About this file

Philadelphia International Airport Digital Content Management System RFP - Q&A Document

This document comprises the City of Philadelphia Department of Aviation's official question and answer responses to vendors regarding RFP Opportunity #21240625164751 for implementation of a Digital Content Management System (CMS) at Philadelphia International Airport (PHL). The CMS is a digital content management platform designed to control content on airport digital displays, not a website-based system. The project requires vendors to provide turnkey solutions including hardware, software, and services to replace the existing Amadeus CMS system. Approximately 1,400 Digital Display Controllers (DDCs) and 1,500 monitors currently exist at the airport, with vendors able to utilize existing Intel Cubi N ADL mini-PCs (both N100 and N200 models) running Windows 10 Enterprise or propose alternative hardware. The project includes integration with existing systems such as the Amadeus AODB (Airport Operations Database), flight data systems, baggage handling systems, queue management systems, and advertising platforms. PHL initially extended the proposal due date from October 18, 2024, and subsequently extended it further to November 1, 2024, following vendor requests. A three-week pilot proof-of-concept is planned with a minimum of 3 endpoints, and PHL prefers system go-live before the end of 2025. The implementation must occur without disrupting daily airport operations, and a capital program will simultaneously upgrade displays, structures, casework, and build select video walls.

Vendors must include all implementation costs in their pricing proposals, with monitors explicitly excluded from scope. PHL will not disclose the project budget but recommends vendors submit the best solutions meeting stated requirements. The project is funded by federal funding or grants and must comply with Section 2 of the Secure Networks Act regarding equipment procurement. A performance bond equal to 50% of contract value is required at execution, with bid bonds required at proposal submission; bond requirements cannot be waived. PHL will provide virtual server infrastructure, backup solutions for on-premises deployments, and tax-exempt certification to the successful applicant. Vendors using PHL's existing DDCs will have PHL responsible for warranty and repair; vendors proposing alternative DDCs assume warranty responsibility. The RFP requires Minority/Women/Disadvantaged Small Business Enterprise (M/W/DSBE) participation of 15-20% for either MBEs or WBEs (or combined), with the City encouraging vendors to exceed minimums and include both categories. On-site personnel are required during implementation, with optional post-acceptance maintenance services available. Detailed asset inventory, Amadeus data dictionary, security protocols, RMS interface specifications, and display manufacturer details will be provided only to the awarded vendor after contract conformance.

View the file

Other files

File Type Posted
IT RFP CMS final 090524_OIT CentProc approved v08292024_Software Systems 03232023_v2.1_lb-cd.v2.pdf PDF
Appendix N - PA, GP and PA-3.pdf PDF
CMS - Appendix D - Requirements Compliance Certification_TSP Enhancement Features Matrix.xlsx XLSX spreadsheet
Exhibit B - B added to sheet_cut sheet for form factor PCs.pdf PDF
Appendix H - Tax and Regulatory Status Form.pdf PDF
CMS Addendum #1_reissued with Zoom link_Cover Sheet.pdf PDF
CMS RFP_Questions and Responses Template (1).docx DOCX document
CMS_Content Mgmt System RFP_Pre-Proposal Meeting_Sep 2024.pdf PDF
Addendum #3 Cover Sheet_CMS RFP QandA.pdf PDF
Appendix F_NOCO.01.04.21.OEO Ranges appendix-CMS.pdf PDF
Addendum #5 Cover Sheet_CMS RFP QandA and Deadline Extension.pdf PDF
Local Business Entity Cert.pdf PDF
Appendix F-2 CMS_FINAL 090524_Non-Profit Diversity Report Form.xlsx XLSX spreadsheet
Computer and Information Svcs.pdf PDF
Addendum #2 Cover Sheet_CMS RFP QandA.pdf PDF
Appendix K - Additional IT Standards_v4.pdf PDF
Appendix A-1 - Full Technical Specs for CMS.pdf PDF
Addendum #4 Cover Sheet_CMS RFP QandA.pdf PDF
Appendix F-1 Antidiscrimination S & C form -DIGITAL CONTENT MANAGEMENT SYSTEM SUPPORT.xls XLS spreadsheet
Appendix L_Airport Security Requirements.pdf PDF
LGBTQ Data Form.pdf PDF
RFP Submission Checklist 2-21 rvsd.pdf PDF
Exhibit A - sample of existing displays.pdf PDF
CMS RFP 2024 Questions and Responses_final .pdf PDF
Show all 24

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

City of Philadelphia RFP Question Responses CMS RFP Opportunity #: 21240625164751

# RFP Section

Question Response

1. Would you need any copywriting or content migration services?

No

2. Would you need any original or stock videography or photography?

No

3.

Is there a CMS that you have a preference for over the other?

No

4.

What CMS platform do you use currently? PHL’s current vendor is Amadeus.

5.

How much content do you currently have on your website?

