CN-370000-HW553-CSS14B.pdf

PDF 975 KB Posted

Attached to
Master Agreement FL|HW553|a65ff82906642c2458d9d92f26cd546e
Contract number
HW553
Issued by
Florida

About this file

This is a Task Assignment Notification Form for DEP Contract No. HW553, issued by the Florida Department of Environmental Protection (FDEP) to Ecology and Environment, Inc. (E&E). The task assignment (CSS-14B, Module CERSI, Grant CER15) is managed by FDEP Contract Manager Ferda Yilmaz and executed by E&E Contractor Representative Richard Stephens. The work is located at the Blue Water Express Wash site (8714 Atlantic Boulevard, Jacksonville, Duval County, Florida), identified as COM #282005, a hazardous waste site with ID FLT070079090.

The task assignment covers Program Management (Subtask 1), Site Inspection Field Investigation (Subtask 2), and SI Report preparation (Subtask 3), with a final deliverable of a Site Inspection Report due May 10, 2017, and execution through June 10, 2017. The total task assignment value is $27,262.37 on a fixed-price basis with no fee schedule, cost reimbursement, or retainage. Invoicing is structured as follows: Site Inspection Fieldnotes ($19,687.45) and Site Inspection Report ($7,574.92). The cost estimate includes direct labor for multiple personnel categories totaling 212.5 hours, travel expenses ($2,038.00), drilling services via subcontractor Probe Domain ($2,400.00 with 10% handling fee), sample shipping ($1,352.00), and field expenses ($1,449.46), with a 10% completion fee applied to total labor costs.

View the file

Other files

File Type Posted
CN-370000-HW553-A11.pdf PDF
CN-370000-HW553-A9.pdf PDF
CN-370000-HW553-BF005A.pdf PDF
CN-370000-HW553-BF005B.pdf PDF
CN-370000-HW553-BF03A.pdf PDF
CN-370000-HW553-BF03ACO1.pdf PDF
CN-370000-HW553-CO2.pdf PDF
CN-370000-HW553-CO3.pdf PDF
CN-370000-HW553-CO4.pdf PDF
CN-370000-HW553-CSS-17A.pdf PDF
CN-370000-HW553-CSS003C.pdf PDF
CN-370000-HW553-CSS09A.pdf PDF
CN-370000-HW553-CSS11B.pdf PDF
CN-370000-HW553-CSS11C.pdf PDF
CN-370000-HW553-CSS11E.pdf PDF
CN-370000-HW553-DC002G.pdf PDF
CN-370000-HW553-DC004I.pdf PDF
CN-370000-HW553-DC006G.pdf PDF
CN-370000-HW553-DC008F.pdf PDF
CN-370000-HW553-DC016E.pdf PDF
CN-370000-HW553-DC01A.pdf PDF
CN-370000-HW553-DC01ACO2.pdf PDF
CN-370000-HW553-DC01ACO5.pdf PDF
CN-370000-HW553-DC01D.pdf PDF
CN-370000-HW553-DC02B.pdf PDF
CN-370000-HW553-DC02C.pdf PDF
CN-370000-HW553-DC02CCO1.pdf PDF
CN-370000-HW553-DC02CCO5.pdf PDF
CN-370000-HW553-DC02ECO3.pdf PDF
CN-370000-HW553-DC02GCO1.pdf PDF
CN-370000-HW553-DC02I.pdf PDF
CN-370000-HW553-DC02ICO4.pdf PDF
CN-370000-HW553-DC03B.pdf PDF
CN-370000-HW553-DC03BCO1.pdf PDF
CN-370000-HW553-DC04BCO2.pdf PDF
CN-370000-HW553-DC04DCO1.pdf PDF
CN-370000-HW553-DC04F.pdf PDF
CN-370000-HW553-DC04G.pdf PDF
CN-370000-HW553-DC05ECO4.pdf PDF
CN-370000-HW553-DC05F.pdf PDF
CN-370000-HW553-DC05FCO1.pdf PDF
CN-370000-HW553-DC06ACO3.pdf PDF
CN-370000-HW553-DC06BCO1.pdf PDF
CN-370000-HW553-DC06E.pdf PDF
CN-370000-HW553-DC06FCO3.pdf PDF
CN-370000-HW553-DC06M.pdf PDF
CN-370000-HW553-DC07DCO1.pdf PDF
CN-370000-HW553-DC07DCO2.pdf PDF
CN-370000-HW553-DC07E.pdf PDF
CN-370000-HW553-DC08B.pdf PDF
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

From: Stephens, Richard To: Yilmaz, Ferda Cc: Conner, Padraic Subject: RE: Blue Water Cost proposal Date: Thursday, December 22, 2016 1:30:04 PM Attachments: Blue Water Field and Report 12212016.xls

Ferda and Padraic:

Please find attached the revised cost sheet for the Blue Water Express Wash.

I addressed all the comments, however based on adding the cyanides to the analysis I had originally under calculated the number of coolers. I now have 8 shipping overnight with samples and 8 returning (2-day), and 8 coolers for ice.

Additionally I had calculated 1-day for the turbidity meter with the GW sampling kit and 1-day during the well install for development (total 2 days). However, I went ahead and removed that additional day as it is not an issue..

Thank you

Richard A. Stephens 325 John Knox Road, Building F, Suite 140, Tallahassee, Florida 32303 Phone: 850-523-0954 Ext: 3915 • Cell: 850-933-7519 rstephens@ene.com • www.ene.com

From: Yilmaz, Ferda [mailto:Ferda.Yilmaz@dep.state.fl.us] Sent: Thursday, December 22, 2016 10:42 AM To: Stephens, Richard Cc: Conner, Padraic Subject: RE: Blue Water Cost proposal

Richard, That’s what I thought. The cost proposal needs some revisions though.

Automobile: you need to use the weekly rate instead of 5days -$272 Turbidity meter: we need to remove that because it is included in the shallow GW sampling kit Hand augers: $8.25 according to your contract Shipment: you have 12 containers for 24hr. Cooler returns should be 2 day shipping.

Inline filters?

Total survey station?

Thank you, Ferda

From: Stephens, Richard [mailto:RStephens@ene.com] Sent: Thursday, December 22, 2016 10:25 AM To: Yilmaz, Ferda <Ferda.Yilmaz@dep.state.fl.us> Subject: Re: Blue Water Cost proposal mailto:RStephens@ene.com mailto:Ferda.Yilmaz@dep.state.fl.us mailto:Padraic.Conner@dep.state.fl.us http://www.ene.com/ mailto:emailaddress@ene.com http://www.ene.com/ mailto:RStephens@ene.com mailto:Ferda.Yilmaz@dep.state.fl.us

Sheet1

Ecology and Environment, Inc.

FDEP Contract HW553

Personnel Roster

April 8, 2016

Contract HW553 min/max rates

Last Name First Name Category Hourly Rate minimum maximum

Principal $47.17 $64.01

Powell Brenda PR $51.92

Brown Neil PR $57.69

Chief $33.18 $48.10

Stephens Richard CH $35.10

Ringo Christina CH $38.50

Kennedy Daniel CH $38.61

Harter Erick CH $39.42

Kelso Perry CH $42.15

Senior $25.04 $39.09

Maldonado Rafael SR $31.10

Krajewski Kevin SR $31.25

Meyers Eric SR $32.79

Elliott Steven SR $34.25

Moore K. Mark SR $34.63

Taravella James SR $35.58

Associate $20.00 $28.09

Rhyne Jessica AS $21.91

Thanawastien Tiara AS $26.49

Hammond Helen AS $27.43

Fowler Heather AS $28.09

Vaughan Kristin AS $28.09

Junior $20.00 $24.47

Bender Eric JR $20.67

Oien Erik JR $20.80

Fluitt Nicole JR $22.12

Technician $18.72 $18.72

N/A TE $18.72

Clerical $16.38 $22.28

Diez Odalys SE $13.30

Benson Debra SE $15.33

Cost Estimate

Template to be used as of April 15, 2016

Labor rates are approved by FDEP on April 11, 2016

Contractor: Ecology and Environment, Inc.

