This is a Task Assignment Notification Form for DEP Contract No. HW553, issued by the Florida Department of Environmental Protection (FDEP) to Ecology and Environment, Inc. (E&E). The task assignment (CSS-14B, Module CERSI, Grant CER15) is managed by FDEP Contract Manager Ferda Yilmaz and executed by E&E Contractor Representative Richard Stephens. The work is located at the Blue Water Express Wash site (8714 Atlantic Boulevard, Jacksonville, Duval County, Florida), identified as COM #282005, a hazardous waste site with ID FLT070079090.
The task assignment covers Program Management (Subtask 1), Site Inspection Field Investigation (Subtask 2), and SI Report preparation (Subtask 3), with a final deliverable of a Site Inspection Report due May 10, 2017, and execution through June 10, 2017. The total task assignment value is $27,262.37 on a fixed-price basis with no fee schedule, cost reimbursement, or retainage. Invoicing is structured as follows: Site Inspection Fieldnotes ($19,687.45) and Site Inspection Report ($7,574.92). The cost estimate includes direct labor for multiple personnel categories totaling 212.5 hours, travel expenses ($2,038.00), drilling services via subcontractor Probe Domain ($2,400.00 with 10% handling fee), sample shipping ($1,352.00), and field expenses ($1,449.46), with a 10% completion fee applied to total labor costs.
View the file
Other files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
From: Stephens, Richard To: Yilmaz, Ferda Cc: Conner, Padraic Subject: RE: Blue Water Cost proposal Date: Thursday, December 22, 2016 1:30:04 PM Attachments: Blue Water Field and Report 12212016.xls
Ferda and Padraic:
Please find attached the revised cost sheet for the Blue Water Express Wash.
I addressed all the comments, however based on adding the cyanides to the analysis I had originally under calculated the number of coolers. I now have 8 shipping overnight with samples and 8 returning (2-day), and 8 coolers for ice.
Additionally I had calculated 1-day for the turbidity meter with the GW sampling kit and 1-day during the well install for development (total 2 days). However, I went ahead and removed that additional day as it is not an issue..
Thank you
Richard A. Stephens 325 John Knox Road, Building F, Suite 140, Tallahassee, Florida 32303 Phone: 850-523-0954 Ext: 3915 • Cell: 850-933-7519 rstephens@ene.com • www.ene.com
From: Yilmaz, Ferda [mailto:Ferda.Yilmaz@dep.state.fl.us] Sent: Thursday, December 22, 2016 10:42 AM To: Stephens, Richard Cc: Conner, Padraic Subject: RE: Blue Water Cost proposal
Richard, That’s what I thought. The cost proposal needs some revisions though.
Automobile: you need to use the weekly rate instead of 5days -$272 Turbidity meter: we need to remove that because it is included in the shallow GW sampling kit Hand augers: $8.25 according to your contract Shipment: you have 12 containers for 24hr. Cooler returns should be 2 day shipping.
Inline filters?
Total survey station?
Thank you, Ferda
From: Stephens, Richard [mailto:RStephens@ene.com] Sent: Thursday, December 22, 2016 10:25 AM To: Yilmaz, Ferda <Ferda.Yilmaz@dep.state.fl.us> Subject: Re: Blue Water Cost proposal mailto:RStephens@ene.com mailto:Ferda.Yilmaz@dep.state.fl.us mailto:Padraic.Conner@dep.state.fl.us http://www.ene.com/ mailto:emailaddress@ene.com http://www.ene.com/ mailto:RStephens@ene.com mailto:Ferda.Yilmaz@dep.state.fl.us
Sheet1
Ecology and Environment, Inc.
FDEP Contract HW553
Personnel Roster
April 8, 2016
Contract HW553 min/max rates
Last Name First Name Category Hourly Rate minimum maximum
Principal $47.17 $64.01
Powell Brenda PR $51.92
Brown Neil PR $57.69
Chief $33.18 $48.10
Stephens Richard CH $35.10
Ringo Christina CH $38.50
Kennedy Daniel CH $38.61
Harter Erick CH $39.42
Kelso Perry CH $42.15
Senior $25.04 $39.09
Maldonado Rafael SR $31.10
Krajewski Kevin SR $31.25
Meyers Eric SR $32.79
Elliott Steven SR $34.25
Moore K. Mark SR $34.63
Taravella James SR $35.58
Associate $20.00 $28.09
Rhyne Jessica AS $21.91
Thanawastien Tiara AS $26.49
Hammond Helen AS $27.43
Fowler Heather AS $28.09
Vaughan Kristin AS $28.09
Junior $20.00 $24.47
Bender Eric JR $20.67
Oien Erik JR $20.80
Fluitt Nicole JR $22.12
Technician $18.72 $18.72
N/A TE $18.72
Clerical $16.38 $22.28
Diez Odalys SE $13.30
Benson Debra SE $15.33
Cost Estimate
Template to be used as of April 15, 2016
Labor rates are approved by FDEP on April 11, 2016
Contractor: Ecology and Environment, Inc.
Date: December 21, 2016
Task #: CSS-14B SubTask 1 PROGRAM MANAGEMENT SubTask 6 SubTask 11 SubTask 16
Site: Blue Water Express Wash SubTask 2 Si Field Invesitgation SubTask 7 SubTask 12 SubTask 17
Site ID #: FLT070079090 SubTask 3 Si Report SubTask 8 SubTask 13 SubTask 18
Activity/Phase: Field and Report SubTask 4 SubTask 9 SubTask 14 SubTask 19
Project Manager: FDEP: Conner / E & E: Stephens SubTask 5 SubTask 10 SubTask 15 SubTask 20
10OHBOA.3077.98
Labor Rate Category Totals 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
$35.10 Project Manager - Richard Stephens 20.5 20.544
Principal
$51.92 Powell 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
$57.69 Brown 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Chief
$35.10 Stephens 64.0 40.0 24.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
$38.50 Ringo 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
$38.61 Kennedy 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
$39.42 Harter 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
$42.15 Kelso 4.0 0.0 4.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Senior
$31.10 Maldonado 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
$31.25 Krajewski 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
$32.79 Meyers 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
$34.25 Elliott 48.0 48.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
$34.63 Moore 8.0 0.0 8.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
$35.58 Taravella 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Associate
$21.91 Rhyne 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
$26.49 Thanawastien 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
$27.43 Hammond 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
$28.09 Fowler 4.0 0.0 4.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
$28.09 Vaughan 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Junior
$20.67 Bender 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
$20.80 Oien 62.0 46.0 16.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
$22.12 Fluitt 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Technician
$18.72 N/A 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Clerical
$13.30 Diez 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
$15.33 Benson 2.0 0.0 2.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Total Hours 212.5 20.5 134.0 58.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1) Direct Labor $6,489.74 $721.08 $4,004.80 $1,763.86 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
2) Fringe (33.44% of Lines 1 ) 0.3344 $2,170.17 $241.13 $1,339.21 $589.83 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
3) Overhead (49.90% of Lines 1 + 2) 0.499 $4,321.29 $480.14 $2,666.66 $1,174.49 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
4) Gen & Admin (36.27% of Lines 1 + 2 + 3) 0.3627 $4,708.28 $523.14 $2,905.47 $1,279.67 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
5) Total Labor (Sum Lines 1 thru 4) $17,689.48 $1,965.49 $10,916.14 $4,807.85 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
6) Other Direct Costs (5.0% of Line 1) 0.05 $324.48 $36.05 $200.24 $88.19 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Travel
7a) Vehicle Rental $1,748.00 $0.00 $1,748.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
7b) Mileage Costs $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
7c) Air Fare $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
7d) Per diem + Hotel $1,378.00 $0.00 $1,378.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
7e) Total Travel $3,126.00 $0.00 $3,126.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor (Equipment Procurement)
8a) Provider - Task # $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
8b) Provider - Task # $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
8c) Provider - Task # $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
8d) Subcontractor Subtotal $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
8e) Procurement Fee $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
8f) Total Subcontractor Cost $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor (Services Procurement)
9a) Drilling (Conventional) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
9b) Drilling (Non-conventional) $2,400.00 $0.00 $2,400.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
9c) Mobile Laboratory $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
9d) Surveying $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
9e) IDW $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
9f) Utilities $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
9g) Other Sub 1 - Task # $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
9h) Other Sub 2- Task # $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
9i) Other Sub 3 - Task # $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
9j) Subcontractor Subtotal $2,400.00 $0.00 $2,400.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
9k) Handling Fee $240.00 $0.00 $240.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
9l) Total Subcontractor Cost $2,640.00 $0.00 $2,640.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Laboratory
10a) Analytical Costs (Fixed Lab) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
10b) Fast Turnaround Rate (%) (Fixed Lab) 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%
10c) Fast Turnaround Charges (Fixed Lab) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
10d) Sample Shipping $1,352.00 $0.00 $1,352.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
10e) Total Laboratory $1,352.00 $0.00 $1,352.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Field Expenses
11a) Personal Protection $252.00 $0.00 $252.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
11b) Expendables $97.50 $0.00 $97.50 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
11c) Equipment (Drilling Related) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
11d) Equipment (Analytical Related) $208.55 $0.00 $208.55 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
11e) Equipment (IDW Related) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
11f) Equipment (Other) $891.41 $0.00 $891.41 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
11g) Total Field Expenses $1,449.46 $0.00 $1,449.46 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subtotal $26,581.42 $2,001.54 $19,683.84 $4,896.04 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Completion Fee 12) (10.0% of Line 5) 0.1 $1,768.95 $196.55 $1,091.61 $480.79 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
13) Total Estimated Cost $28,350.37 $2,198.09 $20,775.45 $5,376.83 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
* Equipment Procurement - 10.0% Per Subcontractor, maximum $2,500 per Subcontractor.