The Content Management System (CMS) is not for a website. This is a Digital Content Management System to control content on digital displays for an Airport.

6. Could you let us know what the budget is for this work?

PHL is not providing the budget for this project. The Airport recommends vendors provide the best solution to meet PHL’s needs per the requirements.

7. Could you please confirm you are not looking for a COTS, but a custom solution for the same?

PHL is looking for the best solution to meet our requirements.

8. Could we ask that the Bid Bond be removed from this procurement process as is the case with most Cities we work with for digital services of this nature?

The bond requirement will not be waived per City requirements.

9. Could you let us know if you have a local preference or are you open to a Canadian agency that has done similar work with clients across the United States, with some currently being the States of California, Colorado and Wyoming?

The Airport is open to review all bids that meet our requirements

# RFP Section

Question Response

10. App A-1 1. Please clarify "queue management". Is this the use of CMS to display information such as security queue wait times, or does it also involve management of queues? Should CMS interface to a system that monitors security queues and estimates wait times?

Yes. The "queue management", system is what shows our security wait times. The CMS should be able to integrate 3rd party data as needed.

11. App A-1

1.1.2 and 1.2.1.I.4

Will PHL’s infrastructure support site-to-site VPN tunnels between the CMS network and cloud servers, such as Amazon AWS?

Airport infrastructure has this ability.

12. App A-1

1.1.2 and 1.2.1.I.4

Will equipment (servers, display devices) be allowed (limited) access to the internet via a PHL gateway to connect to a CMS Cloud instance? For example: downloading content from a CMS cloud server, workstations accessing the CMS cloud server via a public IP, sourcing information such as flights, weather, etc.

Airport infrastructure has this ability.

13. App A-1

1.1.2 and 1.2.1.I.4

Could you please point at the "PHL-specified security and access protocols/procedures"?

PHL-specified security and access protocols/procedures will be shared with the awarded vendor.

14. App A-1 1.2.1.J

Do existing display monitors have their own IP address for monitoring and control? Could you please share the existing monitor manufacturer? Can we assume that future display hardware have the same ability?

Existing monitors don’t have their own IP addresses. The Digital Display Controller (DDC), the form factor PCs, will have IP addresses for monitoring and controls. Airport monitors are currently NEC and Samsung brands.

15. App A-1 2.6.1.C

“The CMS shall primarily provide flight and baggage related information through the existing EVIDS to various displays" Could you please clarify what is meant by "provide...information through the existing EVIDS"? Won't the CMS functionality replace

The CMS must be able to display 3rd party data, which include flight and baggage information. Not all content will be stored within the CMS.

# RFP Section

Question Response the existing EVIDS? Is the intent to temporarily display the new CMS content on existing displays via the old EVIDS?

16. App A-1 2.6.1.C.c)

Advertising content: Does PHL intent to manage the advertising content directly in the new CMS themselves, or embed content from a 3rd party advertising company, such as Clear

Channel or Omnicom?

At this time the CMS should run and store all advertisement media.

17. App A-1 2.6.1.C.m)

Security queuing wait times: Please confirm that there a system that monitors security queues and provides estimates of wait times data to the new CMS?

Yes, PHL has a security wait time system in place.

18. App A-1 2.6.1.C.n)

Visual Paging and Emergency Information:

Could you please share more details about the visual paging system that CMS will interface to and receive content from?

The visual paging and emergency information may come from a 3rd party vendor. The systems should also have the ability to display visual paging and emergency information.

19. App A-1 2.6.1.C.p)

Public announcement information: Could you please confirm if the new CMS will receive text messages from this system and that the new

CMS is not required to do speech-to-text conversion?

The system will not be required to do speech-to-text conversion at this time.

20. AppA-1 2.6.8.B.5

Please confirm if our price should include the implementation of all the systems listed, or if we need to confirm our capability to implement these in the future as part of separate project(s)?

Yes, the price should include implementation of services

# RFP Section

Question Response

21. App A-1 2.6.8.B.4.a)

Could you please share more technical details for the EVIDS Amadeus interface, including the data flow from and to the EVIDS Amadeus system?

The system should have the ability to display 3rd party data. For example, this data may be presented in API, XML or TXT file.

22. App A-1 2.4.A.1.h)

Data shall be backed up periodically in accordance with PHL RPO of XX hours/days.

The system shall provide the mechanisms for the user to define the archive criteria. Note:

the final requirement for “XX hours/days” shall be determined by the PHL representative.

Please clarify that, for on premise solution, if the backup solution is provided by PHL

Airport?

If an on-premises solution is selected, the backup solution will be provided by PHL.

23. App A-1

2.6.1. K

Please clarify if the SMS gateway service and

Email SMTP connection will be provided by

PHL airport?

The awarded vendor will be provided this information.

24. App A-1 2.6.2.H

Could you please share more technical details about the RMS interface?