Date: December 21, 2016

Task #: CSS-14B SubTask 1 PROGRAM MANAGEMENT SubTask 6 SubTask 11 SubTask 16

Site: Blue Water Express Wash SubTask 2 Si Field Invesitgation SubTask 7 SubTask 12 SubTask 17

Site ID #: FLT070079090 SubTask 3 Si Report SubTask 8 SubTask 13 SubTask 18

Activity/Phase: Field and Report SubTask 4 SubTask 9 SubTask 14 SubTask 19

Project Manager: FDEP: Conner / E & E: Stephens SubTask 5 SubTask 10 SubTask 15 SubTask 20

10OHBOA.3077.98

Labor Rate Category Totals 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

$35.10 Project Manager - Richard Stephens 20.5 20.544

Principal

$51.92 Powell 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

$57.69 Brown 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Chief

$35.10 Stephens 64.0 40.0 24.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

$38.50 Ringo 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

$38.61 Kennedy 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

$39.42 Harter 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

$42.15 Kelso 4.0 0.0 4.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Senior

$31.10 Maldonado 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

$31.25 Krajewski 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

$32.79 Meyers 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

$34.25 Elliott 48.0 48.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

$34.63 Moore 8.0 0.0 8.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

$35.58 Taravella 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Associate

$21.91 Rhyne 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

$26.49 Thanawastien 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

$27.43 Hammond 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

$28.09 Fowler 4.0 0.0 4.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

$28.09 Vaughan 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Junior

$20.67 Bender 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

$20.80 Oien 62.0 46.0 16.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

$22.12 Fluitt 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Technician

$18.72 N/A 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Clerical

$13.30 Diez 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

$15.33 Benson 2.0 0.0 2.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Total Hours 212.5 20.5 134.0 58.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

1) Direct Labor $6,489.74 $721.08 $4,004.80 $1,763.86 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

2) Fringe (33.44% of Lines 1 ) 0.3344 $2,170.17 $241.13 $1,339.21 $589.83 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

3) Overhead (49.90% of Lines 1 + 2) 0.499 $4,321.29 $480.14 $2,666.66 $1,174.49 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

4) Gen & Admin (36.27% of Lines 1 + 2 + 3) 0.3627 $4,708.28 $523.14 $2,905.47 $1,279.67 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

5) Total Labor (Sum Lines 1 thru 4) $17,689.48 $1,965.49 $10,916.14 $4,807.85 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

6) Other Direct Costs (5.0% of Line 1) 0.05 $324.48 $36.05 $200.24 $88.19 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Travel

7a) Vehicle Rental $1,748.00 $0.00 $1,748.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

7b) Mileage Costs $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

7c) Air Fare $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

7d) Per diem + Hotel $1,378.00 $0.00 $1,378.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

7e) Total Travel $3,126.00 $0.00 $3,126.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subcontractor (Equipment Procurement)

8a) Provider - Task # $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

8b) Provider - Task # $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

8c) Provider - Task # $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

8d) Subcontractor Subtotal $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

8e) Procurement Fee $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

8f) Total Subcontractor Cost $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subcontractor (Services Procurement)

9a) Drilling (Conventional) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

9b) Drilling (Non-conventional) $2,400.00 $0.00 $2,400.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

9c) Mobile Laboratory $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

9d) Surveying $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

9e) IDW $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

9f) Utilities $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

9g) Other Sub 1 - Task # $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

9h) Other Sub 2- Task # $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

9i) Other Sub 3 - Task # $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

9j) Subcontractor Subtotal $2,400.00 $0.00 $2,400.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

9k) Handling Fee $240.00 $0.00 $240.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

9l) Total Subcontractor Cost $2,640.00 $0.00 $2,640.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Laboratory

10a) Analytical Costs (Fixed Lab) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

10b) Fast Turnaround Rate (%) (Fixed Lab) 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

10c) Fast Turnaround Charges (Fixed Lab) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

10d) Sample Shipping $1,352.00 $0.00 $1,352.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

10e) Total Laboratory $1,352.00 $0.00 $1,352.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Field Expenses

11a) Personal Protection $252.00 $0.00 $252.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

11b) Expendables $97.50 $0.00 $97.50 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

11c) Equipment (Drilling Related) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

11d) Equipment (Analytical Related) $208.55 $0.00 $208.55 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

11e) Equipment (IDW Related) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

11f) Equipment (Other) $891.41 $0.00 $891.41 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

11g) Total Field Expenses $1,449.46 $0.00 $1,449.46 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subtotal $26,581.42 $2,001.54 $19,683.84 $4,896.04 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Completion Fee 12) (10.0% of Line 5) 0.1 $1,768.95 $196.55 $1,091.61 $480.79 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

13) Total Estimated Cost $28,350.37 $2,198.09 $20,775.45 $5,376.83 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

* Equipment Procurement - 10.0% Per Subcontractor, maximum $2,500 per Subcontractor.

** Utilities fees are calculated based on $20 per utility bill per month.

*** Except for utilities fees, 10% of first $50,000, 7% of next $50,000, 5% over $100,000 per Subcontractor.

&C&"Arial,Bold" FDEP Contract HW553 Cost Estimate

&L&"Arial,Regular"&9&F&C&"Arial,Regular"&9&D&R&"Arial,Regular"&9Page &P

HOURS WILL CALCULATE AUTOMATICALLY

ENTER NAME and RATE FOR SPECIFIC PROJECT MGR

Formula Sheet

DSUMs for LABOR Task 1 Task 2 Task 3 Task 4 Task 5 Task 6 Task 7 Task 8 Task 9 Task 10 Task 11 Task 12 Task 13 Task 14 Task 15 Task 16 Task 17 Task 18 Task 19 Task 20

Powell 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

Brown 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

Stephens 0 40 24 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

Ringo 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

Kennedy 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

Harter 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

Kelso 0 0 4 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

Maldonado 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

Krajewski 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

Meyers 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

Elliott 0 48 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

Moore 0 0 8 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

Taravella 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

Rhyne 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

Thanawastien 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

Hammond 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

Fowler 0 0 4 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

Vaughan 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

Bender 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

Oien 0 46 16 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

Fluitt 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

N/A 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

Diez 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

Benson 0 0 2 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

0 134 58 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

Labor Costs $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $1,404.00 $842.40 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $168.60 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $1,644.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $277.04 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $112.36 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $956.80 $332.80 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $30.66 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 total labor dollars $0.00 $4,004.80 $1,763.86 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subcontractor Provider - Task # $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Procurement Provider - Task # $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Fee Provider - Task # $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subcontractor Drilling (Conventional) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Handling Fee Drilling (Non-conventional) $0.00 $240.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Mobile Laboratory $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Surveying $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

IDW $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Utilities $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Other Sub 1 - Task # $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Other Sub 2- Task # $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Other Sub 2- Task # $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $240.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Laboratory Fast Turnaround $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

CRITERIA RANGES FOR LOOKUPS FOR LABOR SUMS

Labor Category Labor Category Labor Category Labor Category Labor Category Labor Category Labor Category Labor Category Labor Category Labor Category Labor Category Labor Category Labor Category Labor Category Labor Category Labor Category Labor Category Labor Category Labor Category Labor Category Labor Category Labor Category Labor Category Labor Category

Powell Brown Stephens Ringo Kennedy Harter Kelso Maldonado Krajewski Meyers Elliott Moore Taravella Rhyne Thanawastien Hammond Fowler Vaughan Bender Oien Fluitt N/A Diez Benson

PRINCPAL PRINCPAL CHIEF CHIEF CHIEF CHIEF CHIEF SENIOR SENIOR SENIOR SENIOR SENIOR SENIOR ASSOCIATE ASSOCIATE ASSOCIATE ASSOCIATE ASSOCIATE JUNIOR JUNIOR JUNIOR TECHNICIAN CLERICAL CLERICAL

