This is a Task Assignment Change Order Form issued by the Florida Department of Environmental Protection (FDEP) for Contract No. CN221, Task Assignment No. TA02. The contract is with Registe, Sliger Engineering, Inc., a civil, structural, and water resources engineering firm based in Tallahassee, Florida. The change order, designated as CO1, pertains to Project No. 6M201, the Bridge Repair and Asphalt Removal project at George Crady Bridge Fishing Pier State Park. The contract manager is Mae Roth of FDEP, and the consultant representative is John Sliger of Registe, Sliger Engineering, Inc.
Change Order #1 adds Bridge Design Load Rating Analysis services exclusively for Subtask #7 with no reduction in existing services or extension of project timeline. The total cost of this change order is $12,045.06, consisting entirely of fixed fees with no reimbursable costs. The original task amount of $161,791.62 remains unchanged in fixed fees, while the net increase of $12,045.06 brings the total task amount to $173,836.68. The change order includes seven subtasks with fixed-price deliverables: site visit/corroboration of FDOT bridge inspection reports ($19,686.02), asbestos and lead-based paint testing ($4,594.00), 90% plans ($81,981.74), permit applications and approvals ($12,500.32), 100% plans ($7,344.96), construction administration services and site visits ($35,443.90), and the new Bridge Load Rating for Saw Pit Fishing Pier Bridge ($12,045.06). Payment is made upon approval of deliverables for each subtask, with an original task end date of September 30, 2017, unchanged by this modification.
View the file
Other files
Show all 38
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .