CLS RFP FA813423RB002 First Draft RFP Questions and Answers.xlsx

XLSX spreadsheet 43 KB Posted

Attached to
C-20/C-37 Contractor Logistics Support (CLS) Services
Solicitation number
CLS-Nov22-RFI
Issued by

View the file

Other files

File Type Posted
Revision Summary 2.pdf PDF
Solicitation - FA813423RB002 Amd 02_5 Jan 2024.pdf PDF
Appendix J C20_C37 CLS Addendum 52.212-1_Rev 2.pdf PDF
Final Amd 1 Questions_5 Jan.pdf PDF
Appendix K C20_C37 CLS Addendum 52.212-2_Rev 2.pdf PDF
Appendix G - Pricing Matrix C20-C37 FINAL 14DEC2023- Protected.xlsx XLSX spreadsheet
Appendix J C20_C37 CLS Addendum 52.212-1_Rev 1.pdf PDF
Revision Summary 1.pdf PDF
Attachment 9 Base Support Agreements_Rev 1.pdf PDF
Final RFP Questions_18 Dec.xlsx XLSX spreadsheet
Appendix G - Pricing Matrix C20-C37 DRAFT Rev 1.xlsx XLSX spreadsheet
Attachment 12 - USCG Airport Agreement_Rev 1.pdf PDF
Attachment 11 Vendor Subscriptions_Rev 1.xlsx XLSX spreadsheet
Solicitation - FA813423RB002 Amd 01_18 Dec.pdf PDF
Appendix K C20_C37 CLS Addendum 52.212-2_Rev 1.pdf PDF
DRAFT Appendix E C20_C-37 CLS DD254_Rev 1.pdf PDF
RFP Interim Question_FA8134-23-R-B002 C-20 C-27 CLS.xlsx XLSX spreadsheet
Appendix K C20_C37 CLS Addendum 52.212-2_for FINAL release.pdf PDF
C20 C37 Aircraft Interior Pictures Final RFP.docx DOCX document
3rd Draft Questions and Answers_All.xlsx XLSX spreadsheet
Rolls Royce Letter - US Airforce LOT Final RFP.docx.pdf PDF
Attachment 4_Mission Essential Services.pdf PDF
PWS 3.10 Original Equipment Manufacturer (OEM) Agreements - Final RFP.pdf PDF
Process to Gain CMP Access revised 6.15.22.pdf PDF
Appendix H - C20_C37AB CMP Codes.pdf PDF
Attachment 11 Vendor Subscriptions_New.xlsx XLSX spreadsheet
C-20 C-37 Aircraft Exteriors Pictures FINAL RFP.docx DOCX document
Appendix C Safety_Final.pdf PDF
Attachment 9 Base Support Agreements Final RFP.pdf PDF
Attachment 1 - Information for CMP Access.pdf PDF
Appendix E C20_C-37 CLS DD254 Final RFP.pdf PDF
Attachment 7 Appearance Standards.pdf PDF
Appendix G - Pricing Matrix C20-C37 DRAFT 15NOV23-Protected.xlsx XLSX spreadsheet
FBO Post.pdf PDF
Appendix J C20_C37 CLS Addendum 52.212-1_for FINAL release.pdf PDF
Attachment 3 Publications Manuals and Forms.pdf PDF
Attachment 2-Definitions Final RFP.pdf PDF
PPI Tool Download Instructions.docx DOCX document
Appendix F Wage Determination.pdf PDF
Appendix I C-20 C-37 Performance Incentive Document (PID).pdf PDF
Solicitation - FA813423RB002 Final RFP.pdf PDF
CDRL A030 Chief Financial Officer Report Attachment 1.xlsx XLSX spreadsheet
Pre-Solicitation Conference Questions and Answers.pdf PDF
C-20 C-37 Synopsis.pdf PDF
C20-C37 Pre-Solicitation Conference.pdf PDF
Projected Flying Hours_Fleet.xlsx XLSX spreadsheet
Draft RFP Updates SAM Announcement.docx DOCX document
DRAFT FA813423RB002 CLIN Structure.pdf PDF
2nd Draft PWS Questions and Answers R2.xlsx XLSX spreadsheet
Appendix G - Pricing Matrix C20-C37 DRAFT 16OCT23-Protected.xlsx XLSX spreadsheet
Show 40 more