25. APP A-1

2.7.4.A.1

Please clarify that, for on premise solution, if the virtual environment of PHL airport can support RHEL9 VMs for CMS solution.

Yes.

26. App A-1 2.6.2.H

Please clarify that, if we can flash the existing small factor PCs with our own produced operating system(gOS) from windows 11?

This would need to be discussed with the awarded vendor if PHL feel this is the best path forward.

27. App A-1 1.2.1.R

Please clarify that, for on premise solution, if

PHL airport will provide VPN connection of the

PHL infrastructure has this ability.

# RFP Section

Question Response new CMS VMs which are hosted on the PHL virtual environment.

28. Appendix A-

1.1.1 – Digital Display Environment identifies that “Initially, the CMS will need to interface with our existing Amadeus System and AODB to receive flight and gate information.” Is the existing Amadeus System and AODB hosted on-premises at PHL, cloud-hosted, or a combination of the two?

Existing is hosted on-premises.

29. Appendix A-

1.1.2 – Supporting Infrastructure identifies that

“The Vendor shall be required to evaluate the existing infrastructure and identify any new cabling, network, or space requirements to support the proposed solution.” When will the

Vendor be granted access to “evaluate the existing infrastructure?”

The awarded vendor will be granted access after the contract is conformed.

30. Appendix A-

2.6.8 – Interface and Integration

Requirements, Part B.4 – identifies initial CMS interface requirements, while Part B.5 – identifies “future” CMS interfaces. Are these

“future” CMS interfaces to be system capabilities or deliverables to be included in the Vendor’s software development and price proposal?

The CMS should be flexible to build future modules or add additional functional based on future needs.

31. Appendix A-

2.6.8 – Interface and Integration

Requirements, Part B.5 – future CMS interfaces: If our SOW is to include these future CMS Interfaces as deliverables within

The system should have the ability to display

# RFP Section

Question Response this RFP’s SOW, can you please define the existing make/model/location/Data Flow

Requirement(s) of each of the noted “systems”

(i.e., RMS, CUS, BHS/BIC, PAS, BMS, SSA, VDGS, Website, OAG, etc.)?

32. Appendix A-

2.7 – Hardware Requirements, Part E identifies that PHL prefers that the Vendor use the existing mini-form factor Windows PCs. Can you please identify both the PC make/model/year of purchase and O/S Version for these PCs (note: Exhibit B is a sales sheet that does not identify the specific build, year of purchase, O/S, etc.)?

Cubi N ADL-076US, - year purchase dates 2023, 2024. The OS is Windows 10.

33. Appendix A-

How many of the above noted PCs are at the end of their warranty or the manufacturer’s rated lifecycle?

None.

34. Appendix A-

Security: As the Owner has declared responsibility for the Network Hardware, Software, and Administration, can you please confirm what security elements will Owner provided (e.g., Provision of ISP and associated

Firewall/Router Security, VPN Security, etc.)?

35. Appendix A-

Security: If it is determined that On-Premise

Virtual Servers are to be supplied and administered by the Owner, what security components will the Owner be responsible for

(e.g., Virtual Server Hardware, O/S, Database, Virtual Software and associated encryption, # RFP Section

Question Response patching, updates, anti-virus, malware, intrusion detection, pen testing and risk assessments, etc.)?

36. Computer & Information

Services

3.8, Sales & Use Tax. Will the City of

Philadelphia provide the Vendor with a Tax

Exempt Certificate for this Work? If not, how does the City of Philadelphia claim a refund and will then the Vendor be reimbursed for paid Sales & Use Tax?

The successful Applicant will be provided a Tax-Exempt Memo from the City.

37. 3.4 Certification of Compliance with Equal

Benefits Ordinance

13.13, Chapter 17-1900 of The Philadelphia

Code: Equal Benefits Ordinance. If the

Vendor’s Health Insurance Benefits are for

Employee Only or Employee and Certified Non-

Working Spouse/Life Partner (i.e., Working

Spouses are responsible for obtaining their own health insurance benefits through their employer), would we be in compliance with the Equal Benefits Ordinance (note: emphasis on “Live Partner”), or would we be forced to change our corporate health insurance policy to meet “The Philadelphia Code: Equal Benefits

Ordinance?”

This information is contained in the General Provisions document attached as an Appendix to this opportunity on the eContract Philly website. An overview offering guidance on the applicability of, and requirements placed on City contractors by Chapter 17-1900 of the Code is available on the City’s website (at https://secure.phila.gov/eContract/ under the “About” link) (see “Minimum Wage and Equal Benefits Ordinances Impacting Some City Contractors”).

38. Misc. Is the Vendor responsible for all custom developed display templates, formatting, functions for new CUS DVLED Displays identified in a parallel RFP (i.e., Philadelphia

International Airport MUFIDS Upgrades Bid

Number 6619 – PHL-1931.14 and Bid Number

PHL issued a separate RFP to perform the electrical, casework, mounting, etc. This CMS RFP is responsible for the CMS and all content herein.

https://secure.phila.gov/eContract/

# RFP Section

Question Response

6620 – PHL-1931.15) or will this SOW be exclusive to the parallel RFP?