** Utilities fees are calculated based on $20 per utility bill per month.
*** Except for utilities fees, 10% of first $50,000, 7% of next $50,000, 5% over $100,000 per Subcontractor.
&C&"Arial,Bold" FDEP Contract HW553 Cost Estimate
&L&"Arial,Regular"&9&F&C&"Arial,Regular"&9&D&R&"Arial,Regular"&9Page &P
HOURS WILL CALCULATE AUTOMATICALLY
ENTER NAME and RATE FOR SPECIFIC PROJECT MGR
Formula Sheet
DSUMs for LABOR Task 1 Task 2 Task 3 Task 4 Task 5 Task 6 Task 7 Task 8 Task 9 Task 10 Task 11 Task 12 Task 13 Task 14 Task 15 Task 16 Task 17 Task 18 Task 19 Task 20
Powell 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
Brown 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
Stephens 0 40 24 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
Ringo 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
Kennedy 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
Harter 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
Kelso 0 0 4 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
Maldonado 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
Krajewski 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
Meyers 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
Elliott 0 48 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
Moore 0 0 8 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
Taravella 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
Rhyne 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
Thanawastien 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
Hammond 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
Fowler 0 0 4 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
Vaughan 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
Bender 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
Oien 0 46 16 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
Fluitt 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
N/A 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
Diez 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
Benson 0 0 2 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 134 58 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
Labor Costs $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $1,404.00 $842.40 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $168.60 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $1,644.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $277.04 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $112.36 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $956.80 $332.80 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $30.66 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 total labor dollars $0.00 $4,004.80 $1,763.86 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor Provider - Task # $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Procurement Provider - Task # $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Fee Provider - Task # $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor Drilling (Conventional) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Handling Fee Drilling (Non-conventional) $0.00 $240.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Mobile Laboratory $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Surveying $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
IDW $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Utilities $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Other Sub 1 - Task # $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Other Sub 2- Task # $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Other Sub 2- Task # $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $240.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Laboratory Fast Turnaround $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
CRITERIA RANGES FOR LOOKUPS FOR LABOR SUMS
Labor Category Labor Category Labor Category Labor Category Labor Category Labor Category Labor Category Labor Category Labor Category Labor Category Labor Category Labor Category Labor Category Labor Category Labor Category Labor Category Labor Category Labor Category Labor Category Labor Category Labor Category Labor Category Labor Category Labor Category
Powell Brown Stephens Ringo Kennedy Harter Kelso Maldonado Krajewski Meyers Elliott Moore Taravella Rhyne Thanawastien Hammond Fowler Vaughan Bender Oien Fluitt N/A Diez Benson
PRINCPAL PRINCPAL CHIEF CHIEF CHIEF CHIEF CHIEF SENIOR SENIOR SENIOR SENIOR SENIOR SENIOR ASSOCIATE ASSOCIATE ASSOCIATE ASSOCIATE ASSOCIATE JUNIOR JUNIOR JUNIOR TECHNICIAN CLERICAL CLERICAL
&C&"CG Times,Bold"&16FDEP COST ESTIMATE
COSTPROJ.XLS&RPage &P
SITE: Blue Water Express Wash
SUBTASK NO.: 1 DESCRIPTION: PROGRAM MANAGEMENT
DATE: December 21, 2016 FACILITY ID NO.: FLT070079090
TASK NO: CSS-14B FOR PM ONLY….HOURS CALC AUTOMATICALLY ON COST EST SHEET