Latest 50 of 106 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

Document:PageSectionDescriptionQuestion/ErrorAnswers
Solicitation - FA813423RB002.pdf40006Odering Period Dates6 Month extension is not includedNoted, will add dates for 6 month extension
Solicitation - FA813423RB002.pdf50001, 0050, 0051, 0052, 0053, 0054, 0055Reference to PWS paragraph 3.1.43.1.4 is not found in PWS June 20, 2023 Rev 1Updated IAW newest PWS
Solicitation - FA813423RB002.pdf50001, 0050, 0051, 0052, 0053, 0054, 0055Reference to PWS paragraph 3.10.23.10.2 is not found in PWS June 20, 2023 Rev 1Updated IAW newest PWS
Solicitation - FA813423RB002.pdf50001, 0050, 0051, 0052, 0053, 0054, 0055Reference to PWS paragraph 5.1.6.25.1.6.2 is not found in PWS June 20, 2023 Rev 1Updated IAW newest PWS
Solicitation - FA813423RB002.pdf70050, 0051, 0052, 0053, 0054, 0055Reference to PWS paragraph 3.163.16 is not found in PWS June 20, 2023 Rev 1Updated IAW newest PWS
Solicitation - FA813423RB002.pdf70050, 0051, 0052, 0053, 0054, 0055Reference to PWS paragraph 4.1.2.2Applies to JBA USAF aircraft onlyAdded note to CLIN description reflecting this information and removed from CLINs 0051, 0052, 0053, 0054
Solicitation - FA813423RB002.pdf70050, 0051, 0052, 0053, 0054, 0055Reference to PWS paragraph 5.1.11.15.1.11.1 s not found in PWS June 20, 2023 Rev 1Updated IAW newest PWS
Solicitation - FA813423RB002.pdf70050, 0051, 0052, 0053, 0054, 0055Reference to PWS paragraph 3.14.1Applies to USAF OnlyNo longer in the CLIN description
Solicitation - FA813423RB002.pdf70051, 0052, 0053, 0054, 0055Reference to PWS paragraph 4.1.2.2Applies to JBA USAF aircraft onlyRemoved from this CLIN
Solicitation - FA813423RB002.pdf800560056 Subscriptions: INDSThe CLIN should reference 0100Corrected
Solicitation - FA813423RB002.pdf901050105 Subscriptions: XM WX BaxicMisspelling: Baxic to BasicCorrected
Solicitation - FA813423RB002.pdf100200, 0201, 0202, 0210, 0211, 0212, 0213, 0220"excluding 3.15.2 and 3.16"These references are not found in PWS dated June 20, 2023 Rev 1Updated IAW newest PWS
Solicitation - FA813423RB002.pdf10O201"….as well as PWS paragraph"Incomplete sentence. Appears text inadvertently deleted.Corrected
Solicitation - FA813423RB002.pdf10O202Reference to PWS 4.1.2.2This applies to USAF at JBA ONLYRemoved from this CLIN
Solicitation - FA813423RB002.pdf12O300"....for this CLIN are provided in corresponding Flying Hours and COMBS CLIN."Verbiage for 0300 is different than all other 300 series MOB CLINS.Corrected all MOB CLINs to add corresponding Flying Hours and COMBS CLIN.
Solicitation - FA813423RB002.pdf12O301, 0312"4 through 4.10 as well as paragra"…...Incomplete sentence. Appears text inadvertently deleted.Corrected to add full description
Solicitation - FA813423RB002.pdf1804130413 Engine Maintenance: …5595AC SN should reference 5592Changed to 5592
Solicitation - FA813423RB002.pdf23O500, 0501, 0510, 0511, 0515, 0516, 0517, 0518, 0525, 0526, 0800, 0901, 0903, 0915Attachment TShould be "Attachment 10"Changed attachment T to PWS Attachment 10
Solicitation - FA813423RB002.pdf300607C-20G Inspections: Operation Package Twenty-seve "10 Year PSE"C-20G Inspections: Operation Package Twenty-seven "10 Year PSE"Added n to "seven"
Solicitation - FA813423RB002.pdf320614, 0617, 0618, 0622, 0624, 0625, 0626, 0627, 0628C-20G Inspections: Operation Pacakge…C-20G Inspections: Operation Package…Corrected spelling
Solicitation - FA813423RB002.pdf3806350635: C-20G Inspections: Remove and Replace EngineAPU (Model -150) Inspection to include remove/replace labor only
no partsRemove and Replace Engine is now 0641 and APU Inspection is now 0640 IAW Appendix H
Solicitation - FA813423RB002.pdf3806350635: C-20G Inspections: Remove and Replace EngineThis should be CLIN 0636Remove and Replace Engine is now 0641 IAW Appendix H
Solicitation - FA813423RB002.pdf3906370637: C-20G Inspections: MK-611 Engine Midlife Inspection (Labor Only, No Parts)This should be CLIN 0638MK-611 Engine Midlife Inspection is now CLIN 0643 IAW Appendix H
Solicitation - FA813423RB002.pdf3906380638: C-20G Inspections: MK-611 Engine Overhaul Inspection (Labor Only No Parts)This should be CLIN 0639Changed to CLIN 0640 IAW Appendix H
Solicitation - FA813423RB002.pdf3906390639: C-20G Inspections: Weight and BalanceThis should be CLIN 0642Changed to CLIN 0647 IAW Appendix H
Solicitation - FA813423RB002.pdf3906400640: C-37A Inspections: "4C" Checks (A Models)This should be CLIN 0700Changed to 0700
Solicitation - FA813423RB002.pdf4607200720: C-37A Inspections: 8300 Cycle Initial/2755 Cycle RecurringThis should be CLIN 0721Changed to 0721
Solicitation - FA813423RB002.pdf4707210721: C-37B Inspections: "4C" checks (B models)This should be CLIN 0725Changed to 0725
Solicitation - FA813423RB002.pdf4707220722: C-37B Inspections: 48 Month Initial/48 Month Recurring InspectionsThis should be CLIN 0726Changed to 0726
Solicitation - FA813423RB002.pdf4707230723: C-37B Inspections: "8 C" ChecksThis should be CLIN 0727Changed to 0727
Solicitation - FA813423RB002.pdf4807240724: C-37B Inspections: 96 Month Initial/96 Month Recurring InspectionThis should be CLIN 0728Changed to 0728
Solicitation - FA813423RB002.pdf4807250725: C-37B Inspections: 144 Month Initial/96 Month Recurring InspectionThis should be CLIN 0729Changed to 0729
Solicitation - FA813423RB002.pdf4807260726: C-37B Inspections: 144 Month Initial/144 Month Recurring InspectionThis should be CLIN 0730Changed to 0730
Solicitation - FA813423RB002.pdf4907270727: C-37B Inspections: 192 Month Initial InspectionThis should be CLIN 0731Changed to 0731
Solicitation - FA813423RB002.pdf4907280728: C-37B Inspections: 192 Month InitialThis should be CLIN 0732Changed to 0732
Solicitation - FA813423RB002.pdf4907290729: C-37B Inspections: Main Landing Gear Sponson Bore Structural InspectionThis should be CLIN 0733Changed to 0733
Solicitation - FA813423RB002.pdf5007300730: C-37B Inspections: Horizontal Stabilizer Actuator Restore/DiscardThis should be CLIN 0734Changedt o 0734
Solicitation - FA813423RB002.pdf5007310731: C-37B Inspections: Landing Gear Overhaul at 5000 LandingsThis should be CLIN 0735Changed to 0735
Solicitation - FA813423RB002.pdf5107320732: C-37B Inspections: 5000 initial/ 2000 Recurring LandingsThis should be CLIN 0736Changed to 0736
Solicitation - FA813423RB002.pdf5107330733: C-37B Inspections: 2700 Initial/2300 Recurring LandingsThis should be CLIN 0737Changed to 0737
Solicitation - FA813423RB002.pdf5107340734: C-37B Inspections: Flap B&C Track 7200 Initial/3400 Recurring LandingsThis should be CLIN 0738Changed to 0738
Solicitation - FA813423RB002.pdf5207350735: C-37B Inspections: 8000 Initial Landing ItemsThis should be CLIN 0739Changed to 0739
Solicitation - FA813423RB002.pdf5207360736: C-37B Inspections: Lower Sponson Doubler 6000 Cycle InitialThis should be CLIN 0740Changed to 0740
Solicitation - FA813423RB002.pdf5207500750: Inspections Common to all C-37s: APU Life Limited Part ReplacementThis should be CLIN 0745Changedt o 0745
Solicitation - FA813423RB002.pdf5307510751: Inspections Common to all C-37s: APU Inspection to include remove/replaceThis should be CLIN 0746Changed to 0746