39. Appendix A-

2.6.7 – Advertising Requirements, Part E.4 –

Can you please provide examples of the referenced Smart Playlist Rules that you envision? Thank you.

See 2.6.7 - E.5.

40. 1.1.1 Will a supported and documented data feed from Amadeus be provided to the CMS vendor for the purpose of integrating this data with the CMS? Will this data feed be cloud accessible or will the CMS vendor need an on-premise intermediary server to access this data? What process should the CMS vendor follow in the event this data feed is down or inaccessible.

41. 1.2.1.C.6 Could the Airport provide further details regarding the desired test environment? How many endpoints are anticipated, and what is the expected service level agreement (SLA) for the test system? Will this environment remain available after the production phase?

The Airport will have a minimum of 3 endpoints (monitors) available during the pilot proof of concept (demo). PHL may want to retain a test environment in our demo lab after the proof of concept.

42. 1.2.4.B Is the Airport looking for the vendor to supply optional on-site personal pricing for 5 years from 6 AM to 11:00 PM for weekdays as mentioned in section 1.2.3.F.1?

Section 1.2.3 of the technical specifications refers to “During Implementation.”

43. Exhibit B – Can you provide the brand and model number of your Intel media players?

Cubi N ADL-076US

# RFP Section

Question Response

44. It was stated in prebid that the intention is to have the new system utilize your preexisting media players, but that you were open to other media player options. Is the desire to utilize existing hardware a cost saving measure or is there a preference for the Windows operating system?

We recently replaced over 400 media players in 2023 and 2024. We do prefer a Windows operating system but will evaluate all proposals/solutions.

45. 4.3.2 Is the performance bond requirement intended to apply to all aspects of the contract, including professional services and software licenses?

The bond requirement does not apply to the software licenses.

46. 4.3.2 Would the City consider adjusting the bond requirements based on the nature of the services provided, since the scope does not include construction?

The City cannot adjust bond requirements given the scope of the project.

47. 1.4 "The solution should be “turnkey”, including all hardware, software and services.” Is hardware included in the price proposal?

The vendor can use PHL’s existing DDC or provide an alternative DDC. All pricing should be listed in Appendix C, Cost Proposal.

Monitors are out of scope. (Do not include monitors in your pricing).

48. 1.4 Will the Amadeus AODB remain as the central repository for flight data even if the Amadeus

CMS is replaced?

PHL will retain the Amadeus AODB.

49. 3.3.1 Our company is privately held and does not have audited financial statements. What forms and/or statements of financial condition

In lieu of a current audited statement of financial condition, the Applicant shall provide a balance sheet and P&L statement with a certified statement by a certified public accountant.

# RFP Section

Question Response are required to meet the Financial

Qualifications?

50. 4.3.2 We understand there is a Performance Bond equal to 50%. Is there a bid bond or any bonding due at the proposal submittal?

If performance bonds are required under the RFP, include a notarized letter from an approved surety stating the willingness of the surety to issue the bonds to the Applicant as principal. Further, upon the execution of the Contract, the Contractor shall, at its sole cost and expense, provide the City with a performance bond.

51. General Does the airport require on-site support? Yes

52. RFP Section 3.3.2, Appendix A- 1, and

Appendix D

The requirement for Compliance Certification is unclear. Section 3.3.2 instructions for

Volume 2, Section 5: Requirements Compliance Certification states, “The Proposal must specify, for each requirement, that the proposed solution and/or services fully satisfies the requirement, does not satisfy the requirement, or partially satisfies the requirement (in which case, the extent of compliance and non-compliance with the requirement must be fully identified and explained, including all features not provided).

Applicants are accordingly required to fill out and submit the Requirements Compliance Matrix attached in Appendix D, Requirements Compliance Certification…” Question - Appendix D is not a comprehensive list of Appendix A or

Appendix A-1 Requirements and doesn’t

The Airport will not submit a revised Appendix D – Requirements Compliance Certification with additional requirements from Appendix A-1.

All vendors must complete Appendix D – Requirements Compliance Certification form.

Vendor proposals should speak to additional requirements listed in Appendix A – 1.

# RFP Section

Question Response offer a place to state compliance other than the Vendor Comment. Will you be providing a revised compliance certification document or should vendors create a compliance matrix based on the Appendix A-1

Requirements?

53. RFP Section 1.5

The current proposal submission date is

October 18, 2024. Given the clarifications and additional details provided by Camille Tomlin, we respectfully ask; Will the City of

Philadelphia consider extending the due date by 6 weeks to enable sufficient time to do proper due diligence on requirements and pricing?

The City cannot extend the proposal due date by 6 weeks.