&C&"CG Times,Bold"&16FDEP COST ESTIMATE

COSTPROJ.XLS&RPage &P

SITE: Blue Water Express Wash

SUBTASK NO.: 1 DESCRIPTION: PROGRAM MANAGEMENT

DATE: December 21, 2016 FACILITY ID NO.: FLT070079090

TASK NO: CSS-14B FOR PM ONLY….HOURS CALC AUTOMATICALLY ON COST EST SHEET

LABOR HOURS

Labor Category Work Description Hours

Principal 0

Chief 0

Senior 0

Associate 0

Junior 0

Technician 0

Clerical 0

TOTAL LABOR HOURS 0.00

VEHICLE RENTAL

ITEM RATE UNIT USAGE TOTAL

Automobile $68.00 Day 0 $0.00

Equipment Truck/Van $97.00 Day 0 $0.00

Equipment Truck/Van $420.00 Week 0 $0.00

TOTAL VEHICLE RENTAL $0.00

MILEAGE AND AIRFARE

ITEM RATE UNIT USAGE TOTAL

Mileage INCLUDED IN VEHICLE RENTAL RATE $0.00

Airfare $0.00

TOTAL MILEAGE AND AIRFARE $0.00

MEALS AND LODGING

ITEM Labor Category RATE UNIT USAGE TOTAL

MEALS

$36.00 Day 0 $0.00

$36.00 Day 0 $0.00

$36.00 Day 0 $0.00

$36.00 Day 0 $0.00

Subtotal - Meals 0 $0.00

LODGING RATE* UNIT USAGE

$77.00 Day 0 $0.00

$77.00 Day 0 $0.00

$77.00 Day 0 $0.00

$77.00 Day 0 $0.00

*Rate may be higher based on geographical location or special events. Subtotal - Lodging $0.00

TOTAL MEALS AND LODGING $0.00

EQUIPMENT PROCUREMENT

Provider List of Equipment RATE UNIT USAGE TOTAL

Provider - Task # $0.00 0 $0.00

Provider - Task # $0.00 0 $0.00

Provider - Task # $0.00 0 $0.00

TOTAL EQUIPMENT PROCUREMENT $0.00

SUBCONTRACTOR

Provider Name of Sub Description of Work RATE UNIT USAGE TOTAL

Drilling (Conventional) $0.00 Lump Sum 0 $0.00

Drilling (Non-conventional) $0.00 Lump Sum 0 $0.00

Mobile Laboratory $0.00 Lump Sum 0 $0.00

Surveying $0.00 Lump Sum 0 $0.00

IDW $0.00 Drum 0 $0.00

Utilities $0.00 0 $0.00

Other Sub 1 - Task # $0.00 0 $0.00

Other Sub 2- Task # $0.00 0 $0.00

Other Sub 3 - Task # $0.00 0 $0.00

TOTAL SUBCONTRACTOR $0.00

LABORATORY and SAMPLE SHIPMENTS

ANALYSIS/PARAMETER FAST TURNAROUND RATE (%) No. for Fast Turnaround Rate RATE Media No. of Samples No. of QA/QC Fast Turn- Around Charges TOTAL

EPA 8021 B VOCs - Hall/PID Series $100 Water/Soil 0 $0.00 $0.00

EPA 8260B VOCs $135 Water/Soil 0 $0.00 $0.00

TO-15 VOCs $200 Air 0 $0.00 $0.00

TCLP/SPLP Bottle extraction $40 Soil 0 $0.00 $0.00

EPA 8270 BNAs $220 Water/Soil 0 $0.00 $0.00

EPA 8270/8310 PAHs - Low Level $100 Water/Soil 0 $0.00 $0.00

FL-PRO TRPH $84 Water/Soil 0 $0.00 $0.00

Digestion $6.00 Water/Soil 0 $0.00 $0.00

$0.00 $0.00

$0.00 $0.00

$0.00 $0.00

$0.00 $0.00

$0.00 $0.00

$0.00 $0.00

*Rate negotiated. Subtotal-Lab Analyses 0 0 $0.00 $0.00

SAMPLE SHIPMENTS

CONTAINER SIZEShipment Method
24 hrNo. of ContainersShipment Method
2 dayNo. of ContainersIceNo. of ContainersTOTAL

Small (<50 lbs.) $63.00 0 $35.00 0 $5.00 0 $0.00

Large (>50 lbs. < 70 lbs.) $104.00 0 $60.00 0 $5.00 0 $0.00

Subtotal-Sample Shipments $0.00

TOTAL LABORATORY and SHIPMENTS $0.00

FIELD EXPENSES

Personal Protection

ITEM RATE UNIT USAGE TOTAL

Level B $172.50 Per Man Day 0 $0.00

Level C $110.00 Per Man Day 0 $0.00

Level D $28.00 Per Man Day 0 $0.00

SUBTOTAL - PERSONAL PROTECTION $0.00

Expendables

ITEM RATE UNIT USAGE TOTAL ITEM TOTAL

Expendables $32.50 Day 0 $0.00

SUBTOTAL - EXPENDABLES $0.00

Drilling Related Equipment

RATE UNIT USAGE

Well Locks $3.40 ea 0 $0.00

2" Well Caps $10.20 ea 0 $0.00

4" Well Caps $14.55 ea 0 $0.00

$0.00 ea 0 $0.00

SUBTOTAL - DRILLING RELATED EQUIPMENT $0.00

Analytical Related Equipment

RATE ITEM UNIT NO OF ITEMS USAGE TOTAL ITEM

Soil Sampling Kit (Corer, generator, auger, WL ind.) $208.55 day 1 0 $0.00

FID/PID Combination OVA $106.70 day 1 0 $0.00

Multiprobe 9000 (ph, cond, temp, do, redox) $126.10 day 1 0 $0.00

Multiprobe 9000 (ph, cond, temp, do, redox) $504.40 week 1 0 $0.00

Shallow GW Sampling Kit (WL ind., Per Pump, Multiprobe, turb meter, and flow cell) $208.55 day 1 0 $0.00

Construction/O&M Supplies (Various items for work/repair) $63.05 day 1 0 $0.00

$0 1 0 $0.00

$0 1 0 $0.00

$0 1 0 $0.00

$0 1 0 $0.00

SUBTOTAL - ANALYTICAL RELATED EQUIPMENT $0.00

IDW Related Equipment

55-Gal Drum $58.20 0 $0.00

$0.00

SUBTOTAL - IDW RELATED EQUIPMENT $0.00

Other Equipment

RATE ITEM UNIT NO OF ITEMS USAGE TOTAL ITEM

Tedlar Bag $14.55 ea 1 0 $0.00

Peristaltic Tubing (Silicon 3/8 x 5/8) $3.20 ft 1 0 $0.00

Disposable Bailers (HDPE) $4.85 ea 1 0 $0.00

Peristaltic Pump $29.10 day 1 0 $0.00

Water Level Indicator $19.40 day 1 0 $0.00

Color-Tec Kit $19.40 day 1 0 $0.00

PCE Detection Tubes $67.90 10 pack 1 0 $0.00

Vacuum Gauges $19.40 ea 1 0 $0.00

Teflon Tubing (1/4 inch OD) $1.95 ft 1 0 $0.00

HDPE Poly tubing (1/4 inch OD) $0.25 ft 1 0 $0.00

$0.00 1 0 $0.00

$0.00 1 0 $0.00

$0.00 1 0 $0.00

*Rate negotiated. SUBTOTAL - OTHER EQUIPMENT $0.00

FIELD EXPENSES $0.00

&L&"Arial,Regular"&9&F/&A&R&"Arial,Regular"&9Page 5

JMTudor:

AFTER COMPLETING ALL ENTRIES FOR SHEET, HIDE UNUSED LINES.

JMTudor:

USE HIGHER LODGING RATE IF GEOGRAPHICAL AREA HAS HIGHER LODGING RATE. ALSO CHECK FOR SPECIAL EVENTS IN AREA AND OFFER COST IF THERE IS AN EVENT THAT CREATES HIGHER LODGING RATES. MAKE NOTE ON TOTAL LINE EXPLAINING HIGHER RATE REASON. NOTE: LODGING SALES TAX CANNOT BE ADDED INTO THE COST SHEET.

AIRFARE IS TO BE NOTED AS RT (ROUNDTRIP) OR OW (FOR ONE-WAY). ADD $28 FEE INTO RATE.