Solicitation - FA813423RB002.pdf5307520752: Inspections Common to all C-37s:48 Month Detailed Corrosion InspectionThis should be CLIN 0747Changedt o 0747
Solicitation - FA813423RB002.pdf5307530753: Inspections Common to all C-37s: Aircraft Complete Strip and Paint to include wheel wells- Blue & WhiteThis should be CLIN 0748Changed to 0748
Solicitation - FA813423RB002.pdf5307540754: Inspections Common to all C-37s: Aircraft Complete Strip and Paint to include wheel wells- White OnlyThis should be CLIN 0749Changedt o 0749
Solicitation - FA813423RB002.pdf5407550755: Inspections Common to all C-37s: Protective CoatingThis should be CLIN 0750Changed to 0750
Solicitation - FA813423RB002.pdf5407560756: Inspections Common to all C-37s: Remove and Replace EngineThis should be CLIN 0751Changed to 0751
Solicitation - FA813423RB002.pdf5407570757: Inspections Common to all C-37s: Weight and BalanceThis should be CLIN 0754Changed to 0754
Solicitation - FA813423RB002.pdf5407580758: Inspections Common to all C-37s: 2900 Cycle Recurring InspectionThis should be CLIN 0756Changed to 0756
Solicitation - FA813423RB002.pdf5407590759: Inspections Common to all C-37s: 6300 Cycle Initial/1000 Cycle RecurringThis should be CLIN 0757Changed to 0757
Solicitation - FA813423RB002.pdf5507600760: Inspections Common to all C-37s: Cycle Initial/1100 or 1300 CycleThis should be CLIN 0758Changed to 0758
Solicitation - FA813423RB002.pdf6009080908: Over and Above: Functional Check FlightThis should be CLIN 0911Changed to 0911
Solicitation - FA813423RB002.pdf6009100910: Over and Above: Maintenance Acceleration/CompressionThis should be CLIN 0912Changed to 0912
Solicitation - FA813423RB002.pdf6009120912: Over and Above: TCTO/Service BulletinsThis should be CLIN 0913Changed to 0913
Solicitation - FA813423RB002.pdf6009150915: Over and Above: TransportationThis should be CLIN 0916Changed to 0916
Solicitation - FA813423RB002.pdf60missingMissing 0909 C-37 Engine RentalAdded as 0909
Solicitation - FA813423RB002.pdf60missingMissing 0910 C-37 Hourly Flying RateAdded as 0910
Solicitation - FA813423RB002.pdf6109160916: Over and Above: DeploymentThis should be CLIN 0915Changed to 0915
Solicitation - FA813423RB002.pdf61missingMissing 0918 Over and Above: Specialized Maintenance Fixed Hourly RateAdded
Solicitation - FA813423RB002.pdf61missingMissing 0919 Over and Above: Specialized Maintenance Overtime RateAdded
Solicitation - FA813423RB002.pdf61missingMissing 0920 Over and Above: Specialized Maintenance Premium RateAdded
Solicitation - FA813423RB002.pdf67missingSkips 0100 through 0109Added Pop
Solicitation - FA813423RB002.pdf8106400640 Period of PerformanceThere is no 0640. I believe this should be 06420640 changed to 0700
Solicitation - FA813423RB002.pdf81missingMissing 0700 "4C" Checks (A Models)0640 changed to 0700
Solicitation - FA813423RB002.pdf8307200720 Period of Performance0720 is a reserved CLIN. I believe this should be 0721changed to 0721
Solicitation - FA813423RB002.pdf8307210722 Period of PerformanceThis is a reserved CLINchanged to 0725
Solicitation - FA813423RB002.pdf8307230723 Period of PerformanceThis is a reserved CLINchanged to 0726
Solicitation - FA813423RB002.pdf8307240724 Period of PerformanceThis is a reserved CLINchanged to 0727
Solicitation - FA813423RB002.pdf84missingMissing 0737 through 0740renumbered to add these CLINs
Solicitation - FA813423RB002.pdf84missingMissing 0745 through 0749renumbered to add these CLINs
Solicitation - FA813423RB002.pdf850752, 0753, 0755, 0759, 07600752 Period of PerformanceThis is a reserved CLINrenumbered to match App G
Solicitation - FA813423RB002.pdf87missingMissing 0909 C-37 Engine RentalCreated CLIN 0909
Solicitation - FA813423RB002.pdf870911, 0913, 0918, 0919, 0920O&A FCF, TCTO/SB, Specialized Maintenance, Specialized Maintenance OT Rate, Specialized Maintenance Premium RateCLINs missingAdded
Solicitation - FA813423RB002.pdf93Travel CostIs it the USG’s intent for offeror to bid travel costs other than C-20/C-37 Contractor Logistics Support mission requirements (training, ground events, deployments and over and above situations) in FFP CLINs X300 – X320?See revised PWS paragraph 2.10.1
Solicitation - FA813423RB002.pdf115ListList of Attachments missing Attachment 12 - Government Minimum Equipment ListAttachment 12 referenced several places in PWS.Removed from PWS, MEL is no longer Attachment 12. It will be found in the bidder's library
PWS2Table 1.1 and 1.7.1Are the USA aircraft at JBA maintained by employees under a CBA and are these the same employees who support the USAF O-level maintenance at the JBA site referenced in the PWS 1.7.1 as "third party contractors"?Full CLS is applicable for USA aircraft at JBA under this PWS (See Table 1-1).
PWS2Table 1-1Will the Gov. add the current engine hours and cycles to this chart?
Engine hours and cycles are available in the Bidder's Library
PWS31.2Covered Aircraft BackgroundCan the Gov. confirm that Section 1.2 of the Draft PWS refers to the Airworthiness Management of the Fleet only and does not extend into the maintenance of the fleet per 14 CFR Part 91 as discussed in PWS Section 1.7.
Airworthiness Management applies to activities only within the scope of the PWS.
PWS31.3Revision of ServicesGiven the potential impact on manpower requirements at impacted locations/commands, will the Government consider removing the prohibition on price adjustments in favor of allowing an economic impact proposal from Contractor when necessary to prevent a disruption to the full CLS services?
Any modification has to be negotiated and incorporated via bilateral adoption. There is clearly no prohibition of price adjustments in the text.
PWS51.6FAA Equivalency/RequirementsAs DAFI 21-101 is not applicable to the maintenance of commercial Gulfstream aircraft, will the Government replace references to DAFI 21-101 in favor of references to the applicable FAA standards found at 14 CFR 91 per PWS Section 1.6?
DAFI 21-101 is applicable as stated in PWS 1.2. The Government has removed the reference to 14 CFR Part 121.
PWS51.6FAA Equivalency/RequirementsAs 14 CFR 121 airline carrier standards are not applicable to the maintenance of commercial Gulfstream aircraft, will the Government replace references to 14 CFR 121 in favor of references to the applicable FAA standards found at 14 CFR 91 per PWS Section 1.6?
DAFI 21-101 is applicable as stated in PWS 1.2. The Government has removed the reference to 14 CFR Part 121.
PWS51.7.1 and 1.7.2Are the USA aircraft at JBA maintained by employees under a CBA and are these the same employees who support the USAF O-level maintenance at the JBA site referenced in the PWS 1.7.1 as "third party contractors"?Full CLS is applicable for USA aircraft at JBA under this PWS (See Table 1-1).
PWS51.7.1Partial CLS - USAF RequirementsCan the Gov. more clearly define the term “partial CLS”?
Re-wrote for clarity & included PWS references
PWS51.7.1Partial CLS - USAF RequirementsCan the Government provide a copy of any applicable "third-party" contractor PWS for clarification of services and responsibilities?