54. General Can you please provide a list of the local certified vendors/service providers that are approved for PHL, specifically M/W/DSBE mentioned on the proposal conference call on

September 20th?

Interested Applicants should visit the Office of Economic Opportunity (OEO) website at https://phila.mwdsbe.com/ and click on “Search Registered Directory” to search the Certified Vendor Directory.

55. General Can you share a budget figure for this project? PHL is not providing the budget for this project.

56. Appendix A, para 1.1.1

Can Amadeus provide a data dictionary defining the elements contained in the existing

AODB?

information

57. Appendix A pg 53 2.7.4-

A-1

What does PHL use as a virtualized server environment (vmWare, HyperV)?

VMWare.

https://phila.mwdsbe.com/

# RFP Section

Question Response

58. Appendix A Are vendors taking over the existing CMS monitors or are you requesting purchase of additional monitors?

Vendors will use the existing monitors.

Monitors are out of scope. (Do not include monitors in your pricing.)

59. Appendix A Is the vendor expected to provide DDCs and displays?

The vendor can use PHL’s existing DDCs (see Exhibit B) or propose new DDCs. The pricing should include the cost of new DDCs.

60. Appendix C This is a commercial business. Is this governed by FAR 12 or FAR 15? The information requested in Appendix C is not typically provided due to commerciality and proprietary.

Appendix C is the Cost Proposal Requirements and is required to be completed by all vendors.

61. Appendix A

In Appendix A 3. Equipment racks/cabinets:

The RFP states, “The Vendor shall be responsible for the supply and installation of any additional equipment racks or cabinets that may be required for equipment installation within PHL communication rooms.”

Question - Does this mean that the vendor can provide on-premises physical servers for our application and not use the PHL virtual environment?

The vendor can propose on-premises physical servers. PHL prefers a virtual environment.

62. Appendix D There are two Appendix Ds. The one referred to in the end of the RFP refers to the compliance certification. The other excel pdf file that is the Local Business Entity Cert is also called Appendix D within the file. How would

Please label the Compliance Certification document as “Appendix D-1,” since PHL cannot alter the Appendix letter assigned by the City to the Local Business Entity Certificate.

# RFP Section

Question Response you prefer the vendors label the submission documents?

63. To develop accurate pricing, can you please provide an accurate number of endpoints (ie, Cubi N ADL and any other devices that will be used to drive a signal to the displays). Number of screens rarely is 1:1 with number of playback devices.

The Airport currently has approximately 1,400 DDCs.

64. Can a breakdown of the display models and their associated use cases (for example, FIDS, GIDS, BIDS, etc) please be provided?

65. There are two models of the Cubi N ADL

MiniPC : N100 and N200. Can you please confirm which of these two models is being used at the airport?

PHL is using both models.

66. The RFP documents reference the replacement of hardware as part of the project but also states that existing hardware could be used.

Can the airport please provide specifications of the display hardware as well as when those displays were procured?

The full list of hardware will be shared with the awarded vendor.

67. The RFP documents states that the Digital

Content Management System should be able display various content types and information.

Can the airport please provide details regarding these data sources and where these

The system should have the ability to display

# RFP Section

Question Response data sources are coming from? System providers?

68. There are several references back to a phased approach for the system implementation. Are there any details regarding the immediate phases or locations that should be considered as part of this approach?

No.

69. Can the airport please advise if there is an anticipated go live date for the Digital Content

Management System?

PHL prefers to go live before the end of 2025.

70. Can the airport please provide any feedback or insight into any gaps in functionality, feature sets or maintenance of the existing system?

71. Appendix F, Are the OEO projected ranges of participation for this NOCO as follows, either:

A: 15-20% MBE AND 15-20% WBE (30-40%

Total), or B: 30-40% Total W/M/DSBE?

The OEO participation requirement is 15-20% MBE AND/OR 15-20% WBE. This means a prime can use any number of MBE or WBE companies to reach the goal. The prime can use an MBE to reach the 15% minimum or can use a WBE to reach the 15% minimum or give both an MBE and WBE enough work to reach the minimum of 15%. The City suggests strongly that primes work to hire MBEs and WBEs to meet or exceed the upper end of the goal, which is 20% total.

72. Appendix D Can you please confirm whether subcontracting with local W/M/DSBE counts toward Local Impact Certification

To obtain proper credit, primes must submit a completed Solicitation and Commitment Form. Subcontractors must be listed on the OEO website at https://phila.mwdsbe.com/.

https://phila.mwdsbe.com/

# RFP Section

Question Response

Click on “Search Registered Directory” to search the Certified Vendor Directory.

73. Appendix A, Introduction section I

(1) passive infrastructure – “the vendor responsibility to fully review … and identify in writing where the infrastructure does not meet the vendor’s requirement” – is this expected prior to submission of the RFP response or after award?

The vendor will be provided this opportunity after contract conformance.

74. Appendix A, Introduction section I

(2) Hardware structure – verify hardware and existing casework – is this expected prior to

RFP response or after award?