SITE: Blue Water Express Wash

SUBTASK NO.: 2 DESCRIPTION: Si Field Invesitgation

DATE: December 21, 2016 FACILITY ID NO.: FLT070079090

TASK NO: CSS-14B

LABOR HOURS

Labor Category Work Description Hours

Principal

Powell

Brown

Chief

Stephens mob/demob, Field investigation 40

Ringo

Kennedy

Harter

Kelso

Senior

Maldonado

Krajewski

Meyers

Elliott Scribe setup, Field Investigation and Scribe downloads 48

Moore

Taravella

Associate

Rhyne

Thanawastien

Hammond

Fowler

Vaughan

Junior

Bender

Oien warehouse setup, mob/demob, field invetsigation 46

Fluitt

Technician

N/A

Clerical

Diez

Benson

TOTAL LABOR HOURS 134.00

VEHICLE RENTAL

ITEM RATE UNIT USAGE TOTAL

Automobile $272.00 Day 5 $1,360.00

Equipment Truck/Van $97.00 Day 4 $388.00

Equipment Truck/Van $420.00 Week 0 $0.00

TOTAL VEHICLE RENTAL $1,748.00

MILEAGE AND AIRFARE

ITEM RATE UNIT USAGE TOTAL

Mileage INCLUDED IN VEHICLE RENTAL RATE $0.00

Airfare $0.00

TOTAL MILEAGE AND AIRFARE $0.00

MEALS AND LODGING

ITEM Labor Category RATE UNIT USAGE TOTAL

MEALS

RS $36.00 Day 4 $144.00

SE $36.00 Day 5 $180.00

EO $36.00 Day 4 $144.00

$36.00 Day 0 $0.00

Subtotal - Meals 0 $468.00

LODGING RATE* UNIT USAGE

RS $91.00 Day 3 $273.00

SE $91.00 Day 4 $364.00

EO $91.00 Day 3 $273.00

$77.00 Day 0 $0.00

*Rate may be higher based on geographical location or special events. Subtotal - Lodging $910.00

TOTAL MEALS AND LODGING $1,378.00

EQUIPMENT PROCUREMENT

Provider List of Equipment RATE UNIT USAGE TOTAL

Provider - Task # $0.00 0 $0.00

Provider - Task # $0.00 0 $0.00

Provider - Task # $0.00 0 $0.00

TOTAL EQUIPMENT PROCUREMENT $0.00

SUBCONTRACTOR

Provider Name of Sub Description of Work RATE UNIT USAGE TOTAL

Drilling (Conventional) $0.00 Lump Sum 0 $0.00

Drilling (Non-conventional) Probe Domain 3 x 15'x 1" $2,400.00 Lump Sum 1 $2,400.00

Mobile Laboratory $0.00 Lump Sum 0 $0.00

Surveying $0.00 Lump Sum 0 $0.00

IDW $0.00 Drum 0 $0.00

Utilities $0.00 0 $0.00

Other Sub 1- Task # $0.00 0 $0.00

Other Sub 2- Task # $0.00 0 $0.00

Other Sub 3 - Task # $0.00 0 $0.00

TOTAL SUBCONTRACTOR $2,400.00

LABORATORY and SAMPLE SHIPMENTS

ANALYSIS/PARAMETER FAST TURNAROUND RATE (%) No. for Fast Turnaround Rate RATE Media No. of Samples No. of QA/QC Fast Turn- Around Charges TOTAL

EPA 6010 Lead 100% 0 $11.50 Water 0 0 $0.00 $0.00

EPA 9040 pH 100% 0 $8.00 Water 0 0 $0.00 $0.00

EPA 6010 Lead 100% 0 $11.50 Soil 0 0 $0.00 $0.00

EPA 6010 Lead 100% 0 $11.50 SPLP 0 0 $0.00 $0.00

TCLP/SPLP Bottle extraction 100% 0 $40.00 Soil 0 0 $0.00 $0.00

Digestion 100% 0 $6.00 Soil 0 0 $0.00 $0.00

0 $0.00 $0.00

0 $0.00 $0.00

$0.00 $0.00

$0.00 $0.00

$0.00 $0.00

$0.00 $0.00

$0.00 $0.00

$0.00 $0.00

*Rate negotiated. Subtotal-Lab Analyses 0 0 $0.00 $0.00

SAMPLE SHIPMENTS

CONTAINER SIZEShipment Method
24 hrNo. of ContainersShipment Method
2 dayNo. of ContainersIceNo. of ContainersTOTAL

Small (<50 lbs.) $63.00 0 $35.00 0 $5.00 0 $0.00

Large (>50 lbs. < 70 lbs.) $104.00 8 $60.00 8 $5.00 8 $1,352.00

Subtotal-Sample Shipments $1,352.00

TOTAL LABORATORY and SHIPMENTS $1,352.00

FIELD EXPENSES

Personal Protection

ITEM RATE UNIT USAGE TOTAL

Level B $172.50 Per Man Day 0 $0.00

Level C $110.00 Per Man Day 0 $0.00

Level D 3 people - 3 days $28.00 Per Man Day 9 $252.00

SUBTOTAL - PERSONAL PROTECTION $252.00

Expendables

ITEM RATE UNIT USAGE TOTAL ITEM TOTAL

Expendables $32.50 Day 3 $97.50

SUBTOTAL - EXPENDABLES $97.50

Drilling Related Equipment

RATE UNIT USAGE

Well Locks $3.40 ea 0 $0.00

2" Well Caps $10.20 ea 0 $0.00

4" Well Caps $14.55 ea 0 $0.00

$0.00 ea 0 $0.00

SUBTOTAL - DRILLING RELATED EQUIPMENT $0.00

Analytical Related Equipment

RATE ITEM UNIT NO OF ITEMS USAGE TOTAL ITEM

Soil Sampling Kit (Corer, generator, auger, WL ind.) $834.20 week 0 0 $0.00

FID/PID Combination OVA $106.70 day 0 0 $0.00

Multiprobe 9000 (ph, cond, temp, do, redox) $126.10 day 0 0 $0.00

Multiprobe 9000 (ph, cond, temp, do, redox) $504.40 week 0 0 $0.00

Shallow GW Sampling Kit (WL ind., Per Pump, Multiprobe, turb meter, and flow cell) $208.55 day 1 1 $208.55

Construction/O&M Supplies (Various items for work/repair) $63.05 day 0 0 $0.00

Turbidity Meter $24.25 day 1 0 $0.00

$0 0 0 $0.00

$0 0 0 $0.00

$0 0 0 $0.00

SUBTOTAL - ANALYTICAL RELATED EQUIPMENT $208.55

IDW Related Equipment

55-Gal Drum $58.20 0 $0.00

$0.00

SUBTOTAL - IDW RELATED EQUIPMENT $0.00

Other Equipment

RATE ITEM UNIT NO OF ITEMS USAGE TOTAL ITEM

Sample Bottles $363.10 lump sum 1 1 $363.10

Peristaltic Tubing (Silicon 3/8 x 5/8) $3.20 ft 1 6 $19.21

Inline Filters (0.45 micron (µm)) $20.20 ea 1 8 $161.60

Peristaltic Pump $29.10 day 0 0 $0.00

Water Level Indicator $19.40 day 0 0 $0.00

Color-Tec Kit $19.40 day 0 0 $0.00

Hand Augers $67.90 10 pack 0 0 $0.00

Hand Augers $8.25 ea 1 8 $66.00

Teflon Tubing (1/4 inch OD) $1.95 ft 1 110 $214.50

HDPE Poly tubing (1/4 inch OD) $0.25 ft 0 0 $0.00

Total Survey Station $41.75 day 1 1 $41.75

Water level indicator $19.40 day 0 0 $0.00

Hand Held GPS $25.25 day 1 1 $25.25

*Rate negotiated. SUBTOTAL - OTHER EQUIPMENT $891.41

FIELD EXPENSES $1,449.46

&L&"Arial,Regular"&9&F/&A&R&"Arial,Regular"&9Page 6

AFTER COMPLETING ALL ENTRIES FOR SHEET, HIDE UNUSED LINES.

JMTudor:

AIRFARE IS TO BE NOTED AS RT (ROUNDTRIP) OR OW (FOR ONE-WAY). ADD $28 FEE INTO RATE.