The Government is not going to provide 3rd party contractual documents with this solicitation.
PWS51.7.1Partial CLS - USAF RequirementsCan the Government confirm that the winning bidder does not have a contractual obligation with any third-party contractors and that the subject Contract is between winning bidder and government only?
Confirmed
PWS61.8.1.1Government Induced DelaysGiven the potential cascading effect of multiple separate delays caused by the Government, will the Government remove the reference to a two-hour threshold in favor of general relief to the Contractor for delays beyond its control that are caused by the Government?
Removed two-hour threshold
PWS61.8.1.2Other DelaysDue to operations with high level Gov officials on board, will the Government add base/ramp freezes to the list of other delays?
Added base/ramp freezes
PWS71.8.2.1USAF FleetCan the Government please provide Attachment 12 as it was not included in the Draft RFP documents?
References to Attachment 12 were removed. Access to MEL is via Bidder's Library and MyCMP access.
PWS71.8.2.3USMC FleetAs the USN Fleet has a GIV, did the Government intend for the section title to be USMC/USN Fleet?
No. The Government did not specify which commercial MMEL is to be used for each applicable aircraft model and expects the Contractor to use the appropriate MMEL.
PWS92.4.3Foreign Object Damage Prevention PlanAs depots have their own FOD Prevention Plans, can the Government provide a definition of "supported location" that does not include depots?
Clarified that DAFI 21-101 applies to COMBS/MOB and DAS 412 applies to Depot maintenance
PWS92.4.3Foreign Object Damage Prevention PlanCan the Gov clarify which specific paragraphs or sections of 8210-1C apply?
Removed reference to 8210-1C
PWS132.13.4Program Management ReviewCan the Government identify the location of the PMR for planning and budgeting purposes?
Clarified that the PMR costs shall be incorporated at the Task Order level, not proposed at the IDIQ level.
PWS152.14.1Quality Program RequirementsAs the two referenced quality standards are vastly different, can the Government clarify that PWS Section 2.14.1 intended to require that the contractor have a quality program that meets either ISO 9001:2015 or AS9100?
Since AS9100 incorporates the entirety of ISO 9001, removed the reference to ISO 9001
PWS152.14.1Quality Program Requirements compliant to ISO9001/AS9100Please clarify whether the Contractor is required to seek and attain third-party registration of the quality management system to validate compliance with ISO9001/AS9100 Standards or is an internal auditing for compliance validation acceptable?PWS requires ISO 9001 compliance, not certification
PWS152.14.1.1Aircraft Maintenance Quality AssuranceAs there are no FAA repair stations in Canada or Germany where the Rolls Royce engines are serviced, will the Gov. also include the CAA and EASA authorities as approvers for repair facilities in the performance of this PWS?
Added “FAA-recognized international equivalent” language to PWS
PWS162.15Warranty Management and ExecutionGiven that the current PWS language may be interpreted as requiring the contractor to provide a warranty on parts supplied by 3rd parties as well as on GFE, can the Gov please define the term, "supplies" as used in Section 2.15 of the PWS?
Lanaguage changed to “parts/SE”
PWS162.15Warranties obtained prior to the CLS, prior contracts, or periods of performancePlease clarify how warranties for components (i.e. rotable component warranties) will be documented and conveyed by the outgoing contractor and how those warranties will be transferred from the outgoing contractor to the incoming contractor or the Government.The current C-20/C-37 CLS Contract PWS para 6.7 states, "The Contractor shall transfer all paperwork related to airworthiness and warranties associated with GFP and GFE to the follow-on Contractor."
PWS222.21.2Other Technical RepresentativesGiven the restrictions imposed on repair stations by the FAA at 14 CFR 145, will the Government revise this section to limit the involvement of other technical representatives to technical support only?
The Contractor shall cooperate with and support over-the-shoulder activities involving other Technical Representatives. PWS language updated with clairfying language.
PWS232.21.5Engineering and Engineering Drawing SupportAs the OEM’s commercial drawings and specifications will remain proprietary and are not GFI, will the Government revise this section to clarify that only drawings and specifications produced as a result of this contract will be provided free of proprietary markings?
Revised language to reflect that only drawings and specs produced as a result of this contract will be provided free of proprietary markings.
PWS232.21.6Reliability and MaintainabilityIf a teardown and analysis/root cause analysis is requested by the PCO, will the costs associated with this effort be an allowable O&A?
No, these costs shall be included in the FFP proposal.
PWS232.22.2 (removed)Time Compliance Technical Orders and Service ActionsAs there are existing FAA or OEM technical bulletins addressing this issue, would the Government consider removing the TCTO requirement in favor of compliance with applicable commercial practices pursuant to the FAA or OEM?
This section has been removed.
PWS253Supply SupportGiven that PMA parts are fully approved by the FAA and the OEM, would the Government consider removing the restrictions against PMA parts and the burden of tracking the use of PMA parts?
The Government's requirement for PMA tracking remains as written.
PWS253Supply SupportAssuming the government revises the evaluation criteria, will the Government add innovation as a subfactor when evaluating the offeror's Supply Support solution?The current evaluation methodology and factors addressed in Appendix K stand as written.
PWS253.0 and 4.13.1Supply SupportWill the government accept DER and FAA 8110-3 approvals for DMSMS mitigation or non-standard repair activities?The Government will consider approvals on a case-by case basis
PWS263.1.2Government Furnished Property Documentation ExceptionsWill secure communication systems equipment be acceptable with Government or Government vendor supplied paperwork?
Added USAF MCS to exceptions.
PWS263.1.1, 5.1.6Serviceablility DocumentationWill documentation requirements apply equally to GFP and how will instances of GFP that do not have applicable documents of the type required under the applicable PWS be addressed? Will the Government require the incoming contractor to re-certify GFP that does not have appropriate documentation as over and above?Any required re-certification of GFP required from the contractor will be treated as over and above cost. All GFE transferred will have proper documentation
PWS273.2.1Partially Mission Capable - SupplyWill the Government consider revising this section to require annual PCMS rates of 4% for the USCG C-37 and 3% for all other fleets?

