CM_PROPOSED_STAFF_FORM-FILLABLE.pdf
PDF 168 KB Posted
- Solicitation number
- 2025-06
- Issued by
- Manatee County, Florida
About this file
The document is a Proposed Staff Form from the School District of Manatee County for CM/CM at-Risk/PM Selection Procedures. This form is designed to be used for shortlisting criteria, specifically for Factors a and b, requiring submission of one form for each employee. The form allows proposers to detail an employee's qualifications, experience, and potential involvement in a construction management, design-build, or program management project.
The form provides comprehensive sections for capturing critical professional information, including the employee's name, title, staff type (Professional/Tech Office Staff or Proposed On-Site Staff), percentage of time to be assigned to the project, and years of experience with the current firm and other firms. It includes checkboxes for various professional abilities such as option analysis, design review, budget estimating, value engineering, construction scheduling, quality control, and project closeout. The form also allows for documenting the employee's education, registrations, licenses, and previous project involvement, making it a detailed tool for evaluating staff capabilities in construction and project management contexts.
View the file
Other files
Show all 18
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
The School District of Manatee County CM/CM at-Risk/PM Selection Procedures
PROPOSED STAFF FORM
(Make copies of this form for use for Shortlist Criteria 5, Factors a and b – Submit one form for each employee)
SDMC PROJECT TITLE: RFQ #:
PROPOSER (PRIME): RFQ Response Due Date:
Joint Venture
EMPLOYEE NAME: TITLE: CHECK ONLY ONE:
❑ Professional/Tech Office Staff ❑ Proposed On-Site Staff
% of time to be assigned to the proposed project: Years with firm: Years with other firms:
DE
LI
VE
RY
ME
TH
OD
Delivery Method Codes: CM = Construction Management DB = Design-Build OT = Others CMR = CM at-Risk TR = Traditional (D/B/B) CMR(M) = CM at-Risk Miscellaneous PM = Program Management
PROJECT TITLE DOLLAR
VALUE
GSF EMPLOYEE’S
INVOLVEMENT
EDUCATION: (highest level achieved, degree earned, school & year)
REGISTRATION(S) & LICENSE(S):
OTHER QUALIFICATIONS:
EMPLOYEE'S
ABILITIES
(check all that apply):
❑ Option analysis ❑ Design review ❑ Budget estimating ❑ Value engineering ❑ Constructability analysis
❑ Life cycle cost analysis ❑ Construction scheduling ❑ Quality control (Design) ❑ Quality control (Construction) ❑ Cost control
❑ Fast-track techniques ❑ Construction supervision ❑ Building code inspection ❑ Project closeout/warranty ❑ Other:
The School District of Manatee County
| SDMC PROJECT TITLE: |
| RFQ: |
| PROPOSER PRIME: |
| RFQ Response Due Date: |
| EMPLOYEE NAME: |
| TITLE: |
| Profess: Off |
| Proposed OnS: Off |
| Years with firm: |
| Years with other firms: |
| of time to be assigned to the proposed projectRow2: |
| PROJECT TITLERow1: |
| DOLLAR VALUERow1: |
| GSFRow1: |
| EMPLOYEES INVOLVEMENTRow1: |
| EDUCATION highest eve achieved degree earned school year: |
| REGISTRATIONS LICENSES: |
| OTHER QUALIFICATIONS: |
| Option analysis: Off |
| Design review: Off |
| Budget estimating: Off |
| Va: Off |
| Constructabi: Off |
| L: Off |
| Construct: Off |
| Qual: Off |
| Qual_2: Off |
| Cost control: Off |
| Fasttrack techn: Off |
| Construct_2: Off |
| Bu: Off |
| Pro: Off |
| Other: On |
| ect closeoutwarranty: |
| Text2: |
| Text3: |
| Text4: |
| Text5: |
| Text6: |
| Text7: |
| Text8: |
| Text9: |
| Text10: |
| Text11: |
| Text12: |
| Text13: |
| Text14: |
| Text15: |
| Text16: |
| Text17: |
| Text18: |
| Text19: |
| Text20: |
| Text21: |
| Text22: |
| Text23: |
| Text24: |
| Text25: |
| Text26: |
| Text27: |
| Text28: |
| Text29: |
| Text30: |
| Text31: |
| Text32: |
| Text33: |
| Text34: |
| Text35: |
| Text36: |
| Text37: |
| Text38: |
| Check Box1: Off |
File details come from the government source that posted it. Updated .