USE HIGHER LODGING RATE IF GEOGRAPHICAL AREA HAS HIGHER LODGING RATE. ALSO CHECK FOR SPECIAL EVENTS IN AREA AND OFFER COST IF THERE IS AN EVENT THAT CREATES HIGHER LODGING RATES. MAKE NOTE ON TOTAL LINE EXPLAINING HIGHER RATE REASON. NOTE: LODGING SALES TAX CANNOT BE ADDED INTO THE COST SHEET.

SITE: Blue Water Express Wash

SUBTASK NO.: 3 DESCRIPTION: Si Report

DATE: December 21, 2016 FACILITY ID NO.: FLT070079090

TASK NO: CSS-14B

LABOR HOURS

Labor Category Work Description Hours

Principal

Powell

Brown

Chief

Stephens Report Generation 24

Ringo

Kennedy

Harter

Kelso PG and QA Review 4

Senior

Maldonado

Krajewski

Meyers

Elliott

Moore GIS Figures 8

Taravella

Associate

Rhyne

Thanawastien

Hammond

Fowler Technical Editing 4

Vaughan

Junior

Bender

Oien Tables and Report generation 16

Fluitt

Technician

N/A

Clerical

Diez

Benson Publicatioons 2

TOTAL LABOR HOURS 58.00

VEHICLE RENTAL

ITEM RATE UNIT USAGE TOTAL

Automobile $68.00 Day 0 $0.00

Equipment Truck/Van $97.00 Day 0 $0.00

Equipment Truck/Van $420.00 Week 0 $0.00

TOTAL VEHICLE RENTAL $0.00

MILEAGE AND AIRFARE

ITEM RATE UNIT USAGE TOTAL

Mileage INCLUDED IN VEHICLE RENTAL RATE $0.00

Airfare $0.00

TOTAL MILEAGE AND AIRFARE $0.00

MEALS AND LODGING

ITEM Labor Category RATE UNIT USAGE TOTAL

MEALS

$36.00 Day 0 $0.00

$36.00 Day 0 $0.00

$36.00 Day 0 $0.00

$36.00 Day 0 $0.00

Subtotal - Meals 0 $0.00

LODGING RATE* UNIT USAGE

$77.00 Day 0 $0.00

$77.00 Day 0 $0.00

$77.00 Day 0 $0.00

$77.00 Day 0 $0.00

*Rate may be higher based on geographical location or special events. Subtotal - Lodging $0.00

TOTAL MEALS AND LODGING $0.00

EQUIPMENT PROCUREMENT

Provider List of Equipment RATE UNIT USAGE TOTAL

Provider - Task # $0.00 0 $0.00

Provider - Task # $0.00 0 $0.00

Provider - Task # $0.00 0 $0.00

TOTAL EQUIPMENT PROCUREMENT $0.00

SUBCONTRACTOR

Provider Name of Sub Description of Work RATE UNIT USAGE TOTAL

Drilling (Conventional) $0.00 Lump Sum 0 $0.00

Drilling (Non-conventional) $0.00 Lump Sum 0 $0.00

Mobile Laboratory $0.00 Lump Sum 0 $0.00

Surveying $0.00 0 $0.00

IDW $0.00 0 $0.00

Utilities $0.00 0 $0.00

Other Sub 1- Task # $0.00 0 $0.00

Other Sub 2- Task # $0.00 0 $0.00

Other Sub 3 - Task # $0.00 0 $0.00

TOTAL SUBCONTRACTOR $0.00

LABORATORY and SAMPLE SHIPMENTS

ANALYSIS/PARAMETER FAST TURNAROUND RATE (%) No. for Fast Turnaround Rate RATE Media No. of Samples No. of QA/QC Fast Turn- Around Charges TOTAL

EPA 8021 B VOCs - Hall/PID Series $100 Water/Soil 0 $0.00 $0.00

EPA 8260B VOCs $135 Water/Soil 0 $0.00 $0.00

TO-15 VOCs $200 Air 0 $0.00 $0.00

TCLP/SPLP Bottle extraction $40 Soil 0 $0.00 $0.00

EPA 8270 BNAs $220 Water/Soil 0 $0.00 $0.00

EPA 8270/8310 PAHs - Low Level $100 Water/Soil 0 $0.00 $0.00

FL-PRO TRPH $84 Water/Soil 0 $0.00 $0.00

Digestion $6.00 Water/Soil 0 $0.00 $0.00

$0.00 $0.00

$0.00 $0.00

$0.00 $0.00

$0.00 $0.00

$0.00 $0.00

$0.00 $0.00

*Rate negotiated. Subtotal-Lab Analyses 0 0 $0.00 $0.00

SAMPLE SHIPMENTS

CONTAINER SIZEShipment Method
24 hrNo. of ContainersShipment Method
2 dayNo. of ContainersIceNo. of ContainersTOTAL

Small (<50 lbs.) $63.00 0 $35.00 0 $5.00 0 $0.00

Large (>50 lbs. < 70 lbs.) $104.00 0 $60.00 0 $5.00 0 $0.00

Subtotal-Sample Shipments $0.00

TOTAL LABORATORY and SHIPMENTS $0.00

FIELD EXPENSES

Personal Protection

ITEM RATE UNIT USAGE TOTAL

Level B $172.50 Per Man Day 0 $0.00

Level C $110.00 Per Man Day 0 $0.00

Level D $28.00 Per Man Day 0 $0.00

SUBTOTAL - PERSONAL PROTECTION $0.00

Expendables

ITEM RATE UNIT USAGE TOTAL ITEM TOTAL

Expendables $32.50 Day 0 $0.00

SUBTOTAL - EXPENDABLES $0.00

Drilling Related Equipment

RATE UNIT USAGE

Well Locks $3.40 ea 0 $0.00

2" Well Caps $10.20 ea 0 $0.00

4" Well Caps $14.55 ea 0 $0.00

$0.00 ea 0 $0.00

SUBTOTAL - DRILLING RELATED EQUIPMENT $0.00

Analytical Related Equipment

RATE ITEM UNIT NO OF ITEMS USAGE TOTAL ITEM

Soil Sampling Kit (Corer, generator, auger, WL ind.) $208.55 day 0 0 $0.00

FID/PID Combination OVA $106.70 day 0 0 $0.00

Multiprobe 9000 (ph, cond, temp, do, redox) $126.10 day 0 0 $0.00

Multiprobe 9000 (ph, cond, temp, do, redox) $504.40 week 0 0 $0.00

Shallow GW Sampling Kit (WL ind., Per Pump, Multiprobe, turb meter, and flow cell) $208.55 day 0 0 $0.00

Construction/O&M Supplies (Various items for work/repair) $63.05 day 0 0 $0.00

Turbidity Meter $24.25 day 0 0 $0.00

$0 0 0 $0.00

$0 0 0 $0.00

$0 0 0 $0.00

SUBTOTAL - ANALYTICAL RELATED EQUIPMENT $0.00

IDW Related Equipment

55-Gal Drum $58.20 0 $0.00

$0.00

SUBTOTAL - IDW RELATED EQUIPMENT $0.00

Other Equipment

RATE ITEM UNIT NO OF ITEMS USAGE TOTAL ITEM

Tedlar Bag $14.55 ea 0 0 $0.00

Peristaltic Tubing (Silicon 3/8 x 5/8) $3.20 ft 0 0 $0.00

Disposable Bailers (HDPE) $4.85 ea 0 0 $0.00

Peristaltic Pump $29.10 day 0 0 $0.00

Water Level Indicator $19.40 day 0 0 $0.00

Color-Tec Kit $19.40 day 0 0 $0.00

PCE Detection Tubes $67.90 10 pack 0 0 $0.00

Vacuum Gauges $19.40 ea 0 0 $0.00

Teflon Tubing (1/4 inch OD) $1.95 ft 0 0 $0.00

HDPE Poly tubing (1/4 inch OD) $0.25 ft 0 0 $0.00

Total Survey Station $41.75 day 0 0 $0.00

Water level indicator $19.40 day 0 0 $0.00

Hand Held GPS $25.25 day 0 0 $0.00

*Rate negotiated. SUBTOTAL - OTHER EQUIPMENT $0.00

FIELD EXPENSES $0.00

&L&"Arial,Regular"&8&F/&A&R&"Arial,Regular"&8Page 7

AFTER COMPLETING ALL ENTRIES FOR SHEET, HIDE UNUSED LINES.