If the Government is unwilling to revise the requirements of this section, can the Government provide metrics to support monthly and yearly PCMS rates per each aircraft model as an achievable goal?

The Government is confident thse metrics are achievable.
PWS273.2Supply Performance RequirementsHow are 'bad from stock' instances addressed in and out of warranty with respect to GFE assumed by the incoming contractor?GFE warranties will follow equipment. The warranties are not associated with a specific contractor.
PWS273.2.2Non- Mission Capable - SupplyWill the Government consider revising this section to require annual NMCS rates of 4% for the USCG C-37 and 3% for all other fleets?

If the Government is unwilling to revise the requirements of this section, can the Government provide metrics to support monthly and yearly NMCS rates per each aircraft model as an achievable goal?

The Government is confident these metrics are achievable.
PWS273.3Main Operating Base Contractor Operated and Maintained Base Supply OperationAs there are no supply references in 14 CFR 121, can the Government provide the correct citation?
Removed reference
PWS283.4.1Parts UpgradesGiven the uncertainty regarding future upgrades, and to eliminate excess cost for the Government in the FFP FH calculation, would the Government consider revising RFP Section 3.4.1 such that upgrades are presented by Contractor as a proposal to the Government?Added back in, " Government will pay for upgrading existing GFP and a negotiated amount of CFP spares."
PWS283.4.2Unique Parts UpgradesGiven the uncertainty regarding future upgrades, and to eliminate excess cost for the Government in the FFP FH calculation, would the Government consider revising RFP Section 3.4.2 such that upgrades are presented by Contractor as a proposal to the Government?
Added back in "Government will pay for upgrading existing GFP and a negotiated amount of CFP spares."
PWS323.6Support EquipmentAs the terms "all" and "Covered Aircraft" includes actions regarding the partial CLS sites, could the Government clarify the language of this paragraph to be applicable only to “full CLS" sites?
The language in question refers to all SE within COMBS
PWS303.6Support EquipmentIs it the Government’s intent for the Contractor to provide and maintain all GSE, hand tools, shop supplies, and test equipment used by third parties at partial CLS sites?

Can the Government provide a copy of any applicable PWS for contractors at partial CLS sites to allow for an understanding of the delineation of duties and provide information necessary for the pricing effort associated with this RFP?

If the item is GFP within COMBS it is the Government's intent that the Contractor shall maintain all GSE, hand tools, shop supplies, and test equipment used by third parties at partial CLS sites.

No PWS will be provided for 3rd party contracts.

