This document is a Task Assignment Change Order Form (Change Order No. 03) issued by the Florida Department of Environmental Protection (FDEP) under FDEP Contract No. CN222 with Stantec Consulting Services Inc. The change order pertains to Task Assignment No. 11 for the Delnor-Wiggins Park Redevelopment project located in Delnor-Wiggins, Florida. The consultant representative is Chris Brockmeier, P.E., with the FDEP Contract Manager being Ralph Perkins. The change order was executed with signatures from FDEP Budget Representative Tamika Bass, Project Manager Theresa Carron, Contract Manager Ralph Perkins, Contract Authority Bryan Bradner, and Consultant Chris E. Brockmeier on March 4, 2024.
The change order authorizes operations area electrical system design and construction administration services to support post-Hurricane Ian park redevelopment efforts. The scope includes nine subtasks: electrical field assessment of existing infrastructure, 60% and 100% electrical design, permit drawings and contractor bid documents, requests for information and submittal review, preconstruction meeting support, final as-built documentation, civil field observation and 60% civil site plan, and 100% civil site plan. All work is performed on a fixed-fee basis with no reimbursable costs. The net increase for this change order is $76,754.34 in fixed fees, bringing the total task amount with all change orders to $308,262.23 (comprising $17,000.00 in reimbursement and $291,262.23 in fixed fees). The task execution date is February 8, 2023, with an original end date of February 25, 2025, which remains unchanged. Payment is made upon FDEP approval of deliverables for each subtask. Funding is sourced through Project 6I411C, Grant FD091, with the 29-digit FLAIR code allocation of $76,754.34.
View the file
Other files
Show all 38
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Florida Department of Environmental Protection
TASK ASSIGNMENT CHANGE ORDER FORM
( ) Page 1 of 1
Required Signatures: Adobe Signature
FDEP Contract No.: Task Assignment No.: Change Order No.: Project No.:
Project Location: Project Name:
Consultant Name:
Consultant Representative: Phone: Email:
FDEP Contract Manager: Phone: Email:
Description and Justification of Change:
Change in Task Amount:
Item Reimbursement Fixed Fee Total
Original Task Amount:
Task amount including all previous Change Orders:
Net increase/decrease in task amount for this Change Order:
Total Amounts with all Change Orders:
Change in Task Time:
Original Task Execution Date:
Original Task End Date:
Present Task End Date:
Net Change in Days:
New Task End Date:
Approval Signatures:
Budget Representative, FDEP Signature Date
Project Manager, FDEP Signature Date
Contract Manager, FDEP Signature Date
Consultant Signature Date
Contract Authority, FDEP Signature Date
Project # Grant # Org Code Cat/Year Fund Module Object Code EO Amount
29 Digit FLAIR Code: Total:
CN222 11 03 6i411C
Delnor-Wiggins Park Redevelopment
Stantec Consulting Services Inc.
Chris Brockmeier, PE 239-649-4040 chris.brockmeier@stantec.com
Ralph Perkins 850-245-2721 Ralph.Perkins@FloridaDEP.gov
Operations area electrical system design and construction administration to support post Hurricane Ian park redevelopment efforts per the attached proposal dated 02/15/2024.
$ 500.00 $ 50,524.08 $ 51,024.08 $ 17,000.00 $ 214,507.89 $ 231,507.89
$ 76,754.34 $ 76,754.34 $ 17,000.00 $ 291,262.23 $ 308,262.23
2/8/2023
2/25/2025
2/25/2025 n/a
Tamika Bass
Theresa Carron
Ralph Perkins
Chris E. Brockmeier, PE
Bryan Bradner
6I411C FD091 37504000091 088040/24 675002 U3200 131500 XR $ 76,754.34
$ 76,754.34