JMTudor:

AIRFARE IS TO BE NOTED AS RT (ROUNDTRIP) OR OW (FOR ONE-WAY). ADD $28 FEE INTO RATE.

USE HIGHER LODGING RATE IF GEOGRAPHICAL AREA HAS HIGHER LODGING RATE. ALSO CHECK FOR SPECIAL EVENTS IN AREA AND OFFER COST IF THERE IS AN EVENT THAT CREATES HIGHER LODGING RATES. MAKE NOTE ON TOTAL LINE EXPLAINING HIGHER RATE REASON. NOTE: LODGING SALES TAX CANNOT BE ADDED INTO THE COST SHEET.

SITE: Blue Water Express Wash

SUBTASK NO.: 4 DESCRIPTION: Dec-99

DATE: December 21, 2016 FACILITY ID NO.: FLT070079090

TASK NO: CSS-14B

LABOR HOURS

Labor Category Work Description Hours

Principal

Powell

Brown

Chief

Stephens

Ringo

Kennedy

Harter

Kelso

Senior

Maldonado

Krajewski

Meyers

Elliott

Moore

Taravella

Associate

Rhyne

Thanawastien

Hammond

Fowler

Vaughan

Junior

Bender

Oien

Fluitt

Technician

N/A

Clerical

Diez

Benson

TOTAL LABOR HOURS 0.00

VEHICLE RENTAL

ITEM RATE UNIT USAGE TOTAL

Automobile $68.00 Day 0 $0.00

Equipment Truck/Van $97.00 Day 0 $0.00

Equipment Truck/Van $420.00 Week 0 $0.00

TOTAL VEHICLE RENTAL $0.00

MILEAGE AND AIRFARE

ITEM RATE UNIT USAGE TOTAL

Mileage INCLUDED IN VEHICLE RENTAL RATE $0.00

Airfare $0.00

TOTAL MILEAGE AND AIRFARE $0.00

MEALS AND LODGING

ITEM Labor Category RATE UNIT USAGE TOTAL

MEALS

$36.00 Day 0 $0.00

$36.00 Day 0 $0.00

$36.00 Day 0 $0.00

$36.00 Day 0 $0.00

Subtotal - Meals 0 $0.00

LODGING RATE* UNIT USAGE

$77.00 Day 0 $0.00

$77.00 Day 0 $0.00

$77.00 Day 0 $0.00

$77.00 Day 0 $0.00

*Rate may be higher based on geographical location or special events. Subtotal - Lodging $0.00

TOTAL MEALS AND LODGING $0.00

EQUIPMENT PROCUREMENT

Provider List of Equipment RATE UNIT USAGE TOTAL

Provider - Task # $0.00 0 $0.00

Provider - Task # $0.00 0 $0.00

Provider - Task # $0.00 0 $0.00

TOTAL EQUIPMENT PROCUREMENT $0.00

SUBCONTRACTOR

Provider Name of Sub Description of Work RATE UNIT USAGE TOTAL

Drilling (Conventional) $0.00 Lump Sum 0 $0.00

Drilling (Non-conventional) $0.00 Lump Sum 0 $0.00

Mobile Laboratory $0.00 Lump Sum 0 $0.00

Surveying $0.00 Lump Sum 0 $0.00

IDW $0.00 Drum 0 $0.00

Utilities $0.00 0 $0.00

Other Sub 1 - Task # $0.00 0 $0.00

Other Sub 2- Task # $0.00 0 $0.00

Other Sub 3 - Task # $0.00 0 $0.00

TOTAL SUBCONTRACTOR $0.00

LABORATORY and SAMPLE SHIPMENTS

ANALYSIS/PARAMETER FAST TURNAROUND RATE (%) No. for Fast Turnaround Rate RATE Media No. of Samples No. of QA/QC Fast Turn- Around Charges TOTAL

EPA 8021 B VOCs - Hall/PID Series $100 Water/Soil 0 $0.00 $0.00

EPA 8260B VOCs $135 Water/Soil 0 $0.00 $0.00

TO-15 VOCs $200 Air 0 $0.00 $0.00

TCLP/SPLP Bottle extraction $40 Soil 0 $0.00 $0.00

EPA 8270 BNAs $220 Water/Soil 0 $0.00 $0.00

EPA 8270/8310 PAHs - Low Level $100 Water/Soil 0 $0.00 $0.00

FL-PRO TRPH $84 Water/Soil 0 $0.00 $0.00

Digestion $6.00 Water/Soil 0 $0.00 $0.00

$0.00 $0.00

$0.00 $0.00

$0.00 $0.00

$0.00 $0.00

$0.00 $0.00

$0.00 $0.00

*Rate negotiated. Subtotal-Lab Analyses 0 0 $0.00 $0.00

SAMPLE SHIPMENTS

CONTAINER SIZEShipment Method
24 hrNo. of ContainersShipment Method
2 dayNo. of ContainersIceNo. of ContainersTOTAL

Small (<50 lbs.) $63.00 0 $35.00 0 $5.00 0 $0.00

Large (>50 lbs. < 70 lbs.) $104.00 0 $60.00 0 $5.00 0 $0.00

Subtotal-Sample Shipments $0.00

TOTAL LABORATORY and SHIPMENTS $0.00

FIELD EXPENSES

Personal Protection

ITEM RATE UNIT USAGE TOTAL

Level B $172.50 Per Man Day 0 $0.00

Level C $110.00 Per Man Day 0 $0.00

Level D $28.00 Per Man Day 0 $0.00

SUBTOTAL - PERSONAL PROTECTION $0.00

Expendables

ITEM RATE UNIT USAGE TOTAL ITEM TOTAL

Expendables $32.50 Day 0 $0.00

SUBTOTAL - EXPENDABLES $0.00

Drilling Related Equipment

RATE UNIT USAGE

Well Locks $3.40 ea 0 $0.00

2" Well Caps $10.20 ea 0 $0.00

4" Well Caps $14.55 ea 0 $0.00

$0.00 ea 0 $0.00

SUBTOTAL - DRILLING RELATED EQUIPMENT $0.00

Analytical Related Equipment

RATE ITEM UNIT NO OF ITEMS USAGE TOTAL ITEM

Soil Sampling Kit (Corer, generator, auger, WL ind.) $208.55 day 0 0 $0.00

FID/PID Combination OVA $106.70 day 0 0 $0.00

Multiprobe 9000 (ph, cond, temp, do, redox) $126.10 day 0 0 $0.00

Multiprobe 9000 (ph, cond, temp, do, redox) $504.40 week 0 0 $0.00

Shallow GW Sampling Kit (WL ind., Per Pump, Multiprobe, turb meter, and flow cell) $208.55 day 0 0 $0.00

Construction/O&M Supplies (Various items for work/repair) $63.05 day 0 0 $0.00

Turbidity Meter $24.25 day 0 0 $0.00

$0 1 0 $0.00

$0 1 0 $0.00

$0 1 0 $0.00

SUBTOTAL - ANALYTICAL RELATED EQUIPMENT $0.00

IDW Related Equipment

55-Gal Drum $58.20 0 $0.00

$0.00

SUBTOTAL - IDW RELATED EQUIPMENT $0.00

Other Equipment

RATE ITEM UNIT NO OF ITEMS USAGE TOTAL ITEM

Tedlar Bag $14.55 ea 0 0 $0.00

Peristaltic Tubing (Silicon 3/8 x 5/8) $3.20 ft 0 0 $0.00

Disposable Bailers (HDPE) $4.85 ea 0 0 $0.00

Peristaltic Pump $29.10 day 0 0 $0.00

Water Level Indicator $19.40 day 0 0 $0.00

Color-Tec Kit $19.40 day 0 0 $0.00

PCE Detection Tubes $67.90 10 pack 0 0 $0.00

Vacuum Gauges $19.40 ea 0 0 $0.00

Teflon Tubing (1/4 inch OD) $1.95 ft 0 0 $0.00

HDPE Poly tubing (1/4 inch OD) $0.25 ft 0 0 $0.00

Total Survey Station $41.75 day 0 0 $0.00

Water level indicator $19.40 day 0 0 $0.00

Hand Held GPS $25.25 day 0 0 $0.00

*Rate negotiated. SUBTOTAL - OTHER EQUIPMENT $0.00

FIELD EXPENSES $0.00

&L&"Arial,Regular"&8&F/&A&R&"Arial,Regular"&8Page 8

AFTER COMPLETING ALL ENTRIES FOR SHEET, HIDE UNUSED LINES.