LABOR HOURS
Labor Category Work Description Hours
Principal 0
Chief 0
Senior 0
Associate 0
Junior 0
Technician 0
Clerical 0
TOTAL LABOR HOURS 0.00
VEHICLE RENTAL
ITEM RATE UNIT USAGE TOTAL
Automobile $68.00 Day 0 $0.00
Equipment Truck/Van $97.00 Day 0 $0.00
Equipment Truck/Van $420.00 Week 0 $0.00
TOTAL VEHICLE RENTAL $0.00
MILEAGE AND AIRFARE
ITEM RATE UNIT USAGE TOTAL
Mileage INCLUDED IN VEHICLE RENTAL RATE $0.00
Airfare $0.00
TOTAL MILEAGE AND AIRFARE $0.00
MEALS AND LODGING
ITEM Labor Category RATE UNIT USAGE TOTAL
MEALS
$36.00 Day 0 $0.00
$36.00 Day 0 $0.00
$36.00 Day 0 $0.00
$36.00 Day 0 $0.00
Subtotal - Meals 0 $0.00
LODGING RATE* UNIT USAGE
$77.00 Day 0 $0.00
$77.00 Day 0 $0.00
$77.00 Day 0 $0.00
$77.00 Day 0 $0.00
*Rate may be higher based on geographical location or special events. Subtotal - Lodging $0.00
TOTAL MEALS AND LODGING $0.00
EQUIPMENT PROCUREMENT
Provider List of Equipment RATE UNIT USAGE TOTAL
Provider - Task # $0.00 0 $0.00
Provider - Task # $0.00 0 $0.00
Provider - Task # $0.00 0 $0.00
TOTAL EQUIPMENT PROCUREMENT $0.00
SUBCONTRACTOR
Provider Name of Sub Description of Work RATE UNIT USAGE TOTAL
Drilling (Conventional) $0.00 Lump Sum 0 $0.00
Drilling (Non-conventional) $0.00 Lump Sum 0 $0.00
Mobile Laboratory $0.00 Lump Sum 0 $0.00
Surveying $0.00 Lump Sum 0 $0.00
IDW $0.00 Drum 0 $0.00
Utilities $0.00 0 $0.00
Other Sub 1 - Task # $0.00 0 $0.00
Other Sub 2- Task # $0.00 0 $0.00
Other Sub 3 - Task # $0.00 0 $0.00
TOTAL SUBCONTRACTOR $0.00
LABORATORY and SAMPLE SHIPMENTS
ANALYSIS/PARAMETER FAST TURNAROUND RATE (%) No. for Fast Turnaround Rate RATE Media No. of Samples No. of QA/QC Fast Turn- Around Charges TOTAL
EPA 8021 B VOCs - Hall/PID Series $100 Water/Soil 0 $0.00 $0.00
EPA 8260B VOCs $135 Water/Soil 0 $0.00 $0.00
TO-15 VOCs $200 Air 0 $0.00 $0.00
TCLP/SPLP Bottle extraction $40 Soil 0 $0.00 $0.00
EPA 8270 BNAs $220 Water/Soil 0 $0.00 $0.00
EPA 8270/8310 PAHs - Low Level $100 Water/Soil 0 $0.00 $0.00
FL-PRO TRPH $84 Water/Soil 0 $0.00 $0.00
Digestion $6.00 Water/Soil 0 $0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
*Rate negotiated. Subtotal-Lab Analyses 0 0 $0.00 $0.00
SAMPLE SHIPMENTS
| CONTAINER SIZE | Shipment Method | |||
| 24 hr | No. of Containers | Shipment Method | ||
| 2 day | No. of Containers | Ice | No. of Containers | TOTAL |
Small (<50 lbs.) $63.00 0 $35.00 0 $5.00 0 $0.00
Large (>50 lbs. < 70 lbs.) $104.00 0 $60.00 0 $5.00 0 $0.00
Subtotal-Sample Shipments $0.00
TOTAL LABORATORY and SHIPMENTS $0.00
FIELD EXPENSES
Personal Protection
ITEM RATE UNIT USAGE TOTAL
Level B $172.50 Per Man Day 0 $0.00
Level C $110.00 Per Man Day 0 $0.00
Level D $28.00 Per Man Day 0 $0.00
SUBTOTAL - PERSONAL PROTECTION $0.00
Expendables
ITEM RATE UNIT USAGE TOTAL ITEM TOTAL
Expendables $32.50 Day 0 $0.00
SUBTOTAL - EXPENDABLES $0.00
Drilling Related Equipment
RATE UNIT USAGE
Well Locks $3.40 ea 0 $0.00
2" Well Caps $10.20 ea 0 $0.00
4" Well Caps $14.55 ea 0 $0.00
$0.00 ea 0 $0.00
SUBTOTAL - DRILLING RELATED EQUIPMENT $0.00
Analytical Related Equipment
RATE ITEM UNIT NO OF ITEMS USAGE TOTAL ITEM
Soil Sampling Kit (Corer, generator, auger, WL ind.) $208.55 day 1 0 $0.00
FID/PID Combination OVA $106.70 day 1 0 $0.00
Multiprobe 9000 (ph, cond, temp, do, redox) $126.10 day 1 0 $0.00
Multiprobe 9000 (ph, cond, temp, do, redox) $504.40 week 1 0 $0.00
Shallow GW Sampling Kit (WL ind., Per Pump, Multiprobe, turb meter, and flow cell) $208.55 day 1 0 $0.00
Construction/O&M Supplies (Various items for work/repair) $63.05 day 1 0 $0.00
$0 1 0 $0.00
$0 1 0 $0.00
$0 1 0 $0.00
$0 1 0 $0.00
SUBTOTAL - ANALYTICAL RELATED EQUIPMENT $0.00
IDW Related Equipment
55-Gal Drum $58.20 0 $0.00
$0.00
SUBTOTAL - IDW RELATED EQUIPMENT $0.00
Other Equipment
RATE ITEM UNIT NO OF ITEMS USAGE TOTAL ITEM
Tedlar Bag $14.55 ea 1 0 $0.00
Peristaltic Tubing (Silicon 3/8 x 5/8) $3.20 ft 1 0 $0.00
Disposable Bailers (HDPE) $4.85 ea 1 0 $0.00
Peristaltic Pump $29.10 day 1 0 $0.00
Water Level Indicator $19.40 day 1 0 $0.00
Color-Tec Kit $19.40 day 1 0 $0.00
PCE Detection Tubes $67.90 10 pack 1 0 $0.00
Vacuum Gauges $19.40 ea 1 0 $0.00
Teflon Tubing (1/4 inch OD) $1.95 ft 1 0 $0.00
HDPE Poly tubing (1/4 inch OD) $0.25 ft 1 0 $0.00
$0.00 1 0 $0.00
$0.00 1 0 $0.00
$0.00 1 0 $0.00
*Rate negotiated. SUBTOTAL - OTHER EQUIPMENT $0.00
FIELD EXPENSES $0.00
&L&"Arial,Regular"&9&F/&A&R&"Arial,Regular"&9Page 5
JMTudor:
AFTER COMPLETING ALL ENTRIES FOR SHEET, HIDE UNUSED LINES.
JMTudor:
USE HIGHER LODGING RATE IF GEOGRAPHICAL AREA HAS HIGHER LODGING RATE. ALSO CHECK FOR SPECIAL EVENTS IN AREA AND OFFER COST IF THERE IS AN EVENT THAT CREATES HIGHER LODGING RATES. MAKE NOTE ON TOTAL LINE EXPLAINING HIGHER RATE REASON. NOTE: LODGING SALES TAX CANNOT BE ADDED INTO THE COST SHEET.
AIRFARE IS TO BE NOTED AS RT (ROUNDTRIP) OR OW (FOR ONE-WAY). ADD $28 FEE INTO RATE.
