.60 week 0 0 $0.00 Peristaltic Tubing (Silicon 3/8 x 5/8) $3.20 ft 0 0 $0.00 Disposable Bailers (HDPE) $4.85 ea 0 0 $0.00 Submersible Pump $74.70 day 1 3 $224.10 Water Level Indicator $19.40 day 0 0 $0.00 Color-Tec Kit $19.40 day 0 0 $0.00 PCE Detection Tubes $67.90 10 pack 0 0 $0.00 Vacuum Gauges $19.40 ea 0 0 $0.00 Teflon Tubing (1/4 inch OD) $1.95 ft 0 0 $0.00 HDPE Poly tubing (3/8 inch OD) $0.25 ft 1 2000 $500.00 Total Survey Station $41.75 day 0 0 $0.00 Water level indicator $19.40 day 0 0 $0.00 Hand Held GPS $25.25 day 0 0 $0.00

*Rate negotiated. SUBTOTAL - OTHER EQUIPMENT $724.10

$1,185.35FIELD EXPENSES

Shallow GW Sampling Kit (WL ind., Per Pump, Multiprobe, turb meter, and

SSS GW Monitor_Cost_Rev/2 Page 6

SUBTASK NO.: 3 DESCRIPTION:

DATE: October 13, 2020 FACILITY ID NO.: 47-1; ERIC_6461

TASK NO: SI-0A107

LABOR HOURS

Labor Category Work Description Hours

Principal Kelso Brown

Chief Werth Moore Elliott Huber

Senior Krajewski Murak Dillon Chappell IDW management (sub coordination of schedule, access, paperwork) 2 Hammond Anders Eucogno Percifull

Associate Oien Kuhn Kowal Fowler Bender

Junior Laitsch Williams Heuston Cooper Balke Slabaugh

Technician Smith

Clerical Dekle Rodriguez

2.00

VEHICLE RENTAL

ITEM RATE UNIT USAGE TOTAL

Automobile $68.00 Day 0 $0.00 Equipment Truck/Van $97.00 Day 0 $0.00 Equipment Truck/Van $420.00 Week 0 $0.00

$0.00

MILEAGE AND AIRFARE

ITEM RATE UNIT USAGE TOTAL

Mileage INCLUDED IN VEHICLE RENTAL RATE $0.00 Airfare $0.00

$0.00

MEALS AND LODGING

ITEM Labor Category RATE UNIT USAGE TOTAL

MEALS

$36.00 Day 0 $0.00 $36.00 Day 0 $0.00 $36.00 Day 0 $0.00 $36.00 Day 0 $0.00

Subtotal - Meals 0 $0.00

LODGING RATE* UNIT USAGE

$77.00 Day 0 $0.00 $77.00 Day 0 $0.00 $77.00 Day 0 $0.00 $77.00 Day 0 $0.00

Subtotal - Lodging $0.00 $0.00

EQUIPMENT PROCUREMENT

Provider List of Equipment RATE UNIT USAGE TOTAL Provider - Task # $0.00 0 $0.00 Provider - Task # $0.00 0 $0.00 Provider - Task # $0.00 0 $0.00

$0.00

SUBCONTRACTOR

Provider Name of Sub Description of Work RATE UNIT USAGE TOTAL Drilling (Conventional) $0.00 Lump Sum 0 $0.00 Drilling (Non-conventional) $0.00 Lump Sum 0 $0.00 Mobile Laboratory $0.00 Lump Sum 0 $0.00 Surveying $0.00 Lump Sum 0 $0.00 IDW Irwin Remediation $125.00 Drum 12 $1,500.00 Utilities $0.00 0 $0.00 Other Sub 1- Task # $0.00 0 $0.00 Other Sub 2- Task # $0.00 0 $0.00 Other Sub 3 - Task # $0.00 0 $0.00

$1,500.00

TOTAL MILEAGE AND AIRFARE

*Rate may be higher based on geographical location or special events.