75. Appendix A, section I

(3) verify equipment racks/cabinets – is this expected prior to RFP response or after award?

76. Appendix A, section J

“Ongoing EVIDS refresh project will replace the majority of the display hardware” – are the details of this project -- e.g., display counts and specifications -- available for review?

Not currently.

77. Appendix A, Introduction section J

“Vendor shall review and assess existing displays and hardware to confirm compatibility” – is this expected prior to RFP response or after award?

78. Appendix A Test/validation lab – is there a detailed description, specification, or list of vendor expectations for the lab environment?

See section 2.3 of the RFP.

# RFP Section

Question Response

79. Appendix A, Page 9-2-e

“If there is a missing network switch the vendor is responsible for procuring and handing it to PHLIT for configuration” – will all relevant, networking hardware and infrastructure information be provided prior to

RFP response submittal for vendors to determine this?

80. Appendix A, Page 24-b-c

“Personnel shall attend 1 week manufacturer training class each year” – please confirm whether this requirement applies to all personnel or to specific roles within the team

This would apply to specific roles.

81. Appendix A, Page 28-D hardware support – “vendor will cover all equipment … whether supplied by vendor, existing, or supplied by others” – please expand on the expectations from the vendor as it relates to “covering” existing hardware and/or hardware supplied by others.

If support for hardware is required, the hardware will be direct from the manufacturer (e.g. OEM parts) and not from a third party supplied “replacement” component.

82. Appendix N In the context of requirements from the vendor, can you please confirm whether this contract is intended to be funded by federal funding and/or grants?

This is funded by federal funding or a grant.

83. Appendix N Please confirm whether media players and servers are required to comply with ‘buy

America’?

All equipment should be covered by Section 2 of the Secure Networks Act.

https://www.fcc.gov/supplychain/coveredlist

84. Appendix N Will the city of Philadelphia provide tax exemption certificate?

The successful Applicant will be provided a Tax-Exempt Memo from the City.

https://www.fcc.gov/supplychain/coveredlist

# RFP Section

Question Response

85. IT RFP CMS

final 090524

Can you please share any additional information regarding the “capital program to upgrade all terminal displays, structures, caseworks and build video walls in select locations?”

The program will upgrade the casework, structures, electrical (if needed), mounting of monitors and other work needed to support the digital displays. This work will be performed by general contractors and electricians.

86. How many single screens are there? There are numerous single screens located throughout the terminals. A full asset listing will be provided to the awarded vendor.

87. How many multi-screen setup displays are there?

There are numerous multi-screen (banks) located throughout the terminals. A full asset listing will be provided to the awarded vendor.

88. What is the setup of those multi-screen displays, IE 2x2, 2x3, 3x3, 1x6, etc?

There is a mixture. A full asset listing will be provided to the awarded vendor.

89. Are there any restrictions on using off-shore resources on this project?

No, but on-site work is required.

90. What contracting channels and vehicles are available to you to procure services?

We do not understand the question.

91. What sort of budget are you working with?

Has it been secured?

PHL is not providing the budget for this project.

92. How large is the website in terms of pages and monthly visitors?

The Content Management System (CMS) is not for a website. This is a Digital Content

# RFP Section

Question Response

93. What is prompting your decision to migrate (or upgrade) your digital properties to AEM (or upgrade) from your current solution?

PHL’s goal is to procure a future-ready, reliable and efficient CMS solution to enhance the passenger experience and operational efficiency at PHL.

94. Can you describe your current CMS and the specific shortcomings or limitations you're experiencing?

The RFP describes all PHL’s requirements for the CMS.

95. What are the primary objectives or expected benefits you hope to achieve through the migration to AEM?

PHL’s goal is to procure a future-ready, reliable and efficient CMS solution to enhance the passenger experience and operational efficiency at PHL.

96. Have you identified any specific challenges or risks associated with the migration process?

The migration can not disrupt the day-to-day operations of the Airport.

97. Are there any dependencies or integrations that need to be considered during the migration (or upgrade)?

98. Are there any compliance or regulatory considerations that need to be addressed during the migration to AEM?

See Appendix A –1 1.2.3 Section A for implementation requirements.

99. What level of support and training do you anticipate needing for your team during and after the migration process?

See Appendix A-1 – 1.2.1 Section P 10.

100. What is your desired timeline for completing the migration , and are there any specific milestones or deadlines to consider (e.g.

project start, go-live)?

PHL prefers to go live before the end of 2025.

101. Are there any internal resources or expertise you plan to allocate to support the move (or upgrade) effort?

Yes, the PHL IT department.

102. How do you plan to measure the success and ROI of the move?

See Appendix A-1 Section 3 3.7 for Final Acceptance Testing.

# RFP Section

Question Response

103. Can you provide insights into your current user feedback or analytics data that are informing your decision to migrate to AEM?