SITE: Blue Water Express Wash
SUBTASK NO.: 2 DESCRIPTION: Si Field Invesitgation
DATE: December 21, 2016 FACILITY ID NO.: FLT070079090
TASK NO: CSS-14B
LABOR HOURS
Labor Category Work Description Hours
Principal
Powell
Brown
Chief
Stephens mob/demob, Field investigation 40
Ringo
Kennedy
Harter
Kelso
Senior
Maldonado
Krajewski
Meyers
Elliott Scribe setup, Field Investigation and Scribe downloads 48
Moore
Taravella
Associate
Rhyne
Thanawastien
Hammond
Fowler
Vaughan
Junior
Bender
Oien warehouse setup, mob/demob, field invetsigation 46
Fluitt
Technician
N/A
Clerical
Diez
Benson
TOTAL LABOR HOURS 134.00
VEHICLE RENTAL
ITEM RATE UNIT USAGE TOTAL
Automobile $272.00 Day 5 $1,360.00
Equipment Truck/Van $97.00 Day 4 $388.00
Equipment Truck/Van $420.00 Week 0 $0.00
TOTAL VEHICLE RENTAL $1,748.00
MILEAGE AND AIRFARE
ITEM RATE UNIT USAGE TOTAL
Mileage INCLUDED IN VEHICLE RENTAL RATE $0.00
Airfare $0.00
TOTAL MILEAGE AND AIRFARE $0.00
MEALS AND LODGING
ITEM Labor Category RATE UNIT USAGE TOTAL
MEALS
RS $36.00 Day 4 $144.00
SE $36.00 Day 5 $180.00
EO $36.00 Day 4 $144.00
$36.00 Day 0 $0.00
Subtotal - Meals 0 $468.00
LODGING RATE* UNIT USAGE
RS $91.00 Day 3 $273.00
SE $91.00 Day 4 $364.00
EO $91.00 Day 3 $273.00
$77.00 Day 0 $0.00
*Rate may be higher based on geographical location or special events. Subtotal - Lodging $910.00
TOTAL MEALS AND LODGING $1,378.00
EQUIPMENT PROCUREMENT
Provider List of Equipment RATE UNIT USAGE TOTAL
Provider - Task # $0.00 0 $0.00
Provider - Task # $0.00 0 $0.00
Provider - Task # $0.00 0 $0.00
TOTAL EQUIPMENT PROCUREMENT $0.00
SUBCONTRACTOR
Provider Name of Sub Description of Work RATE UNIT USAGE TOTAL
Drilling (Conventional) $0.00 Lump Sum 0 $0.00
Drilling (Non-conventional) Probe Domain 3 x 15'x 1" $2,400.00 Lump Sum 1 $2,400.00
Mobile Laboratory $0.00 Lump Sum 0 $0.00
Surveying $0.00 Lump Sum 0 $0.00
IDW $0.00 Drum 0 $0.00
Utilities $0.00 0 $0.00
Other Sub 1- Task # $0.00 0 $0.00
Other Sub 2- Task # $0.00 0 $0.00
Other Sub 3 - Task # $0.00 0 $0.00
TOTAL SUBCONTRACTOR $2,400.00
LABORATORY and SAMPLE SHIPMENTS
ANALYSIS/PARAMETER FAST TURNAROUND RATE (%) No. for Fast Turnaround Rate RATE Media No. of Samples No. of QA/QC Fast Turn- Around Charges TOTAL
EPA 6010 Lead 100% 0 $11.50 Water 0 0 $0.00 $0.00
EPA 9040 pH 100% 0 $8.00 Water 0 0 $0.00 $0.00
EPA 6010 Lead 100% 0 $11.50 Soil 0 0 $0.00 $0.00
EPA 6010 Lead 100% 0 $11.50 SPLP 0 0 $0.00 $0.00
TCLP/SPLP Bottle extraction 100% 0 $40.00 Soil 0 0 $0.00 $0.00
Digestion 100% 0 $6.00 Soil 0 0 $0.00 $0.00
0 $0.00 $0.00
0 $0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
*Rate negotiated. Subtotal-Lab Analyses 0 0 $0.00 $0.00
SAMPLE SHIPMENTS
| CONTAINER SIZE | Shipment Method | |||
| 24 hr | No. of Containers | Shipment Method | ||
| 2 day | No. of Containers | Ice | No. of Containers | TOTAL |
Small (<50 lbs.) $63.00 0 $35.00 0 $5.00 0 $0.00
Large (>50 lbs. < 70 lbs.) $104.00 8 $60.00 8 $5.00 8 $1,352.00
Subtotal-Sample Shipments $1,352.00
TOTAL LABORATORY and SHIPMENTS $1,352.00
FIELD EXPENSES
Personal Protection
ITEM RATE UNIT USAGE TOTAL
Level B $172.50 Per Man Day 0 $0.00
Level C $110.00 Per Man Day 0 $0.00
Level D 3 people - 3 days $28.00 Per Man Day 9 $252.00
SUBTOTAL - PERSONAL PROTECTION $252.00
Expendables
ITEM RATE UNIT USAGE TOTAL ITEM TOTAL
Expendables $32.50 Day 3 $97.50
SUBTOTAL - EXPENDABLES $97.50
Drilling Related Equipment
RATE UNIT USAGE
Well Locks $3.40 ea 0 $0.00
2" Well Caps $10.20 ea 0 $0.00
4" Well Caps $14.55 ea 0 $0.00
$0.00 ea 0 $0.00
SUBTOTAL - DRILLING RELATED EQUIPMENT $0.00
Analytical Related Equipment
RATE ITEM UNIT NO OF ITEMS USAGE TOTAL ITEM
Soil Sampling Kit (Corer, generator, auger, WL ind.) $834.20 week 0 0 $0.00
FID/PID Combination OVA $106.70 day 0 0 $0.00
Multiprobe 9000 (ph, cond, temp, do, redox) $126.10 day 0 0 $0.00
Multiprobe 9000 (ph, cond, temp, do, redox) $504.40 week 0 0 $0.00
Shallow GW Sampling Kit (WL ind., Per Pump, Multiprobe, turb meter, and flow cell) $208.55 day 1 1 $208.55
Construction/O&M Supplies (Various items for work/repair) $63.05 day 0 0 $0.00
Turbidity Meter $24.25 day 1 0 $0.00
$0 0 0 $0.00
$0 0 0 $0.00
$0 0 0 $0.00
SUBTOTAL - ANALYTICAL RELATED EQUIPMENT $208.55
IDW Related Equipment
55-Gal Drum $58.20 0 $0.00
$0.00
SUBTOTAL - IDW RELATED EQUIPMENT $0.00
Other Equipment
RATE ITEM UNIT NO OF ITEMS USAGE TOTAL ITEM
Sample Bottles $363.10 lump sum 1 1 $363.10
Peristaltic Tubing (Silicon 3/8 x 5/8) $3.20 ft 1 6 $19.21
Inline Filters (0.45 micron (µm)) $20.20 ea 1 8 $161.60
Peristaltic Pump $29.10 day 0 0 $0.00
Water Level Indicator $19.40 day 0 0 $0.00
Color-Tec Kit $19.40 day 0 0 $0.00
Hand Augers $67.90 10 pack 0 0 $0.00
Hand Augers $8.25 ea 1 8 $66.00
Teflon Tubing (1/4 inch OD) $1.95 ft 1 110 $214.50
HDPE Poly tubing (1/4 inch OD) $0.25 ft 0 0 $0.00
Total Survey Station $41.75 day 1 1 $41.75
Water level indicator $19.40 day 0 0 $0.00
Hand Held GPS $25.25 day 1 1 $25.25
*Rate negotiated. SUBTOTAL - OTHER EQUIPMENT $891.41
FIELD EXPENSES $1,449.46
&L&"Arial,Regular"&9&F/&A&R&"Arial,Regular"&9Page 6
AFTER COMPLETING ALL ENTRIES FOR SHEET, HIDE UNUSED LINES.
JMTudor:
AIRFARE IS TO BE NOTED AS RT (ROUNDTRIP) OR OW (FOR ONE-WAY). ADD $28 FEE INTO RATE.
USE HIGHER LODGING RATE IF GEOGRAPHICAL AREA HAS HIGHER LODGING RATE. ALSO CHECK FOR SPECIAL EVENTS IN AREA AND OFFER COST IF THERE IS AN EVENT THAT CREATES HIGHER LODGING RATES. MAKE NOTE ON TOTAL LINE EXPLAINING HIGHER RATE REASON. NOTE: LODGING SALES TAX CANNOT BE ADDED INTO THE COST SHEET.