TOTAL MEALS AND LODGING

Public supply well and monitoring well sampling

TOTAL LABOR HOURS

TOTAL VEHICLE RENTAL

TOTAL EQUIPMENT PROCUREMENT

TOTAL SUBCONTRACTOR

SSS GW Monitor_Cost_Rev/3 Page 7

LABORATORY and SAMPLE SHIPMENTS

ANALYSIS/PARAMETER

FAST TURNAROUND

RATE (%)

No. for Fast

Turnaround Rate RATE Media No. of

Samples No. of

QA/QC

Fast Turn- Around Charges TOTAL

EPA 6010 Lead 100% 0 $11.50 Water 0 0 $0.00 $0.00 EPA 9040 pH 100% 0 $8.00 Water 0 0 $0.00 $0.00 EPA 6010 Lead 100% 0 $11.50 Soil 0 0 $0.00 $0.00 EPA 6010 Lead 100% 0 $11.50 SPLP 0 0 $0.00 $0.00 TCLP/SPLP Bottle extraction 100% 0 $40.00 Soil 0 0 $0.00 $0.00 Digestion 100% 0 $6.00 Soil 0 0 $0.00 $0.00

*Rate negotiated. Subtotal-Lab Analyses 0 0 $0.00 $0.00

SAMPLE SHIPMENTS

CONTAINER SIZE

Shipment Method

24 hr No. of

Containers Shipment Method

2 day No. of

Containers Ice No. of

Containers TOTAL Small (<50 lbs.) $63.00 0 $35.00 0 $5.00 0 $0.00 Large (>50 lbs. < 70 lbs.) $104.00 0 $60.00 0 $5.00 0 $0.00

Subtotal-Sample Shipments $0.00 $0.00

FIELD EXPENSES

Personal Protection

ITEM RATE UNIT USAGE TOTAL

Level B $172.50 Per Man Day 0 $0.00 Level C $110.00 Per Man Day 0 $0.00 Level D $28.00 Per Man Day 0 $0.00

SUBTOTAL - PERSONAL PROTECTION $0.00

Expendables

ITEM RATE UNIT USAGE TOTAL ITEM TOTAL

Expendables $32.50 Day 0 $0.00

SUBTOTAL - EXPENDABLES $0.00

Drilling Related Equipment

RATE UNIT USAGE

Well Locks $3.40 ea 0 $0.00 2" Well Caps $10.20 ea 0 $0.00 4" Well Caps $14.55 ea 0 $0.00

SUBTOTAL - DRILLING RELATED EQUIPMENT $0.00

Analytical Related Equipment

RATE ITEM UNIT NO OF ITEMS USAGE TOTAL ITEM

Soil Sampling Kit (Corer, generator, auger, WL ind.) $834.20 week 0 0 $0.00 FID/PID Combination OVA $106.70 day 0 0 $0.00 Multiprobe 9000 (ph, cond, temp, do, redox) $126.10 day 0 0 $0.00 Multiprobe 9000 (ph, cond, temp, do, redox) $504.40 week 0 0 $0.00

$208.55 day 0 0 $0.00 Construction/O&M Supplies (Various items for work/repair) $63.05 day 0 0 $0.00 Turbidity Meter $24.25 day 0 0 $0.00

SUBTOTAL - ANALYTICAL RELATED EQUIPMENT $0.00

IDW Related Equipment

55-Gal Drum $58.20 12 $698.40

SUBTOTAL - IDW RELATED EQUIPMENT $698.40

Other Equipment

RATE ITEM UNIT NO OF ITEMS USAGE TOTAL ITEM

Total GPS Station (Trimble Pro XRS; Trimble GeoX) $566.60 week 0 0 $0.00 Peristaltic Tubing (Silicon 3/8 x 5/8) $3.20 ft 0 0 $0.00 Disposable Bailers (HDPE) $4.85 ea 0 0 $0.00 Peristaltic Pump $29.10 day 0 0 $0.00 Water Level Indicator $19.40 day 0 0 $0.00 Color-Tec Kit $19.40 day 0 0 $0.00 PCE Detection Tubes $67.90 10 pack 0 0 $0.00 Vacuum Gauges $19.40 ea 0 0 $0.00 Teflon Tubing (1/4 inch OD) $1.95 ft 0 0 $0.00 HDPE Poly tubing (1/4 inch OD) $0.25 ft 0 0 $0.00 Total Survey Station $41.75 day 0 0 $0.00 Water level indicator $19.40 day 0 0 $0.00 Hand Held GPS $25.25 day 0 0 $0.00

*Rate negotiated. SUBTOTAL - OTHER EQUIPMENT $0.00

$698.40FIELD EXPENSES

TOTAL LABORATORY and SHIPMENTS

SSS GW Monitor_Cost_Rev/3 Page 7

SUBTASK NO.: 4 DESCRIPTION:

DATE: October 13, 2020 FACILITY ID NO.: 47-1; ERIC_6461

TASK NO: SI-0A107

LABOR HOURS

Labor Category Work Description Hours

Principal Kelso Data analysis, Report Preparion, and Review 4 Brown

Chief Werth Moore Elliott Huber

Senior Krajewski Murak Dillon Chappell Data Tabulation, Report Preparation 8 Hammond Anders Eucogno GIS Map Prep 8 Percifull

Associate Oien Data Tabulation, Report Preparation 8 Kuhn Kowal Fowler Publication/Editing 4 Bender

Junior Laitsch Williams Heuston Cooper Balke Slabaugh

Technician Smith

Clerical Dekle Rodriguez

32.00

VEHICLE RENTAL

ITEM RATE UNIT USAGE TOTAL

Automobile $68.00 Day 0 $0.00 Equipment Truck/Van $97.00 Day 0 $0.00 Equipment Truck/Van $420.00 Week 0 $0.00

$0.00

MILEAGE AND AIRFARE

ITEM RATE UNIT USAGE TOTAL

Mileage INCLUDED IN VEHICLE RENTAL RATE $0.00 Airfare $0.00

$0.00

MEALS AND LODGING

ITEM Labor Category RATE UNIT USAGE TOTAL

MEALS

$36.00 Day 0 $0.00 $36.00 Day 0 $0.00 $36.00 Day 0 $0.00 $36.00 Day 0 $0.00

Subtotal - Meals 0 $0.00

LODGING RATE* UNIT USAGE

$77.00 Day 0 $0.00 $77.00 Day 0 $0.00 $77.00 Day 0 $0.00 $77.00 Day 0 $0.00

Subtotal - Lodging $0.00 $0.00

EQUIPMENT PROCUREMENT

Provider List of Equipment RATE UNIT USAGE TOTAL Provider - Task # $0.00 0 $0.00 Provider - Task # $0.00 0 $0.00 Provider - Task # $0.00 0 $0.00

$0.00

SUBCONTRACTOR

Provider Name of Sub Description of Work RATE UNIT USAGE TOTAL Drilling (Conventional) $0.00 Lump Sum 0 $0.00 Drilling (Non-conventional) $0.00 Lump Sum 0 $0.00 Mobile Laboratory $0.00 Lump Sum 0 $0.00 Surveying $0.00 Lump Sum 0 $0.00 IDW $0.00 Drum 0 $0.00 Utilities $0.00 0 $0.00 Other Sub 1- Task # $0.00 0 $0.00 Other Sub 2- Task # $0.00 0 $0.00 Other Sub 3 - Task # $0.00 0 $0.00

Public supply well and monitoring well sampling

TOTAL LABOR HOURS

TOTAL MILEAGE AND AIRFARE

TOTAL VEHICLE RENTAL

*Rate may be higher based on geographical location or special events.

TOTAL MEALS AND LODGING

TOTAL EQUIPMENT PROCUREMENT

SSS GW Monitor_Cost_Rev/4 Page 8

$0.00 LABORATORY and SAMPLE SHIPMENTS

ANALYSIS/PARAMETER

FAST TURNAROUND

RATE (%)

No. for Fast

Turnaround Rate RATE Media No. of

Samples No. of

QA/QC

Fast Turn- Around Charges TOTAL

EPA 6010 Lead 100% 0 $11.50 Water 0 0 $0.00 $0.00 EPA 9040 pH 100% 0 $8.00 Water 0 0 $0.00 $0.00 EPA 6010 Lead 100% 0 $11.50 Soil 0 0 $0.00 $0.00 EPA 6010 Lead 100% 0 $11.50 SPLP 0 0 $0.00 $0.00 TCLP/SPLP Bottle extraction 100% 0 $40.00 Soil 0 0 $0.00 $0.00 Digestion 100% 0 $6.00 Soil 0 0 $0.00 $0.00

*Rate negotiated. Subtotal-Lab Analyses 0 0 $0.00 $0.00

SAMPLE SHIPMENTS

CONTAINER SIZE

Shipment Method

24 hr No. of

Containers Shipment Method

2 day No. of

Containers Ice No. of

Containers TOTAL Small (<50 lbs.) $63.00 0 $35.00 0 $5.00 0 $0.00 Large (>50 lbs. < 70 lbs.) $104.00 0 $60.00 0 $5.00 0 $0.00

Subtotal-Sample Shipments $0.00 $0.00

FIELD EXPENSES

Personal Protection

ITEM RATE UNIT USAGE TOTAL

Level B $172.50 Per Man Day 0 $0.00 Level C $110.00 Per Man Day 0 $0.00 Level D $28.00 Per Man Day 0 $0.00