No.

104. How do you envision leveraging AEM's personalization and targeting capabilities to enhance user engagement and conversion rates? What will be the digital analytics and reporting solution?

The Content Management System (CMS) is not for a website. This is a Digital Content

105. What are your content management and workflow challenges with your current solution, and how do you anticipate AEM addressing these?

106. General Please provide a display schedule with details of all existing display locations. Ideally the following content would be included: location description, display counts, display technology (if other than LCD), display resolution (if other than 1920x1080 or 3840x2160) display configurations (how many displays in a bank of displays) media player counts, media player type, telecom room serving each location, new or existing location.

This information will be shared with the awarded vendor.

107. General

We respectfully request a two-week extension (Nov 1, 2024) for the due date of the proposal.

We will extend the deadline.

108. General

Please confirm that the 3-week pilot would occur sometime between October 18 and December 18.

We do not know at this time.

109. RFP, Page 3, Existing

Conditions

Regarding the Mini PCs detailed in Exhibit B.

Were all the PCs needed for the airport purchased at one time from the same lot or

They are purchased in large batches.

# RFP Section

Question Response and Exhibit B are they being purchased in smaller batches as needed?

110. RFP, Page 3, Existing

Conditions

Does the airport have a pool of mini-PCs still in the box that can be used by the CMS vendor?

If yes, how many?

Yes, we have a pool of mini PCs.

111. Appendix A, Page 55, "Existing

Conditions"

Regarding the statement “Information regarding current displays (e.g., locations, manufacturer, model number, mounting information, etc.) will be shared with the awarded vendor.” Can the airport provide this information to proposers now? This information significantly affects accuracy in pricing of hardware and installation costs.

There are approximately 1,500 monitors and 1,400 DDCs. The full asset inventory will be shared with the awarded vendor.

Monitors are out of scope.

112. Appendix A, Page 55, "Existing

Conditions"

One could infer that there is one media player per display currently, is that airport open to fewer devices to manage by using DDCs which can drive multiple displays?

Yes.

113. Appendix A, Page 55, "Existing

Conditions"

Please confirm how many Mac minis remain in production.

There are approximately 400 Mac mini’s being replaced by form-factor mini-PCs.

114. Appendix A, Page 55, "Existing

Conditions"

Regarding the statement, "PHL has a capital program to upgrade all terminal displays, structures, casework and build video walls in select locations." Will this be done at the same time the CMS is being deployed or before?

Yes, the same time.

115. Appendix A, Page 55, Also, regarding the statement, "PHL has a capital program to upgrade all terminal displays, structures, casework and build video

Unknown at this time.

# RFP Section

Question Response

"Existing Conditions" walls in select locations", What manufacturer and model are the LCDs that will be installed?

And what display technology

116. Appendix A, Page 56, "Hardware and

Installation"

Regarding the statement, "Necessary hardware including servers, workstations, and digital display controllers must be provided."

Does the Airport have a virtual server environment that can be utilized for this system?

Yes.

117. Appendix A, Page 56, "Hardware and

Installation"

If the airport does have a virtual environment that vendors can utilize, what licenses would the airport supply and what would be expected to be provided by the vendor.

Examples of licenses include but are not limited to server OS, database, hypervisor, load balancers, etc.

PHL will provide the full virtual environment infrastructure.

118. Appendix F Please confirm that only form F1 or F2 need to be submitted with the proposal and not Form F which is informational only.

Complete and submit only the form for Appendix F-1 or F-2.

119. Appendix A- 1, Page 4, 1.1.2

Is the airport aware of any infrastructure issues regarding the reliability of network connectivity or any locations which do not meet PHL requirements?

No.

120. Appendix A- 1, Page 4, 1.1.2

Are proposers expected to include costs for any required network infrastructure updates prior to evaluating the existing

No.

# RFP Section

Question Response

121. Appendix A- 1, Page 26, F

Are on-site personnel required once the system is accepted or is it only required during implementation?

See Appendix A-1 Section 1 1.2.4 on SLA/Maintenance Services (Post System Acceptance – OPTIONAL).

122. General Is a high-level construction schedule available, that the airport can provide, for any work that this project will be dependent upon?

No.

123. General Is office space for 2-3 people available that the contractor can use for the duration of the project?

Yes.

124. A1 – 2.1. D If the Vendor is providing a cloud solution, would PHL also be able to provide a virtual machine (VM) to host the Vendor's integration layer with other systems at the edge (Hybrid Deployment)?

Yes, we can provide VMs.

125. A1 – 1.1.1 Does the current AODB have the capability to provide flight data via an AIDX API, or push the flight data to an AIDX API?

Not at this time.

126. A1 – 2.1. F If the new proposed CMS is capable to have a direct data feed from the AODB/RMS, would PHL like to leave Amadeus FIDS in charge of certain FIDS positions or remove Amadeus FIDS entirely and have the CMS render the flight data for a simpler system?