SITE: Blue Water Express Wash
SUBTASK NO.: 3 DESCRIPTION: Si Report
DATE: December 21, 2016 FACILITY ID NO.: FLT070079090
TASK NO: CSS-14B
LABOR HOURS
Labor Category Work Description Hours
Principal
Powell
Brown
Chief
Stephens Report Generation 24
Ringo
Kennedy
Harter
Kelso PG and QA Review 4
Senior
Maldonado
Krajewski
Meyers
Elliott
Moore GIS Figures 8
Taravella
Associate
Rhyne
Thanawastien
Hammond
Fowler Technical Editing 4
Vaughan
Junior
Bender
Oien Tables and Report generation 16
Fluitt
Technician
N/A
Clerical
Diez
Benson Publicatioons 2
TOTAL LABOR HOURS 58.00
VEHICLE RENTAL
ITEM RATE UNIT USAGE TOTAL
Automobile $68.00 Day 0 $0.00
Equipment Truck/Van $97.00 Day 0 $0.00
Equipment Truck/Van $420.00 Week 0 $0.00
TOTAL VEHICLE RENTAL $0.00
MILEAGE AND AIRFARE
ITEM RATE UNIT USAGE TOTAL
Mileage INCLUDED IN VEHICLE RENTAL RATE $0.00
Airfare $0.00
TOTAL MILEAGE AND AIRFARE $0.00
MEALS AND LODGING
ITEM Labor Category RATE UNIT USAGE TOTAL
MEALS
$36.00 Day 0 $0.00
$36.00 Day 0 $0.00
$36.00 Day 0 $0.00
$36.00 Day 0 $0.00
Subtotal - Meals 0 $0.00
LODGING RATE* UNIT USAGE
$77.00 Day 0 $0.00
$77.00 Day 0 $0.00
$77.00 Day 0 $0.00
$77.00 Day 0 $0.00
*Rate may be higher based on geographical location or special events. Subtotal - Lodging $0.00
TOTAL MEALS AND LODGING $0.00
EQUIPMENT PROCUREMENT
Provider List of Equipment RATE UNIT USAGE TOTAL
Provider - Task # $0.00 0 $0.00
Provider - Task # $0.00 0 $0.00
Provider - Task # $0.00 0 $0.00
TOTAL EQUIPMENT PROCUREMENT $0.00
SUBCONTRACTOR
Provider Name of Sub Description of Work RATE UNIT USAGE TOTAL
Drilling (Conventional) $0.00 Lump Sum 0 $0.00
Drilling (Non-conventional) $0.00 Lump Sum 0 $0.00
Mobile Laboratory $0.00 Lump Sum 0 $0.00
Surveying $0.00 0 $0.00
IDW $0.00 0 $0.00
Utilities $0.00 0 $0.00
Other Sub 1- Task # $0.00 0 $0.00
Other Sub 2- Task # $0.00 0 $0.00
Other Sub 3 - Task # $0.00 0 $0.00
TOTAL SUBCONTRACTOR $0.00
LABORATORY and SAMPLE SHIPMENTS
ANALYSIS/PARAMETER FAST TURNAROUND RATE (%) No. for Fast Turnaround Rate RATE Media No. of Samples No. of QA/QC Fast Turn- Around Charges TOTAL
EPA 8021 B VOCs - Hall/PID Series $100 Water/Soil 0 $0.00 $0.00
EPA 8260B VOCs $135 Water/Soil 0 $0.00 $0.00
TO-15 VOCs $200 Air 0 $0.00 $0.00
TCLP/SPLP Bottle extraction $40 Soil 0 $0.00 $0.00
EPA 8270 BNAs $220 Water/Soil 0 $0.00 $0.00
EPA 8270/8310 PAHs - Low Level $100 Water/Soil 0 $0.00 $0.00
FL-PRO TRPH $84 Water/Soil 0 $0.00 $0.00
Digestion $6.00 Water/Soil 0 $0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
*Rate negotiated. Subtotal-Lab Analyses 0 0 $0.00 $0.00
SAMPLE SHIPMENTS
| CONTAINER SIZE | Shipment Method | |||
| 24 hr | No. of Containers | Shipment Method | ||
| 2 day | No. of Containers | Ice | No. of Containers | TOTAL |
Small (<50 lbs.) $63.00 0 $35.00 0 $5.00 0 $0.00
Large (>50 lbs. < 70 lbs.) $104.00 0 $60.00 0 $5.00 0 $0.00
Subtotal-Sample Shipments $0.00
TOTAL LABORATORY and SHIPMENTS $0.00
FIELD EXPENSES
Personal Protection
ITEM RATE UNIT USAGE TOTAL
Level B $172.50 Per Man Day 0 $0.00
Level C $110.00 Per Man Day 0 $0.00
Level D $28.00 Per Man Day 0 $0.00
SUBTOTAL - PERSONAL PROTECTION $0.00
Expendables
ITEM RATE UNIT USAGE TOTAL ITEM TOTAL
Expendables $32.50 Day 0 $0.00
SUBTOTAL - EXPENDABLES $0.00
Drilling Related Equipment
RATE UNIT USAGE
Well Locks $3.40 ea 0 $0.00
2" Well Caps $10.20 ea 0 $0.00
4" Well Caps $14.55 ea 0 $0.00
$0.00 ea 0 $0.00
SUBTOTAL - DRILLING RELATED EQUIPMENT $0.00
Analytical Related Equipment
RATE ITEM UNIT NO OF ITEMS USAGE TOTAL ITEM
Soil Sampling Kit (Corer, generator, auger, WL ind.) $208.55 day 0 0 $0.00
FID/PID Combination OVA $106.70 day 0 0 $0.00
Multiprobe 9000 (ph, cond, temp, do, redox) $126.10 day 0 0 $0.00
Multiprobe 9000 (ph, cond, temp, do, redox) $504.40 week 0 0 $0.00
Shallow GW Sampling Kit (WL ind., Per Pump, Multiprobe, turb meter, and flow cell) $208.55 day 0 0 $0.00
Construction/O&M Supplies (Various items for work/repair) $63.05 day 0 0 $0.00
Turbidity Meter $24.25 day 0 0 $0.00
$0 0 0 $0.00
$0 0 0 $0.00
$0 0 0 $0.00
SUBTOTAL - ANALYTICAL RELATED EQUIPMENT $0.00
IDW Related Equipment
55-Gal Drum $58.20 0 $0.00
$0.00
SUBTOTAL - IDW RELATED EQUIPMENT $0.00
Other Equipment
RATE ITEM UNIT NO OF ITEMS USAGE TOTAL ITEM
Tedlar Bag $14.55 ea 0 0 $0.00
Peristaltic Tubing (Silicon 3/8 x 5/8) $3.20 ft 0 0 $0.00
Disposable Bailers (HDPE) $4.85 ea 0 0 $0.00
Peristaltic Pump $29.10 day 0 0 $0.00
Water Level Indicator $19.40 day 0 0 $0.00
Color-Tec Kit $19.40 day 0 0 $0.00
PCE Detection Tubes $67.90 10 pack 0 0 $0.00
Vacuum Gauges $19.40 ea 0 0 $0.00
Teflon Tubing (1/4 inch OD) $1.95 ft 0 0 $0.00
HDPE Poly tubing (1/4 inch OD) $0.25 ft 0 0 $0.00
Total Survey Station $41.75 day 0 0 $0.00
Water level indicator $19.40 day 0 0 $0.00
Hand Held GPS $25.25 day 0 0 $0.00
*Rate negotiated. SUBTOTAL - OTHER EQUIPMENT $0.00
FIELD EXPENSES $0.00
&L&"Arial,Regular"&8&F/&A&R&"Arial,Regular"&8Page 7
AFTER COMPLETING ALL ENTRIES FOR SHEET, HIDE UNUSED LINES.
JMTudor:
AIRFARE IS TO BE NOTED AS RT (ROUNDTRIP) OR OW (FOR ONE-WAY). ADD $28 FEE INTO RATE.
USE HIGHER LODGING RATE IF GEOGRAPHICAL AREA HAS HIGHER LODGING RATE. ALSO CHECK FOR SPECIAL EVENTS IN AREA AND OFFER COST IF THERE IS AN EVENT THAT CREATES HIGHER LODGING RATES. MAKE NOTE ON TOTAL LINE EXPLAINING HIGHER RATE REASON. NOTE: LODGING SALES TAX CANNOT BE ADDED INTO THE COST SHEET.