JMTudor:

AIRFARE IS TO BE NOTED AS RT (ROUNDTRIP) OR OW (FOR ONE-WAY). ADD $28 FEE INTO RATE.

USE HIGHER LODGING RATE IF GEOGRAPHICAL AREA HAS HIGHER LODGING RATE. ALSO CHECK FOR SPECIAL EVENTS IN AREA AND OFFER COST IF THERE IS AN EVENT THAT CREATES HIGHER LODGING RATES. MAKE NOTE ON TOTAL LINE EXPLAINING HIGHER RATE REASON. NOTE: LODGING SALES TAX CANNOT BE ADDED INTO THE COST SHEET.

SITE: Blue Water Express Wash

SUBTASK NO.: 5 DESCRIPTION: 0

DATE: December 21, 2016 FACILITY ID NO.: FLT070079090

TASK NO: CSS-14B

LABOR HOURS

Labor Category Work Description Hours

Principal

Powell

Brown

Chief

Stephens

Ringo

Kennedy

Harter

Kelso

Senior

Maldonado

Krajewski

Meyers

Elliott

Moore

Taravella

Associate

Rhyne

Thanawastien

Hammond

Fowler

Vaughan

Junior

Bender

Oien

Fluitt

Technician

N/A

Clerical

Diez

Benson

TOTAL LABOR HOURS 0.00

VEHICLE RENTAL

ITEM RATE UNIT USAGE TOTAL

Automobile $68.00 Day 0 $0.00

Equipment Truck/Van $97.00 Day 0 $0.00

Equipment Truck/Van $420.00 Week 0 $0.00

TOTAL VEHICLE RENTAL $0.00

MILEAGE AND AIRFARE

ITEM RATE UNIT USAGE TOTAL

Mileage INCLUDED IN VEHICLE RENTAL RATE $0.00

Airfare $0.00

TOTAL MILEAGE AND AIRFARE $0.00

MEALS AND LODGING

ITEM Labor Category RATE UNIT USAGE TOTAL

MEALS

$36.00 Day 0 $0.00

$36.00 Day 0 $0.00

$36.00 Day 0 $0.00

$36.00 Day 0 $0.00

Subtotal - Meals 0 $0.00

LODGING RATE* UNIT USAGE

$77.00 Day 0 $0.00

$77.00 Day 0 $0.00

$77.00 Day 0 $0.00

$77.00 Day 0 $0.00

*Rate may be higher based on geographical location or special events. Subtotal - Lodging $0.00

TOTAL MEALS AND LODGING $0.00

EQUIPMENT PROCUREMENT

Provider List of Equipment RATE UNIT USAGE TOTAL

Provider - Task # $0.00 0 $0.00

Provider - Task # $0.00 0 $0.00

Provider - Task # $0.00 0 $0.00

TOTAL EQUIPMENT PROCUREMENT $0.00

SUBCONTRACTOR

Provider Name of Sub Description of Work RATE UNIT USAGE TOTAL

Drilling (Conventional) $0.00 Lump Sum 0 $0.00

Drilling (Non-conventional) $0.00 Lump Sum 0 $0.00

Mobile Laboratory $0.00 Lump Sum 0 $0.00

Surveying $0.00 Lump Sum 0 $0.00

IDW $0.00 Drum 0 $0.00

Utilities $0.00 0 $0.00

Other Sub 1 - Task # $0.00 0 $0.00

Other Sub 2- Task # $0.00 0 $0.00

Other Sub 3 - Task # $0.00 0 $0.00

TOTAL SUBCONTRACTOR $0.00

LABORATORY and SAMPLE SHIPMENTS

ANALYSIS/PARAMETER FAST TURNAROUND RATE (%) No. for Fast Turnaround Rate RATE Media No. of Samples No. of QA/QC Fast Turn- Around Charges TOTAL

EPA 8021 B VOCs - Hall/PID Series $100 Water/Soil 0 $0.00 $0.00

EPA 8260B VOCs $135 Water/Soil 0 $0.00 $0.00

TO-15 VOCs $200 Air 0 $0.00 $0.00

TCLP/SPLP Bottle extraction $40 Soil 0 $0.00 $0.00

EPA 8270 BNAs $220 Water/Soil 0 $0.00 $0.00

EPA 8270/8310 PAHs - Low Level $100 Water/Soil 0 $0.00 $0.00

FL-PRO TRPH $84 Water/Soil 0 $0.00 $0.00

Digestion $6.00 Water/Soil 0 $0.00 $0.00

$0.00 $0.00

$0.00 $0.00

$0.00 $0.00

$0.00 $0.00

$0.00 $0.00

$0.00 $0.00

*Rate negotiated. Subtotal-Lab Analyses 0 0 $0.00 $0.00

SAMPLE SHIPMENTS

CONTAINER SIZEShipment Method
24 hrNo. of ContainersShipment Method
2 dayNo. of ContainersIceNo. of ContainersTOTAL

Small (<50 lbs.) $63.00 0 $35.00 0 $5.00 0 $0.00

Large (>50 lbs. < 70 lbs.) $104.00 0 $60.00 0 $5.00 0 $0.00

Subtotal-Sample Shipments $0.00

TOTAL LABORATORY and SHIPMENTS $0.00

FIELD EXPENSES

Personal Protection

ITEM RATE UNIT USAGE TOTAL

Level B $172.50 Per Man Day 0 $0.00

Level C $110.00 Per Man Day 0 $0.00

Level D $28.00 Per Man Day 0 $0.00

SUBTOTAL - PERSONAL PROTECTION $0.00

Expendables

ITEM RATE UNIT USAGE TOTAL ITEM TOTAL

Expendables $32.50 Day 0 $0.00

SUBTOTAL - EXPENDABLES $0.00

Drilling Related Equipment

RATE UNIT USAGE

Well Locks $3.40 ea 0 $0.00

2" Well Caps $10.20 ea 0 $0.00

4" Well Caps $14.55 ea 0 $0.00

$0.00 ea 0 $0.00

SUBTOTAL - DRILLING RELATED EQUIPMENT $0.00

Analytical Related Equipment

RATE ITEM UNIT NO OF ITEMS USAGE TOTAL ITEM

Soil Sampling Kit (Corer, generator, auger, WL ind.) $208.55 day 0 0 $0.00

FID/PID Combination OVA $106.70 day 0 0 $0.00

Multiprobe 9000 (ph, cond, temp, do, redox) $126.10 day 0 0 $0.00

Multiprobe 9000 (ph, cond, temp, do, redox) $504.40 week 0 0 $0.00

Shallow GW Sampling Kit (WL ind., Per Pump, Multiprobe, turb meter, and flow cell) $208.55 day 0 0 $0.00

Construction/O&M Supplies (Various items for work/repair) $63.05 day 0 0 $0.00

Turbidity Meter $24.25 day 0 0 $0.00

$0 0 0 $0.00

$0 0 0 $0.00

$0 0 0 $0.00

SUBTOTAL - ANALYTICAL RELATED EQUIPMENT $0.00

IDW Related Equipment

55-Gal Drum $58.20 0 $0.00

$0.00

SUBTOTAL - IDW RELATED EQUIPMENT $0.00

Other Equipment

RATE ITEM UNIT NO OF ITEMS USAGE TOTAL ITEM

Tedlar Bag $14.55 ea 0 0 $0.00

Peristaltic Tubing (Silicon 3/8 x 5/8) $3.20 ft 0 0 $0.00

Disposable Bailers (HDPE) $4.85 ea 0 0 $0.00

Peristaltic Pump $29.10 day 0 0 $0.00

Water Level Indicator $19.40 day 0 0 $0.00

Color-Tec Kit $19.40 day 0 0 $0.00

PCE Detection Tubes $67.90 10 pack 0 0 $0.00

Vacuum Gauges $19.40 ea 0 0 $0.00

Teflon Tubing (1/4 inch OD) $1.95 ft 0 0 $0.00

HDPE Poly tubing (1/4 inch OD) $0.25 ft 0 0 $0.00

Total Survey Station $41.75 day 0 0 $0.00

Water level indicator $19.40 day 0 0 $0.00

Hand Held GPS $25.25 day 0 0 $0.00

*Rate negotiated. SUBTOTAL - OTHER EQUIPMENT $0.00

FIELD EXPENSES $0.00

&L&"Arial,Regular"&8&F/&A&R&"Arial,Regular"&8Page 9

AFTER COMPLETING ALL ENTRIES FOR SHEET, HIDE UNUSED LINES.