SUBTOTAL - PERSONAL PROTECTION $0.00

Expendables

ITEM RATE UNIT USAGE TOTAL ITEM TOTAL

Expendables $32.50 Day 0 $0.00

SUBTOTAL - EXPENDABLES $0.00

Drilling Related Equipment

RATE UNIT USAGE

Well Locks $3.40 ea 0 $0.00 2" Well Caps $10.20 ea 0 $0.00 4" Well Caps $14.55 ea 0 $0.00

SUBTOTAL - DRILLING RELATED EQUIPMENT $0.00

Analytical Related Equipment

RATE ITEM UNIT NO OF ITEMS USAGE TOTAL ITEM

Soil Sampling Kit (Corer, generator, auger, WL ind.) $834.20 week 0 0 $0.00 FID/PID Combination OVA $106.70 day 0 0 $0.00 Multiprobe 9000 (ph, cond, temp, do, redox) $126.10 day 0 0 $0.00 Multiprobe 9000 (ph, cond, temp, do, redox) $504.40 week 0 0 $0.00

$208.55 day 0 0 $0.00 Construction/O&M Supplies (Various items for work/repair) $63.05 day 0 0 $0.00 Turbidity Meter $24.25 day 0 0 $0.00

SUBTOTAL - ANALYTICAL RELATED EQUIPMENT $0.00

IDW Related Equipment

55-Gal Drum $58.20 0 $0.00

SUBTOTAL - IDW RELATED EQUIPMENT $0.00

Other Equipment

RATE ITEM UNIT NO OF ITEMS USAGE TOTAL ITEM

Total GPS Station (Trimble Pro XRS; Trimble GeoX) $566.60 week 0 0 $0.00 Peristaltic Tubing (Silicon 3/8 x 5/8) $3.20 ft 0 0 $0.00 Disposable Bailers (HDPE) $4.85 ea 0 0 $0.00 Peristaltic Pump $29.10 day 0 0 $0.00 Water Level Indicator $19.40 day 0 0 $0.00 Color-Tec Kit $19.40 day 0 0 $0.00 PCE Detection Tubes $67.90 10 pack 0 0 $0.00 Vacuum Gauges $19.40 ea 0 0 $0.00 Teflon Tubing (1/4 inch OD) $1.95 ft 0 0 $0.00 HDPE Poly tubing (1/4 inch OD) $0.25 ft 0 0 $0.00 Total Survey Station $41.75 day 0 0 $0.00 Water level indicator $19.40 day 0 0 $0.00 Hand Held GPS $25.25 day 0 0 $0.00

*Rate negotiated. SUBTOTAL - OTHER EQUIPMENT $0.00

$0.00FIELD EXPENSES

TOTAL SUBCONTRACTOR

TOTAL LABORATORY and SHIPMENTS

SSS GW Monitor_Cost_Rev/4 Page 8

WSP USA

325 JOHN KNOX ROAD, BUILDING F

SUITE 140

TALLAHASSEE, FL 32303

Tel.: 850-523-0954 wsp.com

October 13, 2020

Ms. Karlee Fowler Florida Department of Environmental Protection 2600 Blair Stone Road Tallahassee, Florida 32399-2400

Re: Scope of Work and Cost Estimate for Groundwater Sampling for the Silver Springs Shores Well Field Study Area, Ocala, Marion County, Florida. (ERIC_6461;

Task Assignment (SI-0A107)

Dear Karlee:

Per your request, WSP USA (WSP) is pleased to submit to the Florida Department of Environmental Protection (FDEP), Site Investigation Section (SIS), this Scope of Work and Cost Estimate for groundwater sampling activities at the above referenced site. WSP developed this scope of work based on the scope of work outlined in your email dated July 24, 2020.

Site Location, Description, and Investigative History

Silver Springs Shores is an unincorporated community located in the southeastern portion of the Ocala metropolitan area in southern Marion County Florida (see Figure 1). The municipal potable water supply for the community includes two water supply wells (Well #1 and Well #2) located at 493 Oak Road. The water supply point of Entry (POE) and water tank is located approximately 1000 feet northwest of the supply wells on Oak Terrace (see Figure 1).