SITE: Blue Water Express Wash
SUBTASK NO.: 4 DESCRIPTION: Dec-99
DATE: December 21, 2016 FACILITY ID NO.: FLT070079090
TASK NO: CSS-14B
LABOR HOURS
Labor Category Work Description Hours
Principal
Powell
Brown
Chief
Stephens
Ringo
Kennedy
Harter
Kelso
Senior
Maldonado
Krajewski
Meyers
Elliott
Moore
Taravella
Associate
Rhyne
Thanawastien
Hammond
Fowler
Vaughan
Junior
Bender
Oien
Fluitt
Technician
N/A
Clerical
Diez
Benson
TOTAL LABOR HOURS 0.00
VEHICLE RENTAL
ITEM RATE UNIT USAGE TOTAL
Automobile $68.00 Day 0 $0.00
Equipment Truck/Van $97.00 Day 0 $0.00
Equipment Truck/Van $420.00 Week 0 $0.00
TOTAL VEHICLE RENTAL $0.00
MILEAGE AND AIRFARE
ITEM RATE UNIT USAGE TOTAL
Mileage INCLUDED IN VEHICLE RENTAL RATE $0.00
Airfare $0.00
TOTAL MILEAGE AND AIRFARE $0.00
MEALS AND LODGING
ITEM Labor Category RATE UNIT USAGE TOTAL
MEALS
$36.00 Day 0 $0.00
$36.00 Day 0 $0.00
$36.00 Day 0 $0.00
$36.00 Day 0 $0.00
Subtotal - Meals 0 $0.00
LODGING RATE* UNIT USAGE
$77.00 Day 0 $0.00
$77.00 Day 0 $0.00
$77.00 Day 0 $0.00
$77.00 Day 0 $0.00
*Rate may be higher based on geographical location or special events. Subtotal - Lodging $0.00
TOTAL MEALS AND LODGING $0.00
EQUIPMENT PROCUREMENT
Provider List of Equipment RATE UNIT USAGE TOTAL
Provider - Task # $0.00 0 $0.00
Provider - Task # $0.00 0 $0.00
Provider - Task # $0.00 0 $0.00
TOTAL EQUIPMENT PROCUREMENT $0.00
SUBCONTRACTOR
Provider Name of Sub Description of Work RATE UNIT USAGE TOTAL
Drilling (Conventional) $0.00 Lump Sum 0 $0.00
Drilling (Non-conventional) $0.00 Lump Sum 0 $0.00
Mobile Laboratory $0.00 Lump Sum 0 $0.00
Surveying $0.00 Lump Sum 0 $0.00
IDW $0.00 Drum 0 $0.00
Utilities $0.00 0 $0.00
Other Sub 1 - Task # $0.00 0 $0.00
Other Sub 2- Task # $0.00 0 $0.00
Other Sub 3 - Task # $0.00 0 $0.00
TOTAL SUBCONTRACTOR $0.00
LABORATORY and SAMPLE SHIPMENTS
ANALYSIS/PARAMETER FAST TURNAROUND RATE (%) No. for Fast Turnaround Rate RATE Media No. of Samples No. of QA/QC Fast Turn- Around Charges TOTAL
EPA 8021 B VOCs - Hall/PID Series $100 Water/Soil 0 $0.00 $0.00
EPA 8260B VOCs $135 Water/Soil 0 $0.00 $0.00
TO-15 VOCs $200 Air 0 $0.00 $0.00
TCLP/SPLP Bottle extraction $40 Soil 0 $0.00 $0.00
EPA 8270 BNAs $220 Water/Soil 0 $0.00 $0.00
EPA 8270/8310 PAHs - Low Level $100 Water/Soil 0 $0.00 $0.00
FL-PRO TRPH $84 Water/Soil 0 $0.00 $0.00
Digestion $6.00 Water/Soil 0 $0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
*Rate negotiated. Subtotal-Lab Analyses 0 0 $0.00 $0.00
SAMPLE SHIPMENTS
| CONTAINER SIZE | Shipment Method | |||
| 24 hr | No. of Containers | Shipment Method | ||
| 2 day | No. of Containers | Ice | No. of Containers | TOTAL |
Small (<50 lbs.) $63.00 0 $35.00 0 $5.00 0 $0.00
Large (>50 lbs. < 70 lbs.) $104.00 0 $60.00 0 $5.00 0 $0.00
Subtotal-Sample Shipments $0.00
TOTAL LABORATORY and SHIPMENTS $0.00
FIELD EXPENSES
Personal Protection
ITEM RATE UNIT USAGE TOTAL
Level B $172.50 Per Man Day 0 $0.00
Level C $110.00 Per Man Day 0 $0.00
Level D $28.00 Per Man Day 0 $0.00
SUBTOTAL - PERSONAL PROTECTION $0.00
Expendables
ITEM RATE UNIT USAGE TOTAL ITEM TOTAL
Expendables $32.50 Day 0 $0.00
SUBTOTAL - EXPENDABLES $0.00
Drilling Related Equipment
RATE UNIT USAGE
Well Locks $3.40 ea 0 $0.00
2" Well Caps $10.20 ea 0 $0.00
4" Well Caps $14.55 ea 0 $0.00
$0.00 ea 0 $0.00
SUBTOTAL - DRILLING RELATED EQUIPMENT $0.00
Analytical Related Equipment
RATE ITEM UNIT NO OF ITEMS USAGE TOTAL ITEM
Soil Sampling Kit (Corer, generator, auger, WL ind.) $208.55 day 0 0 $0.00
FID/PID Combination OVA $106.70 day 0 0 $0.00
Multiprobe 9000 (ph, cond, temp, do, redox) $126.10 day 0 0 $0.00
Multiprobe 9000 (ph, cond, temp, do, redox) $504.40 week 0 0 $0.00
Shallow GW Sampling Kit (WL ind., Per Pump, Multiprobe, turb meter, and flow cell) $208.55 day 0 0 $0.00
Construction/O&M Supplies (Various items for work/repair) $63.05 day 0 0 $0.00
Turbidity Meter $24.25 day 0 0 $0.00
$0 1 0 $0.00
$0 1 0 $0.00
$0 1 0 $0.00
SUBTOTAL - ANALYTICAL RELATED EQUIPMENT $0.00
IDW Related Equipment
55-Gal Drum $58.20 0 $0.00
$0.00
SUBTOTAL - IDW RELATED EQUIPMENT $0.00
Other Equipment
RATE ITEM UNIT NO OF ITEMS USAGE TOTAL ITEM
Tedlar Bag $14.55 ea 0 0 $0.00
Peristaltic Tubing (Silicon 3/8 x 5/8) $3.20 ft 0 0 $0.00
Disposable Bailers (HDPE) $4.85 ea 0 0 $0.00
Peristaltic Pump $29.10 day 0 0 $0.00
Water Level Indicator $19.40 day 0 0 $0.00
Color-Tec Kit $19.40 day 0 0 $0.00
PCE Detection Tubes $67.90 10 pack 0 0 $0.00
Vacuum Gauges $19.40 ea 0 0 $0.00
Teflon Tubing (1/4 inch OD) $1.95 ft 0 0 $0.00
HDPE Poly tubing (1/4 inch OD) $0.25 ft 0 0 $0.00
Total Survey Station $41.75 day 0 0 $0.00
Water level indicator $19.40 day 0 0 $0.00
Hand Held GPS $25.25 day 0 0 $0.00
*Rate negotiated. SUBTOTAL - OTHER EQUIPMENT $0.00
FIELD EXPENSES $0.00
&L&"Arial,Regular"&8&F/&A&R&"Arial,Regular"&8Page 8
AFTER COMPLETING ALL ENTRIES FOR SHEET, HIDE UNUSED LINES.
JMTudor:
AIRFARE IS TO BE NOTED AS RT (ROUNDTRIP) OR OW (FOR ONE-WAY). ADD $28 FEE INTO RATE.