JMTudor:

AIRFARE IS TO BE NOTED AS RT (ROUNDTRIP) OR OW (FOR ONE-WAY). ADD $28 FEE INTO RATE.

USE HIGHER LODGING RATE IF GEOGRAPHICAL AREA HAS HIGHER LODGING RATE. ALSO CHECK FOR SPECIAL EVENTS IN AREA AND OFFER COST IF THERE IS AN EVENT THAT CREATES HIGHER LODGING RATES. MAKE NOTE ON TOTAL LINE EXPLAINING HIGHER RATE REASON. NOTE: LODGING SALES TAX CANNOT BE ADDED INTO THE COST SHEET.

SITE: Blue Water Express Wash

SUBTASK NO.: 6 DESCRIPTION: 0

DATE: December 21, 2016 FACILITY ID NO.: FLT070079090

TASK NO: CSS-14B

LABOR HOURS

Labor Category Work Description Hours

Principal

Powell

Brown

Chief

Stephens

Ringo

Kennedy

Harter

Kelso

Senior

Maldonado

Krajewski

Meyers

Elliott

Moore

Taravella

Associate

Rhyne

Thanawastien

Hammond

Fowler

Vaughan

Junior

Bender

Oien

Fluitt

Technician

N/A

Clerical

Diez

Benson

TOTAL LABOR HOURS 0.00

VEHICLE RENTAL

ITEM RATE UNIT USAGE TOTAL

Automobile $68.00 Day 0 $0.00

Equipment Truck/Van $97.00 Day 0 $0.00

Equipment Truck/Van $420.00 Week 0 $0.00

TOTAL VEHICLE RENTAL $0.00

MILEAGE AND AIRFARE

ITEM RATE UNIT USAGE TOTAL

Mileage INCLUDED IN VEHICLE RENTAL RATE $0.00

Airfare $0.00

TOTAL MILEAGE AND AIRFARE $0.00

MEALS AND LODGING

ITEM Labor Category RATE UNIT USAGE TOTAL

MEALS

$36.00 Day 0 $0.00

$36.00 Day 0 $0.00

$36.00 Day 0 $0.00

$36.00 Day 0 $0.00

Subtotal - Meals 0 $0.00

LODGING RATE* UNIT USAGE

$77.00 Day 0 $0.00

$77.00 Day 0 $0.00

$77.00 Day 0 $0.00

$77.00 Day 0 $0.00

*Rate may be higher based on geographical location or special events. Subtotal - Lodging $0.00

TOTAL MEALS AND LODGING $0.00

EQUIPMENT PROCUREMENT

Provider List of Equipment RATE UNIT USAGE TOTAL

Provider - Task # $0.00 0 $0.00

Provider - Task # $0.00 0 $0.00

Provider - Task # $0.00 0 $0.00

TOTAL EQUIPMENT PROCUREMENT $0.00

SUBCONTRACTOR

Provider Name of Sub Description of Work RATE UNIT USAGE TOTAL

Drilling (Conventional) $0.00 Lump Sum 0 $0.00

Drilling (Non-conventional) $0.00 Lump Sum 0 $0.00

Mobile Laboratory $0.00 Lump Sum 0 $0.00

Surveying $0.00 Lump Sum 0 $0.00

IDW $0.00 Drum 0 $0.00

Utilities $0.00 0 $0.00

Other Sub 1 - Task # $0.00 0 $0.00

Other Sub 2- Task # $0.00 0 $0.00

Other Sub 3 - Task # $0.00 0 $0.00

TOTAL SUBCONTRACTOR $0.00

LABORATORY and SAMPLE SHIPMENTS

ANALYSIS/PARAMETER FAST TURNAROUND RATE (%) No. for Fast Turnaround Rate RATE Media No. of Samples No. of QA/QC Fast Turn- Around Charges TOTAL

EPA 8021 B VOCs - Hall/PID Series $100 Water/Soil 0 $0.00 $0.00

EPA 8260B VOCs $135 Water/Soil 0 $0.00 $0.00

TO-15 VOCs $200 Air 0 $0.00 $0.00

TCLP/SPLP Bottle extraction $40 Soil 0 $0.00 $0.00

EPA 8270 BNAs $220 Water/Soil 0 $0.00 $0.00

EPA 8270/8310 PAHs - Low Level $100 Water/Soil 0 $0.00 $0.00

FL-PRO TRPH $84 Water/Soil 0 $0.00 $0.00

Digestion $6.00 Water/Soil 0 $0.00 $0.00

$0.00 $0.00

$0.00 $0.00

$0.00 $0.00

$0.00 $0.00

$0.00 $0.00

$0.00 $0.00

*Rate negotiated. Subtotal-Lab Analyses 0 0 $0.00 $0.00

SAMPLE SHIPMENTS

CONTAINER SIZEShipment Method
24 hrNo. of ContainersShipment Method
2 dayNo. of ContainersIceNo. of ContainersTOTAL

Small (<50 lbs.) $63.00 0 $35.00 0 $5.00 0 $0.00

Large (>50 lbs. < 70 lbs.) $104.00 0 $60.00 0 $5.00 0 $0.00

Subtotal-Sample Shipments $0.00

TOTAL LABORATORY and SHIPMENTS $0.00

FIELD EXPENSES

Personal Protection

ITEM RATE UNIT USAGE TOTAL

Level B $172.50 Per Man Day 0 $0.00

Level C $110.00 Per Man Day 0 $0.00

Level D $28.00 Per Man Day 0 $0.00

SUBTOTAL - PERSONAL PROTECTION $0.00

Expendables

ITEM RATE UNIT USAGE TOTAL ITEM TOTAL

Expendables $32.50 Day 0 $0.00

SUBTOTAL - EXPENDABLES $0.00

Drilling Related Equipment

RATE UNIT USAGE

Well Locks $3.40 ea 0 $0.00

2" Well Caps $10.20 ea 0 $0.00

4" Well Caps $14.55 ea 0 $0.00

$0.00 ea 0 $0.00

SUBTOTAL - DRILLING RELATED EQUIPMENT $0.00

Analytical Related Equipment

RATE ITEM UNIT NO OF ITEMS USAGE TOTAL ITEM

Soil Sampling Kit (Corer, generator, auger, WL ind.) $208.55 day 0 0 $0.00

FID/PID Combination OVA $106.70 day 0 0 $0.00

Multiprobe 9000 (ph, cond, temp, do, redox) $126.10 day 0 0 $0.00

Multiprobe 9000 (ph, cond, temp, do, redox) $504.40 week 0 0 $0.00

Shallow GW Sampling Kit (WL ind., Per Pump, Multiprobe, turb meter, and flow cell) $208.55 day 0 0 $0.00

Construction/O&M Supplies (Various items for work/repair) $63.05 day 0 0 $0.00

Turbidity Meter $24.25 day 0 0 $0.00

$0 0 0 $0.00

$0 0 0 $0.00

$0 0 0 $0.00

SUBTOTAL - ANALYTICAL RELATED EQUIPMENT $0.00

IDW Related Equipment

55-Gal Drum $58.20 0 $0.00

$0.00

SUBTOTAL - IDW RELATED EQUIPMENT $0.00

Other Equipment

RATE ITEM UNIT NO OF ITEMS USAGE TOTAL ITEM

Tedlar Bag $14.55 ea 0 0 $0.00

Peristaltic Tubing…