A site assessment report for the Silver Springs Shores Well Field Study area submitted March 30, 2019 to the FDEP documented 1,4-dioxane exceeding the Florida Department of Health Advisory Level (HAL) of 0.35 µg/L in groundwater at the site. Additional site assessment activities were conducted to investigate potential impacts associated with the former Spectratech facility with the investigation report submitted June 26, 2019, which also included additional groundwater sampling data collected from the Lockheed Martin facility.

Scope of Work and Cost Estimate

The purpose of WSP’s proposed activities outlined in this scope of work and cost estimate is to provide groundwater monitoring of two public supply wells, the water supply point of entry (POE), and nine existing monitoring wells in the vicinity of the Silver Springs Shores Well Field Study area.

WSP’s proposed groundwater monitoring activities includes the following tasks:

Task 1 – Project Management;

Task 2 – Sampling of public supply wells and monitoring wells;

Task 3 –Investigative derived waste disposal;

Task 4 - Report Preparation

Ms. Karlee Fowler October 13, 2020

Task 1 – Project Management

This task consists of project management hours only, which are automatically calculated based upon 12.5% of the direct labor costs.

Task 2 – Groundwater Monitoring

A single groundwater monitoring event will include collection of groundwater samples from point-of-entry (POE), public supply wells (PSW-1 and PSW-2), the nine existing monitoring wells (ST-2

SE 90,

ST-1 POE, POE OAK, ST-4-5, ST-3-15, OAK ROW, DRA 7322, DRA 7311, and Cypress ROW).

The groundwater samples will be collected in accordance with FDEP Standard Operating Procedures (SOPs). Additionally, field instrument calibration records (FDEP Form FD9000-8) and groundwater sampling logs (FDEP Form 9000-24) will be completed. During purging, field parameters will be monitored using a YSI Pro series and a flow-through cell. The YSI Pro series, which will be calibrated each day prior to use, has the capability to measure temperature, pH, dissolved oxygen (DO), conductivity, and oxidation-reduction potential (ORP). A calibrated turbidimeter will be used for the collection of turbidity measurements. Upon completion of purging of each monitoring well, the flow-through cell will be disconnected, and the groundwater sample will be collected from the polyethylene tubing. The groundwater samples, a duplicate groundwater sample and one trip blank will be delivered to the FDEP Laboratory and analyzed for 1,4-Dioxane and volatile organic compounds using United States Environmental Protection Agency (USEPA) Methods 522 and 8260.

Depth-to-water (DTW) will be measured in each of the nine monitoring wells during the sampling event to determine groundwater flow direction(s) across the study area.

Groundwater purged from the monitoring wells (investigation-derived waste [IDW]) will be containerized in 55-gallon drums and stored at the POE to await characterization and disposal.

WSP estimates that 12 drums of non-hazardous purge water will be generated during the monitoring event. This task includes labor costs associated with transporting the drums from each well location to the drum staging area.

Task 3 – Investigative Derived Waste Disposal

This task includes costs associated IDW analytical characterization, transportation, and removal.

All required laboratory analyses for IDW characterization will be performed by the FDEP laboratory.

Task 4 –Groundwater Monitoring Report

This task includes labor hours associated with the preparation of a groundwater monitoring report for sampling activities conducted at the above referenced site. Upon receipt of the analytical data from FDEP laboratory, WSP will prepare a Groundwater Monitoring Report, which will include tabulation of current and historical field measured parameters and analytical results, groundwater contaminant concentration figures, groundwater elevation isopleth maps, summary of the sampling event, conclusions, and recommendations.

Ms. Karlee Fowler October 13, 2020

Cost and Schedule

The attached cost table includes WSPs estimate of labor, expenses, and IDW disposal for the groundwater monitoring event. The attached cost assumptions table presents the estimated level of effort for travel, fieldwork, and report preparation for each monitoring event. WSP’s estimated cost for the monitoring event is $16,352.69. The attached cost table shows the task details based on one monitoring event.

The monitoring event will be conducted during early December 2020. The fieldwork is expected to require approximately 3.5 days fieldwork. The mobilization will be combined with the field effort for the City of Sanford Well Field Study.

If you have questions regarding this cost estimate, or other matters pertaining to the project, please call me at (850) 933-2312 or via e-mail at pkelso@ene.com.

Sincerely, WSP

Perry Kelso P.G.

Project Manager

Task Assignment Notification
BWC Task Assignment Form (Rev 02_17).pdf
Task Assignment Notification
BWC Task Assignment Form - Page 2 (Rev 08_10) - Rev 1.pdf
Deliverable & Invoice Schedule

File details come from the government source that posted it. Updated .