PWS313.6.1Test, Measurement, and Diagnostic EquipmentAs the requirements of this paragraph are included in the COMBS CLIN, would the Government consider removing this paragraph?
The Government does not consider this paragraph a duplication. It includes additional information regarding TMDE. It also discusses other branches of the military and calls out a CDRL.
PWS313.6.3Contractor Furnished Support Equipment Maintenance and ServiceabilityWould the Government consider clarifying the language of this paragraph to only be applicable for full CLS sites?
Language has been clairified
PWS363.15USCG Supply Support RequirementsCan the Government provide a copy of Coast Guard MOA #3807C37A0001?
Updated reference to BSA/MOA. USCG BSA is included in Attachment 9 - Joint Base Andrews.
PWS374MaintenanceAssuming the government revises the evaluation criteria, will the government incentivize innovation in the maintenance support concept offered by the Contractor and/or weight innovation as an additional strength in evaluation of the offers received?The current evaluation methodology and factors addressed in Appendix K stand as written.
PWS374.1.2 (removed)Reporting SystemsAs the Army, Navy, USCG, and Marines do not use the stated systems, will the Government consider removing this requirement?
If the Government will not remove this requirement, can the language of this section be revised to clarify that it only applies to USAF maintained aircraft located?This section has been removed. The Government has removed references to Maintenance Management Information Systems (MMIS) from the PWS, reference the Computerized Maintenance Program (CMP) section (PWS 4.1.1) for maintenance tracking and reporting requirements.
PWS374.1.2.1 (removed)Reporting Systems Access, Training, and MonitoringCan the Government revise the language PWS 4.1.2.1 to clarify that it is only applicable to USAF maintained aircraft and that the Contractor is only required to monitor the data but is not required to input data into the subject systems?
This section has been removed. The Government has removed references to Maintenance Management Information Systems (MMIS) from the PWS, reference the Computerized Maintenance Program (CMP) section (PWS 4.1.1) for maintenance tracking and reporting requirements.
PWS384.1.2 (formerly 4.1.2.2)Joint Base Andrews Maintenance DataCan the Government clarify who will receive distribution of the CMP reports and whether electronic delivery is acceptable?
Reports go to the Contracting Officer Representative (COR); removed the word “print” to indicate electronic delivery is acceptable
PWS384.1.2.3 (removed)Corrective ActionsCan the Government confirm that the requirements of PWS 4.1.2.3 are only applicable to USAF maintained aircraft and that completed CMP cards and logbook entries will fulfill said requirements with the Government inputting this data into MMIS?
While completed CMP cards and logbook entries would fulfill these requirements, the Government has removed this section from the PWS.
PWS384.2.1.1USAF OnlyAttachment 12 was not included in the Draft RFP documents, can the Government providethis attachment?
Removed Attachment 12 references from PWS. MELs will be found in the Bidder's Library
PWS394.2.2, Table 2-1Departure Reliability RateAs monthly DRR requirements conflict with Service Summary table 2-1, and considering the limited expected Home Station Departures at some MOB's, will the Government revise the language of this paragraph to require only annual DRR percentages to be consist throughout the PWS?
Revised section 4.2.2 to deconflict the language with the Service Summary. DRR will remain a quarterly-assessed metric. Added "Full CLS) to table 2-1 to ensure consistency with table 1-2.
PWS404.5.4Main Operating Base Service ActionsCan the Government clarify the language of PWS 4.5.4 to only be applicable to full CLS sites?
Clarified in PWS 1.7
PWS404.5.5Main Operating Base Auxiliary Power Unit and Landing Gear Removal/ReplacementCan the Government clarify the language of PWS 4.5.5 to only be applicable to full CLS sites?
Clarified in PWS 1.7
PWS404.5.6Main Operating Base Engine Removal/ReplacementCan the Government clarify the language of PWS 4.5.6 to only be applicable to full CLS sites?
Clarified in PWS 1.7
PWS414.5.14Are the cargo handling equipment standards referenced in PWS 4.5.14 published?The Government is looking for specific standards and regulations published and available to the public.
PWS434.9Base ExercisesWill the Government provide performance metric relief for associated exercises?Edited PWS language to add potential for performance relief due to base exercises.
PWS434.10.Transient AircraftIn consideration of head count and cost drivers, will the Government be willing to revise the language of PWS 4.10 to require support for transient aircraft with discrepancies that are non-deferrable and impact safety of flight operations only?
Government is considering this request.
PWS434.10.Transient Aircraft NoteWill JBPHH BSA services extend to MCBH aircraft while at JBPHH?
Yes, MCBH aircraft will receive JBPHH base services
PWS434.10.Transient Aircraft NoteWill departures out of both MCBH & JBPHH be included in DRR calculations?
Yes, for the purpose of calculating DRR MCBH and JBPHH departures will both be considered home stations for USCM C-20 fleet.
PWS434.11.1Contract Field TeamsWould the Gov consider allowing other aviation authority approved teams to work the aircraft when the aircraft are AOG in other countries?
Government is considering this request.
PWS454.11.3Aircraft On GroundCan the Government confirm that "Covered Aircraft" includes partial CLS aircraft for purposes of PWS 4.11.3?
Confirmed
PWS454.12Depot MaintenanceConsidering the term "Covered Aircraft" includes USCG aircraft and these aircraft do not accomplish depot maintenance on this contract, can the Government revise the language of PWS 4.12 to only only full CLS aircraft?
Clarified in PWS 1.7
PWS454.11.3Aircraft On GroundIs the Government willing to revise the language of PWS 4.11.3 to allow foreign authority approved CFTs to respond to AOGs in international destinations?
Government is considering this request
PWS464.12.1Depot Maintencance PlanGiven the inclusion of partial CLS aircraft on this contract, can the Government revise the language PWS 4.1.2.1 to clarify that it is only applicable full CLS covered aircraft?
Clarified in PWS 1.7
PWS464.12.2Depot Maintencance PlanWill the government provide a list of Site Leads referenced in PWS 4.12.1?
The names will be provided at contract award
PWS474.12.6Drop-In Depot MaintenanceTo accommodate international travel, is the Government willing to revise the language of 4.12.6 to allow for foreign authority approved facilities?
Added language "The Government may approve the use of FAA-recognized international aviation authority approved facilities on a case-by-case basis." to PWS 4.0
PWS474.12.6Drop In MaintenanceDoes the USG have any restrictions or limitations on vendors or individuals providing drop in maintenance?The Government is considering whether drop in maintenance actions will be allowed. If drop-in maintenance by third parties is allowed, it shall only be performed by vendors that meet all security requirements, are FAA FAR Part 91 Certified, and bill IAW Appendix G
PWS484.12.10Over and Above TasksConsidering that the terminology regarding “maintenance team composition" related to ETOPS and a dual engine change is not part of maintenance associated with Gulfstream aircraft, is the Government willing to remove the second sentence of the fourth paragraph in PWS 4.12.10?
Removed “When a dual engine exchange is required, the Contractor shall ensure that the maintenance team composition does not compromise Extended Operations (ETOPS) capability.”
PWS48Paragraphs 4.12.11.2 thru 4.12.11.4,PWS paragraphs 4.12.11.2 thru 4.12.11.4 require the offeror to provide test pilots to accomplish Check Flights, Ferry flights, and Functional Check Flights (FCF) associated with Depot maintenance, "at the direction of the PCO". We were unable to determine the intended workload for these requirements, especially when these tasks will only be accomplished at the direction of the PCO. It would be difficult to maintain test pilot proficiency for the different Mission Design Series (MDS) aircraft if the tasks are infrequently accomplished on such small fleets. It would seem to be advantageous to the Government, for applicable Service (USAF, USN, USMC, USA, and USCG) customer pilots specifically rated for the MDS to accomplish these flight requirements.1. What is the Government's estimated workload, by MDS, for contractor pilot checkflight, ferry, and FCF support?