We anticipate we will transition to the new

CMS as the authority for FlDS data once implementation is complete, and no longer use Amadeus for FIDS.

127. A1 – 2.1. G If Amadeus FIDs is to be removed as the FIDS display system for PHL, how will processes like Check-in and Boarding be performed? Should the proposer make accommodations for interactive modules allowing PHL staff to manage gates, check-ins, airlines, routes, from the CMS system?

Check-in and boarding functionality is out of scope for the CMS.

# RFP Section

Question Response

128. A1 - Exhibit B

What is the current version of Windows installed on the form-factor PCs? If it is Windows 11 Home, will PHL upgrade or provide a license for Windows 11 IoT Enterprise LTSC? This is a long-term stable release of Windows meant for Digital Signage (among other duties) and will aid in stability.

We are using Windows 10 Enterprise.

129. A1 - Exhibit B

How many Display Controllers are currently present at PHL and planned to be used with the CMS system? This is very helpful for sizing the system and proposing an appropriate solution for PHL.

We have approximately 1,400.

130. Exhibit A -sample of existing displays

How many separate LCD panels are in use at PHL? How many will be controlled by the CMS?

This is very helpful for sizing the system and proposing an appropriate solution for PHL.

Currently none. We plan to install video wall panels in the future.

131. A1 – 2.6.1 C. Is there a desire for Interactive (touch screen) capable wayfinding systems? If so, should this be included in the bidder’s proposal?

Interactive (touch screen) is not a requirement. If your system has this capability, call it out in your proposal as a line item with the cost.

132. A1 – 2.6.5 F. Should a budget be included to create original media works for the airport? This could include Sign Language videos, art, etc. that the CMS is required to support. If yes, please outline what content the bidder should plan to create on behalf of PHL.

No.

133. A1 – 1.2.1 0.10

If the bidder has extensive experience of successful CMS projects with a different amount of training than what is required from the RFP, may this be reduced in order to provide savings to PHL?

Our requirements are listed in the RFP. Your proposal can speak to what you propose.

# RFP Section

Question Response

134. A1 – 2.6.8 B.

For integrations dealing in flight data, such as BHS/BIC, Saab Sensis Autobahn, etc., is it safe to assume that these services are to be integrated with the AODB first and therefore the data will come via AODB/RMS integration as one feed? Or is the CMS expected to have direct feeds to all of these flight specific systems?

We currently use Amadeus for our AODB. The system will be required to integrate with that system.

135. A1 – 2.6.8 B.

A billing management system is mentioned as an integration. Can PHL please elaborate on the purpose of this interface in the context of a

CMS?

This is in reference to possible future integrations. The billing management system would be for advertisements.

136. A1 – 2.6.8 B.4.A

For Amadeus FIDS positions, would PHL like to leave the FIDS vendor in control of these positions or shall the CMS control and prime every single passenger facing screen for a unified system?

We anticipate we will transition to the new

CMS as the authority for FlDS data once implementation is complete, and no longer use Amadeus for FIDS.

137. A1 – 2.6.8 B.

Are there any instances whereby the proposer is expected to integrate two unrelated systems or is all integration work concerning what comes into and leaves the CMS?

Currently all integration work is primarily what comes into and leaves the CMS.

138. Exhibit A -sample of existing displays

Are there any existing LED installations (Video Walls) the CMS is expected to drive? If so, can these please be detailed along with the controller PCs attached to them?

There are no video walls at this time. We are expecting to install video walls in the near future.

139. Appendix F Please clarify if the MBE/WBE/DSBE goal is a total of 15-20%, or 15-20% in each category.

For example, if the proposer works with a MBE to provide 20% of the work, then the goal is met.

The opportunity ranges are MBE 15-20% AND/OR WBE 15-20%. The vendor must award a minimum of 15% to one or both. The City encourages Applicants to exceed the minimum percentage, if possible, and to award to both MBEs and WBEs if possible.

# RFP Section

Question Response

140. RFP: page 1 As the City of PHL is issuing answers to questions on Oct 8th, would the City consider an extension to the Oct 18th due date, to give vendors sufficient time to prepare their responses after answers are received?

We will extend the deadline.

141. During the prebid meeting on Sept 20th, it was mentioned that the awarded Prime contractor would be required to enter the spend of the MBE/WBE/DSBE on a monthly basis into the City’s system. Please advise if there is a charge to the Prime contractor to register & use this system.

The City does not charge the Prime to use this system. The City requires that the Prime use this system to enter spend.

142. RFP: 2.4.2 Who is responsible for the Warranty and Breakfix-maintenance of the hardware (DDCs and Monitors) if no hardware is provided as part of the Applicant’s solution?

If the awarded vendor decides to use our existing DDCs, PHL will be responsible for the warranty and repair. If the vendor proposes different DDCs, they will be responsible for the warranty and repair.

Monitors are out of scope.