CM_PROPOSED_STAFF_FORM-FILLABLE.pdf
PDF 168 KB Posted
- Solicitation number
- 2025-06
- Issued by
- Manatee County, Florida
About this file
The document is a Proposed Staff Form from the School District of Manatee County for Construction Management (CM) and Construction Management at Risk (CM at-Risk) project selection procedures. The form is designed for proposers to detail individual employee qualifications for a specific project, allowing contractors to showcase staff capabilities across various technical and professional domains. The form includes sections for employee details, project history, education, registrations/licenses, and a comprehensive checklist of employee abilities such as design review, budget estimating, construction scheduling, and quality control.
The form serves as a critical component of the district's procurement process, enabling evaluators to assess the technical competence and experience of proposed project personnel. It provides a standardized method for documenting an employee's professional background, including years of experience with the current firm and other firms, delivery method expertise (such as Construction Management, Design-Build, or Traditional Design-Bid-Build), and specific project involvement. The checklist of employee abilities allows proposers to highlight staff strengths across multiple project management and construction-related competencies, which will likely factor into the overall evaluation of a contractor's qualifications for the High School AAA project in Lakewood Ranch.
View the file
Other files
Show all 18
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
The School District of Manatee County CM/CM at-Risk/PM Selection Procedures
PROPOSED STAFF FORM
(Make copies of this form for use for Shortlist Criteria 5, Factors a and b – Submit one form for each employee)
SDMC PROJECT TITLE: RFQ #:
PROPOSER (PRIME): RFQ Response Due Date:
Joint Venture
EMPLOYEE NAME: TITLE: CHECK ONLY ONE:
❑ Professional/Tech Office Staff ❑ Proposed On-Site Staff
% of time to be assigned to the proposed project: Years with firm: Years with other firms:
DE
LI
VE
RY
ME
TH
OD
Delivery Method Codes: CM = Construction Management DB = Design-Build OT = Others CMR = CM at-Risk TR = Traditional (D/B/B) CMR(M) = CM at-Risk Miscellaneous PM = Program Management
PROJECT TITLE DOLLAR
VALUE
GSF EMPLOYEE’S
INVOLVEMENT
EDUCATION: (highest level achieved, degree earned, school & year)
REGISTRATION(S) & LICENSE(S):
OTHER QUALIFICATIONS:
EMPLOYEE'S
ABILITIES
(check all that apply):
❑ Option analysis ❑ Design review ❑ Budget estimating ❑ Value engineering ❑ Constructability analysis
❑ Life cycle cost analysis ❑ Construction scheduling ❑ Quality control (Design) ❑ Quality control (Construction) ❑ Cost control
❑ Fast-track techniques ❑ Construction supervision ❑ Building code inspection ❑ Project closeout/warranty ❑ Other:
The School District of Manatee County
| SDMC PROJECT TITLE: |
| RFQ: |
| PROPOSER PRIME: |
| RFQ Response Due Date: |
| EMPLOYEE NAME: |
| TITLE: |
| Profess: Off |
| Proposed OnS: Off |
| Years with firm: |
| Years with other firms: |
| of time to be assigned to the proposed projectRow2: |
| PROJECT TITLERow1: |
| DOLLAR VALUERow1: |
| GSFRow1: |
| EMPLOYEES INVOLVEMENTRow1: |
| EDUCATION highest eve achieved degree earned school year: |
| REGISTRATIONS LICENSES: |
| OTHER QUALIFICATIONS: |
| Option analysis: Off |
| Design review: Off |
| Budget estimating: Off |
| Va: Off |
| Constructabi: Off |
| L: Off |
| Construct: Off |
| Qual: Off |
| Qual_2: Off |
| Cost control: Off |
| Fasttrack techn: Off |
| Construct_2: Off |
| Bu: Off |
| Pro: Off |
| Other: On |
| ect closeoutwarranty: |
| Text2: |
| Text3: |
| Text4: |
| Text5: |
| Text6: |
| Text7: |
| Text8: |
| Text9: |
| Text10: |
| Text11: |
| Text12: |
| Text13: |
| Text14: |
| Text15: |
| Text16: |
| Text17: |
| Text18: |
| Text19: |
| Text20: |
| Text21: |
| Text22: |
| Text23: |
| Text24: |
| Text25: |
| Text26: |
| Text27: |
| Text28: |
| Text29: |
| Text30: |
| Text31: |
| Text32: |
| Text33: |
| Text34: |
| Text35: |
| Text36: |
| Text37: |
| Text38: |
| Check Box1: Off |
File details come from the government source that posted it. Updated .