2. Is required contractor pilot support limited to Depot requirements?USAF anticipates utilizing a contractor check flight every scheduled depot with both pilots being contractor personnel. USN utilizes one Navy test pilot and one contractor pilot for every scheduled depot. Ferry flights, if utilized, are projected to be a rare requirement.
PWS494.12.11.5Depot Return to Service DocumentationAs some of the items listed in the third paragraph of PWS 4.12.11.5 are not always required for every depot vist, is the Government willing to revise the language of this paragraph to include "if applicable" prior to the list of items that must be included in the subject report?
Contractor pilot support is limited to Depot requirements.
PWS504.12.13USAF Mission Communications SystemRemove the extra words, "Remove/Replace,"
Corrected
PWS504.12.14.2Paint Return to ServiceShould Attachment 7 be listed here as the document to be used in satisfaction of PWS 4.12.14.2?
Added
PWS524.14Third-Party Contractor SupportGiven the restrictions imposed on repair stations by the FAA at 14 CFR 145, will the Government revise this section to limit the involvement of third parties to technical support only?
Added
PWS514.13.2Support to TCTO/Modification Activities by Other EntitiesDoes the Government currently anticipate any TTO/Modification Activities by Other Entities for Covered Aircraft?
None anticipated
PWS524.16Engine MaintenanceAs there are no 14 CFR 145 approved repair facilities for the C-37 engines, will the Government revise the language of this paragraph to include the CAA and EASA authorities as approvers for repair facilities in the performance of this PWS?
Added FAA recognized International equivalent agency approvers
PWS524.16Engine MaintenanceAssuming the government revises the technical evaluation criteria, will the government assign additional strengths to contractor proposals that provide innovative engine/APU maintenance solutionsThe current evaluation methodology and factors addressed in Appendix K stand as written.
PWS544.18Landing Gear MaintenanceAssuming the government revises the technical evaluation criteria, will the Government assign additional strengths to contractor proposals that provide innovative landing gear maintenance solutions?The current evaluation methodology and factors addressed in Appendix K stand as written.
PWS564.21Maintenance PlanningGiven the inclusion of partial CLS aircraft on this contract, can the Government revise the language PWS 4.21.1 to clarify that it is only applicable full CLS covered aircraft?
Clarified in PWS 1.7
PWS564.22.1ModificationsGiven the inclusion of partial CLS aircraft on this contract, can the Government revise the language PWS 4.22.1 to clarify that it is only applicable full CLS covered aircraft?
Clarified in PWS 1.7
PWS564.22.2Software UpgradesAs CSO is no longer applicable to the current aircraft configuration, will the Government remove this reference from PWS 4.22.2?
The Government is seeking needed information to further clarify this requirement.
PWS575.1.1After award, will the government provide the Incumbent phase out plan?The Government will provide the needed information, exclusive of third-party pricing.
PWS575.1.1, 3.5.1What is the USGs plan to ensure sufficient GFE is available upon transition out to maintain contractual fleet readiness.All GFE currently on the contract will be transitioned prior to day one of the new contractual PoP via a joint inventory between the outgoing contractor, the new contractor, and the government. All parts to include GFM, SE, and furniture shall be inventoried and documented. However, GFE isn't relied upon to maintian contractual fleet readiness. A newly awarded contractor must come to the table with the spares required to maintain contractual readiness for the C-37 platform. If it's required and not listed on GFE list, contractor will be responsible for obtainting it.
CUI C-37 C-20 PWS DRAFT_RFP_165Attachment 9BSA – Marine Corp Base HawaiiMCBH BSA not included in Attachment 9
MCBH BSA has been added
CUI C-37 C-20 PWS DRAFT_RFP_165Attachment12Attachment 12 – Minimum Equipment ListsAttachment 12 not provided.
Will be provided in the bidder's library; references to Attachment 12 in the PWS have been removed
Appendix DCDRL A025PMA Parts UsageGiven that PMA parts are fully approved by the FAA and the OEM, would the Government consider removing the restrictions against PMA parts and the burden of tracking the use of PMA parts?
No change, government still needs CLS contractor to track PMA parts
Appendix C and Appendix DCDRL A016/App C page1B.1Mishap reportingCan the Government correct the language regarding mishap reporting in Appendix C to be consistent with the language in Appendix D (CDRL A016)?
DID Tailored on A0016 - Use Relationship now states: "damaging government property exceeding $2,000" to match Safety Plan
Appendix G - Pricing Matrix C20-C37 DRAFT 20June23.xlsX413x413USAF-G550-JBA 18-1947/5595Numbering typo should be: USAF-G550-JBA 18-1947/5592Corrected
Appendix G - Pricing Matrix C20-C37 DRAFT 20June23.xlsX510x510Flying Hours: USA C-37B FleetNumbering typo should be: Flying Hours: USA C-37A FleetCorrected
Appendix GC20-C37 CLIN Pricing TabPricingPlease confirm the offeror does not fill in any blue shaded cells on tab "C20-C37 Pricing" in attachment G?That is correct
Appendix GC20-C37 CLIN Pricing TabPricingWill the USG provide all evaluation quantities for all CLINs in columns O-W in order to calculate a TEP?Yes, this information will be provided
Appendix H - C-20 C-37 CMP Codes1x630CMP CodesStarting at X630, does not match Appendix G.
Appendix H and CLIN structure have been update for Draft RFP #2
Appendix HallallC-20 C-37 CMP codesThe Appendix H includes ops packages that have since been deleted, the CMP codes listed in the maintenance CLINs are based on a 2017 revision of the AMM chapter 5, there are numbering errors and the Army C-20 codes are still listed.
Appendix H has been updated for Draft RFP#2
Appendix I4HVA TAT Evaluation CriteriaHVA TAT Evaluation CriteriaGiven that HVA spares are a required part of the COMBS inventory for this contract, and that readily available spares have ensured that all PWS performance metrics have been met or exceed on the current PWS, will the Government remove the penalties associated with lead times for replenishment HVA spares in light of global supply restraints beyond the control of the Contractor?
If the Government is unwilling to remove the penalties identified in Attachment I, will the Government consider ordering additional HVA spares as part of the COMBS inventory making such penalties unnecessary?Appendix I has been revised to better capture the current C-20/C-37 method for determining HVA repair schedules. However, the penalties have not been removed. The Government designed Appendix I to incentivize the follow-on CLS maintenance provider to shorten repair cycles without the need to purchase more HVA spares.
52.212-1 (ITO)/Draft Appendix J5Table 2.3The proposal organization for the Past Performance volume identifies paragraph 4.3.1, Past Performance Information Forms (PPIF) with an asterisk (*) in the Page Limit column. the * note, however, appears to apply only to the Technical volume.Will the Government consider updating Table 2.3 to identify the intended page limit per each PPIF past performance citation?Yes, Table 2.3 and 4.3.1 narrative have been udpated to indicate the Government's request for 5 pages per PPIF.
52.212-1 (ITO)/Draft Appendix J5, 6, 10,Table 2.3, Paragraph 2.3.7,
Paragraph 2.3.5, Paragraph 3.2.2,Cross References, Page Limitations, Volume Organization, and Proposal Organization1. In which proposal volume does the Government intend offerors to include a completed Cross-Reference Matrix (CRM)?
2. Will the Government consider excluding the CRM from the page limitation of the intended proposal volume?1. The ITO paragraph 2.3.7 has been updated to reflect that the Cross Reference Matrix is only required as part of the Technical Volume.