USE HIGHER LODGING RATE IF GEOGRAPHICAL AREA HAS HIGHER LODGING RATE. ALSO CHECK FOR SPECIAL EVENTS IN AREA AND OFFER COST IF THERE IS AN EVENT THAT CREATES HIGHER LODGING RATES. MAKE NOTE ON TOTAL LINE EXPLAINING HIGHER RATE REASON. NOTE: LODGING SALES TAX CANNOT BE ADDED INTO THE COST SHEET.
SITE: Blue Water Express Wash
SUBTASK NO.: 5 DESCRIPTION: 0
DATE: December 21, 2016 FACILITY ID NO.: FLT070079090
TASK NO: CSS-14B
LABOR HOURS
Labor Category Work Description Hours
Principal
Powell
Brown
Chief
Stephens
Ringo
Kennedy
Harter
Kelso
Senior
Maldonado
Krajewski
Meyers
Elliott
Moore
Taravella
Associate
Rhyne
Thanawastien
Hammond
Fowler
Vaughan
Junior
Bender
Oien
Fluitt
Technician
N/A
Clerical
Diez
Benson
TOTAL LABOR HOURS 0.00
VEHICLE RENTAL
ITEM RATE UNIT USAGE TOTAL
Automobile $68.00 Day 0 $0.00
Equipment Truck/Van $97.00 Day 0 $0.00
Equipment Truck/Van $420.00 Week 0 $0.00
TOTAL VEHICLE RENTAL $0.00
MILEAGE AND AIRFARE
ITEM RATE UNIT USAGE TOTAL
Mileage INCLUDED IN VEHICLE RENTAL RATE $0.00
Airfare $0.00
TOTAL MILEAGE AND AIRFARE $0.00
MEALS AND LODGING
ITEM Labor Category RATE UNIT USAGE TOTAL
MEALS
$36.00 Day 0 $0.00
$36.00 Day 0 $0.00
$36.00 Day 0 $0.00
$36.00 Day 0 $0.00
Subtotal - Meals 0 $0.00
LODGING RATE* UNIT USAGE
$77.00 Day 0 $0.00
$77.00 Day 0 $0.00
$77.00 Day 0 $0.00
$77.00 Day 0 $0.00
*Rate may be higher based on geographical location or special events. Subtotal - Lodging $0.00
TOTAL MEALS AND LODGING $0.00
EQUIPMENT PROCUREMENT
Provider List of Equipment RATE UNIT USAGE TOTAL
Provider - Task # $0.00 0 $0.00
Provider - Task # $0.00 0 $0.00
Provider - Task # $0.00 0 $0.00
TOTAL EQUIPMENT PROCUREMENT $0.00
SUBCONTRACTOR
Provider Name of Sub Description of Work RATE UNIT USAGE TOTAL
Drilling (Conventional) $0.00 Lump Sum 0 $0.00
Drilling (Non-conventional) $0.00 Lump Sum 0 $0.00
Mobile Laboratory $0.00 Lump Sum 0 $0.00
Surveying $0.00 Lump Sum 0 $0.00
IDW $0.00 Drum 0 $0.00
Utilities $0.00 0 $0.00
Other Sub 1 - Task # $0.00 0 $0.00
Other Sub 2- Task # $0.00 0 $0.00
Other Sub 3 - Task # $0.00 0 $0.00
TOTAL SUBCONTRACTOR $0.00
LABORATORY and SAMPLE SHIPMENTS
ANALYSIS/PARAMETER FAST TURNAROUND RATE (%) No. for Fast Turnaround Rate RATE Media No. of Samples No. of QA/QC Fast Turn- Around Charges TOTAL
EPA 8021 B VOCs - Hall/PID Series $100 Water/Soil 0 $0.00 $0.00
EPA 8260B VOCs $135 Water/Soil 0 $0.00 $0.00
TO-15 VOCs $200 Air 0 $0.00 $0.00
TCLP/SPLP Bottle extraction $40 Soil 0 $0.00 $0.00
EPA 8270 BNAs $220 Water/Soil 0 $0.00 $0.00
EPA 8270/8310 PAHs - Low Level $100 Water/Soil 0 $0.00 $0.00
FL-PRO TRPH $84 Water/Soil 0 $0.00 $0.00
Digestion $6.00 Water/Soil 0 $0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
*Rate negotiated. Subtotal-Lab Analyses 0 0 $0.00 $0.00
SAMPLE SHIPMENTS
| CONTAINER SIZE | Shipment Method | |||
| 24 hr | No. of Containers | Shipment Method | ||
| 2 day | No. of Containers | Ice | No. of Containers | TOTAL |
Small (<50 lbs.) $63.00 0 $35.00 0 $5.00 0 $0.00
Large (>50 lbs. < 70 lbs.) $104.00 0 $60.00 0 $5.00 0 $0.00
Subtotal-Sample Shipments $0.00
TOTAL LABORATORY and SHIPMENTS $0.00
FIELD EXPENSES
Personal Protection
ITEM RATE UNIT USAGE TOTAL
Level B $172.50 Per Man Day 0 $0.00
Level C $110.00 Per Man Day 0 $0.00
Level D $28.00 Per Man Day 0 $0.00
SUBTOTAL - PERSONAL PROTECTION $0.00
Expendables
ITEM RATE UNIT USAGE TOTAL ITEM TOTAL
Expendables $32.50 Day 0 $0.00
SUBTOTAL - EXPENDABLES $0.00
Drilling Related Equipment
RATE UNIT USAGE
Well Locks $3.40 ea 0 $0.00
2" Well Caps $10.20 ea 0 $0.00
4" Well Caps $14.55 ea 0 $0.00
$0.00 ea 0 $0.00
SUBTOTAL - DRILLING RELATED EQUIPMENT $0.00
Analytical Related Equipment
RATE ITEM UNIT NO OF ITEMS USAGE TOTAL ITEM
Soil Sampling Kit (Corer, generator, auger, WL ind.) $208.55 day 0 0 $0.00
FID/PID Combination OVA $106.70 day 0 0 $0.00
Multiprobe 9000 (ph, cond, temp, do, redox) $126.10 day 0 0 $0.00
Multiprobe 9000 (ph, cond, temp, do, redox) $504.40 week 0 0 $0.00
Shallow GW Sampling Kit (WL ind., Per Pump, Multiprobe, turb meter, and flow cell) $208.55 day 0 0 $0.00
Construction/O&M Supplies (Various items for work/repair) $63.05 day 0 0 $0.00
Turbidity Meter $24.25 day 0 0 $0.00
$0 0 0 $0.00
$0 0 0 $0.00
$0 0 0 $0.00
SUBTOTAL - ANALYTICAL RELATED EQUIPMENT $0.00
IDW Related Equipment
55-Gal Drum $58.20 0 $0.00
$0.00
SUBTOTAL - IDW RELATED EQUIPMENT $0.00
Other Equipment
RATE ITEM UNIT NO OF ITEMS USAGE TOTAL ITEM
Tedlar Bag $14.55 ea 0 0 $0.00
Peristaltic Tubing (Silicon 3/8 x 5/8) $3.20 ft 0 0 $0.00
Disposable Bailers (HDPE) $4.85 ea 0 0 $0.00
Peristaltic Pump $29.10 day 0 0 $0.00
Water Level Indicator $19.40 day 0 0 $0.00
Color-Tec Kit $19.40 day 0 0 $0.00
PCE Detection Tubes $67.90 10 pack 0 0 $0.00
Vacuum Gauges $19.40 ea 0 0 $0.00
Teflon Tubing (1/4 inch OD) $1.95 ft 0 0 $0.00
HDPE Poly tubing (1/4 inch OD) $0.25 ft 0 0 $0.00
Total Survey Station $41.75 day 0 0 $0.00
Water level indicator $19.40 day 0 0 $0.00
Hand Held GPS $25.25 day 0 0 $0.00
*Rate negotiated. SUBTOTAL - OTHER EQUIPMENT $0.00
FIELD EXPENSES $0.00
&L&"Arial,Regular"&8&F/&A&R&"Arial,Regular"&8Page 9
AFTER COMPLETING ALL ENTRIES FOR SHEET, HIDE UNUSED LINES.
JMTudor:
AIRFARE IS TO BE NOTED AS RT (ROUNDTRIP) OR OW (FOR ONE-WAY). ADD $28 FEE INTO RATE.
USE HIGHER LODGING RATE IF GEOGRAPHICAL AREA HAS HIGHER LODGING RATE. ALSO CHECK FOR SPECIAL EVENTS IN AREA AND OFFER COST IF THERE IS AN EVENT THAT CREATES HIGHER LODGING RATES. MAKE NOTE ON TOTAL LINE EXPLAINING HIGHER RATE REASON. NOTE: LODGING SALES TAX CANNOT BE ADDED INTO THE COST SHEET.
SITE: Blue Water Express Wash
SUBTASK NO.: 6 DESCRIPTION: 0
DATE: December 21, 2016 FACILITY ID NO.: FLT070079090
TASK NO: CSS-14B
LABOR HOURS
Labor Category Work Description Hours
Principal
Powell
Brown
Chief
Stephens
Ringo
Kennedy
Harter
Kelso
Senior
Maldonado
Krajewski
Meyers
Elliott
Moore
Taravella
Associate
Rhyne
Thanawastien
Hammond
Fowler
Vaughan
Junior
Bender
Oien
Fluitt
Technician
N/A
Clerical
Diez
Benson
TOTAL LABOR HOURS 0.00
VEHICLE RENTAL
ITEM RATE UNIT USAGE TOTAL
Automobile $68.00 Day 0 $0.00
Equipment Truck/Van $97.00 Day 0 $0.00
Equipment Truck/Van $420.00 Week 0 $0.00
TOTAL VEHICLE RENTAL $0.00
MILEAGE AND AIRFARE
ITEM RATE UNIT USAGE TOTAL
Mileage INCLUDED IN VEHICLE RENTAL RATE $0.00
Airfare $0.00
TOTAL MILEAGE AND AIRFARE $0.00
MEALS AND LODGING
ITEM Labor Category RATE UNIT USAGE TOTAL
MEALS
$36.00 Day 0 $0.00
$36.00 Day 0 $0.00
$36.00 Day 0 $0.00
$36.00 Day 0 $0.00
Subtotal - Meals 0 $0.00
LODGING RATE* UNIT USAGE
$77.00 Day 0 $0.00
$77.00 Day 0 $0.00
$77.00 Day 0 $0.00
$77.00 Day 0 $0.00
*Rate may be higher based on geographical location or special events. Subtotal - Lodging $0.00
TOTAL MEALS AND LODGING $0.00
EQUIPMENT PROCUREMENT
Provider List of Equipment RATE UNIT USAGE TOTAL
Provider - Task # $0.00 0 $0.00
Provider - Task # $0.00 0 $0.00
Provider - Task # $0.00 0 $0.00
TOTAL EQUIPMENT PROCUREMENT $0.00
SUBCONTRACTOR
Provider Name of Sub Description of Work RATE UNIT USAGE TOTAL
Drilling (Conventional) $0.00 Lump Sum 0 $0.00
Drilling (Non-conventional) $0.00 Lump Sum 0 $0.00
Mobile Laboratory $0.00 Lump Sum 0 $0.00
Surveying $0.00 Lump Sum 0 $0.00
IDW $0.00 Drum 0 $0.00
Utilities $0.00 0 $0.00
Other Sub 1 - Task # $0.00 0 $0.00
Other Sub 2- Task # $0.00 0 $0.00
Other Sub 3 - Task # $0.00 0 $0.00
TOTAL SUBCONTRACTOR $0.00
LABORATORY and SAMPLE SHIPMENTS
ANALYSIS/PARAMETER FAST TURNAROUND RATE (%) No. for Fast Turnaround Rate RATE Media No. of Samples No. of QA/QC Fast Turn- Around Charges TOTAL
EPA 8021 B VOCs - Hall/PID Series $100 Water/Soil 0 $0.00 $0.00
EPA 8260B VOCs $135 Water/Soil 0 $0.00 $0.00
TO-15 VOCs $200 Air 0 $0.00 $0.00
TCLP/SPLP Bottle extraction $40 Soil 0 $0.00 $0.00
EPA 8270 BNAs $220 Water/Soil 0 $0.00 $0.00
EPA 8270/8310 PAHs - Low Level $100 Water/Soil 0 $0.00 $0.00
FL-PRO TRPH $84 Water/Soil 0 $0.00 $0.00
Digestion $6.00 Water/Soil 0 $0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
*Rate negotiated. Subtotal-Lab Analyses 0 0 $0.00 $0.00
SAMPLE SHIPMENTS
| CONTAINER SIZE | Shipment Method | |||
| 24 hr | No. of Containers | Shipment Method | ||
| 2 day | No. of Containers | Ice | No. of Containers | TOTAL |
Small (<50 lbs.) $63.00 0 $35.00 0 $5.00 0 $0.00
Large (>50 lbs. < 70 lbs.) $104.00 0 $60.00 0 $5.00 0 $0.00
Subtotal-Sample Shipments $0.00
TOTAL LABORATORY and SHIPMENTS $0.00
FIELD EXPENSES
Personal Protection
ITEM RATE UNIT USAGE TOTAL
Level B $172.50 Per Man Day 0 $0.00
Level C $110.00 Per Man Day 0 $0.00
Level D $28.00 Per Man Day 0 $0.00
SUBTOTAL - PERSONAL PROTECTION $0.00
Expendables
ITEM RATE UNIT USAGE TOTAL ITEM TOTAL
Expendables $32.50 Day 0 $0.00
SUBTOTAL - EXPENDABLES $0.00
Drilling Related Equipment
RATE UNIT USAGE
Well Locks $3.40 ea 0 $0.00
2" Well Caps $10.20 ea 0 $0.00
4" Well Caps $14.55 ea 0 $0.00
$0.00 ea 0 $0.00
SUBTOTAL - DRILLING RELATED EQUIPMENT $0.00
Analytical Related Equipment
RATE ITEM UNIT NO OF ITEMS USAGE TOTAL ITEM
Soil Sampling Kit (Corer, generator, auger, WL ind.) $208.55 day 0 0 $0.00
FID/PID Combination OVA $106.70 day 0 0 $0.00
Multiprobe 9000 (ph, cond, temp, do, redox) $126.10 day 0 0 $0.00
Multiprobe 9000 (ph, cond, temp, do, redox) $504.40 week 0 0 $0.00
Shallow GW Sampling Kit (WL ind., Per Pump, Multiprobe, turb meter, and flow cell) $208.55 day 0 0 $0.00
Construction/O&M Supplies (Various items for work/repair) $63.05 day 0 0 $0.00
Turbidity Meter $24.25 day 0 0 $0.00
$0 0 0 $0.00
$0 0 0 $0.00
$0 0 0 $0.00
SUBTOTAL - ANALYTICAL RELATED EQUIPMENT $0.00
IDW Related Equipment
55-Gal Drum $58.20 0 $0.00
$0.00
SUBTOTAL - IDW RELATED EQUIPMENT $0.00
Other Equipment
RATE ITEM UNIT NO OF ITEMS USAGE TOTAL ITEM
Tedlar Bag $14.55 ea 0 0 $0.00
Peristaltic Tubing…