2. The Cross Reference Matrix is excluded from the Technical Volume page limitation.

52.212-1 (ITO)/Draft Appendix J8Paragraph 2.4.2Tables, Charts, Graphs, and Figures, states: "The following limitation only applies to the Technical Volume. Text intended for evaluation within all figures, charts, tables, and graphs, to include imbedded images, shall be no less than Arial 8-pt.Will the Government consider amending ITO paragraph 2.4.2 to allow a minimum font size of Arial 8-pt for tables, charts, graphs, and figures of all volumes, vice only the Technical Volume?Paragraph 2.4.2 has been udpated require a minimium 8-pt font for all tables, charts, graphs and figures.
52.212-1 (ITO)/Draft Appendix J8Paragraph 2.4.1Paragraph 2.4.1, pages, states: "Page line spacing shall be 1.5 lines." We understand using 1.5 line spacing within Narrative text tends to increase readability for reviewers, however; using that same line spacing within tables, charts, graphs, and figures tends to detract from the readability/understandability of those graphicsWill the Government consider amending ITO paragraph 2.4.2 to allow the use of single line spacing within tables, charts, graphs and figures for all volumes?Paragraph 2.4.2 has been udpated to require single spacing in all tables, charts, graphs, and figures.
52.212-1 (ITO)/Draft Appendix J11Paragraph 3.2.3.a.(1)Paragraph 3.2.3.a.(1), Continuation of Essential Services Plan, requires offerors to submit a Continuation of Essential Services Plan, but does not state whether this plan is excluded from the volume page limitation. This plan is several pages long, and will detract from the Narrative content offerors must address in response to ITO requirements.Will the Government consider amending ITO paragraph 3.2.3.a.(1) to exclude the Continuation of Essential Services Plan from the volume I Technical page limit?Updated Table 2.3 to clarify that any attachments and appendices to the technical volume are excluded from the technical page limit.
52.212-1 (ITO)/Draft Appendix J11Paragraph 3.2.3.b.(3)Paragraph 3.2.3.b.(3) requires Large Offerors to submit a Subcontracting Plan. This paragraph does not specify if this plan is excluded from the volume page limitation. In order to specifically respond to the FAR 52.219-9 requirements, this plan is normally over 16 pages long, and without exclusion from page count, will limit an offeror's ability to provide detailed response to all of the technical volume ITO requirements.Will the Government consider excluding amending ITO paragraph 3.2.3.b.(3) to exclude the Subcontracting Plan from the volume I Technical page limit?The Subcontracting Plan is excluded from the technical subfactor because it's considered an attachment to the technical volume.
52.212-1 (ITO)/
52.212-2 (Evaluation Factors)/ Draft Appendix J/Draft Appendix K8, 15-1 Paragraph 4.3.1

-2 Paragraph 2.3.2.1

2.212-1, ITO, paragraph 4.3.1 identifies a recency period for Past Performance Information Forms (PPIF) of Three (3) years; whereas 52.212-2, Evaluation Factors for Award, paragraph 2.3.2.1 identifies a recency period of five (5) years. Will the government confirm Paragraph 4.3.1 which requires up to three (3) PPIFs for the prime contractor, and up to three (3) PPIFs for each significant subcontractor/teaming partner is the intended PPIF guidance? 52.212-1 and 52.212-2 were revised to remove inconsistency for PPIFs. Three is preferred for each prime and up to three for each significant subfactor.

52.212-1 and 52.212-2 were revised to remove inconsistency for recency period. The recency period is five years.

52.212-1 (ITO)/Draft Appendix JITO Attachment 1.1, pgs 23 and 33;
Paragraph 4.3.1, pg 1552.212-1, ITO, contains two separate Attachments 1.1. The first Attachment 1.1 begins on page 23, and addresses completion of the PPI Tool (an access database) and the second Attachment 1.1 begins on page 33, and appears to be a stand-alone Word-based document.Furthermore... the first paragraph of the second attachment 1.1 (pg 33) contradicts ITO paragraph 4.3.1 concerning the numbers of required past performance citations to be submitted for the Prime contractor and significant subcontractors. Paragraph 4.3.1 requires up to three (3) PPIFs for the prime contractor, and up to three (3) PPIFs for each significant subcontractor/teaming partner; whereas the second attachment 1.1 (pg 33) requests offerors to submit between 6 and 10 PPIS (we think PPI was intended) forms for the prime Contractor and between 4 and 7 for each significant subcontractor/teaming partner. As written in attachment 1.1, page 33, the requirment for betweeen 6 and 10 PPI would signinficantly reduce the competitive landscape and limit competition for this effort.Will the Government please confirm ITO Attachment 1.1 (pg 23) is applicable to this solicitation which equires up to three (3) PPIFs for the prime contractor, and up to three (3) PPIFs for each significant subcontractor/teaming partner?The first ITO Attachment 1.1 is applicable to the solicitation and was changed to Attachment 1.0. The contradictory language was removed from the second ITO Attachment 1.1 (now page 34). Three PPIFs are preferred for each prime and up to three PPIFs for each significant sub are preferred.
Appendix J Instructions to Offerors24ITO Attach 1.1Attachment 1.1 provides instructions for using the PPI Tool and refers to a "PPI_Tool_Download_Instruction" to be included with the solicitation documents.When does the Government anticipate issuing the "PPI_Tool_Download_Instruction" document?PPI_Tool Download is included as Attachment 1.1; it will be changed to Attachment 1.0
Appendix J113.2.3.b(2)Appendix J, paragraph 3.2.3.b(2) requires offerors to provide a Small Business Participation Commitment Document (SBPCD).Can the Government confirm that the SBPCD is not included in the Technical Volume 75-page limit?
Confirmed, the SBPCD is not included in the technical volume page limit.
Appendix J113.2.3.b(3)Appendix J, paragraph 3.2.3.b(3) requires the offeror to submit a subcontracting plan " IAW FAR 19.7, 52.219-9; and Defense Federal Acquisition Regulation Supplement (DFARS) 215.304(c)(i), 252.219-7003, or 252.219-7004."

The Draft PWS, paragraph 2.8 requires a subcontracting plan "IAW FAR 19.704."

Can the Government pease clarify the exact requirements for the subcontracting plan. Appendix J stands as written - note FAR 19.7 is entitled The Small Business Subcontracting Program. This reference is broader and includes information detailing when a plan is required, statutory requirements, and responsibilities . As stated the subcontracting plan submitted with the proposal must meet all requirements described in 19.7 and in 52.219-9 and DFARS 215.304 (c )(i), 252.219-7003 and 252.219-7004.

The PWS points to a narrower FAR reference (19.704) because it is describing requirements for the plan only.

Appendix J113.2.3.c(1)Appendix J, paragraph 3.2.3.c(1) requires the offeror to "Incorporate staffing timelines into the IMS."We asume the IMS in this paragraph is not the Inventory Management System in PWS 3.7.1. Can the Government please define IMS as used in 3.2.3.c.1?
IMS stands for Integrated Master Schedule
Appendix J123.2.4.bAppendix J, paragraph 3.2.4.b requires offerors to submit a Contractor Furnished Support Equipment list for each operating location by name, part or model number, manufacturer, and quantity in an Excel spreadsheet.Can the Government please confirm that the Support Equipment list is not included in the Technical Volume 75-page limit?Yes, Support Equipment list referenced in 3.2.4b is excluded from 75 page limit. Appendix J has been updated to more clearly reflect page limit exclusions.
Appendix J24 and 33ITO Attachment 1.1In Attachment J, Instructions to Offerors, there are two Attachments numbered 1.1Can the Government please clarify which attachments are applicable?Changing the PPI Tool to Attachment 1.0. Both are applicable

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .